JP2973357B2 - Wooden construction method - Google Patents

Wooden construction method

Info

Publication number
JP2973357B2
JP2973357B2 JP9094401A JP9440197A JP2973357B2 JP 2973357 B2 JP2973357 B2 JP 2973357B2 JP 9094401 A JP9094401 A JP 9094401A JP 9440197 A JP9440197 A JP 9440197A JP 2973357 B2 JP2973357 B2 JP 2973357B2
Authority
JP
Japan
Prior art keywords
floor
base
base plate
panel
dimension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP9094401A
Other languages
Japanese (ja)
Other versions
JPH10280533A (en
Inventor
進 森山
功 吉永
由棋 國廣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NODA GOHAN KK
Original Assignee
NODA GOHAN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NODA GOHAN KK filed Critical NODA GOHAN KK
Priority to JP9094401A priority Critical patent/JP2973357B2/en
Publication of JPH10280533A publication Critical patent/JPH10280533A/en
Application granted granted Critical
Publication of JP2973357B2 publication Critical patent/JP2973357B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は木造建築工法に関す
る。
The present invention relates to a wooden construction method.

【0002】[0002]

【従来の技術】特公昭55−6133号公報には、基礎
上に土台、根太を架設して一階床張りを全面的に行い、
次いで柱、梁、桁を建て込んで一階軸組を組み立て、前
記一階の梁、桁に対して腰掛金物を介してその梁、桁と
同一平面をなすように根太を架設して二階床張りを全面
的に行い、次いで柱、梁、桁を建て込んで二階軸組を組
み立て、その上部に屋根材を架設することによる木造建
築工法が提案されている。
2. Description of the Related Art In Japanese Patent Publication No. 55-6133, a foundation and a joist are erected on a foundation, and the first floor is entirely covered with a floor.
Next, pillars, beams, and girders are erected to assemble the first-floor frame, and joists are erected on the first-floor beams and girders through a metal fitting so as to be flush with the beams and girders. A timber construction method has been proposed in which the entire floor is stretched, and then columns, beams and girders are erected to assemble a two-story frame, and a roofing material is erected above the frame.

【0003】この工法は、建築工事のコストダウンおよ
び工期の短縮を図ることができると共に、住宅の質を向
上させることができるものとされている。
This construction method can reduce the cost of construction work and shorten the construction period, and can improve the quality of houses.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、この工
法は、在来の木造軸組建築工法と比較すると、通し柱を
用いない点で建て込みが容易となり、また柱材料として
長尺材を用いる必要がない等の利点を有するものの、腰
掛金物を使い、一階の小梁または大引きを取り付けて根
太を架設するため、該腰掛金物の取付に手間と時間がか
かり、コストを上昇させる欠点を伴う。
However, when compared with the conventional wooden frame construction method, this method is easier to install because it does not use through columns, and it is necessary to use a long material as a column material. Although there are advantages such as not being provided, the use of the stools and the installation of the joists by attaching the small beams or the large pulleys on the first floor require labor and time for mounting the stools, which has the disadvantage of increasing the cost.

【0005】また、床面上にランナーおよび頭継ぎによ
って支持された間柱を建て込み、下地材を取り付けるも
のであるため、材積が増え、これに伴うコスト増も避け
ることができない。
[0005] Further, since a stud supported by a runner and a head joint is erected on the floor surface and a base material is attached, the material volume is increased, and an increase in cost due to this is inevitable.

【0006】[0006]

【課題を解決するための手段】そこで本発明は上記従来
技術の問題点に鑑み、工期短縮とコストダウンを両立さ
せることのできる新規な木造建築工法を提供することを
目的とする。
SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to provide a novel wooden construction method capable of realizing both a shortened construction period and a reduced cost in view of the above-mentioned problems of the prior art.

【0007】すなわち本発明による木造建築工法は、
(a)基礎上に土台および土台間に大引きを架設し、
(b)土台および大引き上に、柱の内寸法と略同一また
はそれよりも短い寸法をモジュールとする床下地板の裏
面に柱芯寸法と略同一寸法をモジュールとする根太を該
根太の両端が床下地板より張り出すように設けられた一
階床パネルを敷設し、(c)土台上に、あらかじめ任意
区画に分割された一階柱および一階横架材を組み付けて
なる一階部材を順次建て込むことにより一階軸組みを組
み立て、d)次に、柱の内寸法と略同一またはそれより
も短い寸法をモジュールとする床下地板の裏面に柱芯寸
法と略同一寸法をモジュールとする根太を該根太の両端
が床下地板より張り出すように設けられた二階床パネル
を一階横架材上に敷設し、(e)一階横架材上に、あら
かじめ任意区画に分割された二階柱および二階横架材を
組み付けてなる二階部材を順次建て込むことにより二階
軸組みを組み立て、(f)二階横架材上に、あらかじめ
むな木、もやおよび束を組み付けてなる小屋組み部材を
建て込むことにより小屋組みを組み立て、(g)小屋組
み上に、屋根部を任意区画に分割したものであって裏面
にたる木を桟材として取り付けられた野地パネルからな
る屋根部材を敷設する、ことを特徴とする木造建築工法
である。
That is, the wooden building method according to the present invention
(A) erecting a base and a base between the base on the foundation;
(B) On the base and the pulling, a joist having a module having a dimension substantially the same as the pillar core dimension is formed on the back surface of the floor base plate having a module having a dimension substantially the same as or shorter than the inner dimension of the pillar. A first-floor panel provided so as to protrude from the floor base plate is laid, and (c) a first-floor member formed by assembling a first-floor column and a first-floor horizontal member previously divided into arbitrary sections on a base is sequentially provided. The first floor frame is assembled by being erected, and d) Next, a joist having a module having the same dimension as the pillar core dimension on the back surface of the floor base plate having a module having a dimension substantially the same as or shorter than the inner dimension of the pillar. (E) laying on a first floor horizontal member a second floor panel provided so that both ends of the joist protrude from the floor base plate, and (e) on the first floor horizontal member, a second floor pillar previously divided into arbitrary sections And the second floor horizontal material (G) assembling a hut assembly by assembling a two-story frame member by sequentially laying members, and (f) assembling a hut assembly member in which a barnwood, a haze and a bundle are previously assembled on a second-story horizontal member; A wooden building construction method, comprising laying a roof member, which is obtained by dividing a roof portion into arbitrary sections and comprising a field panel attached to a back surface of a tree as a bar, on a hut assembly.

【0008】好ましくは、一階および二階の床パネルに
おける該パネル間の張り出した根太上に床下地板隙間パ
ネルを敷設する。
[0008] Preferably, a floor base plate clearance panel is laid on the overhanging joists between the floor panels on the first and second floors.

【0009】本発明の実施において、床パネルにおける
床下地板の裏面の根太間には断熱材を取り付けることが
できる。また、柱の芯寸法を1mとしたメーターモジュ
ールを採用することができる。
In the practice of the present invention, a heat insulating material can be attached between the joists on the back surface of the floor substrate in the floor panel. Further, a meter module in which the core dimension of the pillar is 1 m can be adopted.

【0010】[0010]

【発明の実施の形態】布基礎、ベタ基礎等の基礎1上に
アンカーボルトの固定により土台2を架設する(図
1)。土台2の補強のために火打ち材を架設し、または
火打ち金物を釘、ボルトあるいはかすがい等によって固
定することができる。土台2にはあらかじめ防腐処理を
施しておくことが好ましい。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A base 2 is erected on a foundation 1 such as a cloth foundation or solid foundation by fixing anchor bolts (FIG. 1). A fired material can be erected to reinforce the base 2, or a fired metal can be fixed with nails, bolts, scissors, or the like. It is preferable that the base 2 has been subjected to preservative treatment in advance.

【0011】土台2の間に大引き3および床束4の施工
を行う(同じく図1)。大引き3は土台2にのせ掛けた
り、大引き受け金物や添え束を用いて、釘、ビス、かす
がい、ボルト等を用いて固定される。床束4は束石、玉
石、くつ石等の上に立てられ、釘打ちにより大引きに固
定され、針金による締め付け、根がらみぬき、中ぬき、
通しぬき等により立設される。
[0011] The large-scale pulling 3 and the floor bundle 4 are installed between the bases 2 (also FIG. 1). The large pull 3 is mounted on the base 2 or fixed using nails, screws, braces, bolts, or the like using a large metal fitting or a bundle. The floor bundle 4 is erected on a bunch of stone, cobble stone, stilts, etc., fixed in a large scale by nailing, tightened with wire,
It is erected by passing through.

【0012】基礎1がベタ基礎の場合は、大引き3と固
定された床束4の近傍の基礎底部分にホールインアンカ
ーを打ち込み、大引き3に設けられる貫通孔より該ホー
ルインアンカーにボルトをねじ込み、ナットにて締め付
けることにより床束4を立設してもよい。
When the foundation 1 is a solid foundation, a hole-in anchor is driven into the bottom of the foundation in the vicinity of the floor bundle 4 fixed to the large pull-out 3 and bolts are inserted into the hole-in anchors through through holes provided in the large pull-out 3. The floor bundle 4 may be erected by screwing in and tightening with a nut.

【0013】このようにして取り付け固定された土台
2、大引き3上に一階床パネル5を敷設し、釘の打ち込
みやビスのねじ込み等によって固定する(図2)。
The floor panel 5 on the first floor is laid on the base 2 and the pulley 3 fixed and fixed as described above, and fixed by driving nails or screws (FIG. 2).

【0014】一階床パネル5は、後述する柱10の内寸
法をモジュールとする床下地板6の裏面に、柱の芯寸法
をモジュールとする根太7を、該根太7の両端が床下地
板6より張り出すように釘やビス等により固定されて構
成され、該根太間には断熱材8が取り付けられてなる
(図3)。
The first-floor floor panel 5 has a joist 7 having a core dimension as a module, and a joist 7 having a core dimension as a module. It is configured to be fixed with nails or screws so as to protrude, and a heat insulating material 8 is attached between the joists (FIG. 3).

【0015】一階床パネル5の床下地板6には合板、木
削片板(パーティクルボード、フレークボード、ウエハ
ーボード、オリエンテッドストランドボード、スティッ
クボード等)、繊維板等を用いることができる。
Plywood, wood chipboard (particle board, flake board, wafer board, oriented strand board, stick board, etc.), fiber board and the like can be used as the floor base plate 6 of the first floor panel 5.

【0016】このように一階床パネル5としてあらかじ
め根太7および断熱材8が一体に設けられたものが用い
られることにより、根太および断熱材の施工が不要とな
り、工期の短縮が図られる。
As described above, the use of the first floor panel 5 in which the joist 7 and the heat insulating material 8 are integrally provided in advance makes it unnecessary to construct the joist and the heat insulating material, thereby shortening the construction period.

【0017】また、一階床パネル5においては根太7が
床下地板6の両側縁端より張り出して設けられているた
め、一階床パネル5を土台2、大引き3上の所定位置に
敷いた後、根太張り出し部7’において釘やビス等を打
ち込みあるいはねじ込みすることにより一階床パネル5
を簡単に固定することができる。
Further, in the first floor panel 5, since the joists 7 are provided so as to protrude from both side edges of the floor base plate 6, the first floor panel 5 is laid at predetermined positions on the base 2 and the large scale 3. Then, nails or screws are driven or screwed into the joist overhanging portion 7 ′ to form the first floor panel 5.
Can be easily fixed.

【0018】上記のように、一階床パネル5における床
下地板6は柱の内寸法をモジュールとし、また根太7は
柱の芯寸法をモジュールとして、各々設けられ、且つ根
太7がその両端が張り出すように床下地板6の裏面に設
けられるため、一階床パネル5の敷設においてその位置
決めがきわめて容易である。すなわち、根太7の先端が
土台2や大引き3の中心に位置するように位置決めし、
また床下地板6が柱の内側に位置するようにして一階床
パネル5を位置決めすれば良く、一階床パネル5の敷設
およびその後の一階部材9の建て込みを容易に且つ短期
間で行うことができる。
As described above, the floor base plate 6 of the first floor panel 5 is provided with the inner dimensions of the columns as modules, and the joists 7 are provided with the core dimensions of the columns as modules. Since it is provided on the back surface of the floor base plate 6 so as to be protruded, positioning of the floor panel 5 on the first floor is extremely easy. That is, the joist 7 is positioned so that the tip thereof is located at the center of the base 2 or the large-scale pull 3,
Further, the first floor panel 5 may be positioned so that the floor base plate 6 is positioned inside the pillar, and the laying of the first floor panel 5 and the subsequent installation of the first floor member 9 are performed easily and in a short period of time. be able to.

【0019】一階床パネル5における床下地板6は、柱
の内寸法より短い寸法をモジュールとしてもよく、この
場合にも上記と実質的に同様の効果が得られる。
The floor base plate 6 in the first floor panel 5 may be a module having a dimension shorter than the inner dimension of the pillar. In this case, substantially the same effect as described above can be obtained.

【0020】また、木造建築工法において柱の芯寸法を
1mとするメーターモジュールを採用することにより、
柱の内寸法と略同一またはそれよりも短い寸法のモジュ
ールとされる床下地板6として、一般に尺サイズをモジ
ュールとして提供される前述の合板、木削片板、繊維板
等を無駄なく使用することができる。
In addition, by adopting a meter module having a core dimension of 1 m in the wooden construction method,
As the floor base plate 6 which is a module having a dimension substantially the same as or shorter than the inner dimensions of the pillar, the above-mentioned plywood, wood chipboard, fiberboard, etc., which are generally provided as a module having a size of a scale, are used without waste. Can be.

【0021】なお、図3に示される一階床パネル5にお
いて断熱材8が根太7間に床下地板6の裏面側に設けら
れているが、断熱材を取り付けることは必須ではなく、
必要に応じて行われるものである。また、断熱材8を取
り付ける場合においても、図3に示されるように根太7
と同様に床下地板6の両側から張り出すようにしてもよ
いが、断熱材8については床下地板6から張り出さない
ように取り付けてもよい。断熱材8としては無機繊維
板、無機繊維マット、合成樹脂発泡板等を用いることが
できる。
In the first floor panel 5 shown in FIG. 3, the heat insulating material 8 is provided between the joists 7 on the back side of the floor base plate 6, but it is not essential to attach the heat insulating material.
This is performed as needed. Also, when the heat insulating material 8 is attached, as shown in FIG.
In the same manner as described above, the heat insulating material 8 may be attached so as not to protrude from the floor base plate 6. As the heat insulating material 8, an inorganic fiber board, an inorganic fiber mat, a synthetic resin foam board, or the like can be used.

【0022】次いで、敷設された一階床パネル5の上を
作業場所として、土台2上に、あらかじめ任意区画に分
割された一階柱10および一階横架材11を組み付けて
なる一階部材9を順次建て込む(図4)。一階柱10と
土台2には短ほぞ差し等の仕口加工が施され、また一階
横架材11は梁、桁、胴差し等であり、短ほぞ差し等の
仕口加工が施されている。
Next, a first-floor member formed by assembling a first-floor pillar 10 and a first-floor horizontal member 11 previously divided into arbitrary sections on the base 2 using the laid first-floor panel 5 as a work place. 9 are sequentially built (FIG. 4). The first floor pillar 10 and the base 2 are subjected to a joint processing such as a short tenon, and the first floor horizontal member 11 is a beam, a girder, a trunk, and the like, and is subjected to a short tenon and the like. ing.

【0023】これら一階柱10と一階横架材11は、仕
口加工同士の嵌合固着、あるいはL形金物、T形金物、
山形金物等の金物を釘、ビス、ナット等を用いて仮固着
されて任意区画に分割された一階部材9として組み付け
られ、順次レッカーにより吊り上げて所定位置に搬入さ
れ、土台2と一階柱10の仕口加工同士で嵌合固着さ
れ、さらに羽子板ボルト、箱金物、短冊金物、L形金
物、T形金物、山形金物等の金物により釘、ビスナット
等を用いて固着される。また、一階横架材11の補強の
ために火打ち材または火打ち金物が釘、ビス、かすがい
あるいはボルト等によって固定される。
The first-floor pillar 10 and the first-floor horizontal member 11 are fitted and fixed to each other in connection processing, or are L-shaped hardware, T-shaped hardware,
Hardware such as mountain-shaped hardware is temporarily fixed using nails, screws, nuts and the like and assembled as a first-floor member 9 divided into arbitrary sections, sequentially lifted by a tow truck, brought into a predetermined position, and mounted on the base 2 and the first-floor pillar. The ten joints are fitted and fixed to each other, and further fixed by using a nail, a screw nut, or the like with a metal such as a blade bolt, a box metal, a strip metal, an L-shaped metal, a T-shaped metal, or a chevron metal. In addition, a fired material or a fired metal is fixed by nails, screws, braces, bolts, or the like to reinforce the first floor horizontal member 11.

【0024】以上のようにして一階軸組みが組み立てら
れる(図5)。
The first-order frame assembly is assembled as described above (FIG. 5).

【0025】次に、一階横架材11上に二階床パネル1
2を敷設し、釘やビス等で固定する(図6および図
7)。二階床パネル12の構成は前述の一階床パネルの
構成(図2参照)と実質的に同様であり、建て込まれる
柱の内寸法をモジュールとする床下地板(6)の裏面に
該柱の芯寸法をモジュールとする根太(7)をその両端
が床下地板の側端部より張り出すように釘やビス等によ
り固定されて構成されるものである。
Next, the second floor panel 1 is placed on the first floor horizontal member 11.
2 is laid and fixed with nails or screws (FIGS. 6 and 7). The configuration of the second floor panel 12 is substantially the same as the configuration of the first floor panel described above (see FIG. 2). A joist (7) having a core dimension as a module is fixed with nails or screws so that both ends of the joist (7) project from the side end of the floor substrate.

【0026】一階床パネル5と同様、二階床パネル12
の床下地板には合板、木削片板、繊維板等が用いられ、
必要に応じて根太7間に設けられる断熱材としては無機
繊維板、無機繊維マット、合成樹脂発泡板等が用いられ
る。このように二階床パネル12にもあらかじめ根太お
よび必要な場合にはさらに断熱材が一体に設けられてい
るため、根太および断熱材の施工が不要となり、工期の
短縮が図られる。
Like the first floor panel 5, the second floor panel 12
Plywood, wood chipboard, fiberboard, etc. are used as floor baseboards,
As the heat insulating material provided between the joists 7 as required, an inorganic fiber plate, an inorganic fiber mat, a synthetic resin foam plate, or the like is used. As described above, since the joist and the heat insulating material are further provided integrally with the second floor panel 12 in advance, if necessary, the installation of the joist and the heat insulating material becomes unnecessary, and the construction period is shortened.

【0027】そして、一階床パネル5と同様、二階床パ
ネル12においても根太が床下地板の両側縁端より張り
出して設けられているため、二階床パネル12を一階横
架材11上の所定位置に敷いた後、張り出した根太部分
(7’)において釘やビス等を打ち込みあるいはねじ込
みすることにより二階床パネル12を簡単に固定するこ
とができる。
As in the case of the first floor panel 5, the joists of the second floor panel 12 are also provided so as to protrude from both side edges of the floor base plate. After being laid at the position, the second floor panel 12 can be easily fixed by driving or screwing a nail, a screw, or the like into the overhanging joist (7 ').

【0028】また、二階床パネル12における床下地板
は柱の内寸法をモジュールとし、また根太は柱の芯寸法
をモジュールとして、各々設けられ、且つ根太がその両
端が張り出すように床下地板の裏面に設けられるため、
二階床パネル12の敷設においてその位置決めがきわめ
て容易である。すなわち、根太の先端が一階横架材11
の中心に位置するように位置決めし、また床下地板が柱
の内側に位置するようにして二階床パネル12を位置決
めすれば良く、二階床パネル12の敷設およびその後の
二階部材21の建て込みを容易に且つ短期間で行うこと
ができる。
The floor base plate of the second floor panel 12 is provided with the inner dimensions of the columns as modules, and the joists are provided with the core dimensions of the columns as modules, and the back of the floor base plate is protruded at both ends. Because it is provided in
In laying the second floor panel 12, its positioning is extremely easy. That is, the tip of the joist is the first floor horizontal member 11.
The second floor panel 12 may be positioned so as to be positioned at the center of the floor, and the floor base plate is positioned inside the pillar, so that the laying of the second floor panel 12 and the subsequent installation of the second floor member 21 are easy. And in a short period of time.

【0029】また、二階床パネル12における床下地板
は、柱の内寸法より短い寸法をモジュールとしてもよ
く、この場合にも上記と実質的に同様の効果が得られ
る。特に、木造建築工法において柱の芯寸法を1mとす
るメーターモジュールを採用することにより、柱の内寸
法と略同一またはそれよりも短い寸法のモジュールとさ
れる床下地板として、一般に尺サイズをモジュールとし
て提供される前述の合板、木削片板、繊維板等を無駄な
く使用することができるので有利である。
The size of the floor base plate in the second floor panel 12 may be shorter than the inner dimension of the pillar, and in this case, substantially the same effect as described above can be obtained. In particular, by adopting a meter module with a core dimension of 1 m in the wooden construction method, a floor base plate that is a module having a dimension substantially the same as or shorter than the inner dimension of the pillar, and generally a module of a length size as a module Advantageously, the provided plywood, wood chipboard, fiberboard and the like can be used without waste.

【0030】次いで、敷設された二階床パネル12の上
を作業場所として、一階横架材11上に、あらかじめ任
意区画に分割された二階柱13および二階横架材14を
組み付けてなる二階部材21を順次建て込む(図4)。
二階柱13と一階横架材11には短ほぞ差し等の仕口加
工が施され、また二階横架材14は梁、桁、胴差し等で
あり、短ほぞ差し等の仕口加工が施されている。
Next, using the laid second floor panel 12 as a work place, a second floor member formed by assembling a second floor column 13 and a second floor horizontal member 14 previously divided into arbitrary sections on the first floor horizontal member 11. 21 are sequentially built (FIG. 4).
The second floor pillar 13 and the first floor horizontal member 11 are subjected to a joint processing such as a short tenon, and the second floor horizontal member 14 is a beam, a girder, a trunk, and the like. It has been subjected.

【0031】これら二階柱13と二階横架材14は、仕
口加工同士の嵌合固着、あるいはL形金物、T形金物、
山形金物等の金物を釘、ビス、ナット等を用いて仮固着
されて任意区画に分割された二階部材21して組み付け
られ、順次レッカーにより吊り上げて所定位置に搬入さ
れ、一階横架材11と二階柱13の仕口加工同士で嵌合
固着され、さらに羽子板ボルト、箱金物、短冊金物、L
形金物、T形金物、山形金物等の金物により釘、ビスナ
ット等を用いて固着される。また、二階横架材14の補
強のために火打ち材または火打ち金物が釘、ビス、かす
がいあるいはボルト等によって固定される。
The second-floor pillar 13 and the second-floor horizontal member 14 are fitted and fixed to each other in connection processing, or are L-shaped hardware, T-shaped hardware,
Hardware such as a chevron hardware is temporarily fixed using nails, screws, nuts and the like, assembled into a second-floor member 21 divided into arbitrary sections, sequentially lifted by a tow truck, brought into a predetermined position, and then moved to a first-floor horizontal member 11. And the connection process of the second floor column 13 is fitted and fixed, and further, a blade bolt, a box hardware, a strip hardware, L
It is fixed by using nails, screw nuts, or the like with metal fittings such as shaped metal pieces, T-shaped metal pieces, and angle shaped metal pieces. In order to reinforce the horizontal members 14 on the second floor, a fired material or a fired metal is fixed with nails, screws, scissors, bolts or the like.

【0032】以上のようにして二階軸組みが組み立てら
れる(図9)。
As described above, the second-order shaft assembly is assembled (FIG. 9).

【0033】次に、二階横架材14上に、あらかじめむ
な木、もやおよび束を組み付けてなる小屋組み部材15
を建て込むことにより小屋組みを組み立てる(図1
0)。むな木、もやおよび束には短ほぞ差し等の仕口加
工が施され、該仕口加工同士で嵌合固着されると共に、
L形金物、T形金物、山形金物等の金物を用いて釘、ビ
ス等により仮固着されて小屋組み部材15とされ、順次
レッカーにより吊り上げて所定位置に搬入され、二階横
架材14と束の仕口加工により嵌合固着されると共に、
箱金物、短冊金物、L形金物、T形金物、山形金物等の
金物を用いて釘、ビス等により固着される。このとき、
束に対して二階横架材14と連結する方杖を用いて転び
を防止する。
Next, a hut assembly member 15 in which a barnwood, a haze and a bundle are assembled on the second-floor horizontal member 14 in advance.
To assemble the hut by erection (Fig. 1
0). The wood, haze and bundle are subjected to a joint processing such as a short tenon, and the joint processing is fitted and fixed together,
Using a metal member such as an L-shaped metal member, a T-shaped metal member, or a mountain-shaped metal member, the member is temporarily fixed with nails, screws, or the like to form a shed assembly member 15, which is sequentially lifted by a tow truck and brought into a predetermined position. While being fitted and fixed by the joint processing,
It is fixed with a nail, a screw, or the like using a metal piece such as a box metal piece, a strip metal piece, an L-shaped metal piece, a T-shaped metal piece, and a mountain-shaped metal piece. At this time,
The bundle is prevented from falling by using a brace connected to the second-story horizontal member 14.

【0034】以上にようにして組み立てた小屋組み15
上に、屋根部を任意区画に分割したものであって裏面に
たる木(図示せず)を桟材として取り付けられた野地パ
ネルからなる屋根部材16を敷設する(同じく図1
0)。屋根部材16は、たる木を桟材として分割された
屋根形状に芯組みし、その片面に野地板を釘、ビス等に
よって固定することにより得られ、軒先となる部分には
鼻隠しが取り付けられる。このような屋根部材は順次レ
ッカーにより吊り上げて所定位置に搬入され、小屋組み
部材15のむな木、もやおよび二階横架材14と釘、ビ
ス等によって固定されて、屋根部が形成される。
The hut assembly 15 assembled as described above
On the top, a roof member 16 made of a field panel, which is obtained by dividing a roof portion into arbitrary sections and having a tree (not shown) on the back side attached as a crosspiece, is laid (see also FIG. 1).
0). The roof member 16 is obtained by assembling a roof into a divided roof shape using a bark as a crosspiece, and fixing a base plate on one surface thereof with nails, screws, or the like. Such a roof member is sequentially lifted by a tow truck and carried into a predetermined position, and is fixed to the hut assembly member 15 with the useless wood, mist and the second-floor horizontal member 14 with nails, screws, and the like to form a roof portion.

【0035】好ましくは、隣り合う一階および二階の床
パネル5,12間において根太7が露出している部分に
床下地板隙間パネル(図示せず)を敷設する。すなわ
ち、これら床パネル5,12にはその床下地板6の両側
縁端から張り出した根太7の張り出し部7’(図3)が
存在することから、隣り合う床パネル5,12間にはそ
れらの根太張り出し部7’が突き付けられて露出してい
る部分が生じているため、この根太露出部に床下地板隙
間パネルを敷設し、釘やビス等で根太7に固着すること
により、フラットで隙間のない一階および二階の床下地
面を構成するものである。
Preferably, a floor base plate gap panel (not shown) is laid between exposed floor panels 5 and 12 on the first and second floors where joist 7 is exposed. That is, since these floor panels 5 and 12 have overhang portions 7 ′ (FIG. 3) of joists 7 that protrude from both side edges of the floor base plate 6, these floor panels 5 and 12 are located between the adjacent floor panels 5 and 12. Since there is a portion where the joist overhanging portion 7 'is abutted and exposed, a floor baseboard gap panel is laid on the exposed joist and fixed to the joist 7 with a nail or a screw, etc. Not to constitute the ground floor of the first floor and the second floor.

【0036】床下地板隙間パネルの敷設は、一階柱10
の建て込み後に一階床パネル5について隙間パネルを敷
設し、二階柱13の建て込み後に二階床パネル12につ
いて隙間パネルを敷設してもよく、あるいは一階柱10
および二階柱13の建て込み後に一階床パネル5および
二階床パネル12について一挙に隙間パネルを敷設する
ようにしてもよい。
The floor baseboard gap panel is laid on the first floor pillar 10.
A gap panel may be laid on the first floor panel 5 after the first floor panel 5 has been built, and a gap panel may be laid on the second floor panel 12 after the second floor column 13 has been built.
After the second floor pillars 13 have been built, the first floor panel 5 and the second floor panel 12 may be laid with a gap panel all at once.

【0037】床下地板隙間パネルは床下地板6と同様の
合板、木削片板、繊維板等よりなり、その厚さおよび長
さは床下地板6と略同一であり、その幅は根太張り出し
部7’の幅(張り出し寸法)の約2倍である。
The floor panel gap panel is made of the same plywood, wood chipboard, fiberboard, etc. as the floor panel 6, its thickness and length are substantially the same as the floor panel 6, and its width is the joist overhang 7. 'Is about twice the width (overhang dimension).

【0038】なお、図示されないが、一階柱10間およ
び二階柱13間にはそれぞれ外壁下地パネルが建て込ま
れることは当然である。外壁下地パネルとして用いられ
るものの一例が図11に示されており、この外壁下地パ
ネル17は合板、木削片板、繊維板等の構造用板18の
裏面に任意数の補強桟(間柱)19および必要に応じて
断熱材20が設けられたものである。
Although not shown, it is natural that outer wall base panels are built between the first floor columns 10 and the second floor columns 13, respectively. FIG. 11 shows an example of a panel used as an outer wall base panel. The outer wall base panel 17 has an arbitrary number of reinforcing bars (studs) 19 on the back surface of a structural plate 18 such as plywood, wood chipboard, or fiberboard. In addition, a heat insulating material 20 is provided as needed.

【0039】外壁下地パネル17の建て込みは、一階柱
10の建て込み後に一階外壁下地パネルを建て込み、二
階柱13の建て込み後に二階外壁下地パネルを建て込む
ようにしてもよく、あるいは一階および二階軸組みを組
み立てた後に一挙に一階および二階の外壁下地パネルを
建て込むようにしてもよい。外壁下地パネル17の幅寸
法は好ましくは柱10,13の芯寸法と略同一とされ、
これにより、外壁下地パネル17の両側縁を柱10,1
3の中心に位置合わせして容易に建て込みを行うことが
できる。
The outer wall base panel 17 may be built up after the first floor pillar 10 is built, and the second floor outer wall base panel is built after the second floor pillar 13 is built. After assembling the second-floor frame assembly, the first and second-floor outer wall base panels may be erected at once. The width dimension of the outer wall base panel 17 is preferably substantially the same as the core dimension of the columns 10 and 13,
As a result, both side edges of the outer wall foundation panel 17 are
3 and can easily be built.

【0040】[0040]

【発明の効果】本発明の木造建築工法によれば、通し柱
を使用せず、一階柱および二階柱の建て込みよりも先に
敷設される一階および二階の床上を作業場所として使え
るため作業性に優れ、工期が大幅に短縮され、雨仕舞い
が良好であり、したがって早期に内装工事に取りかかる
ことができる等の効果を有する。
According to the wooden construction method of the present invention, work can be performed without using through columns, and the first and second floors laid before the first and second floor columns can be used as work places. It has excellent effects, the construction period is significantly shortened, the rain is good, and the interior work can be started early.

【0041】また、材料のサイズが小さく、材積が少な
く、標準化された規格品が用いられるため、大幅なコス
トダウンがなされる。
Further, since the size of the material is small, the volume is small, and a standardized standard product is used, the cost is greatly reduced.

【0042】さらに、一階および二階の床パネルとし
て、柱の内寸法と同一またはそれよりも短い寸法をモジ
ュールとする床下地板の裏面に柱の芯寸法をモジュール
とする根太が張り出して設けられるため、床パネルの敷
設および柱の建て込み作業を容易に行うことができる。
Further, as floor panels on the first floor and the second floor, joists having the core dimension of the column as a module are protrudingly provided on the back surface of the floor base plate having the same or shorter dimension as the inner dimension of the column. In addition, the work of laying floor panels and installing columns can be easily performed.

【0043】また、柱の芯寸法にメータモジュールを採
用することにより、尺モジュール出提供される一般的な
板材を床下地板として無駄なく用いることができる。
Further, by adopting the meter module for the core dimension of the pillar, a general board material provided for the shaku module can be used without waste as a floor base board.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による木造建築工法における土台架設工
程を示す斜視図である。
FIG. 1 is a perspective view showing a base erection step in a wooden building method according to the present invention.

【図2】図1の工程に引き続いて行われる一階床パネル
敷設工程を示す斜視図である。
FIG. 2 is a perspective view showing a first-floor floor panel laying step performed subsequent to the step of FIG. 1;

【図3】図2の工程に用いられる一階床パネルを示す斜
視図である。
FIG. 3 is a perspective view showing a first floor panel used in the process of FIG. 2;

【図4】図2の工程に引き続いて行われる一階部材の建
て込み工程を示す斜視図である。
FIG. 4 is a perspective view showing a step of erection of the first floor member performed subsequent to the step of FIG. 2;

【図5】図4の工程完了により組み立てられた一階軸組
みを示す斜視図である。
FIG. 5 is a perspective view showing a first-order shaft assembly assembled by completing the process of FIG. 4;

【図6】組み立てられた一階軸組みの一階横架材上に二
階床パネルを敷設する工程を示す斜視図である。
FIG. 6 is a perspective view showing a process of laying a second floor panel on a first horizontal member assembled on a first floor frame assembly.

【図7】図6の二階床パネル敷設工程が完了した状態を
示す斜視図である。
FIG. 7 is a perspective view showing a state where a second floor panel laying step of FIG. 6 is completed.

【図8】図6および図7の工程に引き続いて行われる二
階部材の建て込み工程を示す斜視図である。
FIG. 8 is a perspective view showing a step of erection of the second-floor member performed subsequent to the steps of FIGS. 6 and 7.

【図9】図8の工程完了により組み立てられた二階軸組
みを示す斜視図である。
9 is a perspective view showing a second-order shaft assembly assembled by completing the process of FIG. 8;

【図10】組み立てられた二階軸組みの二階横架材上に
小屋組みを組み立て野地パネルを敷設する工程を示す斜
視図である。
FIG. 10 is a perspective view showing a process of assembling a hut assembly on a second-story horizontal member of an assembled two-story shaft assembly and laying a field panel.

【図11】用いられる外壁下地パネルの一例を示す斜視
図である。
FIG. 11 is a perspective view showing an example of an outer wall base panel used.

【符号の説明】[Explanation of symbols]

1 基礎 2 土台 5 一階床パネル 6 床下地板 7 根太 7’ 根太の張り出し部 8 断熱材 9 一階部材 10 一階柱 11 一階横架材 12 二階床パネル 13 二階柱 14 二階横架材 15 小屋組み部材 16 屋根部材 17 外壁下地パネル 21 二階部材 Reference Signs List 1 foundation 2 base 5 first floor panel 6 floor base plate 7 joist 7 'joist overhang 8 insulating material 9 first floor member 10 first floor pillar 11 first floor horizontal material 12 second floor panel 13 second floor pillar 14 second floor horizontal material 15 Shed assembly members 16 Roof members 17 Exterior wall base panels 21 Second floor members

フロントページの続き (56)参考文献 特開 平9−60107(JP,A) 特開 平5−79169(JP,A) 実開 平6−1513(JP,U) (58)調査した分野(Int.Cl.6,DB名) E04B 1/26 E04B 1/10 E04B 5/02 Continuation of front page (56) References JP-A-9-60107 (JP, A) JP-A-5-79169 (JP, A) JP-A-6-1513 (JP, U) (58) Fields investigated (Int) .Cl. 6 , DB name) E04B 1/26 E04B 1/10 E04B 5/02

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】(a)基礎上に土台および土台間に大引き
を架設し、(b)土台および大引き上に、柱の内寸法と
略同一またはそれよりも短い寸法をモジュールとする床
下地板の裏面に柱芯寸法と略同一寸法をモジュールとす
る根太を該根太の両端が床下地板より張り出すように設
けられた一階床パネルを敷設し、(c)土台上に、あら
かじめ任意区画に分割された一階柱および一階横架材を
組み付けてなる一階部材を順次建て込むことにより一階
軸組みを組み立て、d)次に、柱の内寸法と略同一また
はそれよりも短い寸法をモジュールとする床下地板の裏
面に柱芯寸法と略同一寸法をモジュールとする根太を該
根太の両端が床下地板より張り出すように設けられた二
階床パネルを一階横架材上に敷設し、(e)一階横架材
上に、あらかじめ任意区画に分割された二階柱および二
階横架材を組み付けてなる二階部材を順次建て込むこと
により二階軸組みを組み立て、(f)二階横架材上に、
あらかじめむな木、もやおよび束を組み付けてなる小屋
組み部材を建て込むことにより小屋組みを組み立て、
(g)小屋組み上に、屋根部を任意区画に分割したもの
であって裏面にたる木を桟材として取り付けられた野地
パネルからなる屋根部材を敷設する、ことを特徴とする
木造建築工法。
(1) Underlaying a base between a base and a base on a foundation, and (b) a module having a dimension substantially the same as or shorter than the inner dimension of a pillar on the base and the base. On the back surface of the base plate, a first-floor floor panel provided with a joist having a module having substantially the same dimension as the column core dimension so that both ends of the joist project from the floor base plate is laid, and (c) an arbitrary section is previously set on the base. The first floor frame is assembled by sequentially building the first floor members each having the first floor column and the first floor horizontal member divided into d. Then, d) Next, the inner dimensions of the columns are substantially the same as or shorter than the columns. On the back side of the floor base plate having dimensions as modules, a second floor panel provided on the first floor horizontal member is provided with a joist having a module having substantially the same dimensions as the pillar core so that both ends of the joists project from the floor base plate. (E) On the first floor horizontal material, Assembly upstairs axis set by sequentially Tatekomu upstairs member made by assembling upstairs column and the second floor horizontal member divided into meaning compartment, (f) on the second floor horizontal member,
Assemble the hut by assembling the hut-assembly members, which are made of prefabricated wood, haze and bundles in advance.
(G) A wooden construction method, comprising laying a roof member made of a field panel having a roof portion divided into arbitrary sections and having a back bar attached as a crosspiece on a hut assembly.
【請求項2】一階および二階の床パネルにおける該パネ
ル間の張り出した根太上に床下地板隙間パネルを敷設す
ることを特徴とする請求項1の木造建築工法。
2. The wooden construction method according to claim 1, wherein a floor base plate gap panel is laid on the overhanging joists between the floor panels on the first and second floors.
【請求項3】前記一階および二階床パネルにおける床下
地板の裏面の根太間に断熱材が取り付けられることを特
徴とする請求項1の木造建築工法。
3. The wooden construction method according to claim 1, wherein a heat insulating material is attached between the joists on the back surface of the floor base plate in the first and second floor panels.
【請求項4】柱の芯寸法を1mとするメーターモジュー
ルが採用されることを特徴とする請求項1の木造建築工
法。
4. The wooden building construction method according to claim 1, wherein a meter module having a pillar having a core dimension of 1 m is employed.
JP9094401A 1997-03-31 1997-03-31 Wooden construction method Expired - Fee Related JP2973357B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9094401A JP2973357B2 (en) 1997-03-31 1997-03-31 Wooden construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9094401A JP2973357B2 (en) 1997-03-31 1997-03-31 Wooden construction method

Publications (2)

Publication Number Publication Date
JPH10280533A JPH10280533A (en) 1998-10-20
JP2973357B2 true JP2973357B2 (en) 1999-11-08

Family

ID=14109241

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9094401A Expired - Fee Related JP2973357B2 (en) 1997-03-31 1997-03-31 Wooden construction method

Country Status (1)

Country Link
JP (1) JP2973357B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149885A (en) * 2015-04-16 2016-11-23 杨华 Simple building structure and the house containing its structure

Also Published As

Publication number Publication date
JPH10280533A (en) 1998-10-20

Similar Documents

Publication Publication Date Title
US7690167B2 (en) Structural support framing assembly
JP2973357B2 (en) Wooden construction method
US20080290233A1 (en) Clamping system
JP2973356B2 (en) Wooden construction method
JP3764020B2 (en) Steel frame structure
JP3854106B2 (en) How to build a wooden house
US4307548A (en) Method of constructing houses
JP2001173240A (en) Reinforced outer wall and method of reinforcing outer wall
JPH09228476A (en) Wooden building construction method
JP3749920B2 (en) How to build a wooden house
JPH10280609A (en) Building structure panel and wooden building method using such building structure panel
JPH08226168A (en) Wooden structure joining hard ware and its system construction method
JPH09228475A (en) Wooden building construction method
JP3517798B2 (en) Reinforcement metal fittings for wooden structures
JP4047784B2 (en) Building structure with wall panels
JPH0734538A (en) Wooden building
RU2045173C1 (en) Prefabricated wooden panel building
JP3078198B2 (en) Unit building with balconies
JPH10317540A (en) Combined building method, unit component, and binding material
JPS60156835A (en) Wood building structure
JPH09119170A (en) Building frame and construction method using building frame
JPH1046708A (en) Exterior wall structure
JPH06330574A (en) Method of construction of internal-external integral light-weight wall-surface body house using split column
JPH05141029A (en) Floor frame for building
JP2000199264A (en) Balcony structure, building unit and balcony installing method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees