JP2722099B2 - Construction method of steel reinforced concrete building - Google Patents
Construction method of steel reinforced concrete buildingInfo
- Publication number
- JP2722099B2 JP2722099B2 JP489389A JP489389A JP2722099B2 JP 2722099 B2 JP2722099 B2 JP 2722099B2 JP 489389 A JP489389 A JP 489389A JP 489389 A JP489389 A JP 489389A JP 2722099 B2 JP2722099 B2 JP 2722099B2
- Authority
- JP
- Japan
- Prior art keywords
- board
- floor
- construction method
- reinforced concrete
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、特に、床PC板または半PC板を使用した鉄骨
鉄筋コンクリート造建築物の構築工法に関するものであ
る。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention particularly relates to a construction method of a steel reinforced concrete building using a floor PC board or a half PC board.
[従来の技術] 従来、床PC板等を使用した鉄骨鉄筋コンクリート造建
築の構築工法としては、第4図に示すように、立設した
鉄骨柱1のスパン方向に鉄骨梁2を架設し、その後、第
5図に示すように、上記柱4・梁2及び壁等の型枠8を
組立てると共に、サポート4を組立て、第6図に示すよ
うに、半PC板5をセットして、床上端配筋を行なった
後、一体にコンクリート打設していた。[Prior Art] Conventionally, as a construction method of a steel-framed reinforced concrete building using a floor PC board or the like, as shown in Fig. 4, a steel beam 2 is erected in the span direction of an upright steel column 1, and thereafter, As shown in FIG. 5, the form 4 such as the column 4, the beam 2, and the wall is assembled, the support 4 is assembled, and as shown in FIG. After arranging the bars, concrete was cast together.
[発明が解決しようとする課題] しかしながら、上記従来工法では、柱・梁・壁の型枠
組立後に半PC板または床PC板をセットしていたので、下
階の型枠大工の作業が終了しないと床上作業を行なうこ
とができず、工期が長くなるばかりでなく、床PC板等を
受ける支保工が多くて施工性が悪い等の問題点があっ
た。[Problems to be Solved by the Invention] However, in the above-mentioned conventional method, since the half PC board or the floor PC board is set after assembling the formwork of columns, beams and walls, the work of the formwork carpenter on the lower floor is completed. Otherwise, work on the floor cannot be performed, and not only the construction period becomes long, but also there are many supports for receiving floor PC boards and the like, resulting in poor workability.
本発明は、上記従来の問題点を解決するためになされ
たもので、その目的とするところは、床上の鉄骨鉄筋組
立作業と床下の型枠工事を並列して行い、工期を短縮す
ることができるばかりでなく、床PC板等の支保工の本数
を少なくして床下空間を広くとり、施工性を向上せしめ
ることが出来る鉄骨鉄筋コンクリート造建築物の構築工
法を提供することにある。The present invention has been made to solve the above-mentioned conventional problems, and an object of the present invention is to reduce the construction period by performing a steel frame rebar assembling operation on a floor and a formwork under a floor in parallel. It is an object of the present invention to provide a construction method of a steel reinforced concrete building capable of not only being capable of reducing the number of support works such as floor PC boards but also providing a wide underfloor space and improving workability.
[課題を解決するための手段] 本発明の鉄骨鉄筋コンクリート造建築物の構築工法
は、スパン方向の鉄骨梁下に埋殺し用の仮設支柱を建て
込み、上記鉄骨梁に付設したブラケットに床PC板または
半PC板を架設しながら又は架設した後、柱・梁・壁等の
型枠を組立てることを特徴とするものである。[Means for Solving the Problems] In the construction method of a steel reinforced concrete building of the present invention, a temporary prop for embedding is erected under a steel beam in a span direction, and a floor PC board is attached to a bracket attached to the steel beam. Alternatively, the method is characterized in that formwork such as columns, beams, walls and the like are assembled while or after the half PC board is installed.
[実施例] 以下、本発明の一実施例について図面を参照してなが
ら説明する。Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
第1図において、1は鉄骨柱、2は鉄骨梁であって、
第1A図からも明らかなように、梁2の下に埋殺し用の仮
設支柱3が立設されている。第1B図は仮設支柱3の鉄骨
梁2への取付構造を示す。また左右の仮設支柱3の中間
には、必要に応じて、サポート4を立設する。In FIG. 1, 1 is a steel column, 2 is a steel beam,
As is clear from FIG. 1A, a temporary support column 3 for embedding is provided below the beam 2. FIG. 1B shows a structure for attaching the temporary support 3 to the steel beam 2. In the middle of the left and right temporary supports 3, supports 4 are erected as necessary.
続いて、第2図に示すように、左右の梁2に半PC板5
を架設する。この半PC板5の架設方法としては、例え
ば、第2A図に拡大して示すように鉄骨梁2の垂直鋼材2a
の外側にブラケット6を溶接等で一体に取付け、該ブラ
ケット6により上記半PC板5を受けるようにする。Subsequently, as shown in FIG.
Erection. As a method of erection of the half PC plate 5, for example, as shown in an enlarged manner in FIG.
A bracket 6 is integrally attached to the outside of the box by welding or the like, and the bracket 6 receives the half PC plate 5.
半PC板5のセットが完了すると、第3図に示すよう
に、柱1、梁2及び壁7に型枠8の組立てを行なう。When the setting of the half PC board 5 is completed, as shown in FIG. 3, the formwork 8 is assembled on the pillar 1, the beam 2, and the wall 7.
同時に、半PC板5上に上端筋を配筋する。 At the same time, upper end bars are arranged on the half PC board 5.
以上の作業が完了すると、柱・壁・梁・半PC板上にコ
ンクリートを一体打ちする。When the above work is completed, concrete is integrally cast on the columns, walls, beams and half-PC boards.
尚、この際、半PC板5の下のサポート4の本数を必要
に応じて増加させて補強する。At this time, the number of the supports 4 under the half PC board 5 is increased as necessary to reinforce the support.
上記半PC板5は床PC板であってもよい。 The half PC board 5 may be a floor PC board.
また、上記柱1等の型枠作業は、床PC板のセット作業
中に行ってもよい。Also, the formwork of the pillar 1 and the like may be performed during the work of setting the floor PC board.
[発明の効果] (1)床PC板又は半PC板を柱・壁・梁等の型枠組立作業
より先行して行なうことによって、上下階の作業を同時
に行い、躯体サイクル工程を短縮することができる。[Effects of the Invention] (1) By performing floor PC boards or semi-PC boards prior to formwork assembling work for columns, walls, beams, etc., work on the upper and lower floors can be performed simultaneously, thereby shortening the frame cycle process. Can be.
(2)コンクリート打設は水平部材、垂直部材を在来工
法と同じように同時にできる。(2) Concrete placing can be performed on horizontal and vertical members at the same time as the conventional construction method.
(3)床PC板または半PC板の性質を先行するため、下階
の型枠組立作業は雨天でも作業が可能である。(3) Since the properties of the floor PC board or half PC board precede, the formwork assembly work on the lower floor can be performed even in rainy weather.
(4)型枠の省力化を図ることができ、柱・梁・壁の型
枠作業が同時に行なえるため、作業能率の向上が図れ
る。(4) Labor saving of the formwork can be achieved, and the formwork of columns, beams and walls can be performed at the same time, so that the work efficiency can be improved.
第1図〜第3図は本発明工法の一実施例を順次説明する
図、第1A図は第1図の矢視Aから見た図、第1B図は仮設
支柱と梁との取付構成を示す拡大図、第2A図は要部の拡
大図、第4〜6図は従来工法の説明図である。 1…鉄骨柱、2…鉄骨梁、2a…垂直鋼材、3…仮設支
柱、4…サポート、5…半PC板、6…ブラケット、7…
壁、8…型枠。1 to 3 are diagrams for sequentially explaining one embodiment of the method of the present invention, FIG. 1A is a diagram viewed from an arrow A in FIG. 1, and FIG. 1B is a mounting structure of a temporary support and a beam. 2A is an enlarged view of a main part, and FIGS. 4 to 6 are explanatory views of a conventional method. DESCRIPTION OF SYMBOLS 1 ... Steel column, 2 ... Steel beam, 2a ... Vertical steel material, 3 ... Temporary support, 4 ... Support, 5 ... Half PC board, 6 ... Bracket, 7 ...
Wall, 8 ... formwork.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 渡辺 茂 静岡県三島市徳倉734―34 (56)参考文献 特開 昭59−34344(JP,A) ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Shigeru Watanabe 734-34 Tokukura, Mishima-shi, Shizuoka (56) References JP-A-59-34344 (JP, A)
Claims (1)
柱を建て込み、上記鉄骨梁に付設したブラケットに床PC
板または半PC板を架設しながら又は架設した後、柱・梁
・壁等の型枠を組立てることを特徴とする鉄骨鉄筋コン
クリート造建築物の構築工法。1. A temporary support column for embedding is erected under a steel beam in the span direction, and a floor PC is mounted on a bracket attached to the steel beam.
A construction method for a steel-framed reinforced concrete building characterized by assembling columns, beams, walls, and other formwork while or after laying a board or half-PC board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP489389A JP2722099B2 (en) | 1989-01-13 | 1989-01-13 | Construction method of steel reinforced concrete building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP489389A JP2722099B2 (en) | 1989-01-13 | 1989-01-13 | Construction method of steel reinforced concrete building |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH02186023A JPH02186023A (en) | 1990-07-20 |
JP2722099B2 true JP2722099B2 (en) | 1998-03-04 |
Family
ID=11596351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP489389A Expired - Fee Related JP2722099B2 (en) | 1989-01-13 | 1989-01-13 | Construction method of steel reinforced concrete building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2722099B2 (en) |
-
1989
- 1989-01-13 JP JP489389A patent/JP2722099B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH02186023A (en) | 1990-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2000144896A (en) | Construction method of rahmen frame using beam having step difference | |
JP2722099B2 (en) | Construction method of steel reinforced concrete building | |
JPH10176378A (en) | Installation structure of earthquakeproofing wall | |
JP3453895B2 (en) | How to install anchor bolts on large steel frames | |
JP3804174B2 (en) | Seismic retrofitting method for existing buildings with square frame structure | |
JP2745238B2 (en) | Temporary support for slab half PCa board erection | |
JP4044676B2 (en) | Unit building | |
JP2784450B2 (en) | Reinforced concrete foundation | |
JP2780055B2 (en) | Construction method of reinforced concrete building | |
JP3284383B2 (en) | Support hardware for SRC beam construction | |
JP2722121B2 (en) | Construction method of reinforced concrete building | |
JPS6046219B2 (en) | Construction method of concrete retaining wall | |
JPH102017A (en) | Building unit and its constructing method | |
JPS6195136A (en) | Construction of multistoried building skeletal by precast reinforced concrete unit | |
JPH0125152Y2 (en) | ||
JPH09256457A (en) | Building assembly method | |
JPH0558112B2 (en) | ||
JPH02167937A (en) | Connecting work of steel plate-concrete structure | |
JP2989337B2 (en) | Pre-assembly method of beam in steel reinforced concrete structure | |
JP3047847U (en) | Foundation mounting brackets and foundation mounting columns | |
JP2558889Y2 (en) | garage | |
JP3082147B2 (en) | Construction method of reinforced concrete structures | |
JP2531045B2 (en) | Construction method for reinforced concrete structure | |
JPS63156138A (en) | Steel roof panel having anchor bolt for connecting shed mounted thereto | |
JPH094255A (en) | Store-front-fitting construction, and frame body used for the construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081128 Year of fee payment: 11 |
|
LAPS | Cancellation because of no payment of annual fees |