JP3003875U - Tool for lifting wire with oysters - Google Patents

Tool for lifting wire with oysters

Info

Publication number
JP3003875U
JP3003875U JP1994005251U JP525194U JP3003875U JP 3003875 U JP3003875 U JP 3003875U JP 1994005251 U JP1994005251 U JP 1994005251U JP 525194 U JP525194 U JP 525194U JP 3003875 U JP3003875 U JP 3003875U
Authority
JP
Japan
Prior art keywords
wire
shaft
tool
oyster
oysters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1994005251U
Other languages
Japanese (ja)
Inventor
睦浩 東
Original Assignee
睦浩 東
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 睦浩 東 filed Critical 睦浩 東
Priority to JP1994005251U priority Critical patent/JP3003875U/en
Application granted granted Critical
Publication of JP3003875U publication Critical patent/JP3003875U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Abstract

(57)【要約】 (修正有) 【目的】 牡蠣いかだにおいて、竹に縛られている重い
牡蠣の付いた針金を、手で解いたり持ち上げたり、運ん
だりする一連の作業をなくすための工具を提供する。 【構成】 ワイヤー5が連結された、握り部1と軸12
を設け、常時押しバネ9によって、ワイヤー5のある方
向に力が加わつているシャフト6があり、そのシャフト
6は、軸12によって軸13を支点として動く爪3が連
結されている。
(57) [Summary] (Corrected) [Purpose] A tool for eliminating the series of operations of manually unraveling, lifting, and carrying wires with heavy oysters tied to bamboo in an oyster raft. provide. [Structure] The grip portion 1 and the shaft 12 to which the wire 5 is connected
There is a shaft 6 to which a force is constantly applied in a certain direction of the wire 5 by a pressing spring 9, and the shaft 6 is connected with a pawl 3 which moves about a shaft 13 as a fulcrum by a shaft 12.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は、牡蠣養殖業者が牡蠣いかだに吊るされている、牡蠣を、船の上等に 吊り上げるための工具に関するものである。 The present invention relates to a tool for an oyster farmer to suspend an oyster on a oyster raft, for lifting the oyster on a ship or the like.

【0002】[0002]

【従来の技術】[Prior art]

牡蠣いかだに吊るされている牡蠣を船に積み込む際、その牡蠣いかだの竹に縛 られている針金を一本づつ解き、その針金で又、輪を作り、その輪を船のレッカ ーのフックに掛けて、ある程度本数をまとめてから吊り上げていた。 When loading oysters suspended on an oyster raft into a ship, unravel the wires bound to the bamboo of the oyster raft one by one, make a loop with the wire, and use that loop on the hook of the ship's wrecker. I hung it up after hanging it up to some extent.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

レッカーのフックに牡蠣の付いた針金を掛けるためには、一端ほどいた針金で 再び輪の部分を作り、それをフックまで運び、そのフックに掛けていたので、牡 蠣の重量が大のため、時間もかかり困難な作業であった。 In order to hang the wire with oysters on the hook of the tow truck, I made a loop part again with the wire that I unrolled, carried it to the hook, and hung it on the hook, so the weight of the oyster is large, It was a time-consuming and difficult task.

【0004】[0004]

【課題を解決するための手段】[Means for Solving the Problems]

本工具は牡蠣の付いた針金を容易に挟んでつかんだり、それを外せたり出来る ようにし、又、ワイヤーを取付け、その先端にはレッカーのフックに掛けられる よう、輪の部分を設ける。 This tool allows you to easily grab and remove a wire with oysters and remove it, and attach a wire, and attach a wire part to the tip of the wire so that it can be hooked on the hook of a tow truck.

【0005】[0005]

【作用】[Action]

牡蠣の付いた針金を手で握る代わりに、この工具でつかみ、牡蠣いかだの竹に 縛られている針金を解く代わりに、その部分の針金をクリッパーなどで切断すれ ば、牡蠣と一緒に工具も沈み、この工具に接続されているワイヤーの先端が予め レッカーのフックに掛けられているため、牡蠣をそのフックまで運んだことにな る。 Instead of grasping the wire with oysters by hand, grasp it with this tool, and instead of releasing the wire bound to the bamboo of the oyster raft, if you cut the wire of that part with a clipper etc., you can also use the tool with the oyster It sank and the oysters were carried to the hook because the tip of the wire connected to this tool was previously hooked on the hook of the wrecker.

【0006】[0006]

【実施例】 図面を参照して説明する。 図4において、握り部1を手でつかみ、牡蠣いかだに下がっている牡蠣の付い た針金4を、フレーム8と爪3とが交わる部分にその針金4に対して直角に当て 、常時、押しバネ9によってワイヤー5の方向へ押されている握り部1を押しバ ネ9のある方向に、つまりこの図では下に押す。Embodiments will be described with reference to the drawings. In Fig. 4, grasp the grip 1 with your hand and apply the wire 4 with the oysters that hang on the oyster raft at a right angle to the wire 4 at the intersection of the frame 8 and the nail 3, and always press the spring The grip 1 which is being pushed in the direction of the wire 5 by means of 9 is pushed in the direction of the push bar 9, ie downward in this figure.

【0007】 すると、握り部1とシャフト6と、それに取り付けられている軸12は、押し バネ9のある方向に移動し、軸13を支点として動く爪3が、針金4の当たって いる部分を開く。Then, the grip portion 1, the shaft 6, and the shaft 12 attached thereto move in the direction in which the pressing spring 9 exists, and the claw 3 that moves with the shaft 13 as a fulcrum moves the portion on which the wire 4 hits. open.

【0008】 それにより、針金4は図5、図6、図8で表すように、フレーム8の凹部10 、11に押し込まれ、握り部1を持っている手を離すと、押しバネ9の復元力に よって、爪3とフレーム8に挟まれ、牡蠣15の付いた針金4に固定されたこと になる。As a result, the wire 4 is pushed into the recesses 10 and 11 of the frame 8 as shown in FIGS. 5, 6 and 8, and when the hand holding the grip portion 1 is released, the push spring 9 is restored. By the force, it is sandwiched between the claw 3 and the frame 8 and fixed to the wire 4 with the oyster 15.

【0009】 握り部1にはワイヤー5が連結されており、図8、図9で表しているように、 その先端を予めレッカーのフック16に掛けてあるため、このワイヤー5がレッ カーによって上に引き上げられると、牡蠣15の付いた針金4は、フレーム8の 凹部10の部分で折れ曲がり吊り上げられていく。A wire 5 is connected to the grip portion 1 and, as shown in FIGS. 8 and 9, the tip of the wire 5 is hooked in advance on a hook 16 of a tow truck. When pulled up, the wire 4 with the oysters 15 is bent and lifted at the recess 10 of the frame 8.

【0010】 この時点で図5で表すように、握り部1とシャフト6と軸12は、ワイヤー5 によって上の方向に力が加わり、又、フレーム8の凹部11には針金4が掛かっ ているため、牡蠣15の重みで下の方向に力が加わり、軸13を支点として針金 4は、爪3とフレーム8の凹部11によって更に締め付けられるため、外れて落 ちることは無い。At this time, as shown in FIG. 5, a force is applied to the grip portion 1, the shaft 6 and the shaft 12 in an upward direction by the wire 5, and the wire 4 is applied to the recess 11 of the frame 8. Therefore, a force is applied downward by the weight of the oysters 15, and the wire 4 is further tightened by the claw 3 and the recess 11 of the frame 8 about the shaft 13 as a fulcrum, and thus the wire 4 does not fall off.

【0011】 なお、爪3とフレーム8とで針金4を挟みむ訳だが、それによって針金4を切 断することの無いように、それらの間には適度の隙間を設けてある。Although the wire 4 is sandwiched between the claw 3 and the frame 8, an appropriate gap is provided between them so that the wire 4 is not cut by it.

【0012】 図8、図9は本工具の使用状態を表したものであり、図8では、本工具を牡蠣 15の付いた針金4に取り付けたところを表している。FIGS. 8 and 9 show how the tool is used, and FIG. 8 shows the tool attached to the wire 4 with the oysters 15.

【0013】 又、図9は牡蠣いかだの竹14に縛られていた針金4の上部を、クリッパーな どで切断したところであるが、このように針金4を掴んだ本工具17は、牡蠣1 5の重みで、レッカーのフック16に掛けられているワイヤー5が張る深さまで 海中へと沈んでいく。Further, FIG. 9 shows the upper part of the wire 4 which is bound to the bamboo 14 of the oyster raft, which is cut with a clipper or the like. The tool 17 holding the wire 4 in this way is the oyster 15 With the weight of, the wire 5 sunk into the sea to the depth where the wire 5 hung on the hook 16 of the wrecker is stretched.

【0014】 つまりこの時点で、ワイヤー5の先端がレッカーのフック16に掛かっている ため、牡蠣15の付いた針金4はレッカーのフック16のところまで運ばれたこ とになる。That is, at this point, since the tip of the wire 5 is hooked on the hook 16 of the tow truck, the wire 4 with the oysters 15 has been carried to the hook 16 of the tow truck.

【0015】[0015]

【考案の効果】[Effect of device]

本考案は上記のように構成されているため、握り部1を押すだけで容易に本工 具17をセット出来、牡蠣15の付いた針金4を手で掴む必要が無く、又、レッ カーのフック16に、本工具17がワイヤー5によって連結されているため、牡 蠣いかだの竹14に縛られている針金4を切断するだけで、牡蠣15の付いた針 金4をレッカーのフック16のところまで運ばれたことになるので、人手によっ て運ぶ必要も無い。 Since the present invention is configured as described above, the tool 17 can be easily set by pushing the grip portion 1, there is no need to grasp the wire 4 with the oyster 15 by hand, and Since this tool 17 is connected to the hook 16 by the wire 5, the wire 4 with the oyster 15 can be attached to the hook 16 of the wrecker simply by cutting the wire 4 bound to the bamboo 14 of the oyster raft. Since it has been carried to that point, there is no need to carry it manually.

【0016】 したがって従来のように、竹に縛られている針金を一端手で解き、又その針金 で輪の部分を作り、それを手で持ってレッカーのフックまで運んで行き、フック に掛けるとゆう一連の作業は不要となるため、楽に船積などが出来る。[0016] Therefore, as in the past, if the wire bound to bamboo is unraveled with one hand, and the wire is used to make a loop part, then carry it by hand to the hook of the wrecker and hang it on the hook. Since a series of operations are not required, shipping can be done easily.

【0017】 又、この工具は海中にある牡蠣の深さを変える手上げ、手下げ作業にもほとん ど同様の使い方ができるため、作業効率が高められる。Further, since this tool can be used in almost the same manner for raising and lowering the depth of oysters in the sea, work efficiency is improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】斜視図である。FIG. 1 is a perspective view.

【図2】正面図である。FIG. 2 is a front view.

【図3】側面図である。FIG. 3 is a side view.

【図4】針金を挟み、掴もうとしているところの断面図
である。
FIG. 4 is a cross-sectional view of a wire being sandwiched and being about to be gripped.

【図5】針金を挟み、掴んだ状態を表した、断面図であ
る。
FIG. 5 is a cross-sectional view showing a state in which a wire is sandwiched and gripped.

【図6】針金を掴んで今からワイヤーで吊り上げようと
しているときの針金と本工具の状態を表した図である。
FIG. 6 is a diagram showing a state of the wire and the tool when the wire is grabbed and is about to be lifted up by a wire.

【図7】針金を本工具によって吊り上げているときの針
金と本工具の状態を表した図である。
FIG. 7 is a diagram showing a state of the wire and the tool when the wire is suspended by the tool.

【図8】本工具の使用例で牡蠣の針金に本工具を取り付
けたときの状態を表した図である。
FIG. 8 is a diagram showing a state in which the tool is attached to an oyster wire in an example of using the tool.

【図9】竹に縛られていた針金を、クリッパーなどで切
断した際の状態を表した図である。
FIG. 9 is a diagram showing a state in which a wire bound to bamboo is cut with a clipper or the like.

【符号の説明】[Explanation of symbols]

1 握り部 2 かしめ 3 爪 4 針金 5 ワイヤー 6 シャフト 7 ストッパー 8 フレーム 9 押しバネ 10、11 凹部 12、13 軸 14 牡蠣いかだの竹 15 牡蠣 16 レッカーのフック 17 本工具 1 Grip 2 Caulking 3 Claw 4 Wire 5 Wire 6 Shaft 7 Stopper 8 Frame 9 Pushing spring 10, 11 Recess 12, 13 Shaft 14 Oyster raft bamboo 15 Oyster 16 Wrecker hook 17 Tools

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 けん引されるシャフト6には軸12が取
り付けてあり、それには軸13を支点として動く爪3が
連結されており、押しバネ9の復元力により、フレーム
8と爪3とによって、針金4をつかむことが出来、更に
シャフト6を吊り上げると、吊り上げられる牡蠣15の
重力によって、フレーム8と爪3で針金4を締め付ける
力が増す構造の、牡蠣の針金を吊り上げる工具。
1. A shaft 12 to be towed is attached with a shaft 12, to which a pawl 3 which moves around a shaft 13 as a fulcrum is connected, and by a restoring force of a pushing spring 9, a frame 8 and a pawl 3 are connected. A tool for lifting an oyster wire having a structure in which the wire 4 can be grabbed, and when the shaft 6 is further lifted, the force of tightening the wire 4 with the frame 8 and the claw 3 is increased by the gravity of the oyster 15 that is lifted.
JP1994005251U 1994-04-04 1994-04-04 Tool for lifting wire with oysters Expired - Lifetime JP3003875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1994005251U JP3003875U (en) 1994-04-04 1994-04-04 Tool for lifting wire with oysters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1994005251U JP3003875U (en) 1994-04-04 1994-04-04 Tool for lifting wire with oysters

Publications (1)

Publication Number Publication Date
JP3003875U true JP3003875U (en) 1994-11-01

Family

ID=43139812

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1994005251U Expired - Lifetime JP3003875U (en) 1994-04-04 1994-04-04 Tool for lifting wire with oysters

Country Status (1)

Country Link
JP (1) JP3003875U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013034428A (en) * 2011-08-08 2013-02-21 Marino-Forum 21 Method of recovering underwater floating body and recovering metal fitting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013034428A (en) * 2011-08-08 2013-02-21 Marino-Forum 21 Method of recovering underwater floating body and recovering metal fitting

Similar Documents

Publication Publication Date Title
US2905498A (en) Picking and grappling device
JP3003875U (en) Tool for lifting wire with oysters
US2715292A (en) Fish hook guard device
US1482056A (en) Hook
JP4726880B2 (en) Tray gripper
JP3075559U (en) Pliers for fishing
US2928692A (en) Clamping hook
JPH04179695A (en) Log carrying fixture
JPH06247679A (en) Hoisting accessory for bulb plate
JP3032410U (en) Timber edge retainer
JPH11130369A (en) Carrier lifting sling
JPH0661063U (en) Oyster hanging piano wire clamp
US1344320A (en) Grapple-hook for skidding logs
JP3020921U (en) Utility pole extraction tool
JP3006622U (en) Root clipper
JP3062923U (en) Dust remover
JP3040558U (en) Fish clipper
SU116231A1 (en) Gripping device for lifting brick blocks and similar goods
JP3000988U (en) hook
JPS6027328A (en) Wire material hanging-up tool
JPH0678U (en) Fishing hook remover
JPH0451490U (en)
US9150387B2 (en) Positive penetration wood handling apparatus
JPH0663509U (en) Grasping tool
JPH073217U (en) Straining clamp for high tension cable