JP2922818B2 - Seismic building - Google Patents

Seismic building

Info

Publication number
JP2922818B2
JP2922818B2 JP8794995A JP8794995A JP2922818B2 JP 2922818 B2 JP2922818 B2 JP 2922818B2 JP 8794995 A JP8794995 A JP 8794995A JP 8794995 A JP8794995 A JP 8794995A JP 2922818 B2 JP2922818 B2 JP 2922818B2
Authority
JP
Japan
Prior art keywords
tile
roof tile
roof
tiles
ridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8794995A
Other languages
Japanese (ja)
Other versions
JPH08284323A (en
Inventor
泰藏 片岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KATAOKA KAWARAKOGYO KK
SUMITOMO RINGYO KK
Original Assignee
KATAOKA KAWARAKOGYO KK
SUMITOMO RINGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KATAOKA KAWARAKOGYO KK, SUMITOMO RINGYO KK filed Critical KATAOKA KAWARAKOGYO KK
Priority to JP8794995A priority Critical patent/JP2922818B2/en
Publication of JPH08284323A publication Critical patent/JPH08284323A/en
Application granted granted Critical
Publication of JP2922818B2 publication Critical patent/JP2922818B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は耐震棟装置に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an earthquake-resistant building.

【0002】[0002]

【従来の技術】昨今の棟部を構成する棟(棟瓦)の従来
工法は大別すると、(1)粘土、シックイ又は緊結具を
媒体として面戸瓦、大のし瓦、多数枚の半截のし瓦及び
丸瓦とを順次積層する構造と、(2)一部粘土と緊結具
を媒体として面戸瓦、大のし瓦、多数枚の半截のし瓦及
び丸瓦を順次、粘土、シックイを利用せず乾式に積層す
る構造と、がある。前記工法の中で、近時、屋根の軽量
化、耐震性向上、棟換気、施工の容易化等の見地から、
後者の工法、即ち、乾式工法が重宝されている。尚、こ
の乾式工法の中でも簡易な支持具と針金(番線)を利用
した3段前後ののし瓦を施工する簡易な乾式工法が種々
研究され、一部は実用に供されている。本発明は、この
簡易な乾式工法(以下、単に乾式工法とする。)に関す
る。
2. Description of the Related Art The conventional construction method of a ridge (ridge tile) constituting a ridge portion in recent years can be roughly classified into the following two types. (2) Partial clay and binders are used as a medium, and face tiles, large tiles, a large number of half-cut tiles and round tiles are sequentially laminated with clay and chic tile. And a structure in which the layers are stacked in a dry manner without using the above. In the construction method, recently, from the viewpoint of lightening the roof, improving earthquake resistance, building ventilation, facilitating construction, etc.,
The latter method, ie, the dry method, is useful. Among these dry construction methods, various studies have been made on simple dry construction methods of constructing a three-stage roof tile using simple supports and wires (wires), and some of them have been put to practical use. The present invention relates to this simple dry method (hereinafter simply referred to as dry method).

【0003】また、この乾式工法の従来例として、次の
ような技術文献がある。(1)特開平2−217555
号公報記載の棟工法における耐震構造がある。この発明
は、棟部に面戸瓦、大のし瓦、数枚ののし瓦及び丸瓦を
積層し、これらの各瓦をずれ止め手段を利用して相互に
連繋することにより瓦のずれ止めを図り、かつ各瓦を貫
通方式の緊結具を利用して連繋一体化する構成であり、
その特徴は、軽量化、耐震性、耐候性、作業の簡略化、
低コスト化等を図ることにある。(2)特開平2−16
7947号公報記載の棟部施工方法及びそれに使用する
各種役瓦がある。この発明は、棟部に一体形の大のし
瓦、多数の半截のし瓦、及び丸瓦を積層し、各瓦を嵌合
溝と嵌合突起部との係合により連繋するとともに、前記
野地板に立設した保持体を半截のし瓦と丸瓦との間に到
らしめ、この保持体に設けた棟木と丸瓦とを保持部材を
利用して緊締する構造であり、前述の(1)の発明と同
効を図ることにある。
[0003] As a conventional example of the dry method, there are the following technical documents. (1) JP-A-2-217555
There is an earthquake-resistant structure in the ridge construction method described in the official gazette. According to the present invention, the roof tiles are stacked by stacking face tiles, large roof tiles, several pieces of tiles and round tiles on the ridge, and connecting these tiles to each other by using a slip prevention means. It is a structure that aims to stop and connects and integrates each tile using a tie-through of the penetration method,
Its features are light weight, earthquake resistance, weather resistance, simplified work,
The aim is to reduce costs and the like. (2) JP-A-2-16
There is a ridge construction method described in Japanese Patent No. 7947 and various roof tiles used therefor. According to the present invention, an integral large scale roof tile, a large number of half-cut roof tiles, and a round roof tile are stacked on a ridge portion, and each tile is connected by engagement of a fitting groove and a fitting projection. The structure is such that the holding body erected on the base plate is cut in half between the roof tile and the round roof tile, and the purlin and the round roof tile provided on the holding body are tightened using a holding member. It is intended to achieve the same effect as the invention of (1).

【0004】[0004]

【発明が解決しようとする課題】前記両発明は乾式工法
としての特徴を備えている。しかし両発明ののし瓦は、
一枚ののし瓦を多数枚積層する構成であることから、手
間を要すること、棟部の軽量化が十分でないこと、等の
課題がある。またこののし瓦相互間にずれ止め手段を要
し、瓦成形に手間を要すること及び歩留りの低下を招来
すること、耐震性向上にはまだ改良の余地があること、
等の課題がある。更に積層構造では、雨水の侵入と、こ
れに基づく野地板の濡れの問題、又はのし瓦間にスペー
スが形成されず、棟換気への活用が図れない問題、等が
あり改良の余地がある。
The above two inventions are characterized by a dry method. However, the roof tiles of both inventions are
Since it is a configuration in which a large number of tiled tiles are stacked, there are problems such as the need for labor and insufficient weight reduction of the ridge. In addition, there is a need for means to prevent slippage between the roof tiles, and it takes time and effort to form the roof tiles, leading to a reduction in yield, and there is still room for improvement in the improvement of earthquake resistance.
And other issues. Furthermore, in the laminated structure, there is room for improvement because there is a problem of rainwater infiltration and the wetting of the baseboard based on this, or a problem that a space is not formed between the roof tiles and it cannot be utilized for ridge ventilation. .

【0005】[0005]

【課題を解決するための手段】本発明は、乾式工法の利
点、即ち、軽量化及び軽量化に伴う耐震性向上を図るこ
と、のし瓦内にスペースを設け棟換気への活用を図るこ
と、また葺き上げ作業の簡略化、確実化、スピード化を
図ること、等を目的として、下記の構成を採用する。
DISCLOSURE OF THE INVENTION The present invention is intended to achieve the advantages of the dry method, that is, to reduce the weight and to improve the seismic resistance associated with the reduction in the weight, and to provide a space in the roof tiles for use in building ventilation. The following configuration is adopted for the purpose of simplifying, assuring, speeding up the roofing work, and the like.

【0006】即ち、本発明の耐震棟装置は、棟部の棧瓦
に載置される大のし瓦、並びにこの大のし瓦に積層され
るのし段付部を数条備えたのし瓦、及びこののし瓦に積
層される丸瓦とでなる棟であって、前記棟部の野地板に
立設固定した支持具の脚部を、前記大のし瓦の透孔に挿
通し、かつ支持具の棟木受部を前記大のし瓦と前記のし
瓦との間に到らしめ、この支持具及び棟木受部に設けた
棟木で前記のし瓦及び丸瓦を支えるとともに、この棟木
と前記丸瓦とを緊結具で連繋する構成である。
That is, the earthquake-resistant building apparatus of the present invention includes a large roof tile placed on the roof tile of the ridge section and several steps provided with a lathing step stacked on the large roof tile. A ridge comprising a tile and a round tile laminated on the roof tile ,
Insert the legs of the support fixture, which is standing and fixed, into the through holes of the large scale roof tile.
The ridgeboard receiving portion of the support tool was passed between the large roof tile and the shingle tile, and provided on the support device and the ridgeboard receiving portion.
The roof tile and the round tile are supported by the purlins, and the purlin and the round tiles are connected to each other by tying tools.

【0007】さらにまた各瓦の一層の緊結強化並びに耐
震性の向上を図ることを目的として下記の構成を採用す
る。
Further, the following structure is adopted for the purpose of further strengthening the binding of each tile and improving the earthquake resistance.

【0008】即ち、本発明の耐震棟装置は、棟部の棧瓦
に載置される面戸瓦、及びこの面戸瓦に積層される大の
し瓦、並びにこの大のし瓦に積層されるのし段付部を数
条備えたのし瓦、及びこののし瓦に積層される丸瓦とで
なる棟であって、前記棟部の野地板に立設固定した第1
支持具の第1棟木受部を前記棧瓦と前記面戸瓦との間に
到らしめ、この第1支持具及び第1棟木受部に設けた第
1棟木でこの面戸瓦を支えるとともに、この第1棟木又
は第1支持具より立設固定した第2支持具の脚部を前記
面戸瓦及び大のし瓦の透孔に挿通し、かつこの第2支持
具の第2棟木受部を前記大のし瓦と前記のし瓦との間に
到らしめ、この第2支持具及び第2棟木受部に設けた第
2棟木で前記のし瓦及び丸瓦を支えるとともに、この第
2棟木と前記丸瓦とを緊結具で連繋する構成構成であ
る。
[0008] That is, the earthquake-resistant building device of the present invention provides a face tile placed on the roof tile of the ridge, a large tile stacked on the face tile, and a large tile stacked on the large tile. A ridge consisting of a roof tile having a plurality of stepped portions and a round tile laminated on the roof tile, wherein the first ridge is fixed to a base plate of the ridge portion .
A first purlin receiving part of the support is reached between the roof tile and the face tile, and the first purlin provided on the first support and the first purlin receiving part supports the face tile. The leg of the first support block or the second support tool standing and fixed from the first support tool is inserted through the through hole of the face tile and the large scale roof tile, and the second support
The second purlin receiving part of the tool is reached between the large roof tile and the above described roof tile, and the second support and the second purlin receiving part provided on the second purlin receiving part are provided.
The two ridges support the roof tile and the round tile, and the second ridge and the round tile are connected with a tie.

【0009】[0009]

【作用】先ず、図1〜図3に示す例は、野地板の稜線に
沿って支持具を順次立設固定するが、この一例では、当
該支持具のベースを釘止め等の手段で固定する。その
後、前記棟部の合掌位置にある棧瓦に面戸瓦を順次葺き
上げていく(粘土を介在させる場合もある。)が、この
際、面戸瓦の切欠と他の面戸瓦の切欠(図示せず)とが
整合されて透孔が形成される(図示せず、整合透孔とす
る。)。この整合透孔と支持具のベースの螺孔とほぼ整
合する。つづいて葺かれた面戸瓦に大のし瓦を積層する
が、通常は面戸瓦の継目に大のし瓦を葺き上げ、かつ面
戸瓦の整合透孔と当該大のし瓦の透孔とを整合させる。
以上の作業を繰り返してすべての面戸瓦に大のし瓦が葺
き上げられるので、その後、支持具のベースに設けた螺
孔に、この支持具を構成する棟木受部を備えた脚部を螺
着する。これにより、棟部の大のし瓦上方に棟木受部が
順次立設された処で、この多数の棟木受部に棟木が架承
される。この棟木にはのし段付部を数条備えたのし瓦が
順次載架されるとともに、当該各のし瓦ののし段付き側
壁部の底面を前記各大のし瓦の天井部(瓦本体表面)に
それぞれ衝止する。これによりのし瓦による葺き上げが
終了する。尚、当該のし瓦と大のし瓦との間には大きな
スペースが形成されるとともに、大のし瓦の継目にはの
し瓦が葺き上げられる。その後、各のし瓦に丸瓦をそれ
ぞれ葺き上げるとともに、こののし瓦及び丸瓦を棟木に
緊結する。尚、図4の例では、前述の面戸瓦に透孔を、
また大のし瓦に切欠を、それぞれ設けた構成であり、面
戸瓦の透孔と支持具のベースの螺孔とほぼ整合する。こ
の葺き上げられた面戸瓦には大のし瓦が積層されるとと
もに、前記面戸瓦の透孔と、この大のし瓦の切欠と他の
大のし瓦の切欠とが整合されて透孔が形成される(図示
せず、整合透孔とする。)。このようにして、大のし瓦
を順次葺き上げかつ前記整合を順次繰り返す。その後、
前記整合透孔及び面戸瓦の透孔を利用して支持具の脚部
を挿入し、この脚部のネジを前記支持具のベースに設け
た螺孔に螺着して、この支持具の棟木受部を棟部の大の
し瓦上方に順次立設固定する。以後の作業及び手順等は
前述の例とほぼ同様である。
First, in the example shown in FIGS. 1 to 3, the supports are sequentially erected and fixed along the ridgeline of the field board. In this example, the base of the supports is fixed by means such as nailing. . After that, the roof tiles are sequentially laid on the roof tiles at the joint position of the ridge section (clay may be interposed). At this time, the cutout of the roof tile and the cutout of the other roof tile are performed. (Not shown) are aligned with each other to form a through hole (not shown, referred to as an aligned through hole). The alignment holes substantially align with the screw holes in the base of the support. Next, large tiles are stacked on the tiles, but usually the tiles are laid up at the joints of the tiles, and the matching openings of the tiles and the transparency of the tiles Align with holes.
By repeating the above operation, the large roof tiles are laid on all the face tiles.After that, the screw holes provided in the base of the support are attached with the legs with the purlin ridges that constitute the support. Screw it. As a result, the purlins are successively erected above the large roof tiles of the ridges, and the purlins are mounted on the many purlins. On this purlin, the roof tiles provided with several steps of the step tiles are successively mounted, and the bottom of the step side walls of the respective tiles is attached to the ceiling of each of the large tiles ( On the roof tile surface). This ends the roofing with the tile. In addition, a large space is formed between the roof tile and the large roof tile, and the roof tile is laid up at the joint of the large roof tile. After that, the roof tiles are laid on the roof tiles, and the roof tiles and the roof tiles are tied to the purlin. In addition, in the example of FIG.
In addition, notches are provided in the large tile, and the through holes of the facing tile and the screw holes of the base of the support are almost aligned. Large roof tiles are laminated on this roofed tile, and the notch of this large roof tile is aligned with the cutout of this large roof tile. A through hole is formed (not shown, which is referred to as an alignment through hole). In this way, the roof tiles are sequentially laid up and the alignment is repeated sequentially. afterwards,
The legs of the support are inserted using the alignment through holes and the through holes of the surface tile, and the screws of the legs are screwed into the screw holes provided in the base of the support, and The ridgewood receiving section will be erected and fixed above the roof tile of the ridge section. Subsequent operations, procedures, and the like are substantially the same as those in the above-described example.

【0010】また図5の例は、対の支持具又は大小の支
持具(以下、対の支持具で説明する。)を利用する構成
であり、第1支持具の第1棟木受部を棧瓦と面戸瓦との
間に位置させ、この第1棟木受部に架承された棟木を前
記棧瓦と面戸瓦との間に設ける。その後、面戸瓦に前述
の例と同様大のし瓦を積層するとともに、面戸瓦の透孔
と大のし瓦の透孔とを整合させる。以上の作業を繰り返
して面戸瓦に大のし瓦が葺き上げられるので、前記第1
棟木の上に第2支持具のベースを固定して、当該第2支
持具を立設するとともに、この第2棟木受部を大のし瓦
上方に位置させる。その後の葺き上げ作業は前述の例と
ほぼ同様である。
FIG. 5 shows an example in which a pair of supports or large and small supports (hereinafter, referred to as a pair of supports) is used, and a first purlin receiving portion of the first support is provided. It is located between the tile and the face tile, and a purlin supported by the first purlin receiving part is provided between the roof tile and the face tile. Thereafter, a large tile is laminated on the face tile as in the above-described example, and the through hole of the face tile is aligned with the through hole of the large tile. By repeating the above operation, large tiles are laid on the face tiles.
The base of the second support is fixed on the purlin, the second support is erected, and the second purlin receiver is positioned above the large tile. Subsequent roofing work is almost the same as the above-mentioned example.

【0011】尚、前述の例では、棧瓦に面戸瓦を載置す
る構成をそれぞれ説明したが、この面戸瓦を使用しない
場合も有る。
In the above-described example, the configuration in which the face tile is placed on the roof tile is described. However, the face tile may not be used in some cases.

【0012】[0012]

【実施例】以下、本発明の一実施例を図面を参照として
説明する。
An embodiment of the present invention will be described below with reference to the drawings.

【0013】野地板1の合掌位置には瓦棧2に係止され
た棧瓦3が布設されている。この合掌部位にある棧瓦3
の稜線方向には多数の支持具4が設けられている。この
支持具4は、螺孔を有するベース41と、脚部42と、
棟木Aを架承する棟木受部43と、で構成され、前記ベ
ース41が野地板1の合掌位置に設けられ、当該ベース
41の螺孔に前記脚部42のネジが螺着脱される構成で
ある(一例である。)。尚、図5に示す第1支持具4’
は前記支持具4とほぼ同構成となっている。図中42’
は脚部、43’は第1棟木A’を架承する第1棟木受部
をそれぞれ示す。また第2支持具4”は前記第1棟木受
部43’に架承された第1棟木A’に立設されるもので
あり、第1棟木A’に設けられるベース41”、及び脚
部42”並びに第2棟木A”を架承する第2棟木受部4
3”と、で構成される。尚、支持具4の棟木受部43は
後述する大のし瓦の上方で後述するのし瓦の下方に配備
されるとともに、当該棟木受部43に架承された棟木A
によりのし瓦は大のし瓦に積層固定される。また第1支
持具4’の第1棟木受部43’は棟部の上方で面戸瓦の
下方に配備されるとともに、当該第1棟木受部43’に
架承された第1棟木A’により面戸瓦は棟部に積層固定
される。また第2支持具4”の第2棟木受部43”は大
のし瓦の上方でのし瓦の下方に配備されるとともに、当
該第2棟木受部43”に架承された第2棟木A”により
のし瓦は大のし瓦に積層固定される。
At the joint position of the base plate 1, a roof tile 3 locked by the roof tile 2 is laid. The roof tile 3 at this joint site
A large number of supports 4 are provided in the ridge line direction. The support 4 includes a base 41 having a screw hole, a leg 42,
And a purlin ridge receiving portion 43 for supporting the purlin A. The base 41 is provided at a joint position of the base plate 1, and a screw of the leg 42 is screwed into and removed from a screw hole of the base 41. There is (one example). The first support 4 'shown in FIG.
Has substantially the same configuration as the support 4. 42 'in the figure
Indicates a leg portion, and 43 'indicates a first purlin receiving portion for supporting the first purlin A'. The second support 4 "is erected on the first purlin A 'mounted on the first purlin receiving part 43', and the base 41" provided on the first purlin A 'and the leg are provided. 42 "and 2nd purlin receiving part 4 supporting 2nd purlin A"
3 ". The purlin receiving portion 43 of the support 4 is disposed above a large roof tile described below and below a false roof tile described later, and is mounted on the purlin receiving portion 43. Purlin tree A
As a result, the tile is stacked and fixed on the large tile. Also, the first purlin receiving part 43 'of the first support 4' is arranged above the ridge part and below the facing tile, and the first purlin A 'mounted on the first purlin receiving part 43'. As a result, the facing tiles are laminated and fixed to the ridge. Also, the second purlin receiving portion 43 "of the second support 4" is arranged above the large roof tile and below the roof tile, and the second purlin supported on the second purlin receiving portion 43 ". The tiles A are stacked and fixed on the large tiles.

【0014】次に図3、図4を基に分解して示す各種瓦
につき詳述する。面戸瓦5は棧瓦3、3又は第1棟木
A’に積層又は載架される瓦であり、その構成は、棟方
向両端に切欠5b、5bを有する天井部51と、当該天
井部51の両側端よりそれぞれ延設された側壁部52
と、で構成されており、前記切欠5bは他の切欠(図示
せず)と整合されて透孔(図示せず、整合透孔とす
る。)を形成する。また図例では天井部51に換気用の
凹部5cが形成されているが、凹部5cを設けない場合
もある。更に前述の如く、この面戸瓦5は省略される場
合も有る。次に大のし瓦6は前記面戸瓦5に積層される
瓦であり、その構成は、面戸瓦5の整合透孔に整合され
る透孔6aを有する天井部61と、当該天井部61の両
側端にそれぞれ設けた拆曲部62と、で構成されてお
り、前記の如く、面戸瓦5に積層したときに、前記両拆
曲部62、62がこの面戸瓦5の両側壁部52、52に
嵌合される構造となっている。尚、両拆曲部62、62
を設ける構成、又は両拆曲部62、62と両側壁部5
2、52との嵌合は一例である。またのし瓦7は前記大
のし瓦6に積層されるほぼ偏平半截筒状を呈する瓦であ
り、その構成は後述する丸瓦係合用の係合突条7aを二
条有する大きな偏平曲面を備えた天井部71と、この天
井部71の両側端よりそれぞれ延設された数条ののし段
付部7b、7b、・・・を有するのし段付き側壁部72
と、で構成されており、棟木A又は第2棟木A”に載架
されるとともに、前述の如く、大のし瓦6の天井部61
に積層される。さらに8は丸瓦で、前記のし瓦7に積層
される瓦で、その両裾部8a、8aが前記のし瓦7の両
突条7a、7aに係止される。また図示しないが、この
両突条7a、7aは、他の形状として丸瓦8の緊結具9
用の孔8bより侵入した雨水を、前記のし瓦7の天井部
71に設けた孔7cに侵入しない構成とすることもでき
る。また図4の例では面戸瓦5の天井部51に透孔5a
を設け、かつ大のし瓦6の天井部61の棟方向両端に切
欠6b、6bを設けて整合透孔を形成する。そして、前
記透孔5aと大のし瓦6の整合透孔とを整合する構造で
ある。
Next, various types of roof tiles disassembled with reference to FIGS. 3 and 4 will be described in detail. The face tile 5 is a tile stacked or mounted on the roof tiles 3 or 3 or the first purlin A ′, and is composed of a ceiling part 51 having notches 5 b and 5 b at both ends in the ridge direction, and a ceiling part 51. Side walls 52 extending from both side ends of the
The notch 5b is aligned with another notch (not shown) to form a through-hole (not shown, referred to as an aligned through-hole). In the illustrated example, the concave portion 5c for ventilation is formed in the ceiling portion 51, but the concave portion 5c may not be provided. Further, as described above, the face tile 5 may be omitted in some cases. Next, the large roof tile 6 is a tile stacked on the facing tile 5, and has a configuration in which a ceiling 61 having a through-hole 6 a that is aligned with the matching through-hole of the facing tile 5, 61, which are provided on both sides of the facing tile 5 as described above. It is structured to be fitted to the walls 52, 52. In addition, both dismantling parts 62, 62
, Or both dismantling portions 62, 62 and both side wall portions 5
The fitting with 2, 52 is an example. The roof tile 7 is a roof tile having a substantially flat, semi-cut cylindrical shape laminated on the large roof tile 6, and has a large flat curved surface having two engagement protrusions 7a for engaging a round roof tile to be described later. , And a stepped side wall 72 having several steps 7b, 7b,... Extending from both sides of the ceiling 71, respectively.
And mounted on the purlin A or the second purlin A ", and the ceiling 61 of the large roof tile 6 as described above.
Laminated. Reference numeral 8 denotes a round roof tile, which is stacked on the roof tile 7 and whose both hem portions 8a, 8a are locked to the both ridges 7a, 7a of the roof tile 7. Although not shown, the ridges 7a, 7a have other shapes as the fastening device 9 of the round roof tile 8.
It is also possible to adopt a configuration in which rainwater that has entered through the hole 8b does not enter the hole 7c provided in the ceiling portion 71 of the roof tile 7. In the example of FIG. 4, a through hole 5 a is formed in the ceiling portion 51 of the facing tile 5.
And notches 6b, 6b are provided at both ends of the ceiling portion 61 of the large scale tile 6 in the ridge direction to form matching through holes. The through hole 5a and the matching through hole of the large scale roof tile 6 are aligned.

【0015】[0015]

【発明の効果】前記構成を採用する本発明は、次のよう
な効果を有する。
The present invention employing the above configuration has the following effects.

【0016】(1)野地板に立設固定した支持具及び棟
木への緊締により耐震性の向上に役立つ。
(1) A support and a ridge standing and fixed on a field base plate
Tightening to trees helps to improve earthquake resistance.

【0017】(2)野地板に立設固定した支持具及び棟
木を介してのし瓦及び丸瓦を支える構成であり、棟部の
軽量化に役立つ。
(2) A support and a ridge standing and fixed on a field base plate
It is a configuration that supports tiles and round tiles through trees,
Useful for weight reduction.

【0018】(3)野地板に立設固定した支持具及び棟
木を介してのし段付部を有するのし瓦を積層する構成で
あり、棟部の軽量化及び作業の容易化・簡略化・低コス
ト化等に役立つ。
(3) Supports and ridges that are erected and fixed on the base plate
It is a configuration in which the roof tiles having the stepped portions are laminated through wood , and are useful for reducing the weight of the ridge portion and facilitating, simplifying, and reducing the cost.

【0019】(4)野地板に立設固定した支持具及び棟
木を介して棟部を施工する構成であり、のし瓦間にスペ
ースが形成され、棟換気に役立つ。
(4) A support and a ridge standing and fixed on a field base plate
The ridge is constructed via wood, and a space is formed between the tiles , which is useful for ridge ventilation.

【0020】(5)野地板に立設固定した支持具及び棟
木を介して棟部を施工する構成であり、のし瓦の一体化
が図れること、又はのし瓦の崩壊又はのし瓦間からの雨
水侵入を防止できる。
(5) Supports and ridges standing and fixed on a field board
The building is constructed via wood, and the roof tiles are integrated.
Can be achieved, or the roof tiles can be prevented from collapsing or rainwater from entering between the roof tiles.

【図面の簡単な説明】[Brief description of the drawings]

【図1】葺き上げ状態の断面図である。FIG. 1 is a cross-sectional view of a roofed state.

【図2】葺き上げ状態の縮尺側面図である。FIG. 2 is a scaled side view in a roofed state.

【図3】棟部の各瓦を分解して示した斜視図である。FIG. 3 is an exploded perspective view showing each roof tile of the ridge.

【図4】棟部の各瓦の他の例を分解して示した斜視図で
ある。
FIG. 4 is an exploded perspective view showing another example of each roof tile in the ridge.

【図5】葺き上げ状態の他の一例を示す断面図である。FIG. 5 is a cross-sectional view showing another example of the roofing state.

【符号の説明】[Explanation of symbols]

1 野地板 2 瓦棧 3 棧瓦 4 支持具 41 ベース 42 脚部 43 棟木受部 4’ 第1支持具 42’ 脚部 43’ 第1棟木受部 4” 第2支持具 41” ベース 42” 脚部 43” 第2棟木受部 5 面戸瓦 5a 透孔 5b 切欠 5c 凹部 51 天井部 52 側壁部 6 大のし瓦 6a 透孔 6b 切欠 61 天井部 62 拆曲部 7 のし瓦 7a 突条 7b のし段付部 7c 孔 71 天井部 72 のし段付き側壁部 8 丸瓦 8a 裾部 8b 孔 9 緊結具 A 棟木 A’ 第1棟木 A” 第2棟木 DESCRIPTION OF REFERENCE NUMERALS 1 field board 2 roof 3 roof 4 support 41 base 42 leg 43 purlin receiving part 4 'first support 42' leg 43 'first purlin receiving part 4 "second support 41" base 42 "leg Part 43 "2nd purlin receiving part 5 Face roof tile 5a Through hole 5b Notch 5c Concave part 51 Ceiling part 52 Side wall part 6 Large roof tile 6a Through hole 6b Notch 61 Ceiling part 62 Debris part 7 Floor tile 7a Ridge 7b Nook Stepped Part 7c Hole 71 Ceiling 72 Sidestepped Sidewall Part 8 Round Roof 8a Hem Part 8b Hole 9 Tightening Tool A Purlin Tree A 'First Purlin Tree A "Second Purlin Tree

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E04D 1/30 601 E04D 3/40 ──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int.Cl. 6 , DB name) E04D 1/30 601 E04D 3/40

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 棟部の棧瓦に載置される大のし瓦、並び
にこの大のし瓦に積層されるのし段付部を数条備えたの
し瓦、及びこののし瓦に積層される丸瓦とでなる棟であ
って、前記棟部の野地板に立設固定した支持具の脚部
を、前記大のし瓦の透孔に挿通し、かつ支持具の棟木受
部を前記大のし瓦と前記のし瓦との間に到らしめ、この
支持具及び棟木受部に設けた棟木で前記のし瓦及び丸瓦
を支えるとともに、この棟木と前記丸瓦とを緊結具で連
繋する構成とした耐震棟装置。
1. A large roof tile placed on a roof tile of a ridge, a roof tile having a plurality of steps with a lathing step laminated on the large roof tile, and a roof tile having a plurality of steps. A building made of laminated tiles, and a leg of a supporter standing and fixed to a field base plate of the building.
Into the through hole of the roof tile, and
The parts tighten lead to between the bookmarks tile and the large Works tile, this
An earthquake-resistant building device having a structure in which the roof tiles and the round tiles are supported by a support tool and a purlin provided at a purlin receiving section, and the purlins and the round tiles are connected with a tie.
【請求項2】 棟部の棧瓦に載置される面戸瓦、及びこ
の面戸瓦に積層される大のし瓦、並びにこの大のし瓦に
積層されるのし段付部を数条備えたのし瓦、及びこのの
し瓦に積層される丸瓦とでなる棟であって、前記棟部の
野地板に立設固定した支持具の脚部を、前記面戸瓦及び
大のし瓦の透孔に挿通し、かつこの支持具の棟木受部を
前記大のし瓦と前記のし瓦との間に到らしめ、この支持
具及び棟木受部に設けた棟木で前記のし瓦及び丸瓦を支
えるとともに、この棟木と前記丸瓦とを緊結具で連繋す
る構成とした耐震棟装置。
2. A number of face tiles to be mounted on the roof tiles of the ridge, a large roof tile stacked on the face tile, and a number of stepped portions laminated on the large roof tile. A ridge comprising a roof tile provided with a ridge and a round tile laminated on the roof tile,
Connect the legs of the support fixture erected on the base plate
Insert through the through hole of the large roof tile, and insert the purlin
Tighten lead to between the large Works tile and the bookmarks tile, this support
An earthquake-resistant building device having a structure in which the roof tiles and the round tiles are supported by the purlins provided in the fixtures and the purlin receiving section, and the purlins and the round tiles are connected with a tie.
【請求項3】 棟部の棧瓦に載置される面戸瓦、及びこ
の面戸瓦に積層される大のし瓦、並びにこの大のし瓦に
積層されるのし段付部を数条備えたのし瓦、及びこのの
し瓦に積層される丸瓦とでなる棟であって、前記棟部の
野地板に立設固定した第1支持具の第1棟木受部を前記
棧瓦と前記面戸瓦との間に到らしめ、この第1支持具及
び第1棟木受部に設けた第1棟木でこの面戸瓦を支える
とともに、この第1棟木又は第1支持具より立設固定
た第2支持具の脚部を前記面戸瓦及び大のし瓦の透孔に
挿通し、かつこの第2支持具の第2棟木受部を前記大の
し瓦と前記のし瓦との間に到らしめ、この第2支持具及
び第2棟木受部に設けた第2棟木で前記のし瓦及び丸瓦
を支えるとともに、この第2棟木と前記丸瓦とを緊結具
で連繋する構成とした耐震棟装置。
3. A roof tile to be placed on a roof tile of a ridge, a large roof tile stacked on the roof tile, and a number of stepped portions laminated on the large roof tile. A ridge comprising a roof tile provided with a ridge and a round tile laminated on the roof tile,
The first purlin receiving portion of the first support standing upright on the field board is reached between the roof tile and the face tile, and the first support and
And the first purlin provided in the first purlin receiving section supports the facing tile, and the leg of the second purlin fixed to the first purlin or the first lug is fixed to the surface. inserted into holes of Tokawara and large Works tiles and tighten Itala a second purlin receiving the second support between the bookmarks tile and the large Works tile, the second supporting member Passing
And a second ridge provided in the second ridge receiving portion, supporting the shingle tile and the round tile, and connecting the second ridge and the round tile with a tie.
【請求項4】 上記大のし瓦とのし段付部を数条備えた
のし瓦との間にスペースを設ける構成とした請求項1、
請求項2又は請求項3記載の耐震棟装置。
4. A configuration in which a space is provided between the large roof tile and the roof tile having several steps with a step.
The earthquake-resistant building device according to claim 2 or 3.
【請求項5】 上記のし段付部を数条備えたのし瓦は、
天井部と左右のし段付き側壁部とが一体構造となってい
る請求項1、請求項2又は請求項3記載の耐震棟装置。
5. A roof tile having a plurality of steps having the above-mentioned step portion,
The earthquake-resistant building device according to claim 1, wherein the ceiling portion and the left and right stepped side wall portions have an integral structure.
JP8794995A 1995-04-13 1995-04-13 Seismic building Expired - Lifetime JP2922818B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8794995A JP2922818B2 (en) 1995-04-13 1995-04-13 Seismic building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8794995A JP2922818B2 (en) 1995-04-13 1995-04-13 Seismic building

Publications (2)

Publication Number Publication Date
JPH08284323A JPH08284323A (en) 1996-10-29
JP2922818B2 true JP2922818B2 (en) 1999-07-26

Family

ID=13929146

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8794995A Expired - Lifetime JP2922818B2 (en) 1995-04-13 1995-04-13 Seismic building

Country Status (1)

Country Link
JP (1) JP2922818B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG11201607781TA (en) * 2014-03-19 2016-10-28 Martin J Rotter Shear tie system for vented roof ridge
US10385583B2 (en) 2016-03-21 2019-08-20 Martin J. Rotter Shear transfer system

Also Published As

Publication number Publication date
JPH08284323A (en) 1996-10-29

Similar Documents

Publication Publication Date Title
US5060426A (en) Building structure
US6415575B1 (en) Zipper sheathing tie down
CA2227540C (en) Framing system for wood frame buildings
CN109415898B (en) Building and its construction technology
US4894964A (en) Building structure and method
US20070151196A1 (en) System, method, and apparatus for frame assembly and building
US5060432A (en) Modular panel
US4464873A (en) Wall panel system
JP2922818B2 (en) Seismic building
EP0623182A1 (en) Improved building structure and method of use
US5540015A (en) Preconstructed soffit-fascia assembly
JP3734079B2 (en) Log house
JP2901180B2 (en) Ventilation building equipment
JP3115266B2 (en) Garden balcony deck panel mounting method and mounting structure
JP2519384B2 (en) Auxiliary surface of wooden prefabricated building
JPH0649999B2 (en) Structural panel for frame wall construction method
JPS606485Y2 (en) Pillar fixing device
JPS642894Y2 (en)
JP2584692B2 (en) Building roof and construction method of building roof
JP3262524B2 (en) Wing structure
JP3153498B2 (en) Earthquake-resistant building structure using ridge core rafters and tatami roof tiles
JP2828857B2 (en) Auxiliary surface joint structure of wooden prefabricated building
JPH07305413A (en) House built by wood panel method
JPH03191178A (en) Woody system garret extension device for concrete system building
JPS606484Y2 (en) Pillar fixing device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090430

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110430

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term