JP2879373B2 - Guide pipe for compacted pile - Google Patents

Guide pipe for compacted pile

Info

Publication number
JP2879373B2
JP2879373B2 JP34123990A JP34123990A JP2879373B2 JP 2879373 B2 JP2879373 B2 JP 2879373B2 JP 34123990 A JP34123990 A JP 34123990A JP 34123990 A JP34123990 A JP 34123990A JP 2879373 B2 JP2879373 B2 JP 2879373B2
Authority
JP
Japan
Prior art keywords
pile
guide pipe
cover plate
compacted
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP34123990A
Other languages
Japanese (ja)
Other versions
JPH05209409A (en
Inventor
正昭 加倉井
清 山下
富男 土屋
佳彦 栗田
拓平 福原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Takenaka Doboku Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Takenaka Doboku Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd, Takenaka Doboku Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP34123990A priority Critical patent/JP2879373B2/en
Publication of JPH05209409A publication Critical patent/JPH05209409A/en
Application granted granted Critical
Publication of JP2879373B2 publication Critical patent/JP2879373B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 この発明は、場所打ちコンクリート杭、連続地中壁、
既成コンクリート杭(埋込み杭)等の構築において、そ
の先端支持力を増強するための締め固め杭を先端地盤
(孔底地盤)の中へ貫入するために使用されるガイドパ
イプ、さらに云えば、場所打ちコンクリート杭、連続地
中壁などの鉄筋を利用して、又は既成杭の中空部を利用
して使用されるガイドパイプに関する。
The present invention relates to a cast-in-place concrete pile, a continuous underground wall,
In the construction of precast concrete piles (embedded piles), etc., guide pipes used to penetrate compacted piles into the tip ground (hole bottom ground) to enhance their tip bearing capacity, The present invention relates to a guide pipe used by using a reinforcing bar such as a cast-in-place concrete pile, a continuous underground wall, or using a hollow portion of a pre-made pile.

従来の技術 従来、場所打ちコンクリート杭などの構築において
は、掘削による先端地盤の緩みに原因する先端支持力の
低下が問題とされ、特開昭63−312419号公報に記載され
た施工法では、打設コンクリートが強度を発現した後に
先端地盤中へ締め固め杭を貫入し、先端地盤を締め固め
て支持力を高める工法が提案されている。
Conventional technology Conventionally, in the construction of cast-in-place concrete piles and the like, it has been a problem that the tip support force is reduced due to loosening of the tip ground due to excavation, and in the construction method described in JP-A-63-312419, A method has been proposed in which after the cast concrete has developed strength, a compacted pile is penetrated into the tip ground, and the tip ground is compacted to increase the bearing capacity.

本発明が解決しようとする課題 締め固め杭を先端地盤へ貫入するためには、場所打ち
コンクリート杭や連続地中壁の場合は、地上にまで届く
専用の長いガイドパイプが必要であるが、実際にこのガ
イドパイプをいかなる手段と態様で設置するか問題であ
る。また、既成コンクリート杭(埋込み杭)の場合は、
その中空部分をガイドパイプに利用可能であるが、実際
に既成杭の中空部をどのような手段と態様で有効利用す
るか問題である。
Problems to be solved by the present invention In order to penetrate the compacted pile into the tip ground, in the case of cast-in-place concrete piles or continuous underground walls, a special long guide pipe that reaches the ground is necessary, but in practice The problem is how to install this guide pipe. In the case of ready-made concrete piles (embedded piles)
Although the hollow part can be used for the guide pipe, there is a problem in what means and manner in which the hollow part of the existing pile is actually used effectively.

その上、ガイドパイプの特に先端部分には少なくとも
次の4機能が要求される。
In addition, at least the following four functions are required for the guide pipe, particularly at the distal end.

1) 場所打ちコンクリート杭等の躯体が完成するまで
の間、掘削孔内の泥水圧力やコンクリート圧力に耐えて
その逆流(浸入)を防ぎ、先端地盤面(掘削孔底)に着
底した際に破損しないだけの強度で先端開口が水密的に
閉じられていること。
1) Until the body such as cast-in-place concrete pile is completed, it can withstand the muddy water pressure and concrete pressure in the excavation hole to prevent the backflow (penetration), and when it reaches the ground surface at the tip (bottom of the excavation hole) The tip opening must be closed water-tight with enough strength not to break.

2) 締め固め孔が下降してきた際には、その偏心を補
正する芯合せ機能を具備していること。
2) When the compaction hole comes down, it has a centering function to correct the eccentricity.

3) 締め固め杭を先端地盤へ貫入する作業のときは、
前記先端開口の封鎖を容易に破断できること。
3) When the compacted pile penetrates into the tip ground,
The closure of the tip opening can be easily broken.

4) 締め固め杭の貫入に伴う封鎖の破断後も掘削泥水
や地下水等の逆流(浸水)が少なく、よって先端地盤の
乱れやガイドパイプの中詰めとなるセメントミルクの品
質低下を防止できること。
4) The backflow (flooding) of excavated muddy water, groundwater, etc. is small even after the breakage of the blockage due to the penetration of the compaction pile, and therefore, it is possible to prevent the disturbance of the ground at the tip and the deterioration of the quality of cement milk which is filled in the guide pipe.

しかるに従来、上述した問題点を解決し、あるいは先
端機能の要求を満たすガイドパイプは開発されていない
ので、本発明の解決すべき課題となっている。
However, conventionally, a guide pipe that solves the above-described problems or that satisfies the demand for advanced functions has not been developed.

課題を解決するための手段 上述した従来技術の課題を解決するための手段とし
て、この発明に係る締め固め杭用のガイドパイプは、図
面に実施例を示したように、 場所打ちコンクリート杭などの掘削孔底地盤7(以
下、先端地盤と云う)の中へ貫入される締め固め杭2を
地上から孔底まで案内するためのガイドパイプにおい
て、 イ) ガイドパイプ1の先端部は蓋板12で水密的に遮蔽
され、同蓋板12には中心部から放射状配置に複数本の切
込み溝15…が形成され、蓋板12は締め固め杭2により破
断することが可能に構成されていること、 ロ) 前記ガイドパイプ1は、場所打ちコンクリート杭
3又は連続地中壁の鉄筋4に所要の配置で所要本数だけ
一体的に付設されていること、 をそれぞれ特徴とする(第1図)。
Means for Solving the Problems As means for solving the above-mentioned problems of the prior art, a guide pipe for a compacted pile according to the present invention is, as shown in the embodiment of the drawings, a cast-in-place concrete pile or the like. A guide pipe for guiding the compacted pile 2 penetrating into the excavation hole bottom ground 7 (hereinafter referred to as the tip ground) from the ground to the hole bottom. A plurality of cut grooves 15 are formed in the lid plate 12 in a radial arrangement from the center, and the lid plate 12 is configured to be able to be broken by the compaction pile 2; B) The guide pipes 1 are integrally attached to a cast-in-place concrete pile 3 or a reinforcing steel bar 4 of a continuous underground wall in a required arrangement by a required number (FIG. 1).

本発明に係る締め固め杭用のガイドパイプはまた、 イ) 中空構造の既成杭5の先端部の中空部5a内に、同
中空部5aと同心配置で締め固め杭2の外径と略同内径の
ガイドパイプ11が設置され、ガイドパイプ11の上端部は
漏斗形状に拡径して中空部内面に当接されていること、 ロ) 前記ガイドパイプ11の先端部は蓋板12で水密的に
遮蔽され、同蓋板12には中心部から放射状配置に複数本
の切込み溝15…が形成され、蓋板12は締め固め杭2によ
り破断することが可能に構成されていること、 も特徴とする(第3,4図)。
The guide pipe for a compacted pile according to the present invention also has the following features: a) In the hollow portion 5a at the distal end of the existing pile 5 having a hollow structure, the outer diameter of the compacted pile 2 is substantially the same as the outer diameter of the compacted pile 2 in a concentric arrangement with the hollow portion 5a. A guide pipe 11 having an inner diameter is installed, and the upper end of the guide pipe 11 is expanded in a funnel shape and is in contact with the inner surface of the hollow part. B) The tip of the guide pipe 11 is watertight with a lid plate 12. The cover plate 12 is formed with a plurality of cut grooves 15... Arranged radially from the center, and the cover plate 12 is configured to be able to be broken by the compaction pile 2. (Figs. 3 and 4).

さらに本発明に係る締め固め杭用のガイドパイプは、 イ) 中空構造で大径の既成杭5′の先端部の中空部5a
内に、同中空部5aの横断面内に配分された複数の位置に
締め固め杭2の外径と略同内径の複数本のガイドパイプ
11…が並列状に配置され、各々連結板6a,6bで既成杭
5′と一体的構造に拘束され、各ガイドパイプ11…の上
端部11aは中空部5a内を下降してきた締め固め杭2の誘
導に適切なテーパの漏斗状に形成されていること、 ロ) 前記の各ガイドパイプ11の先端部は蓋板12で水密
的に遮蔽され、同蓋板12には中心部から放射状配置に複
数本の切込み溝15…が形成され、蓋板12は締め固め杭2
により破断することが可能に構成されていること、 も特徴とする(第5図)。
Furthermore, the guide pipe for the compacted pile according to the present invention includes: a) a hollow portion 5a at the tip end of a large-diameter ready-made pile 5 'having a hollow structure.
Inside, a plurality of guide pipes having substantially the same inner diameter as the outer diameter of the compaction pile 2 at a plurality of positions distributed in the cross section of the hollow portion 5a.
Are arranged in parallel with each other, and each of the connecting pipes 6a and 6b is constrained integrally with the existing pile 5 '. The upper end 11a of each guide pipe 11 ... is a compacted pile 2 which has descended in the hollow part 5a. The tip of each guide pipe 11 is water-tightly shielded by a cover plate 12, and the guide plate 11 is radially arranged from the center portion of the guide pipe 11. A plurality of cut grooves 15 are formed, and the cover plate 12 is
(Fig. 5).

さらに上記の各発明において、蓋内12にはその外側面
に切込み溝15…が形成され、同蓋板12の内側面とガイド
パイプ1又は11の内面との間に倒立円すい形状の補強盤
13が設置されていることも特徴とする(第2図A,B,
C)。
Further, in each of the above-mentioned inventions, cut-in grooves 15 are formed in the outer surface of the lid 12, and an inverted conical reinforcing plate is provided between the inner surface of the lid plate 12 and the inner surface of the guide pipe 1 or 11.
13 (Fig. 2 A, B,
C).

作用 鉄筋4と一体のガイドパイプ1(第1図)は、その鉄
筋4を場所打ちコンクリート杭3又は連続地中壁などに
ついて定められた態様で掘削孔中へ挿入し設置すること
により、同時にガイドパイプ1の設置が正規に行なわれ
る。
The guide pipe 1 (FIG. 1) integrated with the reinforcing bar 4 is simultaneously guided by inserting the reinforcing bar 4 into the excavation hole in a predetermined manner with respect to the cast-in-place concrete pile 3 or the continuous underground wall and the like. The installation of the pipe 1 is performed normally.

同様に、既成杭5又は5′の中空部5aをガイドパイプ
の一部に利用する構成(第3〜5図)の場合も、掘削孔
に沿って既成杭5又は5′を埋込むことにより、同時に
ガイドパイプ11の設置が正規に行なわれる。
Similarly, in the case of using the hollow portion 5a of the existing pile 5 or 5 'as a part of the guide pipe (FIGS. 3 to 5), the existing pile 5 or 5' is embedded along the excavation hole. At the same time, the guide pipe 11 is properly installed.

しかも、ガイドパイプ1又は11の先端開口は、蓋板12
で水密的に遮蔽されているので、掘削孔内の泥水や地下
水又は打設コンクリートなどがガイドパイプ1又は11内
へ逆流(浸水)することは防止される。
In addition, the tip opening of the guide pipe 1 or 11 is
, Water, etc., is prevented from flowing back (flooding) into the guide pipe 1 or 11 due to muddy water, groundwater or cast concrete in the borehole.

ガイドパイプ1又は11中に挿入された締め固め杭2を
強力に押し下げると、蓋板12は切込み溝15…に沿ってチ
ューリップ状に比較的容易に破断され、締め固め杭2は
先端地盤の中に進入してゆく。かくして貫入された締め
固め杭2の体積分だけ先端地盤7(支持層地盤)が締め
固められる。
When the compaction pile 2 inserted into the guide pipe 1 or 11 is strongly pushed down, the cover plate 12 is relatively easily broken in the form of a tulip along the cut grooves 15. To enter. The tip ground 7 (support layer ground) is compacted by the volume of the compacted pile 2 thus penetrated.

蓋板12のチューリップ状に破断された各破断片は、鉄
板等の材質固有の弾力性により締め固め杭2の外周面に
まとわり着く形となって遮蔽効果が比較的良好に維持さ
れ、掘削泥水や地下水などの逆流が抑制される。
Each of the tulips of the lid plate 12 broken in a tulip shape is attached to the outer peripheral surface of the compaction pile 2 due to elasticity inherent to a material such as an iron plate, so that the shielding effect is relatively well maintained. Backflow such as drilling mud and groundwater is suppressed.

実 施 例 次に、図示した本発明の実施例を説明する。Embodiment Next, the illustrated embodiment of the present invention will be described.

第1図に示したガイドパイプ1は、例えば場所打ちコ
ンクリート杭3の構築において用意された鉄筋かご4
に、3本(但し、本数はこの限りでない)のガイドパイ
プ1…が場所打ちコンクリート杭3の横断面内に適正設
計で配分された位置に一体的に付設され、鉄筋かご4と
共にガイドパイプ1の設置が行なわれ、各ガイドパイプ
1…により地上から先端地盤7(孔底地盤)まで締め固
め杭2を誘導できる構成とされている。そのためガイド
パイプ1には、締固め杭2の外径よりも少し大きい内径
(例えば32cm位)の鉄管が使用されている。ガイドパイ
プ1の先端開口部は、第2図A,Bのように鉄板などによ
る蓋板12で水密的に遮蔽されている。蓋板12の内側面と
ガイドパイプ1の内面との間には、およそ45゜ぐらいの
テーパで倒立円すい形状の補強板13が設置され、蓋板12
の耐圧補強、及びガイドパイプ1内に挿入された締め固
め杭2の芯合せ補正を可能ならしめている。補強板13
は、第2図Aのようにガイドパイプ1が先端地盤7の中
へ少しめり込むぐらいに着底された際にも蓋板12が破損
しない程度に補強する。また、蓋板12には、第2図Bの
ように中心部から放射状配置で多数の切込み溝15…が形
成されている。切込み溝15の詳細は第2図Cに示したよ
うに、蓋板12の外側面(下側面)に、同蓋板12の板厚t
(約4mm)に対して深さa、開口幅bが2×2mmぐらいの
Vカット溝として形成されている。従って、蓋板12は外
側からの圧力に対しては強いが、内側からの圧力には比
較的弱く、締め固め杭2による破断(所謂ノックアウ
ト)は比較的容易である。
The guide pipe 1 shown in FIG. 1 is, for example, a steel cage 4 prepared in the construction of a cast-in-place concrete pile 3.
In addition, three guide pipes 1 (however, the number is not limited to this) are integrally provided at positions allocated by appropriate design in the cross section of the cast-in-place concrete pile 3, and the guide pipes 1 together with the rebar cage 4 are provided. Is installed, and the compaction pile 2 can be guided from the ground to the tip ground 7 (hole bottom ground) by the respective guide pipes 1. Therefore, an iron pipe having an inner diameter (for example, about 32 cm) slightly larger than the outer diameter of the compaction pile 2 is used as the guide pipe 1. As shown in FIGS. 2A and 2B, the opening at the tip end of the guide pipe 1 is watertightly shielded by a cover plate 12 made of an iron plate or the like. Between the inner surface of the cover plate 12 and the inner surface of the guide pipe 1, a reinforcing plate 13 having a tapered angle of about 45 ° and an inverted cone shape is installed.
And the centering correction of the compaction pile 2 inserted in the guide pipe 1 is made possible. Reinforcement plate 13
2A, the guide pipe 1 is reinforced so that the cover plate 12 is not damaged even when the guide pipe 1 is slightly settled into the tip ground 7. In addition, a large number of cut grooves 15 are formed in the cover plate 12 in a radial arrangement from the center as shown in FIG. 2B. As shown in FIG. 2C, details of the cut groove 15 are provided on the outer surface (lower surface) of the cover plate 12 with the thickness t of the cover plate 12.
It is formed as a V-cut groove having a depth a and an opening width b of about 2 × 2 mm with respect to (about 4 mm). Therefore, the cover plate 12 is strong against the pressure from the outside, but relatively weak against the pressure from the inside, and the breakage (so-called knockout) by the compaction pile 2 is relatively easy.

従って、鉄筋かご4と共に掘削孔中に挿入され第2図
Aのように先端地盤6へ着底する態様で設置されたガイ
ドパイプ1の中に締め固め杭2を下降させてゆくと、ま
ず倒立円すい形状の補強板13により締め固め杭2の偏心
を補正する芯合せが行なわれ、締め固め杭2の先端は蓋
板12の略中心部に位置する。この締め固め杭2を強力に
押し下げると、蓋板12は切込み溝15…に沿って破断さ
れ、締め固め杭2は先端地盤7の中へ進入してゆく。締
め固め杭2は先端地盤7中に所望の深さまで貫入され、
その体積分だけ先端地盤7は締固められる。しかる後に
ガイドパイプ1の中に中詰めのセメントミルクが充填さ
れ、締固め杭2の貫入状態が固定される。蓋板12は、締
固め杭2の貫入に伴い第2図Bに示した放射状配置の切
込み溝15…に沿ってチューリップ状に破断され、各破断
片は締固め杭2の外周面にまとわり着くので、掘削泥水
などの逆流は良好に抑制され、中詰めセメントミルク等
の品質低下は防止される。
Therefore, when the compaction pile 2 is lowered into the guide pipe 1 which is inserted into the excavation hole together with the rebar cage 4 and is set in such a manner as to land on the tip ground 6 as shown in FIG. Alignment for correcting the eccentricity of the compaction pile 2 is performed by the conical reinforcing plate 13, and the tip of the compaction pile 2 is located substantially at the center of the cover plate 12. When the compaction pile 2 is strongly pushed down, the cover plate 12 is broken along the cut grooves 15..., And the compaction pile 2 enters the tip ground 7. The compacted pile 2 penetrates into the tip ground 7 to a desired depth,
The tip ground 7 is compacted by that volume. After that, the guide pipe 1 is filled with the cement milk which is filled in, and the penetrating state of the compaction pile 2 is fixed. The cover plate 12 is cut into tulips along the radially arranged cut grooves 15 shown in FIG. 2B as the compaction pile 2 penetrates. Since it is calm, the backflow of drilling mud and the like is well suppressed, and the quality deterioration of the filled cement milk and the like is prevented.

なお第2図Aに示した蓋板12は水平な平板状である
が、この限りではない。蓋板12の中心部が外面(下側
面)の方へ若干凸のゆるいテーパの円すい形状とし、そ
の内側面に補強板3を設置した構成で実施すると、外側
面へ凸の円すい形状をなす蓋板12は外側面へ負荷される
掘削泥水圧や打設コンクリート圧などに対して耐力が大
きい利点がある。よって、テーパがさらに急峻な円すい
形状の蓋板12で実施すると、補強板を省略することも可
能である。
The cover plate 12 shown in FIG. 2A is a horizontal flat plate, but is not limited to this. If the center of the cover plate 12 is formed to have a tapered conical shape slightly convex toward the outer surface (lower surface) and the reinforcing plate 3 is provided on the inner surface thereof, a lid having a conical shape convex to the outer surface is formed. The plate 12 has an advantage that the proof stress is large with respect to the excavation mud pressure applied to the outer surface, the cast concrete pressure, and the like. Therefore, if the operation is performed with the conical lid plate 12 having a steeper taper, the reinforcing plate can be omitted.

その他の実施例 次に、第3図は、中空構造の既成コンクリート杭5の
先端部の中空部5a内に、同中空部5aと同心配置で締め固
め杭2の外径(約30cmぐらい)と略同内径の短いガイド
パイプ11を設置してこれを先端金具10と水密的に接合
し、同ガイドパイプ11の先端開口は蓋板12で水密的に遮
蔽し、既成杭5の中空部5aをガイドパイプに利用した構
成のものを示している。ガイドパイプ11の上半部は漏斗
形状に上向きに拡径せしめられ、既成杭5の中空部5aの
内面に滑らかなテーパで当接されている。したがって、
中空部5a内に挿入された締め固め杭2は円滑にガイドパ
イプ11内に進入し、偏心の芯合わせ補正が行なわれる。
Other Examples Next, FIG. 3 shows that the outer diameter (about 30 cm) of the compacted pile 2 is concentrically arranged with the hollow part 5a in the hollow part 5a at the tip of the existing concrete pile 5 having a hollow structure. A short guide pipe 11 having substantially the same inner diameter is installed and joined to the tip fitting 10 in a water-tight manner. The tip opening of the guide pipe 11 is shielded by a lid plate 12 in a water-tight manner. The structure used for the guide pipe is shown. The upper half of the guide pipe 11 is enlarged upward in a funnel shape, and is in contact with the inner surface of the hollow portion 5a of the existing pile 5 with a smooth taper. Therefore,
The compacted pile 2 inserted into the hollow portion 5a smoothly enters the guide pipe 11, and the eccentricity correction is performed.

ガイドパイプ11の先端を遮蔽した蓋板12は倒立円すい
形状の補強板13で補強され、さらに放射状配置で複数の
切込み溝を形成し進入した締め固め杭2による破断を容
易ならしめていることは、上記第1実施例と同じであ
る。この点はまた、以下の各実施例についても共通する
事項である。
The lid plate 12 that shields the tip of the guide pipe 11 is reinforced by an inverted cone-shaped reinforcing plate 13, and furthermore, a plurality of cut grooves are formed in a radial arrangement to facilitate the breakage by the compacted pile 2 that has entered, This is the same as the first embodiment. This point is also common to the following embodiments.

次に、第4図の実施例は、締め固め杭2の全長(50cm
〜1mぐらい)よりも少し長いガイドパイプ11を既成コン
クリート杭5の中空部5a内に設置した構成を特徴とす
る。
Next, in the embodiment of FIG. 4, the total length (50 cm) of the compacted pile 2 is shown.
(About 1 m) is installed in the hollow portion 5a of the existing concrete pile 5 in a slightly longer length.

また、第5図の実施例は、締め固め杭2の外径(約30
cmぐらい)よりも数倍も大きい内径の中空部5aをもつ大
径の既成コンクリート杭5について、その中空部5aをガ
イドパイプの一部に利用する実施例を示している。即
ち、大径の既成杭5′の先端部の中空部5a内に、同中空
部5aの横断面内に適正設計で配分された3箇所の位置
(但し、箇所数は3箇の限りではない)に、締め固め杭
2の外径と略同内径の3本のガイドパイプ11…が平行に
並列配置され、各ガイドパイプ11…は共通の連結板(又
はフレーム)6a、6bで既成杭5′と一体的構造に拘束し
て設置されている。特に上端部の連結板6aは、ガイドパ
イプ11の上端と略同レベルに設置されている。しかもガ
イドパイプ11の上端部は漏斗状に上向きに拡径されてい
るから、大径の中空部5a内に挿入され下降してきた締め
固め杭2は、漏斗状の入口から円滑に各ガイドパイプ11
中に進入する。下端の連結板6bは既成杭5′の先端金具
10と水密的に接合されている。
In the embodiment shown in FIG. 5, the outer diameter of the compacted pile 2 (approximately 30
An example is shown in which a large-diameter ready-made concrete pile 5 having a hollow portion 5a having an inner diameter several times larger than about (cm) is used as a part of a guide pipe. That is, in the hollow portion 5a at the tip of the large-diameter ready-made stake 5 ', there are three positions allocated by appropriate design in the cross section of the hollow portion 5a (however, the number of positions is not limited to three). ), Three guide pipes 11 having substantially the same inner diameter as the outer diameter of the compaction pile 2 are arranged in parallel in parallel, and each of the guide pipes 11 is formed by a common connecting plate (or frame) 6a, 6b. ′ And is installed by being restrained by an integral structure. In particular, the connecting plate 6a at the upper end is installed at substantially the same level as the upper end of the guide pipe 11. In addition, since the upper end of the guide pipe 11 is expanded upward in a funnel shape, the compacted pile 2 inserted into the large-diameter hollow portion 5a and descending is smoothly moved from the funnel-shaped inlet to each guide pipe 11.
Enter inside. The connecting plate 6b at the lower end is a metal fitting at the tip of the existing pile 5 '.
10 and watertight.

本発明が奏する効果 本発明に係る締固め杭用のガイドパイプは、場所打ち
コンクリート杭3又は連続地中壁などの鉄筋4と共に設
置され、あるいは既成杭5又は5′の埋込みと共にきっ
ちり設置されるから、作業性がよく、確実に精度よく設
置できて、実施が極めて容易である。その上、ガイドパ
イプ1又は11の先端開口を遮蔽した蓋板12は掘削泥水圧
力や打設コンクリート圧力などに十分耐え、掘削孔底に
着底したときにも破損しない強度を有し、かつ締め固め
杭2の貫入時には切込み溝5…に沿って容易に破断され
て先端地盤7への貫入を確実にできること、及び切込み
溝15…に沿ってチューリップ状に破断された蓋板12の各
破断片は締固め杭2の外周面にまとわり着いて掘削泥水
などの逆流を良好に防ぎ、先端地盤7の乱れや中詰めセ
メントミルク等の品質低下を防ぐので、先端地盤7の締
め固めによる支持力の増強に優れた実効を奏するのであ
る。
Advantageous Effects of the Present Invention The guide pipe for compacted pile according to the present invention is installed together with the reinforcing steel 4 such as the cast-in-place concrete pile 3 or the continuous underground wall, or is installed tightly with the embedded pile 5 or 5 ′. Therefore, the workability is good, the installation can be performed reliably and accurately, and the implementation is extremely easy. In addition, the cover plate 12 which shields the opening at the tip of the guide pipe 1 or 11 has sufficient strength to withstand the pressure of excavated muddy water or the pressure of cast concrete, has the strength not to be damaged even when it is settled on the bottom of the excavation hole, When the compacted pile 2 penetrates, it can be easily broken along the cut grooves 5 to ensure penetration into the tip ground 7, and each piece of the cover plate 12 broken like a tulip along the cut grooves 15 Is attached to the outer peripheral surface of the compaction pile 2 to prevent backflow such as drilling mud and the like, and to prevent disturbance of the tip ground 7 and deterioration of the quality of the cement milk, etc., so that the tip ground 7 is supported by compaction. It has an excellent effect on increasing power.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の第1実施例のガイドパイプを示した斜
視図、第2図A,B,Cは蓋板部分の垂直断面と底面図及び
切込み溝の拡大断面図、第3図〜第5図は本発明の異な
る実施例を示した断面図である。 1,11……ガイドパイプ、2……締固め杭 12……蓋板、5……切込み溝 4……鉄筋かご、5,5′……既成コンクリート杭 5a……中空部、6a,6b……連結板 13……補強板
FIG. 1 is a perspective view showing a guide pipe according to a first embodiment of the present invention, FIGS. 2A, 2B, and 2C are a vertical section and a bottom view of a cover plate portion and an enlarged sectional view of a cut groove, and FIGS. FIG. 5 is a sectional view showing a different embodiment of the present invention. 1,11… Guide pipe, 2… Compacted pile 12 …… Cover plate, 5… Cut groove 4 …… Reinforced basket, 5,5 ′… Precast concrete pile 5a …… Hollow section, 6a, 6b… ... Connecting plate 13 ... Reinforcing plate

───────────────────────────────────────────────────── フロントページの続き (72)発明者 土屋 富男 東京都江東区南砂2丁目5番14号 株式 会社竹中工務店技術研究所内 (72)発明者 栗田 佳彦 東京都江東区南砂2丁目5番14号 株式 会社竹中工務店技術研究所内 (72)発明者 福原 拓平 東京都中央区銀座8丁目21番1号 株式 会社竹中土木内 (56)参考文献 特開 昭63−312419(JP,A) (58)調査した分野(Int.Cl.6,DB名) E02D 5/62,5/34 E02D 5/20,3/08 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Tomio Tsuchiya 2-5-114 Minamisuna, Koto-ku, Tokyo Inside Takenaka Corporation Technical Research Institute Co., Ltd. (72) Yoshihiko Kurita 2-5-1-14 Minamisuna, Koto-ku, Tokyo No. Takenaka Corporation Technical Research Institute Co., Ltd. (72) Inventor Takuhei Fukuhara 8-21-1, Ginza, Chuo-ku, Tokyo Co., Ltd. Takenaka Civil Engineering Co., Ltd. (56) References JP-A-63-321419 (JP, A) ( 58) Fields surveyed (Int.Cl. 6 , DB name) E02D 5 / 62,5 / 34 E02D 5 / 20,3 / 08

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】場所打ちコンクリート杭などの掘削孔底地
盤中へ貫入される締め固め杭を地上から孔底まで案内す
るためのガイドパイプにおいて、 イ) ガイドパイプの先端部は蓋板で水密的に遮蔽さ
れ、同蓋板には中心部から放射状配置に複数本の切込み
溝が形成され、蓋板は締め固め杭により破断することが
可能に構成されていること、 ロ) 前記ガイドパイプは、場所打ちコンクリート杭又
は連続地中壁の鉄筋に所要の配置で所要本数だけ一体的
に付設されていること、 をそれぞれ特徴とする締め固め杭用のガイドパイプ。
1. A guide pipe for guiding a compacted pile, such as a cast-in-place concrete pile, which penetrates into the bottom of an excavation hole from the ground to the bottom of the hole, a) The tip of the guide pipe is watertight with a lid plate. The cover plate is provided with a plurality of cut grooves formed radially from the center, and the cover plate is configured to be able to be broken by a compaction pile. B) The guide pipe is Guide pipes for compacted piles, each of which is integrally attached to the required number of cast piles or reinforcing bars of continuous underground walls in the required arrangement.
【請求項2】イ) 中空構造の既成杭の先端部の中空部
内に、同中空部と同心配置で締め固め杭の外径と略同内
径のガイドパイプが設置され、ガイドパイプの上端部は
漏斗形状に拡径して中空部内面に当接されていること、 ロ) 前記ガイドパイプの先端部は蓋板で水密的に遮蔽
され、同蓋板には中心部から放射状配置に複数本の切込
み溝が形成され、蓋板は締め固め杭により破断すること
が可能に構成されていること、 をそれぞれ特徴とする締め固め杭用のガイドパイプ。
2. A guide pipe having an outer diameter substantially equal to the outer diameter of the compacted pile, which is concentrically arranged with the hollow portion, is installed in a hollow portion at the tip of the existing pile having a hollow structure. The diameter of the guide pipe should be expanded to be in contact with the inner surface of the hollow part. B) The tip of the guide pipe is water-tightly shielded by a cover plate. A guide pipe for a compacted pile, characterized in that a cut groove is formed and the cover plate is configured to be breakable by the compacted pile.
【請求項3】イ) 中空構造で大径の既成杭の先端部の
中空部内に、同中空部の横断面内に配分された複数の位
置に締め固め杭の外径と略同内径の複数本のガイドパイ
プが並列状に配置され、各々連結板で既成杭と一体的構
造に拘束されていると共に、各ガイドパイプの上端部は
中空部を下降してきた締め固め杭の誘導に適切なテーパ
の漏斗状に形成されていること、 ロ) 前記の各ガイドパイプの先端部は蓋板で水密的に
遮蔽され、同蓋板には中心部から放射状配置に複数本の
切込み溝が形成され、蓋板は締め固め杭により破断する
ことが可能に構成されていること、 をそれぞれ特徴とする締め固め杭用のガイドパイプ。
3. A pile having a hollow structure having a large diameter and having a diameter substantially equal to the outer diameter and the outer diameter of the compacted pile at a plurality of positions distributed in a cross section of the hollow portion at the tip of the existing pile. The guide pipes are arranged side by side, each of them is constrained in an integrated structure with the existing pile by the connecting plate, and the upper end of each guide pipe is tapered to guide the compacted pile that has descended the hollow part. B) the tip of each of the guide pipes is water-tightly shielded by a cover plate, and the cover plate has a plurality of cut grooves formed radially from the center; The cover pipe is configured to be able to be broken by the compaction pile, and the guide pipe for the compaction pile, respectively.
【請求項4】蓋板の外側面に切込み溝が形成され、同蓋
板の内側面とガイドパイプの内面との間に倒立円すい形
状の補強板が設置されていることを特徴とする特許請求
の範囲第1項又は第2項又は第3項に記載した締め固め
杭用のガイドパイプ。
4. A notch groove is formed on an outer surface of the cover plate, and an inverted conical reinforcing plate is provided between an inner surface of the cover plate and an inner surface of the guide pipe. 4. A guide pipe for a compaction pile according to any one of the first, second, and third aspects.
JP34123990A 1990-11-30 1990-11-30 Guide pipe for compacted pile Expired - Fee Related JP2879373B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP34123990A JP2879373B2 (en) 1990-11-30 1990-11-30 Guide pipe for compacted pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP34123990A JP2879373B2 (en) 1990-11-30 1990-11-30 Guide pipe for compacted pile

Publications (2)

Publication Number Publication Date
JPH05209409A JPH05209409A (en) 1993-08-20
JP2879373B2 true JP2879373B2 (en) 1999-04-05

Family

ID=18344472

Family Applications (1)

Application Number Title Priority Date Filing Date
JP34123990A Expired - Fee Related JP2879373B2 (en) 1990-11-30 1990-11-30 Guide pipe for compacted pile

Country Status (1)

Country Link
JP (1) JP2879373B2 (en)

Also Published As

Publication number Publication date
JPH05209409A (en) 1993-08-20

Similar Documents

Publication Publication Date Title
KR100913569B1 (en) Phc pile for retaining wall
CN112942368B (en) Deep foundation pit construction method with side wall supporting function
JP4663541B2 (en) Seismic reinforcement method for existing concrete pier
CN215594049U (en) Foundation pit supporting structure
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
CN210737572U (en) Foundation ditch stagnant water curtain structure
JP2879373B2 (en) Guide pipe for compacted pile
CN216739655U (en) Foundation pit support meeting underground structure
CN113957880B (en) Construction method of steel-concrete underground continuous wall
CN213358593U (en) Foundation pit supporting structure formed by combining stirring pile and cast-in-place pile with inserted profile steel at top
CN212225231U (en) Protective structure for bias tunnel portal
JP2797030B2 (en) Guide pipe for compacted pile
KR100549088B1 (en) Method for isolated footing type under-Reamed pile and the isolated footing type under-Reamed thereof
JPS6115209B2 (en)
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JP2958717B2 (en) Guide pipe for compacted pile
JPS61109822A (en) Construction work of pile
JP3586839B2 (en) In-situ formed concrete pile and its forming method
CN218437020U (en) Composite type dado structure suitable for underground river environment pile foundation construction
JP3005609B2 (en) Construction method for high strength steel continuous walls
CN214738100U (en) Go up and stride existing underground structure's foundation ditch envelope and newly-built structure
JP2000178966A (en) Structure of diaphragm wall
JPS59118926A (en) Improving work of ground under water pressure and iron-bar setter to be used therein
JP2936353B2 (en) Construction method of high strength embedded pile
CN212427117U (en) Foundation ditch stagnant water supporting construction

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees