JP2973833B2 - Jumbo for central advanced rear widening tunnel excavation - Google Patents

Jumbo for central advanced rear widening tunnel excavation

Info

Publication number
JP2973833B2
JP2973833B2 JP24623994A JP24623994A JP2973833B2 JP 2973833 B2 JP2973833 B2 JP 2973833B2 JP 24623994 A JP24623994 A JP 24623994A JP 24623994 A JP24623994 A JP 24623994A JP 2973833 B2 JP2973833 B2 JP 2973833B2
Authority
JP
Japan
Prior art keywords
tunnel
jumbo
face
excavation
advanced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24623994A
Other languages
Japanese (ja)
Other versions
JPH08109788A (en
Inventor
知平 登坂
好信 居相
洋一 守屋
健太 松原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOBAYASHIGUMI KK
Original Assignee
OOBAYASHIGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOBAYASHIGUMI KK filed Critical OOBAYASHIGUMI KK
Priority to JP24623994A priority Critical patent/JP2973833B2/en
Publication of JPH08109788A publication Critical patent/JPH08109788A/en
Application granted granted Critical
Publication of JP2973833B2 publication Critical patent/JP2973833B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、トンネル中央の先進
掘削部分とこれに後続する側方の拡幅掘削部分の掘削作
業を併進して行なう機能を備えた中央先進後方拡幅型ト
ンネル掘削用ジャンボに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jumbo for drilling a central advanced rearward widened tunnel having a function of performing a parallel excavation work of an advanced excavation portion at the center of a tunnel and a lateral widening excavation portion following the tunnel. Things.

【0002】[0002]

【従来の技術】従来より、軟岩から硬岩に至る岩盤や砂
質土等からなる比較的安定した地盤内にトンネルを掘削
形成して行くいわゆる山岳トンネルでは、開放された切
羽面を、爆薬を用いた発破作業により、あるいは各種の
掘削重機を用いた削岩、割岩作業等により掘削して行く
のが一般的である。
2. Description of the Related Art Conventionally, in a so-called mountain tunnel in which a tunnel is excavated and formed in a relatively stable ground made of rock or sandy soil from soft rock to hard rock, an open face is used for explosives. It is common to excavate by blasting work used, or by rock drilling and split rock work using various types of heavy equipment.

【0003】そして、かかる山岳トンネルでは、特に大
断面のトンネルを掘削形成して行く場合、切羽面の安定
を図りつつ掘削作業を行なう必要があるため、全断面を
一度に掘削することなく、トンネル断面を分割し、トン
ネル断面の一部を残置して切羽面あるいは周囲の地山を
押さえつつ段階的に掘削作業を順次行なう工法が採用さ
れている。
[0003] In such a mountain tunnel, especially when a tunnel having a large cross section is formed by excavation, it is necessary to perform excavation work while stabilizing the face face. A construction method is adopted in which a cross section is divided and excavation work is sequentially performed in a stepwise manner while keeping a part of the tunnel cross section and holding the face face or surrounding ground.

【0004】このようなトンネルの掘削工法としては、
例えば、トンネルの断面を水平方向に少なくとも2以上
に分割し、分割された断面の上方部分から順次先行して
掘削作業を行なういわゆるベンチカット工法や、トンネ
ルの側方部分を先行して掘削しこれに後続して残りのト
ンネル断面を掘削するいわゆるサイロット工法、その他
の各種のトンネル工法が知られている。また、トンネル
断面の全部あるいは一部を縦方向に分割し、その中央部
分を先行掘削するとともに、これに後続してこれの側方
の拡幅部分を掘削するいわゆる中央先進後方拡幅型のト
ンネル掘削工法も考えられる。かかる中央先進後方拡幅
型のトンネル掘削工法によれば、トンネル側方部分の地
山を効率よく防護しつつ掘削作業を行なうことができる
ため、特にトンネル側方の地山の安定化を図りつつ掘削
作業を行なう必要がある場合の工法として有効である。
[0004] Such tunnel excavation methods include:
For example, a so-called bench cut method in which a cross section of a tunnel is divided into at least two sections in the horizontal direction, and excavation work is sequentially performed from the upper portion of the divided cross section, or a side portion of the tunnel is previously excavated. After that, a so-called silot method for excavating the remaining tunnel section and other various tunnel methods are known. In addition, the so-called central advanced rear widening tunnel excavation method, in which all or part of the tunnel cross section is vertically divided and the central part is excavated in advance and the widened part is excavated subsequently to the central part. Is also conceivable. According to the tunnel excavation method of the central advanced rearward widening type, the excavation work can be performed while efficiently protecting the ground at the side of the tunnel, so that the excavation is performed while stabilizing the ground at the side of the tunnel. It is effective as a construction method when work needs to be performed.

【0005】一方、爆薬を用いた発破作業や、削岩、割
岩作業による山岳トンネルの掘削作業を効率良く行うた
めの重機として、従来よりジャンボと呼ばれる掘削重機
が知られている。
[0005] On the other hand, as a heavy machine for efficiently performing a blasting operation using explosives and a digging operation of a mountain tunnel by rock drilling and rock cutting work, a heavy digging machine called a jumbo is conventionally known.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、上記中
央先進後方拡幅型のトンネル掘削工法に適する掘削機械
として、中央先進部分とこれに後続する側方拡幅部分の
掘削作業を併進して効率良く行なうことのできるトンネ
ル掘削用ジャンボは、未だ開発されていないのが現状で
ある。
However, as an excavating machine suitable for the above-mentioned central advanced rearward widening tunnel excavation method, it is necessary to efficiently perform the excavation work of the central advanced part and the subsequent widened part following the central advanced part. At present, no jumbo for tunnel excavation has been developed.

【0007】また、かかるトンネル掘削用ジャンボが採
用される、安定した地盤内に形成される山岳トンネルに
おいても、亀裂やすべり面の多い地山や土砂地山、強度
の小さい柔岩や膨脹性地山など地質条件の悪い地山を通
過する場合があり、このような地盤内においてトンネル
掘削用ジャンボによる掘削作業を行なうと、周囲の地山
の崩落や崩壊等の危険を招く惧れがある。
[0007] Further, even in a mountain tunnel formed in a stable ground in which such a jumbo for tunnel excavation is adopted, a ground or a sandy ground having many cracks or slip surfaces, a soft rock having a low strength or an inflatable ground can be obtained. In some cases, the vehicle may pass through a mountain having a bad geological condition such as a mountain, and if a drilling operation is performed by using a tunnel excavation jumbo in such a ground, there is a fear that the surrounding ground may collapse or collapse.

【0008】そこで、この発明は、上記従来の課題に着
目してなされたもので、中央先進部分とこれに後続する
側方への拡幅部分の掘削作業を、一台のトンネル掘削用
ジャンボにより併進して行なうことを可能にして、中央
先進後方拡幅型のトンネル掘削工法を効率良く行なうこ
とのできる中央先進後方拡幅型トンネル掘削用ジャンボ
を提供することを目的とするものである。
In view of the above, the present invention has been made in view of the above-mentioned conventional problems, and the excavation work of the central advanced portion and the subsequent widened portion is translated by one tunnel excavating jumbo. It is an object of the present invention to provide a central advanced rearward widening tunnel excavation jumbo capable of efficiently performing a central advanced rearward widening tunnel excavation method.

【0009】また、この発明は、トンネルの周囲の地山
の安定を図りつつ容易に掘削作業を行なうことのできる
中央先進後方拡幅型トンネル掘削用ジャンボを提供する
ことを目的とするものである。
Another object of the present invention is to provide a center advanced rearward widened tunnel excavation jumbo capable of easily excavating while stabilizing the ground around the tunnel.

【0010】[0010]

【課題を解決するための手段】この発明は、上記目的を
達成するためになされたもので、その要旨は、トンネル
中央の先進部切羽面に対向配置される前方掘削部、及び
この前方掘削部の後方において前記先進部側方の拡幅部
切羽面に対向配置される後方掘削部を有する、トンネル
掘進方向に移動可能なジャンボ架台と、前記前方掘削部
及び後方掘削部の各先端部分に設けられて、対向する各
切羽面の削孔を行なう複数の削孔装置とからなることを
特徴とする中央先進後方拡幅型トンネル掘削用ジャンボ
にある。
SUMMARY OF THE INVENTION The present invention has been made to achieve the above-mentioned object, and its gist is to provide a front excavation portion which is arranged to face a face of an advanced portion at the center of a tunnel, and a front excavation portion which is provided. A rear excavation portion disposed opposite to the face of the widened portion on the side of the advanced portion, a jumbo gantry movable in the tunnel excavation direction, and provided at each end portion of the front excavation portion and the rear excavation portion. A central advanced rearward widening tunnel excavating jumbo characterized by comprising a plurality of drilling devices for drilling each of the facing face surfaces.

【0011】また、この発明の中央先進後方拡幅型トン
ネル掘削用ジャンボは、前記ジャンボ架台の上方周囲に
おいて、トンネル横断方向に、トンネル天端面の形状に
沿って延長するフォアパイル用スライド軌道と、該スラ
イド軌道により支持されて前記切羽面の天端部分に対向
配置されるとともに、当該フォアパイル用スライド軌道
に沿って移動することにより、トンネル天端面に沿って
これの前方の地山に順次フォアパイルを打ち込むフォア
パイル打設装置を備えることが好ましい。
The center advanced rearward widening type tunnel excavating jumbo of the present invention includes a fore pile slide track extending along a shape of a tunnel top end surface in a cross direction of the tunnel around the jumbo mount. The fore pile is supported by the slide track and is disposed opposite to the top end of the face, and moves along the fore pile slide track to sequentially fore pile the ground in front of the tunnel along the top face of the tunnel. Is preferably provided.

【0012】さらに、この発明の中央先進後方拡幅型ト
ンネル掘削用ジャンボは、前記ジャンボ架台の上方周囲
において、トンネル横断方向に、トンネル天端面の形状
に沿って延長する吹付用スライド軌道と、該吹付用スラ
イド軌道により支持されてトンネル天端面に対向配置さ
れるとともに、当該吹付用スライド軌道に沿って移動す
ることにより、トンネル天端面に沿って吹付けコンクリ
ートを吹付ける吹付け機を備えることが好ましい。
Further, the center advanced rearward widening type tunnel excavating jumbo of the present invention comprises a blowing slide track extending along the shape of the top end surface of the tunnel in the cross direction of the tunnel above the jumbo mount, and It is preferable to include a spraying machine which is supported by the slide track for use and is disposed to face the tunnel top end face, and moves along the spraying slide track to spray the shotcrete along the tunnel top end face. .

【0013】さらにまた、この発明の中央先進後方拡幅
型トンネル掘削用ジャンボは、前記ジャンボ架台の後方
掘削部の側部に、側方の地山に向けて対向配置されたサ
イドパイル打設装置を備えることもできる。
[0013] Further, the center advanced rearward widening type tunnel excavating jumbo of the present invention is characterized in that a side pile driving device is disposed on the side of the rear excavating portion of the jumbo stand facing the ground on the side. It can also be provided.

【0014】[0014]

【作用】この発明の中央先進後方拡幅型トンネル掘削用
ジャンボによれば、ジャンボ架台が、トンネル中央の先
進部切羽面に対向配置される前方掘削部と、この前方掘
削部の後方において前記先進部側方の拡幅部切羽面に対
向配置される後方掘削部とからなるので、ジャンボ架台
をトンネル掘進方向に移動させつつ、前方掘削部の先端
部分に設けられた削孔装置により先進部切羽面を、後方
掘削部の先端部分に設けられた削孔装置により拡幅部切
羽面を各々削孔することにより、中央先進部分とこれに
後続する側方拡幅部分の掘削作業を併進しつつ容易に行
なうことができる。
According to the central advanced rearward widening type tunnel excavating jumbo of the present invention, the jumbo gantry is provided with a front excavating portion opposed to the face of the advanced portion in the center of the tunnel, and the advanced portion behind the front excavating portion. Since it consists of a rear excavation part arranged opposite to the side face of the widened part, while moving the jumbo frame in the tunnel excavation direction, the drilling device provided at the tip of the front excavation part cuts the advanced part face By drilling the face of the widened section with a drilling device provided at the tip of the rear excavated section, it is possible to easily perform the excavation work of the central advanced section and the subsequent widened section following this. Can be.

【0015】また、前記ジャンボ架台の上方周囲におい
て、トンネル横断方向に、トンネル天端面の形状に沿っ
て延長するフォアパイル用スライド軌道と、該スライド
軌道により支持されて前記切羽面の天端部分に対向配置
されるとともに、当該フォアパイル用スライド軌道に沿
って移動することにより、トンネル天端面に沿ってこれ
の前方の地山に順次フォアパイルを打ち込むフォアパイ
ル打設装置を設ければ、ジャンボ架台の上方周囲におい
てトンネル天端面の形状に沿って設けたフォアパイル用
スライド軌道上にフォアパイル打設装置を順次移動させ
つつ、当該打設装置によりフォアパイルをトンネルの天
端部に沿った所定の位置に容易に打ち込むことができ
る。すなわち、フォアパイル用スライド軌道は、ジャン
ボ架台を足場として、切羽面の天端の近傍に強固に支持
固定されるとともに、フォアパイル打設装置は、トンネ
ルの天端面に沿った形状のスライド軌道をガイドとして
順次移動しつつ、多数のフォアパイルを天端面に沿った
所定の位置に精度良く打ち込むことができる。
[0015] A fore pile slide track extending along the shape of the tunnel top end surface in the cross direction of the tunnel around the upper side of the jumbo gantry, and a top end portion of the face face supported by the slide track. If a fore pile placing device is provided that is arranged to face and moves along the fore pile slide track to sequentially drive the fore pile into the ground ahead of the tunnel along the top end surface of the tunnel, a jumbo gantry is provided. While the fore pile driving device is sequentially moved on the fore pile slide track provided along the shape of the tunnel top surface around the top of the tunnel, the fore pile is moved by the driving device to a predetermined position along the top end of the tunnel. It can be easily driven into position. That is, the fore pile slide track is firmly supported and fixed in the vicinity of the top end of the face face, using the jumbo gantry as a scaffold, and the fore pile driving device forms a slide track along the top end face of the tunnel. While sequentially moving as a guide, a large number of forepiles can be accurately driven into predetermined positions along the top end face.

【0016】なお、ここで、上記フォアパイルは、トン
ネルの切羽面から前方の地山に向かって、例えば鋼製部
材や硬化体からなる線形の芯材をトンネルの天端面に沿
って多数打ち込み、かかる多数の芯材によって形成され
た掘削地盤を覆うルーフにより掘削地盤を先受け防護し
てから掘削作業を行なう、いわゆるフォアパイリング工
法において、前記芯材として地中に打ち込まれるもので
ある。
Here, the fore pile is formed by driving a large number of linear cores made of, for example, a steel member or a hardened body from the face of the tunnel toward the ground in front thereof along the top end surface of the tunnel. In a so-called fore-piling method in which excavation work is performed after receiving and protecting the excavated ground with a roof covering the excavated ground formed by such a large number of core materials, the core material is driven into the ground.

【0017】さらに、この発明の中央先進後方拡幅型ト
ンネル掘削用ジャンボには、ジャンボ架台の上方周囲に
吹付用スライド軌道を設けこれに沿って吹付けコンクリ
ートの吹付け機を移動させることにより、掘削後のトン
ネル天端面を吹付けコンクリートによって迅速に防護す
ることができる。
Further, in the jumbo for center advanced rearward widening type tunnel excavation of the present invention, a spraying slide track is provided around the upper side of the jumbo gantry, and a spraying machine for shotcrete is moved along the slide track. The rear end of the tunnel can be quickly protected by shotcrete.

【0018】さらにまた、前記ジャンボ架台の後方掘削
部の側部に、側方の地山に向けて対向配置されたサイド
パイル打設装置を設けておけば、トンネルの側方の地盤
をも同時に補強しつつ掘削作業を行なうことができる。
Furthermore, if a side pile driving device is provided on the side of the rear excavation portion of the jumbo mount, the side pile driving device is disposed so as to face the ground on the side, and the ground on the side of the tunnel can be simultaneously formed. Excavation work can be performed with reinforcement.

【0019】[0019]

【実施例】以下、この発明の一実施例を添付図面を参照
しつつ詳細に説明する。この実施例にかかる中央先進後
方拡幅型トンネル掘削用ジャンボ1は、例えば、背面図
としての図1に示すように、幅が約15m程度の大きさ
のトンネル50の上半部分60を先行掘削するいわゆる
上半先進工法において、当該上半部分60のトンネル断
面を中央先進部分51とこれの両側の側方拡幅部分52
とに縦方向に三分割し、中央先進部分51の先行掘削作
業と、これに後続する側方拡幅部分52の掘削作業とを
併進して行なうことにより、いわゆる中央先進後方拡幅
型のトンネル掘削工法を効率良く行なうべく採用された
ものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the accompanying drawings. For example, as shown in FIG. 1 as a rear view, the central advanced rearward widening type tunnel excavating jumbo 1 according to this embodiment excavates an upper half portion 60 of a tunnel 50 having a width of about 15 m. In a so-called upper half advanced construction method, the tunnel section of the upper half portion 60 is formed by a central advanced portion 51 and side widened portions 52 on both sides thereof.
By vertically dividing into three parts in the vertical direction and performing the preceding excavation work of the central advanced part 51 and the excavation work of the lateral widening part 52 following it in parallel, the so-called central advanced rear widening type tunnel excavation method is performed. Is adopted in order to carry out efficiently.

【0020】そして、この実施例のトンネル掘削用ジャ
ンボ1は、側面図としての図2、平面図としての図3及
び図2におけるA−A,B−B,C−C断面である図
4、図5及び図6にも示すように、主として、中央先進
部分51の切羽面53と対向配置される突出部分として
の前方掘削部31と、この前方掘削部31の後方におい
て後方拡幅部分52の切羽面54と対向配置される拡幅
部分としての後方掘削部32とからなる凸型の平面形状
を有するジャンボ架台3と、これの前方掘削部31の先
端部分に設けられて中央先進部分51の切羽面53の削
孔を行なう削孔装置としての複数の削孔用ドリフター1
9と、後方掘削部32のトンネル軸方向先端部すなわち
後方掘削部32の張出し部分33の前面に設けらて側方
拡幅部分52の切羽面54の削孔を行なう複数の削孔用
ドリフター19′とによって構成される。
FIG. 2 is a side view, FIG. 3 is a plan view, and FIG. 4 is a sectional view taken along line AA, BB, and CC in FIG. As also shown in FIGS. 5 and 6, the front excavation portion 31 mainly serving as a protruding portion facing the face face 53 of the central advanced portion 51, and the face of the rear widening portion 52 behind the front excavation portion 31. A jumbo gantry 3 having a convex planar shape composed of a rear excavated portion 32 as a widened portion facing the surface 54 and a face face of a central advanced portion 51 provided at a front end portion of the front excavated portion 31. A plurality of drilling drifters 1 as drilling devices for drilling 53 holes
9 and a plurality of drilling drifters 19 ′ that are provided on the front end of the rear excavation part 32 in the tunnel axial direction, that is, on the front surface of the overhanging part 33 of the rear excavation part 32 and drill the face face 54 of the lateral widened part 52. It is constituted by and.

【0021】前記ジャンボ架台3は、例えばH形鋼やそ
の他の鋼材を組立て、接合してなる骨組構造からなり、
後述する各装置による各作業の支持架台となるととも
に、その主柱55の下端には車輪56を備え、これによ
りトンネル上半部分60の底盤すなわちトンネル下半部
分70の上面に敷設したレール2に沿ってトンネル軸方
向に一体となって走行移動する。
The jumbo gantry 3 has a frame structure formed by assembling and joining, for example, H-shaped steel and other steel materials.
In addition to being a support base for each operation by each device described later, the lower end of the main column 55 is provided with wheels 56, so that the rail 2 laid on the bottom of the upper half portion 60 of the tunnel, that is, on the upper surface of the lower half portion 70 of the tunnel. Travel along the tunnel axis along the axis.

【0022】なお、前方掘削部31の後方掘削部32か
らの突出長は、トンネル断面の大きさや周囲の地盤の土
質、安定性等を鑑みて適宜設計されるが、この実施例の
トンネル掘削用ジャンボ1では突出長さを例えば10m
とし、したがってトンネル50の中央先進部分51を側
法拡幅部分52より常に10m程度先行して掘削するこ
とができる構成となっている。
The length of the front excavation portion 31 protruding from the rear excavation portion 32 is appropriately designed in consideration of the size of the tunnel cross section, the soil properties of the surrounding ground, stability, and the like. For jumbo 1, the protruding length is, for example, 10 m.
Therefore, the central advanced portion 51 of the tunnel 50 can be always excavated about 10 m ahead of the laterally widened portion 52.

【0023】一方、前記削孔用ドリフター19,19′
は、これの前方掘削部31の先端部分あるいは後方掘削
部32の張出し部分33前面のフレーム部材に固定され
た削孔用ドリフターブーム台7と、これから前方に延長
する屈曲可能な関節部を備えたドリフターブーム58
と、ドリフター本体59とからなり、ドリフター本体5
9をジャンボ架台3の前方に配置して、後述する駆動・
制御室62からの駆動により、各切羽面53,54に、
発破用の爆薬を装填するための削孔を所定の位置に形成
する。なお、これらの削孔用ドリフター19,19’を
割岩機等に置き換え、これによって直接切羽面の掘削作
業を行なうこともできる。すなわちこの発明における削
孔装置とは割岩機等の他の掘削装置をも含むものであ
る。
On the other hand, the drilling drifters 19, 19 '
Has a drilling drill boom base 7 fixed to a frame member in front of the front end portion of the front excavation portion 31 or the overhang portion 33 of the rear excavation portion 32, and a bendable joint portion extending forward from this. Drifter boom 58
And the drifter body 59, and the drifter body 5
9 is disposed in front of the jumbo gantry 3 to
By driving from the control room 62, the face surfaces 53 and 54 are
A hole is formed at a predetermined position for loading a blasting explosive. The drilling drifters 19, 19 'can be replaced with a rock drill or the like, and thereby the face face can be directly excavated. That is, the drilling device in the present invention includes other excavating devices such as a rock drill.

【0024】なお、ジャンボ架台3の上方はアーチ状の
プロテクター4によって覆われ、これによって、これの
下方において行われる作業の安全や装置の安全が図られ
ている。また、ジャンボ架台3の後部には、後方部分の
プロテクター4によって防護されて、駆動・制御室62
が設けられ、ここから削孔用ドリフター19,19’や
フォアパイル打設装置5、その他の装置、設備を駆動制
御するとともに、この駆動・制御室62は、カウンター
ウェイトとしての機能をもはたし、トンネル掘削用ジャ
ンボ1による削孔作業あるいはフォアパイル打設作業中
における装置の安定に寄与している。さらに、ジャンボ
架台3の先端には、支保工ハンドリング装置21が設け
られ、各種の支保工組立作業ができるようになってい
る。
The upper part of the jumbo stand 3 is covered by an arch-shaped protector 4 to ensure the safety of the work performed below and the safety of the device. The rear of the jumbo stand 3 is protected by the protector 4 at the rear, and the drive / control room 62 is protected.
The drive / control room 62 has a function as a counterweight, from which the drilling drifters 19, 19 ', the fore pile driving device 5, other devices and equipment are driven and controlled. However, this contributes to the stability of the apparatus during the drilling operation or the fore pile driving operation by the tunnel excavating jumbo 1. Further, a supporter handling device 21 is provided at the tip of the jumbo gantry 3 so that various supporter assembly operations can be performed.

【0025】そして、この実施例のトンネル掘削用ジャ
ンボ1は、さらに、前方掘削部31より前方の地山にフ
ォアパイルを打ち込むためのフォアパイル打設装置5を
備えている。すなわち、このトンネル掘削用ジャンボ1
は、前方掘削部31の上方周囲において、トンネル50
の横断方向に、トンネル50の天端面の形状に沿って延
長する、フォアパイル用スライド軌道としての前方及び
後方ガイドセル13,14を備え、フォアパイル打設装
置5は、かかるの前後のガイドセル13,14により支
持されて、これらに沿ってスライド移動しつつ、前方の
地山に順次多数のフォアパイル6を打ち込むことができ
る。
The tunnel excavating jumbo 1 of this embodiment further includes a fore pile driving device 5 for driving a fore pile into the ground in front of the front excavating portion 31. That is, this tunnel excavating jumbo 1
Is a tunnel 50 around the upper part of the front excavation part 31.
The front and rear guide cells 13 and 14 as fore pile slide tracks extend in the transverse direction along the shape of the top end surface of the tunnel 50, and the fore pile driving device 5 includes the front and rear guide cells. The fore piles 6 can be driven into the ground in front while being slid along these while being supported by 13 and 14.

【0026】このフォアパイル打設装置5は、前方及び
後方ガイドセル13,14上に支持されてこれらに沿っ
て各々スライド移動する、前方及び後方フォアパイル用
ドリフターブーム台66,67と、かかるドリフターブ
ーム台66,67によって支持されたガイドロッド18
と、このガイドロッド18の前方に延長する、フォアパ
イル用ドリフター17とによって構成されている。すな
わち、各前後のドリフターブーム台66,67は上下に
昇降可能なジャッキ機構を備え、トンネル切羽の天端部
分に向けて容易かつ精度良く位置決めすることができる
とともに、ガイドロッド18すなわちフォアパイル6の
打ち込み角度を任意に調整することができる。そして、
ドリフターブーム台66,67はガイドセル13,14
に沿って順次スライド移動することにより、アーチ形の
トンネル天端面に沿って、多数のフォアパイル6を、切
羽面の前方のトンネル掘削部分をルーフ状に覆って、フ
ォアパイル用ドリフター17により順次整然と精度良く
打ち込むことができる。
The fore pile driving apparatus 5 includes front and rear for pile pile drifter boom bases 66 and 67 supported on the front and rear guide cells 13 and 14 and slidably moved along the guide cells 13 and 14, respectively. Guide rod 18 supported by boom bases 66 and 67
And a fore-pile drifter 17 extending forward of the guide rod 18. That is, each of the front and rear drifter boom bases 66 and 67 is provided with a jack mechanism that can move up and down and can be easily and accurately positioned toward the top end of the tunnel face, and the guide rod 18, that is, the fore pile 6 The driving angle can be arbitrarily adjusted. And
Drifter boom tables 66 and 67 are guide cells 13 and 14
Along the arch-shaped tunnel top end surface, covering a large number of forepiles 6 in a roof shape over the tunnel excavation portion in front of the facet, and sequentially and orderly by the forepile drifter 17. It can be driven accurately.

【0027】また、この実施例のトンネル掘削用ジャン
ボ1は、前方掘削部31における前記前方ガイドセル1
3のさらに前方には、これと同様のアーチ状の形状を有
する吹付用ガイドセル12を備え、掘削直後の天端面に
向けて配置された吹付け機15がこれに沿って移動しつ
つ吹付けコンクリートを吹付けることにより、掘削後の
アーチ状の天端面を迅速かつ容易に防護することができ
るようになっている。
The tunnel excavating jumbo 1 of this embodiment is provided with the front guide cell 1 in the front excavating section 31.
Further, a spraying guide cell 12 having an arch-like shape similar to the above is provided, and a spraying machine 15 disposed toward the top end surface immediately after excavation is sprayed while moving along the spraying guide cell 15 further forward of the blower. By spraying the concrete, the arched top end face after excavation can be protected quickly and easily.

【0028】なお、この実施例では、フォアパイル打設
装置5及び吹付け機15を、ジャンボ架台3の前方掘削
部31に設ける場合について記載したが、後方掘削部3
2においても同様に、トンネル横断方向に、トンネル天
端面の形状に沿って延長するフォアパイル用ガイドセル
70や吹付用ガイドセル71を設け(図2参照)、これ
らに沿ってフォアパイル打設装置5及び吹付け機15を
移動させることにより、側方拡幅部分52の切羽面54
前方の地山の先受け防護作業及び掘削直後のトンネル天
端面の防護作業を容易に行うことができる(図6の符号
6´参照)。なお、この際には、前方掘削部31におい
て用いたフォアパイル打設装置5をトンネル軸方向にス
ライド移動させて後方掘削部32のフォアパイル用ガイ
ドセル70上に載せることにより、当該フォアパイル打
設装置5を転用して使用することもでき、また、吹付け
機15においても同様である。
In this embodiment, the case where the fore pile driving device 5 and the spraying machine 15 are provided in the front excavating portion 31 of the jumbo gantry 3 has been described.
2, a fore pile guide cell 70 and a spray guide cell 71 are provided in the transverse direction of the tunnel along the shape of the tunnel top end face (see FIG. 2). 5 and the spraying machine 15 are moved, so that the face face 54 of the side widened portion 52 is moved.
It is possible to easily perform the work of protecting the ground in front and the work of protecting the top end of the tunnel immediately after excavation (see reference numeral 6 'in FIG. 6). At this time, the fore pile driving device 5 used in the front excavation part 31 is slid in the tunnel axis direction and placed on the fore pile guide cell 70 of the rear excavation part 32, whereby the fore pile driving is performed. The setting device 5 can be diverted and used, and the same applies to the spraying machine 15.

【0029】さらに、この実施例のトンネル掘削用ジャ
ンボ1は、ジャンボ架台3の側方掘削部32の両側部に
位置するフレーム部材には、サイドパイル用ドリフター
ブーム台9(図2参照)を介してサイドパイル打設用ド
リフターブーム10が設けられ(図6参照)、これによ
って、トンネル10の側方の地山に当該側方の地山を補
強するためのサイドパイル8を打設することができるよ
うになっている。なお、ここで、サイドパイル8とはト
ンネル10の側方の地盤に打ち込まれる例えば鋼製部材
や硬化体からなる線形の芯材で、いわゆるサイドパイル
やマイクロパイル、フットパイル等も含むものである。
Further, in the tunnel excavating jumbo 1 of this embodiment, the frame members located on both sides of the side excavating portion 32 of the jumbo stand 3 are provided with a side pile drifter boom base 9 (see FIG. 2). A side pile driving drifter boom 10 is provided (see FIG. 6), so that the side pile 8 for reinforcing the ground on the side of the tunnel 10 can be formed on the ground on the side of the tunnel 10. I can do it. Here, the side pile 8 is a linear core made of, for example, a steel member or a hardened body which is driven into the ground beside the tunnel 10 and includes so-called side piles, micro piles, foot piles and the like.

【0030】そして、上記構成を有するこの実施例のト
ンネル掘削用ジャンボ1によれば、ジャンボ架台3をレ
ール2に沿ってスライド移動させながら、前方掘削部3
1によって中央先進部分51をこれの両側の側方拡幅部
分52から10m程度常に先行させつつトンネルの掘削
作業を行なうことにより、残置される側方拡幅部分52
によって側方の地山を押さえてこれの安定を図りつつ、
中央先進部分51と側方拡幅部分52の掘削作業を併進
しつつ行なうことができる。
According to the jumbo tunnel excavation 1 of this embodiment having the above configuration, the front excavation part 3 is moved while the jumbo base 3 is slid along the rail 2.
1, the tunnel excavation work is performed while the center advanced portion 51 always precedes the side widened portions 52 on both sides of the central advanced portion 51 by about 10 m.
While holding down the ground on the sides to stabilize this,
The excavation work of the central advanced portion 51 and the lateral widened portion 52 can be performed while moving in parallel.

【0031】また、フォアパイル打設装置5や吹付けコ
ンクリートの吹付け機15、あるいはサイドパイル打設
用ドリフターブーム10を備えることにより、地質条件
の悪い地山を通過する場合でも、トンネルの周囲の地山
の安定を図りつつ容易に掘削作業を行なうことができる
とともに、これらの作業のための他の重機を使用するこ
とによる重機の輻輳を回避しつつ、効率良くトンネルの
掘削作業を行なうことができる。
Further, by providing the fore pile driving device 5, the shotcrete spraying machine 15, or the side pile driving drifter boom 10, even if the vehicle passes through a ground with bad geological conditions, the surroundings of the tunnel can be improved. Excavation work can be easily performed while stabilizing the ground in the area, and the tunnel excavation work can be efficiently performed while avoiding the congestion of heavy equipment by using other heavy equipment for these works. Can be.

【0032】なお、上記実施例では、この発明の中央先
進後方拡幅型トンネル掘削用ジャンボを、上半先進工法
に用いた場合について記載したが、この発明のトンネル
掘削用ジャンボはかかる実施例に限定されるものではな
く、トンネルを縦方向に分割して掘削する工法であれ
ば、例えば、トンネルの全断面を同時に掘削する場合等
その他のトンネル工法にも適用することができる。
In the above embodiment, the case where the center advanced rearward widening type tunnel excavation jumbo of the present invention is used in the upper half advanced construction method has been described. However, the tunnel excavation jumbo of the present invention is limited to this embodiment. However, if it is a construction method of excavating the tunnel by dividing the tunnel in the vertical direction, it can be applied to other tunnel construction methods such as a case of excavating the entire cross section of the tunnel at the same time.

【0033】[0033]

【発明の効果】以上詳細に説明したように、この発明の
中央先進後方拡幅型トンネル掘削用ジャンボによれば、
ジャンボ架台が、トンネル中央の先進部切羽面に対向配
置される前方掘削部と、この前方掘削部の後方において
前記先進部側方の拡幅部切羽面に対向配置される後方掘
削部とからなり、ジャンボ架台をトンネル掘進方向に移
動させつつ、前方掘削部の先端部分に設けられた削孔装
置により先進部切羽面を、後方掘削部の先端部分に設け
られた削孔装置により拡幅部切羽面を各々削孔すること
により、中央先進部分を常に先行させつつトンネルの掘
削作業を行なうとともに、残置される側方拡幅部分によ
って側方の地山を押さえてこれの安定を図りつつ、中央
先進部分とこれに後続する側方拡幅部分の掘削作業を併
進して容易に行なうことができる。
As described above in detail, according to the central advanced rearward widening type tunnel excavating jumbo of the present invention,
The jumbo gantry comprises a front excavation portion disposed opposite to the advanced face in the center of the tunnel, and a rear excavation portion disposed behind the front excavation portion and opposed to the widened portion face on the side of the advanced portion, While moving the jumbo gantry in the tunnel excavation direction, the advanced face face is drilled by the drilling device provided at the tip of the front excavation part, and the widening face is cut by the drilling device provided at the tip of the rear excavation part. By drilling each, the excavation work of the tunnel is performed while always keeping the central advanced part ahead, and the left side widening part holds down the side ground and stabilizes this, while Subsequent excavation work of the laterally widened portion can be easily performed in parallel.

【0034】また、切羽面の前方の地山にフォアパイル
を打ち込む機能や、トンネルの天端面に吹付けコンクリ
ートを吹付ける機能、あるいは側方の地山にサイドパイ
ルを打ち込む機能を備えることにより、トンネルが地質
条件の悪い地山を通過する場合であっても、トンネルの
周囲の地山の安定を図りつつ容易に掘削作業を行なうこ
とができる。
Also, by providing a function of driving a fore pile into the ground in front of the face, a function of blowing concrete to the top end of the tunnel, or a function of driving a side pile into the ground on the side, Even when the tunnel passes through a ground with poor geological conditions, excavation work can be easily performed while stabilizing the ground around the tunnel.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の一実施例にかかる中央先進後方拡幅
型トンネル掘削用ジャンボを後方から見た略示背面図で
ある。
FIG. 1 is a schematic rear view of a central advanced rearward widening type tunnel excavation jumbo according to an embodiment of the present invention as viewed from the rear side.

【図2】この発明の一実施例にかかる中央先進後方拡幅
型トンネル掘削用ジャンボの略示側面図である。
FIG. 2 is a schematic side view of a jumbo for excavating a center advanced rearward widening tunnel according to an embodiment of the present invention.

【図3】この発明の一実施例にかかる中央先進後方拡幅
型トンネル掘削用ジャンボの略示平面図である。
FIG. 3 is a schematic plan view of a center advanced rear widening type tunnel excavating jumbo according to an embodiment of the present invention.

【図4】図2のA−Aに沿った略示断面図である。FIG. 4 is a schematic sectional view taken along AA of FIG. 2;

【図5】図2のB−Bに沿った略示断面図である。FIG. 5 is a schematic sectional view taken along line BB of FIG. 2;

【図6】図2のC−Cに沿った略示断面図である。FIG. 6 is a schematic sectional view taken along the line CC of FIG. 2;

【符号の説明】[Explanation of symbols]

1 トンネル掘削用ジャンボ 2 レール 3 ジャンボ架台 5 フォアパイル打設装置 6,6′ フォアパイル 8 サイドパイル 10 サイドパイル用のドリフターブーム 12 吹付用ガイドセル(吹付用スライド軌道) 13,14 フォアパイル用ガイドセル(フォアパイル
用スライド軌道) 15 吹付け機 17 フォアパイル用ドリフター 19,19′ 削孔用ドリフター(削孔装置) 31 前方掘削部 32 後方掘削部 50 トンネル 51 中央先進部分 52 側法拡幅部分 53 切刃面(中央先進部分) 54 切刃面(側法拡幅部分)
DESCRIPTION OF SYMBOLS 1 Jumbo for tunnel excavation 2 Rail 3 Jumbo stand 5 Fore pile setting device 6, 6 'Fore pile 8 Side pile 10 Drifter boom for side pile 12 Spray guide cell (slide track for spray) 13, 14 Fore pile guide Cell (slide track for forpile) 15 Sprayer 17 Drifter for forpile 19, 19 'Drifter for drilling (drilling device) 31 Forward excavation part 32 Rear excavation part 50 Tunnel 51 Central advanced part 52 Side widening part 53 Cutting edge surface (central advanced part) 54 Cutting edge surface (side widening part)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 松原 健太 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社内 (56)参考文献 特開 平6−257376(JP,A) 特開 平5−33589(JP,A) 特開 平6−280476(JP,A) (58)調査した分野(Int.Cl.6,DB名) E21D 9/00 E21D 9/04 ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kenta Matsubara 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo Head Office (56) References JP-A-6-257376 (JP, A) JP-A-Hei 5-33589 (JP, A) JP-A-6-280476 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) E21D 9/00 E21D 9/04

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネル中央の先進部切羽面に対向配置
される前方掘削部、及びこの前方掘削部の後方において
前記先進部側方の拡幅部切羽面に対向配置される後方掘
削部を有する、トンネル掘進方向に移動可能なジャンボ
架台と、前記前方掘削部及び後方掘削部の各先端部分に
設けられて、対向する各切羽面の削孔を行なう複数の削
孔装置とからなることを特徴とする中央先進後方拡幅型
トンネル掘削用ジャンボ。
1. A front excavation portion disposed opposite to an advanced portion face in the center of a tunnel, and a rear excavation portion disposed behind the front excavation portion and opposed to the widened portion face on the side of the advanced portion. It is characterized by comprising a jumbo gantry movable in the tunnel excavation direction, and a plurality of drilling devices provided at each of the front end portions of the front excavation portion and the rear excavation portion, and performing drilling of the facing face surfaces. Jumbo for excavating the central advanced rear widening tunnel.
【請求項2】 前記ジャンボ架台の上方周囲において、
トンネル横断方向に、トンネル天端面の形状に沿って延
長するフォアパイル用スライド軌道と、該スライド軌道
により支持されて前記切羽面の天端部分に対向配置され
るとともに、当該フォアパイル用スライド軌道に沿って
移動することにより、トンネル天端面に沿ってこれの前
方の地山に順次フォアパイルを打ち込むフォアパイル打
設装置をさらに備えたことを特徴とする請求項1に記載
の中央先進後方拡幅型トンネル掘削用ジャンボ。
2. In the upper periphery of the jumbo gantry,
A fore-pile slide track extending in the tunnel transverse direction along the shape of the tunnel top end face; and a fore-pile slide track supported by the slide track and disposed opposite to the top end portion of the face face. The center advanced rear widening type according to claim 1, further comprising a fore pile driving device that sequentially moves the fore pile into the ground in front of the tunnel along the top end surface by moving along the top of the tunnel. Jumbo for tunnel excavation.
【請求項3】 前記ジャンボ架台の上方周囲において、
トンネル横断方向に、トンネル天端面の形状に沿って延
長する吹付用スライド軌道と、該吹付用スライド軌道に
より支持されてトンネル天端面に対向配置されるととも
に、当該吹付用スライド軌道に沿って移動することによ
り、トンネル天端面に沿って吹付けコンクリートを吹付
ける吹付け機をさらに備えたことを特徴とする請求項1
又は請求項2に記載の中央先進後方拡幅型トンネル掘削
用ジャンボ。
3. In the upper periphery of the jumbo gantry,
A spraying slide track extending in the transverse direction of the tunnel along the shape of the tunnel top end face, and is arranged to face the tunnel top end face supported by the spraying slide track and move along the spraying slide track. 2. The spraying machine according to claim 1, further comprising a spraying machine for spraying the sprayed concrete along the top surface of the tunnel.
Or, the jumbo for excavating a center advanced rearward widening tunnel according to claim 2.
【請求項4】 前記ジャンボ架台の後方掘削部の側部に
は、側方の地山に向けて対向配置されたサイドパイル打
設装置をさらに備えたことを特徴とする請求項2又は請
求項3に記載の中央先進後方拡幅型トンネル掘削用ジャ
ンボ。
4. The device according to claim 2, further comprising a side pile driving device disposed on a side of the rear excavation portion of the jumbo gantry so as to face the ground on the side. 3. The jumbo for drilling a central advanced rear widening tunnel according to item 3.
JP24623994A 1994-10-12 1994-10-12 Jumbo for central advanced rear widening tunnel excavation Expired - Fee Related JP2973833B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24623994A JP2973833B2 (en) 1994-10-12 1994-10-12 Jumbo for central advanced rear widening tunnel excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24623994A JP2973833B2 (en) 1994-10-12 1994-10-12 Jumbo for central advanced rear widening tunnel excavation

Publications (2)

Publication Number Publication Date
JPH08109788A JPH08109788A (en) 1996-04-30
JP2973833B2 true JP2973833B2 (en) 1999-11-08

Family

ID=17145583

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24623994A Expired - Fee Related JP2973833B2 (en) 1994-10-12 1994-10-12 Jumbo for central advanced rear widening tunnel excavation

Country Status (1)

Country Link
JP (1) JP2973833B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4224604B2 (en) * 2003-03-25 2009-02-18 独立行政法人土木研究所 Tunnel widening device
JP4035079B2 (en) * 2003-04-23 2008-01-16 三井住友建設株式会社 Tunnel widening method
DE102006044733C5 (en) * 2006-09-20 2013-03-28 Gta Maschinensysteme Gmbh Mobile housing with jacking units
JP5290667B2 (en) * 2008-08-29 2013-09-18 株式会社熊谷組 Multiple receiving material installation equipment
JP5290668B2 (en) * 2008-08-29 2013-09-18 株式会社熊谷組 Prior material installation method

Also Published As

Publication number Publication date
JPH08109788A (en) 1996-04-30

Similar Documents

Publication Publication Date Title
JP2973833B2 (en) Jumbo for central advanced rear widening tunnel excavation
US4711502A (en) Apparatus for cutting excavations having a substantially planar face
JPS5927833B2 (en) Underground structure construction method
DE19522228C2 (en) Jacking and loading machine
JP2594006B2 (en) Tunnel lining method and device
JPH07217392A (en) Working apparatus for tunnel construction
JP3863320B2 (en) Tunnel receiving method
JPH08128291A (en) Enlarging excavating device for recessed part for housing anchor body head part
JPH0868290A (en) Jumbo for tunnel excavation
JPS58222297A (en) Road reinforcing method and apparatus
JPH0642285A (en) Tunnelling machine for reaming
CA2139611C (en) Roadbed profiler
JP3450639B2 (en) Rock bolt driving method and rock bolt driving machine
JP2791261B2 (en) Multi-function excavator
JPH08184283A (en) Advanced excavation work of guide tunnel in side wall
JP2898551B2 (en) Working equipment for tunnel construction
JP2935403B2 (en) Drilling angle setting method for drilling machine
JP2001280078A (en) Excavating method for excavator
JPH05106388A (en) Drilling jumbo and pipe roof construction method therewith
JPH0694789B2 (en) Tunnel excavation method and shield machine
JP2709913B2 (en) Drilling machine
JP3399617B2 (en) Self-propelled drilling machine
JPH1088993A (en) Lock bolt driver
JPH07310492A (en) Bedrock tunnel excavating construction method
JPH0718980A (en) Tunnel boring machine

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080903

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090903

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100903

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100903

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110903

Year of fee payment: 12

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20110903

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110903

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120903

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20120903

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20130903

LAPS Cancellation because of no payment of annual fees