JP2789455B2 - A method of arranging long pipes in trenches with earth retaining equipment - Google Patents

A method of arranging long pipes in trenches with earth retaining equipment

Info

Publication number
JP2789455B2
JP2789455B2 JP8236641A JP23664196A JP2789455B2 JP 2789455 B2 JP2789455 B2 JP 2789455B2 JP 8236641 A JP8236641 A JP 8236641A JP 23664196 A JP23664196 A JP 23664196A JP 2789455 B2 JP2789455 B2 JP 2789455B2
Authority
JP
Japan
Prior art keywords
long
sheeting
retaining device
plate
long pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP8236641A
Other languages
Japanese (ja)
Other versions
JPH09105126A (en
Inventor
一哉 古賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NITSUTO TETSUKO KK
Original Assignee
NITSUTO TETSUKO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NITSUTO TETSUKO KK filed Critical NITSUTO TETSUKO KK
Priority to JP8236641A priority Critical patent/JP2789455B2/en
Publication of JPH09105126A publication Critical patent/JPH09105126A/en
Application granted granted Critical
Publication of JP2789455B2 publication Critical patent/JP2789455B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土留装置を設置し
た溝内への長尺管配設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for arranging a long pipe in a groove provided with a retaining device.

【0002】[0002]

【従来の技術】従来、上下水道管或いはガス管等の埋設
工事においては、図7に示す土留装置が使用されてい
た。この土留装置は、所定区間(通常30m程度)にわ
たって掘削した土壁部分の土留用に使用されるもので、
主にシーティングプレート2と伸縮自在の切梁4とから
構成されている。
2. Description of the Related Art Conventionally, in burying water and sewage pipes or gas pipes, a retaining device shown in FIG. 7 has been used. This soil retaining device is used for retaining a soil wall portion excavated over a predetermined section (usually about 30 m).
It is mainly composed of a seating plate 2 and an extensible cutting beam 4.

【0003】このシーティングプレート2は通常2〜3
m程度の水平方向の長さを有し、プレート2aとこのプ
レート2aの左右両端部に設けられた縦梁1とからな
り、この縦梁1には数カ所上記切梁4を装着するための
装着口7が設けられている。また前記縦梁1の上部には
シーティングプレート2を上方向に重ねるための接続金
具3が取付けられており、溝底部に着地する縦梁1の下
端にはカッティングシュー6が取付けられる。
[0003] This sheeting plate 2 is usually 2-3.
m, having a horizontal length of about m, comprising a plate 2a and vertical beams 1 provided at both left and right ends of the plate 2a. A mouth 7 is provided. A connection fitting 3 for mounting the seating plate 2 on the vertical beam 1 is mounted on an upper portion of the vertical beam 1, and a cutting shoe 6 is mounted on a lower end of the vertical beam 1 which lands on the groove bottom.

【0004】組立に際しては、必要な間隔をあけて互い
に対向して配置されるシーティングプレート2同士を切
梁4を用いて連結する。またこれらのシーティングプレ
ート2の上辺に他のシーティングプレート2を重ね、こ
れらを接続金具3で接続しウイングボルト8で固定す
る。このようにしてシーティングプレート2を複数段積
み重ねて必要な高さの土留装置を形成する。
At the time of assembling, the sheeting plates 2 which are arranged facing each other at a required interval are connected to each other by using cutting beams 4. Further, another seating plate 2 is superimposed on the upper side of the seating plate 2, these are connected by a connection fitting 3, and fixed by a wing bolt 8. In this way, a plurality of the sheeting plates 2 are stacked to form a retaining device having a required height.

【0005】使用時には、上記組立てられた土留装置を
クレーン等を用いて予め掘削された溝内に搬入し、これ
を所定の位置に設置する。そしてこの土留装置の箱状の
内部を掘削し、接続金具3にプレッシャーフード15を
嵌め込んでこの部位を押圧して土留装置を押し込む。さ
らに溝の深さに応じてシーティングプレート2を積み重
ね、この作業を繰返して所定の深さに土留装置を沈設す
る。同様の作業により、溝内の所定区間にわたって土留
装置を連ねて設置する。このようにして土留装置を配置
して土留めを行った後、この土留装置のシーティングプ
レート2及び両切梁4で形成される開口部を経由させて
管体を溝内へ投入し、所定の埋設作業を行なう。
In use, the assembled earth retaining device is carried into a previously excavated trench using a crane or the like, and is installed at a predetermined position. Then, the box-shaped interior of the earth retaining device is excavated, the pressure hood 15 is fitted into the connection fitting 3, and this portion is pressed to push the earth retaining device. Further, the sheeting plates 2 are stacked according to the depth of the groove, and this operation is repeated to set the earth retaining device to a predetermined depth. By the same operation, the soil retaining device is continuously installed over a predetermined section in the groove. After the soil retaining device is arranged and earth retaining is performed in this way, the pipe body is put into the groove through the opening formed by the sheeting plate 2 and the two cutting beams 4 of the soil retaining device, and is filled in a predetermined manner. Perform burial work.

【0006】[0006]

【発明が解決しようとする課題】さて、上記土留装置に
用いられるシーティングプレート2の長さは通常2〜3
m程度であり、シーティングプレート2の両端部に設け
られる切梁4の間隔も略同程度であるから、この間隔よ
りも長い長尺管10を溝内に投入する際には長尺管10
を水平方向のまま溝内に入れることができない。
The length of the sheeting plate 2 used in the earth retaining device is usually 2-3.
m, and the gap between the cutting beams 4 provided at both ends of the sheeting plate 2 is also substantially the same. Therefore, when a long pipe 10 longer than this gap is inserted into the groove, the long pipe 10
Cannot be inserted into the groove while remaining horizontal.

【0007】このため、一般には図8に示すように長尺
管10を傾けた状態で斜め方向に投入する方法が用いら
れている。この方法では長尺管10が切梁4間より長い
関係上、長尺管10が通過する部位の切梁4を予め何箇
所か外しておかなければならない。また、図9に示すよ
うに比較的大口径の長尺管11を投入する際にも、上記
と同様な方法が用いられるが、この場合には口径の大き
さ分多くの切梁4が長尺管11の投入通路の邪魔にな
り、それだけ多くの切梁4を取外しておく必要がある。
For this reason, a method is generally used in which the long tube 10 is inserted obliquely in an inclined state as shown in FIG. In this method, since the long tube 10 is longer than the space between the cutting beams 4, some of the cutting beams 4 at the site where the long tube 10 passes must be removed in advance. Also, as shown in FIG. 9, the same method as described above is used when a relatively large-diameter long tube 11 is charged. In this case, however, more cutting beams 4 are longer by the size of the diameter. This obstructs the input passage of the shank 11, so that it is necessary to remove as many cutting beams 4 as possible.

【0008】このように、従来、上記長尺管10,11
の投入に際しては、この投入経路の切梁4を取外す手間
を要し、また斜め方向に投入せざるを得ない等で作業が
複雑になるといった問題点があった。
As described above, conventionally, the above-mentioned long tubes 10, 11
In addition, there is a problem in that it takes time to remove the cutting beam 4 in the feeding path, and the work becomes complicated because the feeding must be performed in an oblique direction.

【0009】一方、従来の2倍の長さの開口部を形成す
るために、シーティングプレート2の2倍の長さを有し
隣合う土留装置のシーティングプレート2間にはり渡す
長尺状の梁材(腹起し材)を用い、これを対向するそれ
ぞれのシーティングプレート2の内側に架け渡して支持
する方法が行われている。この場合、対向して設けられ
る腹起し材の両端部同士を切梁4で連結すれば従来の2
倍の切梁4の間隔が確保されるので、これを開口部とし
て利用すれば長尺管11の投入が容易になる。しかしこ
の構成では、同じ幅の開口部を形成するためには、腹起
し材の厚さを加味した分よけいに溝幅を掘削する必要が
あり、また組立も複雑になること等の問題点がある。
On the other hand, in order to form an opening twice as long as the conventional one, a long beam which is twice as long as the sheeting plate 2 and is passed between the sheeting plates 2 of the adjacent earth retaining device. A method of using a material (belly material) and supporting the material by bridging it inside each of the opposing seating plates 2 is used. In this case, if both ends of the flared material provided opposite to each other are connected to each other by cutting beams 4, the conventional two
Since the interval between the double cut beams 4 is ensured, if this is used as an opening, it becomes easy to insert the long tube 11. However, in this configuration, in order to form an opening having the same width, it is necessary to excavate the groove width in consideration of the thickness of the protruding material, and the assembly becomes complicated. There is.

【0010】本願発明は、上記問題点に鑑みてなされた
ものであり、とくに長尺の管体の溝内への配設作業が容
易に行える土留装置を設置した溝内への長尺管配設方法
を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and in particular, has a long pipe distribution in a groove in which a soil retaining device is installed, in which a long pipe can be easily disposed in the groove. The purpose is to provide an installation method.

【0011】[0011]

【課題を解決するための手段】以上の技術的課題を解決
するため、本発明に係る土留装置を設置した溝内への長
尺管配設方法は、図1に示すように所定区間にわたって
掘削した溝内に、両端部に縦梁1を有するシーティング
プレート2の一対を間隔をおいて対向させこれらを切梁
4で連結した土留装置12と、両端部に縦梁1を有する
長尺シーティングプレート5の一対を間隔をおいて対向
させ、敷設する長尺管9の長さより長い切梁4の間隔を
有して投入口14とした長尺管投入用土留装置13とを
長さ方向に組合わせて並設し、上記投入口14から長尺
管9を溝内に順次降下させて投入した後溝方向に移動さ
せ、上記区間内に長尺管9を配設するようにしたことで
ある。
In order to solve the above technical problems, a method of arranging a long pipe in a trench in which a retaining device according to the present invention is installed is performed by excavating a predetermined section as shown in FIG. An earthing device 12 in which a pair of sheeting plates 2 each having a longitudinal beam 1 at both ends are opposed to each other at intervals and connected by a cutting beam 4, and a long sheeting plate having a longitudinal beam 1 at both ends. 5 are opposed to each other with an interval therebetween, and a long pipe input retaining device 13 having an interval of the cutting beam 4 longer than the length of the long pipe 9 to be laid and serving as an input port 14 is assembled in the length direction. The long pipes 9 are arranged side by side, and the long pipes 9 are sequentially lowered into the grooves from the input ports 14 and are then moved in the groove direction, so that the long pipes 9 are arranged in the sections. .

【0012】また、これに加えて、図2に示すように、
上記シーティングプレート2の略2倍の長さの長尺シー
ティングプレート5を有し、接続金具を用いて、この長
尺シーティングプレート5の上部の両半部分に2枚の上
記シーティングプレート2を重ねて接続する一方、接続
金具を用いて2枚の上記シーティングプレート2の上部
に長尺シーティングプレート5’を重ねて接続して3段
重ねの土留用シーティングプレート組合体を形成し、こ
の3段重ねの土留用シーティングプレート組合体同士を
向かい合わせて設置し、対向する長尺シーティングプレ
ート5,5’の両端部に設けられた縦梁1の間を伸縮自
在の切梁4で連結した土留装置を上記長尺管投入用土留
装置13としたことである。
In addition to this, as shown in FIG.
It has a long sheeting plate 5 approximately twice as long as the above-mentioned sheeting plate 2, and two sheets of the above-mentioned sheeting plate 2 are superimposed on both upper half portions of the long sheeting plate 5 using a connection fitting. On the other hand, the long sheeting plate 5 'is overlapped on the two sheeting plates 2 using a connection fitting to form a three-tiered seating plate assembly, and the three-tiered seating plate assembly is formed. The above-mentioned earthing device is provided by installing the earthing sheeting plate combination bodies facing each other, and connecting between the longitudinal beams 1 provided at both ends of the opposing long sheeting plates 5 and 5 ′ by extendable cutting beams 4. That is, the earth retaining device 13 for feeding a long pipe is used.

【0013】上記長尺管配設方法をもちいて、例えば上
記所定区間にわたって掘削された溝内の中央部に長尺管
投入用土留装置13を配設し、これ以外の個所には土留
装置12を並べて設置し所定区間全体に土留装置を並設
しておく。そして、この長尺管投入用土留装置13を長
尺管9の投入口14として利用し、この投入口14から
長尺管9を水平方向のまま溝内に降下して投入し、ここ
から土留装置12の設置された溝方向の方へ長尺管9を
移動して区間内全体に長尺管9を配設する。
Using the above-described method for disposing a long pipe, for example, a retaining apparatus 13 for introducing a long pipe is disposed at a central portion in a trench excavated over the predetermined section, and a retaining apparatus 12 is disposed at other locations. Are installed side by side, and retaining devices are arranged side by side over the entire predetermined section. The elongate pipe charging device 13 is used as the input port 14 of the elongate pipe 9, and the elongate pipe 9 is dropped into the groove from the input port 14 while keeping the horizontal direction, and the evacuation is performed from here. The long pipe 9 is moved in the direction of the groove where the device 12 is installed, and the long pipe 9 is disposed throughout the section.

【0014】[0014]

【発明の実施の形態】以下本発明の実施の形態に係る土
留装置を設置した溝内への長尺管配設方法を図面に基づ
いて詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method of arranging a long pipe in a groove provided with a retaining device according to an embodiment of the present invention will be described in detail with reference to the drawings.

【0015】図2及び図3は、上記実施の形態に用いら
れる長尺管投入用の土留装置を示したものである。この
土留装置は、上下3段のシーティングプレートで構成さ
れ、その中段には上記従来例で説明したシーティングプ
レート2が配置され、上段及び下段にはこのシーティン
グプレート2の2倍の水平方向長さを有する長尺シーテ
ィングプレート5,5’が配置されている。
FIG. 2 and FIG. 3 show a retaining device for charging a long pipe used in the above embodiment. This earth retaining device is composed of three upper and lower sheeting plates, the middle of which is provided with the seating plate 2 described in the above conventional example, and the upper and lower of which has a horizontal length twice as long as the seating plate 2. The long sheeting plates 5 and 5 ′ are disposed.

【0016】上記シーティングプレート2は通常3m程
度の水平方向長さを有し、外面は鋼材の平板でまた内面
はテーパ状のフレームで形成されたプレート2aと、こ
のプレート2aの左右両端部に設けられる縦梁1とを有
している。この縦梁1にはシーティングプレート同士を
連結する切梁4の装着口7が設けられ、この縦梁1の上
部には他のシーティングプレートを接続するための接続
金具3が取付けられている。また、前記切梁4は伸縮自
在に構成され、シーティングプレート同士の間隔が調整
される。
The sheeting plate 2 has a horizontal length of usually about 3 m. The outer surface is a flat plate made of steel and the inner surface is a plate 2a formed by a tapered frame. And a vertical beam 1. The vertical beam 1 is provided with a mounting opening 7 for a cutting beam 4 for connecting the sheeting plates to each other, and a connection fitting 3 for connecting another sheeting plate is mounted on the upper portion of the vertical beam 1. Further, the cutting beam 4 is configured to be extendable and contractible, and the interval between the sheeting plates is adjusted.

【0017】上記長尺シーティングプレート5,5’
は、図2及び図5に示すように上記シーティングプレー
ト2の2倍の水平方向長さ(シーティングプレート2が
3mの場合長尺シーティングプレート5,5’は6mの
長さになる)を有している。そしてこの長尺シーティン
グプレート5,5’は、前記プレート2aの略2倍の長
さのプレート5aと、このプレート5aの左右両端部に
設けられた縦梁1とを有し、これら縦梁1の上部には上
方に突出して接続金具3が設けられている。また前記縦
梁1には長尺シーティングプレート5,5’同士を連結
する切梁4の装着口7が設けられている。
The above long sheeting plates 5, 5 '
Has a horizontal length twice as long as the above-mentioned sheeting plate 2 as shown in FIGS. 2 and 5 (when the sheeting plate 2 is 3 m, the long sheeting plates 5 and 5 ′ have a length of 6 m). ing. The long sheeting plates 5 and 5 'have a plate 5a approximately twice as long as the plate 2a and vertical beams 1 provided at both left and right ends of the plate 5a. A connection fitting 3 is provided at an upper portion of the connection member 3 so as to protrude upward. The longitudinal beam 1 is provided with a mounting opening 7 for a cutting beam 4 connecting the long sheeting plates 5 and 5 '.

【0018】さらに上記プレート5aの中央部には2本
の中間縦梁1aが並設され、プレート5aの中央部上面
には上方に突出して2つの接続金具3aが設けられてい
る。また溝底部に着地する縦梁1及び中間縦梁1aの下
端にはカッティングシュー6が取付けられる。
Further, two intermediate vertical beams 1a are arranged in parallel at the center of the plate 5a, and two connection fittings 3a are provided on the upper surface of the center of the plate 5a to protrude upward. A cutting shoe 6 is attached to lower ends of the vertical beam 1 and the intermediate vertical beam 1a that land on the groove bottom.

【0019】上記土留装置の組立に際しては、上記長尺
シーティングプレート5の上辺の右半分と左半分のそれ
ぞれの部位に2枚のシーティングプレート2を並設し、
接続金具3,3aにシーティングプレート2の縦梁1の
下部を嵌め込んでこの接続部位をウイングボルト8を用
いて固定し、上下のシーティングプレート同士を接続す
る。
At the time of assembling the earth retaining device, two sheeting plates 2 are arranged side by side on the right half and the left half of the upper side of the long sheeting plate 5,
The lower part of the longitudinal beam 1 of the seating plate 2 is fitted into the connection fittings 3 and 3a, and this connection portion is fixed using wing bolts 8, and the upper and lower seating plates are connected to each other.

【0020】さらに、これら並べて配置された2枚のシ
ーティングプレート2の上に、接続金具3を介して長尺
シーティングプレート5’を接続し、全体として3段に
シーティングプレートを重ねる。そして、この3段シー
ティングプレートと、同様にして形成された他の3段シ
ーティングプレートの両端部の縦梁1同士を切梁4で連
結すれば、図3及び図4に示す3段重ねの長尺管投入用
土留装置13が組立てられる。
Further, a long sheeting plate 5 'is connected to the two seating plates 2 arranged side by side via a connection fitting 3, and the sheeting plates are stacked in three stages as a whole. Then, by connecting the longitudinal beams 1 at both ends of the three-stage seating plate and another three-stage seating plate formed in the same manner with the cutting beams 4, the length of the three-stage stack shown in FIGS. The shank charging device 13 is assembled.

【0021】ここで、上記長尺管投入用土留装置13を
用いて長尺管9を配設する場合の長尺管配設方法につい
て説明する。上記投入される長尺管9の長さは、従来か
ら用いられているシーティングプレート2の水平方向長
さより長く、また上記長尺シーティングプレート5,
5’よりも短いものが対象とされ、このような長尺管9
を埋設する場合にこの長尺管配設方法が適用される。
Here, a method of arranging the long pipes in the case of arranging the long pipes 9 by using the above-described long pipe charging earth retaining device 13 will be described. The length of the long tube 9 to be charged is longer than the horizontal length of the conventionally used sheeting plate 2, and the length of the long sheeting plate 5.
Those shorter than 5 'are targeted, and such long tubes 9
This method of arranging long pipes is applied when burying a long pipe.

【0022】まず、図1に示すように所定区間(通常3
0m程度)にわたって溝を掘削し、この溝内に土留装置
を設置する。この際上記長尺管9を投入する部位には、
上記3段重ねの長尺管投入用土留装置13を配置し、こ
れ以外の区間には従来から用いられているシーティング
プレート2のみからなる土留装置12を配置する。
First, as shown in FIG.
A trench is excavated over about 0 m), and a retaining device is installed in the trench. At this time, at the site where the long tube 9 is to be charged,
The above-described three-tiered long tube charging soil retaining device 13 is arranged, and in other sections, the conventional soil retaining device 12 including only the seating plate 2 is disposed.

【0023】上記配設方法においては、上記所定区間の
略中央部の1箇所に上記3段重ねの長尺管投入用土留装
置13を配置するものとする。そして、この長尺管投入
用土留装置13をクレーンを用いて予め掘削された溝内
に搬入し所定の位置に設置し、この土留装置13の箱状
の内部を掘削してさらに土留装置を押し込む。この土留
装置の押し込みの際には、各縦梁1,1a上部の接続金
具3,3aにプレッシャーフード15を嵌め込んでお
き、例えばバックホーのバケット部を用いて長尺シーテ
ィングプレート5’両端の縦梁1部を交互に押圧し、或
いは中間縦梁1a部を押圧して徐々に土留装置を押し込
んでいく。
In the above-mentioned arrangement method, the three-tiered long pipe charging earth retaining device 13 is arranged at one location substantially at the center of the predetermined section. Then, the long pipe charging soil retaining device 13 is carried into a previously excavated groove by using a crane, and is set in a predetermined position. . When the retaining device is pushed in, the pressure hood 15 is fitted into the connection fittings 3 and 3a on the upper portions of the vertical beams 1 and 1a. The beam 1 is alternately pressed, or the intermediate vertical beam 1a is pressed to gradually push the retaining device.

【0024】さらに溝の深さに応じてこの上部に新しく
3段重ねの土留装置を積み重ね、この作業を繰返して所
定の深さに土留装置を沈設する。この際、必要に応じて
例えば下段に2枚のシーティングプレート2を並設し、
この上段に長尺シーティングプレート5を配置した2段
重ねの長尺管投入用土留装置を積み重ねるようにしても
よい。
Further, a new three-tiered retaining device is stacked on the upper portion according to the depth of the groove, and this operation is repeated to set the retaining device to a predetermined depth. At this time, if necessary, for example, two sheeting plates 2 are juxtaposed at the lower stage,
You may make it pile up the earthing device for long pipe | tube injection | stacking which the long sheeting plate 5 is arrange | positioned at this upper stage in two steps.

【0025】上記長尺管投入用土留装置13を配置した
以外の区間は、シーティングプレート2のみからなる土
留装置12を配置する。そして上記長尺管投入用土留装
置13は、投入する長尺管9の長さより広い切梁4の間
隔を有しているので、ここを長尺管9の投入口14とし
て使用する。
In a section other than the place where the long pipe charging soil retaining device 13 is arranged, the soil retaining device 12 including only the sheeting plate 2 is disposed. Further, since the long pipe input retaining device 13 has an interval between the cutting beams 4 which is wider than the length of the long pipe 9 to be input, this is used as the input port 14 of the long pipe 9.

【0026】所定区間に渡って土留装置を配置した後、
クレーン等を用いて上記投入口14から長尺管9を溝内
に投入する。この際、図6に示すようにこの投入口14
の溝方向の間隔は長尺管9より長いので、長尺管9は水
平方向の状態でそのまま垂直に降下させて溝内に投入す
る。この長尺管9は溝内に投入した後溝方向に移動し、
この後新しく長尺管9を上記投入口14から投入し、こ
の作業を繰り返して長尺管9を上記所定区間に渡って配
設し、所定の埋設工事を行う。
After arranging the retaining device over a predetermined section,
The long pipe 9 is charged into the groove from the charging port 14 using a crane or the like. At this time, as shown in FIG.
Is longer than the long tube 9, so that the long tube 9 is dropped vertically in the horizontal state and is put into the groove. This long tube 9 moves in the groove direction after being put into the groove,
Thereafter, a new long pipe 9 is inserted from the input port 14, and this operation is repeated to dispose the long pipe 9 over the predetermined section to perform predetermined embedding work.

【0027】従って上記長尺管配設方法によれば、長尺
管9を埋設する所定区間のうち、一箇所については長尺
管投入用土留装置13を配置して長尺管9の投入口14
を形成し、それ以外の区間については従来から用いられ
ている土留装置12を配置し、長尺管9の投入に際して
は上記投入口14を利用する方法を採用したから、長尺
管9を水平状態のまま垂直に降下させて投入することが
できるので溝内への長尺管9の配設作業が容易になると
共に、この投入口14以外の区間については従来からの
土留装置12を用いることとしたから、これらの土留装
置12を有効利用でき、また運搬も比較的容易である。
Therefore, according to the above-described method for disposing the long pipe, in one section of the predetermined section in which the long pipe 9 is buried, the retaining device 13 for charging the long pipe is arranged so that the inlet of the long pipe 9 is provided. 14
In the other sections, a conventionally used earth retaining device 12 is disposed, and when the long pipe 9 is charged, the method using the inlet 14 is adopted. Since it can be dropped vertically and loaded in the state as it is, the work of arranging the long pipe 9 in the groove becomes easy, and the conventional retaining device 12 is used for the section other than the loading port 14. Therefore, these soil retaining devices 12 can be used effectively, and transport is relatively easy.

【0028】また、上記長尺管投入用土留装置13は、
従来から用いられているシーティングプレート2とこの
2倍の長さを有する長尺シーティングプレート5,5’
とを複数段に重ね、長尺シーティングプレート5,5’
の両端部に切梁4を装着するものとしたから、切梁4の
間隔が広くなるので長尺管9の投入作業が容易になる。
In addition, the above-mentioned elongate pipe charging earth retaining device 13 comprises:
A conventionally used seating plate 2 and long sheeting plates 5, 5 'having a length twice as long as this.
And multiple layers, and long sheeting plates 5, 5 '
Since the cutting beams 4 are attached to both ends of the tube, the interval between the cutting beams 4 is widened, so that the work of inserting the long pipe 9 becomes easy.

【0029】また、この長尺管投入用土留装置13の一
部には、従来からあるシーティングプレート2を用いる
構成としたから、このシーティングプレート2が有効利
用できると共に長尺シーティングプレート5,5’のみ
で長尺管投入用土留装置13を構成するものでないから
その分運搬も容易となる。
Further, since the conventional sheeting plate 2 is used as a part of the long pipe charging soil retaining device 13, the sheeting plate 2 can be effectively used and the long sheeting plates 5, 5 '. Since only the long pipe charging device 13 does not constitute the elongate pipe charging device 13, the transportation becomes easy.

【0030】[0030]

【発明の効果】以上説明したように、本発明に係る土留
装置を設置した溝内への長尺管配設方法によれば、溝内
に、土留装置12と敷設する長尺管9の長さより長い切
梁4の間隔を有して投入口14とした長尺管投入用土留
装置13とを組合わせて並設し、投入口14から長尺管
9を投入して溝内の所定区間に配設する方法を採用した
から、長尺管9の溝内への配設作業が容易になると共
に、この投入口14以外の区間については、例えば従来
から用いられている長尺管9の長さよりも短い土留装置
12を配置することで足りるのでこれらの土留装置12
の有効利用ができ、また必要最小限の長尺管投入用土留
装置13で済むので運搬も容易である。
As described above, according to the method of arranging the long pipe in the groove in which the retaining device according to the present invention is installed, the length of the long pipe 9 laid with the retaining device 12 in the groove is obtained. A long pipe input retaining device 13 having an interval 14 longer than that of the cutting beams 4 is installed in parallel in combination with the elongate pipe input retaining device 13, and the elongated pipe 9 is input from the input port 14 to a predetermined section in the groove. The method of arranging the long pipe 9 in the groove becomes easy, and the section other than the inlet 14 is, for example, of the long pipe 9 conventionally used. Since it is sufficient to dispose the retaining device 12 shorter than the length, these retaining devices 12
Can be effectively used, and transportation is easy because only the minimum necessary length of the retaining device 13 for long pipes is required.

【0031】また、シーティングプレート2の略2倍の
長さの長尺シーティングプレート5の上部にシーティン
グプレート2を重ね、さらに長尺シーティングプレート
5’を重ねて接続し、この3段重ねの土留用シーティン
グプレート組合体同士を向かい合わせて設置し、これら
の間を切梁4で連結した土留装置を上記長尺管投入用土
留装置13としたから、従来から用いられているシーテ
ィングプレート2が有効利用できると共に、長尺シーテ
ィングプレート5,5’のみで長尺管投入用土留装置を
構成するものでないからその分運搬及び取扱いが容易で
ある。
Further, the sheeting plate 2 is superimposed on the long sheeting plate 5 having a length approximately twice as long as the sheeting plate 2, and further the long sheeting plate 5 'is superposed and connected. The sheeting plate assembly is installed facing each other, and the retaining device connected between them by the cutting beam 4 is used as the above-described retaining device 13 for long pipe charging. Therefore, the conventionally used sheeting plate 2 is effectively used. In addition, since the long sheeting plates 5 and 5 'alone do not constitute a long pipe charging soil retaining device, transport and handling are easy.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態に係る溝内への長尺管配設
方法を示す図である。
FIG. 1 is a view showing a method of disposing a long pipe in a groove according to an embodiment of the present invention.

【図2】実施の形態に係る長尺管投入用土留装置を示す
分解斜視図である。
FIG. 2 is an exploded perspective view showing the long pipe charging soil retaining device according to the embodiment.

【図3】実施の形態に係る長尺管投入用土留装置の斜視
図であり、(a)は外面からみた斜視図であり、(b)
は内面からみた斜視図である。
FIG. 3 is a perspective view of the long pipe charging soil retaining device according to the embodiment, where (a) is a perspective view as viewed from the outside, and (b).
FIG. 3 is a perspective view seen from the inner surface.

【図4】実施の形態に係る長尺管投入用土留装置を側面
からみた図である。
FIG. 4 is a side view of the long pipe charging retaining device according to the embodiment.

【図5】実施の形態に係る長尺管投入用土留装置の説明
図であり、(a)は平面図、(b)は正面図、(c)は
一部拡大図及び(d)は側面図である。
FIGS. 5A and 5B are explanatory views of a long pipe charging retaining device according to an embodiment, wherein FIG. 5A is a plan view, FIG. 5B is a front view, FIG. 5C is a partially enlarged view, and FIG. FIG.

【図6】実施の形態に係る長尺管投入用土留装置を用い
た長尺管投入の様子を示す図である。
FIG. 6 is a view showing a state of long pipe charging using the long pipe charging earth retaining device according to the embodiment.

【図7】従来例に係る土留装置を示す分解斜視図であ
る。
FIG. 7 is an exploded perspective view showing a retaining device according to a conventional example.

【図8】従来例に係る土留装置を用いた長尺管投入の様
子を示す図である。
FIG. 8 is a view showing a state in which a long pipe is charged using a retaining device according to a conventional example.

【図9】従来例に係る土留装置を用いた大口径の長尺管
投入の様子を示す図である。
FIG. 9 is a view showing a state in which a large-diameter long pipe is charged by using a retaining device according to a conventional example.

【符号の説明】[Explanation of symbols]

1 縦梁 1a 中間縦梁 2 シーティングプレート 2a プレート 3,3a 接続金具 4 切梁 5,5’ 長尺シーティングプレート 5a プレート 7 装着口 9 長尺管 14 投入口 DESCRIPTION OF SYMBOLS 1 Longitudinal beam 1a Intermediate vertical beam 2 Seating plate 2a plate 3, 3a Connecting bracket 4 Cutting beam 5, 5 'Long seating plate 5a plate 7 Mounting port 9 Long pipe 14 Input port

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 所定区間にわたって掘削した溝内に、 両端部に縦梁(1)を有するシーティングプレート
(2)の一対を間隔をおいて対向させこれらを切梁
(4)で連結した土留装置(12)と、 両端部に縦梁(1)を有する長尺シーティングプレート
(5)の一対を間隔をおいて対向させ、敷設する長尺管
(9)の長さより長い切梁(4)の間隔を有して投入口
(14)とした長尺管投入用土留装置(13)とを長さ
方向に組合わせて並設し、 上記投入口(14)から長尺管(9)を溝内に順次降下
させて投入した後溝方向に移動させ、上記区間内に長尺
管(9)を配設することを特徴とする土留装置を設置し
た溝内への長尺管配設方法。
An earth retaining device in which a pair of sheeting plates (2) having longitudinal beams (1) at both ends thereof are opposed to each other at intervals in a trench excavated over a predetermined section and connected by a cutting beam (4). (12) and a pair of long sheeting plates (5) having longitudinal beams (1) at both ends thereof are opposed to each other at intervals, and a cutting beam (4) longer than the length of the long pipe (9) to be laid is provided. A long pipe charging earth retaining device (13) having an input port (14) with an interval is combined in the length direction and arranged side by side, and the long pipe (9) is grooved from the input port (14). A long pipe (9) is disposed in the section, and a long pipe (9) is disposed in the section.
【請求項2】 上記シーティングプレート(2)の略2
倍の長さの長尺シーティングプレート(5)を有し、接
続金具を用いて、この長尺シーティングプレート(5)
の上部の両半部分に2枚の上記シーティングプレート
(2)を重ねて接続する一方、接続金具を用いて2枚の
上記シーティングプレート(2)の上部に長尺シーティ
ングプレート(5’)を重ねて接続して3段重ねの土留
用シーティングプレート組合体を形成し、 この3段重ねの土留用シーティングプレート組合体同士
を向かい合わせて設置し、対向する長尺シーティングプ
レート(5,5’)の両端部に設けられた縦梁(1)の
間を伸縮自在の切梁(4)で連結した土留装置を上記請
求項1記載の長尺管投入用土留装置(13)としたこと
を特徴とする請求項1記載の土留装置を設置した溝内へ
の長尺管配設方法。
2. The seating plate (2) having approximately 2
A long sheeting plate (5) having a double length, and using a connection fitting, this long sheeting plate (5)
While the two above-mentioned seating plates (2) are overlapped and connected to both upper halves of the above, a long sheeting plate (5 ') is overlaid on the two above-mentioned sheeting plates (2) using a connection fitting. To form a three-tiered seating plate assembly for soil retaining. The three-tiered seating plate assembly for soil retaining is installed facing each other, and the facing long sheeting plate (5, 5 ') is installed. 2. A retaining device for a long pipe input according to claim 1, wherein the retaining device is formed by connecting a vertical beam provided at both ends with a stretchable cutting beam. A method for arranging a long pipe in a groove provided with the retaining device according to claim 1.
JP8236641A 1996-09-06 1996-09-06 A method of arranging long pipes in trenches with earth retaining equipment Expired - Fee Related JP2789455B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8236641A JP2789455B2 (en) 1996-09-06 1996-09-06 A method of arranging long pipes in trenches with earth retaining equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8236641A JP2789455B2 (en) 1996-09-06 1996-09-06 A method of arranging long pipes in trenches with earth retaining equipment

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP18168193A Division JPH0734459A (en) 1993-07-22 1993-07-22 Long pipe feeding and arrangement using earth retaining device

Publications (2)

Publication Number Publication Date
JPH09105126A JPH09105126A (en) 1997-04-22
JP2789455B2 true JP2789455B2 (en) 1998-08-20

Family

ID=17003641

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8236641A Expired - Fee Related JP2789455B2 (en) 1996-09-06 1996-09-06 A method of arranging long pipes in trenches with earth retaining equipment

Country Status (1)

Country Link
JP (1) JP2789455B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767643B (en) * 2012-07-27 2014-01-15 河北二十冶工程技术有限公司 Sectional laying and mounting method for long-distance pipeline in culvert

Also Published As

Publication number Publication date
JPH09105126A (en) 1997-04-22

Similar Documents

Publication Publication Date Title
JPS5836160B2 (en) Equipment for laying pipe rows in grabens
JP2789455B2 (en) A method of arranging long pipes in trenches with earth retaining equipment
JP2019143794A (en) Underground pipe protection method and protection structure
GB2094373A (en) Trench shoring
US7021868B1 (en) Lightweight shoring system for accommodating crossing utilities
JPH05321249A (en) Method for constructing underground continuous steel wall
JPH086107Y2 (en) Seating plate for soil retaining and seating plate combination for soil retaining
JPH0734459A (en) Long pipe feeding and arrangement using earth retaining device
JP2004084766A (en) Method for burying underground pipe body
JPH05280664A (en) Piping method and piping material used in this method
JP6542825B2 (en) Construction method of underground structure
KR20200074412A (en) Structure of steel pipe for work area to facilitate dismantling
JPH09163537A (en) Pipe connection unit, pipe connection device and pipe connection method
JPH10229618A (en) Device and method for embedding cable tube underground
JP2000257069A (en) Earth retaining and earth retaining construction method
JPS6078016A (en) Sheathig work
JP3554263B2 (en) Pipe pillow and method of use
JP2922433B2 (en) Drilling gutter support equipment
JPH0776842A (en) Cut and cover tunneling method and earth retaining device for the method
JPH08121650A (en) Pipeline laying construction method
JP3122357B2 (en) Connection method of hollow segment and this hollow segment
JPH07190252A (en) Pipe unit and piping method
JPH11215676A (en) Underground embedding method for tubular body
JP3178357B2 (en) Construction method of large section tunnel
JPH01271538A (en) In-groove casting method for long pipe in sheet pile construction

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees