JP2762899B2 - Steel pipe concrete pillar and beam connection structure - Google Patents
Steel pipe concrete pillar and beam connection structureInfo
- Publication number
- JP2762899B2 JP2762899B2 JP5197061A JP19706193A JP2762899B2 JP 2762899 B2 JP2762899 B2 JP 2762899B2 JP 5197061 A JP5197061 A JP 5197061A JP 19706193 A JP19706193 A JP 19706193A JP 2762899 B2 JP2762899 B2 JP 2762899B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pipe column
- concrete
- fixing plate
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Description
【0001】[0001]
【産業上の利用分野】鋼管コンクリ−ト柱と梁の仕口構
造に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a joint structure between steel pipe concrete columns and beams.
【0002】[0002]
【従来の技術】鋼管コンクリート柱は高耐力、高剛性が
期待出来、また変形性能にも優れた構造部材であるた
め、これからの構造部材として注目されている。ところ
が、鋼管コンクリート柱と梁の接合部に関しては従来、
通しダイアフラム、内ダイアフラム、及び外ダイアフラ
ム形式の他にスプリットTによる長締めボルト方式が用
いられていた。2. Description of the Related Art Steel pipe concrete columns are expected to have high yield strength and high rigidity and are also excellent in deformability. Therefore, they are attracting attention as future structural members. However, regarding the joints between steel pipe concrete columns and beams,
In addition to the through-diaphragm, inner-diaphragm, and outer-diaphragm types, a long tightening bolt system using a split T has been used.
【0003】[0003]
【発明が解決しようとする課題】しかし、通しダイアフ
ラム、内ダイアフラムに関してはコンクリートの充填性
が悪く、一方内側に突起物の無い外ダイアフラム形式で
は仕上げ材との干渉が生ずるという欠点がある。また長
締めボルト方式はコンクリートの充填性もよく、梁の応
力が柱の反対側の梁に直接流れる優れた構造性を示す。
しかし従来の長締めボルト方式だと鋼管柱にコンクリー
トを打設する前にボルトの本締めを行うと鋼管柱が凹変
形を起こし好ましくないためコンクリートを柱に打設後
本締めを行うのが普通である。また角柱の場合は、コン
クリートの側圧によって鋼管柱が円形に膨出しようとす
る。その他ボルトに導入された軸力は鋼管柱内のコンク
リートのクリープにより、長期的には減少する。このた
め接合部の固定度が小さくなる。また梁が鋼管柱に接す
る際、長締めボルトの挿入は梁をセットした状態で行う
ため梁が不安定で、施工が困難であるといった欠点も多
かった。However, the through-diaphragm and the inner-diaphragm have poor filling properties of concrete, while the outer-diaphragm type having no projections on the inside has a drawback of causing interference with the finishing material. In addition, the long-tightening bolt system has good filling properties of concrete, and exhibits excellent structural properties in which the stress of the beam flows directly to the beam on the opposite side of the column.
However, with the conventional long-tightening bolt method, if the bolt is fully tightened before casting concrete on the steel pipe column, the steel pipe column will be deformed concavely, which is not preferable. It is. In the case of a prism, the steel tube column tends to bulge in a circular shape due to the lateral pressure of the concrete. In addition, the axial force introduced to the bolt will decrease in the long term due to the creep of concrete in the steel column. For this reason, the degree of fixation of the joint is reduced. In addition, when the beam comes into contact with the steel pipe column, the long fastening bolt is inserted in a state where the beam is set, so that the beam is unstable, and there are many disadvantages such as difficulty in construction.
【0004】本発明はこれらの問題点を解決するように
工夫されたものである。The present invention has been devised to solve these problems.
【0005】[0005]
【課題を解決するための手段】鋼管柱の梁を接合しよう
とする部位にリングスティフナを溶接し、該リングステ
ィフナ上に、予めエンドプレートを溶接した梁を仮置き
する。高強度太径ねじ鉄筋を梁のエンドプレートと鋼管
柱に挿入し鋼管柱両側に充填式ねじ定着板を取着する。
充填式ねじ定着板が所定の位置にあることを確認して、
充填式ねじ定着板に固結剤を注入する。しかる後鋼管柱
にコンクリートを打設して床コンクリートを打設する。
この時スラブには、鋼管柱の拘束のため出来ればリング
筋を配置しておく。しかしリング筋はなくてもよい。A ring stiffener is welded to a portion of a steel pipe column to which a beam is to be joined, and a beam to which an end plate is welded in advance is temporarily placed on the ring stiffener. A high-strength large-diameter threaded reinforcing bar is inserted into the end plate of the beam and the steel pipe column, and a filling screw fixing plate is attached to both sides of the steel pipe column.
Check that the filling screw fixing plate is in the predetermined position,
Inject the binder into the filling screw fixing plate. After that, concrete is cast on the steel pipe columns and floor concrete is cast.
At this time, a ring bar is preferably arranged on the slab for restraining the steel pipe column. However, there is no need for the ring streaks.
【0006】[0006]
【作用】前述のようにリングスティフナを設けることに
より、 (イ)梁を鋼管柱に取着する場合の受け台とすることが
出来、太径ねじ鉄筋を挿入する際の施工を容易にする。By providing a ring stiffener as described above, (a) a pedestal can be provided when a beam is attached to a steel pipe column, and the construction for inserting a large-diameter threaded rebar is facilitated.
【0007】(ロ)梁フランジの引張力に対して、鋼管
柱の膨出を防止するのに役立つ。(B) It is helpful to prevent the steel pipe column from bulging against the tensile force of the beam flange.
【0008】(ハ)梁の下方向の剪断力に有効に抵抗す
る。(C) effectively resisting downward shearing force of the beam;
【0009】高強度太径ねじ鉄筋を使用したことによ
り、(ニ)梁の引張力を有効に反対側の梁に伝達するこ
とが出来る。The use of the high-strength, large-diameter threaded rebar enables (d) the tensile force of the beam to be effectively transmitted to the opposite beam.
【0010】(ホ)コンクリートと高力太径ねじ鉄筋の
付着力を用いて、梁からの応力の一部を、鋼管柱部材に
直接伝達する。本発明の構造では張力により柱と梁の離
間荷重まで固定度が確保される。従来から用いられてき
た長締めボルト方式はボルトの張力により固定度を確保
するが、本発明では鉄筋に対する付着力を利用する。(E) Part of the stress from the beam is directly transmitted to the steel pipe column member by using the adhesive force between the concrete and the high-strength large-diameter threaded reinforcing bar. In the structure of the present invention, the degree of fixation is ensured by the tension up to the separation load between the column and the beam. The long fastening bolt method that has been used conventionally secures the degree of fixation by the tension of the bolt, but in the present invention, the adhesive force to the reinforcing bar is used.
【0011】充填式ねじ定着板を使用することによっ
て、 (ヘ)太径ねじ鉄筋は定着され、 (ト)固結剤を注入することにより充填式ねじ定着板を
固定するため、コンクリート打設時の充填式ねじ定着板
の緩みを押え、高力太径ねじ鉄筋からの引張力による緩
みを生じない。By using the filling screw fixing plate, (f) the large-diameter screw reinforcing bar is fixed, and (g) the filling screw fixing plate is fixed by injecting a binding agent. Of the filling type screw fixing plate, and does not loosen due to the tensile force from the high-strength large-diameter screw rebar.
【0012】[0012]
【実施例】図1(a)に本発明の実施例を示す。鋼管柱
1にリングスティフナ2を溶接し、梁3の端部にエンド
プレート4を溶接した該梁3を設置する。左右の梁3の
エンドプレート4と鋼管柱1に太径ねじ鉄筋5を通し充
填式ねじ定着板6で締結する。図3(a)に充填式ねじ
定着板6の詳細図を示す。図3(b)は断面図で、固結
剤注入孔7を設ける。図1(a)のように充填式ねじ定
着板6の位置を確認した上で、固結剤注入孔7より固結
剤を注入して充填式ねじ定着板6を固定する。しかる
後、鋼管柱1にコンクリートを打設する。最後に床コン
クリートを打設するが、鋼管柱1を拘束するためリング
筋8を埋設することもある。FIG. 1A shows an embodiment of the present invention. A ring stiffener 2 is welded to a steel pipe column 1, and an end plate 4 is welded to an end of the beam 3. A large-diameter screw rebar 5 is passed through the end plates 4 of the left and right beams 3 and the steel pipe column 1 and fastened with a filling screw fixing plate 6. FIG. 3A shows a detailed view of the filling screw fixing plate 6. FIG. 3B is a cross-sectional view in which a consolidating agent injection hole 7 is provided. After confirming the position of the filling screw fixing plate 6 as shown in FIG. 1A, the filling agent is injected from the fixing agent injection hole 7 to fix the filling screw fixing plate 6. After that, concrete is poured into the steel pipe column 1. Finally, floor concrete is cast, but a ring bar 8 may be buried to restrain the steel pipe column 1.
【0013】[0013]
【発明の効果】この発明の効果は、鋼管コンクリート柱
のコンクリートのクリープの影響の少ない、ボルト締め
構造が可能である。従来は梁が鋼管柱に接する場合、太
径ねじ鉄筋は梁をセットした状態で行うため梁が不安定
で施工が困難であったが、リングスティフナを設けるこ
とにより、問題は解消する。According to the effects of the present invention, it is possible to provide a bolted structure which is less affected by the creep of concrete of a steel pipe concrete column. Conventionally, when a beam is in contact with a steel tube column, the large diameter threaded rebar is set with the beam set, so the beam is unstable and construction is difficult. However, providing a ring stiffener solves the problem.
【図1】(a)本発明の側断面図である。 (b)(a)のA−A断面図である。 (c)(a)のB−B断面図である。FIG. 1 (a) is a side sectional view of the present invention. (B) It is AA sectional drawing of (a). (C) It is BB sectional drawing of (a).
【図2】図1(a)のC−C視図である。FIG. 2 is a CC view of FIG. 1 (a).
【図3】(a)充填式ねじ定着板を鋼管柱に取着した図
である。 (b)充填式ねじ定着板の側断面図である。 (c)充填式ねじ定着板のD−D視図である。FIG. 3A is a view in which a filling screw fixing plate is attached to a steel pipe column. FIG. 2B is a side sectional view of the filling screw fixing plate. FIG. 3C is a DD view of the filling screw fixing plate.
1・・・鋼管柱、2・・・リングスティフナ、3・・・
梁、4・・・エンドプレート、5・・・太径ねじ鉄筋、
6・・・充填式ねじ定着板、7・・・固結剤注入孔、8
・・・リング筋1 ... steel pipe column, 2 ... ring stiffener, 3 ...
Beam, 4 ... End plate, 5 ... Large diameter screw rebar,
6: Filling screw fixing plate, 7: Binder injection hole, 8
... Ring streaks
Claims (1)
し、リングスティフナ2に達するまで四方に拡大したエ
ンドプレート4を溶接した梁3を、該リングスティフナ
2の上に載上し、エンドプレート4と鋼管柱1に太径ね
じ鉄筋5を通して、充填式ねじ定着板6で梁3を鋼管柱
1に固着し、該鋼管柱1にコンクリートを打設してなる
ことを特徴とする鋼管コンクリート柱と梁の仕口構造。A beam 3 obtained by welding a ring stiffener 2 to a steel pipe column 1 and welding an end plate 4 expanded in four directions until reaching the ring stiffener 2 is mounted on the ring stiffener 2. A steel pipe concrete column characterized in that a large diameter screw reinforcing bar 5 is passed through a steel pipe column 1, a beam 3 is fixed to the steel pipe column 1 by a filling screw fixing plate 6, and concrete is poured into the steel pipe column 1. Beam connection structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5197061A JP2762899B2 (en) | 1993-08-09 | 1993-08-09 | Steel pipe concrete pillar and beam connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5197061A JP2762899B2 (en) | 1993-08-09 | 1993-08-09 | Steel pipe concrete pillar and beam connection structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0748876A JPH0748876A (en) | 1995-02-21 |
JP2762899B2 true JP2762899B2 (en) | 1998-06-04 |
Family
ID=16368068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5197061A Expired - Lifetime JP2762899B2 (en) | 1993-08-09 | 1993-08-09 | Steel pipe concrete pillar and beam connection structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2762899B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924539A (en) * | 2019-12-06 | 2020-03-27 | 燕山大学 | Self-resetting steel pipe concrete column-steel beam joint connecting device |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109898651A (en) * | 2018-12-12 | 2019-06-18 | 中建四局第六建筑工程有限公司 | The connection structure and construction method of antidetonation steel pipe in a kind of shear wall |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0657974B2 (en) * | 1987-03-05 | 1994-08-03 | 日本鋼管株式会社 | Square steel pipe concrete column-beam connection structure |
JPH01111937A (en) * | 1987-04-09 | 1989-04-28 | Takenaka Komuten Co Ltd | Opening structure and construction method of pillar and beam of building body |
-
1993
- 1993-08-09 JP JP5197061A patent/JP2762899B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924539A (en) * | 2019-12-06 | 2020-03-27 | 燕山大学 | Self-resetting steel pipe concrete column-steel beam joint connecting device |
Also Published As
Publication number | Publication date |
---|---|
JPH0748876A (en) | 1995-02-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2000144906A (en) | Column/beam joint section between cft structural column and src structural beam and beam main bar fixing metal fixture | |
JP2759755B2 (en) | Prestressed bridge reinforcement method using lower cable | |
JP4094149B2 (en) | Column and beam joint structure | |
JP2762899B2 (en) | Steel pipe concrete pillar and beam connection structure | |
JP2973812B2 (en) | Joint structure between steel members and concrete members | |
KR101148218B1 (en) | Joint device of civil construction | |
JP3101163B2 (en) | How to join columns and beams | |
JP2698545B2 (en) | Connection method between precast concrete columns and steel beams | |
JPH06185140A (en) | Steel beam joining structure with reinforced concrete earthquake resisting wall | |
JP3252237B2 (en) | Outer tank side wall in low-temperature storage tank and method of constructing the outer tank side wall | |
JPH10131398A (en) | Mounting method of separator and jig | |
JP2001107373A (en) | Joint structure of steel column base with foundation concrete | |
JP2688613B2 (en) | Stringed beam floor structure | |
JP2001262981A (en) | Coupling method and coupling device for concrete attachment | |
JPH10338907A (en) | Concrete-filled pier | |
JP2570085B2 (en) | Anchor bolt construction method | |
JP2711572B2 (en) | Formwork construction method | |
JP3844480B2 (en) | Construction method for beam-to-column joints of precast concrete columns with X-type reinforcements | |
JP2901889B2 (en) | Beam main bar anchorage device at the connection between column and beam | |
JPH10292488A (en) | Connecting structure for steel frame column and concrete foundation | |
JPH10169387A (en) | Long bolt type composite segment | |
JP2000110239A (en) | Method of bonding pillar to foundation | |
JP3109030B2 (en) | Joint structure between columns and horizontal members | |
JPH03208965A (en) | Anchoring method for prestressing steel bar | |
KR20220016706A (en) | Composite column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19980224 |