JP2771426B2 - Manufacturing method of earth leakage breaker - Google Patents
Manufacturing method of earth leakage breakerInfo
- Publication number
- JP2771426B2 JP2771426B2 JP5144570A JP14457093A JP2771426B2 JP 2771426 B2 JP2771426 B2 JP 2771426B2 JP 5144570 A JP5144570 A JP 5144570A JP 14457093 A JP14457093 A JP 14457093A JP 2771426 B2 JP2771426 B2 JP 2771426B2
- Authority
- JP
- Japan
- Prior art keywords
- relay
- zero
- current transformer
- phase current
- case
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Breakers (AREA)
Description
【発明の詳細な説明】
【0001】
【産業上の利用分野】本発明は、零相変流器、可動接点
台、導電線、漏電検出部、過電流リレー部を有する漏電
遮断器に係り、特に零相変流器と過電流リレー部の組立
作業性と絶縁信頼性の向上に好適な漏電遮断器の製造方
法に関する。
【0002】
【従来の技術】従来の漏電遮断器は特開昭60−230
333号公報に開示されているように、漏電遮断器の外
形寸法が比較的大きく余裕があるため、零相変流器を過
電流検出装置と負荷側端子との間に配置していた。
【0003】
【発明が解決しようとする課題】上記従来技術は、過電
流検出装置と負荷側端子との間に零相変流器を設置する
ためのスペースを必要とし、漏電遮断器の電源側端子か
ら負荷側端子に至る寸法が大きくなり、漏電遮断器を小
型化して協約形寸法に仕上げることが非常に困難であっ
た。
【0004】また、本発明に至る過程で漏電遮断器の小
型化を図るために図12〜図16に示すように、オイル
ダッシュポットリレーの下部に零相変流器を納めること
が検討された。すなわち、図13に示すように底面にケ
ース穴部1a’を有する漏電遮断器ケース1’に図12
に示すような負荷側端子15’、ダッシュポットリレー
部14、貫通線11’、零相変流器13、可動絶縁軸体
7’可動接点台8’の組み立て品を装着することが検討
された。漏電遮断器ケース1’のダッシュポットリレー
部14の取り付け部分はケース底面を上げ底にした形で
他の部分と一体に形成され、この取り付け部分の上側に
はダッシュポットリレー部14が装着され、下側には零
相変流器13と漏電検出部27’が装着される。図14
〜図16はこの漏電遮断器の組立段階を示し、ダッシュ
ポットリレー部14を装着後、各極の貫通線11’が貫
通する零相変流器13と漏電検出部27’をケース穴部
1a’へ挿入してダッシュポットリレー下側の所定位置
に固定する過程を順に示している。
【0005】この案では、漏電遮断器のケース上面側か
ら零相変流器、漏電検出回路用プリント基板を含む漏電
検出手段、過電流検出手段であるダッシュポットリレー
部を組付けるに際して、零相変流器13および漏電検出
部27’の装着の作業性が悪いとともに零相変流器13
を貫通する導線の絶縁チューブの損傷を招くなど絶縁信
頼性の点で問題がある。
【0006】本発明の目的は上記問題点に鑑み、筐体内
への部品装着の作業性の向上を図れる漏電遮断器の製造
方法を提供することにある。
【0007】
【課題を解決するための手段】上記の目的は、ケースと
カバーにより構成された筺体内に、複数極の各極にそれ
ぞれ設けられた固定接点台と、これらの固定接点台のそ
れぞれに対応して各極に設けられた可動接点台と、各極
の可動接点台にそれぞれ接続された接続線が貫通する零
相変流器と、接続線に接続されて各極毎に設けられて過
電流を検出して引外しのための機械的出力を発生するリ
レー部と、このリレー部に接続された負荷側端子と、複
数極分のリレー部を取り付けらるよう構成されるととも
にケースに着脱自在に装着された取付部材とが収納され
た漏電遮断器の組立方法であって、可動接点台と接続線
と零相変流器とリレー部と負荷側端子とをあらかじめ組
み立てて可動接点台から接続線と零相変流器とリレー部
を介して負荷側端子に連なるリレー組立品を形成し、ケ
ースのカバーに面する側から同時にリレー組立品の3相
分の接続線と零相変流器をケース内に装着し、リレー部
を取付部材上に装着してケース内の零相変流器のカバー
に面する側に固定した漏電遮断器の組立方法によって達
成される。
【0008】
【作用】各極の可動接触子と過電流検出部は零相変流器
を介して接続線で接続されているので、可動接触子、可
動接触子に接続する接続線、零相変流器及び過電流検出
部を予めリレー部組立品として組んでおくことができ
る。過電流検出部とこの過電流検出部に吸引されて動作
する過電流引き外し装置は第1の取り付け部材に取り付
けられ、各極の可動接触子は第2の取り付け部材に一体
に取り付けられて可動接触子の開閉機構に装着されるの
で、リレー部組み立て品を筐体上面の開口部から落し込
んで挿入することができる。
【0009】
【実施例】以下本発明の実施例を図1〜図11および図
17、図18により説明する。
【0010】本発明の第1実施例を図1〜図11を用い
て説明する。本実施例は3相用の漏電遮断器であり、図
1は本発明の第1実施例における漏電遮断器の側断面
図、図2は同平面図、図3は本実施例の要部組立斜視
図、図4は本実施例の可動接点台の組立斜視図、図5は
本実施例のオイルダッシュポットリレー部斜視図、図6
は本実施例の極間絶縁台の斜視図、図7は本実施例のオ
イルダッシュポットリレー部と極間絶縁台組立斜視図、
図8は本実施例の漏電遮断器ケースの平面図、図9は本
実施例におけるオイルダッシュポットリレー部のケース
への組込み作業図である。
【0011】本実施例の漏電遮断器は図1に示されるよ
うにケース1に格納された電源側端子に接続されて固定
接点23を有する固定接点台16、可動接点22を有し
固定接点台16と対向して配置された可動接点台8、可
動接点台8を保持する可動絶縁軸体7と操作ハンドル4
の動作を可動絶縁軸体7に伝達するレバー5を有する可
動接点台4の開閉機構、漏電電流を検出する零相変流器
13、零相変流器13の出力から漏電を検出して引き外
しのための出力を発生する漏電検出部27、漏電検出部
27に接続されその電気的出力により動作して引き外し
のための機械的出力を発生する引き外し装置19、過電
流を検出して引き外しのための機械的出力を発生するオ
イルダッシュポットリレー部(以下リレー部と略称す
る)14、漏電電流または過電流が流れたとき引き外し
装置19またはリレー部14の出力によりトリップ動作
をして開閉機構を引き外す引き外し機構30、負荷側端
子台15を有し、さらにケース1はその底面が裏蓋3で
覆われ、上面(操作ハンドル4のある側)がモールドカ
バー2で覆われている。
【0012】リレー部14は図1に示されるように過電
流を検出する検出部としてのコイル部分14bと、過電
流時にこのコイル部分に流れる電流によりコイルが励磁
されると吸引される可動コア14cの動作を機械的出力
として発生する過電流引き外し装置としてのオイルダッ
シュポットリレーを有し、この出力は可動コアの一部を
介して引き外し機構30に伝達される。
【0013】ケース1には図1、図3、図8および図9
に示すように、零相変流器13、リレー部14、漏電検
出部27が装着される部分の底面に開口する穴1aが形
成されている。この穴1aは各部品が装着された後下面
から取付けられた裏蓋3により覆われる。また、ケース
1、モールドカバー2および裏蓋3は筐体を形成してい
る。
【0014】本実施例では図3、図7、図9に示される
ようにリレー部14はその負荷側は負荷側端子15に接
続されるとともに、その電源側は零相変流器13を貫通
する接続線11により可動接点台8に接続された状態で
リレー部組み立て品としてあらかじめ組み立てられ、ケ
ース1に対して着脱自在に構成された取り付け部材とし
ての極間絶縁台20の上側に装着される。さらに本実施
例では可動接点台8はピン9により可動絶縁軸体7に回
動自在に軸支される。
【0015】本実施例では可動接点台8と、この可動接
点台8の回動を支持するピン9を一体構造にして可動絶
縁軸体7に組み込むので、強度と耐磨耗性が向上して接
点圧の高い高定格電流フレームにも適用が可能となる。
【0016】リレー部組み立て品は可動絶縁軸体7が装
着され、零相変流器13の上方にリレー部14が位置す
る状態でケース1に装着される。ケース1には零相変流
器13の上方となる位置に極間絶縁台20が着脱自在に
装着される。これによりリレー部組み立て品の装着後は
極間絶縁台20の上側に過電流検出部と過電流検出装置
を配置し、零相変流器13をケース1の底部と極間絶縁
台20の間に配置した構成となる。
【0017】また、極間絶縁台20は図6、図7に示さ
れるように各相のリレー部14間を仕切る隔壁部分20
bを有し、この隔壁部分20bは極間の絶縁壁として機
能する。
【0018】可動絶縁軸体7の中央極部分には操作ハン
ドル4の動作を可動絶縁軸体7に伝達するレバー5を有
する可動接点台4の開閉機構が接続され、この開閉機構
には漏電電流または過電流が流れたとき引き外し装置1
9またはリレー部14の出力によりトリップ動作をして
開閉機構を引き外す引き外し機構30が接続される。引
き外し装置19は、中央極の隣の極に設けられ、引き外
し機構30に係合して漏電検出部27の出力により動作
して引き外し機構30をトリップさせる。
【0019】本実施例では上記構成により漏電遮断器の
底面積(据え付け面積)を従来のものに比べ小さくする
ことができる。
【0020】また、過電流検出部が零相変流器の上側に
あるので、過電流検出部の発熱が零相変流器に伝わるの
が防止でき、零相変流器13を貫通する接続線11の絶
縁被覆の熱による劣化を防止できる。
【0021】本実施例の漏電遮断器のON−OFFはモ
ールドカバー2の表面から突出した操作ハンドル4を図
1の矢印A−B方向へ回動操作することによってなされ
る。ON操作はハンドル4を矢印A方向に回動させる
と、2節リンクを構成するレバー5を経てローラ6がモ
ールドケース1の下方に向かって可動絶縁軸体7を押圧
し、これにより可動絶縁軸体に支持された複数の可動接
点台8の可動接点22がモールドケース1に配設された
固定接点台16の固定接点23と接触し電源ONの状態
となる。
【0022】可動絶縁軸体7は圧縮ばね26により図1
中でその上側に向かう方向に付勢されており、また可動
接点台8の一端に係着されるCNばね10により、ON
時には可動接点台8をピン9を中心として反時計方向に
回動付勢されて接点圧が付与されている。この接点圧の
反力はピン9を経て可動絶縁軸体7に図示上方への負荷
として作用するように構成される。
【0023】極間絶縁台20の一部には可動接点台8の
動作の範囲を規制するストッパ部20aが形成され、こ
のストッパ部20aは可動接点22と固定接点23間が
開極するとき、可動接点台8の可動接点22の反対側端
の上限を規制する機能を有する。
【0024】可動接点台8に連結された接続線11は3
相分の接続線全てが零相変流器13を貫通して負荷側端
子15に接続されている。
【0025】負荷側端子15に漏電電流が流れた場合
は、各相の電流のバランスが崩れて零相変流器13に出
力が発生し、この零相変流器13の出力により漏電を検
知してプリント基板上に構成された電子回路を有する漏
電検出部27(図9)で増幅し、引き外し装置19(図
2)を動作させて引き外し機構30をトリップ動作さ
せ、レバー5の2節リンクを折りまげて漏電遮断器を開
極状態に至らせる。
【0026】一方、負荷側端子15に過電流が流れた場
合は、リレー部14を動作させ、引き外し機構30をト
リップ動作させ、レバー5の2節リンクを折りまげて漏
電遮断器を開極状態に至らせる。
【0027】上記の各部品の組付け手順について図3〜
図9を用いて説明する。負荷側端子15、絶縁チューブ
で覆われた接続線11、可動接点台8、リレー部14、
零相変流器13、漏電検出部27と連なるリレー組立品
と可動絶縁軸体7を図5に示すように予め組み立ててお
く。
【0028】この組み立て品をモールドケース1内に装
着するにあたり、まず図7に示されるようにリレー部1
4を図6の極間絶縁台20上に装着し、次いで図3、図
9に示すようにケース1の上部側から可動接点台8を組
付けた可動絶縁軸体7を挿入し、同時に3相分の接続線
11、零相変流器13、漏電検出部であるプリント基板
組立品27も挿入する。ケース1には図8に示すよう
に、前記の各部品装着対応部に穴1aが大きく開口され
ているから、漏電リレー部を構成する各部品をモールド
ケース内に容易に挿入して組み付けることができ、部品
の装着組付作業は極めて容易である。
【0029】次いでリレー部14が装着された極間絶縁
台20を零相変流器13の上部に載置してケース1内に
固定する。さらに、ハンドル4を含む開閉機構部、引き
外し装置19を順次装着し、モールドカバー2で上面を
覆い、裏蓋3を下面から取付けて全組立を終了する。
【0030】リレー部14のコイルと負荷側端子15と
の接続部は図10に示すように、接続部24aに幅広の
編織導電体24を使用すると、リレー部14の多少の移
動や、コイルと負荷側端子15間の位置ずれ誤差を吸収
して組立作業性を向上するのに好適である。
【0031】図11(a)、(b)は固定接点台16の
一端にアークホーン25を固定する手順を示す。まず同
図(a)のように固定接点台16の切欠き溝16aにア
ークホーン25を嵌装する。次いで、アークホーン25
の足部25aを折り曲げ、塑性変形加工により固定接点
台16に密着させて同図(b)のように固定した後、固
定接点23と共に固定接点台16にロー付けする。
【0032】これにより、アークホーン25は塑性変形
加工による密着とロー付けによる2重の固定手段により
固定接点台16に強固に固定され、衝撃力や振動による
緩みの発生が防止できて部品点数を増加することなしに
固定信頼性を高めることができるとともに固定接点23
との間の電気抵抗が減少してアークを導きやすくなる。
【0033】本発明の第2実施例を図17、図18によ
り説明する。本実施例は図17に示すように、リレー部
14の各極間を仕切ると共にヨーク14aの両端及び零
相変流器13を絶縁して収容する絶縁箱体28と、可動
接点台8を組み込んだ可動絶縁軸体7を設け、これらの
組立品を図18に示す漏電遮断器ケース1”に装着した
ものである。図18の穴部1”aは絶縁箱体28が挿入
される穴である。本実施例はリレー部14関連部品の組
立が安定し作業性が一層向上する。他の部分の構成は第
1実施例と同じである。
【0034】以上の実施例によれば、可動接点台8、可
動接点台8に接続する導電性の接続線11、零相変流器
13、極間絶縁台20及び漏電検出部27を有するリレ
ー部組立品を、ケース上面側からケース内に落し込んで
挿入し、次いで極間絶縁台20をケース内に装着固定す
ればよく、漏電遮断器のケース内への上記各部品の収納
部分は極間絶縁台20がケースと着脱自在であるため、
空間が広くなって組立時に上記部品の挿入が容易とな
り、アークホーンの固定の簡易化、リレー部14のコイ
ルと負荷側端子15の接続の容易化とあいまって作業性
が向上する。
【0035】また、接続線11を被覆している絶縁チュ
ーブの損傷が防止され絶縁信頼性が向上する。
【0036】また、零相変流器をリレー部の下部に配置
することにより小型化を前提とした協約形寸法への対応
が容易にできる。
【0037】
【発明の効果】本発明によれば、零相変流器を含む3相
の可動接点台、接続線、漏電検出部等の各部品を筐体内
に上方から容易に挿入して組み付けることができ、作業
性に優れた漏電遮断器を得ることができる。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an earth leakage circuit breaker having a zero-phase current transformer, a movable contact block, a conductive wire, an earth leakage detecting section, and an overcurrent relay section. In particular, the present invention relates to a method of manufacturing an earth leakage breaker suitable for improving workability of assembling and insulation reliability of a zero-phase current transformer and an overcurrent relay section. 2. Description of the Related Art A conventional earth leakage breaker is disclosed in Japanese Patent Laid-Open No. 60-230.
As disclosed in Japanese Patent No. 333, the outer dimensions of the earth leakage breaker are relatively large and there is a margin, so that the zero-phase current transformer is arranged between the overcurrent detection device and the load side terminal. [0003] The above prior art requires a space for installing a zero-phase current transformer between the overcurrent detection device and the load side terminal, and the power supply side of the earth leakage breaker. The dimension from the terminal to the load side terminal has increased, and it has been very difficult to reduce the size of the earth leakage breaker to a compact size. Further, in order to reduce the size of the earth leakage breaker in the course of reaching the present invention, it has been considered to install a zero-phase current transformer below the oil dash pot relay as shown in FIGS. . That is, as shown in FIG. 13, the earth leakage breaker case 1 ′ having the case hole
It has been considered to attach an assembly of the load side terminal 15 ', the dashpot relay section 14, the through wire 11', the zero-phase current transformer 13, the movable insulating shaft 7 'and the movable contact stand 8' as shown in FIG. . The mounting portion of the dashpot relay portion 14 of the earth leakage circuit breaker case 1 'is formed integrally with the other portion with the case bottom raised and the bottom, and the dashpot relay portion 14 is mounted above the mounting portion, and The zero-phase current transformer 13 and the leakage detection unit 27 'are mounted on the side. FIG.
16 to 16 show the steps of assembling the earth leakage breaker. After the dashpot relay section 14 is mounted, the zero-phase current transformer 13 through which the through wire 11 'of each pole penetrates and the earth leakage detection section 27' are inserted into the case hole 1a. , And the process of fixing the dashpot relay at a predetermined position below the dashpot relay is shown in order. In this case, when assembling a zero-phase current transformer, a leakage detecting means including a printed circuit board for a leakage detecting circuit, and a dashpot relay section as an overcurrent detecting means from the upper surface side of the case of the leakage breaker. The workability of mounting the current transformer 13 and the leakage detector 27 'is poor, and the zero-phase current transformer 13
There is a problem in terms of insulation reliability, such as damage to the insulating tube of the conducting wire passing through the wire. SUMMARY OF THE INVENTION An object of the present invention is to provide a method of manufacturing an earth leakage breaker which can improve the workability of mounting components in a housing in view of the above problems. [0007] The above object is achieved by a case and
In the housing composed of the cover,
The fixed contact blocks provided and the fixed contact blocks
A movable contact block provided for each pole corresponding to each
Through which the connection wires respectively connected to the movable contact blocks of
The phase current transformer is connected to the connection line and provided for each pole.
A relay that detects the current and generates a mechanical output for tripping
Relay section and the load side terminal connected to this relay section.
It is configured so that relay parts for several poles can be attached
And a mounting member detachably mounted on the case
Method for assembling a grounded circuit breaker, comprising:
And the zero-phase current transformer, relay section, and load side
From the movable contact stand, connecting line, zero-phase current transformer and relay section
Form a relay assembly connected to the load side terminal via
3 phase of relay assembly at the same time from the side facing the case cover
The connection line and the zero-phase current transformer in the case.
On the mounting member and cover the zero-phase current transformer in the case.
This is achieved by the method of assembling the earth leakage circuit breaker fixed on the side facing the . Since the movable contact of each pole and the overcurrent detecting section are connected by a connection line via the zero-phase current transformer, the movable contact, the connection line connected to the movable contact, and the zero-phase The current transformer and the overcurrent detector can be assembled in advance as a relay assembly. The overcurrent detecting section and the overcurrent tripping device which is operated by being attracted to the overcurrent detecting section are mounted on the first mounting member, and the movable contacts of each pole are integrally mounted on the second mounting member and are movable. Since the relay assembly is mounted on the contact opening / closing mechanism, the relay assembly can be dropped from the opening on the upper surface of the housing and inserted. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. A first embodiment of the present invention will be described with reference to FIGS. This embodiment is an earth leakage breaker for three phases. FIG. 1 is a side sectional view of an earth leakage breaker according to a first embodiment of the present invention, FIG. 2 is a plan view thereof, and FIG. FIG. 4 is an assembled perspective view of the movable contact stand of the present embodiment, FIG. 5 is a perspective view of an oil dash pot relay portion of the present embodiment, and FIG.
FIG. 7 is a perspective view of the gap insulating table of the present embodiment, FIG. 7 is an assembly perspective view of the oil dashpot relay section and the gap insulating table of the present embodiment,
FIG. 8 is a plan view of the earth leakage breaker case of the present embodiment, and FIG. 9 is a work view of assembling the oil dashpot relay portion in the case of the present embodiment. As shown in FIG. 1, the earth leakage breaker of this embodiment is connected to a power supply terminal stored in a case 1 and has a fixed contact base 16 having a fixed contact 23 and a fixed contact base having a movable contact 22. A movable contact shaft 8, a movable insulating shaft 7 holding the movable contact plate 8, and an operation handle 4.
Of the movable contact block 4 having the lever 5 for transmitting the above operation to the movable insulating shaft 7, a zero-phase current transformer 13 for detecting a leakage current, and detecting and drawing a leakage from the output of the zero-phase current transformer 13. A leakage detecting unit 27 that generates an output for disconnection; a tripping device 19 that is connected to the leakage detecting unit 27 and operates by the electric output to generate a mechanical output for tripping; An oil dashpot relay section (hereinafter abbreviated as a relay section) 14 for generating a mechanical output for tripping, and tripping is performed by an output of the tripping device 19 or the relay section 14 when leakage current or overcurrent flows. The case 1 further includes a trip mechanism 30 for tripping the opening / closing mechanism, and the load-side terminal block 15. The case 1 is covered with a back cover 3 on the bottom surface and covered with a mold cover 2 on the top surface (the side with the operation handle 4). And . As shown in FIG. 1, the relay section 14 has a coil section 14b as a detecting section for detecting an overcurrent, and a movable core 14c which is attracted when the coil is excited by a current flowing through the coil section at the time of the overcurrent. Has an oil dashpot relay as an overcurrent tripping device that generates the above operation as a mechanical output, and this output is transmitted to the tripping mechanism 30 through a part of the movable core. FIGS. 1, 3, 8 and 9 show case 1.
As shown in FIG. 2, a hole 1a is formed on the bottom surface of the portion where the zero-phase current transformer 13, the relay unit 14, and the leakage detection unit 27 are mounted. This hole 1a is covered by a back cover 3 attached from the lower surface after each component is mounted. The case 1, the mold cover 2, and the back cover 3 form a housing. In this embodiment, as shown in FIGS. 3, 7 and 9, the relay section 14 has its load side connected to the load terminal 15 and its power supply side penetrates the zero-phase current transformer 13. In a state connected to the movable contact stand 8 by the connecting wire 11 to be assembled, it is pre-assembled as a relay assembly, and is mounted on the upper side of the inter-electrode insulating stand 20 as a mounting member detachably attached to the case 1. . Further, in this embodiment, the movable contact stand 8 is rotatably supported on the movable insulating shaft 7 by a pin 9. In the present embodiment, the movable contact stand 8 and the pin 9 for supporting the rotation of the movable contact stand 8 are integrally formed and incorporated into the movable insulating shaft 7, so that the strength and wear resistance are improved. It can also be applied to high rated current frames with high contact pressure. The relay assembly is mounted on the case 1 with the movable insulating shaft 7 mounted thereon and the relay 14 positioned above the zero-phase current transformer 13. In the case 1, a gap insulating table 20 is detachably mounted at a position above the zero-phase current transformer 13. Thus, after the relay assembly is mounted, the overcurrent detecting unit and the overcurrent detecting device are arranged above the inter-electrode insulating stand 20, and the zero-phase current transformer 13 is connected between the bottom of the case 1 and the inter-electrode insulating stand 20. Is arranged. As shown in FIGS. 6 and 7, the inter-electrode insulating table 20 is a partition wall section 20 for separating the relay sections 14 of each phase.
b, and this partition wall portion 20b functions as an insulating wall between the poles. An opening / closing mechanism for a movable contact stand 4 having a lever 5 for transmitting the operation of the operating handle 4 to the movable insulating shaft 7 is connected to the central pole portion of the movable insulating shaft 7. Or trip device 1 when overcurrent flows
9 or a trip mechanism 30 for tripping by the output of the relay unit 14 to trip the opening / closing mechanism. The tripping device 19 is provided at the pole next to the center pole, engages with the tripping mechanism 30, operates by the output of the leakage detecting unit 27, and trips the tripping mechanism 30. In the present embodiment, the bottom area (installation area) of the earth leakage breaker can be made smaller than the conventional one by the above configuration. Further, since the overcurrent detecting section is located above the zero-phase current transformer, the heat generated by the overcurrent detecting section can be prevented from being transmitted to the zero-phase current transformer. Deterioration of the insulating coating of the wire 11 due to heat can be prevented. The ON / OFF operation of the earth leakage breaker of this embodiment is performed by rotating the operation handle 4 projecting from the surface of the mold cover 2 in the direction of arrows AB in FIG. In the ON operation, when the handle 4 is rotated in the direction of the arrow A, the roller 6 presses the movable insulating shaft 7 downward through the lever 5 forming the two-node link, thereby moving the movable insulating shaft 7 downward. The movable contacts 22 of the plurality of movable contact stands 8 supported by the body come into contact with the fixed contacts 23 of the fixed contact stand 16 disposed in the mold case 1 to be in a power ON state. The movable insulating shaft 7 is compressed by a compression spring 26 as shown in FIG.
And is turned on by a CN spring 10 which is engaged with one end of the movable contact stand 8.
Occasionally, the movable contact table 8 is urged to rotate counterclockwise about the pin 9 to apply a contact pressure. The reaction force of the contact pressure is configured to act as a load on the movable insulating shaft 7 via the pin 9 in the upward direction in the drawing. A stopper 20a for regulating the range of operation of the movable contact stand 8 is formed in a part of the inter-electrode insulating stand 20, and this stopper 20a is used when the movable contact 22 and the fixed contact 23 are opened. It has a function of regulating the upper limit of the end of the movable contact stand 8 opposite to the movable contact 22. The connection line 11 connected to the movable contact stand 8 is 3
All of the connection wires for the phases pass through the zero-phase current transformer 13 and are connected to the load-side terminals 15. When a leakage current flows through the load-side terminal 15, the current of each phase is out of balance and an output is generated at the zero-phase current transformer 13, and the leakage is detected based on the output of the zero-phase current transformer 13. Then, the signal is amplified by the electric leakage detecting section 27 (FIG. 9) having an electronic circuit formed on the printed circuit board, the tripping device 19 (FIG. 2) is operated, and the tripping mechanism 30 is tripped. Fold the node link to open the earth leakage breaker. On the other hand, when an overcurrent flows through the load terminal 15, the relay unit 14 is operated, the trip mechanism 30 is tripped, the two-node link of the lever 5 is folded, and the earth leakage breaker is opened. Let it reach a state. The procedure for assembling the above parts is shown in FIGS.
This will be described with reference to FIG. A load terminal 15, a connection wire 11 covered with an insulating tube, a movable contact block 8, a relay section 14,
The relay assembly connected to the zero-phase current transformer 13 and the leakage detecting unit 27 and the movable insulating shaft 7 are assembled in advance as shown in FIG. When mounting the assembled product in the mold case 1, first, as shown in FIG.
4 is mounted on the inter-electrode insulating stand 20 shown in FIG. 6, and then, as shown in FIGS. The connection wires 11 for the phases, the zero-phase current transformer 13, and the printed circuit board assembly 27, which is a leakage detection unit, are also inserted. As shown in FIG. 8, the case 1 has a large opening 1a in each of the above-mentioned parts mounting corresponding parts. Therefore, it is possible to easily insert and assemble each part constituting the earth leakage relay part into the mold case. It is very easy to mount and assemble parts. Next, the inter-electrode insulating stand 20 on which the relay section 14 is mounted is mounted on the upper part of the zero-phase current transformer 13 and fixed in the case 1. Further, the opening / closing mechanism including the handle 4 and the trip device 19 are sequentially mounted, the upper surface is covered with the mold cover 2, and the back cover 3 is attached from the lower surface, thereby completing the entire assembly. As shown in FIG. 10, the connection between the coil of the relay section 14 and the load-side terminal 15 can be slightly changed by using a wide woven conductor 24 for the connection section 24a. It is suitable for absorbing a displacement error between the load-side terminals 15 and improving the assembly workability. FIGS. 11A and 11B show a procedure for fixing the arc horn 25 to one end of the fixed contact stand 16. First, the arc horn 25 is fitted into the notch groove 16a of the fixed contact stand 16 as shown in FIG. Next, Arc Horn 25
Is bent and plastically deformed to make it closely adhere to the fixed contact base 16 and fixed as shown in FIG. 2B, and then brazed to the fixed contact base 16 together with the fixed contacts 23. As a result, the arc horn 25 is firmly fixed to the fixed contact base 16 by double fixing means by adhesion and brazing by plastic deformation processing, and it is possible to prevent the occurrence of loosening due to impact force or vibration and to reduce the number of parts. The fixing reliability can be increased without increasing the number of the fixed contacts 23.
And the electric resistance between them decreases, so that an arc can be easily led. A second embodiment of the present invention will be described with reference to FIGS. As shown in FIG. 17, the present embodiment incorporates an insulating box 28 which partitions between the poles of the relay section 14 and insulates and accommodates both ends of the yoke 14a and the zero-phase current transformer 13, and a movable contact stand 8. A movable insulating shaft 7 is provided, and these assemblies are mounted on an earth leakage breaker case 1 "shown in Fig. 18. A hole 1" a in Fig. 18 is a hole into which the insulating box 28 is inserted. is there. In this embodiment, the assembly of the parts related to the relay section 14 is stabilized, and the workability is further improved. The configuration of other parts is the same as that of the first embodiment. According to the above embodiment, the relay having the movable contact stand 8, the conductive connection line 11 connected to the movable contact stand 8, the zero-phase current transformer 13, the inter-electrode insulating stand 20, and the leakage detecting section 27 is provided. The part assembly may be dropped into the case from the top side of the case and inserted, and then the interelectrode insulating stand 20 may be mounted and fixed in the case. Since the insulating stand 20 is detachable from the case,
The space is widened so that the above components can be easily inserted at the time of assembling, and the workability is improved by simplifying the fixing of the arc horn and facilitating the connection between the coil of the relay section 14 and the load terminal 15. Further, damage to the insulating tube covering the connection wire 11 is prevented, and insulation reliability is improved. Further, by arranging the zero-phase current transformer at the lower part of the relay section, it is possible to easily cope with the agreement-type dimensions assuming miniaturization. According to the present invention, components such as a three-phase movable contact block including a zero-phase current transformer, a connection line, and a leakage detecting section are easily inserted into the housing from above and assembled. And an earth leakage breaker excellent in workability can be obtained.
【図面の簡単な説明】
【図1】本発明の第1実施例における漏電遮断器の側断
面図である。
【図2】本発明の第1実施例における漏電遮断器の平面
図である。
【図3】本発明の第1実施例における漏電遮断器の要部
組立斜視図である。
【図4】本発明の第1実施例における漏電遮断器の可動
接点台の組立斜視図である。
【図5】本発明の第1実施例における漏電遮断器のリレ
ー部斜視図である。
【図6】本発明の第1実施例における漏電遮断器の極間
絶縁台の斜視図である。
【図7】本発明の第1実施例における漏電遮断器のリレ
ー部と極間絶縁台組立斜視図である。
【図8】本発明の第1実施例における漏電遮断器のケー
スの平面図である。
【図9】本発明の第1実施例における漏電遮断器のリレ
ー部のケースへの組込み作業図である。
【図10】本発明の第1実施例における漏電遮断器のリ
レーコイルと負荷端子板との接続部の斜視図である。
【図11】本発明の第1実施例における漏電遮断器の固
定接点台とアークホーンの組付けを示す手順図を示す斜
視図で同図(a)は固定前の状態、同図(b)は固定後
の状態をそれぞれ示す図である。
【図12】従来のリレー部の平面図である。
【図13】従来の漏電遮断器のケースの平面図である。
【図14】従来のリレー部のケースへの組込み作業の初
期状態を示す図である。
【図15】従来のリレー部のケースへの組込み作業の途
中状態を示す図である。
【図16】従来のリレー部のケースへの組込み作業の終
了状態を示す図である。
【図17】本発明の第2実施例のリレー部と極間絶縁台
組立斜視図である。
【図18】本発明の第2実施例の漏電遮断器のケースの
平面図である。
【符号の説明】
7…可動絶縁軸体、8…可動接点台、9…ピン、11…
接続線(貫通線)、13…零相変流器、14…リレー
部、20…極間絶縁台、24…幅広編織導電体、25…
アークホーン、28…絶縁箱体BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a side sectional view of an earth leakage breaker according to a first embodiment of the present invention. FIG. 2 is a plan view of an earth leakage breaker according to the first embodiment of the present invention. FIG. 3 is an assembled perspective view of a main part of the earth leakage breaker according to the first embodiment of the present invention. FIG. 4 is an assembled perspective view of a movable contact block of the earth leakage breaker according to the first embodiment of the present invention. FIG. 5 is a perspective view of a relay section of the earth leakage breaker according to the first embodiment of the present invention. FIG. 6 is a perspective view of a gap insulating stand of the earth leakage breaker according to the first embodiment of the present invention. FIG. 7 is an assembled perspective view of a relay part and a gap insulating base of the earth leakage breaker according to the first embodiment of the present invention. FIG. 8 is a plan view of a case of an earth leakage breaker according to the first embodiment of the present invention. FIG. 9 is a work view of assembling a relay portion of the earth leakage breaker into a case according to the first embodiment of the present invention. FIG. 10 is a perspective view of a connection portion between a relay coil and a load terminal plate of the earth leakage breaker according to the first embodiment of the present invention. FIGS. 11A and 11B are perspective views showing a procedure for assembling the fixed contact block and the arc horn of the earth leakage breaker according to the first embodiment of the present invention; FIG. FIG. 4 is a view showing a state after fixing. FIG. 12 is a plan view of a conventional relay unit. FIG. 13 is a plan view of a case of a conventional earth leakage breaker. FIG. 14 is a diagram illustrating an initial state of a work of assembling a conventional relay unit into a case. FIG. 15 is a view showing a state in the middle of a work of assembling a conventional relay unit into a case. FIG. 16 is a diagram showing a state in which a conventional operation of assembling a relay unit into a case is completed. FIG. 17 is an assembled perspective view of a relay section and an inter-electrode insulating table according to a second embodiment of the present invention. FIG. 18 is a plan view of a case of an earth leakage breaker according to a second embodiment of the present invention. [Description of Signs] 7 ... Movable insulating shaft, 8 ... Movable contact block, 9 ... Pin, 11 ...
Connection line (through wire), 13: zero-phase current transformer, 14: relay unit, 20: inter-electrode insulating stand, 24: wide woven conductor, 25 ...
Arc horn, 28 ... Insulated box
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) H01H 69/00 H01H 83/02──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 6 , DB name) H01H 69/00 H01H 83/02
Claims (1)
の各極にそれぞれ設けられた固定接点台と、これらの固
定接点台のそれぞれに対応して各極に設けられた可動接
点台と、上記各極の可動接点台にそれぞれ接続された接
続線が貫通する零相変流器と、上記接続線に接続されて
各極毎に設けられて過電流を検出して引外しのための機
械的出力を発生するリレー部と、このリレー部に接続さ
れた負荷側端子と、複数極分の上記リレー部を取り付け
らるよう構成されるとともに上記ケースに着脱自在に装
着された取付部材とが収納された漏電遮断器の組立方法
であって、 上記可動接点台と上記接続線と上記零相変流器と上記リ
レー部と上記負荷側端子とをあらかじめ組み立てて上記
可動接点台から上記接続線と上記零相変流器と上記リレ
ー部を介して上記負荷側端子に連なるリレー組立品を形
成し、 上記ケースの上記カバーに面する側から同時に上記リレ
ー組立品の3相分の上記接続線と上記零相変流器を上記
ケース内に装着し、 上記リレー部を上記取付部材上に装着して上記ケース内
の上記零相変流器の上記カバーに面する側に固定した こ
とを特徴とする漏電遮断器の製造方法。(57) [Claims] Multiple poles inside a housing composed of a case and a cover
Fixed contact blocks provided for each pole of
Movable contacts provided for each pole corresponding to each of the constant contact blocks
The point base and the contacts connected to the movable contact base
Connected to the zero-phase current transformer through which the connection
A device provided for each pole for detecting overcurrent and tripping
A relay that generates mechanical output, and connected to this relay
The load side terminal and the relay section for multiple poles
And detachably mounted on the case.
Method of assembling earth leakage circuit breaker in which attached mounting member is stored
A is, the movable contact base and the connecting line and the zero-phase current transformer and the Li
Lay part and the load side terminal are assembled in advance and
From the movable contact block, connect the connection line, the zero-phase current transformer, and the relay
Form a relay assembly connected to the load side terminal through the
From the side of the case facing the cover at the same time.
-Connect the connection wires for the three phases of the assembly and the zero-phase current transformer
Attach in the case, attach the relay part on the mounting member, and
A method for manufacturing an earth leakage breaker, wherein the zero-phase current transformer is fixed to a side facing the cover .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5144570A JP2771426B2 (en) | 1993-06-16 | 1993-06-16 | Manufacturing method of earth leakage breaker |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5144570A JP2771426B2 (en) | 1993-06-16 | 1993-06-16 | Manufacturing method of earth leakage breaker |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP63288843A Division JP2585763B2 (en) | 1988-11-17 | 1988-11-17 | Earth leakage breaker |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0668776A JPH0668776A (en) | 1994-03-11 |
JP2771426B2 true JP2771426B2 (en) | 1998-07-02 |
Family
ID=15365284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5144570A Expired - Fee Related JP2771426B2 (en) | 1993-06-16 | 1993-06-16 | Manufacturing method of earth leakage breaker |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2771426B2 (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02135643A (en) * | 1988-11-17 | 1990-05-24 | Hitachi Ltd | Earth leakage breaker |
-
1993
- 1993-06-16 JP JP5144570A patent/JP2771426B2/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02135643A (en) * | 1988-11-17 | 1990-05-24 | Hitachi Ltd | Earth leakage breaker |
Also Published As
Publication number | Publication date |
---|---|
JPH0668776A (en) | 1994-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4702002A (en) | Method of forming signal processor module for ground fault circuit breaker | |
US4641216A (en) | Signal processor module for ground fault circuit breaker | |
US5218331A (en) | Molded case circuit breaker with interchangeable trip circuits | |
EP0153609B1 (en) | Electrical interconnect arrangement for a gfci magnetic sensor module plug-in subassembly | |
US5510759A (en) | Miniature circuit breaker with ground fault electronics supported by stiff conductors for easy assembly | |
EP0152043A2 (en) | Ground fault test arrangement for a ground fault circuit interrupter | |
US7436639B2 (en) | Compact ground fault circuit interrupter module | |
JP2771426B2 (en) | Manufacturing method of earth leakage breaker | |
JP2651105B2 (en) | Earth leakage breaker | |
JP2595184B2 (en) | Earth leakage breaker | |
JP2901927B2 (en) | Earth leakage breaker | |
JP2585763B2 (en) | Earth leakage breaker | |
JP3228018B2 (en) | Earth leakage breaker | |
JP3357168B2 (en) | Earth leakage breaker | |
JP3418674B2 (en) | Earth leakage breaker | |
CN217280659U (en) | Circuit breaker | |
JP3296460B2 (en) | Circuit breaker | |
JP2816010B2 (en) | Earth leakage breaker | |
JP3375277B2 (en) | Earth leakage breaker | |
JP2785415B2 (en) | Earth leakage breaker | |
JP3106977B2 (en) | Circuit breaker | |
JPH0215308Y2 (en) | ||
JP3418675B2 (en) | Earth leakage breaker | |
JPH0721900A (en) | Circuit breaker | |
JP4647821B2 (en) | Earth leakage breaker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |