JP2923800B2 - Ice weighing accuracy improvement method - Google Patents

Ice weighing accuracy improvement method

Info

Publication number
JP2923800B2
JP2923800B2 JP24538390A JP24538390A JP2923800B2 JP 2923800 B2 JP2923800 B2 JP 2923800B2 JP 24538390 A JP24538390 A JP 24538390A JP 24538390 A JP24538390 A JP 24538390A JP 2923800 B2 JP2923800 B2 JP 2923800B2
Authority
JP
Japan
Prior art keywords
ice
weighing
screw conveyor
charging area
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24538390A
Other languages
Japanese (ja)
Other versions
JPH04122820A (en
Inventor
浩 田渕
平治 土居
隆信 郡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kato Heavy Industries Construction Machinery Co Ltd
Original Assignee
Ishikawajima Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Construction Machinery Co Ltd filed Critical Ishikawajima Construction Machinery Co Ltd
Priority to JP24538390A priority Critical patent/JP2923800B2/en
Publication of JPH04122820A publication Critical patent/JPH04122820A/en
Application granted granted Critical
Publication of JP2923800B2 publication Critical patent/JP2923800B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明はコンクリート原料配合プラントで用いられる
アイス計量器によるアイス計量の精度を向上させるため
の方法に関するものである。
Description: TECHNICAL FIELD The present invention relates to a method for improving the accuracy of ice weighing by an ice weigher used in a concrete raw material blending plant.

[従来の技術] コンクリート原料配合プラントでは、コンクリート原
料としての粗骨材、細骨材、セメント等のほかにアイス
を計量して必要量を放出させ、これらをミキサで混練し
てコンクリートとするようにしてある。
[Conventional technology] In a concrete material mixing plant, in addition to coarse aggregate, fine aggregate, cement, and the like as concrete raw materials, ice is measured and discharged in a required amount, and these are kneaded with a mixer to produce concrete. It is.

上記アイスの計量を行うアイス計量装置は、第4図に
示す如く、下部に放出ゲート2を開閉自在に備えたアイ
ス計量器1の上方に、貯氷庫3内のアイスを搬送するス
クリューコンベヤ4を配設し、該スクリューコンベヤ4
の切出口に計量弁5を設けて、該計量弁5の開閉により
スクリューコンベヤ4からのアイスをアイス計量器1内
へ投入させたり、投入停止をさせたりするようにしてあ
る。6はアイス計量器1のロードセルである。
As shown in FIG. 4, the ice weighing device for weighing ice includes a screw conveyor 4 for transporting ice in an ice storage 3 above an ice weighing device 1 provided with a release gate 2 at its lower part so as to be openable and closable. The screw conveyor 4
A measuring valve 5 is provided at the cutout of the device, and the ice from the screw conveyor 4 is charged into the ice measuring device 1 or stopped by opening and closing the measuring valve 5. Reference numeral 6 denotes a load cell of the ice weighing device 1.

上記スクリューコンベヤ4からアイス計量器1ヘアイ
スを投入させる場合は、目標計量値に達するまで計量弁
5にて計量しながらスクリューコンベヤ4からアイス計
量器1ヘアイスを投入させるようにするが、従来は、目
標計量値の約90%までは大投入域として、スクリューコ
ンベヤ4からのアイスを計量弁5で計量して連続的に大
量のアイスをアイス計量器1へ投入させるようにし、以
後目標計量値までは、小投入域として、計量弁5を間欠
的に開閉動作させながら、アイスを少量ずつ計量してア
イス計量器1へ投入させるようにしている。
When the ice is supplied from the screw conveyor 4 to the ice weighing device 1, the ice is supplied from the screw conveyor 4 to the ice weighing device 1 while being measured by the measuring valve 5 until the target weighing value is reached. Up to about 90% of the target weighing value, as a large charging area, the ice from the screw conveyor 4 is measured by the measuring valve 5 so that a large amount of ice is continuously charged into the ice weighing device 1, and thereafter, until the target weighing value is reached. , As a small charging area, ice is measured little by little and charged into the ice measuring device 1 while the measuring valve 5 is opened and closed intermittently.

[発明が解決しようとする課題] ところが、コンクリート原料配合に用いるアイスは、
通常、薄切りの氷片状にスライスされたスライスアイス
とか、かき氷状に薄片とされたフレークアイスが使用さ
れているため、氷の薄片同士が供給中にくっつき合って
整流されにくくなる。そのため、短時間に大量のアイス
を計量する場合に、上記従来の方法の如き小投入域でア
イスを間欠的に計量して目標計量値にしようとするもの
では、実際の計量値と目標計量値の間に生ずる誤差が大
きく、精度良く計量することができなかった。
[Problems to be Solved by the Invention] However, the ice used for mixing the raw materials for concrete is
Usually, sliced ice sliced into sliced ice or flake ice sliced into shaved ice is used, so that the ice slices stick to each other during supply and are not easily regulated. Therefore, when a large amount of ice is weighed in a short time, in the case of intermittently weighing ice to a target weighing value in a small charging area as in the conventional method described above, the actual weighing value and the target weighing value Was large and the measurement could not be performed accurately.

そこで、本発明は、短時間に大量のアイスを計量する
場合に目標計量値になるように計量精度の向上が図れる
ようにしようとするものである。
Therefore, the present invention is intended to improve the measurement accuracy so that a large amount of ice is measured in a short time so that the target measurement value is obtained.

[課題を解決するための手段] 本発明は、上記課題を解決するために、スクリューコ
ンベヤからアイス計量器へアイスを投入するほかに冷水
を注入できるようにし、目標計量値に近い計量重量まで
の大投入域ではスクリューコンベヤ切出口の計量弁にて
計量し、次いで、最終計量を行う小投入域では上記冷水
を計量して、該冷水の計量値で最終計量分を補うように
する。又、上記大投入域では、スクリューコンベヤのア
イス送給速度を可変にすると共に、計量弁を開閉させ
て、スクリューコンベヤ高速で計量弁全開、スクリュー
コンベヤ低速で計量弁全開、スクリューコンベヤ低速で
計量弁の間欠的開閉、を段階的に行ってアイスの計量を
行うようにしてもよい。
[Means for Solving the Problems] In order to solve the above-described problems, the present invention provides a method in which cold water can be injected in addition to charging ice from a screw conveyor to an ice weighing device, and a weighing amount close to a target weighing value. In the large charging area, the metering valve at the screw conveyor cut-off port is used for measurement, and then, in the small charging area where the final metering is performed, the cold water is measured, and the measured value of the cold water is used to supplement the final metering amount. In addition, in the above-mentioned large charging area, the screw feeding speed of the screw conveyor is made variable and the measuring valve is opened and closed, the metering valve is fully opened at a high speed of the screw conveyor, the metering valve is fully opened at a low speed of the screw conveyor, and the metering valve is at a low speed of the screw conveyor. The intermittent opening and closing may be performed in stages to measure the ice.

[作用] 目標計量値に達する最終計量分を、冷水の計量値で補
うようにするので、供給時に整流されにくい薄片のアイ
スを計量弁の間欠的開閉で最終計量を行う場合に比し
て、目標計量値に近付け易く、計量精度を向上させるこ
とができる。大投入域を、スクリューコンベヤの送給速
度を可変にして段階的に計量させると、より短時間に大
量のアイスを計量できる。
[Action] Since the final measurement amount that reaches the target measurement value is supplemented by the measurement value of the cold water, compared to the case where the final measurement is performed by intermittently opening and closing the flake ice that is not easily rectified during supply by intermittent opening and closing of the measurement valve. It is easy to approach the target measurement value, and the measurement accuracy can be improved. If the large feeding area is measured stepwise by changing the feeding speed of the screw conveyor, a large amount of ice can be measured in a shorter time.

[実施例] 以下、本発明の実施例を図面を参照して説明する。[Example] Hereinafter, an example of the present invention will be described with reference to the drawings.

第1図は本発明の方法を実施するための装置の概要を
示すもので、下部に放出ゲート2を開閉用シリンダ7の
伸縮作動により開閉自在に備えているアイス計量器1の
上方位置に、貯氷庫3からのアイスを搬送するスクリュ
ーコンベヤ4を臨ませて、該スクリューコンベヤ4の切
出口に計量弁5を設け、スクリューコンベヤ4により搬
送されてアイス計量器1に投入されるアイスを計量弁5
で計量するようにし、且つアイス計量器5の上方位置
に、冷水配管8を臨ませて、該冷水配管8の途中に冷水
計量弁9を取り付け、冷水を計量してアイス計量器1に
投入できるようにする。6はロードセルを示す。
FIG. 1 shows the outline of an apparatus for carrying out the method of the present invention. The screw conveyor 4 that conveys ice from the ice storage 3 is faced, and a measuring valve 5 is provided at the cutout of the screw conveyor 4, and the ice conveyed by the screw conveyor 4 and put into the ice measuring device 1 is measured by a measuring valve. 5
The chilled water pipe 8 faces the position above the ice weighing device 5, and a chilled water measuring valve 9 is attached in the middle of the chilled water piping 8. To do. Reference numeral 6 denotes a load cell.

アイス計量器1にアイスを投入してアイス計量を行う
場合は、目標計量値のたとえば約90%までと、残り目標
計量値までとに分けて、前者を大投入域I、後者を小投
入域IIとし、大投入域Iでは、スクリューコンベヤ4を
作動させると共に計量弁5を開にして、スクリューコン
ベヤ4により搬送されて来るアイスを計量弁5で計量し
ながら連続的に投入させるようにし、次いで、小投入域
IIでは、アイスの計量弁5を閉じて、アイスの投入に代
えて冷水を投入させて最終計量分を冷水で補うようにす
る。すなわち、最終目標の計量値に近くなった小投入域
IIでは、冷水配管8を送られて来る冷水を計量弁9で計
量しながら投入させ、大投入域Iで投入したアイスの計
量重量に、小投入域IIでアイスに代えて投入する冷水の
計量重量をプラスさせて、目標計量値に達するようにす
る。小投入域IIでは冷水によるため、計量が正確に行わ
れて実際の計量値の精度を上げることができ、目標計量
値との間の誤差を少なくすることができる。
When the ice is weighed by putting ice into the ice weighing device 1, the former is divided into a large weighing region I and the latter is a small weighing region. II, in the large charging area I, the screw conveyor 4 is operated and the measuring valve 5 is opened so that the ice conveyed by the screw conveyor 4 is continuously charged while being measured by the measuring valve 5, , Small input area
In II, the ice metering valve 5 is closed, and cold water is introduced instead of ice to make up the final metered amount with cold water. In other words, a small input area close to the final target weighing value
In II, the chilled water sent through the chilled water pipe 8 is metered in by the metering valve 9, and the weighing of the ice thrown in the large throwing area I is measured in the small throwing area II instead of the ice. Add weight to reach target weighing value. Since cold water is used in the small input area II, accurate measurement can be performed and the accuracy of the actual measured value can be increased, and an error between the target measured value and the measured value can be reduced.

上記計量における計量時間と計量重量の関係は第2図
に示す如くであり、アイス計量器1でのアイス計量の最
終計量分を冷水計量で補うことから計量精度を向上でき
て短時間に大量のアイス計量を行うことができる。
The relationship between the weighing time and the weighing weight in the above weighing is as shown in FIG. 2, and since the final weighing amount of the ice weighing in the ice weighing device 1 is supplemented by the cold water weighing, the weighing accuracy can be improved and a large amount of weighing can be performed in a short time. Ice weighing can be performed.

上記した実施例では、大投入域Iで計量弁5を全開に
してスクリューコンベヤ4から送られて来るアイスを連
続的にアイス計量器1へ投入させる場合を示したが、上
記大投入域Iでのアイス計量を段階的に行えるようにす
ることもできる。
In the above-described embodiment, the case where the measuring valve 5 is fully opened in the large charging region I and the ice sent from the screw conveyor 4 is continuously charged into the ice measuring device 1 has been described. Ice weighing can be performed stepwise.

第3図は大投入域Iを段階的に分けた例を示すもの
で、スクリューコンベヤ4は、アイス計量開始時から所
定時間まで高速運転とし、次に、低速運転に切り換える
ようにし、且つアイス計量弁5は、上記スクリューコン
ベヤ4を低速に切り換えてから所定時間経過後まで全開
にし、以後は、計量弁5を間欠的に開閉動作させて間欠
的にアイスが投入されるようにし、上記スクリューコン
ベヤ4が高速運転で計量弁5が全開状態にある部分を第
1ステップS1とし、スクリューコンベヤ4が低速運転で
計量弁5が全開の部分を第2ステップS2とし、スクリュ
ーコンベヤ4が低速運転で計量弁5が間欠的に開閉する
部分を第3ステップS3としたものである。
FIG. 3 shows an example in which the large charging area I is divided stepwise. The screw conveyor 4 operates at high speed from the start of ice weighing until a predetermined time, and then switches to low speed operation. The valve 5 is fully opened until a predetermined time elapses after the screw conveyor 4 is switched to a low speed, and thereafter, the metering valve 5 is opened and closed intermittently so that ice is intermittently supplied. 4 is a first step S1 where the metering valve 5 is fully opened and the metering valve 5 is fully open. The screw conveyor 4 is a low speed operation and the metering valve 5 is fully open is a second step S2. The screw conveyor 4 is metered at a low speed. The part where the valve 5 opens and closes intermittently is the third step S3.

このように大投入域Iを段階的に分けて計量する方法
を実施すると、第1ステップS1、第2ステップS2では大
量のアイスを短時間に計量でき、第3ステップS3ではス
クリューコンベヤ4が低速で且つアイスの切り出しが間
欠的であるため、アイスを少量ずつ低速で投入させて計
量精度を向上させることができる。小投入域IIでは、前
記実施例の場合と同様にアイスに代えて冷水を用い、該
冷水を計量して最終目標値に近づけるようにする。
When the method of measuring the large charging area I step by step as described above is implemented, a large amount of ice can be measured in a short time in the first step S1 and the second step S2, and the screw conveyor 4 is operated at a low speed in the third step S3. In addition, since the cutting of the ice is intermittent, it is possible to improve the weighing accuracy by introducing the ice little by little at a low speed. In the small charging area II, cold water is used instead of ice as in the case of the above-described embodiment, and the cold water is measured to approach the final target value.

この実施例によると、大投入域Iではスクリューコン
ベヤ4による送給速度の可変と、アイス計量弁5の開閉
を組み合わせ、小投入域IIでは冷水を用いているので、
大投入域Iでの計量精度を向上させ、且つ小投入域IIで
給水を用いて最終計量分を補うことができて、目標計量
値と実際の計量値との間に発生する誤差をより少なくで
きて、計量精度の向上を図ることができる。
According to this embodiment, in the large charging area I, the feeding speed can be varied by the screw conveyor 4 and the opening and closing of the ice measuring valve 5 are combined. In the small charging area II, cold water is used.
The accuracy of weighing in the large input area I can be improved, and the small weighing area II can be used to supplement the final weighing using water supply, reducing the error that occurs between the target weighing value and the actual weighing value. As a result, the measurement accuracy can be improved.

[発明の効果] 以上述べた如く、本発明のアイス計量精度向上法によ
れば、コンクリート原料配合に用いるアイスを予め定め
られた目標計量値に達するまでの実際の計量区分を、ほ
とんど目標計量値に近い計量値までアイス計量器にアイ
スを投入する大投入域と、残りの最終計量分を投入する
小投入域とに分け、大投入域では、スクリューコンベヤ
で送給されるアイス計量弁で計量し、最終計量分を冷水
の計量で補うようにするので、最終計量分の計量を迅速
に且つ正確に行うことができて、目標計量値に対する実
際の計量値の差(誤差)を小さくすることができて、計
量精度を向上させることができる。又、上記大投入域で
は、スクリューコンベヤによる送給速度を高速にしてア
イス計量弁を全開にする第1ステップと、スクリューコ
ンベヤによる送給速度を低速にしてアイス計量弁を全開
にする第2ステップと、スクリューコンベヤによる送給
速度を低速にしてアイス計量弁を間欠的開閉させる第3
ステップに段階的に分け、第1ステップ、第2ステッ
プ、第3ステップの順に計量して行くようにし、小投入
域では冷水計量とすることにより、大投入域でも計量重
量が増加して行くほど精度の高い計量ができて、計量精
度のより向上を図ることができる。
[Effects of the Invention] As described above, according to the method for improving the accuracy of ice weighing of the present invention, the actual weighing section until the ice used for mixing the concrete raw material reaches the predetermined target weighing value is almost changed to the target weighing value. The ice weighing device is divided into a large charging area where the ice is poured into the ice weighing device up to a weighing value close to the weighing value, and a small charging area where the remaining final weighing amount is charged. In addition, since the final measurement is supplemented by cold water measurement, the final measurement can be quickly and accurately measured, and the difference (error) between the actual measurement value and the target measurement value can be reduced. And the weighing accuracy can be improved. Further, in the above-mentioned large charging range, a first step of increasing the feeding speed by the screw conveyor to fully open the ice measuring valve, and a second step of reducing the feeding speed by the screw conveyor to fully open the ice measuring valve. And a third for intermittently opening and closing the ice metering valve by lowering the feeding speed by the screw conveyor.
It is divided into steps, and the first step, the second step, and the third step are weighed in this order, and the cold water is measured in the small charging area. Measurement can be performed with high accuracy, and the measurement accuracy can be further improved.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の方法を実施するための装置の概要図、
第2図は本発明の方法の一実施例を示す計量要領図、第
3図は本発明の方法の他の実施例を示す計量要領図、第
4図は従来のアイス計量装置の概略図である。 1……アイス計量器、2……放出ゲート、3……貯氷
庫、4……スクリューコンベヤ、5……計量弁、8……
冷水配管、9……冷水計量弁、I…大投入域、II……小
投入域。
FIG. 1 is a schematic diagram of an apparatus for performing the method of the present invention;
FIG. 2 is a measuring procedure diagram showing one embodiment of the method of the present invention, FIG. 3 is a measuring procedure diagram showing another embodiment of the method of the present invention, and FIG. 4 is a schematic diagram of a conventional ice measuring device. is there. 1 ... Ice meter, 2 ... Discharge gate, 3 ... Ice storage, 4 ... Screw conveyor, 5 ... Measuring valve, 8 ...
Chilled water piping, 9 ... Chilled water metering valve, I ... Large input area, II ... Small input area.

フロントページの続き (58)調査した分野(Int.Cl.6,DB名) G01G 13/00 - 13/08 G01G 17/00 - 17/06 B28C 7/00 - 7/14 Continuation of the front page (58) Field surveyed (Int.Cl. 6 , DB name) G01G 13/00-13/08 G01G 17/00-17/06 B28C 7/00-7/14

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】コンクリート原料配合に用いるアイスを予
め定められた目標計量値でアイス計量器から放出できる
よう上記目標計量値に達する計量値までアイスを計量し
ながらアイス計量器へ投入する過程を、上記目標計量値
に近い計量値までアイスを投入する大投入域と、最終計
量分のアイスを投入する小投入域とに区分し、大投入域
ではスクリューコンベヤで送給されるアイスを計量弁で
計量し、次いで、小投入域では冷水計量弁で冷水を計量
して、冷水で最終計量分を補うようにすることを特徴と
するアイス計量精度向上法。
1. A process of charging ice used for mixing concrete raw materials into an ice weighing device while weighing ice up to a weighing value that reaches the target weighing value so that the ice can be discharged from the ice weighing device at a predetermined target weighing value. It is divided into a large charging area where ice is charged up to the weighing value close to the target weighing value, and a small charging area where ice for the final weighing is charged.In the large charging area, ice fed by the screw conveyor is measured by a measuring valve. A method for improving the accuracy of ice weighing, comprising weighing and then measuring cold water with a cold water metering valve in a small charging area, and supplementing the final measurement with cold water.
【請求項2】大投入域を、スクリューコンベヤによるア
イス送給速度を高速にして計量弁を全開にする第1ステ
ップと、上記アイス送給速度を低速にして計量弁を全開
にする第2ステップと、上記アイス送給速度を低速にし
て計量弁を間欠的に開閉する第3ステップとに段階的に
分け、第1ステップ、第2ステップ、第3ステップの順
に操作してアイスを計量するようにする請求項(1)記
載のアイス計量精度向上法。
2. A first step in which the metering valve is fully opened by increasing the ice feeding speed by the screw conveyor in a large charging area, and a second step in which the metering valve is fully opened by lowering the ice feeding speed. And a third step of intermittently opening and closing the metering valve by lowering the ice feeding speed so as to measure the ice by operating the first step, the second step, and the third step in this order. The method for improving ice weighing accuracy according to claim 1.
JP24538390A 1990-09-14 1990-09-14 Ice weighing accuracy improvement method Expired - Fee Related JP2923800B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24538390A JP2923800B2 (en) 1990-09-14 1990-09-14 Ice weighing accuracy improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24538390A JP2923800B2 (en) 1990-09-14 1990-09-14 Ice weighing accuracy improvement method

Publications (2)

Publication Number Publication Date
JPH04122820A JPH04122820A (en) 1992-04-23
JP2923800B2 true JP2923800B2 (en) 1999-07-26

Family

ID=17132845

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24538390A Expired - Fee Related JP2923800B2 (en) 1990-09-14 1990-09-14 Ice weighing accuracy improvement method

Country Status (1)

Country Link
JP (1) JP2923800B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007301942A (en) * 2006-05-15 2007-11-22 Kyc Machine Industry Co Ltd Batcher plant

Also Published As

Publication number Publication date
JPH04122820A (en) 1992-04-23

Similar Documents

Publication Publication Date Title
US20150103614A1 (en) Apparatus and method for a concrete plant
US9180605B2 (en) Volumetric concrete mixing method and apparatus
JP2010149348A (en) Method of making concrete and system of making concrete
US4865457A (en) Concrete batcher with segmented entry of mixing ingredients
JP2923800B2 (en) Ice weighing accuracy improvement method
CN204728168U (en) Equipped to put for accurately mixing of reclaimed materials for asphalt pavement, control system and equipment thereof
GB2095569A (en) Plant for mixing the constituents of a settable building material composition
JP6304641B1 (en) Batch mixing method and batch mixing device
JP4431204B2 (en) Material input method to mixer
JP3079904B2 (en) Solidification of radioactive waste
KR100966051B1 (en) Precision Weighting Method of Large Amount Material and Precision Control Method of Concrete Component of Concrete Batch Plant Using the Weighting Method
CN110271102A (en) A kind of concrete mixing plant batching control system and control method
JP4037473B2 (en) Manufacturing method and manufacturing equipment for high fluidity concrete
JP2004154996A (en) Method and apparatus for producing ready-mixed concrete
JP2512311Y2 (en) Aggregate surface water rate measuring device
JP3408346B2 (en) Mixing correction device for ready-mixed concrete material
JPS60132707A (en) Car loading type ready-mixed concrete plant
JP3684896B2 (en) Method of blending fine aggregate and water for mixing and method of continuous kneading of concrete
JPH04125108A (en) Control method for concrete manufacturing plant
JPH0890549A (en) Kneading apparatus of ready-mixed concrete
JPH02251724A (en) Measuring method of fluid material
JPS59187Y2 (en) Concrete aggregate surface water management device in batchya plant
JPS6013813B2 (en) Method for controlling the amount of material input in batchya plants
GB2171326A (en) Controlling mixing of slurries by power consumption
SU608651A1 (en) Apparatus for control over preparation of cellular-concrete mix

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees