Plate meandering correction device for tandem rolling millInfo
- Publication number
- JP2970488B2 JP2970488B2 JP7216395A JP21639595A JP2970488B2 JP 2970488 B2 JP2970488 B2 JP 2970488B2 JP 7216395 A JP7216395 A JP 7216395A JP 21639595 A JP21639595 A JP 21639595A JP 2970488 B2 JP2970488 B2 JP 2970488B2
- Authority
- JP
- Japan
- Prior art keywords
- meandering
- rolling mill
- tandem rolling
- amount
- rolled material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Control Of Metal Rolling (AREA)
Description
【0001】[0001]
【発明の属する技術分野】この発明は熱間・冷間のタン
デム圧延機の板蛇行修正装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a meandering correction device for a hot and cold tandem rolling mill.
【0002】[0002]
【従来の技術】従来のタンデム圧延機の板蛇行修正方法
において、特開昭57−4315号公報に開示されてい
るように、上下のロールを圧延板の平行面内で交叉させ
てロール軸心の交叉角度を一定に保持した状態で圧延を
行い、上下のロールの交叉角度は保持したまま圧延板の
平行面内で同方向に回転させて圧延板の蛇行をオンライ
ンで制御する蛇行修正方法が知られている。2. Description of the Related Art In a conventional meandering correction method for a tandem rolling mill, as disclosed in Japanese Patent Application Laid-Open No. 57-4315, upper and lower rolls are crossed within a parallel plane of a rolled plate, and a roll shaft center is formed. Rolling is performed with the crossing angle of the rolled plate kept constant and the meandering correction method of controlling the meandering of the rolled plate online by rotating in the same direction within the parallel plane of the rolled plate while maintaining the crossing angle of the upper and lower rolls Are known.
【0003】また、従来のタンデム圧延機の板蛇行修正
方法およびその装置において、複数のタンデム圧延機を
連ねた圧延装置の板蛇行修正方法は、特開昭63−20
114号公報に開示されているように、圧延材の蛇行量
と蛇行修正目標値との差から左右のロール端の圧化修正
量を算出し、左右のロールギャップを調整して圧延材の
蛇行修正を行う方法およびその装置が知られている。[0003] In a conventional method and a device for correcting a meandering of a tandem rolling mill, a method of correcting a meandering of a rolling device in which a plurality of tandem rolling mills are connected is disclosed in JP-A-63-20 / 1988.
As disclosed in Japanese Unexamined Patent Publication No. 114, the right and left roll end pressure correction amounts are calculated from the difference between the meandering amount of the rolled material and the meandering correction target value, and the left and right roll gaps are adjusted to adjust the meandering of the rolled material. Methods and devices for making corrections are known.
【0004】また、蛇行修正目標値は蛇行制御装置に備
えた目標値設定装置で設定し、制御対象のタンデム圧延
機に対して上流側タンデム圧延機の入口側かあるいは出
口側の圧延材幅方向位置を、制御対象のタンデム圧延機
の蛇行修正目標値としている。The meandering correction target value is set by a target value setting device provided in the meandering control device, and the rolling material width direction on the inlet side or the outlet side of the upstream tandem rolling mill with respect to the tandem rolling mill to be controlled. The position is set as a meandering correction target value of the tandem rolling mill to be controlled.
【0005】[0005]
【発明が解決しようとする課題】従来のタンデム圧延機
の板蛇行修正装置は、圧延材の幅方向の板厚分布や幅方
向あるいは長手方向の平坦度などを改善するため、上下
のロールを圧延板の平行面内で一定角度で交叉させた状
態で圧延を行っている。The conventional meandering correction device for a tandem rolling mill rolls the upper and lower rolls in order to improve the thickness distribution in the width direction of the rolled material and the flatness in the width or longitudinal direction. Rolling is performed in a state where the plates are crossed at a constant angle in a parallel plane of the plates.
【0006】このような幅方向の非対称圧延では、圧延
制御動作のなかで圧延材幅方向で互いに逆方向の圧延速
度成分が不均衡になりやすく、圧延材は幅方向に変位す
る挙動をみせる。[0006] In such asymmetric rolling in the width direction, rolling speed components in directions opposite to each other in the width direction of the rolled material tend to be unbalanced in the rolling control operation, and the rolled material exhibits a behavior of being displaced in the width direction.
【0007】この変位を回避するには圧延速度を低下せ
ざるを得ず、また圧延速度を低下させずに変位を修正し
ようとすると圧延材の幅方向の板厚分布や幅方向あるい
は長手方向の平坦度の圧延制御による改善効果を低下さ
せる課題がある。In order to avoid this displacement, the rolling speed must be decreased, and if the displacement is to be corrected without decreasing the rolling speed, the thickness distribution of the rolled material in the width direction or the width direction or the longitudinal direction is reduced. There is a problem that the improvement effect of the flatness rolling control is reduced.
【0008】図5に従来のタンデム圧延機の板蛇行修正
方法およびその装置による蛇行修正結果を示す。図5に
おいて、複数のタンデム圧延機を連ねた従来のタンデム
圧延機の板蛇行修正方法は、(i)番と(i+1)番タ
ンデム圧延機の蛇行量e1とe2に対して同時に蛇行修正
操作を行って(i)番タンデム圧延機の出口側では蛇行
が修正されて収束する。FIG. 5 shows a meandering correction method of a conventional tandem rolling mill and a meandering correction result by the apparatus. In FIG. 5, the conventional meandering correction method for a tandem rolling mill in which a plurality of tandem rolling mills are connected is a method of simultaneously correcting the meandering amounts e1 and e2 of the (i) and (i + 1) th tandem rolling mills. Then, on the exit side of the (i) tandem rolling mill, the meandering is corrected and converged.
【0009】(i+1)番タンデム圧延機では、(i)
番タンデム圧延機の蛇行修正操作の影響を受けて修正す
べき蛇行量e2を越え、タンデム圧延機両者の蛇行修正
動作終了時点では図示したような蛇行が(i+1)番タ
ンデム圧延機に現れ、以後(i)番タンデム圧延機の蛇
行修正点が(i+1)番タンデム圧延機に到達するまで
続く。In the (i + 1) th tandem rolling mill, (i)
When the meandering amount e2 to be corrected exceeds the meandering amount e2 to be corrected due to the influence of the meandering correction operation of the tandem rolling mill, the meandering as shown appears in the (i + 1) th tandem rolling mill at the end of the meandering correction operation of both tandem rolling mills. It continues until the meandering correction point of the (i) tandem rolling mill reaches the (i + 1) tandem rolling mill.
【0010】(i)番タンデム圧延機の蛇行修正操作の
影響は、両タンデム圧延機の蛇行修正動作終了後、(i
+1)番タンデム圧延機出口側に伝播して終了するま
で、(i+1)番タンデム圧延機出口側の蛇行を大きく
してしまう課題がある。[0010] The effect of the meandering correction operation of the tandem rolling mill (i) is as follows.
There is a problem that the meandering on the outlet side of the (i + 1) -th tandem rolling mill is increased until it propagates to the outlet side of the + 1-th tandem rolling mill and ends.
【0011】さらに、複数のタンデム圧延機を連ねた圧
延ラインに瞬間的に大きな蛇行が発生した場合にもこの
現象が現れ、大きな危険が伴う課題がある。Further, even when a large meandering occurs instantaneously in a rolling line connecting a plurality of tandem rolling mills, this phenomenon appears, and there is a problem with great danger.
【0012】この発明はこのような課題を解決するため
になされたもので、その目的は圧延材の蛇行を速やかに
収束させて大きな蛇行を引き起こさず、安定した圧延制
御ができるタンデム圧延機の板蛇行修正方法およびその
装置を提供することにある。SUMMARY OF THE INVENTION The present invention has been made to solve such a problem, and an object of the present invention is to quickly converge the meandering of a rolled material so as not to cause large meandering and to achieve a stable rolling control of a plate of a tandem rolling mill. It is an object of the present invention to provide a meandering correction method and its device.
【0013】[0013]
【課題を解決するための手段】前記課題を解決するため
請求項1に係るタンデム圧延機の板蛇行修正装置は、板
蛇行修正装置に、計測装置で測定した計測蛇行量と移動
速度および予測蛇行量に基づいて圧延材の蛇行修正部分
が下流側タンデム圧延機に到達するタイミングとロール
操作量とを演算する蛇行制御装置と、演算したロール操
作量を一時的に保持する記憶装置と、上流側タンデム圧
延機で修正した圧延材の蛇行修正部分が下流側タンデム
圧延機に到達するまでロール操作を遅延する遅延装置と
を備え、上流側タンデム圧延機で圧延材の蛇行修正制御
を行った結果が下流側タンデム圧延機に現れるまでの予
測時間と予測蛇行量を演算し、上流側タンデム圧延機で
修正した圧延材の蛇行修正部分が予測時間後に下流側タ
ンデム圧延機に到達するタイミングで、下流側タンデム
圧延機の計測蛇行量から予測蛇行量を予め差し引いた値
に相当するロール操作量を目標値として蛇行修正制御を
行うとともに、この蛇行修正制御を各タンデム圧延機毎
に連続して行うことを特徴とする。Means for Solving the Problems] plate meandering correction apparatus of a tandem rolling mill according to claim 1 for solving the above problem is, in a plate meandering correction device, mobile <br/> the measurement meandering amount measured by the measuring device A meandering control device that calculates a timing and a roll operation amount at which a meandering correction portion of a rolled material reaches a downstream tandem rolling mill based on a speed and a predicted meandering amount, and a storage device that temporarily holds the calculated roll operation amount. And, a delay device that delays the roll operation until the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill reaches the downstream tandem rolling mill, and controls the meandering correction of the rolled material by the upstream tandem rolling mill. Calculate the predicted time and the meandering amount until the result obtained appears on the downstream tandem rolling mill, and the meandering correction part of the rolled material corrected by the upstream tandem rolling mill is the downstream tandem rolling mill after the predicted time At the arrival timing, meandering correction control is performed using a roll operation amount corresponding to a value obtained by subtracting the predicted meandering amount from the measured meandering amount of the downstream tandem rolling mill in advance, and this meandering correction control is performed for each tandem rolling mill. Is performed continuously.
【0014】また、請求項2に係るタンデム圧延機の板
蛇行修正装置は、板蛇行修正装置に、計測装置で測定し
た計測蛇行量と移動速度および上流側タンデム圧延機の
計測蛇行量に基づいて圧延材の蛇行修正部分が下流側タ
ンデム圧延機に到達するタイミングとロール操作量とを
演算する蛇行制御装置と、計測装置で測定した計測蛇行
量を一時的に保持する記憶装置と、上流側タンデム圧延
機で修正した圧延材の蛇行修正部分が下流側タンデム圧
延機に到達するまで計測蛇行量を遅延する遅延装置とを
備え、上流側タンデム圧延機で圧延材の蛇行修正制御を
行った結果が下流側タンデム圧延機に現れるまでの予測
時間を演算するとともに蛇行量を計測し、上流側タンデ
ム圧延機で修正した圧延材の蛇行修正部分が予測時間後
に下流側タンデム圧延機に到達するタイミングで、下流
側タンデム圧延機の計測蛇行量から上流側タンデム圧延
機の計測蛇行量を予め差し引いた値に相当するロール操
作量を目標値として蛇行修正制御を行うとともに、この
蛇行修正制御を各タンデム圧延機毎に連続して行うこと
を特徴とする。According to a second aspect of the present invention, there is provided a tandem rolling machine with a meandering correction device, comprising: a meandering amount and a moving speed measured by a measuring device;
A meandering control device meandering correction portion of the strip on the basis of the measurement meandering amount computing a timing and roll operation amount reaching the downstream tandem mill, temporarily store holding a measurement meandering amount measured by the measuring device Device, and a delay device that delays the measured meandering amount until the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill reaches the downstream tandem rolling mill, and corrects the meandering of the rolled material by the upstream tandem rolling mill. The predicted time until the control result appears in the downstream tandem rolling mill is calculated and the meandering amount is measured, and the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill is changed to the downstream tandem rolling mill after the predicted time. At the timing of reaching, the roll operation amount corresponding to a value obtained by subtracting the measured meander amount of the upstream tandem rolling mill from the measured meander amount of the downstream tandem rolling mill in advance is set as the target value. Performs meandering correction control, and performing in succession the meandering correction control for each tandem mill.
【0015】さらに、請求項3に係るタンデム圧延機の
板蛇行修正装置は、板蛇行修正装置に、計測装置で測定
した計測蛇行量と移動速度とマーク測定信号および予測
蛇行量に基づいて圧延材の蛇行修正部分が下流側タンデ
ム圧延機に到達する時間を設定するタイマとロール操作
量とを演算する蛇行制御装置と、演算したロール操作量
を一時的に保持する記憶装置と、上流側タンデム圧延機
で修正した圧延材の蛇行修正部分が下流側タンデム圧延
機に到達するまでロール操作を遅延する遅延装置と、を
備え、上流側タンデム圧延機で蛇行修正処理をおこなっ
た圧延材上の蛇行修正点を示すマークを検出するマーク
測定信号に基づいてタイマの計時を開始し、タイマの設
定時間により下流側タンデム圧延機に到達するタイミン
グを決定し、下流側タンデム圧延機の計測蛇行量から予
測蛇行量を予め差し引いた値に相当するロール操作量を
目標値として蛇行修正制御を行うとともに、この蛇行修
正制御を各タンデム圧延機毎に連続して行うことを特徴
とする。Further, in the tandem rolling mill according to claim 3,
The plate meandering correction device is measured by the measuring device to the plate meandering correction device.
Measurement meandering amount, moving speed, mark measurement signal and prediction
Based on the meandering amount, the meandering correction part of the rolled material is
Timer and roll operation to set the time to reach the rolling mill
Meandering control device that calculates the amount and the calculated roll operation amount
And a tandem rolling mill on the upstream side
The meandering correction part of the rolled material corrected in step tandem rolling on the downstream side
A delay device that delays the roll operation until it reaches the machine.
A mark that detects a mark indicating a meandering correction point on a rolled material that has been subjected to meandering correction processing by an upstream tandem rolling mill
Start timing of the timer based on the measurement signal, and set the timer.
Taimin reaching downstream tandem mill at fixed time
Determine the grayed, pre from the measured amount of meandering of the downstream tandem mill
The roll operation amount equivalent to the value obtained by subtracting the
As well as performing meandering correction control as the target value,
The direct control is continuously performed for each tandem rolling mill .
【0016】[0016]
【発明の実施の形態】以下、この発明の実施の形態を添
付図面に基づいて説明する。図1はこの発明に係るタン
デム圧延機の板蛇行修正装置の全体構成図である。Embodiments of the present invention will be described below with reference to the accompanying drawings. FIG. 1 is an overall configuration diagram of a meandering correction device for a tandem rolling mill according to the present invention.
【0017】図1において、タンデム圧延機の板蛇行修
正装置1は、タンデム圧延機2と、計測装置4と、ロー
ル操作装置5と、板蛇行修正装置9とで構成する。In FIG. 1, a meandering correction device 1 for a tandem rolling mill comprises a tandem rolling mill 2, a measuring device 4, a roll operating device 5, and a meandering correcting device 9 for a plate.
【0018】タンデム圧延機2(以下、スタンド2と称
する。)は、上下のロール軸の方向を同時または独立に
変化して圧延材3の板厚分布や平坦度を改善しつつ圧延
するとともに圧延材3の蛇行を修正する。The tandem rolling mill 2 (hereinafter referred to as a stand 2) performs rolling while simultaneously or independently changing the direction of the upper and lower roll shafts to improve the thickness distribution and flatness of the rolled material 3 while rolling. Correct the meandering of material 3.
【0019】計測装置4は、各スタンド2の下流側に配
置して圧延材の蛇行量や移動速度あるいは蛇行修正点な
ど圧延材3の蛇行状況を計測し、板蛇行修正装置9に測
定蛇行信号e、測定速度信号v、マーク測定信号mなど
の測定信号(e,v,m)を提供する。The measuring device 4 is disposed downstream of each stand 2 to measure the meandering amount, the moving speed, and the meandering state of the rolled material 3 such as the meandering correction point, and sends a measurement meandering signal to the plate meandering correcting device 9. e, measurement speed signal v, mark measurement signal m, and other measurement signals (e, v, m).
【0020】ロール操作装置5は、板蛇行修正装置9か
ら提供されるロール操作信号(θ)に基づいて各スタン
ド2の上下ロールを圧延材3の平行面あるいは垂直面で
操作する。The roll operating device 5 operates the upper and lower rolls of each stand 2 on the parallel surface or the vertical surface of the rolled material 3 based on the roll operation signal (θ) provided from the plate meandering correcting device 9.
【0021】板蛇行修正装置9は、蛇行制御装置6と、
記憶装置7と、遅延装置8とで構成し、各計測装置4か
ら供給される測定蛇行信号e、測定速度信号v、マーク
測定信号mなどの測定信号(e,v,m)に基づいて各
ロール操作装置5へロール操作信号(θ)を提供する。The plate meandering correction device 9 includes a meandering control device 6,
It is composed of a storage device 7 and a delay device 8, and based on measurement signals (e, v, m) such as a measurement meander signal e, a measurement speed signal v, and a mark measurement signal m supplied from each measurement device 4. A roll operation signal (θ) is provided to the roll operation device 5.
【0022】上流側スタンド2で行った蛇行修正制御の
結果が下流側スタンドに現れるまでの時間と蛇行量を、
測定信号(e,v,m)に基づいて演算して予測し、下
流側スタンドにおける蛇行修正制御は、予測蛇行量を予
め差し引いた修正蛇行量に相当するロール操作量を蛇行
修正制御の目標値とし、ロール操作信号(θ)でロール
操作装置5を駆動して行う。The time and the meandering time until the result of the meandering correction control performed in the upstream stand 2 appears on the downstream stand are
The meandering correction control in the downstream stand calculates and predicts the roll operation amount corresponding to the corrected meandering amount by subtracting the predicted meandering amount in advance from the measurement signal (e, v, m). The operation is performed by driving the roll operation device 5 with the roll operation signal (θ).
【0023】なお、蛇行修正制御の行われるタイミング
は、演算した予測時間に基づいて上流側スタンド2で行
った蛇行修正制御の結果が下流側スタンドに到達するタ
イミングで行う。The meandering correction control is performed when the result of the meandering correction control performed in the upstream stand 2 reaches the downstream stand based on the calculated predicted time.
【0024】蛇行制御装置6は、演算手段を備えて各ス
タンドの下流側に設置された計測装置4から供給される
測定蛇行信号e、測定速度信号v、マーク測定信号mに
基づいて予測蛇行量や修正蛇行量やロール操作量あるい
は蛇行修正タイミングなどを演算する。The meandering control device 6 is provided with a calculating means and has a meandering amount estimated based on the measured meandering signal e, the measured speed signal v, and the mark measurement signal m supplied from the measuring device 4 installed downstream of each stand. And a meandering correction amount, a roll operation amount, a meandering correction timing, and the like.
【0025】記憶装置7は、信号を一時的に記憶する保
持手段を備え、蛇行制御装置6で演算されたロール操作
量あるいは計測蛇行量を一時的に記憶する。The storage device 7 has a holding means for temporarily storing signals, and temporarily stores the roll operation amount or the measured meandering amount calculated by the meandering control device 6.
【0026】遅延手段8は、信号を一定時間遅延する遅
延手段を備え、記憶手段7に記憶したロール操作量をロ
ール操作装置5に提供する時期あるいは計測蛇行量を蛇
行制御装置6に提供する時期を、蛇行修正制御操作を実
行するタイミングまで遅延する。The delay means 8 includes a delay means for delaying a signal for a predetermined time, and when the roll operation amount stored in the storage means 7 is provided to the roll operation device 5 or when the measured meandering amount is provided to the meandering control device 6. Until the timing at which the meandering correction control operation is performed.
【0027】図2は請求項1に係る予測蛇行量演算によ
る板蛇行修正装置の要部ブロック構成図である。図2に
基づいて上流側スタンドの蛇行修正操作の影響を考慮し
て下流側スタンドにおける蛇行修正操作量を演算し、上
流側スタンドにおける蛇行修正部分が到達するタイミン
グで蛇行修正制御を行う、この発明の実施の形態につい
て説明する。FIG. 2 is a block diagram showing the principal part of the plate meandering correction apparatus according to the first embodiment. This invention calculates the meandering correction operation amount in the downstream stand in consideration of the influence of the meandering correction operation of the upstream stand based on FIG. 2, and performs meandering correction control at the timing when the meandering correction part in the upstream stand reaches. An embodiment will be described.
【0028】なお、図2は、複数スタンドで構成したタ
ンデム圧延機の板蛇行修正装置1の一部である(i)番
と(i+1)番スタンドを示しており、両スタンドの構
成は同じなので(i)番スタンドについて説明を行うも
のとし、また、圧延材3、ロール操作装置51は、図1
に同じなので説明を省略する。FIG. 2 shows the (i) and (i + 1) th stands which are a part of the plate meandering correction device 1 of the tandem rolling mill composed of a plurality of stands. Since both stands have the same structure. (I) The stand will be described, and the rolled material 3 and the roll operating device 51 will be described with reference to FIG.
Therefore, the description is omitted.
【0029】図2において、蛇行量計測装置41aは、
CCDカメラあるいは差動トランス等のセンサを圧延材
3の両側端部に配置し、圧延材3の幅方向の設定値に対
するズレの長さを測定して測定蛇行信号e1を発生す
る。In FIG. 2, the meandering amount measuring device 41a
Sensors such as a CCD camera or a differential transformer are arranged at both side ends of the rolled material 3 to measure a length of a deviation of the rolled material 3 from a set value in a width direction to generate a measurement meander signal e1.
【0030】速度計測装置42aは、圧延材3の側縁に
自在に接触して圧延材3の移動に応じてパルス信号を発
生する長さ検出器を配置し、移動距離に対応したパルス
を計数して測定速度信号v1を発生する。The speed measuring device 42a is provided with a length detector which freely contacts the side edge of the rolled material 3 and generates a pulse signal in accordance with the movement of the rolled material 3, and counts the pulses corresponding to the moving distance. To generate a measured speed signal v1.
【0031】蛇行制御装置6は、予測蛇行演算手段61
aと、蛇行修正演算手段61bと、修正計数手段61c
と、移送時間演算手段61dとを備える。The meandering control device 6 includes a predicted meandering calculating means 61.
a, meandering correction calculating means 61b, and correction counting means 61c
And transfer time calculation means 61d.
【0032】予測蛇行演算手段61aは、演算器を備え
て図示しない(i−1)番スタンドから供給される修正
蛇行信号eS0と予測到達時間信号にt01に基づき、圧延
材3の(i−1)番スタンドで修正された部分の蛇行
が、(i)番スタンドに到達した時点で現れると予想さ
れる蛇行量を演算して予測蛇行信号eP1を発生する。The predicted meander calculating means 61a is provided with an arithmetic unit, and calculates the (i-1) of the rolled material 3 based on the corrected meander signal eS0 and the predicted arrival time signal supplied from the (i-1) th stand (not shown) based on t01. The meandering amount corrected at the (stand) No. stand is calculated by calculating the amount of meander that is expected to appear when it reaches the (i) stand to generate the predicted meander signal eP1.
【0033】蛇行修正演算手段61bは、演算器を備え
て蛇行量計測装置41aから供給される測定蛇行信号e
1と予測蛇行演算手段61aから提供される予測蛇行信
号eP1に基づき、修正蛇行信号eS1を発生して修正係数
手段61cに提供するとともに(i+1)番スタンドの
予想蛇行演算手段62aに提供する。The meandering correction calculating means 61b is provided with a calculating device and has a meandering signal e supplied from the meandering amount measuring device 41a.
Based on 1 and the predicted meander signal eP1 provided from the predicted meander calculating means 61a, a corrected meander signal eS1 is generated and provided to the correction coefficient means 61c and to the predicted meander calculating means 62a of the (i + 1) th stand.
【0034】なお、修正蛇行信号eS1は、(i)番スタ
ンドの下流側で計測した(i)番スタンドの蛇行量であ
る測定蛇行信号e1から予測蛇行演算手段61aが提供
する予測蛇行信号eP1を差し引いた、(i)番スタンド
で修正されるべき蛇行量である。The corrected meander signal eS1 is obtained by calculating the predicted meander signal eP1 provided by the predicted meander calculating means 61a from the measured meander signal e1 which is the amount of meander of the (i) stand measured downstream of the (i) stand. The meandering amount to be corrected at the (i) th stand after subtraction.
【0035】修正計数手段61cは、係数器を備えて蛇
行修正演算手段61bから供給される修正蛇行信号eS1
を、ロール操作機5のロール操作量に変換してロール操
作信号θ01を発生する。The correction counting means 61c is provided with a coefficient unit and has a correction meandering signal eS1 supplied from the meandering correction calculation means 61b.
Is converted into a roll operation amount of the roll operation device 5 to generate a roll operation signal θ01.
【0036】移送時間演算手段61dは、演算器を備え
て速度計測装置42aから供給される測定速度信号v1
に基づき、予測到達時間信号t12を演算して(i+1)
番スタンドの予測蛇行演算手段62aと遅延手段82に
提供する。The transfer time calculating means 61d is provided with a calculating device and has a measuring speed signal v1 supplied from the speed measuring device 42a.
Is calculated on the basis of (i + 1)
The predicted meander calculating means 62a and the delay means 82 of the third stand are provided.
【0037】なお、予測到達時間信号t12は、既知であ
る(i)番および(i+1)番スタンドと速度計測装置
42aとの間の距離と測定速度v1を割り算し、圧延材
3の(i)番スタンドで修正された部分の蛇行が、(i
+1)番スタンドに到達するまでの時間を演算した予測
到達時間である。The estimated arrival time signal t12 is obtained by dividing the distance between the known stand (i) and the stand (i + 1) and the speed measuring device 42a by the measured speed v1 to obtain the (i) of the rolled material 3. The meandering of the part corrected at the stand is (i
+1) This is a predicted arrival time obtained by calculating the time required to reach the No. 1 stand.
【0038】記憶装置7は、記憶器を備えた保持手段7
1からなり、修正係数手段61cから供給されるロール
操作信号θ01を一時的に保持して遅延手段81にロール
操作信号θM1を提供する。The storage device 7 includes a holding unit 7 having a storage device.
1 to temporarily hold the roll operation signal θ01 supplied from the correction coefficient means 61c and provide the roll operation signal θM1 to the delay means 81.
【0039】遅延装置8は、タイマを備えた遅延手段8
1からなり、保持手段71から供給されるロール操作信
号θM1を(i−1)番スタンドから供給される予測到達
時間信号t01の時間だけ遅延して(i)番スタンドのロ
ール操作装置5にロール操作信号θ1を提供する。The delay unit 8 includes a delay unit 8 having a timer.
1 and the roll operation signal θM1 supplied from the holding means 71 is delayed by the time of the predicted arrival time signal t01 supplied from the (i-1) th stand and rolled to the roll operation device 5 of the (i) th stand. An operation signal θ1 is provided.
【0040】図6にこの発明に係るタンデム圧延機の板
蛇行修正方法およびその装置による蛇行修正結果を示
す。図6において、(i)番と(i+1)番スタンドの
蛇行量e1とe2に対して同時には蛇行修正操作はおこな
わず、(i)番スタンドの蛇行修正がなされた後に(i
+1)番スタンドの蛇行修正を行う場合の蛇行の様子を
表している。FIG. 6 shows a meandering correction method and a meandering correction result of the tandem rolling mill according to the present invention. In FIG. 6, the meandering correction operation is not performed on the meandering amounts e1 and e2 of the stands (i) and (i + 1) at the same time, and after the meandering correction of the stand (i) is performed, (i).
The figure shows the meandering state when the meandering correction of the +1) th stand is performed.
【0041】(i+1)番スタンドの蛇行修正は、移送
時間演算手段61dから供給される予想到達時間信号t
12の時間だけ遅れて(i)番スタンドの蛇行修正点が
(i+1)番スタンドに到達した時点で蛇行修正がおこ
なわれる。The meandering correction of the (i + 1) th stand is performed by adjusting the estimated arrival time signal t supplied from the transfer time calculation means 61d.
The meandering correction is performed when the meandering correction point of the (i) th stand reaches the (i + 1) th stand with a delay of 12 hours.
【0042】このように、請求項1に係るタンデム圧延
機の板蛇行修正装置は、板蛇行修正装置に、計測装置で
測定した計測蛇行量と移動速度および予測蛇行量に基づ
いて圧延材の蛇行修正部分が下流側スタンドに到達する
タイミングとロール操作量とを演算する蛇行制御装置
と、演算したロール操作量を一時的に保持する記憶装置
と、上流側スタンドで修正した圧延材の蛇行修正部分が
下流側スタンドに到達するまでロール操作を遅延する遅
延装置とを備え、上流側スタンドで圧延材の蛇行修正制
御を行った結果が下流側スタンドに現れるまでの予測時
間と予測蛇行量を演算し、上流側スタンドで修正した圧
延材の蛇行修正部分が予測時間後に下流側スタンドに到
達するタイミングで、下流側スタンドの計測蛇行量から
予測蛇行量を予め差し引いた値に相当するロール操作量
を目標値として蛇行修正制御を行うとともに、この蛇行
修正制御を各スタンド毎に連続して行うことができるの
で、下流側スタンドでは、上流側スタンドで蛇行修正し
た結果を考慮して板蛇行修正制御をすることができる。As described above, according to the first aspect of the present invention, the meandering correction device for a tandem rolling mill is configured such that the meandering correction device uses the meandering amount and the moving speed measured by the measuring device, and the meandering of the rolled material based on the predicted meandering amount. A meandering control device that calculates the timing at which the correction portion reaches the downstream stand and the roll operation amount, a storage device that temporarily stores the calculated roll operation amount, and a meandering correction portion of the rolled material corrected by the upstream stand And a delay device that delays the roll operation until it reaches the downstream stand, and calculates a predicted time and a predicted meander amount until the result of performing the meandering correction control of the rolled material at the upstream stand appears at the downstream stand. At the timing when the meandering correction portion of the rolled material corrected at the upstream stand reaches the downstream stand after the predicted time, the predicted meandering amount is previously calculated from the measured meandering amount of the downstream stand. The meandering correction control is performed with the roll operation amount corresponding to the subtracted value as a target value, and the meandering correction control can be continuously performed for each stand. The meandering correction control can be performed in consideration of the result.
【0043】図3は請求項2に係る実測蛇行量演算によ
る板蛇行修正装置の要部ブロック構成図である。上流側
スタンドの計測蛇行量と下流側スタンドの計測蛇行量に
基づいて下流側スタンドにおける蛇行修正操作量を演算
し、上流側スタンドにおける蛇行修正部分が到達するタ
イミングで板蛇行修正制御を行う、この発明の実施の形
態について図3に基づいて説明する。FIG. 3 is a block diagram of a main part of the plate meandering correction apparatus based on the actual meandering amount calculation according to the second aspect. The meandering correction operation amount in the downstream stand is calculated based on the measured meandering amount of the upstream stand and the measured meandering amount of the downstream stand, and the plate meandering correction control is performed at the timing when the meandering correction part in the upstream stand reaches. An embodiment of the present invention will be described with reference to FIG.
【0044】なお、図3は、複数スタンドで構成したタ
ンデム圧延機の板蛇行修正装置1の一部である(i)番
と(i+1)番スタンドを示しており、両スタンドの構
成は同じなので(i)番スタンドについて説明を行うも
のとし、また、圧延材3、ロール操作装置51は図1
に、蛇行量計測装置41a、速度計測装置42aは図2
に同じなので説明を省略する。FIG. 3 shows the (i) and (i + 1) th stands which are part of the plate meandering correction device 1 of the tandem rolling mill composed of a plurality of stands, and the structures of both stands are the same. (I) Stand No. will be described, and the rolled material 3 and the roll operating device 51 are shown in FIG.
FIG. 2 shows the meandering amount measuring device 41a and the speed measuring device 42a.
Therefore, the description is omitted.
【0045】図3において、蛇行制御装置11は、蛇行
修正演算手段61bと、修正計数手段61cと、移送時
間演算手段61dとを備える。In FIG. 3, the meandering control device 11 includes meandering correction calculating means 61b, correction counting means 61c, and transfer time calculating means 61d.
【0046】蛇行修正演算手段61bは、演算器を備え
て蛇行量計測装置41aから供給される測定蛇行信号e
1と図示しない(i−1)番スタンドの遅延手段から供
給される遅延測定蛇行信号eO0に基づき、修正蛇行信号
eS1を発生して修正係数手段61cに提供する。The meandering correction calculating means 61b is provided with an arithmetic unit and has a meandering signal e supplied from the meandering amount measuring device 41a.
Based on the delay measurement meander signal eO0 supplied from the delay means of the (i-1) th stand (not shown), a corrected meander signal eS1 is generated and provided to the correction coefficient means 61c.
【0047】なお、修正蛇行信号eS1は、(i)番スタ
ンドの下流側で計測した(i)番スタンドの蛇行量であ
る測定蛇行信号e1から(i−1)番スタンドの下流側
で計測した(i−1)番スタンドの蛇行量である測定蛇
行信号e0を遅延して差し引いた(i)番スタンドで修
正されるべき蛇行量である。The corrected meandering signal eS1 is measured on the downstream side of the (i-1) th stand from the measured meandering signal e1 which is the meandering amount of the (i) stand measured on the downstream side of the (i) th stand. This is the meandering amount to be corrected at the (i) th stand obtained by delaying and subtracting the measured meandering signal e0, which is the meandering amount of the (i-1) th stand.
【0048】修正係数手段61cは、係数器を備えて蛇
行修正演算手段61bから供給される修正蛇行信号eS1
を、ロール操作機5のロール操作量に変換してロール操
作信号θ1を発生する。The correction coefficient means 61c is provided with a coefficient unit and has a correction meandering signal eS1 supplied from the meandering correction calculation means 61b.
Is converted into a roll operation amount of the roll operation device 5 to generate a roll operation signal θ1.
【0049】移送時間演算手段61dは、演算器を備え
て速度計測装置42aから供給される測定速度信号v1
に基づき、予測到達時間信号t12を演算して遅延手段8
1に提供する。The transfer time calculating means 61d is provided with a calculating device and has a measuring speed signal v1 supplied from the speed measuring device 42a.
Calculates the estimated arrival time signal t12 based on
1 to provide.
【0050】なお、予測到達時間信号t12は、既知であ
る(i)番および(i+1)番スタンドと速度計測装置
42aとの間の距離と測定速度v1を割り算し、圧延材
3の(i)番スタンドで修正された部分の蛇行が、(i
+1)番スタンドに到達するまでの時間を演算した予測
到達時間である。The estimated arrival time signal t12 is obtained by dividing the distance between the known stand (i) and the stand (i + 1) and the speed measuring device 42a by the measured speed v1 to obtain (i) of the rolled material 3. The meandering of the part corrected at the stand is (i
+1) This is a predicted arrival time obtained by calculating the time required to reach the No. 1 stand.
【0051】記憶装置7は、記憶器を備えた保持手段7
1からなり、(i)番スタンドの下流側で計測した
(i)番スタンドの蛇行量である測定蛇行信号e1を一
時的に保持して遅延手段81に記憶測定蛇行信号eM1を
提供する。The storage device 7 includes a holding unit 7 having a storage device.
1 and temporarily stores the measured meandering signal e1, which is the meandering amount of the (i) stand measured downstream of the (i) stand, and provides the stored meandering meandering signal eM1 to the delay means 81.
【0052】遅延装置8は、タイマを備えた遅延手段8
1からなり、保持手段71から供給される記憶測定蛇行
信号eM1を移送時間演算手段61dから供給される予測
到達時間信号t12の時間だけ遅延して(i+1)番スタ
ンドの蛇行修正演算手段62bに提供する。The delay unit 8 includes a delay unit 8 having a timer.
1 and is supplied to the meandering correction calculating means 62b of the (i + 1) th stand after delaying the stored measurement meandering signal eM1 supplied from the holding means 71 by the time of the predicted arrival time signal t12 supplied from the transfer time calculating means 61d. I do.
【0053】図6に示すように、(i+1)番スタンド
の蛇行修正は、(i)番スタンドの移送時間演算手段6
1dから供給される予想到達時間信号t12の時間だけ遅
れて、(i)番スタンドの蛇行修正点が(i+1)番ス
タンドに到達した時点で蛇行修正がおこなわれる。As shown in FIG. 6, the meandering correction of the (i + 1) th stand is performed by the transfer time calculating means 6 of the (i) th stand.
The meandering correction is performed when the meandering correction point of the (i) th stand reaches the (i + 1) th stand with a delay of the expected arrival time signal t12 supplied from 1d.
【0054】このように、請求項2に係るタンデム圧延
機の板蛇行修正装置は、板蛇行修正装置に、計測装置で
測定した計測蛇行量と移動速度および上流側スタンドの
計測蛇行量に基づいて圧延材の蛇行修正部分が下流側ス
タンドに到達するタイミングとロール操作量とを演算す
る蛇行制御装置と、計測装置で測定した計測蛇行量を一
時的に保持する記憶装置と、上流側スタンドで修正した
圧延材の蛇行修正部分が下流側スタンドに到達するまで
計測蛇行量を遅延する遅延装置とを備え、上流側スタン
ドで圧延材の蛇行修正制御を行った結果が下流側スタン
ドに現れるまでの予測時間を演算するとともに蛇行量を
計測し、上流側スタンドで修正した圧延材の蛇行修正部
分が予測時間後に下流側スタンドに到達するタイミング
で、下流側スタンドの計測蛇行量から上流側スタンドの
計測蛇行量を予め差し引いた値に相当するロール操作量
を目標値として蛇行修正制御を行うとともに、この蛇行
修正制御を各スタンド毎に連続して行うことができるの
で、下流側スタンドでは、上流側スタンドで計測した蛇
行量を差し引いた修正蛇行量で板蛇行修正制御をするこ
とができる。As described above, the meandering correction device for a tandem rolling mill according to the second aspect includes the meandering amount measured and the moving speed measured by the measuring device and the moving speed of the upstream stand.
A meandering control device meandering correction portion of the strip on the basis of the measurement meandering amount computing a timing and roll operation amount reaching the downstream stand, a storage device for temporarily storing the measurement meandering amount measured by the measuring device A delay device that delays the measured meandering amount until the meandering correction portion of the rolled material corrected at the upstream stand reaches the downstream stand, and the result of performing the meandering correction control of the rolled material at the upstream stand is the downstream side. The estimated time to appear on the stand is calculated and the meandering amount is measured, and at the timing when the meandering correction portion of the rolled material corrected at the upstream stand reaches the downstream stand after the estimated time, the measured meandering amount of the downstream stand is calculated. The meandering correction control is performed using the roll operation amount corresponding to the value obtained by subtracting the measured meandering amount of the upstream stand in advance as a target value, and the meandering correction control is performed by each of the masters. Can be performed continuously for each de, in the downstream stands, it can be a plate meandering correction control Fixed meandering amount obtained by subtracting the meandering amount measured by the upstream stand.
【0055】図4は請求項3に係る修正位置マーク検出
による板蛇行修正装置の要部ブロック構成図である。図
4に基づいて上流側スタンドで蛇行修正された蛇行修正
点を示すマークが、蛇行計測装置を通過してから一定時
間後に下流スタンドで板蛇行修正制御を行う、この発明
の実施の形態について説明する。FIG. 4 is a block diagram of a main part of a meandering plate correcting apparatus for detecting a correction position mark according to a third embodiment. A description will be given of an embodiment of the present invention, in which a mark indicating a meandering correction point corrected in the upstream stand based on FIG. 4 passes through the meandering measurement device and performs plate meandering correction control in the downstream stand after a predetermined time. I do.
【0056】なお、図4は、先に図2で説明した蛇行修
正部分の下流スタンド到達時間を演算して予測する蛇行
制御装置6の移送時間演算手段61d、62dをマーク
信号発生手段61e、62eに、速度計測装置42a、
42bをマーク検出装置43a、43bに置き替えて構
成したものであり、また、(i)番スタンドと(i+
1)番スタンドは同じ構成なので、(i)番スタンドの
マーク検出装置43aとマーク信号発生手段61eを中
心に説明する。FIG. 4 shows the transfer time calculating means 61d and 62d of the meandering control device 6 for calculating and estimating the arrival time at the downstream stand of the meandering correction part described above with reference to FIG. 2 and the mark signal generating means 61e and 62e. In addition, speed measurement device 42a,
42b is replaced by mark detection devices 43a and 43b, and the (i) stand and (i +
Since the 1st stand has the same configuration, the description will focus on the mark detection device 43a and the mark signal generating means 61e of the (i) th stand.
【0057】図4において、マーク検出装置43aは、
CCDカメラを備えて蛇行量計測装置41aと同位置に
配置し、圧延材3の側縁に取り付けられた蛇行修正点を
示すマークを、CCDカメラが提供する画像信号を処理
して検知してマーク測定信号m1をマーク信号発生手段
61eに提供する。In FIG. 4, the mark detecting device 43a
A mark indicating a meandering correction point, which is provided at the same position as the meandering amount measuring device 41a with a CCD camera and is attached to the side edge of the rolled material 3, is detected by processing an image signal provided by the CCD camera. The measurement signal m1 is provided to the mark signal generation means 61e.
【0058】蛇行制御装置12に備えたマーク信号発生
手段61eは、タイマを備えてマーク測定信号m1に基
づいてタイマの計時を開始し、予め設定された時間を計
時した後にマーク到達信号m12を(i+1)番スタンド
の予測蛇行演算手段62aと遅延手段82に提供する。The mark signal generating means 61e provided in the meandering control device 12 includes a timer, starts counting time of the timer based on the mark measurement signal m1, and outputs a mark arrival signal m12 after counting a predetermined time ( The predicted meandering operation means 62a and the delay means 82 of the (i + 1) th stand are provided.
【0059】予め設定する時間は、上流スタンドの蛇行
修正点が下流側スタンドに到達するタイミングに相当
し、圧延材3の速度は既知であるとしてマーク検出装置
43aと下流側スタンド間との距離から算出して決定す
る。The preset time corresponds to the timing when the meandering correction point of the upstream stand reaches the downstream stand, and the speed of the rolled material 3 is assumed to be known, and the distance between the mark detection device 43a and the downstream stand is determined. Calculate and decide.
【0060】以上が、上流側スタンドにおける蛇行修正
が下流側スタンドへ到達するタイミングを、圧延材3上
の蛇行修正点マークを検知して知る方法およびその装置
の実施の形態である。なお、先に図3で説明した蛇行制
御装置11で、蛇行修正部分の下流スタンド到達時間を
演算して予測する移送時間演算手段61d、62dをマ
ーク信号発生手段に、速度計測装置42a、42bをマ
ーク検出装置に置き替えて構成することができ、図4の
場合と同様の実施の形態となるので説明を省略する。The above is the embodiment of the method and the apparatus for detecting the timing at which the meandering correction in the upstream stand reaches the downstream stand by detecting the meandering correction point mark on the rolled material 3. Note that the meandering control device 11 described above with reference to FIG. 3 uses the transfer time calculating means 61d and 62d for calculating and predicting the downstream stand arrival time of the meandering correction portion as the mark signal generating means, and the speed measuring devices 42a and 42b as the mark signal generating means. Since the configuration can be replaced with a mark detection device, and the embodiment is the same as that of FIG. 4, the description is omitted.
【0061】このように、請求項3に係るタンデム圧延
機の板蛇行修正装置は、上流側タンデム圧延機で蛇行修
正処理をおこなった圧延材上の蛇行修正点を示すマーク
を検出するマーク測定信号に基づいてタイマの計時を開
始し、タイマの設定時間により下流側タンデム圧延機に
到達するタイミングを決定し、下流側タンデム圧延機の
計測蛇行量から予測蛇行量を予め差し引いた値に相当す
るロール操作量を目標値として蛇行修正制御を行うとと
もに、この蛇行修正制御を各タンデム圧延機毎に連続し
て行うので、上流側スタンドの蛇行修正点が下流スタン
ドに到達するタイミングを正確に捕捉することができ
る。[0061] mark indicating Thus, the plate meandering correction apparatus of a tandem rolling mill according to claim 3, the meandering correction point on rolled material was subjected to meandering correction processing on downstream tandem mill
The timer starts timing based on the mark measurement signal that detects
To the downstream tandem rolling mill according to the time set by the timer.
Determine the timing to reach, the downstream tandem rolling mill
It corresponds to the value obtained by subtracting the predicted meandering amount from the measured meandering amount in advance.
When the meandering correction control is performed with the roll operation amount
In addition, this meandering correction control is continuously performed for each tandem rolling mill.
Is performed, it is possible to meandering correction point upstream stand to accurately capture the time to reach the downstream stand.
【0062】[0062]
【発明の効果】以上説明したようにこの発明に係るタン
デム圧延機の板蛇行修正装置は、板蛇行修正装置に、計
測装置で測定した計測蛇行量と移動速度および予測蛇行
量に基づいて圧延材の蛇行修正部分が下流側タンデム圧
延機に到達するタイミングとロール操作量とを演算する
蛇行制御装置と、演算したロール操作量を一時的に保持
する記憶装置と、上流側タンデム圧延機で修正した圧延
材の蛇行修正部分が下流側タンデム圧延機に到達するま
でロール操作を遅延する遅延装置とを備え、上流側タン
デム圧延機で圧延材の蛇行修正制御を行った結果が下流
側タンデム圧延機に現れるまでの予測時間と予測蛇行量
を演算し、上流側タンデム圧延機で修正した圧延材の蛇
行修正部分が予測時間後に下流側タンデム圧延機に到達
するタイミングで、下流側タンデム圧延機の計測蛇行量
から予測蛇行量を予め差し引いた値に相当するロール操
作量を目標値として蛇行修正制御を行うとともに、この
蛇行修正制御を各タンデム圧延機毎に連続して行うこと
ができ、下流側スタンドでは、上流側スタンドで蛇行修
正した結果を考慮して板蛇行修正制御をすることができ
るので、過渡的な蛇行量の増大を抑えて好ましくない蛇
行を回避して安定した圧延制御をすることができる。As described above, the sheet meandering correction device of the tandem rolling mill according to the present invention is configured such that the sheet meandering correction device is provided with a rolled material based on the measured meandering amount, the moving speed, and the estimated meandering amount measured by the measuring device. A meandering control device that calculates the timing and roll operation amount at which the meandering correction portion reaches the downstream tandem rolling mill, a storage device that temporarily holds the calculated roll operation amount, and correction by the upstream tandem rolling mill A delay device that delays the roll operation until the meandering correction portion of the rolled material reaches the downstream tandem rolling mill, and the result of performing the meandering correction control of the rolled material by the upstream tandem rolling mill is a result of the downstream tandem rolling mill. Calculate the predicted time and the meandering amount until it appears, and at the timing when the meandering correction part of the rolled material corrected by the upstream tandem rolling mill reaches the downstream tandem rolling mill after the forecasting time. A meandering correction control is performed with a roll operation amount corresponding to a value obtained by subtracting the predicted meandering amount from the measured meandering amount of the downstream tandem rolling mill in advance, and the meandering correction control is continuously performed for each tandem rolling mill. In the downstream stand, plate meandering correction control can be performed in consideration of the result of the meandering correction in the upstream stand, so that transient increase in the meandering amount is suppressed to avoid undesired meandering and stable. Rolling control can be performed.
【0063】また、この発明に係るタンデム圧延機の板
蛇行修正装置は、板蛇行修正装置に、計測装置で測定し
た計測蛇行量と移動速度および上流側タンデム圧延機の
計測蛇行量に基づいて圧延材の蛇行修正部分が下流側タ
ンデム圧延機に到達するタイミングとロール操作量とを
演算する蛇行制御装置と、計測装置で測定した計測蛇行
量を一時的に保持する記憶装置と、上流側タンデム圧延
機で修正した圧延材の蛇行修正部分が下流側タンデム圧
延機に到達するまで計測蛇行量を遅延する遅延装置とを
備え、上流側タンデム圧延機で圧延材の蛇行修正制御を
行った結果が下流側タンデム圧延機に現れるまでの予測
時間を演算するとともに蛇行量を計測し、上流側タンデ
ム圧延機で修正した圧延材の蛇行修正部分が予測時間後
に下流側タンデム圧延機に到達するタイミングで、下流
側タンデム圧延機の計測蛇行量から上流側タンデム圧延
機の計測蛇行量を予め差し引いた値に相当するロール操
作量を目標値として蛇行修正制御を行うとともに、この
蛇行修正制御を各タンデム圧延機毎に連続して行うこと
ができ、下流側スタンドでは、上流側スタンドで計測し
た蛇行量を差し引いた修正蛇行量で板蛇行修正制御をす
ることができるので、過渡的な蛇行量の増大を抑えて好
ましくない蛇行を回避して安定した圧延制御をすること
ができる。The meandering correction device for a tandem rolling mill according to the present invention includes a meandering amount and a moving speed measured by a measuring device and a meandering correction device for the upstream tandem rolling mill.
A meandering control device meandering correction portion of the strip on the basis of the measurement meandering amount computing a timing and roll operation amount reaching the downstream tandem mill, temporarily store holding a measurement meandering amount measured by the measuring device Device, and a delay device that delays the measured meandering amount until the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill reaches the downstream tandem rolling mill, and corrects the meandering of the rolled material by the upstream tandem rolling mill. The predicted time until the control result appears in the downstream tandem rolling mill is calculated and the meandering amount is measured, and the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill is changed to the downstream tandem rolling mill after the predicted time. At the timing of reaching, the roll operation amount corresponding to a value obtained by subtracting the measured meander amount of the upstream tandem rolling mill from the measured meander amount of the downstream tandem rolling mill in advance is set as the target value. In addition to performing meandering correction control, this meandering correction control can be performed continuously for each tandem rolling mill.At the downstream side stand, the sheet meandering correction control is performed using the corrected meandering amount obtained by subtracting the meandering amount measured at the upstream side stand. Therefore, it is possible to perform a stable rolling control by suppressing a transient increase in the meandering amount and avoiding an undesirable meandering.
【0064】さらに、この発明に係るタンデム圧延機の
板蛇行修正装置は、板蛇行修正装置に、計測装置で測定
した計測蛇行量と移動速度とマーク測定信号および予測
蛇行量に基づいて圧延材の蛇行修正部分が下流側タンデ
ム圧延機に到達する時間を設定するタイマとロール操作
量とを演算する蛇行制御装置と、演算したロール操作量
を一時的に保持する記憶装置と、上流側タンデム圧延機
で修正した圧延材の蛇行修正部分が下流側タンデム圧延
機に到達するまでロール操作を遅延する遅延装置と、を
備え、上流側タンデム圧延機で蛇行修正処理をおこなっ
た圧延材上の蛇行修正点を示すマークを検出するマーク
測定信号に基づいてタイマの計時を開始し、タイマの設
定時間により下流側タンデム圧延機に到達するタイミン
グを決定し、下流側タンデム圧延機の計測蛇行量から予
測蛇行量を予め差し引いた値に相当するロール操作量を
目標値として蛇行修正制御を行うとともに、この蛇行修
正制御を各タンデム圧延機毎に連続して行うので、上流
側スタンドの蛇行修正点が下流スタンドに到達するタイ
ミングを正確に捕捉することができ、下流側スタンドで
は、圧延板の蛇行修正処理を適切なタイミングで行うこ
とができる。Further, the sheet meandering correction device of the tandem rolling mill according to the present invention includes a sheet meandering correction device and a measuring device for measurement.
Measurement meandering amount, moving speed, mark measurement signal and prediction
Based on the meandering amount, the meandering correction part of the rolled material is
Timer and roll operation to set the time to reach the rolling mill
Meandering control device that calculates the amount and the calculated roll operation amount
And a tandem rolling mill on the upstream side
The meandering correction part of the rolled material corrected in step tandem rolling on the downstream side
A delay device that delays the roll operation until it reaches the machine.
A mark that detects a mark indicating a meandering correction point on a rolled material that has been subjected to meandering correction processing by an upstream tandem rolling mill
Start timing of the timer based on the measurement signal, and set the timer.
Taimin reaching downstream tandem mill at fixed time
Determine the grayed, pre from the measured amount of meandering of the downstream tandem mill
The roll operation amount equivalent to the value obtained by subtracting the
As well as performing meandering correction control as the target value,
Since the positive control performed continuously for each tandem mill, Ki out the meandering correction point upstream stand to accurately capture the time to reach the downstream stand, a downstream stand, meandering correction processing of the rolled plate Can be performed at an appropriate timing.
【0065】よって、圧延材の蛇行を速やかに収束させ
て大きな蛇行を引き起こさず、安定した圧延制御ができ
るタンデム圧延機の板蛇行修正方法およびその装置を提
供することができる。Accordingly, it is possible to provide a sheet meandering correction method for a tandem rolling mill and a device therefor that can stably control rolling without causing large meandering by rapidly converging the meandering of the rolled material.
【図1】この発明に係るタンデム圧延機の板蛇行修正装
置の全体構成図FIG. 1 is an overall configuration diagram of a meandering correction device for a tandem rolling mill according to the present invention.
【図2】請求項1に係る予測蛇行量演算による板蛇行修
正装置の要部ブロック構成図FIG. 2 is a block diagram of a main part of a plate meandering correction apparatus based on a predicted meandering amount calculation according to claim 1;
【図3】請求項2に係る実測蛇行量演算による板蛇行修
正装置の要部ブロック構成図FIG. 3 is a block diagram of a main part of the plate meandering correction apparatus based on the actual meandering amount calculation according to claim 2;
【図4】請求項3に係る修正位置マーク検出による板蛇
行修正装置の要部ブロック構成図FIG. 4 is a block diagram of a main part of a plate meandering correction apparatus based on correction position mark detection according to claim 3;
【図5】従来のタンデム圧延機の板蛇行修正方法および
その装置による蛇行修正結果FIG. 5 shows a conventional meandering correction method for a tandem rolling mill and a meandering correction result by the apparatus.
【図6】この発明に係るタンデム圧延機の板蛇行修正方
法およびその装置による蛇行修正結果FIG. 6 shows a meandering correction method and a meandering correction result of the tandem rolling mill according to the present invention.
1…タンデム圧延機の板蛇行修正装置、2…タンデム圧
延機、3…圧延材、4…計測装置、5、51、52…ロ
ール操作装置、6…蛇行制御装置、7…記憶装置、8…
遅延装置、9…板蛇行修正装置、21…(i)番スタン
ド、22…(i+1)番スタンド、41a、41b…蛇
行量計測装置、42a、42b…速度計測装置、43
a、43b…マーク検出装置、61a、62a…予測蛇
行演算手段、61b、62b…蛇行修正演算手段、61
c、62c…修正係数手段、61d、62d…移送時間
演算手段、61e、62e…マーク信号発生手段、7
1、72…保持手段、81、82…遅延手段、e、e
1、e2…測定蛇行信号、eM1、eM2…記憶測定蛇行信
号、eO0、eO1、eO2…遅延測定蛇行信号、eP1、eP2
…予測蛇行信号、eSO、eS1、eS2…修正蛇行信号、
m、m1、m2…マーク測定信号、mO1、m12、m23…マ
ーク到達信号、tO1、t12、t23…予測到達時間信号、
v、v1、v2…測定速度信号、(θ)、θ01、θ02、θ
M1、θM2、θ1、θ2…ロール操作信号、(e,v,m)
…測定信号。DESCRIPTION OF SYMBOLS 1 ... Meandering correction device of tandem rolling mill, 2 ... Tandem rolling machine, 3 ... Rolled material, 4 ... Measuring device, 5, 51, 52 ... Roll operating device, 6 ... Meandering control device, 7 ... Storage device, 8 ...
Delay device, 9: plate meandering correction device, 21: (i) stand, 22: (i + 1) stand, 41a, 41b: meandering amount measuring device, 42a, 42b: speed measuring device, 43
a, 43b: mark detection device, 61a, 62a: predicted meander calculating means, 61b, 62b: meander correction calculating means, 61
c, 62c: correction coefficient means, 61d, 62d: transfer time calculation means, 61e, 62e: mark signal generation means, 7
1, 72 ... holding means, 81, 82 ... delay means, e, e
1, e2: measured meander signal, eM1, eM2: stored measured meander signal, eO0, eO1, eO2: delay measured meander signal, eP1, eP2
... Predicted meander signal, eSO, eS1, eS2 ... Corrected meander signal,
m, m1, m2 ... mark measurement signal, m01, m12, m23 ... mark arrival signal, t01, t12, t23 ... predicted arrival time signal,
v, v1, v2... measurement speed signal, (θ), θ01, θ02, θ
M1, θM2, θ1, θ2: Roll operation signal, (e, v, m)
... Measurement signal.
Claims (3)
に変化して圧延材の蛇行を修正する複数のタンデム圧延
機と、前記タンデム圧延機のロールを操作するロール操
作装置と、前記タンデム圧延機の下流側に配置して前記
圧延材の蛇行状況を測定する計測装置と、前記計測装置
から供給される信号に基づいて前記ロール操作装置を操
作して圧延材の蛇行修正制御をする板蛇行修正装置と、
を備えたタンデム圧延機の板蛇行修正装置において、 前記板蛇行修正装置は、前記計測装置で測定した計測蛇
行量と移動速度および予測蛇行量に基づいて圧延材の蛇
行修正部分が下流側タンデム圧延機に到達するタイミン
グとロール操作量とを演算する蛇行制御装置と、演算し
たロール操作量を一時的に保持する記憶装置と、上流側
タンデム圧延機で修正した圧延材の蛇行修正部分が下流
側タンデム圧延機に到達するまでロール操作を遅延する
遅延装置と、を備え、上流側タンデム圧延機で圧延材の
蛇行修正制御を行った結果が下流側タンデム圧延機に現
れるまでの予測時間と予測蛇行量を演算し、上流側タン
デム圧延機で修正した圧延材の蛇行修正部分が予測時間
後に下流側タンデム圧延機に到達するタイミングで、下
流側タンデム圧延機の計測蛇行量から予測蛇行量を予め
差し引いた値に相当するロール操作量を目標値として蛇
行修正制御を行うとともに、この蛇行修正制御を各タン
デム圧延機毎に連続して行うことを特徴とするタンデム
圧延機の板蛇行修正装置。1. A plurality of tandem rolling mills for simultaneously or independently changing the directions of upper and lower roll axes to correct meandering of a rolled material, a roll operating device for operating rolls of the tandem rolling mill, and the tandem rolling machine. A measuring device arranged downstream of the mill to measure the meandering state of the rolled material; and a plate meandering for controlling the meandering of the rolled material by operating the roll operating device based on a signal supplied from the measuring device. A correction device;
In the meandering correction device for a tandem rolling mill, the meandering correction device includes a meandering correction portion for a rolled material based on the measured meandering amount, the moving speed, and the predicted meandering amount measured by the measuring device. Control device that calculates the timing at which the roller reaches the downstream tandem rolling mill and the roll operation amount, a storage device that temporarily stores the calculated roll operation amount, and the meandering of the rolled material corrected by the upstream tandem rolling mill A delay device that delays the rolling operation until the corrected portion reaches the downstream tandem rolling mill, and a delay device that performs the meandering correction control of the rolled material with the upstream tandem rolling mill until the result appears in the downstream tandem rolling mill. The predicted time and the meandering amount are calculated, and when the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill reaches the downstream tandem rolling mill after the forecasting time, the downstream tandem pressure is calculated. The meandering amount is calculated by subtracting the predicted meandering amount from the measured meandering amount of the rolling mill in advance, and the meandering correction control is performed using the roll operation amount as a target value, and the meandering correction control is continuously performed for each tandem rolling mill. Tandem rolling mill meandering correction device.
に変化して圧延材の蛇行を修正する複数のタンデム圧延
機と、前記タンデム圧延機のロールを操作するロール操
作装置と、前記タンデム圧延機の下流側に配置して前記
圧延材の蛇行状況を測定する計測装置と、前記計測装置
から供給される信号に基づいて前記ロール操作装置を操
作して圧延材の蛇行修正制御をする板蛇行修正装置と、
を備えたタンデム圧延機の板蛇行修正装置において、 前記板蛇行修正装置は、前記計測装置で測定した計測蛇
行量と移動速度および上流側タンデム圧延機の計測蛇行
量に基づいて圧延材の蛇行修正部分が下流側タンデム圧
延機に到達するタイミングとロール操作量とを演算する
蛇行制御装置と、前記計測装置で測定した計測蛇行量を
一時的に保持する記憶装置と、上流側タンデム圧延機で
修正した圧延材の蛇行修正部分が下流側タンデム圧延機
に到達するまで計測蛇行量を遅延する遅延装置と、を備
え、上流側タンデム圧延機で圧延材の蛇行修正制御を行
った結果が下流側タンデム圧延機に現れるまでの予測時
間を演算するとともに蛇行量を計測し、上流側タンデム
圧延機で修正した圧延材の蛇行修正部分が予測時間後に
下流側タンデム圧延機に到達するタイミングで、下流側
タンデム圧延機の計測蛇行量から上流側タンデム圧延機
の計測蛇行量を予め差し引いた値に相当するロール操作
量を目標値として蛇行修正制御を行うとともに、この蛇
行修正制御を各タンデム圧延機毎に連続して行うことを
特徴とするタンデム圧延機の板蛇行修正装置。2. A plurality of tandem rolling mills for simultaneously or independently changing the directions of upper and lower roll axes to correct meandering of a rolled material, a roll operating device for operating rolls of the tandem rolling mill, and the tandem rolling machine. A measuring device arranged downstream of the mill to measure the meandering state of the rolled material; and a plate meandering for controlling the meandering of the rolled material by operating the roll operating device based on a signal supplied from the measuring device. A correction device;
In the meandering correction device of a tandem rolling mill, the meandering correction device includes a measurement meandering amount and a moving speed measured by the measurement device and a measurement meandering of an upstream tandem rolling mill.
A meandering control device meandering correction portion of the strip on the basis of the amount for calculating the timing and roll operation amount reaches the downstream tandem mill, the measuring device temporarily holding store device the measured measured meandering amount at And a delay device that delays the measured meandering amount until the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill reaches the downstream tandem rolling mill, and corrects the meandering of the rolled material by the upstream tandem rolling mill. The predicted time until the control result appears in the downstream tandem rolling mill is calculated and the meandering amount is measured, and the meandering correction portion of the rolled material corrected by the upstream tandem rolling mill is changed to the downstream tandem rolling mill after the predicted time. At the timing of reaching, the roll operation amount corresponding to a value obtained by subtracting the measured meander amount of the upstream tandem rolling mill from the measured meander amount of the downstream tandem rolling mill in advance is set as the target value. Performs line correction control, a plate meandering correction apparatus of a tandem rolling mill, which comprises carrying out successively the meandering correction control for each tandem mill.
に変化して圧延材の蛇行を修正する複数のタンデム圧延
機と、前記タンデム圧延機のロールを操作するロール操
作装置と、前記タンデム圧延機の下流側に配置して前記
圧延材の蛇行状況を測定する計測装置と、前記計測装置
から供給される信号に基づいて前記ロール操作装置を操
作して圧延材の蛇行修正制御をする板蛇行修正装置と、
を備えたタンデム圧延機の板蛇行修正装置において、 前記板蛇行修正装置は、前記計測装置で測定した計測蛇
行量と移動速度とマーク測定信号および予測蛇行量に基
づいて圧延材の蛇行修正部分が下流側タンデム圧延機に
到達する時間を設定するタイマとロール操作量とを演算
する蛇行制御装置と、演算したロール操作量を一時的に
保持する記憶装置と、上流側タンデム圧延機で修正した
圧延材の蛇行修正部分が下流側タンデム圧延機に到達す
るまでロール操作を遅延する遅延装置と、を備え、 上流
側タンデム圧延機で蛇行修正処理をおこなった圧延材上
の蛇行修正点を示すマークを検出するマーク測定信号に
基づいてタイマの計時を開始し、タイマの設定時間によ
り下流側タンデム圧延機に到達するタイミングを決定
し、下流側タンデム圧延機の計測蛇行量から予測蛇行量
を予め差し引いた値に相当するロール操作量を目標値と
して蛇行修正制御を行うとともに、この蛇行修正制御を
各タンデム圧延機毎に連続して行うことを特徴とするタ
ンデム圧延機の板蛇行修正装置。3. The direction of the upper and lower roll axes is simultaneous or independent.
Tandem rolling to change the meander of rolled material by changing to
Roll operation for operating the rolls of the tandem rolling mill
Working device, and disposed downstream of the tandem rolling mill,
Measuring device for measuring meandering condition of rolled material, and the measuring device
Controls the roll operating device based on a signal supplied from the
A plate meandering correction device that makes and controls the meandering of rolled material,
In a meandering correction device for a tandem rolling mill, the meandering correction device includes a measuring meander measured by the measuring device.
Based on the line amount, moving speed, mark measurement signal and estimated meandering amount
Then, the meandering correction part of the rolled material is transferred to the downstream tandem rolling mill.
Calculate timer to set arrival time and roll operation amount
Meandering control device and the calculated roll operation amount
Retained storage device and modified with upstream tandem rolling mill
The meandering correction of the rolled material reaches the downstream tandem mill
A delay device that delays the roll operation until the mark measurement signal for detecting a mark indicating a meandering correction point on a rolled material that has been subjected to meandering correction processing by an upstream tandem rolling mill.
The timer starts timing based on the
The timing to reach the downstream tandem rolling mill
From the measured meandering amount of the downstream tandem rolling mill.
The roll operation amount corresponding to the value obtained by subtracting
To perform the meandering correction control, and
Filter to the unit performs sequentially for each tandem mill <br/> tandem rolling mill of a plate meandering correction system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7216395A JP2970488B2 (en) | 1995-08-24 | 1995-08-24 | Plate meandering correction device for tandem rolling mill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7216395A JP2970488B2 (en) | 1995-08-24 | 1995-08-24 | Plate meandering correction device for tandem rolling mill |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0957323A JPH0957323A (en) | 1997-03-04 |
JP2970488B2 true JP2970488B2 (en) | 1999-11-02 |
Family
ID=16687898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP7216395A Expired - Fee Related JP2970488B2 (en) | 1995-08-24 | 1995-08-24 | Plate meandering correction device for tandem rolling mill |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2970488B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108043884B (en) * | 2017-12-25 | 2023-12-15 | 青岛理工大学 | Main and auxiliary double closed loop deviation rectifying control system based on PID |
-
1995
- 1995-08-24 JP JP7216395A patent/JP2970488B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0957323A (en) | 1997-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2970488B2 (en) | Plate meandering correction device for tandem rolling mill | |
JP3589226B2 (en) | Meandering control method for rolled material | |
JP4306273B2 (en) | Strip meander control device and meander control method for tandem rolling mill | |
WO2024034020A1 (en) | Sheet width control device for reversing rolling mill | |
JP3224052B2 (en) | Thickness control method for continuous rolling mill | |
JPH0289757A (en) | Method for adjusting meandering of band material | |
JPH07178455A (en) | Straightening method of special shape plate and controlling device therefor | |
JP2018134661A (en) | Plate thickness control device and method of rolling machine, and rolling machine | |
JPH0413411A (en) | Method for controlling strip thickness when strip is passed through in hot continuous mill | |
JP3350294B2 (en) | Control method and control device for tandem mill | |
JP3355089B2 (en) | Plate thickness control device and plate thickness control method | |
JPH07178434A (en) | Control method of meandering in hot rolling | |
JPS5897417A (en) | Controlling device for roll eccentricity | |
JP2716866B2 (en) | Mass flow controller for tandem rolling mill | |
JP2675665B2 (en) | Method and apparatus for controlling plate thickness of hot rolling mill | |
JPH0683855B2 (en) | Transport table roller speed control method in hot rolling mill | |
JPH05220511A (en) | Method for controlling thickness in continuous hot rolling mill | |
JPS5868414A (en) | Method for controlling sheet thickness using inlet-side thickness gauge | |
JPS6024725B2 (en) | Hot rolling mill strip width control method and device | |
JPH08197125A (en) | Control method for meandering and rolling mill equipment row for tandem plate | |
JPH07115057B2 (en) | Plate shape control method in rolling mill | |
JPH10263657A (en) | Method for measuring roll profile and device therefor | |
JPH0616893B2 (en) | Strip width control method for hot tandem rolling mill | |
JP2001347309A (en) | Thickness control device for rolling mill | |
JPH0371910A (en) | Control method for plate thickness of hot continuous rolling mill |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070827 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080827 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080827 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090827 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090827 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100827 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110827 Year of fee payment: 12 |
|
LAPS | Cancellation because of no payment of annual fees |