JP3002718B2 - Work progress management method - Google Patents

Work progress management method

Info

Publication number
JP3002718B2
JP3002718B2 JP3163064A JP16306491A JP3002718B2 JP 3002718 B2 JP3002718 B2 JP 3002718B2 JP 3163064 A JP3163064 A JP 3163064A JP 16306491 A JP16306491 A JP 16306491A JP 3002718 B2 JP3002718 B2 JP 3002718B2
Authority
JP
Japan
Prior art keywords
data
schedule
start date
scheduled
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3163064A
Other languages
Japanese (ja)
Other versions
JPH058378A (en
Inventor
裕久 秋田
忠義 広瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dai Nippon Printing Co Ltd
Original Assignee
Dai Nippon Printing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dai Nippon Printing Co Ltd filed Critical Dai Nippon Printing Co Ltd
Priority to JP3163064A priority Critical patent/JP3002718B2/en
Publication of JPH058378A publication Critical patent/JPH058378A/en
Application granted granted Critical
Publication of JP3002718B2 publication Critical patent/JP3002718B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Inking, Control Or Cleaning Of Printing Machines (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、例えば包装材料等の印
刷加工において、作業進行予定組みを支援し生産管理業
務の省力化,合理化を図るための作業進行管理方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work progress management method for supporting a work progress schedule and saving labor and rationalizing production management work, for example, in printing of packaging materials.

【0002】[0002]

【従来の技術】包装材料の印刷は、印刷工程と加工工程
が不可分に絡み合うバラエティに富んだ作業となるのが
普通であり、その多くは受注生産で、極端に多品種であ
る。また、受注品(品目)によって工程の数が多様に異
なり、加工の難易度も異なるが、使用する機械は共通の
ものが多く、また、材料も共通のものが多い。
2. Description of the Related Art Printing of packaging materials usually involves a variety of operations in which a printing process and a processing process are inseparably intertwined, and many of them are made-to-order and extremely diverse. The number of processes varies depending on the order (item), and the degree of difficulty in processing also varies. However, many machines are used in common and many materials are used in common.

【0003】このような包装材料等の印刷を効率よく行
うには、工場の各部門の生産能力とか、材料の入荷状況
等をにらみながら、次々と入ってくる受注品のそれぞれ
の納期を満足させるよう進行予定組みを行って、機械別
(横割)の進行予定表を作成する必要がある。従来、こ
の進行予定組みは、山積み式といって、受注データをプ
リントアウトした品名毎の伝票を基に、各部門でコンピ
ュータを用いて時間軸上にデータを積み上げ、次いで、
機械の能力を超えた分を画面操作で前にずらしていく
(山崩し)といった方法で行い、それをもとに手書きで
横割の進行予定表を作成するのが普通であった。
[0003] In order to efficiently print such packaging materials and the like, each delivery time of incoming ordered products is satisfied while taking into account the production capacity of each section of the factory and the status of material arrival. It is necessary to create a schedule for each machine (horizontal split) by making a schedule. Conventionally, this set of progress schedules is called a stacking type, and based on a slip for each product name that printed out the order data, each department uses a computer to pile up data on the time axis,
It was common practice to shift the screen beyond the capabilities of the machine by moving the screen forward (landfall), and to create a horizontal schedule by hand based on that.

【0004】[0004]

【発明が解決しようとする課題】包装材料等の印刷にお
ける進行予定組みを上記のように山積み式で行い、手作
業で機械別の予定表を作成するのでは、一旦プリントア
ウトした伝票から必要なデータを各部門のコンピュータ
に再入力するのに手間がかかるし、山積み及びそれに続
くオーバーフロー分の予定再配置(山崩し)にかなりの
熟練を要するという問題がある他、予定表の筆記作業に
も時間がかかり、ミスも生じ易いといった問題がある。
また、包装材料等の印刷加工は上述のようにかなり特殊
な性格を有する作業であって、山積み式という一般的な
手法では対応に限界があり、また、品目単位の縦割進行
管理を容易に行えないなどの問題もあって、多種多様な
ユーザニーズに柔軟に対応しきれない。
[0006] As described above, when a set of scheduled progresses in printing of packaging materials and the like is performed in a piled manner, and a machine-specific schedule is created manually, it is necessary to use a slip once printed out. It takes time and effort to re-input data to each department's computer, and there is a problem that considerable skill is required for the pile-up and the subsequent relocation of the overflow (sloping down). There is a problem that it takes time and errors easily occur.
In addition, printing of packaging materials, etc., is a work with a very special character as described above, and there is a limit to the general method of stacking, and it is easy to manage the progress of vertical splitting for each item. Due to problems such as inability to perform, it is not possible to flexibly respond to a wide variety of user needs.

【0005】本発明は上記問題点に鑑みてなされたもの
であって、既存システムの持っている受注データをその
まま活用して自動的に進行予定組みを行うことができ、
また、予定修正に伴う品目単位の縦割進行管理が容易
で、最適な進行予定を容易かつ能率的に作成することの
できる作業進行管理方法を得ることを目的とする。
[0005] The present invention has been made in view of the above-mentioned problems, and it is possible to automatically make a scheduled progress set by utilizing order data of an existing system as it is.
It is another object of the present invention to provide a work progress management method capable of easily managing the vertical progress of each item in accordance with the schedule correction and capable of easily and efficiently creating an optimum progress schedule.

【0006】[0006]

【課題を解決するための手段】本発明に係る作業進行管
理方法は、見積もり明細形式の受注関連データからなる
受注データファイルから受注データを取り出す段階と、
得意先・品目別に工程順,進行機械番号,工程間の必要
日数等のデータを収納した工程データファイルから前記
受注データ中の得意先・品目に該当する工程データを取
り出す段階と、前記工程データファイル中に前記得意先
・品目に該当する工程データが存在しない場合に新たに
前記得意先・品目に対応した工程データを作成し前記工
程データファイルに入れる段階と、機械別稼働データフ
ァイルに収納された機械別稼働データを取り出し、前記
受注データと前記工程データと前記機械別稼働データと
により予定組み計算を行って予定組みデータを作成する
段階と、作成された予定組みデータを予定表データファ
イルに入れる段階からなることを特徴とする。
A work progress management method according to the present invention comprises the steps of: taking out order data from an order data file comprising order-related data in the form of a quote detail;
Extracting the process data corresponding to the customer / item in the received order data from a process data file storing data such as process order, progress machine number, and the number of days required between processes for each customer / item; If there is no process data corresponding to the customer / item in the process, newly creating process data corresponding to the customer / item and putting the process data in the process data file, and storing the process data in the machine-specific operation data file Extracting the operation data for each machine, performing a scheduled assembly calculation based on the received order data, the process data, and the operation data for each machine to create the scheduled assembly data, and putting the created scheduled assembly data into the schedule data file It is characterized by comprising steps.

【0007】ここで、前記受注データと前記工程データ
と前記機械別稼働データとにより予定組み計算を行って
予定組みデータを作成する前記段階は、納入予定日から
所要日数を遡って第1工程の着手日を算出し当該着手日
以降で最も近い作業可能時間枠を当てはめる第1工程着
手日設定の段階と、設定された第1工程の着手日に第1
工程から第2工程への移動時間を加算して第2工程着手
日を算出し当該着手日以降で最も近い作業可能日を当て
はめる第2工程着手日設定の段階と、前記各段階の手法
を繰り返すことにより第3工程以降最終工程までの各工
程の着手日を設定する第3工程以降着手日設定の各段階
からなるものとできる。
Here, the step of preparing the scheduled set data by performing the scheduled set calculation based on the received order data, the process data, and the machine-specific operation data includes the step of executing the first process by going back the required number of days from the scheduled delivery date. A first process start date setting stage in which a start date is calculated and a workable time frame closest to the start date is applied, and a first process start date set in the first process is set.
The steps in the second process start date setting step of calculating the second process start date by adding the travel time from the process to the second process and applying the closest workable date after the start date, and the methods in the above steps are repeated. In this way, it is possible to configure each stage of setting the start date of the third step and thereafter to set the start date of each step from the third step to the final step.

【0008】また、本発明に係る作業進行管理方法に
は、さらに、前記予定表データファイルに収納された予
定組みデータを取り出して画面対話形式により前記予定
組みデータに修正を加え修正後の予定組みデータを再度
予定表データファイルに入れる段階を付加することがで
きる。
Further, in the work progress management method according to the present invention, the scheduled set data stored in the schedule table data file is taken out, and the scheduled set data after the correction is corrected by screen interactive format. A step can be added to put the data back into the schedule data file.

【0009】[0009]

【作用】この発明によれば、見積もり明細形式の受注関
連データからなる受注データファイルから受注データが
取り出され、次いで、得意先・品目別に工程順,進行機
械番号,工程間の必要日数等のデータを収納した工程デ
ータファイルから前記受注データ中の得意先・品目に該
当する工程データが取り出され、次いで、前記工程デー
タファイル中に前記得意先・品目に該当する工程データ
が存在しない場合に新たに前記得意先・品目に対応した
工程データが作成されて前記工程データファイルに入れ
られ、次いで、機械別稼働データファイルに収納された
機械別稼働データが取り出され、次いで、前記受注デー
タと前記工程データと前記機械別稼働データとにより予
定組み計算が行われて予定組みデータが作成され、次い
で、作成された予定組みデータが予定表データファイル
に入れられる。
According to the present invention, order data is taken out from an order data file consisting of order-related data in the form of quote details, and then data such as the order of processes, the machine numbers in progress, and the number of days required between processes for each customer / item. The process data corresponding to the customer / item in the received order data is extracted from the process data file containing the data, and if the process data corresponding to the customer / item does not exist in the process data file, the process data is newly added. Process data corresponding to the customer / item is created and put into the process data file, then the machine-specific operation data stored in the machine-specific operation data file is taken out, and then the order data and the process data And the above-mentioned machine-specific operation data, a scheduled assembly calculation is performed to create scheduled assembly data, and then the created schedule Set data is placed in the calendar data file.

【0010】ここで、前記予定組みデータの作成のため
の予定組み計算では、一例として、納入予定日から所要
日数を遡って第1工程の着手日が算出され当該着手日以
降で最も近い作業可能時間枠が当てはめられ、次いで、
設定された第1工程の着手日に第1工程から第2工程へ
の移動時間が加算されて第2工程着手日が算出され当該
着手日以降で最も近い作業可能日が当てはめられ、次い
で、前記各段階の手法が繰り返されることにより第3工
程以降最終工程までの各工程の着手日の設定が行われ
る。
Here, in the scheduled set calculation for creating the scheduled set data, as an example, the start date of the first process is calculated by going back the required number of days from the scheduled delivery date, and the closest work after the start date is possible. The time frame is applied, then
The moving time from the first process to the second process is added to the set start date of the first process to calculate the second process start date, and the closest workable date after the start date is applied, and then, The start date of each process from the third process to the final process is set by repeating the method of each stage.

【0011】また、予定組みデータの変更を行う段階を
加えたものでは、一例として、前記予定表データファイ
ルに収納された予定組みデータが取り出されて画面対話
形式により修正が加えられ、修正後の予定組みデータが
再度予定表データファイルに入れられる。
Further, in the case where the schedule set data is changed, the scheduled set data stored in the schedule table data file is taken out and modified in a screen interactive manner, as an example. The schedule data is put back into the schedule data file.

【0012】[0012]

【実施例】図1は本発明の一実施例に係る食品容器生産
の印刷部門における作業進行管理システムの概略図であ
る。このシステムは、ホストコンピュータより受け取っ
た受注データ等の情報をもとに作業進行予定組みのコン
ピュータにより作業進行予定組みを支援するものであっ
て、下記の手順により作業進行予定表のプリント出力ま
でを行う。
FIG. 1 is a schematic diagram of a work progress management system in a printing section for producing food containers according to an embodiment of the present invention. This system supports a work progress schedule set by a work progress schedule set computer based on information such as order data received from a host computer. Do.

【0013】まず、受注データ等予定組みに必要なデ
ータを日々ホストコンピュータより受け取る。
First, data necessary for a scheduled set such as order data is received from a host computer every day.

【0014】ホストコンピュータには、受注データ(受
注番号,頭・完納期,品名,数量等),生産データ(生
産実績等),用紙データ(入荷日等),シリンダデータ
(版胴管理データ)といった各種データが生産管理の既
存システムによって入力されている。そして、この既存
システムによるデータが、そのまま、オンラインで予定
組みのコンピュータにデータ転送される。
The host computer stores order data (order number, head / complete delivery date, product name, quantity, etc.), production data (production results, etc.), paper data (arrival date, etc.), cylinder data (plate cylinder management data). Various data are input by the existing system of production management. Then, the data from the existing system is transferred as it is online to a scheduled computer.

【0015】予定組みのコンピュータでは、受け取っ
た受注データ等を加工し、部門別手持ち一覧表,工程フ
ァイル不一致一覧表,工程ファイル未登録一覧表といっ
た各種一覧表をプリント出力する。
The scheduled computer processes the received order data and the like, and prints out various lists such as a section-specific hand-held list, a process file mismatch list, and a process file unregistered list.

【0016】部門別手持ち一覧表は、各工程別に手持ち
品目を得意先,品名順に並べて表示するものであり、こ
れにより、手持ち量の計算・把握を行い、また、前工程
の進度の確認,シリンダ(版胴)の有無の確認,刷版予
定日の確認,用紙手配有無の確認,用紙入荷日の確認お
よび稼働計画の見直し等を行う。
The section-by-section hand-held list displays the hand-held items for each process in the order of the customer and the product name, thereby calculating and grasping the hand-held quantity, confirming the progress of the previous process, and checking the cylinders. Check the presence or absence of (plate cylinder), check the scheduled printing plate date, check the paper arrangement, check the paper arrival date, and review the operation plan.

【0017】工程ファイル不一致一覧表は、工程ファイ
ルが既に登録されている品目の再版受注の内で、登録さ
れた工程ファイルの内容に今回の受注内容と一致しない
項目(例えば工程数)があるものについて、今回の受注
内容を工程ファイルの内容と対比した形で表示するもの
であって、工程ファイル作成の際の工程ファイル変更登
録インプット票とされる。
The process file mismatch list is a list of reprint orders for items for which a process file has already been registered, and there are items (eg, the number of processes) in the contents of the registered process file that do not match the current order contents. Is displayed in comparison with the contents of the process file, and is used as a process file change registration input form when the process file is created.

【0018】工程ファイル未登録一覧表は、工程ファイ
ルがまだ登録されていない新規受注品目について工程
順,進行機番,熟成日数等を表示する一覧表であって、
必要に応じ追記,訂正を加えた後、工程ファイル登録イ
ンプット票とされる。
The process file unregistered list is a list that displays the process order, the progress machine number, the number of aging days, and the like for a new order item for which a process file has not been registered.
After adding and correcting as necessary, it is used as a process file registration input form.

【0019】図2は工程ファイル未登録一覧表の一例を
示している。工程ファイル未登録一覧表は、受注データ
等から自動設定される項目を受注品目別に示すものであ
って、図に示すように、受注番号,得意先,品名(#番
号は、その品目については何回目の受注であるかを示
す。例えば、#01なら新製品受注である。),工程番
号(010,020,・・・),工程名(例えば、GR
L:グラビア印刷),進行機番,次の工程の指示(工
順),熟成日数(熟日)等を表示する。ここで、熟成日
数の欄が空白ということは、熟成処理のため次工程まで
に1日置くことを意味し、この欄が例えば3であれば、
次工程までに4日(1日プラス3日)置くことを意味す
る。また、X/Y欄にXと表示した場合は、その工程と
その次の工程(図2の例の場合であれば、060と07
0で行う2種類の貼り合わせAB,CD)を一つの機械
で一緒に行うことを意味する。この場合、熟成日数欄
は、先の工程(060)(熟成日数ゼロ)については欄
そのものが無いものと扱い、後の工程(070)を基準
に次工程までの熟成日数を表示する。それに対し、X/
Y欄にYと表示した場合は、単に、その工程とその次の
工程を中1日置かずにまとめて行うことを意味する。そ
して、この場合も先の工程については熟成日数欄は無い
ものとし、後の工程を基準に次工程までの熟成工程を表
示する。なお、X表示の場合は、例えば二つの工程の処
理量がそれぞれ1000mであれば、全体としての処理
量も1000mであるのに対し、Y表示の場合は、作業
進行は別々であるので、二つの工程の処理量がそれぞれ
1000mであれば、全体としての処理量は1000m
×2で2000mとなる。
FIG. 2 shows an example of a process file unregistered list. The process file unregistered list shows items that are automatically set from order data and the like for each order item. As shown in the figure, the order number, customer, and product name (# numbers indicate what Indicates whether it is the first order received, eg, # 01 is a new product order), process number (010, 020,...), Process name (eg, GR
L: gravure printing), progress machine number, instruction (procedure) for the next process, aging days (ripening days), etc. are displayed. Here, the blank in the column of the aging days means that one day is left until the next step for the aging process. For example, if this column is 3,
4 days (1 day plus 3 days) before the next process. Further, when X is displayed in the X / Y column, the step and the next step (060 and 07 in the case of the example of FIG. 2) are performed.
0 means that two types of bonding AB and CD) are performed together by one machine. In this case, in the aging days column, the previous step (060) (zero aging days) is treated as having no column itself, and the aging days until the next step are displayed based on the subsequent steps (070). On the other hand, X /
When Y is displayed in the Y column, it simply means that the step and the next step are collectively performed without leaving for one day. In this case as well, it is assumed that there is no aging day column for the preceding process, and the aging process up to the next process is displayed based on the subsequent process. In the case of X display, for example, if the processing amounts of the two processes are each 1000 m, the total processing amount is also 1000 m. On the other hand, in the case of Y display, the work progress is different. If the processing amount of each process is 1000 m, the total processing amount is 1000 m
It becomes 2000m by x2.

【0020】つぎに、新製品受注品目および受注内容
に一部変更のある再版受注品目について、進行機番,工
程順序,熟成日数等を入力して品目毎の工程ファイルを
作成する。
Next, for a new product ordered item and a reprint ordered item with a partially changed order content, a process file for each item is created by inputting the progress machine number, process sequence, aging days, and the like.

【0021】この工程ファイルは、上述の工程ファイル
不一致一覧表および工程ファイル未登録一覧表に必要に
応じて追記,訂正を加えたものをベースに、画面入力に
よって作成する。
This process file is created by screen input based on the above-mentioned process file mismatch list and the process file unregistered list which are added and corrected as necessary.

【0022】図3は工程ファイルの内容を示すメンテナ
ンス画面の一例である。この画面表示における各事項の
意味するところは、図2の工程ファイル未登録一覧表の
ものと同様である。これら工程ファイルは、例えば、図
3に示す得意先名コード「9999001」と品名コー
ド「88888888」の15桁の数字によって管理さ
れる。
FIG. 3 is an example of a maintenance screen showing the contents of a process file. The meaning of each item in this screen display is the same as that in the process file unregistered list in FIG. These process files are managed by, for example, 15-digit numbers of the customer name code “9999001” and the product name code “888888888” shown in FIG.

【0023】つぎに、新規受注あるいは再版受注に対
して縦割予定組み計算を行う。すなわち、工程ファイル
を用い、また、機械ファイルおよび機別勤務ファイルか
ら機械および勤務の能率に関するデータを読み込んで、
各品目の納期から逆算した着手日を基準に既存予定の隙
間を捜す形で各工程の予定日時を設定する。
Next, a vertically scheduled set calculation is performed for a new order or a reprint order. That is, using the process file, read the data on the efficiency of the machine and work from the machine file and machine-specific work file,
Based on the start date calculated backward from the delivery date of each item, the scheduled date and time of each process is set by searching for the existing gap.

【0024】縦割予定組み計算は、この実施例の場合、
コンピュータによる自動的な計算処理である。その具体
的手順の一例を図4のフローチャートに基づいて説明す
る。S1〜S11はこのフローの各ステップを示す。
In the case of this embodiment, the vertical division schedule calculation is as follows.
This is an automatic calculation process by a computer. An example of the specific procedure will be described based on the flowchart of FIG. S1 to S11 show each step of this flow.

【0025】S1はデータ読み込みのステップであっ
て、ここで、まず新しく受注された受注データを読み込
む。
Step S1 is a data reading step. First, newly received order data is read.

【0026】次に、S2およびS3は工数計算のステッ
プであって、まず、S2で各工程の作業所要時間を算出
して格納し、S3で各工程間の移動所要時間を算出し格
納する。
Next, steps S2 and S3 are steps for calculating man-hours. First, in S2, the required work time of each process is calculated and stored, and in S3, the required travel time between each process is calculated and stored.

【0027】次に、S4〜S6は第1工程仮着手日計算
のステップであって、まず、S4で生産機械の稼働計画
表を参照して納期から所要日数を遡り第1工程仮着手日
を算出し、S5で、その第1工程仮着手日が既に予定が
確定している範囲の最終日より後であるかどうかを見
て、予定確定範囲最終日より後であればそのまま次の第
1工程着手日設定のステップに進み、また、算出した仮
着手日が予定確定範囲最終日以前であれば、S6で第1
工程仮着手日を予定確定範囲最終日の翌日に設定して第
1工程着手日設定のステップに進む。
Next, steps S4 to S6 are steps for calculating the first process temporary start date. First, in S4, the required number of days from the delivery date is traced back to the first process temporary start date by referring to the operation plan table of the production machine. In S5, it is determined whether the first process provisional start date is later than the last day of the range in which the schedule is already determined. The process proceeds to the step of setting the process start date. If the calculated temporary start date is before the last day of the scheduled confirmation range, the first in S6
The process provisional start date is set on the day following the final day of the schedule determination range, and the process proceeds to the first process start date setting step.

【0028】次に、S7は第1工程着手日(作業予定
日)設定のステップであって、第1工程生産機械の作業
予定表を参照して、第1工程仮着手日以降でこれに一番
近い作業可能時間枠(未予定枠)を検索して当てはめ
る。
Next, step S7 is a step of setting the first process start date (scheduled work date). The process is referred to in the work schedule of the first process production machine, and the first process start date is set to one or more times. Search and apply the closest workable time frame (unscheduled frame).

【0029】次に、S8は第2工程仮着手日設定のステ
ップであって、設定された第1工程着手日に第1工程〜
第2工程の移動所要時間を加算して第2工程の仮着手日
を算出する。
Next, step S8 is a step of setting a second process provisional start date, in which the first process to the first process start date are set.
The temporary start date of the second step is calculated by adding the required travel time of the second step.

【0030】次に、S9は第2工程着手日(作業予定
日)設定のステップであって、第2工程生産機械の作業
予定表を参照して、第2工程仮着手日以降でこれに一番
近い作業可能時間枠(未予定枠)を検索して当てはめ
る。
Next, step S9 is a step of setting a second process start date (scheduled work date). The step S9 refers to the work schedule of the second process production machine, and is set to one after the second process temporary start date. Search and apply the closest workable time frame (unscheduled frame).

【0031】次にS10は第3工程以降最終工程までの
各工程の着手日(作業予定日)を設定するステップを示
すものであって、上記S8〜S9を繰り返すことにより
最終工程までの各工程の着手日を設定する。
Next, step S10 is a step for setting a start date (scheduled work date) of each step from the third step to the final step. By repeating the above steps S8 to S9, each step until the final step is performed. Set the start date for.

【0032】次に、S11は納入可能日設定のステップ
であって、最終工程作業予定日に納入所要作業時間を加
算して納入可能日を算出する。
Next, step S11 is a step of setting a deliverable date, in which a required delivery work time is added to a scheduled final work day to calculate a deliverable date.

【0033】上記のようにして自動設定した予定日時
は、機械別で日時順の一覧表(横割仮予定表)としてプ
リント出力する。この仮予定表は、後述の予定修正のた
めのチェック票とするものであり、そのため、予定修正
作業の参考になるよう刷版予定日,用紙の入荷予定日等
を併せて表示し、また、納期に対し遅れが予想される場
合は警告マークを表示する。
The scheduled date and time automatically set as described above are printed out as a list of date and time (temporary horizontal schedule) for each machine. This tentative schedule is used as a check sheet for correcting the schedule described later. Therefore, the planned printing date, the scheduled arrival date of the paper, etc. are displayed together for reference of the schedule correction work. If the delivery is expected to be delayed, a warning mark is displayed.

【0034】つぎに、上記仮予定表によって納期等の
チェックを行い、そのチェック結果に基づく修正、ある
いは進行予定順序あるいは機番の意図的な入れ替えによ
る変更を予定修正画面により対話形式で行う。
Next, the delivery date and the like are checked based on the tentative schedule, and a correction based on the check result, or a change due to intentional replacement of the progress schedule order or the machine number is performed in an interactive manner on the schedule correction screen.

【0035】ここで、予定修正画面には、図5に示すよ
うに既存予定の各工数を機械別に時間軸に沿って並べた
形の横割のグラフが表示できるものとする。進行予定順
序入替等の作業は、このグラフにおける空きを捜す形で
行う。また、予定修正画面は、修正対象の機番の仮予定
表の他、予定修正のために必要な参考情報(刷版予定
日,用紙の入荷日,前工程の予定日,進行実績等)をも
同一画面上に呼び出し表示できるものとする。また、前
工程予定日と後工程予定日の間に正しく入らない工程が
あれば表示色の変化によって警告を発するようにする。
Here, it is assumed that the schedule modification screen can display a horizontal split graph in which each man-hour of the existing schedule is arranged along the time axis for each machine as shown in FIG. Operations such as changing the scheduled progress order are performed by searching for an empty space in this graph. In addition, the schedule correction screen displays the provisional schedule of the machine number to be corrected, as well as reference information necessary for the schedule correction (scheduled plate date, paper arrival date, scheduled date of the previous process, progress results, etc.). Can be called and displayed on the same screen. Further, if there is a step that does not correctly enter between the pre-process scheduled date and the post-process scheduled date, a warning is issued by a change in display color.

【0036】上記予定修正を行った後、予定修正品目
について画面上に予定表を呼び出し、また、それを縦割
進行チェック表としてプリント出力し、工程順序に逆転
等が生じていないかどうかをチェックする。そして、逆
転等が生じていれば、再修正を行う。
After performing the above-mentioned schedule correction, a schedule table is called on the screen for the scheduled correction item, and the schedule table is printed out as a vertical division progress check table to check whether the process order is reversed or not. I do. Then, if reverse rotation or the like has occurred, the correction is performed again.

【0037】上記予定修正は一定期間分(例えば1週
間分)をバッチ処理によって行う。そして、縦割進行チ
ェックで問題が無ければ、本予定表として図6に示すよ
うな横割の予定表をプリント出力し、この進行予定にし
たがって作業を行う。図6に示す進行予定表は、グラビ
ア印刷の機械3台分を並べて予定日時順に進行予定を表
示したものである。
The above-mentioned schedule correction is performed for a fixed period (for example, for one week) by batch processing. If there is no problem in the vertical split progress check, a horizontal split schedule as shown in FIG. 6 is printed out as the main schedule, and work is performed according to the progress schedule. The progress schedule table shown in FIG. 6 displays the progress schedule in the order of the scheduled date and time by arranging three gravure printing machines.

【0038】なお、上記実施例は縦割予定組みをコンピ
ュータによって行っているが、本発明は必ずしもそれに
限定されるものではない。
In the above-described embodiment, the vertical division is performed by a computer, but the present invention is not necessarily limited to this.

【0039】[0039]

【発明の効果】本発明は以上のように構成され、既存シ
ステムの持っている受注データをデータ転送によってそ
のまま活用し、品目毎の工程ファイルを作成して進行予
定組みを行えるようにしたので、進行予定組みが自動的
に行え、また、画面対話形式による予定修正ならびに品
目単位の縦割進行管理が容易で、最適な進行予定を容易
かつ能率的に作成できる。
The present invention is configured as described above, and the order data of the existing system is utilized as it is by data transfer, and a process file is created for each item to enable a scheduled progression. The progress schedule can be automatically set, the schedule can be corrected in the interactive screen format, and the vertical progress management of each item can be easily performed, so that the optimum progress schedule can be created easily and efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例に係る印刷加工部門における
作業進行管理システムの概略図
FIG. 1 is a schematic diagram of a work progress management system in a print processing department according to an embodiment of the present invention.

【図2】同実施例におけるプリント出力された工程ファ
イル未登録一覧表の一例
FIG. 2 shows an example of a process file unregistered list printed out in the embodiment.

【図3】同実施例における工程ファイルの内容を示すメ
ンテナンス画面の一例
FIG. 3 is an example of a maintenance screen showing contents of a process file in the embodiment.

【図4】同実施例における縦割予定組み計算の手順を示
すフローチャート
FIG. 4 is a flowchart showing a procedure for calculating a vertically scheduled set in the embodiment.

【図5】同実施例における画面表示の一例であって、既
存予定の各工数を機械別に時間軸に沿って並べたグラフ
FIG. 5 is an example of a screen display in the embodiment, and is a graph in which each man-hour of an existing schedule is arranged along a time axis for each machine.

【図6】同実施例におけるプリント出力された進行予定
表の一例
FIG. 6 is an example of a printed schedule table according to the embodiment.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B41F 33/00 B41F 33/16 G06F 17/60 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) B41F 33/00 B41F 33/16 G06F 17/60

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 見積もり明細形式の受注関連データから
なる受注データファイルから受注データを取り出す段階
と、得意先・品目別に工程順,進行機械番号,工程間の
必要日数等のデータを収納した工程データファイルから
前記受注データ中の得意先・品目に該当する工程データ
を取り出す段階と、前記工程データファイル中に前記得
意先・品目に該当する工程データが存在しない場合に新
たに前記得意先・品目に対応した工程データを作成し前
記工程データファイルに入れる段階と、機械別稼働デー
タファイルに収納された機械別稼働データを取り出し、
前記受注データと前記工程データと前記機械別稼働デー
タとにより予定組み計算を行って予定組みデータを作成
する段階と、作成された予定組みデータを予定表データ
ファイルに入れる段階からなることを特徴とする作業進
行管理方法。
1. A step of extracting order data from an order data file comprising order-related data in the form of an estimate detail, and process data containing data such as a process order, a progress machine number, and the number of days required between processes for each customer / item. Extracting the process data corresponding to the customer / item in the received order data from the file; and, if there is no process data corresponding to the customer / item in the process data file, newly extracting the customer / item. Creating the corresponding process data and putting it in the process data file, and taking out the machine-specific operation data stored in the machine-specific operation data file,
A step of performing a scheduled set calculation based on the received order data, the process data, and the machine-specific operation data to create scheduled set data, and a step of inserting the created scheduled set data into a schedule table data file. Work progress management method.
【請求項2】 前記受注データと前記工程データと前記
機械別稼働データとにより予定組み計算を行って予定組
みデータを作成する段階が、納入予定日から所要日数を
遡って第1工程の着手日を算出し当該着手日以降で最も
近い作業可能時間枠を当てはめる第1工程着手日設定の
段階と、設定された第1工程の着手日に第1工程から第
2工程への移動時間を加算して第2工程着手日を算出し
当該着手日以降で最も近い作業可能日を当てはめる第2
工程着手日設定の段階と、前記各段階の手法を繰り返す
ことにより第3工程以降最終工程までの各工程の着手日
を設定する第3工程以降着手日設定の各段階からなる請
求項1記載の作業進行管理方法。
2. The step of performing a scheduled assembly calculation based on the received order data, the process data, and the machine-specific operation data to create the scheduled assembly data includes the step of starting the first process by going back a required number of days from a scheduled delivery date. Is calculated, and the first process start date setting stage for applying the closest workable time frame after the start date and the set moving time from the first process to the second process on the start date of the first process are added. To calculate the second process start date and apply the closest workable date after the start date.
2. The method according to claim 1, further comprising the steps of: setting a process start date; and setting the start date of each process from the third process to the final process by repeating the method of each step. Work progress management method.
【請求項3】 前記予定表データファイルに収納された
予定組みデータを取り出して画面対話形式により前記予
定組みデータに修正を加え修正後の予定組みデータを再
度予定表データファイルに入れる段階を付加した請求項
1または2記載の作業進行管理方法。
3. A step of taking out the schedule data stored in the schedule data file, modifying the schedule data in a screen interactive manner, and re-entering the revised schedule data in the schedule data file is added. The work progress management method according to claim 1.
JP3163064A 1991-07-03 1991-07-03 Work progress management method Expired - Lifetime JP3002718B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3163064A JP3002718B2 (en) 1991-07-03 1991-07-03 Work progress management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3163064A JP3002718B2 (en) 1991-07-03 1991-07-03 Work progress management method

Publications (2)

Publication Number Publication Date
JPH058378A JPH058378A (en) 1993-01-19
JP3002718B2 true JP3002718B2 (en) 2000-01-24

Family

ID=15766498

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3163064A Expired - Lifetime JP3002718B2 (en) 1991-07-03 1991-07-03 Work progress management method

Country Status (1)

Country Link
JP (1) JP3002718B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000218769A (en) * 1999-02-04 2000-08-08 Yoshioka Printing Co Ltd Printing process control system

Also Published As

Publication number Publication date
JPH058378A (en) 1993-01-19

Similar Documents

Publication Publication Date Title
US6882441B1 (en) Automated typesetting system
US20030061217A1 (en) Internet label production system
CN109409452B (en) Method and device for analyzing universal label and automatically generating printing label
US7171903B2 (en) Ratioing algorithm for a label printing system using plates
JP3002718B2 (en) Work progress management method
JPH01264751A (en) Preparation for production process planning table
JPS62224561A (en) Work load display system
CN112181324A (en) Distributed online label printing system for removing center agreement
JPH08225118A (en) Automated storage and retrieval system for parts
JPH06187354A (en) Production schedule preparing system for printed product
JPH09253982A (en) Production control system
JP3074233B2 (en) Delivery note creation system
JP3475794B2 (en) Parts ordering system
JPH05101073A (en) Production schedule planning device
JPH052514A (en) Master file preparation supporting system
JP3264022B2 (en) Management support processing method for order instruction card
JPH03256657A (en) Working schedule managing device for production machine
JPH0612429A (en) Production control system
JP2000326182A (en) Production plan drafting method and its device
JP3143931B2 (en) Data processing device
JPH0950463A (en) Production management system
JPH0966442A (en) Process control device
JPH086997A (en) Preparing method for arrow diagram master classified by types
JPH0573591A (en) Selling management system based on preceding arrangement managing master
JPH08147366A (en) Production planning device