JP2759707B2 JP31886590A JP31886590A JP2759707B2 JP 2759707 B2 JP2759707 B2 JP 2759707B2 JP 31886590 A JP31886590 A JP 31886590A JP 31886590 A JP31886590 A JP 31886590A JP 2759707 B2 JP2759707 B2 JP 2759707B2
Authority
JP
Japan
Prior art keywords
wall
pca
floor
ceiling slab
hardware
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP31886590A
Other languages
Japanese (ja)
Other versions
JPH04189940A (en
Inventor
洋一 大垣
信明 市東
勝志 内村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP31886590A priority Critical patent/JP2759707B2/en
Publication of JPH04189940A publication Critical patent/JPH04189940A/en
Application granted granted Critical
Publication of JP2759707B2 publication Critical patent/JP2759707B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は、鉄骨鉄筋コンクリート、鉄筋コンクリート
等の建物における壁板のチルトアップ工法、特に、先行
施工した躯体の梁下乃至天井スラブ下に後行施工する鉄
筋コンクリートの壁体についてのチルトアップ工法に関
する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a method for tilting up a wall plate in a building made of steel reinforced concrete, reinforced concrete, etc., and in particular, a post-installation work under a beam or a ceiling slab of a pre-constructed skeleton. The present invention relates to a tilt-up method for a reinforced concrete wall.

「従来の技術と発明が解決しようとする課題」 従来、先行施工した鉄骨鉄筋コンクリート、鉄筋コン
クリート等の建物躯体の梁下乃至天井スラブ下に、鉄筋
コンクリートの壁体、例えば、間仕切壁、界壁、戸境壁
等の内壁や逆打ち工法における地中外壁等を後行施工す
る場合、型枠・配筋・コンクリート打ちを現位置で行う
現場打ち工法が一般的となっている。
"Problems to be Solved by Conventional Techniques and Inventions" Conventionally, reinforced concrete walls, for example, partition walls, boundary walls, doorways, etc., under beams or ceiling slabs of building frames such as steel reinforced concrete, reinforced concrete, etc. previously constructed. When the inner wall such as a wall or the underground outer wall in the reverse beating method is to be installed later, an in-situ casting method in which formwork, reinforcing bars, and concrete driving are performed at the current position has become common.

ところで、昨今は、労働力不足の背景から壁をPca板
(プレキャストコンクリート板)化し、これをクレーン
等で吊り上げて所定の位置にセットする工業化工法が増
えてきているが、上述の後行施工の壁体にあっては、施
工箇所の上部が塞がっているためにクレーン等の使用が
できず、工業化工法が採用し難い現状にある。
By the way, in recent years, due to the lack of labor, there has been an increasing number of industrialized construction methods in which walls are made of Pca plates (precast concrete plates), lifted with a crane, etc., and set in place. With respect to the wall, the crane or the like cannot be used because the upper part of the construction site is closed, and it is difficult to adopt the industrialization method.

したがって、従来技術では、現場打ち工法とならざる
を得ず、労働力不足の折りから、安定生産は図り難い部
分であると考えられてきた。
Therefore, in the prior art, it was inevitable to use a cast-in-place method, and it was considered that stable production was difficult to achieve due to the labor shortage.

本発明は、斯る問題点を解決しようとするものであ
る。
The present invention seeks to solve such a problem.

「課題を解決するための手段」 本発明は、先行施工した躯体の梁下乃至天井スラブ下
に後行施工する壁体の施工において、該壁体施工箇所近
傍の梁乃至天井スラブの適所に、吊り金物を取り外し可
能に装備させて、該吊り金物にチェーンブロック、チェ
ーンホイスト等の物上げ装置を支持させ、また、その壁
体施工箇所に隣接する床上で、Pca壁板を倒伏姿勢にて
製作し、該Pca壁板を上記物上げ装置により吊り上げて
建て起こし、定位置に定着させることを特徴とする。
"Means for solving the problem" The present invention is, in the construction of a wall to be subsequently constructed under a beam of a pre-constructed skeleton or under a ceiling slab, in the right place of the beam or ceiling slab near the wall construction site, The hanging hardware is detachably equipped, the lifting hardware such as a chain block and a chain hoist are supported by the hanging hardware, and the Pca wallboard is manufactured in a prone position on the floor adjacent to the wall construction site. Then, the Pca wall plate is lifted and erected by the hoisting device and fixed at a fixed position.

「作用」 如上の構成であり、梁乃至天井スラブの適所に装備さ
せた吊り金物は、チェーンブロック、チェーンホイスト
等の物上げ装置の支持を可能にし、該物上げ装置は、壁
体施工箇所に隣接する床上でのPca壁板の製作、建て起
こし及び定着を可能にする。
"Operation" The structure as described above, the hanging hardware mounted in place on the beam or ceiling slab enables the support of hoisting equipment such as chain blocks and chain hoists, and the hoisting equipment is installed at the wall construction site. Enables fabrication, erecting and anchoring of Pca wallboard on adjacent floors.

「実施例」 その1. 第1図乃至第9図は、本発明の第1の実施例をに係
り、特に、第1図乃至第7図は、施工の手順を順次に示
している。以下、この手順につき、説明する。
Embodiment 1 1. FIGS. 1 to 9 relate to a first embodiment of the present invention. In particular, FIGS. 1 to 7 sequentially show the procedure of construction. Hereinafter, this procedure will be described.

I.第I図 先行施工に係る鉄骨鉄筋コンクリート躯体の梁下の壁
体施工箇所Aにおいて、その梁1及び床3の壁体定着
部、並びに、その近傍の梁1乃至天井スラブ2の適所
(下記型枠の上方)に、適宜に複数のインサート4を配
設する。
I. Fig. I At the wall construction location A under the beam of the steel reinforced concrete skeleton according to the preceding construction, the beam anchoring part of the beam 1 and the floor 3 and the appropriate place of the beam 1 and the ceiling slab 2 in the vicinity (described below) The plurality of inserts 4 are appropriately disposed above the mold.

また、その壁体施工箇所Aに隣接する床上で、所要数
のPca壁板を倒伏姿勢にて製作する型枠5を仮設し、該
型枠内に、各Pca壁板に必要な配筋6を施し、所要の複
数のインサート7を適宜に配する。更に、型枠内には、
各Pca壁板の脚部両側に位置させてそれぞれアンカー付
きの係合金物8(第3図乃至第6図、第8図参照)を配
し、かつ、各Pca板の頭部一縁に位置させてそれぞれア
ンカー付きの突当て金物9を配する。
Further, on the floor adjacent to the wall construction site A, a formwork 5 for temporarily manufacturing a required number of Pca wallboards in a prone position is temporarily provided, and inside the formwork, reinforcing bars 6 necessary for each Pca wallboard are provided. And a required plurality of inserts 7 are appropriately arranged. Furthermore, in the formwork,
An engaging hardware 8 (refer to FIGS. 3 to 6 and 8) with an anchor is arranged on each side of the leg of each Pca wall plate, and is located at one edge of the head of each Pca plate. Then, the butting hardware 9 with the anchor is arranged.

II.第2図 上記型枠5内にコンクリート10を打設し、養生して、
所要数のPca壁板11を製作する。
II. Fig. 2 Concrete 10 is poured into form 5 and cured.
The required number of Pca wallboards 11 are manufactured.

III.第3図 壁体定着部の梁1の各インサート4に、それぞれPca
壁板11突き当てる受け金物12をボルトにて固定し、か
つ、壁体定着部の床3の各インサート4に、Pca壁板11
の各係合金物8を係合させる複数のピンベース13にボル
トにて固定する。このピンベース13は、第8図に示すよ
うに、U字状のベース部材14にピン15を横設したもので
あり、ピンを、施工する壁体の壁面に平行させて装着す
る。Pca壁板が隣り合う箇所では、第9図に示す幅広い
ピンベース13を用いて、双方に共用する。
III. Fig. 3 Each insert 4 of the beam 1 in the wall anchoring section
The receiving metal 12 against the wall plate 11 is fixed with bolts, and the Pca wall plate 11 is attached to each insert 4 of the floor 3 of the wall fixing portion.
Are fixed to the plurality of pin bases 13 with which the respective fittings 8 are engaged by bolts. As shown in FIG. 8, the pin base 13 has a U-shaped base member 14 on which a pin 15 is provided, and the pin is mounted in parallel with the wall surface of the wall to be constructed. Where the Pca wallboard is adjacent, a wide pin base 13 shown in FIG. 9 is used for both sides.

また、壁体定着部近傍の梁1及び天井スラブ2に配し
た各インサート4に、それぞれ吊り金物16を取り外し可
能に螺着し、これらの吊り金物の内、梁1と天井スラブ
2との適宜2つのものに、それぞれUリンク17を介して
チェーンブロック、チェーンホイスト等の物上げ装置19
を支持させる。
In addition, the hanging hardware 16 is detachably screwed to each of the inserts 4 arranged on the beam 1 and the ceiling slab 2 near the wall fixing portion, and of these hanging hardware, the beam 1 and the ceiling slab 2 are appropriately connected. A hoisting device 19 such as a chain block and a chain hoist is connected to each of the two objects via the U-link 17.
To support.

更に、それらの物上げ装置19に対応するPca壁板11の
各インサート7に、それぞれ吊り金物20を取り外し可能
に螺着し、これらの吊り金物の内、脚部側のものに、、
Uリンク21を介して梁1側の物上げ装置19のフック22
を、かつ、頭部側のものに、玉掛けワイヤー23を介して
天井スラブ2側の物上げ装置19のフック22を係合させ
る。
Furthermore, the hanging hardware 20 is detachably screwed to each of the inserts 7 of the Pca wall plate 11 corresponding to the hoisting devices 19, and of these hanging hardware, the one on the leg side is:
Hook 22 of hoisting device 19 on beam 1 side via U-link 21
The hook 22 of the hoisting device 19 on the ceiling slab 2 side is engaged with the one on the head side via the slinging wire 23.

而して、それらの物上げ装置19を巻き上げ、そのPca
壁板11を上昇させて型枠5から脱型させ、次いで、両係
合金物8をそれぞれ所定のピンベース13のピン15へと係
合させる。
Then, those hoisting devices 19 are wound up, and their Pca
The wall plate 11 is lifted and removed from the mold 5, and then both the engagement hardwares 8 are respectively engaged with the pins 15 of the predetermined pin base 13.

IV.第4図 梁1側の物上げ装置19の隣りに同様にして他の一つの
物上げ装置19を装着し、天井スラブ2側の物上げ装置19
を外して、その頭部側の吊り金物20にそれぞれUリンク
21を介して梁1側の二つの物上げ装置19の各フック22を
係合させ、次いで、二つの物上げ装置を同時に巻き上
げ、そのPca壁板11を、ピンベース13のピン15を中心に
回動させて建て起こす。
IV. Fig. 4 Another lifting device 19 is mounted next to the lifting device 19 on the beam 1 side, and the lifting device 19 on the ceiling slab 2 side.
And attach U-links to the hanging hardware 20 on the head side, respectively.
The hooks 22 of the two hoisting devices 19 on the beam 1 side are engaged with each other via 21, and then the two hoisting devices are simultaneously wound up, and the Pca wall plate 11 is centered on the pin 15 of the pin base 13. Rotate and build.

V.第5図 そのPca壁板11を直立させると同時に、頭部の突当て
金物9を梁1の受け金物12に突き当て、相互間を溶接し
て固定する。
V. FIG. 5 At the same time that the Pca wall plate 11 is erected, the abutment metal 9 of the head is abutted against the receiving metal 12 of the beam 1, and the parts are welded and fixed.

VI.第6図 以上の手順を操り返して全てのPca壁板11を建て込
み、溶接して固定する。その後、全ての物上げ装置19、
吊り金物16,20等を撤去し、各部の隙間に目地材24を詰
めて目地爪詰め仕上げを行い(第7図参照)、壁体25を
築造する。
VI. Fig. 6 Repeat the above procedure to build all Pca wall boards 11 and fix them by welding. After that, all the hoisting equipment 19,
The hanging hardware 16, 20 and the like are removed, and joints 24 are filled in the gaps between the parts to perform joint claw filling (see FIG. 7), thereby constructing the wall body 25.

以上の工法では、ピンベース13を用いるので、床3が
壁体施工箇所Aで上床18になっている場合に特に有効で
ある。
In the above construction method, since the pin base 13 is used, it is particularly effective when the floor 3 is the upper floor 18 at the wall construction site A.

その2. 第10図は、第2の実施例を示している。2. FIG. 10 shows a second embodiment.

この場合も、前例とほぼ同様に施工するが、特に、壁
体25を天井スラブ下に施工する点、ピンベース13及び係
合金物8に代えて凹溝26を用いる点で異なっている。
In this case as well, construction is performed in substantially the same manner as in the previous example, except that the wall 25 is constructed below the ceiling slab, and that the groove 26 is used in place of the pin base 13 and the engagement hardware 8.

凹溝26は、壁体施工箇所Aの床3の壁体定着部に、Pc
a壁体11の厚さよりもやや広幅に形成し、第11図に示す
ように、両溝縁に複数のアンカー27で定着されるアング
ル28を設けるか、又は、第12図に示すように、凹溝内面
に複数のアンカー29で定着されるチャンネル30を設け
る。
The groove 26 is formed in the wall fixing portion of the floor 3 at the wall construction point A by Pc
a It is formed slightly wider than the thickness of the wall body 11, and as shown in FIG. 11, an angle 28 fixed with a plurality of anchors 27 is provided on both groove edges, or as shown in FIG. 12, A channel 30 fixed by a plurality of anchors 29 is provided on the inner surface of the concave groove.

また、Pca壁板11の脚部の下側縁部に、複数のアンカ
ーで定着されるアングル31を設けて、その脚部を建て起
こしの際に凹溝26へと挿入させる。建て起こし後は、Pc
a壁板11のアングル31と凹溝26のアングル28又はチャン
ネル30とを溶接して固定する。
An angle 31 fixed by a plurality of anchors is provided on the lower edge of the leg of the Pca wall plate 11, and the leg is inserted into the groove 26 when the leg is erected. After erecting, Pc
aThe angle 31 of the wall plate 11 and the angle 28 or the channel 30 of the concave groove 26 are fixed by welding.

なお、この場合、化粧板32は壁体25の築造後に装着す
るものとする。
In this case, the decorative board 32 is to be attached after the wall body 25 is built.

必要であれば、凹溝26内にピンベース13を配し、これ
に対応させてPca壁体11に係合金物8設けてもよい。
If necessary, the pin base 13 may be arranged in the concave groove 26, and the fitting metal 8 may be provided on the Pca wall body 11 correspondingly.

その3. 第13図は、第3の実施例を示している。Part 3. FIG. 13 shows a third embodiment.

この場合もまた、第1の実施例とほぼ同様に施工する
が、特に、ピンベース13及び係合金物8に代えて平坦な
帯鋼33等を用いる点で異なっている。つまり、壁体施工
箇所Aの床3の壁体定着部に、Pca壁板11の厚さよりも
広幅の平坦な帯鋼33のアンカー34により定着させ、該帯
鋼33の一縁部に突き当て用のアングル35を配し、Pca壁
体11の脚部の下側縁部に、前例同様に複数のアンカーで
定着されるアングル31を設けて、Pca壁体11を帯鋼33上
で建て起こし、最終的には、Pca壁板11のアングル31と
帯鋼33とを溶接して固定する。
In this case, too, the construction is performed in substantially the same manner as in the first embodiment, except that a flat steel strip 33 or the like is used in place of the pin base 13 and the engagement hardware 8. That is, it is fixed to the wall fixing portion of the floor 3 at the wall construction site A by the anchor 34 of the flat steel strip 33 having a width wider than the thickness of the Pca wall plate 11, and abuts against one edge of the steel strip 33. An angle 35 for the Pca wall 11 is provided, and an angle 31 fixed by a plurality of anchors is provided at the lower edge of the leg of the Pca wall 11 as in the previous example, and the Pca wall 11 is erected on the steel strip 33. Finally, the angle 31 of the Pca wall plate 11 and the steel strip 33 are fixed by welding.

なお、建て起こしに当たり、第14図に示すように、丁
番36を用いてもよい。
Note that the hinge 36 may be used for erecting as shown in FIG.

「発明の効果」 本発明によれば、Pca壁板を壁体施工箇所に隣接する
床上で倒伏姿勢にて製作し、建て起こすので、次の優れ
た効果を奏する。
[Effects of the Invention] According to the present invention, the Pca wallboard is manufactured and erected on the floor adjacent to the wall construction site in a prone position, so that the following excellent effects are obtained.

1)型枠工事量が現場打ち工法に比べて格段に減少し、
労働力不足による工程の遅れ予防が可能となる。
1) The amount of formwork is significantly reduced compared to the cast-in-place method.
It is possible to prevent process delays due to labor shortage.

2)ダクト等の開口取り付け、補強作業が容易となり、
床上での安定作業となる。
2) Installation of ducts and other openings and reinforcement work are easy,
It is stable work on the floor.

3)後打ち壁としたて現位置で立上がり壁を打設する場
合と比較すると、コンクリート打込みが容易となる。
3) Concrete can be easily poured in as compared with a case where a rising wall is cast at the current position as a post-hitting wall.

4)Pca壁板の運搬移動作業が不要となる。4) No need to transport and move Pca wall boards.

5)小人数編成による施工部隊で計画的な施工、管理が
可能となり、労働の平準化を図ることができる。
5) Systematic construction and management can be performed by a construction unit composed of small groups, and labor can be leveled.

6)以上より、大幅なコストダウン(具体的には、施工
日の約3割りものコストダウン)が可能となる。
6) From the above, a significant cost reduction (specifically, a cost reduction of about 30% on the construction date) is possible.

【図面の簡単な説明】[Brief description of the drawings]

図面は、本発明の実施例を示し、第1図乃至第6図は、
第1例の工程説明図、第7図は、同例の切断側面図、第
8図、第9図は、同例要部の拡大斜視図、第10図は、第
2例の截断側面図、第11図は、同例要部の拡大断面図、
第12図は同例要部の変形例を示す拡大断面図、第13図
は、第3例の要部の拡大断面図、第14図は、同例要部の
変形例を示す拡大断面図である。 A……壁体施工箇所 1……梁、2……天井スラブ 3……床、4……インサート 5……型枠、6……配筋 7……インサート、8……係合金物 9……突当て金物、10……コンクリート 11……Pca壁板、12……受け金物 13……ピンベース、14……ベース部材 15……ピン、16……吊り金物 17……Uリンク、18……上床 19……物上げ装置、20……吊り金物 21……Uリンク、22……フック 23……玉掛けワイヤー 24……目地材、25……壁体 26……凹溝、27……アンカー 28……アングル、29……アンカー 30……チャンネル、31……アングル 32……化粧板、33……帯鋼 34……アンカー、35……アングル
The drawings illustrate an embodiment of the invention, and FIGS.
FIG. 7 is a process side view of the first example, FIG. 7 is a cutaway side view of the same example, FIGS. 8 and 9 are enlarged perspective views of main parts of the same example, and FIG. 10 is a cutaway side view of the second example. , FIG. 11 is an enlarged sectional view of a main part of the example,
12 is an enlarged cross-sectional view showing a modification of the main part of the example, FIG. 13 is an enlarged cross-sectional view of a main part of the third example, and FIG. 14 is an enlarged cross-sectional view showing a modification of the main part of the same example. It is. A: Wall construction location 1 ... Beam, 2 ... Ceiling slab 3 ... Floor, 4 ... Insert 5 ... Formwork, 6 ... Reinforcement 7 ... Insert, 8 ... Engagement hardware 9 ... … Bumping hardware, 10… Concrete 11… Pca wall board, 12… Receiving hardware 13 …… Pin base, 14 …… Base member 15 …… Pin, 16 …… Hanging hardware 17 …… U-link, 18… … Upper floor 19… Lifting device, 20… Hanging hardware 21… U-link, 22… Hook 23… Sling wire 24… Joint material, 25… Wall 26… Groove, 27… Anchor 28 …… Angle, 29 …… Anchor 30 …… Channel, 31 …… Angle 32 …… Veneer, 33 …… Strip 34 …… Anchor, 35 …… Angle

フロントページの続き (51)Int.Cl.6 識別記号 FI E04B 2/56 632 E04B 2/56 632M 633 633A 633G 642 642A 642F (56)参考文献 特開 昭51−46715(JP,A) 特開 昭61−179944(JP,A) (58)調査した分野(Int.Cl.6,DB名) E04B 2/56 E04G 21/14Continuation of the front page (51) Int.Cl. 6 Identification symbol FI E04B 2/56 632 E04B 2/56 632M 633 633A 633G 642 642A 642F (56) References JP-A-51-46715 (JP, A) JP-A Sho 51-46715 61-179944 (JP, A) (58) Field surveyed (Int. Cl. 6 , DB name) E04B 2/56 E04G 21/14

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】先行施工した躯体の梁下乃至天井スラブ下
に後行施工する壁体の施工において、該壁体施工箇所近
傍の梁乃至天井スラブの適所に、吊り金物を取り外し可
能に装備させて、該吊り金物にチェーンブロック、チェ
ーンホイスト等の物上げ装置を支持させ、また、その壁
体施工箇所に隣接する床上で、Pca壁板を倒伏姿勢にて
製作し、該Pca壁板を上記物上げ装置により吊り上げて
建て起こし、定位置に定着させることを特徴とするチル
トアップ工法。
In the construction of a wall to be subsequently installed under a beam or a ceiling slab of a pre-constructed skeleton, a hanging metal is detachably mounted at an appropriate position of a beam or a ceiling slab near the wall construction site. Then, a lifting device such as a chain block and a chain hoist is supported by the hanging hardware, and a Pca wall plate is manufactured in a prone position on the floor adjacent to the wall construction site, and the Pca wall plate is placed on the floor. A tilt-up method characterized by being lifted and raised by a hoisting device, and fixed at a fixed position.
JP31886590A 1990-11-22 1990-11-22 Tilt-up method Expired - Fee Related JP2759707B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31886590A JP2759707B2 (en) 1990-11-22 1990-11-22 Tilt-up method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31886590A JP2759707B2 (en) 1990-11-22 1990-11-22 Tilt-up method

Publications (2)

Publication Number Publication Date
JPH04189940A JPH04189940A (en) 1992-07-08
JP2759707B2 true JP2759707B2 (en) 1998-05-28

Family

ID=18103828

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31886590A Expired - Fee Related JP2759707B2 (en) 1990-11-22 1990-11-22 Tilt-up method

Country Status (1)

Country Link
JP (1) JP2759707B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101285189B1 (en) * 2011-11-29 2013-07-10 경희대학교 산학협력단 External Drywall Unit Structure For PC Rahmen Structure, And Construction Method Thereof

Also Published As

Publication number Publication date
JPH04189940A (en) 1992-07-08

Similar Documents

Publication Publication Date Title
US3810601A (en) Form for use in building construction
US6223480B1 (en) Pre-cast concrete panels for construction of a building
US5643488A (en) Multi-room modular construction system
AU2017304226B2 (en) Precast concrete formwork, floor system and a method of construction
US5246640A (en) Method of constructing a wall from pourable concrete material
SG187296A1 (en) A multi-storey building with prefabricated members and a semi-prefabricating construction method thereof
CN100529274C (en) Method of constructing strip, foundations with longitudinal socket
JP2759707B2 (en) Tilt-up method
WO2020214086A1 (en) Precast building
EP0054026B1 (en) Lost formwork for use when casting concrete floors
AU2019203603B1 (en) Stair assembly and method
JP3191951B2 (en) Foundation construction method
WO2001000943A1 (en) Hollow filler block for a block-and-rib reinforced concrete slab
US5072565A (en) Pre-cast concrete wall panel and joist assembly and method of construction
JPH10317503A (en) Constructing method for wall type ferro-concrete structure
JPH084196A (en) Panel for building
EP1233123A2 (en) A bricklaying method and an arrangement for the implementation thereof
JPH084195A (en) Panel for building
JPH0642184A (en) Construction of skeleton using half precast floor board
JPH10219708A (en) Precast concrete block for continuous footing and continuous footing method by use thereof
JP2981009B2 (en) Foundation structure
JP2002194892A (en) Construction method of building
JP2732004B2 (en) Restoration method of temporary opening of floor slab
JP3281972B2 (en) Reinforcing unit and method of constructing reinforced concrete building using the same
JP3009298B2 (en) Method of manufacturing PCa slab

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees