JP2930146B2 - Shino exchange method in spinning machine - Google Patents

Shino exchange method in spinning machine

Info

Publication number
JP2930146B2
JP2930146B2 JP16215891A JP16215891A JP2930146B2 JP 2930146 B2 JP2930146 B2 JP 2930146B2 JP 16215891 A JP16215891 A JP 16215891A JP 16215891 A JP16215891 A JP 16215891A JP 2930146 B2 JP2930146 B2 JP 2930146B2
Authority
JP
Japan
Prior art keywords
bobbin
shino
full
peg
creel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16215891A
Other languages
Japanese (ja)
Other versions
JPH0641829A (en
Inventor
賢次 佐々木
一夫 山田
博史 杉本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Howa Kogyo KK
Original Assignee
Howa Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howa Kogyo KK filed Critical Howa Kogyo KK
Priority to JP16215891A priority Critical patent/JP2930146B2/en
Publication of JPH0641829A publication Critical patent/JPH0641829A/en
Application granted granted Critical
Publication of JP2930146B2 publication Critical patent/JP2930146B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は精紡クリールの前後2
列の小玉ボビンと、予備レールの前後2列の満ボビンと
を前後対単位で全錘篠継し、かつ篠交換する方法に関す
る。
BACKGROUND OF THE INVENTION This invention relates to a spinning creel.
The present invention relates to a method in which a row of small bobbins and full bobbins in two rows in front and rear of a spare rail are connected in a front-rear pair, and all the weights are spliced and replaced.

【0002】[0002]

【従来の技術】前記篠交換方法は例えば特開昭63−5
7478号の第3図に開示されている。これによれば、
予備レールに機台長手に沿う前後2列の満ボビンを準備
し、予備レールから精紡機の機台幅方向に対向する前後
2個の満ボビンを篠交換機上へそのままの配列で取降
し、一対の篠端口出しノズルを、精紡機の篠継すべき一
対の小玉ボビンの篠を案内しているトランペットと機台
幅方向に対向して機台長手方向に並んだ状態から、前記
篠交換機上に取り降ろした前後2個の満ボビン外周に機
台長手方向に対向して機台幅方向に並ぶ前後状態に配列
を変更して口出しし、その後、口出しノズルを逆に配列
変換させて篠継ヘッドに篠を受渡しし篠継するようにな
っている。
2. Description of the Related Art The Shino replacement method is disclosed, for example, in Japanese Patent Application Laid-Open No. 63-5 / 1988.
It disclosed in Figure 3 of the No. 7478. According to this,
Prepare two full bobbins in front and rear along the machine stand length on the spare rail, and take off the two front and rear full bobbins facing in the machine width direction of the spinning machine from the spare rail in the same arrangement on the Shino exchange, a pair of Shino end yarn end finding nozzle, a pair of Kodama state aligned to face the trumpet and machine base width direction and guides the Shino the bobbin machine frame longitudinally to be Shino passage of the spinning machine, the
Shino switch on to take down the front and rear two full bobbin outer periphery machine frame longitudinally opposite sequence before and after a state arranged in the machine frame width direction
Change the tapping and then arrange the tapping nozzles in reverse
It is converted and delivered to the Shinotsu head and transferred to Shinotsu.

【0003】[0003]

【発明が解決しようとする課題】前記によれば、篠端口
出しノズルの配列を、機台長手方向に並んだ状態と機台
幅方向に並んだ状態との間で変更して、前後2個の満ボ
ビンから篠端口出しをするので、口出しノズルの移動機
構が複雑となる問題がある。また、満ボビンを扱う一対
のペッグの隣に精紡クリールのボビンハンガの左右ピッ
チで小玉ボビンを扱う前後一対のペッグがある場合に
は、前記のように口出しノズルを移動させる空間を満、
小玉ボビン用のペッグの間に確保することが極めて困難
である。
According to the above, according to the above, the arrangement of the Shino end outlet nozzles is different from the arrangement of the nozzles in the longitudinal direction of the machine base.
Since it is changed between the state in which the bobbin is arranged in the width direction and the front and rear two full bobbins are used , the moving mechanism of the discharging nozzle becomes complicated. In addition, when there is a pair of front and rear pegs that handle small bobbins at the left and right pitches of the spinning creel bobbin hanger next to a pair of pegs that handle full bobbins, the space for moving the outlet nozzle is filled as described above.
It is extremely difficult to secure between the pegs for small bobbins.

【0004】[0004]

【課題を解決するための手段】前記問題点の解決のた
め、この発明は,精紡クリールの前後2列の小玉ボビン
と、クリール手前上方の予備レールに準備した前後2列
の満ボビンとを、精紡機の機台幅方向に対向する前後対
単位で篠継しつつ交換していく精紡機における篠交換方
法において、予備レールから前後対の満ボビンを取外
し、これらを機台長手方向に並んで配設されている口出
しノズルに対応する左右対に並べて前記口出しノズルを
そのままの配列で上昇させて篠端口出しし、その後、口
出しノズルをそのままの配列で下降させて篠継ヘッドに
受け渡して篠換すべき小玉ボビンの篠に篠継する動作
と、左右対満ボビンを再び前後対に並べ換える動作を行
い、この前後対の満ボビンとクリールの前後対の小玉ボ
ビンとを交換し、これらの作動を機台の一端から他端へ
向けて順次行うようにしたことを特徴とする。
In order to solve the above-mentioned problems, the present invention comprises two rows of small bobbins before and after a spinning creel, and two full rows of front and rear bobbins prepared on a spare rail above the creel. In the Shino replacement method for a spinning machine in which the front and rear pairs are opposed to each other in the machine width direction of the spinning machine and are replaced in a spinning manner, the full bobbins of the front and rear pairs are removed from the spare rail and these are lined up in the machine longitudinal direction. Exits arranged in
Side -to-side pairs corresponding to the nozzles
Raise it in the same arrangement and put out Shinohana , then
Lowering the discharge nozzle in the same arrangement as in the Shinotsu head
Operation will be ShinoTsugi to Shino of Kodama bobbin should be Shino conversion Te delivery
And, line operation Ru rearranged in pair of front and rear left and right TaiMitsuru bobbin again
There, the exchange and Kodama bobbin pairs before and after the full bobbin and creel around pairs, characterized in that the sequentially performed toward these operating the machine base at one end to the other.

【0005】[0005]

【作用】上記方法によれば、予備レールから取降した前
後対満ボビンを左右対に配列変更して篠端口出し後に篠
継し、また、篠端口出し後の満ボビンを再び前後対に戻
し、その後、前後対の満ボビンとクリールの小玉ボビン
を交換する。前後対の満ボビンを左右対として篠端口出
しするため、口出しノズルを機台長手方向に並んだ状態
のまま昇降させて口出しでき、口出しノズルの移動機構
が簡単となる。
According to the above-mentioned method, the front and rear full bobbins removed from the spare rail are rearranged to the left and right pairs, and the bobbin is spliced after the Shino end is ejected, and the full bobbin after the Shino end is ejected is returned to the front and rear pair again. Then, exchange the front and rear pairs of bobbins with creels. Since the front and rear pairs of the full bobbins are left and right paired, the discharge nozzles can be raised and lowered while being lined up in the machine base longitudinal direction, thereby simplifying the mechanism for moving the discharge nozzles.

【0006】[0006]

【実施例】この実施例では、精紡機1の機台長手方向を
左右方向、また、機巾方向を前後方向と記すことにす
る。図1において、精紡機1のクリール2には左右方向
に所定間隔でクリールピラー3が立設され、このクリー
ルピラー3間に支持ブラケット4bを介して左右方向に
延設した前後2本の支持レール5,6が取着してある。
各支持レール5,6には夫々精紡機1の錘数の1/4の
ボビンハンガ7が左右方向にトランペット14のピッチ
A1の2倍の左右ピッチA2で支承されている(図1
8,19)。各ボビンハンガ7の前後中間位置に図19
に示すように開口部8を備えたC字状のロービングガイ
ド9が前記左右ピッチA2で配置されている。ロービン
グガイド9の両端部は中心方向へ湾曲した係止部9aに
形成されている。ロービングガイド9は支持ブラケット
4bの間にばねを介して吊下してあり、満ボビンFBの
進入時には満ボビンFBによっておしのけられて側方へ
逃げ、満ボビンFBの通過後、元へ復帰するようになっ
ている。ボビンハンガ7に吊下される前、後列の篠巻ボ
ビンは全て満ボビンFBとして紡出を開始し、各ボビン
の前後2個の組を以下、前後対P1と記す。
In this embodiment, the longitudinal direction of the frame of the spinning machine 1 is referred to as the left-right direction, and the width direction is referred to as the front-back direction. In FIG. 1, a creel 2 of a spinning machine 1 is provided with creel pillars 3 erected at predetermined intervals in the left-right direction, and two front and rear support rails extending in the left-right direction between the creel pillars 3 via support brackets 4b. 5 and 6 are attached.
On each of the support rails 5, 6, a bobbin hanger 7 having a quarter of the number of spindles of the spinning machine 1 is supported in the left-right direction at a left-right pitch A2 twice the pitch A1 of the trumpet 14 (FIG. 1).
8, 19). FIG. 19 shows the front and rear intermediate positions of each bobbin hanger 7.
As shown in the figure, a C-shaped roving guide 9 having an opening 8 is arranged at the left-right pitch A2. Both ends of the roving guide 9 are formed in locking portions 9a curved toward the center. The roving guide 9 is suspended via a spring between the support brackets 4b. When the full bobbin FB enters, the roving guide 9 is pushed away by the full bobbin FB and escapes to the side, and returns to the original state after passing through the full bobbin FB. It has become. Before being hung on the bobbin hanger 7, all the Shinomori bobbins in the rear row start spinning as full bobbins FB, and a set of two bobbins before and after each is hereinafter referred to as a front-back pair P1.

【0007】クリールピラー3上端の支持ブラケット4
a先端には下方に開口したほぼ矩形断面形状の2本の予
備レール11a,11bが左右方向に沿って延設してあ
り、クリール2の手前上方に位置している。予備レール
11a,11bの前後ピッチはクリール2のボビンハン
ガ7の前後ピッチA3に一致させてある。各予備レール
11a,11bには、前記クリール2の前列のボビンハ
ンガ7と同数のボビンハンガ12を前記左右ピッチA2
で左右方向に一列で支承したボビンキャリッジ13が走
行可能に吊下してある。ボビンキャリッジ13の各ボビ
ンハンガ12には篠交換に先立ち満ボビンFBが吊下さ
れ、各満ボビンFBがクリール2で紡出中の篠巻ボビン
と対向するようにボビンキャリッジ13が停止してい
る。
[0007] The support bracket 4 at the upper end of the creel pillar 3
Two auxiliary rails 11a and 11b each having a substantially rectangular cross-section and opening downward extend in the left-right direction at the distal end of a, and are located above the creel 2 in front of the creel 2. The front-rear pitch of the spare rails 11a and 11b is made to match the front-rear pitch A3 of the bobbin hanger 7 of the creel 2. The same number of bobbin hangers 12 as the bobbin hangers 7 in the front row of the creel 2 are provided on each of the spare rails 11a and 11b.
The bobbin carriage 13 supported in a line in the left-right direction is suspended so as to be able to run. A full bobbin FB is suspended from each bobbin hanger 12 of the bobbin carriage 13 prior to the Shino exchange, and the bobbin carriage 13 is stopped so that each full bobbin FB faces a Shino winding bobbin being spun by the creel 2.

【0008】次に篠交換機20について説明する。図1
において篠交換機20は本体21下部の車輪22と精紡
機1のガイドレール1aに案内されるガイドローラ23
を備え、周知のように図示しない走行モータで回動され
るスクロールカムとガイドレール1aの側方へ突設した
ガイドピンとの係合により精紡機1に沿って走行し、か
つ、所定の篠換作業位置に停止するようにしてある。
Next, the Shino exchange 20 will be described. FIG.
In the Shino exchange 20, a wheel 22 at a lower part of a main body 21 and a guide roller 23 guided by a guide rail 1 a of the spinning machine 1.
And runs along the spinning machine 1 by engagement of a scroll cam rotated by a traveling motor (not shown) and a guide pin protruding to the side of the guide rail 1a, as is well known, It stops at the working position.

【0009】本体21には前後対P1の小玉ボビンSB
とこれと交換される予備レール11a,11bの前後対
P1の満ボビンFBとを夫々複数対(3対)同時に交換
するための複数(6個)のペッグユニット30A,30
Bと、3対6個の満ボビンFBから篠端を空気吸引によ
り吸引口出しする篠端引出し装置70と、満ボビンFB
の篠端を紡出中の小玉ボビンSBに追継させる6個の篠
継ヘッド100と、満ボビンFBの篠をロービングガイ
ド9に掛ける篠掛け装置130と、これらの装置を動作
させるそれぞれの駆動手段を備えている。
The main body 21 has front and rear pairs P1 of small ball bobbins SB.
A plurality (6) of peg units 30A, 30 for simultaneously exchanging a plurality of pairs (three pairs) of the full bobbins FB of the front and rear pairs P1 of the spare rails 11a, 11b to be exchanged therewith, respectively.
B, a Shinobashi drawing-out device 70 for drawing out the Shinobashi from the 3 to 6 full bobbins FB by air suction, and a Fullbobbin FB
Heads 100 for transferring the Shino end of the bobbin to the small ball bobbin SB being spun, a Shino hanging device 130 for hanging the Shino of the full bobbin FB on the roving guide 9, and respective drives for operating these devices Means.

【0010】まずこの発明において最も特徴のあるペッ
グユニット30A,30Bについて説明する。6つのペ
ッグユニット30A,30Bは1つおきに小玉ボビン用
ペッグユニット30A、満ボビン用ペッグユニット30
Bである。満ボビン用ペッグユニット30Bは図3〜5
に示すように断面コ字状のスライド本体30前方に固着
したユニット本体31の前部には前ペッグ32が回動自
在に支承され、本体31上面に固着した正逆転モータ3
3により、ギヤ列34を介して回動するようにしてあ
る。正逆転モータ33の後方には揺動アーム35の基端
が軸支され、本体31上面の揺動モータ36によりギヤ
列37を介して所定角度水平揺動するようにしてある。
この揺動アーム35の後端上面には、前記前ペッグ32
と同一高さ位置に前ペッグ32と共に一対のペッグを構
成する後ペッグ38が回動自在に支承され、揺動アーム
35上面に設けた正逆転モータ39によりギヤ列40を
介して回動するようにしてある。これらの前、後ペッグ
32,38を適宜正逆回転することで、後述の篠交換動
作中にペッグ32,38上の満ボビンFBから繰り出さ
れる篠R2が適切なたるみ状態となるようにしてある。
First, the peg units 30A and 30B which are the most characteristic of the present invention will be described. Every six peg units 30A and 30B are peg units 30A for small bobbins and peg units 30 for full bobbins.
B. The bobbin peg unit 30B is shown in FIGS.
A front peg 32 is rotatably supported at the front of a unit body 31 fixed to the front of a slide body 30 having a U-shaped cross section, as shown in FIG.
By means of 3, the rotation is made via the gear train 34. A base end of a swing arm 35 is pivotally supported behind the forward / reverse rotation motor 33, and is horizontally swung by a predetermined angle via a gear train 37 by a swing motor 36 on the upper surface of the main body 31.
The front peg 32 is provided on the upper surface of the rear end of the swing arm 35.
A rear peg 38, which forms a pair of pegs together with the front peg 32, is rotatably supported at the same height position as the front peg 32, and is rotated via a gear train 40 by a forward / reverse rotation motor 39 provided on the upper surface of a swing arm 35. It is. By rotating the front and rear pegs 32 and 38 forward and backward as appropriate, the Shino R2 fed out from the full bobbin FB on the pegs 32 and 38 during the Shino replacement operation described below is appropriately slackened. .

【0011】この後ペッグ38は前ペッグ32に対して
前後方向に一直線に並ぶ原位置S1にある時、前、後ペ
ッグ32,38間の間隔がクリール2の前後2列のボビ
ンハンガ7の前後ピッチA3(図18)となる位置に取
付けられ、また、前記揺動アーム35の揺動中心は前記
揺動アーム35が所定角度揺動した時に、後ペッグ38
が前ペッグ32の左右方向にクリール2のボビンハンガ
7の左右ピッチA2で並ぶ変位位置(図3S2)となる
位置に設定されている。こうして揺動アーム35、揺動
モータ36、ギヤ列37により後ペッグ38を原位置S
1と変位位置S2との間で移動させるペッグ移動装置4
1が構成される。
When the rear peg 38 is at the original position S1 aligned in the front-rear direction with respect to the front peg 32, the interval between the front and rear pegs 32, 38 is equal to the front-rear pitch of the bobbin hanger 7 in two rows before and after the creel 2. A3 (FIG. 18), and the swing center of the swing arm 35 is set at the rear peg 38 when the swing arm 35 swings by a predetermined angle.
Are set at positions that are displaced positions (S2 in FIG. 3) in which the bobbin hanger 7 of the creel 2 is arranged in the left-right direction of the front peg 32 at the left-right pitch A2. Thus, the rear peg 38 is moved to the original position S by the swing arm 35, the swing motor 36, and the gear train 37.
Peg moving device 4 for moving between the position 1 and the displacement position S2
1 is configured.

【0012】次に小玉ボビン用のペッグユニット30A
は、図8に示すように揺動アーム35とその揺動機構を
持たず、後ペッグ38が前ペッグ32に対して前後方向
に前後ピッチA3を保ってユニット本体31aに支持さ
れている他は満ボビン用のペッグユニット30Bと同一
である。このペッグユニット30Aのユニット本体31
aの側面には篠さばきガイド240が一体装着してあ
る。篠さばきガイド240は図8(a)〜(c)に示す
ように線材を折曲げて形成され、ペッグユニット30A
に沿う前後ガイド部241とその先端から斜め上方へ折
曲げて前ペッグ32の上端前方を横切って上方へ立ち上
げた案内部242を備えている。この篠さばきガイド2
40は図20(f)に示すように、左右対P2の満ボビ
ンFBを前後対P1とし、かつ、ペッグユニット30A
を前進させるときに、篠継した2本の篠R2をペッグユ
ニット30Aの側方へさばき、ペッグユニット30Aと
篠R2の干渉を避けるのに役立つ。
Next, a peg unit 30A for a small bobbin
8 does not have the swing arm 35 and its swing mechanism as shown in FIG. 8, and the rear peg 38 is supported by the unit body 31a while maintaining the front-rear pitch A3 in the front-rear direction with respect to the front peg 32. It is the same as the peg unit 30B for the full bobbin. The unit body 31 of the peg unit 30A
On the side of "a", a shino separation guide 240 is integrally mounted. As shown in FIGS. 8A to 8C, the shino separation guide 240 is formed by bending a wire, and the peg unit 30A.
And a guide portion 242 bent obliquely upward from the tip thereof and crossing the front of the upper end of the front peg 32 and rising upward. This Shino Sasaki Guide 2
40, the full bobbin FB of the left and right pair P2 is set to the front and rear pair P1, and the peg unit 30A as shown in FIG.
When moving forward, the two joined Shino R2 are separated to the side of the peg unit 30A to help avoid interference between the peg unit 30A and Shino R2.

【0013】次にペッグユニット30A,30Bの前後
動機構について説明する。夫々のペッグユニット30
A,30Bにおいて、上方に開口した断面コ字状のベー
ス45の前後両端内側に対向して設けたブラケット46
上面に前後方向のガイドロッド47が固着してある。こ
のガイドロッド47にスライド体30後部の左右両側に
一体固着した案内部48が摺動自在に嵌装されている。
スライド体30の下面には前後方向のラック49が固着
され、このラック49とベース45の下面に取付けた前
後動用モータ50で回転するピニオン51が噛合わさ
れ、ペッグユニット30A,30Bは篠交換機20内に
ある状態から前、後ペッグ32,38がクリール2の前
後2列のボビンハンガ7の直下位置の間で前後動するよ
うになっている。
Next, the mechanism for moving the peg units 30A and 30B back and forth will be described. Each peg unit 30
A, 30B, brackets 46 provided facing the inside of the front and rear ends of a base 45 having a U-shaped cross section opened upward.
A front-rear direction guide rod 47 is fixed to the upper surface. A guide portion 48 integrally fixed to the left and right sides of the rear portion of the slide body 30 is slidably fitted to the guide rod 47.
A rack 49 in the front-rear direction is fixed to the lower surface of the slide body 30, and the rack 49 is engaged with a pinion 51 rotated by a motor 50 for front-rear movement mounted on the lower surface of the base 45, and the peg units 30 A, 30 B are mounted inside the Shino exchange 20. , The front and rear pegs 32 and 38 move back and forth between the positions immediately below the two rows of bobbin hangers 7 of the creel 2.

【0014】次にペッグユニット30A,30Bの昇降
装置について図6〜9図を用いて説明する。篠交換機2
0の本体21上部と下部のブラケット55a,55b間
に上下方向の6本のガイドロッド56が立設してある。
このガイドロッド56の1本おきの3本に図9に示すよ
うに空ボビン用の昇降部材57が、残る3本に満ボビン
用の昇降部材58が夫々昇降自在に嵌装してある。各昇
降部材57,58の上方へ伸びる連結部57a,58a
上端には前記ベース45が夫々一体連結され、後ペッグ
38が原位置S1にある状態で隣合うペッグユニット3
0A,30Bの前ペッグ32、後ペッグ38の左右ピッ
チが夫々クリール2のボビンハンガ7の左右ピッチA2
と一致させてある。各昇降部材57,58は本体21の
下部に設けた夫々の昇降モータ59の駆動スプロケット
60と、上部のブラケット55aに回動自在に支持した
スプロケット61の間に巻回したチェン62の中間に連
結してあり、チェン62の周回によって、ペッグユニッ
ト30A,30Bが上下方向の待機位置(図6S3)
と、予備レール11a,11bのボビンハンガ12にボ
ビンを着脱する上昇端位置(図6S4)の間で昇降する
ようにしてある。
Next, a lifting device for the peg units 30A and 30B will be described with reference to FIGS. Shino Exchanger 2
Six vertical guide rods 56 are provided upright between the upper and lower brackets 55a and 55b of the main body 21.
As shown in FIG. 9, an elevating member 57 for an empty bobbin is fitted to every other three of the guide rods 56, and an elevating member 58 for a full bobbin is fitted to the remaining three rods so as to be able to move up and down. Connecting portions 57a, 58a extending above the lifting members 57, 58
The base 45 is integrally connected to the upper end, and the adjacent peg units 3 with the rear peg 38 at the original position S1.
The left and right pitches of the front peg 32 and the rear peg 38 of 0A and 30B are respectively the left and right pitches A2 of the bobbin hanger 7 of the creel 2.
Has been matched. Each of the lifting members 57 and 58 is connected to the middle of a chain 62 wound between a driving sprocket 60 provided at a lower portion of the main body 21 and a sprocket 61 rotatably supported by an upper bracket 55a. With the rotation of the chain 62, the peg units 30A and 30B are in the standby position in the vertical direction (S3 in FIG. 6).
And the bobbin hanger 12 of the spare rails 11a and 11b is moved up and down between the rising end positions (S4 in FIG. 6) where the bobbin is attached and detached.

【0015】次に篠端引出し装置70について説明す
る。図10,11において、篠交換機20の本体21の
左右両側に本体21下面から上部へ斜め前方に向けてカ
ムプレート71が取付けてある。カムプレート71には
カム溝72が形成してある。カムプレート71の夫々の
外側には斜め方向のガイドロッド73が延設してある。
左右のガイドロッド73には夫々L字状のスライドブロ
ック74が摺動自在に案内してある。各スライドブロッ
ク74には本体21下面に取付けたモータ75で回転さ
れるスプロケット76と、本体21上部に回動自在に支
持したスプロケット77間に巻回したチェン78が夫々
連結されている。左右のスライドブロック74の先端に
は一端を吸引源に接続したパイプ79が回動自在に支持
してある。パイプ79の一端(図11左端)にはレバー
80の一端が回動自在かつ軸方向に一体に連結してあ
る。このレバー80の他端には前記スライドブロック7
4方向に回り止めロッド81が突設され、この回り止め
ロッド81はスライドブロック74に設けた孔82を貫
通している。レバー80の他端には更に後方へロッド8
3が突設され、ロッド83先端にはカムフォロア84が
回動自在に支持してある。このカムフォロア84は本体
21左側板と一体の横移動カム板85のカム溝86に嵌
装してある。このカム溝86はスライドブロック74の
上昇によりパイプ79を左右方向へトランペットピッチ
A1だけシフトさせるものである。
Next, the shin end drawer 70 will be described. 10 and 11, cam plates 71 are attached to the left and right sides of the main body 21 of the Shino exchanger 20 diagonally forward from the lower surface of the main body 21 to the upper part. A cam groove 72 is formed in the cam plate 71. An oblique guide rod 73 extends outside each of the cam plates 71.
L-shaped slide blocks 74 are slidably guided by the left and right guide rods 73, respectively. A sprocket 76 rotated by a motor 75 attached to the lower surface of the main body 21 and a chain 78 wound around a sprocket 77 rotatably supported on the upper part of the main body 21 are connected to each slide block 74. At the tips of the left and right slide blocks 74, a pipe 79 having one end connected to a suction source is rotatably supported. One end of a lever 79 is rotatably connected to one end of the pipe 79 (the left end in FIG. 11) and is integrally connected in the axial direction. The other end of the lever 80 has the slide block 7
Detent rods 81 project in four directions, and penetrate through holes 82 provided in the slide block 74. The other end of the lever 80 has a rod 8
A cam follower 84 is rotatably supported at the tip of the rod 83. The cam follower 84 is fitted in a cam groove 86 of a laterally moving cam plate 85 integrated with the left side plate of the main body 21. The cam groove 86 shifts the pipe 79 right and left by the trumpet pitch A1 by raising the slide block 74.

【0016】パイプ79には左右一対のカムレバー87
が一体固着され、先端には前記カムプレート71のカム
溝72に案内される案内ロッド88が取付けてある。左
右の案内ロッド88はパイプ79がシフトしてもカム溝
72から外れない長さにしてある。パイプ79には口出
しノズル89が2個ずつ3組固着、連通してある。各組
における口出しノズル89の左右ピッチは精紡機1のト
ランペット14の左右ピッチA1と一致され、各組間の
左右ピッチは前記左右ピッチA1の4倍に設定してあ
る。そして前記カムプレート71のカム溝72はスライ
ドブロック74が上昇するにつれて口出しノズル89を
後述の篠継ヘッド100と干渉しない軌跡で上昇させる
ように形成してある。従ってスライドブロック74の昇
降により、口出しノズル89は待機位置S7と口出し位
置S8との間でシフトされつつ昇降移動する。
The pipe 79 has a pair of left and right cam levers 87.
And a guide rod 88 which is guided by the cam groove 72 of the cam plate 71 is attached to the end. The left and right guide rods 88 have a length that does not deviate from the cam groove 72 even when the pipe 79 shifts. Three sets of two outlet nozzles 89 are fixedly connected to the pipe 79 and communicate with each other. The left and right pitches of the outlet nozzle 89 in each set are matched with the left and right pitch A1 of the trumpet 14 of the spinning machine 1, and the left and right pitch between each set is set to be four times the left and right pitch A1. The cam groove 72 of the cam plate 71 is formed so as to raise the outlet nozzle 89 along a locus that does not interfere with the Shinotsu head 100 described later as the slide block 74 rises. Therefore, by moving the slide block 74 up and down, the outlet nozzle 89 moves up and down while being shifted between the standby position S7 and the outlet position S8.

【0017】次に篠継ヘッド100とその作動機構につ
いて図1,12,13を参照して説明する。本体21の
左右にわたるシャフト110が本体21の前部に取付け
たブラケット111に回動自在に支持してある。このシ
ャフト110には、各小玉ボビン用ペッグユニット30
Aの左側に夫々アーム112が一体楔着してある。各ア
ーム112の先端には篠継ヘッド100のコ字状のヘッ
ド本体101の一端に設けた軸部101aが夫々回動自
在に支持してある。軸部101aはアーム112より突
出し、レバー113を介してヘッド揺動シリンダ114
のピストンロッド115に連結してあり、篠継ヘッド1
00を垂下状態からほぼ水平状態の間で揺動するように
してある。前記シャフト110の一端はレバー116の
一端と楔着され、レバー116他端は揺動シリンダ11
7のピストンロッド118に連結してある。この揺動シ
リンダ117の作用でアーム112を篠交換機20内の
待機位置から、水平状態とした篠継ヘッド100がトラ
ンペット14上方の篠継位置S9となる前進端位置まで
揺動させる。
Next, the Shinotsu head 100 and its operating mechanism will be described with reference to FIGS. A shaft 110 extending right and left of the main body 21 is rotatably supported by a bracket 111 attached to a front portion of the main body 21. This shaft 110 has a peg unit 30 for each small bobbin.
Arms 112 are integrally wedge-fitted on the left side of A. At the tip of each arm 112, a shaft portion 101a provided at one end of a U-shaped head main body 101 of the Shinotsu head 100 is rotatably supported. The shaft portion 101a protrudes from the arm 112, and a head swing cylinder 114 is
Shinotsu head 1
00 swings between a hanging state and a substantially horizontal state. One end of the shaft 110 is wedge-fitted to one end of a lever 116, and the other end of the lever 116 is
7 is connected to the piston rod 118. By the action of the swing cylinder 117, the arm 112 is swung from the standby position in the Shino exchange 20 to the forward end position where the Shino joint head 100 in the horizontal state becomes the Shino joint position S9 above the trumpet 14.

【0018】篠継ヘッド100は例えば特開昭64−5
2828号で周知のものとほぼ同一なので、図13を用
いて簡単に説明する。この篠継ヘッド100は1つのヘ
ッド本体101にトランペット14の左右ピッチA1と
一致して一対設けられ、各篠継ヘッド100は夫々支軸
102を支点として揺動する篠把持レバー103を備え
ており、リンク104を介してエアシリンダ105に連
結してある。そして、エアシリンダ105の作用で、篠
把持レバー103の先端がストッパブロック106と当
接して満ボビンFBの篠R2を把持する位置と、ストッ
パブロック107と当接して小玉ボビンSBの篠R1を
把持する位置と、両方のストッパブロック106,10
7に当接しない中立位置の3つの位置に切換えられるよ
うになっている。
Shinotsu head 100 is disclosed in, for example,
Since it is almost the same as that known in Japanese Patent No. 2828, it will be briefly described with reference to FIG. A pair of the Shinotsu heads 100 are provided on one head body 101 so as to coincide with the left-right pitch A1 of the trumpet 14, and each Shinotsu head 100 is provided with a Shino grip lever 103 that swings around a support shaft 102 as a fulcrum. , And a link 104 to an air cylinder 105. Then, by the action of the air cylinder 105, the tip of the Shino grip lever 103 contacts the stopper block 106 to grip the Shino R2 of the full bobbin FB, and the stopper block 107 to grip the Shino R1 of the small bobbin SB. And the stopper blocks 106 and 10
7 can be switched to three neutral positions.

【0019】次に篠掛け装置130について図9,14
〜17を参照して説明する。図9で示すように空ボビン
用の昇降部材57をガイドしている3本のガイドロッド
56前方で上下のブラケット55a,55b間に3本の
ガイドロッド131が立設してある。3本のガイドロッ
ド131には昇降ブロック132の3つのガイド部13
2aが昇降自在に嵌装してある。
Next, the shining device 130 is shown in FIGS.
This will be described with reference to FIGS. As shown in FIG. 9, three guide rods 131 are provided upright between the upper and lower brackets 55a and 55b in front of the three guide rods 56 for guiding the elevating member 57 for the empty bobbin. The three guide rods 131 have three guide portions 13 of the lifting block 132.
2a is fitted so as to be movable up and down.

【0020】昇降ブロック132にはガイド部132a
間に左右方向の揺動軸133が回動自在に支持してあ
る。揺動軸133には3本の篠掛けバー134の下端が
楔着され、小玉ボビン用ペッグユニット30Aを挾ん
で、前記篠継ぎヘッド100のアーム112と逆側に夫
々位置されている。中央のガイド部132aの側面には
揺動回転軸133の揺動用モータ135が取付けてあ
り、揺動用モータ135の駆動ギヤ136が揺動軸13
3に楔着した従動ギヤ137と噛合っている。またこの
昇降ブロック132には、上部のブラケット55aに回
動自在に支持したスプロケット138と下部のブラケッ
ト55bに取付けた昇降モータ139のスプロケット1
40間に巻回したチェン141が連結してある。
The elevating block 132 has a guide portion 132a.
A horizontal swing shaft 133 is rotatably supported therebetween. The lower ends of three shining bars 134 are wedge-fitted to the swing shaft 133, and are located on the opposite side of the arm 112 of the shining joint head 100 with the small ball bobbin peg unit 30A interposed therebetween. A rocking motor 135 for the rocking rotation shaft 133 is attached to a side surface of the central guide portion 132a, and a driving gear 136 of the rocking motor 135 is mounted on the rocking shaft 13.
3 is engaged with a driven gear 137 wedge-mounted. The lifting block 132 includes a sprocket 138 rotatably supported by an upper bracket 55a and a sprocket 1 of a lifting motor 139 mounted on a lower bracket 55b.
A chain 141 wound between 40 is connected.

【0021】各篠掛けバー134の先端部には図16,
図17のように一対の篠ガイド部材145が設けてあ
る。即ち篠掛けバー134先端部上面に固定したブラケ
ット146に互いに反対方向を向けて2個のエアーシリ
ンダ147を並設し、夫々のエアーシリンダ147のピ
ストンロッド148の先端部にガイド凹み145aを形
成した鉤状の篠ガイド部材145が螺着してある。篠ガ
イド部材145の下面は凹状に形成されていて、その凹
部を篠掛けバー134の上面に固着した角状のガイドバ
ー149上に載置し、篠ガイド部材145は第16図に
おける実線と仮想線で図示した位置にガイドバー149
に案内されて往復摺動する。本実施例のエアーシリンダ
147はシリンダ本体内にばねを内蔵した周知の単動シ
リンダで常時はばねで付勢されてピストンロッドが突出
していて(実線で示した状態)篠ガイド部材145の左
右の間隔Bは前記満ボビンの間隔A2と等しい間隔で左
右のガイド凹み145aは篠掛けする2個のC字状ロー
ビングガイド9の開口部8とほぼ対向している。
At the end of each bar 134, FIG.
As shown in FIG. 17, a pair of shin guide members 145 are provided. That is, two air cylinders 147 are arranged side by side in opposite directions to the bracket 146 fixed to the top surface of the tip of the Shino bar 134, and a guide recess 145a is formed at the tip of the piston rod 148 of each air cylinder 147. A hook-shaped shin guide member 145 is screwed. The lower surface of the Shino guide member 145 is formed in a concave shape, and the concave portion is placed on a square guide bar 149 fixed to the upper surface of the Shino hanging bar 134. The Shino guide member 145 is indicated by a solid line and a virtual line in FIG. The guide bar 149 is located at the position indicated by the line.
And slide back and forth. The air cylinder 147 of this embodiment is a well-known single-acting cylinder in which a spring is built in the cylinder body, and is normally urged by a spring to project a piston rod (in a state shown by a solid line). The interval B is equal to the interval A2 between the full bobbins, and the left and right guide recesses 145a are substantially opposed to the openings 8 of the two C-shaped roving guides 9 to be hung.

【0022】以上の構成により本発明の方法を実施する
場合、以下のようになる。前述のようにクリール2の前
後2列のボビンハンガ7に全て満ボビンFBを仕掛けて
紡出を始める。満ボビンFBが小玉ボビンSBとなると
篠交換機20が精紡機1の前面に沿って左方(第20図
で矢印Y方向)へ進入し、交換すべき1列おきの3つの
前後対P1の小玉ボビンSBの右端列と、篠交換機20
に搭載した右端(第20図で下端)の小玉ボビン用ペッ
グユニット30Aとを対向させて停止する。このとき各
ペッグユニット30Bの各前後ペッグ32,38は予備
レール11a,11bで1列おきの3つの前後対P1
(6個)の満ボビンFBの直下に位置する(第20図
(a))。この時、篠継ヘッド100、及び口出しノズ
ル89は篠継ぎされる小玉ボビンSBの篠R1を案内す
るトランペット14と対向しており、篠ガイド部材14
5は小玉ボビンSBの篠R1を案内しているC字状ロー
ビングガイド9と対向している。3つの満ボビン用ペッ
グユニット30Bを昇降モータ59とチェン62を介し
て待機位置S3から最上昇位置S4へ上昇させて、前後
対P1の満ボビンFBをその前後ペッグ32,38上へ
載置する。次いで満ボビン取降位置S5まで下降して停
止し、3つの満ボビン用ペッグユニット30Bの揺動モ
ータ36を作動させて揺動アーム35を反時計方向に水
平揺動して後ペッグ38を原位置S1から変位位置S2
へ移動させ、各前後対P1の満ボビンFBを左右対P2
とし、予備レール11bの直下で1列配列にする。
When the method of the present invention is implemented by the above configuration, the following is performed. As described above, the full bobbin FB is set on the bobbin hangers 7 in the two rows before and after the creel 2 and spinning is started. When the full bobbin FB becomes the small bobbin SB, the Shino exchanger 20 advances to the left (in the direction of the arrow Y in FIG. 20) along the front surface of the spinning machine 1, and the three front-back pairs P1 in every other row to be replaced. The rightmost row of bobbins SB and Shino Exchange 20
And stops at the right end (lower end in FIG. 20) of the small ball bobbin peg unit 30A. At this time, the front and rear pegs 32 and 38 of each peg unit 30B are divided into three front and rear pairs P1 in every other row by the spare rails 11a and 11b.
It is located immediately below (six) full bobbins FB (FIG. 20 (a)). At this time, the shino splicing head 100 and the outlet nozzle 89 face the trumpet 14 for guiding the shino R1 of the small bobbin SB to be spliced, and the shino guide member 14
Numeral 5 is opposed to a C-shaped roving guide 9 for guiding the shin R1 of the small bobbin SB. The three full bobbin peg units 30B are raised from the standby position S3 to the highest position S4 via the lifting motor 59 and the chain 62, and the full bobbin FB of the front and rear pair P1 is placed on the front and rear pegs 32 and 38. . Next, it descends to the full bobbin removal position S5, stops, and operates the rocking motors 36 of the three full bobbin peg units 30B to horizontally rock the rocking arm 35 in the counterclockwise direction to remove the rear peg 38. Displacement position S2 from position S1
To move the full bobbin FB of each front-back pair P1 to the left-right pair P2.
, And arranged in a row just below the spare rail 11b.

【0023】続いて口出しノズル昇降用のモータ75が
チェン78を周回し、スライドブロック74が斜め前方
上方へ上昇することにより案内ロッド88が傾動用のカ
ム溝72に、また、ロッド83先端のカムフォロア84
がシフト用のカム溝86に夫々案内され、口出しノズル
89は待機位置S7から口出し位置S8まで左右方向へ
移動しつつ上昇され、口出し位置S8で6つの満ボビン
FB外周に前面から近接して停止する。口出し位置S8
で図示しない吸引源が作動して口出しノズル89が吸引
を始めると共に、満ボビンFBを載置した各前、後ペッ
グ32,38を2つの正逆転モータ33,39により篠
巻戻し方向へゆっくり回転させて、口出しノズル89が
篠端を吸引口出しする(図20(b))。
Subsequently, the motor 75 for raising and lowering the outlet nozzle orbits the chain 78, and the slide block 74 rises diagonally forward and upward, so that the guide rod 88 is in the cam groove 72 for tilting and the cam follower at the tip of the rod 83. 84
Are guided to the shift cam grooves 86, respectively, and the outlet nozzle 89 is moved up and down from the standby position S7 to the outlet position S8 while moving in the left-right direction, and stops at the outlet position S8 from the front of the six full bobbins FB from the front. I do. Exit position S8
Then, the suction source (not shown) is activated to cause the outlet nozzle 89 to start suctioning, and the front and rear pegs 32, 38 before and after loading the full bobbin FB are slowly rotated in the Shino rewind direction by the two forward / reverse rotation motors 33, 39. Then, the outlet nozzle 89 sucks out the shin end (FIG. 20B).

【0024】次いで吸引を続けながら前記と逆の動作で
口出しノズル89を口出し位置S8から篠継ヘッド10
0下方の待機位置S7へ横移動させつつ下降させる。こ
の時、満ボビンFBは篠切断が生じないように巻戻し方
向に回転される。口出しされた満ボビンFBの篠端は篠
ガイド部材145の前方を通って篠継ヘッド100の篠
把持レバー103とストッパブロック106との間に把
持される。この時、揺動アーム35の後ペッグ38上の
満ボビンFBの篠は、篠さばきガイド240の水平部分
242aに掛けられる(図20(c))。
Next, the suction nozzle 89 is moved from the discharge position S8 to the Shinotsu head 10 by performing the reverse operation while continuing suction.
0 and descend while moving laterally to the standby position S7 below. At this time, the full bobbin FB is rotated in the rewinding direction so as not to cause the cutting of the shin. The Shino end of the full bobbin FB that has been ejected passes through the front of the Shino guide member 145 and is gripped between the Shino grip lever 103 of the Shino joint head 100 and the stopper block 106. At this time, the shin of the full bobbin FB on the rear peg 38 of the swing arm 35 is hung on the horizontal part 242a of the shin-shin guide 240 (FIG. 20C).

【0025】次いで、篠継ヘッド100をヘッド揺動シ
リンダ114の動作で垂下状態からほぼ水平状態へ揺動
させ、口出しノズル89と篠継ヘッド100間で篠R2
を口出しノズル89内のコーム(図示なし)の作用によ
り篠端を筆先状にして切断する(図20(d))。
Then, the Shinotsu head 100 is swung from the hanging state to a substantially horizontal state by the operation of the head swing cylinder 114, and the Shino R2 is moved between the outlet nozzle 89 and the Shinotsu head 100.
Is cut into a brush tip shape by the action of a comb (not shown) in the outlet nozzle 89 (FIG. 20D).

【0026】次に篠掛け装置130の揺動用モータ13
5が回転して篠掛けバー134を前方へ傾動し、同時に
昇降モータ139の動作で篠ガイド部材145を僅かに
上昇させると、篠ガイド部材145が、篠継ヘッド10
0と満ボビンFBの間の2本の満ボビンFBの篠R2の
間に入り込み、各2本の篠R2は篠ガイド部材145の
斜面で左右にさばかれ、その中間部が夫々ガイド凹み1
45a内に位置される。篠ガイド部材145を前列の小
玉ボビンSBの直下へ移動させると同時に満ボビンFB
を巻戻し方向へ回転させつつ篠継ヘッド100の揺動シ
リンダ117を作動してアーム112を前進端位置まで
揺動させ、篠継ヘッド100をトランペット14上方の
篠継位置S9に位置させる。こうして篠継ヘッド100
が把持してその溝底部101aに保持されている満ボビ
ンFBの篠R2に小玉ボビンSBの篠R1を重ね合せ、
篠把持レバー103を中立位置にする。すると満ボビン
FBの篠R2は把持を解放されて小玉ボビンSBの篠R
1と共にトランペット14からドラフトローラ15へ連
れ込まれて追継ぎが行なわれる(図20(e))。
Next, the swinging motor 13 of the shining device 130
5 rotates and tilts the Shino bar 134 forward, and at the same time slightly raises the Shino guide member 145 by the operation of the elevating motor 139, the Shino guide member 145 moves the Shino head 10
0 and the full bobbin FB enter between the Shino R2 of the two full bobbins FB, and each of the two Shino R2 is flanked by the slope of the Shino guide member 145 to the left and right.
45a. At the same time as moving the Shino guide member 145 directly below the small bobbin SB in the front row, the full bobbin FB
The arm 112 is swung to the forward end position by operating the swing cylinder 117 of the Shinotsu joint head 100 while rotating in the unwinding direction, and the Shino joint head 100 is positioned at the Shino joint position S9 above the trumpet 14. Thus, Shinotsu head 100
Superimposes Shino R1 of the small bobbin SB on Shino R2 of the full bobbin FB held by the groove bottom 101a and
The Shino grip lever 103 is set to the neutral position. Then, Shino R2 of the full bobbin FB is released from being held, and Shino R of the small bobbin SB is released.
1 together with the trumpet 14 from the trumpet 14 to the draft roller 15 to perform the joining (FIG. 20E).

【0027】次いで篠把持レバー103が小玉ボビンS
Bの篠R1をストッパブロック107との間で把持し、
小玉ボビンSBの篠R1がドラフトローラ15へ送り込
まれることで小玉ボビンSBの篠R1が切断される。同
時に、満ボビンFBを載せている後ペッグ38を巻戻し
方向へ回転させつつ揺動アーム35の移動により原位置
S1に戻し、左右対P2の満ボビンFBを前後対P1に
並べ換える。次いで前後動用モータ50を駆動して空ボ
ビン用ペッグユニット30Aを前進させ、それらの前、
後ペッグ32,38を交換すべき前後対P1の小玉ボビ
ンSBの直下に位置させる。この時篠さばきガイド24
0により、ペッグユニット30Aの前方の篠R2はペッ
グユニット30Aの側方にさばかれる(図20
(f))。
Next, the Shino grip lever 103 is moved to the small bobbin S
B. Shino R1 of B is held between the stopper block 107 and
When the Shinobu R1 of the small bobbin SB is fed to the draft roller 15, the Shinobu R1 of the small bobbin SB is cut. At the same time, after the full bobbin FB has been placed, the peg 38 is returned to the original position S1 by rotating the swing arm 35 while rotating in the rewind direction, and the full bobbin FB of the left and right pair P2 is rearranged into the front and rear pair P1. Next, the forward / backward movement motor 50 is driven to advance the empty bobbin peg unit 30A, and before them,
The rear pegs 32 and 38 are located immediately below the small bobbins SB of the front and rear pair P1 to be replaced. At this time, the guide 24
Due to 0, the shino R2 in front of the peg unit 30A is judged to the side of the peg unit 30A (FIG. 20).
(F)).

【0028】前記小玉ボビンSB直下の小玉ボビン用ペ
ッグユニット30Aを昇降して前後対P1の小玉ボビン
SBをクリール2のボビンハンガ7から外し、前、後ペ
ッグ32,38上に小玉ボビンSBを載せた状態で小玉
ボビンSBをペッグ回転により篠巻取方向へ回転させ
て、切断した小玉ボビンSBの篠R1を巻取る(図21
(a))。小玉ボビンSBを載せた小玉ボビン用ペッグ
ユニット30Aを後退させて、対応した前後対P1の満
ボビンFBの隣へ前後対P1のまま取り出す(図21
(b))。篠ガイド部材145をロービングガイド9の
僅か前方へ移動させ、篠ガイド部材145の下流の篠R
2をロービングガイド9の開口部8からC字状のロービ
ングガイド9内へ導く。次いで2個のエアーシリンダ1
47の作用で篠ガイド部材145を互いに接近移動させ
た後、篠ガイド部材145を後退させ、篠R2をロービ
ングガイド9の係止部9aの内側に引掛ける(図21
(c),図19の2点鎖線)。
The small bobbin peg unit 30A immediately below the small bobbin SB is moved up and down to remove the front and rear P1 small bobbin SB from the bobbin hanger 7 of the creel 2, and the small bobbin SB is placed on the front and rear pegs 32 and 38. In this state, the small bobbin SB is rotated in the Shino winding direction by peg rotation, and the Shino R1 of the cut small bobbin SB is wound (FIG. 21).
(A)). The peg unit 30A for the small bobbin on which the small bobbin SB is placed is retracted, and taken out next to the full bobbin FB of the corresponding front and rear pair P1 as the front and rear pair P1 (FIG. 21).
(B)). The Shino guide member 145 is moved slightly forward of the roving guide 9, and the Shino R on the downstream side of the Shino guide member 145 is moved.
2 is guided into the C-shaped roving guide 9 from the opening 8 of the roving guide 9. Then two air cylinders 1
After the Shino guide members 145 are moved closer to each other by the action of 47, the Shino guide members 145 are retracted, and the Shino R2 is hooked inside the locking portions 9a of the roving guide 9 (FIG. 21).
(C), two-dot chain line in FIG. 19).

【0029】次いで篠ガイド部材145を待機位置へ戻
し、満ボビンFBを載せた3つの満ボビン用ペッグユニ
ット30Bを待機位置S3まで下降させると共に篠交換
機20全体を右方向にクリール2のボビンハンガ7の左
右ピッチA2だけ移動させて各前後対P1の満ボビンF
Bを、クリール2の小玉ボビンSBを取外した空のボビ
ンハンガ7と対向させる(図21(d))。そして満ボ
ビンFBを載せた満ボビン用ペッグユニット30Bを前
進させて前後対P1のボビンハンガ7直下に位置させた
後昇降し、満ボビンFBを小玉ボビンSBを外した後の
ボビンハンガ7に挿着する。その後、満ボビン用ペッグ
ユニット30Bを後退させ、篠交換機20を左方へクリ
ール2のボビンハンガ7の左右ピッチA2の2倍だけ移
動させる(図21(e))。小玉ボビンSBを載せた小
玉ボビン用ペッグユニット30Aを上昇させ、3対の前
後列P1の小玉ボビンSBを満ボビンFBを外した後の
予備レール11a,11bのボビンハンガ12に挿着す
る(図21(f))。そして次回の篠交換では、今回篠
交換された3対の満ボビンFBの隣の小玉ボビンSBが
満ボビンFBと交換される。以下、これらの動作を繰返
し、小玉ボビンSBが全錘交換される。
Next, the Shino guide member 145 is returned to the standby position, the three full bobbin peg units 30B on which the full bobbins FB are placed are lowered to the standby position S3, and the entire Shino exchange 20 is moved rightward by the bobbin hanger 7 of the creel 2. Full bobbin F of each front and rear pair P1 by moving left and right pitch A2
B faces the empty bobbin hanger 7 from which the small bobbin SB of the creel 2 has been removed (FIG. 21D). Then, the full bobbin peg unit 30B on which the full bobbin FB is placed is moved forward and positioned immediately below the bobbin hanger 7 of the front and rear pair P1, and then moved up and down, and the full bobbin FB is inserted into the bobbin hanger 7 after the small bobbin SB is removed. . Thereafter, the full bobbin peg unit 30B is retracted, and the Shino exchanger 20 is moved to the left by twice the left-right pitch A2 of the bobbin hanger 7 of the creel 2 (FIG. 21 (e)). The peg unit 30A for the small bobbin on which the small bobbin SB is mounted is raised, and the small bobbins SB in the three pairs of front and rear rows P1 are inserted into the bobbin hangers 12 of the spare rails 11a and 11b after the full bobbin FB is removed (FIG. 21). (F)). Then, in the next Shino exchange, the small ball bobbins SB next to the three pairs of full bobbins FB that have been exchanged this time are exchanged for full bobbins FB. Hereinafter, these operations are repeated, and the small bobbin SB is exchanged for all weights.

【0030】尚、この実施例ではペッグユニット30B
の揺動アーム35の回転中心はユニット本体31に対し
て前後方向に移動不能であるが、これを所定量前後方向
に往復動するようにし、この移動量に応じて揺動アーム
35の旋回半径を短くすることもできる。また、本実施
例では、篠継後に左右対の満ボビンを再び前後対に並び
換えたが、篠端口出し後であれば篠継前であっても前記
並び換えを行なってよい。更にこの実施例では篠継後の
前後対満ボビンを精紡クリールの空のボビンハンガと前
後方向に対向させる時、篠交換機自体を左右方向に左右
ピッチA2だけ移動させたが、ペッグユニット30A,
30Bを篠交換機の本体に対して左右方向に左右ピッチ
A2移動するようにしてあっても本方法は実施できる。
In this embodiment, the peg unit 30B
The center of rotation of the swing arm 35 cannot be moved in the front-rear direction with respect to the unit body 31. However, the swing center of the swing arm 35 is reciprocated in the front-rear direction by a predetermined amount. Can also be shortened. Further, in the present embodiment, the left and right full bobbins are rearranged into the front and rear pair again after the splicing, but the rearranging may be performed even before the splicing if the splint is opened. Further, in this embodiment, when the front and rear full bobbins after the splicing are opposed to the empty bobbin hanger of the spinning creel in the front and rear direction, the Shino exchanger itself is moved in the left and right direction by the left and right pitch A2, but the peg units 30A,
This method can be implemented even if 30B is moved left and right pitches A2 in the left and right direction with respect to the main body of the Shino exchange.

【0031】[0031]

【発明の効果】以上のようにこの発明の方法によれば、
予備レールの前後対の満ボビンと精紡クリールの前後2
列の小玉ボビンとを前後対単位で篠継しつつ交換する篠
交換方法において、予備レールから前後対で取外した満
ボビンを左右対とし、この状態で口出しノズルを機台長
手方向に並べた状態のまま昇降させて篠端口出して篠継
ヘッドに受け渡して篠継を行なうことで、口出しノズル
の配列変更を行わずに満ボビンからの篠端口出し、篠継
ヘッドへの篠受け渡しができ、口出しノズルの移動機構
が簡素化でき、また、口出しノズルの配列変更を伴わな
いで口出しノズルを昇降させるようにしたので、機台長
手方向に満、小玉ボビン用のペッグが隣接している時で
も、これらに関係無く口出しノズルを篠交換機の搭載で
きる利点がある。
As described above, according to the method of the present invention,
A pair of full bobbins before and after the spare rail and two before and after the spinning creel
Shino that exchanges Kodama bobbins in a row while transferring them in pairs
In the replacement method, the full bobbins removed from the spare rail in front and rear pairs are left and right pairs, and the outlet nozzle is
Raise and lower while keeping it aligned in the hand direction
The nozzle is delivered by handing over to the head and performing Shinotsu
Shinohata out of full bobbin without changing the arrangement of
Shino can be delivered to the head, the moving mechanism of the outlet nozzle can be simplified, and no change in the arrangement of the outlet nozzle is required.
Since so as to lift the yarn end finding nozzle have, when the full the machine frame longitudinally, the peg for Kodama bobbin adjacent
However, there is an advantage that the outlet nozzle can be mounted on the Shino exchanger regardless of the above.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を実施するのに好適な篠交換機の概略側
面図である。
FIG. 1 is a schematic side view of a Shino exchange suitable for carrying out the present invention.

【図2】図1の正面図である。FIG. 2 is a front view of FIG.

【図3】満ボビン用ペッグユニット平面図である。FIG. 3 is a plan view of a full bobbin peg unit.

【図4】図3のIV−IV断面図である。FIG. 4 is a sectional view taken along line IV-IV of FIG. 3;

【図5】図3の正面図である。FIG. 5 is a front view of FIG. 3;

【図6】ペッグユニットの昇降機構を示す側面図であ
る。
FIG. 6 is a side view showing a lifting mechanism of the peg unit.

【図7】図6の正面図である。FIG. 7 is a front view of FIG. 6;

【図8】篠さばきガイドの説明図である。FIG. 8 is an explanatory diagram of a Shinobu separation guide.

【図9】図6のIX−IX断面図である。FIG. 9 is a sectional view taken along line IX-IX of FIG. 6;

【図10】篠端引出し装置の側面図である。FIG. 10 is a side view of the shin end drawer.

【図11】図10の正面図である。FIG. 11 is a front view of FIG. 10;

【図12】篠継ヘッドの作動機構の正面図である。FIG. 12 is a front view of an operating mechanism of the Shinotsu head.

【図13】1対の篠継ヘッドの拡大図である。FIG. 13 is an enlarged view of a pair of Shinotsu heads.

【図14】篠掛け装置の側面図である。FIG. 14 is a side view of the shining device.

【図15】図14の正面図である。FIG. 15 is a front view of FIG.

【図16】篠ガイド部材の拡大正面図である。FIG. 16 is an enlarged front view of a shino guide member.

【図17】図16の左側面図である。17 is a left side view of FIG.

【図18】ボビンの前後、左右ピッチを示す説明図であ
る。
FIG. 18 is an explanatory diagram showing front and rear, left and right pitches of a bobbin.

【図19】ロービングガイドと篠の関係を示す図であ
る。
FIG. 19 is a diagram showing a relationship between a roving guide and a shin.

【図20】平面図と側面図を同時に表した動作説明図で
ある。
FIG. 20 is an operation explanatory diagram simultaneously showing a plan view and a side view.

【図21】平面図と側面図を同時に表した動作説明図で
ある。
FIG. 21 is an operation explanatory diagram simultaneously showing a plan view and a side view.

【符号の説明】[Explanation of symbols]

1 精紡機、 2 クリール、 7,12 ボビンハン
ガ、11a,11b 予備レール、 20 篠交換機、
21 篠交換機の本体、30A 小玉ボビン用ペッグ
ユニット、30B 満ボビン用ペッグユニット、 32
前ペッグ、 38 後ペッグ、41 ペッグ移動装
置、 70 篠端引出し装置、 100 篠継ヘッド、
130 篠掛け装置、 210 ボビン移載装置、 P
1 前後対、P2 左右対、 S1 原位置、 S2
変位位置 、FB 満ボビン、SB 小玉ボビン、 R
1,R2 篠
1 spinning machine, 2 creel, 7,12 bobbin hanger, 11a, 11b spare rail, 20 Shino exchange,
21 Main body of Shino exchanger, 30A Peg unit for small bobbin, 30B Peg unit for full bobbin, 32
Front peg, 38 Rear peg, 41 Peg moving device, 70 Shino end drawer, 100 Shino head,
130 Shinobu device, 210 Bobbin transfer device, P
1 front and back pair, P2 left and right pair, S1 original position, S2
Displacement position, FB full bobbin, SB Kodama bobbin, R
1, R2 Shino

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 精紡クリールの前後2列の小玉ボビン
と、クリール手前上方の予備レールに準備した前後2列
の満ボビンとを、精紡機の機台幅方向に対向する前後対
単位で篠継しつつ交換していく精紡機における篠交換方
法において、予備レールから前後対の満ボビンを取外
し、これらを機台長手方向に並んで配設されている口出
しノズルに対応する左右対に並べて前記口出しノズルを
そのままの配列で上昇させて篠端口出しし、その後、口
出しノズルをそのままの配列で下降させて篠継ヘッドに
受け渡して篠換すべき小玉ボビンの篠に篠継する動作
と、左右対満ボビンを再び前後対に並べ換える動作を行
い、この前後対の満ボビンとクリールの前後対の小玉ボ
ビンとを交換し、これらの作動を機台の一端から他端へ
向けて順次行うようにしたことを特徴とする精紡機にお
ける篠交換方法。
1. A small ball bobbin in two rows before and after a spinning creel and a full bobbin in two rows before and after prepared on a spare rail in front of the creel are paired in front and rear units facing in the machine width direction of the spinning machine. In the Shino replacement method for spinning machines that are being exchanged while being spliced, the front and rear pairs of full bobbins are removed from the spare rail, and the bobbin is arranged side by side in the machine longitudinal direction.
Side -to-side pairs corresponding to the nozzles
Raise it in the same arrangement and put out Shinohana , then
Lowering the discharge nozzle in the same arrangement as in the Shinotsu head
Operation will be ShinoTsugi to Shino of Kodama bobbin should be Shino conversion Te delivery
And, line operation Ru rearranged in pair of front and rear left and right TaiMitsuru bobbin again
The replacement of the full bobbin of the front and rear pair and the small ball bobbin of the front and rear pair of the creel is performed sequentially from one end of the machine base to the other end. Method.
JP16215891A 1991-06-05 1991-06-05 Shino exchange method in spinning machine Expired - Lifetime JP2930146B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16215891A JP2930146B2 (en) 1991-06-05 1991-06-05 Shino exchange method in spinning machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16215891A JP2930146B2 (en) 1991-06-05 1991-06-05 Shino exchange method in spinning machine

Publications (2)

Publication Number Publication Date
JPH0641829A JPH0641829A (en) 1994-02-15
JP2930146B2 true JP2930146B2 (en) 1999-08-03

Family

ID=15749137

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16215891A Expired - Lifetime JP2930146B2 (en) 1991-06-05 1991-06-05 Shino exchange method in spinning machine

Country Status (1)

Country Link
JP (1) JP2930146B2 (en)

Also Published As

Publication number Publication date
JPH0641829A (en) 1994-02-15

Similar Documents

Publication Publication Date Title
JP2553052B2 (en) How to replace a spinning machine
JPS6361414B2 (en)
KR900008534B1 (en) Method and apparatus for automatically doffing cops and replacing then with emptytube in a roving frame
JP2930146B2 (en) Shino exchange method in spinning machine
JP2915988B2 (en) Shino exchange method and Shino exchange in spinning machine
JP2979733B2 (en) Shino exchange method and Shino exchange in spinning machine
JP2979735B2 (en) Peg unit in Shino exchange
JP3240763B2 (en) Spinning machine for roving yarn
JP2979734B2 (en) Shino exchange method and Shino exchange in spinning machine
JPH05195346A (en) Sliver exchanger of fine spinning machine
EP0485324B1 (en) Method and apparatus for exchanging roving bobbins in a ring spinning frame
JP3114169B2 (en) Shinotsu mistake processing equipment in Shinojo machine
JPH0585659B2 (en)
JPS6361416B2 (en)
JPH07103496B2 (en) Shinobing machine in spinning machine
JPH0621388B2 (en) Shino exchange for spinning machines
JP2502969B2 (en) Shinotsuji method for spinning machines
JP2520383B2 (en) How to hang a full bobbin
JP3074945B2 (en) Pipe replacement method and pipe replacement device in roving machine
JPH0737692B2 (en) How to hang a full bobbin
JP2559980B2 (en) How to replace a spinning machine
JP2513447B2 (en) Shinotsugi device
JPS62223328A (en) Roving changing machine in spinning machine
JPH0726261B2 (en) Shinotsugi method and Shinotsuji machine for spinning machines
JP2869965B2 (en) Shinohata opening method