JP2932992B2 - Work management alarm event suppression method - Google Patents

Work management alarm event suppression method

Info

Publication number
JP2932992B2
JP2932992B2 JP7347707A JP34770795A JP2932992B2 JP 2932992 B2 JP2932992 B2 JP 2932992B2 JP 7347707 A JP7347707 A JP 7347707A JP 34770795 A JP34770795 A JP 34770795A JP 2932992 B2 JP2932992 B2 JP 2932992B2
Authority
JP
Japan
Prior art keywords
alarm event
work
construction
construction work
failure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7347707A
Other languages
Japanese (ja)
Other versions
JPH09168010A (en
Inventor
信司 笠木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
Nippon Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Electric Co Ltd filed Critical Nippon Electric Co Ltd
Priority to JP7347707A priority Critical patent/JP2932992B2/en
Publication of JPH09168010A publication Critical patent/JPH09168010A/en
Application granted granted Critical
Publication of JP2932992B2 publication Critical patent/JP2932992B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ネットワーク管理
システムに関し、特にパケット交換機、電話交換機、伝
送装置等のネットワーク機器の工事作業に伴うアラーム
イベントのオペレータへの通知方式に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a network management system and, more particularly, to a system for notifying an operator of an alarm event associated with construction work of a network device such as a packet switch, a telephone switch, and a transmission device.

【0002】[0002]

【従来の技術】従来、この種のネットワーク管理システ
ムにおける障害の管理及び出力については、例えば特開
平2−234597号公報に記載されているように、工
事作業時に発生するアラームをマスクして真の故障によ
るアラームのみを障害として出力するアラーム相互マス
ク方式が提案されているが、工事対象装置の包含木の構
成に伴う上位反映の扱いが決められていない。
2. Description of the Related Art Conventionally, regarding the management and output of faults in this type of network management system, as described in, for example, Japanese Patent Application Laid-Open No. 2-234597, an alarm generated at the time of construction work is masked to obtain a true Although an alarm mutual mask method that outputs only an alarm due to a failure as a failure has been proposed, the handling of higher-level reflection associated with the configuration of the inclusion tree of the construction target device has not been determined.

【0003】また、工事対象装置の包含木の構成に伴う
上位反映の扱いとしては、例えば、工事作業時間帯にお
ける障害の発生時は、工事対象装置の障害の発生のアラ
ームイベントの上位反映を行わないが、工事作業時間帯
における障害の復旧時は、工事対象装置の障害の復旧の
アラームイベントの上位反映を行うようにするものがあ
る。
[0003] In addition, as a method of handling the higher reflection associated with the configuration of the inclusion tree of the construction target device, for example, when a failure occurs during the construction work time, the higher reflection of the alarm event of the failure of the construction target device is performed. However, when a failure is restored during the construction work time, there is a configuration in which an alarm event for restoration of the failure of the construction target device is reflected at a higher level.

【0004】なお、特開平5−207015号公報に記
載されているように、装置について発生した障害の影響
をカウントし、被監視物毎にカウント値を比較して障害
の種類を判断するネットワーク状態管理方法も提案され
ている。
As described in Japanese Patent Laid-Open No. Hei 5-207015, a network state in which the influence of a fault that has occurred on a device is counted and the type of the fault is determined by comparing the count value for each monitored object. Management methods have also been proposed.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、前記各
公報等に記載された従来のネットワーク管理システムに
は、以下のような問題点がある。
However, the conventional network management systems described in the above publications have the following problems.

【0006】第1の問題点は、アラームイベントで表さ
れる障害の発生/復旧を管理する障害管理と工事作業に
よる障害のアラームイベントの管理とを工事対象装置毎
に行っていることである。
A first problem is that fault management for managing occurrence / recovery of a fault represented by an alarm event and management of a fault alarm event due to a construction work are performed for each construction target device.

【0007】包含木の構成で上位反映を行う場合、工事
対象装置の障害の復旧のアラームイベントのみ上位反映
を行うと、オペレータにとっては工事作業時間帯に入っ
ても工事対象装置の障害の上位反映が継続されたままと
なるため、本当の障害の発生が上位反映されたものか否
かの区別がつかず、オペレータのネットワーク監視作業
を混乱させてしまうという問題がある。
[0007] In the case of performing higher-level reflection in the configuration of the inclusion tree, if only the alarm event for restoration of a failure of a device to be constructed is reflected in the upper-level, the operator can reflect the failure of the device to be constructed higher even during the construction work period. Is continued, so that it is not possible to distinguish whether or not the real failure is reflected on the upper level, which confuses the network monitoring work of the operator.

【0008】その理由は、工事作業に伴って当然に発生
が予測される障害の発生/復旧のアラームイベントにつ
いて、発生のアラームイベントを通知することなく、復
旧のアラームイベントのみオペレータに通知しているた
めである。
[0008] The reason is that, regarding a failure occurrence / recovery alarm event which is naturally predicted to occur due to construction work, the operator is notified only of the recovery alarm event without notifying the occurrence alarm event. That's why.

【0009】第2の問題点は、工事作業終了時に、実際
のネットワーク機器では障害が発生しているにも拘わら
ず、工事作業時間帯における障害の発生が上位反映され
ないため、オペレータへの障害の通知に不一致が生じる
ことである。
[0009] The second problem is that, at the end of the construction work, the occurrence of the failure in the construction work time zone is not reflected at the top even though a failure has occurred in the actual network equipment. A mismatch occurs in the notification.

【0010】その理由は、工事作業による障害の管理に
ついては、アラームイベントを上位反映する/しないの
判断をするだけで、工事作業時間帯における障害の発生
/復旧を蓄積しないため、工事作業中における障害の状
態と工事作業終了時における障害の状態とが不一致とな
るからである。
[0010] The reason for this is that regarding the management of faults due to construction work, it is only necessary to judge whether or not to reflect the alarm event at the higher rank, and the occurrence / recovery of faults during the construction work time period is not accumulated. This is because the state of the obstacle and the state of the obstacle at the end of the construction work do not match.

【0011】従って、本発明は前記問題点に鑑みてなさ
れたものであり、工事作業に伴うアラームイベントのオ
ペレータへの通知を抑止してネットワーク監視作業にお
けるオペレータの混乱を防止することができる作業管理
アラームイベント抑止方式を提供することを目的とす
る。
SUMMARY OF THE INVENTION Accordingly, the present invention has been made in view of the above-mentioned problems, and has been made in view of the above problems, and has a work management capable of suppressing a notification of an alarm event accompanying a construction work to an operator and preventing confusion of the operator in a network monitoring work. An object of the present invention is to provide an alarm event suppression method.

【0012】[0012]

【課題を解決するための手段】前記目的を達成するた
め、本発明は、管理対象となるネットワーク機器からの
アラームイベントをオペレータに通知するネットワーク
管理システムにおいて、前記ネットワーク機器に接続さ
れるネットワーク接続部と、該ネットワーク接続部を介
して受け取った前記アラームイベントを処理する障害管
理部と、前記ネットワーク機器の工事作業を管理する作
業管理部と、を有し、工事作業時間帯のアラームイベン
トを蓄積し、前記ネットワーク機器の工事作業に伴うア
ラームイベントのオペレータへの通知を抑止するととも
に、工事作業終了時、前記ネットワーク機器に障害が発
生している場合に、工事作業時間帯に蓄積されたアラー
ムイベントが上位反映されるようにしたことを特徴とす
る作業管理アラームイベント抑止方式を提供する。
To achieve the above object, the present invention provides a network management system for notifying an operator of an alarm event from a network device to be managed, the network connection unit being connected to the network device. When a fault management unit to process the alarm events received via the network connection unit, said has a work management unit for managing the construction work of the network equipment, a construction work time during which the alarm event
Tomo When accumulating bets, to suppress the notification to the operator of the alarm event associated with the construction work of the network device
At the end of the construction work,
Alarms accumulated during construction work
The present invention provides a work management alarm event suppression method characterized in that a system event is reflected at a higher level .

【0013】また、本発明の作業管理アラームイベント
抑止方式は、前記作業管理部が、工事作業が予定される
工事作業時間帯と工事対象装置とを管理し、前記工事作
業時間帯における前記工事対象装置からのアラームイベ
ントのオペレータへの通知を抑止するようにするとよ
い。
In the work management alarm event suppressing method according to the present invention, in the work management section, the work management section manages a construction work time zone in which a construction work is scheduled and a construction target device, and It is preferable to suppress the notification of the alarm event from the device to the operator.

【0014】さらに、本発明の作業管理アラームイベン
ト抑止方式は、前記障害管理部が、ネットワークの包含
木構成における下位装置の障害の発生及び復旧のアラー
ムイベントを上位反映する手段と、オペレータにより入
力される工事作業が予定される工事作業時間帯と工事対
象装置とを蓄積する手段と、前記工事作業時間帯の開始
時に、前記工事対象装置となる下位装置からのアラーム
イベントの上位反映を擬似的に復旧させる手段と、前記
工事作業時間帯において、前記工事対象装置となる下位
装置からのアラームイベントの上位反映を停止する手段
と、前記工事作業時間帯において、前記工事対象装置と
なる下位装置からのアラームイベントを蓄積する手段
と、前記工事作業時間帯の終了時に、前記蓄積されたア
ラームイベントを上位反映する手段と、を含むものであ
るとよい。
Further, in the work management alarm event suppressing method according to the present invention, the fault management unit may include means for reflecting an alarm event of occurrence and recovery of a failure of a lower device in a containment tree configuration of the network, and an operator inputting the means. Means for accumulating the construction work time zone in which the construction work is to be scheduled and the construction target device, and at the start of the construction work time zone, the upper reflection of the alarm event from the lower device serving as the construction target device in a pseudo manner. Means for restoring, means for stopping higher-order reflection of an alarm event from the lower device serving as the construction target device in the construction work time zone, and means for stopping the reflection of the alarm event from the lower device serving as the construction target device in the construction work time zone. Means for accumulating alarm events, and updating the accumulated alarm events at the end of the construction work period. Means for reflecting, may is intended to include.

【0015】本発明の作業管理アラームイベント抑止方
式によれば、管理対象となるネットワーク機器の工事作
業に伴って当然に発生が予測される障害の発生/復旧の
アラームイベントをオペレータに通知しないようにし、
オペレータがネットワーク機器の障害に伴う監視すべき
障害や運用に支障のある障害だけを判別及び認識できる
ようにする。
According to the work management alarm event suppression method of the present invention, an operator is not notified of a failure occurrence / recovery alarm event which is naturally predicted to occur due to construction work of a network device to be managed. ,
An operator can determine and recognize only a failure to be monitored due to a failure of a network device or a failure that hinders operation.

【0016】[0016]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照して詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0017】図1は、本発明の一実施形態に係る作業管
理アラームイベント抑止方式の構成を示す図である。
FIG. 1 is a diagram showing a configuration of a work management alarm event suppression system according to an embodiment of the present invention.

【0018】図1に示すように、本実施形態に係る作業
管理アラームイベント抑止方式は、ネットワーク20を
管理するためのネットワーク管理システムに適用するこ
とができる。
As shown in FIG. 1, the work management alarm event suppression method according to the present embodiment can be applied to a network management system for managing the network 20.

【0019】ワークステーション21は、ディスプレイ
21aと、ワークステーション本体21bと、から構成
される。ワークステーション本体21bは、ネットワー
ク20のネットワーク機器に接続されるネットワーク接
続部22と、ネットワーク接続部22を介して受け取っ
たアラームイベント27を処理する障害管理部23と、
ディスプレイ21a上に所定の形式で障害に関する情報
を表示する障害表示部24と、ネットワーク機器の工事
作業を管理する作業管理部25と、ネットワーク機器の
状態に関する情報を保持する状態蓄積部26と、を主要
な構成として含む。
The workstation 21 comprises a display 21a and a workstation body 21b. The workstation main body 21b includes a network connection unit 22 connected to a network device of the network 20, a failure management unit 23 that processes an alarm event 27 received via the network connection unit 22,
A failure display unit 24 for displaying information about a failure in a predetermined format on the display 21a, a work management unit 25 for managing construction work of the network device, and a state storage unit 26 for holding information about the state of the network device. Included as main components.

【0020】ネットワーク接続部22は、管理対象とな
るネットワーク20のネットワーク機器から上がるアラ
ームイベント27を受信し、障害管理部23に送る。
The network connection unit 22 receives an alarm event 27 sent from a network device of the network 20 to be managed and sends it to the fault management unit 23.

【0021】障害管理部23は、包含木の構成をとる地
域、局、装置等(以下単に「装置」とも総称する)毎
に、障害の発生/復旧の対応を取って管理すると共に、
作業管理部25からの指示により、工事作業時間帯の
間、下位装置のアラームイベントの上位装置への反映
(「上位反映」という)を停止し、その間の情報を状態
蓄積部26へ送る。
The fault management unit 23 manages and manages the occurrence / recovery of a fault for each region, station, device, etc. (hereinafter, also simply referred to as "device") having a containment tree structure.
In accordance with an instruction from the work management unit 25, the reflection of the alarm event of the lower device to the higher device (referred to as “higher reflection”) is stopped during the construction work time zone, and the information during that period is sent to the state storage unit 26.

【0022】障害表示部24は、障害管理部23から上
げられるアラームイベントをリスト形式やネットワーク
監視図の形式でディスプレイ21a上に表示する。
The fault display unit 24 displays the alarm event sent from the fault management unit 23 on the display 21a in the form of a list or a network monitoring diagram.

【0023】作業管理部25は、オペレータとのインタ
フェースを持ち、オペレータが入力した工事予定装置
名、工事作業の予定開始時刻及び終了時刻を内部に取り
込む。作業管理部25は、時刻を監視し、予定された作
業開始時刻になると障害管理部23に対して工事予定装
置について障害の発生/復旧の上位反映を行わないよう
指示を出すと共に、予定された作業終了時刻になると障
害管理部23に対して工事予定装置についての上位反映
を行うよう指示を出す。
The work management unit 25 has an interface with the operator, and takes in the construction schedule device name, the scheduled start time and the end time of the construction work input by the operator. The work management unit 25 monitors the time, and when the scheduled work start time comes, instructs the failure management unit 23 not to reflect the occurrence / recovery of the failure occurrence / recovery for the device to be constructed, and sets the scheduled work start time. When the work end time comes, the failure management unit 23 is instructed to perform higher-level reflection on the construction-scheduled device.

【0024】状態蓄積部26は、障害の発生/復旧の対
応、及び工事作業中に上位反映を行わなかった装置の状
態を蓄積して管理する。なお、作業管理部25からの指
示により工事作業の終了が通知されると、障害管理部2
3は状態蓄積部26から該当する装置の状態を読み出
し、障害発生中であれば上位反映を行う。
The status accumulation unit 26 accumulates and manages the response to the occurrence / recovery of a fault and the status of the device that has not been reflected during the construction work. When the end of the construction work is notified by an instruction from the work management unit 25, the failure management unit 2
Reference numeral 3 reads the status of the corresponding device from the status storage unit 26, and if a failure has occurred, reflects the higher level.

【0025】図2は、本発明の一実施形態に係る作業管
理アラームイベント抑止方式による障害管理の一例を説
明するための模式図である。
FIG. 2 is a schematic diagram for explaining an example of fault management by the work management alarm event suppression method according to one embodiment of the present invention.

【0026】図2に示すように、包含木の構成をとる各
装置の状態が、時間の経過とともに状態(a)から状態
(g)のように変化するものとする。10は正常状態を
示し、11は該当部障害が発生している状態を示し、1
2は下位装置の障害が上位反映されて上位反映障害表示
がなされている状態を示し、13は上位反映を停止させ
る基準となる作業中設定箇所を示す。
As shown in FIG. 2, it is assumed that the state of each device having the configuration of the containment tree changes from state (a) to state (g) over time. 10 indicates a normal state, 11 indicates a state in which a corresponding unit failure has occurred, and 1
Reference numeral 2 denotes a state in which a failure of a lower device is reflected at a higher level and a higher reflection failure is displayed, and reference numeral 13 denotes a work setting position serving as a reference for stopping higher reflection.

【0027】オペレータは、作業開始時刻15と作業終
了時刻16とを入力して工事作業時間帯14を設定する
と共に、工事作業中設定箇所13を指定してこれ以下の
装置を工事予定装置として設定する。
The operator sets the construction work time zone 14 by inputting the work start time 15 and the work end time 16, and designates a setting place 13 during construction work and sets a device below this as a construction scheduled device. I do.

【0028】工事作業時間帯14以外の通常時において
は、状態(a)に示すように、該当部障害11が発生し
た部位よりも上位の装置に障害の発生を反映させ、これ
らを上位反映障害表示12として表す。また、下位装置
の障害が復旧した場合には、状態(b)に示すように、
同様に下位装置の障害の復旧を上位反映させる。
In normal times other than the construction work time zone 14, as shown in the state (a), the occurrence of the failure is reflected in the device higher than the part where the corresponding part failure 11 has occurred, and these are reflected in the higher reflection failure. Represented as display 12. When the failure of the lower-level device is restored, as shown in the state (b),
Similarly, the recovery of the failure of the lower-level device is reflected on the upper level.

【0029】その後、予定された作業開始時刻15にな
ると、状態(c)に示すように、作業中設定箇所13の
部位以下で発生した障害を上位反映させない。また、下
位装置の障害が復旧した場合にも、状態(d)に示すよ
うに、同様に障害の復旧を上位反映させない。なお、そ
の時刻以前に上位反映されている下位装置の障害がある
場合には、これを擬似的に復旧し、下位装置の障害をオ
ペレータに見せないようにする。
After that, when the scheduled work start time 15 comes, as shown in the state (c), the faults occurring below the working set point 13 are not reflected on the upper level. Also, when the failure of the lower-level device is restored, the restoration of the failure is not similarly reflected in the higher order as shown in the state (d). If there is a failure in the lower device that has been reflected higher before that time, this is restored in a pseudo manner, so that the failure of the lower device is not shown to the operator.

【0030】また、予定された作業終了時刻16になっ
たときに、工事作業時間帯14において設定されている
作業中設定箇所13の部位以下の装置の障害が発生した
ままであると、作業中設定箇所13の部位以下の装置に
ついて蓄積されている障害を読み出し、上位反映を行
う。
At the scheduled work end time 16, if the failure of the equipment below the work setting location 13 set in the construction work time zone 14 continues to occur, The failures accumulated for the devices below the part of the set point 13 are read out and reflected on the higher order.

【0031】このようにすることにより、工事作業中に
おいては、作業中設定箇所13の部位以下の装置の工事
作業に伴う障害の発生/復旧について、オペレータは何
ら意識することなくネットワーク監視作業を行うことが
できるようになる。
In this way, during the construction work, the network monitoring work is performed without the operator being conscious of the occurrence / recovery of the trouble caused by the construction work of the devices below the part set during the work 13. Will be able to do it.

【0032】以上、本発明の一実施形態について説明し
てきたが、本発明はこのような実施の形態に限定される
ことなく、本発明の原理に準ずる各種の実施の形態を含
む。
While one embodiment of the present invention has been described above, the present invention is not limited to such an embodiment, but includes various embodiments according to the principle of the present invention.

【0033】[0033]

【発明の効果】以上説明したように、本発明の作業管理
アラームイベント抑止方式によれば、工事作業中は、所
定の部位以下の装置について工事作業により当然に予測
される障害の発生/復旧をオペレータに通知しないた
め、ネットワーク監視作業におけるオペレータの混乱を
防止し、工事作業について何ら意識することなくネット
ワーク監視作業を行うことが可能となる。
As described above, according to the work management alarm event suppression method of the present invention, during the construction work, the occurrence / recovery of a failure that is naturally predicted by the construction work for devices below a predetermined part is performed. Since no notification is given to the operator, confusion of the operator in the network monitoring work is prevented, and the network monitoring work can be performed without any awareness of the construction work.

【0034】また、本発明の作業管理アラームイベント
抑止方式によれば、工事作業時間帯における障害の発生
/復旧を蓄積することにより、工事対象装置の障害の上
位反映が継続されたままとならず、本当の障害の発生の
みが障害として上位反映されるため、上位装置の障害を
容易に復旧させることが可能となる。
Further, according to the work management alarm event suppression method of the present invention, the occurrence / recovery of failures during the construction work time period is accumulated, so that the reflection of the failure of the construction target device is not continued. Since only the actual occurrence of a fault is reflected as a fault, the fault in the host device can be easily recovered.

【0035】さらに、本発明の作業管理アラームイベン
ト抑止方式によれば、工事作業時間帯における障害の発
生/復旧を蓄積することにより、工事作業終了時に実際
のネットワーク機器に障害が発生している場合でも、工
事作業時間帯における障害の発生が適切に上位反映され
るため、オペレータへの障害の通知に不一致が生ずるこ
とを防止できる。
Further, according to the work management alarm event suppression method of the present invention, the occurrence / recovery of a failure during the construction work time period is accumulated, so that a failure occurs in an actual network device at the end of the construction work. However, since the occurrence of a failure in the construction work time zone is appropriately reflected in the higher rank, it is possible to prevent occurrence of inconsistency in the notification of the failure to the operator.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態に係る作業管理アラームイ
ベント抑止方式の構成を示す図である。
FIG. 1 is a diagram showing a configuration of a work management alarm event suppression method according to an embodiment of the present invention.

【図2】本発明の一実施形態に係る作業管理アラームイ
ベント抑止方式による障害管理の一例を説明するための
模式図である。
FIG. 2 is a schematic diagram for explaining an example of fault management by a work management alarm event suppression method according to an embodiment of the present invention.

【符号の説明】[Explanation of symbols]

10 正常状態 11 該当部障害 12 上位反映障害表示 13 作業中設定箇所 14 工事作業時間帯 15 作業開始時刻 16 作業終了時刻 20 ネットワーク 21 ワークステーション 21a ディスプレイ 21b ワークステーション本体 22 ネットワーク接続部 23 障害管理部 24 障害表示部 25 作業管理部 26 状態蓄積部 27 アラームイベント Reference Signs List 10 Normal state 11 Corresponding part failure 12 Upper reflection failure display 13 Work setting place 14 Construction work time zone 15 Work start time 16 Work end time 20 Network 21 Workstation 21a Display 21b Workstation main body 22 Network connection part 23 Failure management part 24 Fault display unit 25 Work management unit 26 Status storage unit 27 Alarm event

フロントページの続き (58)調査した分野(Int.Cl.6,DB名) H04L 12/24 H04L 12/26 H04L 29/14 H04M 3/22 Continued on the front page (58) Fields surveyed (Int.Cl. 6 , DB name) H04L 12/24 H04L 12/26 H04L 29/14 H04M 3/22

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】管理対象となるネットワーク機器からのア
ラームイベントをオペレータに通知するネットワーク管
理システムにおいて、 前記ネットワーク機器に接続されるネットワーク接続部
と、 該ネットワーク接続部を介して受け取った前記アラーム
イベントを処理する障害管理部と、 前記ネットワーク機器の工事作業を管理する作業管理部
と、 を有し、工事作業時間帯のアラームイベントを蓄積し、 前記ネッ
トワーク機器の工事作業に伴うアラームイベントのオペ
レータへの通知を抑止するとともに、工事作業終了時、
前記ネットワーク機器に障害が発生している場合に、工
事作業時間帯に蓄積されたアラームイベントが上位反映
されるようにしたことを特徴とする作業管理アラームイ
ベント抑止方式。
1. A network management system for notifying an operator of an alarm event from a network device to be managed, comprising: a network connection unit connected to the network device; and an alarm event received via the network connection unit. A fault management unit for processing, and a work management unit for managing the construction work of the network device , comprising: storing an alarm event during a construction work time zone ; In addition to suppressing notifications, at the end of construction work,
If a failure has occurred in the network device,
Alarm events accumulated during work hours are reflected at the top
A work management alarm event suppression method characterized by being performed.
【請求項2】前記作業管理部が、工事作業が予定される
工事作業時間帯と工事対象装置とを管理し、前記工事作
業時間帯における前記工事対象装置からのアラームイベ
ントのオペレータへの通知を抑止するようにしたことを
特徴とする請求項1記載の作業管理アラームイベント抑
止方式。
2. The work management unit manages a construction work time zone in which construction work is scheduled and a construction target device, and notifies an operator of an alarm event from the construction target device in the construction work time period. The work management alarm event suppression method according to claim 1, wherein the work management alarm event suppression method is performed.
【請求項3】前記障害管理部が、 ネットワークの包含木構成における下位装置の障害の発
生及び復旧のアラームイベントを上位反映する手段と、 オペレータにより入力される工事作業が予定される工事
作業時間帯と工事対象装置とを蓄積する手段と、 前記工事作業時間帯の開始時に、前記工事対象装置とな
る下位装置からのアラームイベントの上位反映を擬似的
に復旧させる手段と、 前記工事作業時間帯において、前記工事対象装置となる
下位装置からのアラームイベントの上位反映を停止する
手段と、 前記工事作業時間帯において、前記工事対象装置となる
下位装置からのアラームイベントを蓄積する手段と、 前記工事作業時間帯の終了時に、前記蓄積されたアラー
ムイベントを上位反映する手段と、 を含むことを特徴とする請求項1又は2記載の作業管理
アラームイベント抑止方式。
3. A means for reflecting an alarm event of occurrence and recovery of a failure of a lower-level device in an inclusion tree configuration of a network, wherein the failure management unit includes: Means for accumulating the construction work device and, at the start of the construction work time zone, means for pseudo-restoring the higher reflection of an alarm event from a lower device that is the construction work device, and Means for stopping the reflection of the alarm event from the lower device serving as the construction target device, and means for accumulating the alarm event from the lower device serving as the construction target device in the construction work time zone; And means for reflecting the accumulated alarm event at the end of a time period. Or the work management alarm event suppression method described in 2.
JP7347707A 1995-12-15 1995-12-15 Work management alarm event suppression method Expired - Lifetime JP2932992B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7347707A JP2932992B2 (en) 1995-12-15 1995-12-15 Work management alarm event suppression method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7347707A JP2932992B2 (en) 1995-12-15 1995-12-15 Work management alarm event suppression method

Publications (2)

Publication Number Publication Date
JPH09168010A JPH09168010A (en) 1997-06-24
JP2932992B2 true JP2932992B2 (en) 1999-08-09

Family

ID=18392042

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7347707A Expired - Lifetime JP2932992B2 (en) 1995-12-15 1995-12-15 Work management alarm event suppression method

Country Status (1)

Country Link
JP (1) JP2932992B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108121305A (en) * 2016-11-30 2018-06-05 北京理工大学 A kind of dynamic dispatching method and device of job shop task

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04217140A (en) * 1990-12-18 1992-08-07 Nec Eng Ltd Remote work control system for switchboard
JP2770678B2 (en) * 1992-10-19 1998-07-02 日本電気株式会社 Line failure suppression method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108121305A (en) * 2016-11-30 2018-06-05 北京理工大学 A kind of dynamic dispatching method and device of job shop task
CN108121305B (en) * 2016-11-30 2020-01-17 北京理工大学 Dynamic scheduling method and device for job shop tasks

Also Published As

Publication number Publication date
JPH09168010A (en) 1997-06-24

Similar Documents

Publication Publication Date Title
US20120265872A1 (en) Systems and Methods of Automatically Remediating Fault Conditions
JPH02105947A (en) Computer surrounding subsystem and exception event automatic detecting analyzing method
JP2932992B2 (en) Work management alarm event suppression method
Burke All circuits are busy now: The 1990 AT&T long distance network collapse
JPH06175887A (en) Fault monitoring/reporting system
JP3019789B2 (en) Monitoring device
JPH0595355A (en) Network monitor system
JP3208885B2 (en) Fault monitoring system
JP5029697B2 (en) Server system of operation system
JPH06324916A (en) Fault information logging system
JP3410295B2 (en) Automatic transaction equipment monitoring system
JP3142757B2 (en) Remote monitoring device
JP2714623B2 (en) Alarm control device
JP2000166127A (en) System and method for supervising electric facility
JP2005018152A (en) Control/monitoring system
JP3581934B2 (en) Communication device failure report method and communication device failure report system
JPS6036148B2 (en) Failure handling method
JPH02216931A (en) Fault information reporting system
JPS63242150A (en) Power system monitoring system
JP3099757B2 (en) Network monitoring equipment
JP2985776B2 (en) Device failure management method
KR100283183B1 (en) Periodic output of fault messages in the switching system
JPH06103122A (en) Fault monitoring system for information processor
JP2570927B2 (en) Suppression method for fault monitoring of specific equipment of centralized monitoring equipment for transmission equipment
Nelson et al. NMESys: An expert system for network fault detection

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990427