JP2831603B2 - Panel mounting method - Google Patents

Panel mounting method

Info

Publication number
JP2831603B2
JP2831603B2 JP7279043A JP27904395A JP2831603B2 JP 2831603 B2 JP2831603 B2 JP 2831603B2 JP 7279043 A JP7279043 A JP 7279043A JP 27904395 A JP27904395 A JP 27904395A JP 2831603 B2 JP2831603 B2 JP 2831603B2
Authority
JP
Japan
Prior art keywords
panel
mounting
head
mounting screw
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP7279043A
Other languages
Japanese (ja)
Other versions
JPH09119179A (en
Inventor
皎 尾崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BISAN SHOJI KK
Original Assignee
BISAN SHOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BISAN SHOJI KK filed Critical BISAN SHOJI KK
Priority to JP7279043A priority Critical patent/JP2831603B2/en
Publication of JPH09119179A publication Critical patent/JPH09119179A/en
Application granted granted Critical
Publication of JP2831603B2 publication Critical patent/JP2831603B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Panels For Use In Building Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建築物の屋根や壁
に使用されるパネルの取り付け方法、特にパネル間に隙
間が発生しないように取り付ける方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for mounting a panel used on a roof or a wall of a building, and more particularly to a method for mounting a panel so that no gap is generated between panels.

【0002】[0002]

【従来の技術】図6〜図8において、1は建築物の基礎
に固定され、建築物の骨格となるH型鋼であり、このH
型鋼1に壁面となすパネル2を取り付けるに際し、従来
は以下に示す順序で行っていた。
2. Description of the Related Art In FIGS. 6 to 8, reference numeral 1 denotes an H-shaped steel fixed to a foundation of a building and serving as a framework of the building.
Conventionally, when the panel 2 serving as the wall surface is attached to the mold steel 1, the following sequence is performed.

【0003】すなわち、パネル2の前記H型鋼1への取
り付け面の所定位置、例えば図6に示す例では、両側に
おける高さ方向に所定の間隔を存した2か所に、ナット
3が埋設されており、このナット3に螺合するボルト4
で、パネル2にアングル材5を取り付ける。なお、この
アングル材5は、H型鋼1に対するパネル2の取り付け
を容易に行うために、遊びをつくるために採用されるも
のである。
That is, nuts 3 are buried at predetermined positions of a mounting surface of the panel 2 on the H-section steel 1, for example, in the example shown in FIG. Bolt 4 that is screwed into this nut 3
Then, the angle member 5 is attached to the panel 2. The angle member 5 is used to create play in order to easily attach the panel 2 to the H-section steel 1.

【0004】次に、アングル材5を取り付けたパネル2
を、例えばクレーンを用いて吊り下げ、前記アングル材
5の他方垂直面と、H型鋼1のパネル2の取り付け面側
に固着したフラットバー6を相対させ、これらフラット
バー6とアングル材5をボルト7とナット8で取り付け
るものである。なお、2aはパネル2の上端面に開設し
たクレーンの吊り穴である。
Next, a panel 2 to which an angle member 5 is attached
Is suspended using a crane, for example, so that the other vertical surface of the angle member 5 and the flat bar 6 fixed to the mounting surface side of the panel 2 of the H-section steel 1 are opposed to each other, and these flat bar 6 and the angle member 5 are bolted. 7 and nut 8. Reference numeral 2a denotes a hanging hole of the crane formed on the upper end surface of the panel 2.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記し
たような従来の取り付け方法では、パネル2を取り付
けるに際し、ボルト4,7の数が多いことから、取り付
けに多くの時間がかかる。また、フラットバー6に穿
孔されたボルト7の挿入孔は、一定のピッチであり、ま
た、パネル2の高さ方向の製作誤差は0mmから−2mmの
間であることから、パネル2を取り付けた際に、図8に
示すように、最大4mmの隙間が発生する。さらに、パ
ネル2に予め埋設されたナット3には、錆が発生してい
る場合があり、この場合には、ボルト4が螺入できな
い。というような問題があった。
However, in the conventional mounting method as described above, it takes much time to mount the panel 2 because the number of bolts 4 and 7 is large. The insertion holes of the bolts 7 drilled in the flat bar 6 have a constant pitch, and the manufacturing error in the height direction of the panel 2 is between 0 mm and -2 mm. At this time, as shown in FIG. 8, a gap of a maximum of 4 mm occurs. Further, the nut 3 previously embedded in the panel 2 may be rusted, and in this case, the bolt 4 cannot be screwed. There was such a problem.

【0006】本発明は、上記した従来の問題点に鑑みて
なされたものであり、パネルを取り付けるに際し、取り
付けねじの数を可及的に減少させて、取り付けに要する
時間の短縮を図るとともに、取り付けたパネル間の隙間
をなくすることができ、かつ、従来方法によるナットの
錆発生に起因する現地手直しや、メーカー手直しを無く
することができるパネルの取り付け方法を提供すること
を目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned conventional problems. In mounting a panel, the number of mounting screws is reduced as much as possible to shorten the time required for mounting. It is an object of the present invention to provide a panel mounting method capable of eliminating a gap between the mounted panels and eliminating local repairs and maker repairs due to the generation of rust on nuts by a conventional method.

【0007】[0007]

【課題を解決するための手段】上記した目的を達成する
ために、本発明のパネルの取り付け方法は、取り付け面
所定位置に、取り付けねじの頭部を収納できる大きさを
有する嵌入穴を、高さ方向に所要の長さだけ設けるとと
もに、その取り付け面側は、挿入部を取り付けねじの頭
部より大きくなし、またこの挿入部に続く上方又は下方
は、取り付けねじの頭部より小さく、その軸部より大径
の案内長孔からなる前記頭部の嵌入部を設けたパネル
を、建築物の骨格となる柱や梁等のパネル取り付け部に
位置せしめた後、柱や梁等の前記パネル取り付け部所定
位置に、直接又は治具を介して、仮止めした取り付けね
じの頭部を、パネルにおける前記挿入部より嵌入穴に挿
入し、その後、嵌入穴が取り付けねじの頭部に案内され
ることでパネルを下方に移動し、その下方に取り付けた
パネルに当接させ、最後に取り付けねじを螺締めするの
である。
In order to achieve the above-mentioned object, according to the panel mounting method of the present invention, a fitting hole having a size large enough to accommodate a head of a mounting screw is provided at a predetermined position on a mounting surface. The mounting surface side of the mounting screw is not larger than the head of the mounting screw, and the upper or lower portion following the insertion portion is smaller than the mounting screw head. After the panel provided with the fitting portion of the head composed of the guide elongated hole having a diameter larger than that of the part is positioned at the panel mounting part such as a pillar or a beam which becomes a skeleton of a building, the panel mounting such as a pillar or a beam is performed. The head of the temporarily screwed mounting screw is inserted into the fitting hole from the insertion portion of the panel, directly or via a jig, at a predetermined position, and then the fitting hole is guided by the head of the mounting screw. Down the panel with Go to, brought into contact with the panel attached to its lower, it is to screw and tighten the screw end mounting.

【0008】[0008]

【発明の実施の形態】本発明のパネルの取り付け方法
は、先ず、取り付け面所定位置に、取り付けねじの頭部
を収納できる大きさを有する嵌入穴を、高さ方向に所要
の長さだけ設けるとともに、その取り付け面側は、挿入
部を取り付けねじの頭部より大きくなし、またこの挿入
部に続く上方又は下方は、取り付けねじの頭部より小さ
く、その軸部より大径の案内長孔からなる前記頭部の嵌
入部を設けたパネルを用意する。また、建築物の骨格と
なる柱や梁等のパネル取り付け部所定位置には、直接又
は治具を介して、取り付け面側に取り付けねじの頭部が
突出するように、取り付けねじを仮止めする。
DESCRIPTION OF THE PREFERRED EMBODIMENTS According to the panel mounting method of the present invention, first, at a predetermined position on a mounting surface, a fitting hole having a size capable of accommodating a head of a mounting screw is provided in a height direction by a required length. At the same time, on the mounting surface side, the insertion part is not larger than the head of the mounting screw, and the upper or lower part following this insertion part is smaller than the head of the mounting screw, and from the guide slot with a larger diameter than the shaft part. A panel provided with a fitting portion for the head is prepared. In addition, at a predetermined position of the panel mounting portion such as a pillar or a beam that serves as a skeleton of the building, the mounting screw is temporarily fixed directly or through a jig such that the head of the mounting screw protrudes to the mounting surface side. .

【0009】このように準備した後、前記パネルを柱や
梁等のパネル取り付け部に位置せしめ、柱や梁等の前記
パネル取り付け部に仮止めした取り付けねじの頭部を、
パネルにおける前記挿入部より嵌入穴に挿入する。そし
て、その後、その下方に取り付けたパネルに当接するま
で、パネルを下方に移動する。このパネルの移動は、嵌
入穴が取り付けねじの頭部に案内されることで円滑に行
われる。最後に取り付けねじを螺締めし、パネルを建築
物の骨格となる柱や梁等に、直接又は治具を介して固定
する。
After the above preparation, the panel is positioned on a panel mounting portion such as a pillar or a beam, and the head of a mounting screw temporarily fixed to the panel mounting portion such as a column or a beam is attached.
The panel is inserted into the fitting hole from the insertion section. Thereafter, the panel is moved downward until it comes into contact with the panel attached below. The movement of the panel is smoothly performed by guiding the fitting hole to the head of the mounting screw. Finally, the mounting screws are tightened, and the panel is fixed directly or via a jig to columns, beams, or the like serving as the skeleton of the building.

【0010】[0010]

【実施例】以下、本発明のパネルの取り付け方法を図1
〜図5に示す一実施例に基づいて説明する。図1(a)
は本発明のパネルの取り付け方法に使用するパネルの斜
視図、(b)は同じくパネルの嵌入部の拡大図、(c)
は(b)のA−A断面図、図2は図1のパネルを建築物
の骨格となる柱に直接取り付けた状態を平面方向から見
た説明図、図3は図1のパネルを建築物の骨格となる柱
に取り付けた状態を側面方向から見た説明図、図4は取
り付けねじの他の例として、通常の六角ボルトの頭部に
取り付ける金物を一例を示す斜視図、図5(a)は図1
のパネルを建築物の骨格となる柱に、治具を介して取り
付けた状態を正面方向から見た説明図、(b)は(a)
の拡大説明図である。なお、図1〜図5において、図6
〜図8と同一番号は同一部品あるいは相当部品を示し、
詳細な説明を省略する。
FIG. 1 shows a method for mounting a panel according to the present invention.
A description will be given based on one embodiment shown in FIGS. FIG. 1 (a)
Is a perspective view of a panel used in the panel mounting method of the present invention, (b) is an enlarged view of a fitting portion of the panel, and (c).
Fig. 2 is an AA cross-sectional view of Fig. 2 (b), Fig. 2 is an explanatory view of a state in which the panel of Fig. 1 is directly attached to a pillar serving as a skeleton of a building, viewed from a plane direction, and Fig. FIG. 4 is an explanatory view of a state of being attached to a pillar serving as a skeleton viewed from the side. FIG. 4 is a perspective view showing another example of a mounting screw, which is a metal fitting to a head of a normal hexagonal bolt, and FIG. Figure 1)
(B) is an explanatory view of a state in which the panel is attached to a pillar serving as a skeleton of a building via a jig as viewed from the front, and FIG.
FIG. In addition, in FIGS.
8 indicate the same parts or equivalent parts,
Detailed description is omitted.

【0011】図1〜図5において、11は本発明の取り
付け方法に使用するパネルであり、建築物の例えば柱と
なるH型鋼1への取り付け面の所定位置、例えば図1
(a)に示す例では、両側における高さ方向に所定の間
隔を存したそれぞれ2か所に、後述する取り付けねじ1
2の頭部12aの嵌入部11aを設けるとともに、上端
面にはクレーンの吊り穴11bを、例えば片側に2個ず
つで合計4個設けている。
In FIGS. 1 to 5, reference numeral 11 denotes a panel used in the mounting method of the present invention.
In the example shown in (a), mounting screws 1 (described later) are provided at two locations at predetermined intervals in the height direction on both sides.
In addition to providing the fitting portion 11a of the second head 12a, the upper end surface is provided with four hanging holes 11b of the crane, for example, two on each side.

【0012】そして、この嵌入部11aは、例えば図1
(b)(c)に示すように、取り付けねじ12の頭部1
2aの短辺側長さより若干大径で所定深さを有する嵌入
穴11aaをパネル11の高さ方向に所要長さ、すなわ
ち、パネル11の製作誤差をカバーできる長さだけ設
け、パネル11の下方向への移動を円滑に行うようにす
るとともに、パネル11の取り付け面側は、挿入部11
abを取り付けねじ12の頭部12aより大きくして、
取り付けねじ12の頭部12aが嵌入穴11aaに挿入
できるようにし、また、この挿入部11abに続く上方
は、取り付けねじ12の頭部12aの短辺側長さより小
径で、取り付けねじ12の軸部12bより大径の案内長
孔11acとなし、この嵌入穴11aaと案内長穴11
acの作用によって、取り付けねじ12の締め付け時、
取り付けねじ12の頭部12aが嵌入穴11aaから出
ず、パネル11を直接H型鋼1に取り付けられるような
っている。
The fitting portion 11a is provided, for example, in FIG.
(B) As shown in (c), the head 1 of the mounting screw 12
An insertion hole 11aa having a diameter slightly larger than the short side of 2a and having a predetermined depth is provided in the height direction of the panel 11 by a required length, that is, a length that can cover a manufacturing error of the panel 11, and is provided under the panel 11. The panel 11 is smoothly moved in the direction shown in FIG.
ab is larger than the head 12a of the mounting screw 12,
The head 12a of the mounting screw 12 can be inserted into the fitting hole 11aa. The upper part following the insertion portion 11ab has a diameter smaller than the length of the short side of the head 12a of the mounting screw 12, and the shaft of the mounting screw 12 A guide slot 11ac having a diameter larger than that of the guide slot 12b is formed.
When the mounting screw 12 is tightened by the action of ac,
The panel 11 can be directly attached to the H-shaped steel 1 without the head 12a of the attachment screw 12 coming out of the fitting hole 11aa.

【0013】なお、本実施例では、取り付けねじ12の
締め付けを容易かつ簡単確実に行えるようにするため、
取り付けねじ12として、通常の六角ボルトより頭部の
大きな、すなわち、頭部の短辺側の一方端面と軸部の外
周との間隔がより大きなねじを使用するとともに、嵌入
穴11aaの幅を、この取り付けねじ12の頭部12a
の短辺側長さより若干大径にし、仮に取り付けねじ12
の締め付け時に取り付けねじ12が回っても、取り付け
ねじ12の頭部12aの長辺側が嵌入穴11aaに当た
り、それ以上取り付けねじ12が回動しないものを開示
したが、取り付けねじ12の締め付け時、他の手段、例
えば通常の6角ボルトの頭部に、図4に示すような金物
15を取り付けることによって、取り付けねじ12の締
め付け時における回動を阻止するものであっても良い。
In this embodiment, in order to easily and securely tighten the mounting screw 12,
As the mounting screw 12, a screw having a larger head than a normal hexagon bolt, that is, a screw having a larger interval between one end face on the short side of the head and the outer periphery of the shaft portion is used, and the width of the fitting hole 11aa is reduced. The head 12a of the mounting screw 12
The diameter is slightly larger than the short side length of
Although the long side of the head 12a of the mounting screw 12 hits the fitting hole 11aa even if the mounting screw 12 is turned at the time of tightening, the mounting screw 12 is not further rotated. For example, by attaching a hardware 15 as shown in FIG. 4 to the head of a normal hexagonal bolt, rotation of the mounting screw 12 at the time of tightening may be prevented.

【0014】12は前記H型鋼1のパネル取り付け部所
定位置に仮止めした取り付けねじであり、パネル11の
取り付け面側に頭部12aが突出するように、ナット1
3を用いて仮止めされている。このように取り付けねじ
12を仮止めしたH型鋼1のパネル取り付け部に、前記
した構成のパネル11を、例えばクレーンを用いて吊り
下げ状に配置せしめ、パネル11における挿入部11a
bから嵌入穴11aaに、前記取り付けねじ12の頭部
12aを挿入する。
Reference numeral 12 denotes a mounting screw temporarily fixed to a predetermined position of the panel mounting portion of the H-shaped steel 1. The nut 1 is mounted so that the head 12a protrudes from the mounting surface side of the panel 11.
3 is temporarily fixed. The panel 11 having the above-described configuration is disposed in a suspended manner using, for example, a crane on the panel mounting portion of the H-shaped steel 1 to which the mounting screw 12 is temporarily fixed, and the insertion portion 11a in the panel 11 is provided.
b, the head 12a of the mounting screw 12 is inserted into the fitting hole 11aa.

【0015】そして、その後、図3に示すように、その
下方に取り付けたパネル11の上端に、次のパネル11
の下端が当接するまで、パネル11を下方に移動する。
このパネル11の移動は、嵌入穴11aaが取り付けね
じ12の頭部12aに案内されることで円滑に行われ
る。最後に取り付けねじ12をナット13で螺締めし、
パネル11をH型鋼1に固定する。
Then, as shown in FIG. 3, the next panel 11 is attached to the upper end of the panel 11 attached below.
The panel 11 is moved downward until the lower end of the panel 11 abuts.
The movement of the panel 11 is smoothly performed by guiding the fitting hole 11aa to the head 12a of the mounting screw 12. Finally, screw the mounting screw 12 with the nut 13,
The panel 11 is fixed to the H-shaped steel 1.

【0016】図2に示す実施例では、H型鋼1に直接パ
ネル11を取り付けるものを示したが、図5に示すよう
な治具14を介してパネル11をH型鋼1に取り付ける
ものでも良い。また、この図5に示す実施例では、案内
長孔11acの上側に挿入部11abを配置したものを
示しているが、このようにしたものでも、取り付けねじ
12の仮止め時の遊び等により、同様にパネル11を取
り付けることができる。また、本実施例では挿入部11
abの形状として円形状のものを開示しているが、図4
に示すような金物15を取り付ける場合には、挿入部1
1abは矩形状となすことは言うまでもない。なお、こ
の挿入部11abの形状は、取り付けねじ12の頭部1
2aが入るものであれば、他の多角形でもよい。
In the embodiment shown in FIG. 2, the panel 11 is directly attached to the H-shaped steel 1, but the panel 11 may be attached to the H-shaped steel 1 via a jig 14 as shown in FIG. In the embodiment shown in FIG. 5, the insertion portion 11ab is disposed above the guide slot 11ac. However, even with such a configuration, the play of the mounting screw 12 at the time of temporary fixing may be caused. Similarly, the panel 11 can be attached. In this embodiment, the insertion unit 11
Although a circular shape is disclosed as the shape of ab, FIG.
When mounting the hardware 15 as shown in FIG.
It goes without saying that 1ab is rectangular. The shape of the insertion portion 11ab is the same as that of the head 1 of the mounting screw 12.
Other polygons may be used as long as 2a is included.

【0017】[0017]

【発明の効果】以上説明したように、本発明のパネルの
取り付け方法によれば、パネルを取り付けるのに必要な
取り付けねじの数が、従来方法の半分に減少するので、
取り付けに要する時間が半減するとともに、パネルの製
作誤差に関係なく、取り付けたパネル間の隙間を零にす
ることができる。加えて、従来方法によるナットの錆発
生に起因する現地手直しや、メーカー手直しも無くする
ことができる。
As described above, according to the panel mounting method of the present invention, the number of mounting screws required for mounting the panel is reduced to half that of the conventional method.
The time required for mounting can be reduced by half, and the gap between the mounted panels can be reduced to zero regardless of the manufacturing error of the panels. In addition, it is possible to eliminate the need for on-site rework and manufacturer rework due to the generation of rust on the nut by the conventional method.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)は本発明のパネルの取り付け方法に使用
するパネルの斜視図、(b)は同じくパネルの嵌入部の
拡大図、(c)は(b)のA−A断面図である。
FIG. 1A is a perspective view of a panel used in the panel mounting method of the present invention, FIG. 1B is an enlarged view of a fitting portion of the panel, and FIG. 1C is a cross-sectional view taken along line AA of FIG. is there.

【図2】図1のパネルを建築物の骨格となる柱に取り付
けた状態を平面方向から見た説明図である。
FIG. 2 is an explanatory diagram showing a state in which the panel of FIG. 1 is attached to a pillar serving as a skeleton of a building, viewed from a plane direction.

【図3】図1のパネルを建築物の骨格となる柱に取り付
けた状態を側面方向から見た説明図である。
FIG. 3 is an explanatory diagram showing a state in which the panel of FIG. 1 is attached to a pillar serving as a skeleton of a building, as viewed from a side.

【図4】取り付けねじの他の例として、通常の六角ボル
トの頭部に取り付ける金物を一例を示す斜視図である。
FIG. 4 is a perspective view showing another example of a mounting screw, which is a metal fitting to be attached to the head of a normal hexagon bolt.

【図5】(a)は図1のパネルを建築物の骨格となる柱
に、治具を介して取り付けた状態を正面方向から見た説
明図、(b)は(a)の拡大説明図である。
FIG. 5A is an explanatory view of a state in which the panel of FIG. 1 is attached to a pillar serving as a skeleton of a building via a jig as viewed from the front, and FIG. 5B is an enlarged explanatory view of FIG. It is.

【図6】従来のパネルの取り付け方法に使用するパネル
の斜視図である。
FIG. 6 is a perspective view of a panel used for a conventional panel mounting method.

【図7】図6のパネルを建築物の骨格となる柱に取り付
けた状態を平面方向から見た説明図である。
FIG. 7 is an explanatory diagram showing a state in which the panel of FIG. 6 is attached to a pillar serving as a skeleton of a building, as viewed from a plane direction.

【図8】図6のパネルを建築物の骨格となる柱に取り付
けた状態を側面方向から見た説明図である。
FIG. 8 is an explanatory view showing a state in which the panel of FIG. 6 is attached to a pillar serving as a skeleton of a building, as viewed from a side.

【符号の説明】[Explanation of symbols]

1 H型鋼 11 パネル 11a 嵌入部 11aa 嵌入穴 11ab 挿入部 11ac 案内長孔 12 取り付けねじ 12a 頭部 12b 軸部 13 ナット DESCRIPTION OF SYMBOLS 1 H-shaped steel 11 Panel 11a Insertion part 11aa Insertion hole 11ab Insertion part 11ac Guide long hole 12 Mounting screw 12a Head 12b Shaft part 13 Nut

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E04B 2/56 E04B 7/02 511 E04C 2/30 E04B 2/90 E04F 13/08 101 E04B 1/60──────────────────────────────────────────────────続 き Continued on the front page (58) Fields surveyed (Int.Cl. 6 , DB name) E04B 2/56 E04B 7/02 511 E04C 2/30 E04B 2/90 E04F 13/08 101 E04B 1/60

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 取り付け面所定位置に、取り付けねじの
頭部を収納できる大きさを有する嵌入穴を、高さ方向に
所要の長さだけ設けるとともに、その取り付け面側は、
挿入部を取り付けねじの頭部より大きくなし、またこの
挿入部に続く上方又は下方は、取り付けねじの頭部より
小さく、その軸部より大径の案内長孔からなる前記頭部
の嵌入部を設けたパネルを、建築物の骨格となる柱や梁
等のパネル取り付け部に位置せしめた後、柱や梁等の前
記パネル取り付け部所定位置に、直接又は治具を介し
て、仮止めした取り付けねじの頭部を、パネルにおける
前記挿入部より嵌入穴に挿入し、その後、嵌入穴が取り
付けねじの頭部に案内されることでパネルを下方に移動
し、その下方に取り付けたパネルに当接させ、最後に取
り付けねじを螺締めすることを特徴とするパネルの取り
付け方法。
1. A mounting hole having a size capable of accommodating a head of a mounting screw is provided at a predetermined position on a mounting surface by a required length in a height direction.
The insertion part is not larger than the head of the mounting screw, and the upper or lower part following the insertion part is smaller than the head of the mounting screw, and the fitting part of the head consisting of a guide slot having a larger diameter than the shaft part is formed. After the provided panel is positioned at a panel mounting portion such as a pillar or a beam which serves as a skeleton of a building, the panel is temporarily fixed to a predetermined position of the panel mounting portion such as a column or a beam directly or through a jig. The head of the screw is inserted into the insertion hole from the insertion portion of the panel, and then the insertion hole is guided by the head of the mounting screw to move the panel downward and abut the panel attached below. And finally tightening the mounting screws.
JP7279043A 1995-10-26 1995-10-26 Panel mounting method Expired - Fee Related JP2831603B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7279043A JP2831603B2 (en) 1995-10-26 1995-10-26 Panel mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7279043A JP2831603B2 (en) 1995-10-26 1995-10-26 Panel mounting method

Publications (2)

Publication Number Publication Date
JPH09119179A JPH09119179A (en) 1997-05-06
JP2831603B2 true JP2831603B2 (en) 1998-12-02

Family

ID=17605610

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7279043A Expired - Fee Related JP2831603B2 (en) 1995-10-26 1995-10-26 Panel mounting method

Country Status (1)

Country Link
JP (1) JP2831603B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0726689A (en) * 1993-07-12 1995-01-27 Nippon Electric Glass Co Ltd Mounting structure of wall board

Also Published As

Publication number Publication date
JPH09119179A (en) 1997-05-06

Similar Documents

Publication Publication Date Title
JP2831603B2 (en) Panel mounting method
JP2714804B2 (en) Floor panel fixing device
JPH0768735B2 (en) Lightweight cellular concrete panel
JP3146290B2 (en) Exterior wall corner support device
JP3532369B2 (en) Fasteners for exterior wall panels
JPH0334972Y2 (en)
JP3483094B2 (en) Outer wall panel mounting structure on window
JPS6135606Y2 (en)
JP2504388Y2 (en) Wall scaffold wall mounting hardware and mounting structure
JPH0528243Y2 (en)
JP2813367B2 (en) Mounting hardware and precast concrete panels
JP2574827Y2 (en) Panel hanging beam structure
JPS6340579Y2 (en)
JPS5821844Y2 (en) Structure of panel wall mounting part
JPH019859Y2 (en)
JPH0220778B2 (en)
JPH031529Y2 (en)
JPH0334977Y2 (en)
JPH0213639Y2 (en)
JP3199658B2 (en) Floor panel mounting structure
JPS6397743A (en) Apparatus for mounting exterior material for building
JPH011846A (en) Load-bearing wall mounting structure
JPH06316982A (en) Metal fixture of pc curtan wall
JP2003120129A (en) Sash fitting method
JP4502542B2 (en) Corner panel mounting structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070925

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080925

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090925

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees