JP2875246B1 - Pillar fixing device for wooden buildings - Google Patents

Pillar fixing device for wooden buildings

Info

Publication number
JP2875246B1
JP2875246B1 JP4569598A JP4569598A JP2875246B1 JP 2875246 B1 JP2875246 B1 JP 2875246B1 JP 4569598 A JP4569598 A JP 4569598A JP 4569598 A JP4569598 A JP 4569598A JP 2875246 B1 JP2875246 B1 JP 2875246B1
Authority
JP
Japan
Prior art keywords
column
foundation concrete
receiving
holding piece
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4569598A
Other languages
Japanese (ja)
Other versions
JPH11247296A (en
Inventor
藤原恭史
Original Assignee
株式会社トーアエンジニアリング
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社トーアエンジニアリング filed Critical 株式会社トーアエンジニアリング
Priority to JP4569598A priority Critical patent/JP2875246B1/en
Application granted granted Critical
Publication of JP2875246B1 publication Critical patent/JP2875246B1/en
Publication of JPH11247296A publication Critical patent/JPH11247296A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

【要約】 【課題】 柱を強固に固定でき、斬新な構造の柱固定装
置を提供する。 【解決手段】 基礎コンクリートBc上に載置した柱受
盤1上に柱Pを立設し、該柱Pと前記柱受盤1立設した
接続片4を横方向に重合させて固定杆8で互いに止着す
る。前記柱受盤1の両側に突設した一対の受杆2,2の
適所に、押え片5の両端を載置する。また、前記基礎コ
ンクリートBcに立設して前記押え片5を貫通させたア
ンカーボルトaに第一締付けナット10を螺合して前記
押え片5を前記基礎コンクリートBcに締付けると共
に、このアンカーボルトaを、前記基礎コンクリートB
cに前記受杆2乃至前記押え片5を介して載置した土台
bに貫通させ、土台より突出するボルト先端に第二締付
けナット12を螺合する。
Abstract: PROBLEM TO BE SOLVED: To provide a column fixing device having a novel structure capable of firmly fixing a column. SOLUTION: A column P is erected on a column receiving plate 1 placed on a foundation concrete Bc, and the column P and a connecting piece 4 erected on the column receiving plate 1 are overlapped in a lateral direction to fix a fixed rod 8. To fasten each other. Both ends of the holding piece 5 are placed at appropriate positions of a pair of receiving rods 2 and 2 protruding from both sides of the column receiving board 1. Also, a first tightening nut 10 is screwed into an anchor bolt a which is erected on the foundation concrete Bc and through which the holding piece 5 is penetrated, and the holding piece 5 is fastened to the foundation concrete Bc. To the foundation concrete B
c through the receiving rod 2 through the holding piece 5 to penetrate the base b, and screw the second tightening nut 12 to the tip of a bolt protruding from the base.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は木造建物の柱固定装置に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column fixing device for a wooden building.

【0002】[0002]

【従来の技術】基礎コンクリート上に突設したアンカー
ボルトを用いて土台を固定し、該土台に設けたほぞ穴に
ほぞを嵌合してを前記土台上に立設するようにしてい
る。
2. Description of the Related Art A base is fixed by using anchor bolts projecting from a foundation concrete, and a tenon is fitted in a tenon hole provided on the base so as to be erected on the base.

【0003】[0003]

【発明が解決しようとする課題】前記従来例は、所謂ほ
ぞ接合のみで、柱を土台に組付けているため、その組付
け強度が弱く、例えば、筋違い装置などの補強装置を必
要とするのみならず、ほぞとほぞ穴の結合作業が煩雑で
ある。
In the conventional example, since the pillar is mounted on the base only by so-called tenon connection, the mounting strength is low. For example, only a reinforcing device such as a bracing device is required. In addition, the work of joining the tenon and tenon is complicated.

【0004】本発明は斯様な従来例の欠点に着目し、こ
れまでにない斬新な構造を備えた固定装置を提供すべく
創案したものである。
The present invention has been made in view of such a drawback of the conventional example, and has been devised to provide a fixing device having an unprecedented novel structure.

【0005】[0005]

【課題を解決するための手段】基礎コンクリート上に載
置した柱受盤上に柱を立設し、該柱と前記柱受盤に立設
した接続片を横方向に重合させて固定杆で互いに止着
し、前記柱受盤の両側に突設した一対の受杆の適所に、
押え片の両端を載置し、前記基礎コンクリートに立設し
て前記押え片を貫通させたアンカーボルトに第一締付け
ナットを螺合して前記押え片を前記基礎コンクリートに
締付けると共に、このアンカーボルトを、前記基礎コン
クリート上に前記受杆乃至前記押え片を介して載置した
土台に貫通させ、土台より突出するボルト先端に第二締
付けナットを螺合することを基本的手段とし、接続片を
柱に設けたスリットに挾挿することにより接続片を外部
から見えにくくして外観体裁を良好にし、また、押え片
を受杆と別体にし、該押え片に基礎コンクリートの幅員
方向に長い、アンカーボルト貫通用の長孔を設けること
によりアンカーボルトの設置上の誤差を吸収するように
したものである。
A column is erected on a column receiving plate placed on a foundation concrete, and the column and the connecting piece erected on the column receiving plate are overlapped in a horizontal direction and fixed with a fixed rod. Fastened to each other, in place of a pair of receiving rods protruding on both sides of the pillar receiving board,
A first tightening nut is screwed into an anchor bolt which is placed on both ends of the holding piece, erected on the foundation concrete and penetrated the holding piece, and tightens the holding piece on the foundation concrete. Through a base placed on the foundation concrete via the receiving rod or the pressing piece, and screwing a second tightening nut to a tip of a bolt protruding from the base as a basic means. By inserting the connecting piece into the slit provided in the pillar, the connecting piece is hardly visible from the outside and the appearance is improved, and the holding piece is separate from the receiving rod, and the holding piece is long in the width direction of the foundation concrete. By providing a long hole for anchor bolt penetration, an error in the installation of the anchor bolt is absorbed.

【0006】[0006]

【実施例】図面は本発明に係る木造建物の柱立設装置の
一実施例を示し、図1は一部欠裁正面図、図2は図1の
X−X線断面図、図3は図1のY−Y線断面図、図4は
金具の斜視図、図5は金具の他実施例の斜視図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a front view of a partly cut-off apparatus for a wooden building according to the present invention, FIG. 1 is a partially cutaway front view, FIG. FIG. 4 is a perspective view of a metal fitting, and FIG. 5 is a perspective view of another embodiment of the metal fitting.

【0007】図中、Aは固定金具で、固定金具Aは、柱
受盤1の相対する両側に一対の受杆2,2を突設し、該
受杆2,2の先端部下面側に補強片3をわたして固着
し、また、柱受盤1の中央に該柱受盤1と同幅にして接
続片4を立設し、該接続片4にはドリフトピン8貫通用
の透孔9を縦方向に列設して構成し、この固定金具Aの
前記受杆2,2の適所に該受杆2(固定金具A)と別体
の押え片5の両端の係合部片6,6を載置して組合わ
せ、押え片5は、基礎コンクリートBc(土台b)の幅
員方向に長い長孔7を備えた中央部片5Aの両端に、前
記受杆2の断面円形状と一致する円曲上の前記係合部片
6,6を備えたものである。すなわち、実施例の柱固定
装置は、前記固定金具Aと押え片5を組合わせて用いて
柱Pを固定するようにしたものである。
In the drawing, A is a fixing bracket, and the fixing bracket A is provided with a pair of receiving rods 2 and 2 projecting on opposite sides of a column receiving plate 1, and on the lower surface of the distal end portion of the receiving rods 2. A reinforcing piece 3 is fixedly attached by pulling, and a connecting piece 4 is erected at the center of the pillar receiving board 1 so as to have the same width as the pillar receiving board 1. 9 are arranged in the vertical direction, and engaging portions 6 at both ends of a holding piece 5 separate from the receiving rod 2 (fixing metal A) are provided at appropriate positions of the receiving rods 2 and 2 of the fixing metal A. , 6 are placed and combined, and the holding piece 5 is provided at both ends of a central piece 5A provided with an elongated hole 7 in the width direction of the base concrete Bc (base b) with the circular cross section of the receiving rod 2 at both ends. It is provided with the engaging portion pieces 6 and 6 on a matching circular curve. That is, in the column fixing device of the embodiment, the column P is fixed by using the fixing bracket A and the pressing piece 5 in combination.

【0008】前記固定金具Aは、基礎コンクリートBc
の上面より突出させたアンカーボルトaを受杆2,2間
に介在させるようにして基礎コンクリートBcの所定位
置に載置し、前記アンカーボルトaを長孔7に貫通させ
るようにして該アンカーボルトaに組合わせたに押え片
5の係合部片6を前記受杆2に係合載置し、前記長孔7
より突出するアンカーボルトaに第一締付けナット10
を螺合して押え片5を受杆2を介して基礎コンクリート
Bcに締付けるようにして基礎コンクリートBcに固着
してある。
[0008] The fixing bracket A is made of a foundation concrete Bc.
An anchor bolt a protruding from the upper surface of the base is placed at a predetermined position of the foundation concrete Bc so as to be interposed between the receiving rods 2 and 2, and the anchor bolt a is penetrated through the elongated hole 7. The engaging portion 6 of the holding piece 5 combined with the a
The first tightening nut 10 is attached to the protruding anchor bolt a.
And the holding piece 5 is fixed to the basic concrete Bc via the receiving rod 2 so as to be fastened to the basic concrete Bc.

【0009】押え片5に基礎コンクリートBcに設けた
幅員方向に長い長孔7にアンカーボルトaを貫通させる
ようにしたのは、アンカーボルトaの基礎コンクリート
Bcの幅員方向の設置誤差を吸収するためで、また、押
え片5を受杆2(固定金具A)に対して別体にしたの
は、アンカーボルトaの基礎コンクリートBcの長手方
向の設置誤差を吸収するためである(元より、工事現場
において設置位置の異なるアンカーボルトとの組合わせ
を行えるためでもある)。
The anchor bolt a is made to penetrate through the elongated hole 7 in the width direction provided in the base concrete Bc in the holding piece 5 in order to absorb the installation error of the anchor bolt a in the width direction of the base concrete Bc. The reason why the holding piece 5 is made separate from the receiving rod 2 (fixing bracket A) is to absorb an installation error of the anchor bolt a in the longitudinal direction of the foundation concrete Bc (from the beginning, construction work). This is also because it can be combined with anchor bolts with different installation positions at the site).

【0010】図中、bは土台で、土台bは前記アンカー
ボルトa位置と対応する貫通孔11を予め形成してお
き、該貫通孔11に第一締付けナット10より突出する
アンカーボルトaの先端を貫通させるようにして、前記
受杆2乃至押え片5を介して基礎コンクリートBc上に
載置し、貫通孔11より突出するボルト先端に第二締付
けナット12を螺合締付けて基礎コンクリートBcに固
定してある。
In the drawing, b is a base, and the base b has a through hole 11 formed in advance corresponding to the position of the anchor bolt a, and the tip of the anchor bolt a protruding from the first tightening nut 10 in the through hole 11. Is mounted on the foundation concrete Bc via the receiving rods 2 to the holding pieces 5, and a second tightening nut 12 is screwed and fastened to the tip of a bolt projecting from the through hole 11 to the foundation concrete Bc. It is fixed.

【0011】なお、固定金具A(受杆2)部以外の土台
bと基礎コンクリートBc間には、例えば、実公平1−
24248号公報所載のような換気口材13を点在さ
せ、該換気口13間の土台bと基礎コンクリートBcと
の間に生じる間隔を床下換気口として機能させる。
In addition, between the base b and the base concrete Bc other than the fixing bracket A (rod 2), for example,
The ventilation port material 13 as disclosed in Japanese Patent No. 24248 is scattered, and an interval generated between the base b and the foundation concrete Bc between the ventilation ports 13 functions as an underfloor ventilation port.

【0012】この換気口材13は、板厚は前記柱受盤1
の厚みとほぼ同幅にし、従って、土台bの下面と柱受盤
1の上面は互いに同一平面上に存するようにして配さ
れ、土台bの端縁と柱受盤1の受杆2側の端縁は互いに
一致するようにして土台bは基礎コンクリートBc上に
固定してある。
The ventilation opening 13 has a plate thickness equal to that of the column support 1.
Therefore, the lower surface of the base b and the upper surface of the column receiving plate 1 are arranged so as to be on the same plane with each other. The base b is fixed on the foundation concrete Bc so that the edges coincide with each other.

【0013】前記柱Pは、下端面中央にスリット14を
備え、このスリット14に基礎コンクリートBc上に定
着した柱受盤1に立設した接続片4を挾装するようにし
て柱受盤1上に載置し(前記土台b,bで構成される間
隔幅と柱受盤1および柱Pの幅は同幅としてある)、前
記透孔9と一致するように予め形成した貫通孔11´の
一端側よりドリフトピン8(ボルトとナットに代えても
良い)を嵌挿して柱Pを基礎コンクリートBc上立設し
て実施例装置としたものである。
The column P is provided with a slit 14 at the center of the lower end face thereof, and a connecting piece 4 erected on the column receiving plate 1 fixed on the foundation concrete Bc is inserted into the slit 14 so as to be inserted therebetween. It is placed on the top (the width of the gap formed by the bases b, b and the width of the column receiving plate 1 and the column P are the same width), and a through hole 11 ′ formed in advance so as to match the through hole 9. A drift pin 8 (which may be replaced with a bolt and a nut) is inserted from one end of the column P, and the column P is erected on the foundation concrete Bc to obtain an embodiment apparatus.

【0014】なお、図5で示すものは、第一実施例のも
のが、柱Pを介在する二方に土台b,bを配するように
したものであるに対し、四方に土台b,b,b,bを配
するようにした第二実施例の固定金具を示し、残余の点
は第一実施例と同様に理解して良いので説明を省略す
る。
FIG. 5 shows the first embodiment in which the bases b, b are arranged on two sides with the pillar P interposed therebetween, whereas the bases b, b are arranged on all sides. , B, and b are shown, and the remaining parts can be understood in the same manner as in the first embodiment, and therefore the description is omitted.

【0015】また、実施例の接続片4(柱Pと同幅)は
柱受盤1の中央に立設してあるが、例えば、柱受盤1の
相対する両端に設けて該両端に設けた接続片間に柱Pを
介在させるようにしても良い。
The connecting piece 4 (having the same width as the column P) in the embodiment is provided upright at the center of the column receiving plate 1. For example, it is provided at opposite ends of the column receiving plate 1 and provided at both ends. The column P may be interposed between the connecting pieces.

【0016】[0016]

【発明の効果】本発明は前記の通りの構成であるから、
従来のほぞ接合と較べ柱を強固に固定することができ、
しかも、対土台だけではなく基礎コンクリートに固定し
た構成を採るから立設状態を確実に保持し、斬新な構造
の柱固定装置を提供できる。
The present invention has the configuration described above,
Compared with conventional tenon joints, the pillars can be firmly fixed,
In addition, since it adopts a configuration in which it is fixed not only to the base but also to the foundation concrete, the standing state can be reliably maintained, and a column fixing device having a novel structure can be provided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】一部欠裁正面図である。FIG. 1 is a partially cutaway front view.

【図2】図1のX−X線断面図である。FIG. 2 is a sectional view taken along line XX of FIG.

【図3】図1のY−Y線断面図である。FIG. 3 is a sectional view taken along line YY of FIG. 1;

【図4】金具の斜視図である。FIG. 4 is a perspective view of a fitting.

【図5】金具の他実施形の斜視図である。FIG. 5 is a perspective view of another embodiment of the metal fitting.

【符号の説明】[Explanation of symbols]

1 柱受盤 2 受杆 4 接続 5 押え片 10 第一締付けナット 12 第二締付けナット a アンカーボルト Bc 基礎コンクリート b 土台 P 柱 DESCRIPTION OF SYMBOLS 1 Column receiving board 2 Receiving rod 4 Connection 5 Pressing piece 10 First tightening nut 12 Second tightening nut a Anchor bolt Bc Foundation concrete b Base P Column

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 基礎コンクリート上に載置した柱受盤上
に柱を立設し、該柱と前記柱受盤に立設した接続片を横
方向に重合させて固定杆で互いに止着し、前記柱受盤の
両側に突設した一対の受杆の適所に、押え片の両端を載
置し、前記基礎コンクリートに立設して前記押え片を貫
通させたアンカーボルトに第一締付けナットを螺合して
前記押え片を前記基礎コンクリートに締付けると共に、
このアンカーボルトを、前記基礎コンクリート上に前記
受杆乃至前記押え片を介して載置した土台に貫通させ、
土台より突出するボルト先端に第二締付けナットを螺合
した、木造建物の柱固定装置。
1. A column is erected on a column receiving plate placed on a foundation concrete, and the column and a connecting piece erected on the column receiving plate are overlapped in a lateral direction and fixed to each other with a fixed rod. A first tightening nut is mounted on an anchor bolt having both ends of a holding piece placed on appropriate positions of a pair of receiving rods protruding on both sides of the column receiving board, standing on the foundation concrete, and penetrating the holding piece. And screwing the presser piece to the foundation concrete,
This anchor bolt is passed through the base placed on the foundation concrete via the receiving rod or the pressing piece,
A pillar fixing device for wooden buildings, in which a second tightening nut is screwed onto the tip of a bolt protruding from the base.
【請求項2】 接続片を柱に設けたスリットに挾挿し
た、請求項1記載の木造建物の柱固定装置。
2. The pillar fixing device for a wooden building according to claim 1, wherein the connecting piece is inserted into a slit provided in the pillar.
【請求項3】 押え片を受杆と別体にし、該押え片に基
礎コンクリートの幅員方向に長い、アンカーボルト貫通
用の長孔を設けた、請求項1又は2記載の木造建物の柱
固定装置。
3. The pillar fixing of a wooden building according to claim 1, wherein the holding piece is formed separately from the receiving rod, and the holding piece has a long hole extending in the width direction of the foundation concrete and through which an anchor bolt passes. apparatus.
JP4569598A 1998-02-26 1998-02-26 Pillar fixing device for wooden buildings Expired - Fee Related JP2875246B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4569598A JP2875246B1 (en) 1998-02-26 1998-02-26 Pillar fixing device for wooden buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4569598A JP2875246B1 (en) 1998-02-26 1998-02-26 Pillar fixing device for wooden buildings

Publications (2)

Publication Number Publication Date
JP2875246B1 true JP2875246B1 (en) 1999-03-31
JPH11247296A JPH11247296A (en) 1999-09-14

Family

ID=12726530

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4569598A Expired - Fee Related JP2875246B1 (en) 1998-02-26 1998-02-26 Pillar fixing device for wooden buildings

Country Status (1)

Country Link
JP (1) JP2875246B1 (en)

Also Published As

Publication number Publication date
JPH11247296A (en) 1999-09-14

Similar Documents

Publication Publication Date Title
JPH0754405Y2 (en) Fasteners for wooden building materials and fastening structures for wooden buildings
JPH10152894A (en) Framework device for wooden building
JP3488870B2 (en) Pillar bracket
JP3714902B2 (en) Column and cross member joining device
JP2875246B1 (en) Pillar fixing device for wooden buildings
JP2902633B1 (en) Pillar fixing device for wooden buildings
JP3583389B2 (en) Column and base fastening device
JP4050687B2 (en) Pillar fixing device in wooden buildings
JP2891415B1 (en) Equipment for joining horizontal members in wooden buildings
JP2570543Y2 (en) Pillar establishment fixed structure in wooden building
JPH08312044A (en) Panel attachment and attachment structure therefor
JP3051878B2 (en) Equipment for joining columns and beams to horizontal members
JP2003096922A (en) Column base fixture
JPH0528247Y2 (en)
JP2570544Y2 (en) Pillar establishment fixed structure in wooden building
KR100296353B1 (en) Formwork for concrete beams
JP2931290B1 (en) Pillar hardware
JPH069121Y2 (en) Veranda sleeve wall mounting structure
JPH06123139A (en) Metal fitting for joining timber
JP2884401B2 (en) Brace connection structure and its combination with bolts and bolt row plate
JPH08311993A (en) Connection structure and connection metal member of column base in wooden framework
JPH061921Y2 (en) Reinforcing metal fittings for frame structures of wooden buildings
KR200148349Y1 (en) Indoor partition for the building
JP2959757B2 (en) Attracting hardware of wooden building
JP3668693B2 (en) Pillar fixing device