- JP2992400B2 JP2992400B2 JP4107054A JP10705492A JP2992400B2 JP 2992400 B2 JP2992400 B2 JP 2992400B2 JP 4107054 A JP4107054 A JP 4107054A JP 10705492 A JP10705492 A JP 10705492A JP 2992400 B2 JP2992400 B2 JP 2992400B2
- Authority
- JP
- Japan
- Prior art keywords
- construction method
- road surface
- support pile
- floor plate
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は地下構築方法に係り、詳
しくは地上の交通流を妨げることなく、地上における作
業を極力避けることができる地下構築方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underground construction method, and more particularly to an underground construction method capable of minimizing work on the ground without obstructing traffic flow on the ground.
【0002】[0002]
【従来の技術】従来、地下構造物を構築するためのオー
プンシールド工法等、いわゆる開削工法における道路の
地下掘削工事では、工事を中断する夜間等のみ、掘削し
た抗の上部を覆工し、路面を形成して交通を可能にして
いる。しかし、工事を実施している時間帯は、道路を占
有し交通を遮断している。2. Description of the Related Art Conventionally, in the underground excavation of a road in the so-called open-cutting method, such as an open shield method for constructing an underground structure, the upper portion of an excavated pier is covered only during nighttime when construction is interrupted. To make traffic possible. However, during construction, they occupy roads and block traffic.
【0003】他方、近年、快適な都市空間作りの一案と
して、いわゆるジオフロント構想(地下都市計画)等が
提唱されているが、これを推進するために必要な技術的
アプローチは十分になされていない。仮に、高速道路あ
るいは幹線道路を地下式とし、その上に構造物等を築造
すると、効率のよい都市空間の利用を計ることができる
が、このような都市開発を推し進めていくには、従来の
工法のみでは困難である。On the other hand, in recent years, a so-called geofront concept (underground city planning) and the like have been proposed as a proposal for creating a comfortable urban space, but the technical approaches necessary to promote this have been sufficiently made. Absent. If an expressway or an arterial road is made underground and structures are built on top of it, efficient use of urban space can be measured. It is difficult only with the construction method.
【0004】[0004]
【発明が解決しようとする課題】上述したような従来の
工法では、掘削等の工事中は車両が通行できず、他方、
車両を通すためには工事を中断しなければならない。In the above-mentioned conventional construction method, vehicles cannot pass during construction work such as excavation.
The construction must be interrupted to allow the vehicle to pass.
【0005】また、従来の工法では、覆工のための占用
替えの都度、路面の設置、撤去が必要となる。このこと
は、特に交差点部においては大きな問題となっている。
このような問題を十分に解決できなければ、ジオフロン
ト構想(地下都市計画)等の実現は不可能であり、地上
の交通を遮断することがない有効な工法の開発が望まれ
る。In the conventional construction method, it is necessary to install and remove the road surface every time the occupation is changed for lining. This is a major problem especially at intersections.
If such problems cannot be sufficiently solved, it is impossible to realize a geofront concept (underground city planning) and the like, and it is desired to develop an effective construction method that does not block ground traffic.
【0006】本発明は上記の観点からなされたものであ
り、工事中であっても交通流を妨げることなく、かつ、
地上における作業を極力避けることができる地下構築方
法を提供することを課題とする。The present invention has been made in view of the above, and does not obstruct traffic flow even during construction, and
An object of the present invention is to provide an underground construction method capable of avoiding work on the ground as much as possible.
【0007】[0007]
【課題を解決するための手段】本発明者は、舗装路面の
上に覆工を架設した後、掘削、舗装のとり壊しを行う工
法を提供することにより、上記課題を解決したものであ
り、次のような構成としている。Means for Solving the Problems The present inventor has solved the above-mentioned problems by providing a construction method of digging and pavement demolishing after laying a lining on a pavement road surface. It has the following configuration.
【0008】すなわち、本発明は、舗装道路の交差点部
の地下掘削工事において、杭天端が路面よりも高くなる
ように支持杭を打ち、この支持杭の上に、路面に接しな
いように床板を設置した後に、床板下の掘削及び路面の
取り壊しを行うことを特徴とする地下構築方法である。That is, according to the present invention, in an underground excavation work at an intersection of a pavement road, a support pile is hit so that a pile top is higher than a road surface, and a floor plate is installed on the support pile so as not to contact the road surface. After that, the underground construction method is characterized in that excavation under a floor plate and demolition of a road surface are performed.
【0009】さらに本発明は、前記支持杭の天端と床板
下面との間に高さ調節用ピースを介在させ、この高さ調
節用ピースの厚さにより床板と路面との距離を調節する
ことを特徴とする地下構築方法を提供する。Further, according to the present invention, a height adjusting piece is interposed between the top end of the support pile and the lower surface of the floor plate, and the distance between the floor plate and the road surface is adjusted by the thickness of the height adjusting piece. An underground construction method is provided.
【0010】以下、本発明を詳細に説明する。支持杭
は、交差点部の路面上方に車両が通行するための床板を
設置するためのものであり、天端が路面よりも高くなる
ようにして路面に打ち、この天端上に床板を置載する。
支持杭の下端は、掘削後の抗内底面よりも深くなるよう
に打ち込む。この支持杭にはH鋼等を使用するのが好ま
しい。支持杭どうしの間隔は床板の形状に合わせ、例え
ば床板が長方形の場合には、床板の4角に相当する位置
とする。支持杭を打つ前に、抗の側面に土留の施工を行
っておくとよい。Hereinafter, the present invention will be described in detail. The support pile is used to set a floor board for vehicles to pass above the road surface at the intersection, hit the road surface with the top edge higher than the road surface, and place the floor plate on this top edge. I do.
The lower end of the support pile is driven so as to be deeper than the bottom surface after excavation. It is preferable to use H steel or the like for this support pile. The spacing between the support piles is adjusted to the shape of the floorboard. For example, when the floorboard is rectangular, it is set at a position corresponding to four corners of the floorboard. Before hitting the support stake, it is advisable to carry out earth retaining on the side of the pier.
【0011】床板は、舗装面の代わりに路面を形成する
板上体であり、鋼製あるいはプレキャストコンクリート
版が好ましい。厚さは100〜300mmが好ましく、
取扱性、強度等を考慮すると200mm程度がさらに好
ましい。床板は舗装面から離して設置し、この距離が3
0〜60mm、好ましくは50mm程度となるようにす
る。この床板の高さは、支持杭の天端と床板との間に高
さ調節用ピースを介在させ、このピースの厚さにより調
節することができる。高さ調節用ピースとしては、例え
ば一面が開放した箱状体があげられる。この箱状体の底
部の厚さの異なるものを用意しておき、所望の高さに調
節されるように高さ調節用ピースを選択し、支持杭の天
端部にかぶせればよい。The floorboard is an upper body that forms a road surface instead of a pavement surface, and is preferably a steel or precast concrete slab. The thickness is preferably 100 to 300 mm,
Considering handling properties, strength, etc., it is more preferably about 200 mm. The floorboards should be installed away from the pavement and this distance should be 3
It is set to be 0 to 60 mm, preferably about 50 mm. The height of the floor plate can be adjusted by interposing a height adjusting piece between the top end of the support pile and the floor plate, and adjusting the thickness of the piece. As the height adjusting piece, for example, a box-shaped body having one open side can be cited. What is necessary is to prepare a box-shaped body having a different bottom thickness, select a height-adjusting piece so as to adjust the height to a desired height, and cover the top end of the support pile.
【0012】床板の固定は、床板どうし及び支持杭と床
板、あるいは高さ調節用ピースと床板とをボルトで締結
することにより行う。床板部分に車両が通行しやすくす
るために、床板の路面末端に相当する部分は、斜面にな
るようにして舗装面に接地させる。The floor plates are fixed by bolts between the floor plates and the support pile and the floor plate, or between the height adjustment piece and the floor plate. In order to make it easier for vehicles to pass through the floorboard portion, the portion corresponding to the road surface end of the floorboard is formed as a slope and is grounded to the pavement surface.
【0013】支持杭を打ち、床板を設置した後に、床板
下の掘削、舗装面の取り壊しを行う。この作業は、地下
に構築する構造物の種類に応じて適宜行う。掘削は、自
走装置を備えたシールドマシン等を用いて行うとよい。
また、掘削により生ずる土砂は土砂圧送装置等により外
部に送り出す。[0013] After the supporting pile is struck and the floorboard is installed, excavation under the floorboard and demolishment of the pavement surface are performed. This operation is appropriately performed according to the type of the structure to be constructed underground. Excavation may be performed using a shield machine equipped with a self-propelled device.
In addition, the earth and sand generated by the excavation is sent to the outside by an earth and sand pumping device or the like.
【0014】[0014]
【作用】舗装面の上に床板を設置してこれを路面とし、
路面下で掘削工事を行うので、地上での作業を低減さ
せ、交通流を妨げることなく掘削工事を行うことができ
る。[Function] A floor plate is installed on a pavement surface and used as a road surface.
Since excavation work is performed below the road surface, work on the ground can be reduced, and excavation work can be performed without obstructing traffic flow.
【0015】[0015]
【実施例】以下に、本発明の実施例を図面に基づいて説
明する。はじめに掘削後の抗の側面に相当する部分に、
図示しない土留杭を打ち込む。続いて支持杭1を舗装路
に垂直を打ち込む。この支持杭はH鋼であるが、他の形
状のものでもよい。支持杭1の間隔は床板の大きさに合
わせて適宜設定する。支持杭1の天端は路面より30〜
60mm程度高くなるようにする。Embodiments of the present invention will be described below with reference to the drawings. First, in the part corresponding to the side of the drill after excavation,
Driving a retaining pile (not shown). Subsequently, the support pile 1 is driven vertically into the pavement. The support pile is H steel, but may be of another shape. The spacing between the support piles 1 is appropriately set according to the size of the floorboard. The top end of the support pile 1 is 30 ~ from the road surface.
It should be about 60 mm higher.
【0016】この支持杭1の上に床板2を置載する。必
要に応じて床板の高さを調節するために、支持杭1の天
端部に高さ調節用ピース2をかぶせ、上面と路面との距
離が30〜60mm程度になるように調節し、その上に
床板3を載置する(図2)。この高さ調節用ピース2
は、一面が開放した箱状体であり、内面の大きさは支持
杭1よりもわずかに大きい。A floor plate 2 is placed on the support pile 1. In order to adjust the height of the floorboard if necessary, cover the top end of the support pile 1 with a height adjustment piece 2 and adjust the distance between the upper surface and the road surface to be about 30 to 60 mm. The floor plate 3 is placed on the top (FIG. 2). This height adjustment piece 2
Is a box-like body having one open side, and the size of the inner surface is slightly larger than the support pile 1.
【0017】支持杭1の天端部あるいは高さ調節用ピー
スの上に、長方形の鋼板からなる床板3を、その4角が
支持杭1に対応するように置載し、ボルトで締結する
(図1)。この床板3は、厚さ200mmの鋼板であ
り、床板3どうしも同様にボルトで固定する。A floor plate 3 made of a rectangular steel plate is placed on the top end or the height adjusting piece of the support pile 1 so that its four corners correspond to the support pile 1 and fastened with bolts ( (Fig. 1). The floor plate 3 is a steel plate having a thickness of 200 mm, and the floor plates 3 are similarly fixed with bolts.
【0018】図3に、上記のようにして交差点部に施工
した外観を示す。舗装路と床板3との境界部分は、床板
3が斜面になるように支持杭1の高さを調節し、床板の
一端が路面に設置するようにする。このようにすること
によって、車両が滑らかに走行することができる。FIG. 3 shows an external appearance constructed at the intersection as described above. At the boundary between the paved road and the floorboard 3, the height of the support pile 1 is adjusted so that the floorboard 3 is inclined, and one end of the floorboard is installed on the road surface. By doing so, the vehicle can run smoothly.
【0019】次に、地下構造物の種類に応じて床板下部
の掘削を行い、必要に応じて舗装の取り壊しを行う。Next, the lower part of the floor plate is excavated according to the type of the underground structure, and the pavement is demolished as necessary.
【0020】[0020]
【発明の効果】本発明によれば、地上の交通路を確保し
たまま地下工事を施工することができるので、交通流を
妨げることなく、地上における作業を低減することが可
能な地下構築方法を提供することができる。According to the present invention, since an underground construction can be performed while securing a ground traffic path, an underground construction method capable of reducing work on the ground without obstructing traffic flow. Can be provided.
【図1】 本発明の工法の一例を示す斜視図。FIG. 1 is a perspective view showing an example of a method of the present invention.
【図2】 本発明の一例を示す側面図。FIG. 2 is a side view showing an example of the present invention.
【図3】 本発明の概念を示す斜視図。FIG. 3 is a perspective view showing the concept of the present invention.
【符号の説明】 1.支持杭 2.高さ調節用ピース 3.床板 4.アスファルト[Explanation of Codes] Support pile 2. Height adjustment piece 3. Floorboard 4. asphalt
Claims (2)
いて、杭天端が路面よりも高くなるように支持杭を打
ち、この支持杭の上に、路面に接しないように床板を設
置した後に、床板下の掘削及び路面の取り壊しを行うこ
とを特徴とする地下構築方法。In an underground excavation work at an intersection of a pavement road, a support pile is driven so that a pile top is higher than a road surface, and a floor plate is placed on the support pile so as not to contact the road surface. Underground construction method characterized by performing excavation below and demolishing a road surface.
支持杭の天端と床板下面との間に高さ調節用ピースを介
在させ、この高さ調節用ピースの厚さにより床板と路面
との距離を調節することを特徴とする地下構築方法。2. The underground construction method according to claim 1,
An underground construction method comprising interposing a height adjusting piece between a top end of a support pile and a lower surface of a floor plate, and adjusting a distance between the floor plate and a road surface by a thickness of the height adjusting piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4107054A JP2992400B2 (en) | 1992-04-24 | 1992-04-24 | Underground construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4107054A JP2992400B2 (en) | 1992-04-24 | 1992-04-24 | Underground construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05302338A JPH05302338A (en) | 1993-11-16 |
JP2992400B2 true JP2992400B2 (en) | 1999-12-20 |
Family
ID=14449339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4107054A Expired - Fee Related JP2992400B2 (en) | 1992-04-24 | 1992-04-24 | Underground construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2992400B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4606665B2 (en) * | 2001-08-29 | 2011-01-05 | 鹿島建設株式会社 | Road construction method |
CN107345384B (en) * | 2016-05-07 | 2024-05-03 | 沈阳汇智云创科技有限公司 | Multipurpose steel box girder plate |
JP7298441B2 (en) * | 2018-10-26 | 2023-06-27 | 株式会社豊田中央研究所 | road structure |
JP7272307B2 (en) * | 2020-03-30 | 2023-05-12 | 株式会社豊田中央研究所 | road structure |
-
1992
- 1992-04-24 JP JP4107054A patent/JP2992400B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH05302338A (en) | 1993-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3327191B2 (en) | Underground structure and its construction method | |
JP3586864B2 (en) | Underground structure construction method and elevated traffic path | |
EP1916338A1 (en) | Self-supporting soundproofing and retaining prefabricated concrete panel | |
JP2992400B2 (en) | Underground construction method | |
JP3600214B2 (en) | Road construction method and superstructure used for it | |
US20100272509A1 (en) | Traffic barrier section | |
JP3789100B2 (en) | How to build a widening tunnel | |
JP2813807B2 (en) | How to build an underground tunnel | |
JP3450294B2 (en) | Supporting structure of lining plate and lining method | |
JP4468133B2 (en) | Overhangway block and method for constructing overhangway using the block | |
JP4233025B2 (en) | How to construct a three-dimensional intersection | |
JP3249636B2 (en) | Foundation structure and construction method | |
JP2802909B2 (en) | Roadway widening block and roadway widening method | |
JP3409186B2 (en) | Messel shield machine lining structure and lining method | |
JP3175636B2 (en) | How to build an overhanging sidewalk | |
JP6378414B1 (en) | Cast-in-place pile method and building method | |
JP2023127632A (en) | Method for installing guard fence and guard fence | |
JP2000297403A (en) | Passage and construction method therefor | |
JP2006265857A (en) | Overhanging roadway block, and method of constructing overhanging roadway using the block | |
JP2003278477A (en) | Widening method of tunnel, tunnel and simple protector | |
JP2000087440A (en) | Road crossing ditch structure | |
JPH05230842A (en) | Construction method of underground structure | |
JP2859139B2 (en) | Construction structure of pedestrian road boundary block and pedestrian road boundary | |
JP2736756B2 (en) | Pipe burial method | |
JPH09242169A (en) | Packaging side ditch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19990928 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071015 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081015 Year of fee payment: 9 |
|
LAPS | Cancellation because of no payment of annual fees |