JP2965738B2 - Power system monitoring device - Google Patents
Power system monitoring deviceInfo
- Publication number
- JP2965738B2 JP2965738B2 JP8782891A JP8782891A JP2965738B2 JP 2965738 B2 JP2965738 B2 JP 2965738B2 JP 8782891 A JP8782891 A JP 8782891A JP 8782891 A JP8782891 A JP 8782891A JP 2965738 B2 JP2965738 B2 JP 2965738B2
- Authority
- JP
- Japan
- Prior art keywords
- accident
- power system
- data
- state
- storage means
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012806 monitoring device Methods 0.000 title claims description 11
- 238000013500 data storage Methods 0.000 claims description 23
- 238000012544 monitoring process Methods 0.000 claims description 9
- 238000010586 diagram Methods 0.000 description 11
- 238000000034 method Methods 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 7
- 230000001681 protective effect Effects 0.000 description 2
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、電力系統に発生した事
故の内容を推定する電力系統監視装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a power system monitoring device for estimating the nature of an accident that has occurred in a power system.
【0002】[0002]
【従来の技術】電力系統に事故が発生した場合、事故が
発生した設備そのものを保護したり、事故の範囲を最小
限にするために各種の保護装置が働き、しゃ断器が開放
するなど刻々と電力系統が変化する。このように、事故
による電力系統の変化があると、事故内容を推定する必
要があり、そのため従来は、事故後の電力系統状態と事
故の関係に関する知識を用いて行なっていた。図13は従
来の事故内容を推定する電力系統監視装置の構成例であ
る。2. Description of the Related Art When an accident occurs in an electric power system, various protection devices work to protect the equipment in which the accident occurred, and to minimize the scope of the accident. The power system changes. As described above, if there is a change in the power system due to an accident, it is necessary to estimate the content of the accident, and therefore, conventionally, knowledge about the relationship between the state of the power system after the accident and the accident has been used. FIG. 13 shows a configuration example of a conventional power system monitoring device for estimating the content of an accident.
【0003】図に示されるように、電力系統からの状変
データは送信局2及び受信局3を経由して電子計算機4
内の状変監視手段42に入力される。設備データ格納手段
41には予め設備データが格納されている。事故内容推定
手段44は状変監視手段42のデータと設備データ格納手段
41のデータ及び知識格納手段43に格納された知識ベース
を用いて当該事故内容を推定し、その結果を表示装置5
に出力する。[0003] As shown in the figure, state change data from a power system is transmitted to a computer 4 via a transmitting station 2 and a receiving station 3.
It is input to the state change monitoring means 42 inside. Equipment data storage means
41 stores equipment data in advance. The accident content estimating means 44 is a means for storing the data of the condition changing
The accident contents are estimated using the data of 41 and the knowledge base stored in the knowledge storage means 43, and the result is displayed on the display device 5.
Output to
【0004】[0004]
【発明が解決しようとする課題】電力系統がより一層複
雑化する傾向にあり、それに応じて更に電力供給の信頼
度を高める必要がある。したがって複数の保護装置がよ
り複雑な協調をとるようになってきている。このため、
被監視系統内のしゃ断器がどの保護装置により開放させ
られたかを一意に判断できなくなってきた。例えば図2
の電力系統のB#1母線に事故が発生した場合、図13に
示す従来の電力系統監視装置では、図14に示すような推
定結果の表示出力となる。As the power system tends to become more and more complicated, it is necessary to further increase the reliability of the power supply. Therefore, a plurality of protection devices are taking on more complicated coordination. For this reason,
It has become impossible to uniquely determine which protection device has opened the circuit breaker in the monitored system. For example, FIG.
In the case where an accident occurs in the B # 1 bus of the power system, the conventional power system monitoring device shown in FIG. 13 outputs a display of the estimation result as shown in FIG.
【0005】このような場合、それぞれの保護装置が動
作した実際の電力系統状態を正しく認識する必要があ
り、事故後の電力系統状態データだけでは事故内容の推
定が難しくその技術はいまだ確立されていない。本発明
は上記事情に鑑みてなされたものであり、複数の保護装
置が連続して動作した場合の途中の電力系統状態を考慮
して、事故内容の推定を行なうことの可能な電力系統監
視装置を提供することを目的としている。In such a case, it is necessary to correctly recognize the actual state of the power system in which the respective protective devices have operated, and it is difficult to estimate the details of the accident only from the data of the state of the power system after the accident, and the technology is still established. Absent. The present invention has been made in view of the above circumstances, and in consideration of a power system state in the middle of a case where a plurality of protection devices operate continuously, a power system monitoring device capable of estimating the content of an accident. It is intended to provide.
【0006】[0006]
【課題を解決するための手段】上記目的を達成するため
の構成を実施例に対応する図1を用いて説明すると、本
発明は被監視系統の状態データを含む電力系統設備デー
タを格納する設備データ格納手段41と、前記被監視系統
の各々の設備から送られてくる状態変化時刻を含む状態
変化データを常に監視し、設備データ格納手段41を更新
する状変監視手段42と、前記状態変化データと設備デー
タ格納手段41の内容とから状態変化が連続したとき、継
電器動作時点を原因とした継電器及び遮断器の時系列的
な状変データをもとにしたの電力系統状態を再現する系
統状態再現手段45と、前記事故時の電力系統状態と状変
データと事故との関係に関する知識を格納する知識格納
手段43と、前記設備データ格納手段41の内容と系統状態
再現手段45で作成された事故時の電力系統状態と状態変
化データと知識格納手段43の内容とから事故の内容を推
定する事故内容推定手段44とから構成した。A structure for achieving the above object will be described with reference to FIG. 1 corresponding to an embodiment. The present invention relates to an equipment for storing power system equipment data including state data of a monitored system. A data storage unit 41, a state change monitoring unit 42 that constantly monitors state change data including a state change time sent from each equipment of the monitored system, and updates the equipment data storage means 41; A system that reproduces the state of the power system based on the time-series state change data of the relay and the circuit breaker due to the operation time of the relay when the state change continues from the data and the contents of the equipment data storage means 41. State reproduction means 45, knowledge storage means 43 for storing knowledge about the relationship between the power system state at the time of the accident, state change data and the accident, and contents of the equipment data storage means 41 and system state reproduction means 45 Was An accident content estimating means 44 for estimating the contents of the accident from the power system state at the time of the accident, the state change data, and the contents of the knowledge storage means 43.
【0007】[0007]
【作用】被監視系統から入力される状態変化データは状
変監視手段42により設備データ格納手段41に格納され
る。事故内容推定手段44では設備データ格納手段41の内
容と、知識格納手段43に格納されている知識を用いて系
統状態再現手段45に対する要求事項を作成する。即ち、
要求があると、系統状態再現手段45では状態変化データ
と設備データ格納手段41の内容から継電器動作時点の電
力系統状態を再現する。一方、事故内容推定手段44では
系統状態再現手段45で作成された電力系統状態と、設備
データ格納手段41の内容と、知識格納手段43に格納され
ている知識を用いて事故の内容を推定する。The state change data input from the monitored system is stored in the facility data storage means 41 by the state change monitoring means. The accident content estimating means 44 creates requirements for the system state reproducing means 45 using the contents of the equipment data storing means 41 and the knowledge stored in the knowledge storing means 43. That is,
When there is a request, the system state reproducing means 45 reproduces the power system state at the time of operation of the relay from the state change data and the contents of the facility data storage means 41. On the other hand, the accident content estimation means 44 estimates the content of the accident using the power system state created by the system state reproduction means 45, the contents of the facility data storage means 41, and the knowledge stored in the knowledge storage means 43. .
【0008】[0008]
【実施例】以下図面を参照して実施例を説明する。図1
は本発明による電力系統監視装置の一実施例の機能ブロ
ック図である。図1において、1は電力系統、2,3は
電力系統1と後述する電子計算機4との間の情報伝送装
置であり、2は電力系統1から電子計算機4への送信
局、3は同じく受信局である。4は電子計算機で送信局
2及び受信局3を介して得られる電力系統1の状況を基
に、事故の内容を推定する。5は電子計算機4で推定さ
れた事故の内容を表示する表示装置である。An embodiment will be described below with reference to the drawings. FIG.
1 is a functional block diagram of an embodiment of a power system monitoring device according to the present invention. In FIG. 1, 1 is a power system, 2 and 3 are information transmission devices between the power system 1 and a computer 4 described later, 2 is a transmitting station from the power system 1 to the computer 4, and 3 is a receiving station. Bureau. Reference numeral 4 denotes an electronic computer for estimating the nature of the accident based on the status of the power system 1 obtained via the transmitting station 2 and the receiving station 3. Reference numeral 5 denotes a display device for displaying the details of the accident estimated by the computer 4.
【0009】また、電子計算機4において、41は電力系
統1をモデル化し、更にその状況を保存する設備データ
格納手段、42は電力系統1の状況を入力して設備データ
格納手段41へ格納し、また、後述する事故内容推定手段
44へ状変データを渡す状変監視手段、43は事故内容の推
定に関する知識を格納した知識格納手段、44は状変監視
手段42で作成された状変データと設備データ格納手段41
に格納されている電力系統1のモデル化された内容と知
識格納手段43に格納されている事故内容推定知識と後述
する系統状態再現手段によって作成された電力系統から
事故の内容を推定する事故内容推定手段、45は事故内容
推定手段44が事故の内容を推定するために必要な電力系
統を再現する系統再現手段である。図2は被監視系統で
ある電力系統の一例である。Also, in the computer 4, 41 is a facility data storage means for modeling the power system 1 and further storing the situation, 42 is a state of the power system 1 input and stored in the facility data storage means 41, Also, an accident content estimating means described later
Status change monitoring means for passing the status change data to 44, knowledge storage means 43 for storing knowledge about the estimation of accident contents, 44 status change data and equipment data storage means 41 created by the status change monitoring means 42
Of the accident that estimates the contents of the accident from the modeled contents of the electric power system 1 stored in the storage unit, the accident contents estimation knowledge stored in the knowledge storage unit 43, and the electric power system created by the system state reproduction unit described later. Estimating means 45 is a system reproducing means for reproducing the electric power system necessary for the accident content estimating means 44 to estimate the content of the accident. FIG. 2 is an example of a power system that is a monitored system.
【0010】図3は図2の場合の設備データ格納手段41
の一部分図である。図3の最初のデータはA電気所に設
置されている設備はA#1母線とA−1CBとA−2C
Bであることを示している。また、図3の6番目のデー
タはA電気所のA−1CBにはAB#1L送電線とA#
1母線が接続されていることを示し、また設置されてい
るリレーは、SGリレーとCOVGリレーであることを
示している。FIG. 3 shows equipment data storage means 41 in the case of FIG.
FIG. The first data in FIG. 3 indicates that the equipment installed in the A substation is A # 1 bus, A-1CB and A-2C.
B. In addition, the sixth data in FIG. 3 shows that A-1CB at A substation has AB # 1L transmission line and A #
One bus is connected, and the installed relays are an SG relay and a COVG relay.
【0011】図4は被監視系統における状変データの一
例図である。左端の番号は便宜上つけた行番号である。
1行目は、B−5CBに設置されているBTリレーが時
刻9時55分5.010 秒に動作したことを示し、また7行目
は、B−5CBが時刻9時55分5.070 秒にしゃ断したこ
とを示している。図5は図4の状変データを例にしたと
きの電力系統監視装置における事故内容の推定結果の表
示装置5への出力例図であり、図4の状変データに対
し、B電気所の#1母線に事故が発生したことを示して
いる。FIG. 4 is an example of state change data in the monitored system. The leftmost number is a line number given for convenience.
The first line shows that the BT relay installed on the B-5CB operated at 9: 55: 5.010 seconds, and the seventh line B-5CB shut down at 9: 55: 5.070 seconds. It is shown that. FIG. 5 is a diagram showing an example of the output of the result of estimation of the details of an accident in the power system monitoring device to the display device 5 when the state change data of FIG. 4 is used as an example. This indicates that an accident occurred on the # 1 bus.
【0012】次に作用ついて説明する。図6は表示装置
5に対して、図5のように出力するための事故内容の推
定処理を示すフローチャートであり、電子計算機全体と
してみた場合の処理である。まず、ステップS61 では状
変監視手段42により電力系統1の状態を常に監視し、状
態に変化が発生すると、その状変の状況を取り込み、状
変データを受信して設備データ格納手段41に格納されて
いる設備状態のデータを変更する。Next, the operation will be described. FIG. 6 is a flowchart showing a process of estimating the content of an accident for outputting to the display device 5 as shown in FIG. 5, which is a process in the case where the entire computer is viewed. First, in step S61, the status of the power system 1 is constantly monitored by the status change monitoring means 42, and when a change occurs in the status, the status of the status change is fetched, the status change data is received and stored in the facility data storage means 41. The equipment status data that has been set.
【0013】また、状変監視手段42により事故内容推定
手段44へ状変データを渡す。図4は図2の系統に対して
の状変データの一例である。ステップS62 ではステップ
S61で受信した状態変化データと設備データ格納手段41
に格納されている電力系統1の状況と知識格納手段43に
格納されている知識を適用して電力系統1に発生した事
故の内容を推定する。ステップS63 ではステップS62 に
推定した事故の内容を出力装置に出力して、処理を終了
する。The state change monitoring means 42 transfers the state change data to the accident content estimating means 44. FIG. 4 is an example of state change data for the system of FIG. Step S62
State change data and equipment data storage means 41 received in S61
Of the power system 1 stored in the power system 1 and the knowledge stored in the knowledge storage means 43 are used to estimate the contents of the accident that has occurred in the power system 1. In step S63, the contents of the accident estimated in step S62 are output to the output device, and the process ends.
【0014】次に、図6で示したステップS62 の処理に
ついて図7を用いて詳細に説明する。ステップS71 では
ステップS61 によって受信された状変データからリレー
の動作に関する状変データを抽出する。図4の状変デー
タを例にすると図8のようになる。図8では動作したリ
レーが6つあることを示している。ステップS72 ではス
テップS71 で抽出したリレーの全てに対するリレーの保
護設備を設備データ格納手段41の設備データと知識格納
手段43の知識を用いて求める。Next, the processing in step S62 shown in FIG. 6 will be described in detail with reference to FIG. In step S71, state change data relating to the operation of the relay is extracted from the state change data received in step S61. FIG. 8 shows an example of the state change data of FIG. FIG. 8 shows that there are six activated relays. In step S72, the relay protection equipment for all the relays extracted in step S71 is determined using the equipment data in the equipment data storage means 41 and the knowledge in the knowledge storage means 43.
【0015】図9は図8に示したリレーの保護設備の例
である。ステップS73 でステップS72 によって求めた保
護設備の中から全てのリレーの保護設備に共通となって
いる設備を抽出し、その設備を事故設備とする。図9に
おいて全てのリレーの保護設備に共通となっている設備
は、B#1母線でありB#1母線が事故設備となる。FIG. 9 shows an example of the protection equipment for the relay shown in FIG. In step S73, from among the protection facilities obtained in step S72, a facility common to all the relay protection facilities is extracted, and the facility is designated as an accident facility. In FIG. 9, equipment common to all relay protection equipment is the B # 1 bus, and the B # 1 bus is the accident equipment.
【0016】次に図10を用いてステップS72 の推論処理
について説明する。ステップS101ではステップS71 によ
って抽出されたリレーの内、リレーの保護設備をまだ求
めていないリレーを1つ選択する。ステップS102ではス
テップS101によって選択したリレーに対する適用知識を
抽出する。ステップS103では抽出した知識において系統
状態の再現が必要であるか否かを判断して、必要があれ
ばステップS104にて系統状態を再現する。必要がなけれ
ばステップS105によって設備データ格納手段に保存され
ている系統状態を取り出す。ステップS104では対象とす
るリレーが動作した時点における系統状態をステップS6
1 によって受信された状変データと設備データ格納手段
41に格納された設備データを用いて再現する。また再現
した系統をステップS106で使用する系統とする。Next, the inference process in step S72 will be described with reference to FIG. In step S101, one of the relays extracted in step S71 for which protection equipment for the relay has not yet been requested is selected. In step S102, application knowledge for the relay selected in step S101 is extracted. In step S103, it is determined whether or not it is necessary to reproduce the system state based on the extracted knowledge. If necessary, the system state is reproduced in step S104. If it is not necessary, the system status stored in the facility data storage is extracted in step S105. In step S104, the state of the system at the time when the target relay operates is determined in step S6.
1 and storage means for facility data received by
Reproduce using the equipment data stored in 41. The reproduced system is used as the system used in step S106.
【0017】図12は図2の系統一例図に対して、図8の
動作したリレーにおいて5番目のCOVGが動作した時
点の系統状態を再現した図である。ステップS105ではス
テップS61 によって変更された設備データ格納手段41に
格納されている系統を取り出すと共に、ステップS106で
使用する系統とする。ステップS106ではステップS104に
よって再現された系統状態、もしくはステップS105によ
って取り出された系統状態と知識格納手段43に格納され
ている知識とでリレーの保護設備を求める。ステップS1
07では動作したリレーでリレーに対する保護設備を求め
ていないリレーがあるか否かを判断し、保護設備を求め
ていないリレーがあればステップS101へ戻って前記処理
を行ない、なければステップS72 の処理を終了する。FIG. 12 is a diagram that reproduces the state of the system at the time when the fifth COVG operates in the operated relay of FIG. 8 with respect to the example of the system of FIG. In step S105, the system stored in the facility data storage means 41 changed in step S61 is extracted, and is set as the system used in step S106. In step S106, a relay protection facility is determined based on the system state reproduced in step S104 or the system state extracted in step S105 and the knowledge stored in the knowledge storage unit 43. Step S1
In step 07, it is determined whether there is a relay that does not require protection equipment for the relay in the activated relay.If there is a relay that does not require protection equipment, the process returns to step S101 to perform the above-described processing. To end.
【0018】次に図11に示す事故内容を推定するための
知識例を参照しながら、ステップS72 の詳細な処理につ
いて説明する。図11は知識格納手段43に格納されている
知識の一部である。そして図11に示す知識は事故内容を
推定するための知識の一部例であり、IFから始まる条件
部において着目しているリレーが動作した系統状態を判
断している。またTHENから始まる実行部において着目し
ているリレーの保護設備を確定する。Next, the detailed processing in step S72 will be described with reference to a knowledge example for estimating the content of an accident shown in FIG. FIG. 11 shows a part of the knowledge stored in the knowledge storage means 43. The knowledge shown in FIG. 11 is a partial example of knowledge for estimating the details of an accident, and determines the system state in which the relay of interest operates in a conditional part starting from IF. Also, determine the protection equipment for the relay of interest in the execution unit starting with THEN.
【0019】図2において図8に示すようなリレーが動
作した場合を例に説明する。まず図8の状変データの1
番目のB−5CB,BTリレーを選択する。B−5C
B,BTリレーの動作に対して抽出される知識は図11の
3番目の知識である。この3番目の知識の条件部におい
て、図3の設備データに適応するとB#1母線に接続す
る開閉器B−5CBがあり、開閉器B−5CBにBTリ
レーが設置され、更にBTリレーが動作しているという
全ての条件が成立する。その結果、実行部において保護
設備はB#1母線とB#2母線となる。In FIG. 2, a case where a relay as shown in FIG. 8 operates will be described as an example. First, 1 of the state change data in FIG.
The second B-5CB, BT relay is selected. B-5C
The knowledge extracted for the operation of the B and BT relays is the third knowledge in FIG. In the condition part of the third knowledge, when adapted to the equipment data of FIG. 3, there is a switch B-5CB connected to the B # 1 bus, a BT relay is installed in the switch B-5CB, and the BT relay is further operated. All the conditions are satisfied. As a result, in the execution unit, the protection equipment is a B # 1 bus and a B # 2 bus.
【0020】次に図8の2番目のB−1CB,COVG
リレーが選択される。B−1CB,COVGリレーの動
作に対して適応する知識は、図11の4番目と5番目の知
識である。図11の4番目と5番目の知識では系統状態を
再現する必要があるため、B−1CB,COVGリレー
が動作した時点の系統状態を再現する。図12はB−1C
B,COVGリレーが動作した時点の系統状態を再現し
たものである。図12中の□*は、CBがしゃ断状態であ
ることを示しており、また□は、CBが入り状態である
ことを示している。Next, the second B-1CB, COVG in FIG.
Relay is selected. The knowledge applicable to the operation of the B-1CB, COVG relay is the fourth and fifth knowledge in FIG. Since it is necessary to reproduce the system state with the fourth and fifth knowledges in FIG. 11, the system state at the time when the B-1CB, COVG relay operates is reproduced. FIG. 12 shows B-1C
B, This is a reproduction of the system state at the time when the COVG relay operates. In FIG. 12, □ * indicates that the CB is in the cutoff state, and □ indicates that the CB is in the on state.
【0021】図11の4番目の知識の条件部において、図
3の設備データに適応するとAB#1L送電線に接続す
る開閉器B−1CBがあり、開閉器B−lCBにCOV
Gリレーが設置されており、COVGリレーが動作して
いるという条件が成立する。しかし、再現した系統状態
において、AB#1L送電線に接続する開閉器のいずれ
もしゃ断していないという条件に反する。このため、B
−1CB,COVGリレーに対して、図11の4番目の知
識の実行部は処理されない。In the condition part of the fourth knowledge shown in FIG. 11, when adapted to the equipment data shown in FIG. 3, there is a switch B-1CB connected to the AB # 1L transmission line, and the switch B-1CB has a COV.
The condition that the G relay is installed and the COVG relay is operating is satisfied. However, this is contrary to the condition that none of the switches connected to the AB # 1L transmission line is cut off in the reproduced system state. Therefore, B
For the -1CB, COVG relay, the fourth knowledge execution unit in FIG. 11 is not processed.
【0022】また図8の5番目のB−1CB,COVG
リレーの動作に対して、図11の5番目の知識の条件部に
おいて、図3の設備データに適応すると、AB#1L送
電線に接続する開閉器B−1CBがあり、開閉器B−1
CBにCOVGリレーが設置されており、COVGリレ
ーが動作しているといる条件が成立する。更に再現した
系統状態において、AB#1L送電線に接続する開閉器
のいずれかがしゃ断しているという全ての条件が成立す
る。The fifth B-1CB, COVG in FIG.
For the operation of the relay, in the condition part of the fifth knowledge of FIG. 11, when adapting to the equipment data of FIG. 3, there is a switch B-1CB connected to the AB # 1L transmission line, and the switch B-1
The condition that the COVG relay is installed in the CB and the COVG relay is operating is satisfied. Further, in the reproduced system state, all the conditions that one of the switches connected to the AB # 1L transmission line is cut off are satisfied.
【0023】その結果、THENから始まる実行部におい
て、保護設備はB#1母線とBC#1L送電線となる。
図8の3番目以降の全てのリレーについて前記と同様に
処理を行ない、リレーの保護区間を求める。これにより
図2において図8に示すリレーが動作した場合に、図9
に示すようなリレーの保護区間を求めることができる。
以上説明したよに図2のB#1母線に発生した事故内容
について、正しく推定することが可能となる。As a result, in the execution section starting from THEN, the protection equipment is a B # 1 bus and a BC # 1L transmission line.
The same processing as described above is performed for all the third and subsequent relays in FIG. 8 to determine the protection section of the relay. As a result, when the relay shown in FIG. 8 operates in FIG.
The protection section of the relay as shown in FIG.
As described above, it is possible to correctly estimate the details of the accident that has occurred on the B # 1 bus in FIG.
【0024】[0024]
【発明の効果】以上説明したように、本発明によれば事
故発生時に動作リレーを抽出し、全てのリレーに対する
保護設備の設備データを格納手段内の知識を用いて求め
て系統状態の再現が必要であるか否かを判断し、必要時
には対象となるリレーが動作した時点における系統状態
を再現して、改めて保護設備を求める構成としたので、
電力系統が複雑化し、複数個の保護装置が複雑な協調を
とるような電力系統に事故が発生した場合においても、
事故内容を推定することが可能な電力系統監視装置を提
供することが可能となる。As described above, according to the present invention, the operation relay is extracted when an accident occurs, and the equipment data of the protection equipment for all the relays is obtained by using the knowledge in the storage means to reproduce the system state. Judgment as to whether or not it is necessary, and when necessary, the system status at the time when the target relay was operated was reproduced, so that the protection equipment was newly requested,
Even if an accident occurs in the power system where the power system becomes complicated and multiple protective devices cooperate in a complicated manner,
It is possible to provide a power system monitoring device capable of estimating the details of an accident.
【図1】本発明による電力系統事故判定装置の一実施例
の機能ブロック図。FIG. 1 is a functional block diagram of an embodiment of a power system accident determination device according to the present invention.
【図2】電力系統1の一例図。FIG. 2 is an example diagram of an electric power system 1.
【図3】図2の系統構成の場合の設備データ格納手段の
一部例図。FIG. 3 is a partial example diagram of equipment data storage means in the case of the system configuration of FIG. 2;
【図4】図2の被監視系統における状変データの一例
図。FIG. 4 is an example diagram of state change data in the monitored system of FIG. 2;
【図5】本発明による事故内容推定結果の表示装置5へ
の出力例図。FIG. 5 is a view showing an example of output of an accident content estimation result to a display device 5 according to the present invention.
【図6】表示装置に図5のように出力するための事故内
容推定処理を示すフローチャート。FIG. 6 is a flowchart showing an accident content estimation process for outputting to the display device as shown in FIG. 5;
【図7】図6ステップS62 の処理を示すフローチャー
ト。FIG. 7 is a flowchart showing the process of step S62 in FIG. 6;
【図8】図4の状変データにおけるリレーの動作に関す
るデータの一例図。FIG. 8 is an example of data relating to the operation of the relay in the state change data of FIG. 4;
【図9】図2において図8のデータに関するリレー保護
区間の一例図。FIG. 9 is a view showing an example of a relay protection section relating to the data of FIG. 8 in FIG. 2;
【図10】図7のステップS72 の処理を示すフローチャー
ト。FIG. 10 is a flowchart showing a process in step S72 of FIG. 7;
【図11】知識格納手段の構成例図。FIG. 11 is a configuration example diagram of a knowledge storage unit.
【図12】図2の電力系統に図4の状変が発生した場合の
途中の電力系統の一例図。FIG. 12 is an example diagram of a power system in the middle of the case where the state of FIG. 4 has occurred in the power system of FIG. 2;
【図13】従来の電力系統監視装置の一実施例の機能ブロ
ック図。FIG. 13 is a functional block diagram of one embodiment of a conventional power system monitoring device.
【図14】従来の電力系統監視装置による事故内容推定結
果の出力例図。FIG. 14 is an output example diagram of an accident content estimation result by the conventional power system monitoring device.
1 電力系統 2 送信局 3 受信局 41 設備データ格納手段 42 状変監視手段 43 知識格納手段 44 事故内容推定手段 45 系統状態再現手段 5 表示装置 Reference Signs List 1 power system 2 transmitting station 3 receiving station 41 equipment data storage means 42 condition change monitoring means 43 knowledge storage means 44 accident content estimation means 45 system state reproduction means 5 display device
───────────────────────────────────────────────────── フロントページの続き (72)発明者 島田 和恵 東京都府中市東芝町1番地 株式会社東 芝 府中工場内 (72)発明者 梶原 康正 東京都府中市東芝町1番地 株式会社東 芝 府中工場内 (72)発明者 粕谷 健志 東京都府中市武蔵台1丁目1番15号 東 芝エンジニアリング株式会社 府中事業 所内 (72)発明者 夏村 悦郎 東京都府中市武蔵台1丁目1番15号 東 芝エンジニアリング株式会社 府中事業 所内 (56)参考文献 特開 昭61−224830(JP,A) 特開 平2−168827(JP,A) 特開 昭63−161817(JP,A) (58)調査した分野(Int.Cl.6,DB名) H02H 3/00 - 5/00 ──────────────────────────────────────────────────続 き Continued on the front page (72) Kazue Shimada, 1 Toshiba-cho, Fuchu-shi, Tokyo Inside the Toshiba Fuchu Plant, Inc. (72) Inventor Takeshi Kasuya 1-1-1 Musashidai, Fuchu-shi, Tokyo Toshiba Engineering Corporation Fuchu Works (72) Inventor Etsuro Natsumura 1-1-1-1 Musashidai, Fuchu-shi, Tokyo Toshiba (56) References JP-A-61-224830 (JP, A) JP-A-2-16827 (JP, A) JP-A-63-161817 (JP, A) (58) Fields investigated (Int.Cl. 6 , DB name) H02H 3/00-5/00
Claims (1)
設備データを格納する設備データ格納手段と、前記被監
視系統の各々の設備から送られてくる状態変化時刻を含
む状変データを常に監視し、設備データ格納手段を更新
する状変監視手段と、前記状変データと設備データ格納
手段の内容とから状変が連続したとき、継電器動作時点
を原因とした継電器及び遮断器の時系列的な状変データ
をもとにした電力系統状態を再現する系統状態再現手段
と、前記事故時の電力系統状態と状変データと事故との
関係に関する知識を格納する知識格納手段と、前記設備
データ格納手段の内容と系統状態再現手段で作成された
事故時の電力系統状態と状変データと知識格納手段の内
容とから事故の内容を推定する事故内容推定手段とから
なることを特徴とする電力系統監視装置。1. A constantly monitors the facilities data storage unit, wherein the variable data form includes a state change time is come transmitted from each facility of the monitored system for storing electric power system equipment data including status data of the monitored system And a state change monitoring means for updating the equipment data storage means, and when the state change is continuous from the state change data and the contents of the equipment data storage means, the relay operation time
Time-series data on relays and circuit breakers due to traffic
System state reproduction means for reproducing a power system state based on the above, knowledge storage means for storing knowledge about the relationship between the power system state, state change data, and accident at the time of the accident, and contents of the equipment data storage means It is made of the accident contents estimation means for estimating the content of the accident from the contents of the power system state and state change data and knowledge storage means at the time of the accident created in the system condition reproducer power system monitoring device according to claim.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8782891A JP2965738B2 (en) | 1991-03-27 | 1991-03-27 | Power system monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8782891A JP2965738B2 (en) | 1991-03-27 | 1991-03-27 | Power system monitoring device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05103427A JPH05103427A (en) | 1993-04-23 |
JP2965738B2 true JP2965738B2 (en) | 1999-10-18 |
Family
ID=13925811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8782891A Expired - Fee Related JP2965738B2 (en) | 1991-03-27 | 1991-03-27 | Power system monitoring device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2965738B2 (en) |
-
1991
- 1991-03-27 JP JP8782891A patent/JP2965738B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH05103427A (en) | 1993-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100352866B1 (en) | Monitoring control system of electric power system and recording medium of stored program | |
JP2001202104A (en) | Integration of field device in equipment control system | |
JP2965738B2 (en) | Power system monitoring device | |
JP3789036B2 (en) | Monitoring control device, power system protection control device, distributed control system, and storage medium storing program | |
US7103453B2 (en) | Installation of a protective function in a protective device for an electrical power distribution network | |
JP2009017625A (en) | System and method for monitoring electric power system | |
JPH09200959A (en) | Power system fault analysis supporter | |
JP3494792B2 (en) | Automatic recovery equipment for electrical facilities | |
KR102673587B1 (en) | System and Method for preliminary integrated control monitoring to relieve vulnerability of digital substation | |
JP3302224B2 (en) | Substation equipment | |
JPH0739074A (en) | Power receiving and transforming facility | |
JP2966957B2 (en) | Power system accident judgment device | |
JP4128907B2 (en) | Supervisory control system | |
JP2008278662A (en) | Bus protective relaying device | |
JP2908219B2 (en) | Distribution line load accommodation calculation constraint relaxation method | |
JP2002369375A (en) | Distribution line supervisory control device | |
JPH0635611Y2 (en) | Gas insulated switchgear | |
JP2002057667A (en) | Network maintenance equipment | |
Brantley et al. | The Application of IEC® 61850 to Replace Auxiliary Devices Including Lockout Relays | |
CA2054486C (en) | Reservation and interlocking in the operation of electric switching devices | |
JP2897934B2 (en) | Power system monitoring control knowledge processing system | |
JPS60144116A (en) | Power system simulator | |
JP2002373020A (en) | Monitoring and control system | |
JP3177701B2 (en) | Accident recovery inference method at substation | |
JPH05161264A (en) | Power system monitor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313115 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |