JP2719265B2 - Grout method of double steel pipe for propulsion - Google Patents
Grout method of double steel pipe for propulsionInfo
- Publication number
- JP2719265B2 JP2719265B2 JP5500192A JP5500192A JP2719265B2 JP 2719265 B2 JP2719265 B2 JP 2719265B2 JP 5500192 A JP5500192 A JP 5500192A JP 5500192 A JP5500192 A JP 5500192A JP 2719265 B2 JP2719265 B2 JP 2719265B2
- Authority
- JP
- Japan
- Prior art keywords
- propulsion
- steel pipe
- double steel
- pipe
- grout
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、二重管構造を備えた例
えばガス管等の推進用二重鋼管を土中に推進させること
により土中に埋設する推進工法における、推進用二重鋼
管の連結部分を充填するグラウト方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a double steel pipe for propulsion in a propulsion method in which a double steel pipe having a double pipe structure, such as a gas pipe, is propelled into the soil to be buried in the soil. Grouting method for filling the connecting portion of the grout.
【0002】[0002]
【従来の技術】例えば高圧ガスを送るために土中に埋設
する管として、その管の強度等の保持のために、内管と
外管との間にコンクリート等が流し込まれた二重鋼管が
用いられることがある。またこの二重鋼管を土中に埋設
するにあたり、埋設する経路に沿う延々と長細い溝を地
上から開削して埋設するのではなく、所定の立坑を掘っ
ておいて、この立坑の横壁からその二重鋼管をその長手
方向に推進することにより埋設するいわゆる推進工法が
採用されることがある。2. Description of the Related Art For example, a double steel pipe in which concrete or the like is poured between an inner pipe and an outer pipe is used as a pipe buried in the soil to send high-pressure gas, in order to maintain the strength of the pipe. May be used. Also, when burying this double steel pipe in the soil, instead of digging and burying a long and narrow groove along the path to be buried from the ground, digging a predetermined shaft, A so-called propulsion method of burying a double steel pipe by propelling it in the longitudinal direction may be adopted.
【0003】図5は上記のような推進工法を採用する際
に用いられる従来の推進用二重鋼管の一例を示した側面
図(a)および断面図(b)である。この二重鋼管31
は、その基本構造として、内管33と外管35と、これ
ら内管33と外管35との間を埋めるコンクリート37
とからなる。ここで、内管33の前端部33aと後端部
33bはコンクリート37には覆われず露出している。FIG. 5 is a side view (a) and a sectional view (b) showing an example of a conventional double steel pipe for propulsion used when adopting the above-mentioned propulsion method. This double steel pipe 31
Has, as its basic structure, an inner pipe 33 and an outer pipe 35, and a concrete 37 filling the space between the inner pipe 33 and the outer pipe 35.
Consists of Here, the front end 33a and the rear end 33b of the inner pipe 33 are not covered with the concrete 37 and are exposed.
【0004】このような二重鋼管31を何本も用意し、
図に矢印で示す推進方向に土中に推進するが、その際、
既に推進された二重鋼管31の後端面33dと新たな二
重鋼管31の前端面33cとを当接させて溶接し、この
溶接部分に、リングが複数に分割された形状のものをリ
ング状に嵌め合わせて、既に推進された二重鋼管31の
外管35の後端面35bと新たな二重鋼管31の外管5
の前端面35aとの間をつなぎ、その後新たな二重鋼管
31の内管33の後端面33dと外管35の後端面35
bに推力を加え、矢印方向に推進する。これを何回も繰
り返すことにより互いに連結された二重鋼管31が土中
に埋設される。[0004] A number of such double steel pipes 31 are prepared,
Propulsion into the ground in the direction indicated by the arrow in the figure,
The rear end face 33d of the double steel pipe 31 already propelled and the front end face 33c of the new double steel pipe 31 are brought into contact with each other and welded. To the rear end face 35b of the outer pipe 35 of the double steel pipe 31 already propelled and the outer pipe 5 of the new double steel pipe 31.
Of the inner pipe 33 of the new double steel pipe 31 and the rear end face 35 of the outer pipe 35.
A thrust is applied to b to propel it in the direction of the arrow. By repeating this many times, the double steel pipes 31 connected to each other are buried in the soil.
【0005】[0005]
【発明が解決しようとする課題】ここで上記の二重鋼管
31を用いた推進工法においては、二重鋼管31どおし
の連結部分の内管33と外管35(ないしリング状に嵌
め合せたもの)との間はセメントミルク等で充填するこ
とが強度上好ましいが、隙間なく完全充填を行うことが
難しいという問題があり、また充填を行わなわず、鋼製
セグメントを円周状にはめ込み、推進することもある。
ただしこの場合連結部分の強度が問題となる。Here, in the propulsion method using the above-mentioned double steel pipe 31, the inner pipe 33 and the outer pipe 35 (or ring-like fitting) of the connecting portion of the double steel pipe 31 are connected. Is preferably filled with cement milk or the like from the viewpoint of strength, but there is a problem that it is difficult to completely fill without gaps. Also, without filling, the steel segment is fitted into the circumference. , Sometimes promote.
However, in this case, the strength of the connecting portion becomes a problem.
【0006】また上記のような従来の二重鋼管を用いた
場合は、推進により、内管33の後端面33dに例えば
折れ曲がりや傷が生じ、次の二重鋼管の内管と溶接する
前にその後端面33dを整形する工程が必要であった。
また、この推進により内管33に内部応力が生じ、土中
に埋設され使用されている間にこの内管33に例えばピ
ンホールや亀裂等が生じる恐れがあった。When the conventional double steel pipe as described above is used, for example, the rear end face 33d of the inner pipe 33 is bent or scratched by the propulsion, and before being welded to the next inner pipe of the double steel pipe. Thereafter, a step of shaping the end face 33d was required.
Further, the propulsion causes internal stress in the inner pipe 33, and for example, a pinhole or a crack may be generated in the inner pipe 33 while it is buried and used in the soil.
【0007】本発明は、上記事情に鑑み、内管の後端面
を整形する工程が不要であり、かつ内管に内部応力を生
じさせない推進工法を採用した上で、その推進工法に用
いられる推進用二重鋼管のグラウト方法を提供すること
を目的とする。In view of the above circumstances, the present invention employs a propulsion method that does not require a step of shaping the rear end face of the inner pipe and does not cause internal stress in the inner pipe, and then employs a propulsion method used in the propulsion method. It is an object of the present invention to provide a method for grouting a double steel pipe.
【0008】[0008]
【課題を解決するための手段】上記目的を達成するため
の本発明の推進用二重鋼管のグラウト方法は、内管と、
該内管の両端部が露出するように該内管の外周を覆う中
間材と、該中間材に設けられた長手方向に延びるグラウ
トホース挿通孔と、前記中間材との間で摺動する外管と
を備えた推進用二重鋼管が用いられる。To achieve the above object, the present invention provides a method for grouting a double steel pipe for propulsion, comprising the steps of:
An intermediate member that covers the outer periphery of the inner tube so that both ends of the inner tube are exposed, a grout hose insertion hole extending in the longitudinal direction provided in the intermediate member, and an outer member that slides between the intermediate member. A double steel pipe for propulsion provided with a pipe is used.
【0009】本発明の推進用二重鋼管のグラウト方法
は、上記推進用二重鋼管どおしの連結部分を充填する方
法であって、 (1)既に推進された後端部が立坑に突出した前記推進
用二重鋼管の前記内管の後端面に新たな前記推進用二重
鋼管の前記内管の前端面を当接させてこれらの内管どお
しを接続する第1工程 (2)既に推進された前記推進用二重鋼管の前記グラウ
トホース挿入孔の後端の開口から露出したグラウトホー
スの後端と新たな前記推進用二重鋼管の前記グラウトホ
ース挿入孔の前端の開口から露出したグラウトホースの
前端とを接続する第2工程 (3)前記新たな推進用二重鋼管の前記外管を前記中間
材に対して前方に摺動させて該外管の前端面を既に推進
された前記推進用二重鋼管の前記外管の後端面に当接さ
せる第3工程 (4)新たな前記推進用二重鋼管の前記外管に推力を作
用させて該推進用二重鋼管を推進させる第4工程 (5)複数の推進用二重鋼管に亘って前記第1工程、前
記第2工程、前記第3工程、及び前記第4工程を繰り返
した後、順次接続されたグラウトホースを順次抜き取り
ながら該グラウトホースに充填材を流し込んで、該グラ
ウトホースの端部を推進用二重鋼管の連結部分に位置さ
せては、該充填材により、推進用二重鋼管の連結部分の
内管と外管との間を充填する第5工程からなることを特
徴とするものである。The method for grouting a double steel pipe for propulsion according to the present invention.
Is to fill the connecting part of the above double steel pipe for propulsion.
(1) the propulsion in which the already propelled rear end protrudes into the shaft.
New propulsion double on the rear end face of the inner pipe of
The front end faces of the inner pipes of the steel pipes are brought into contact with each other to
(2) The grou of the already propelled double steel pipe for propulsion
Grout hoe exposed from the opening at the rear end of the hose insertion hole
The rear end of the steel and the grout
Of the grout hose exposed from the opening at the front end of the
Second step of connecting to the front end (3) The outer tube of the new double steel tube for propulsion is connected to the intermediate
Sliding forward against the material, the front end of the outer tube has already been propelled
Abutting the rear end face of the outer pipe of the double steel pipe for propulsion
Third step (4) Applying thrust to the outer pipe of the new double steel pipe for propulsion
The fourth step of propelling the double steel pipe for propulsion (5) The first step before the plurality of double steel pipes for propulsion
The second step, the third step, and the fourth step are repeated.
After doingPull out grout hoses sequentially connected
WhilePour the filler into the grout hose,The gra
Position the end of the out hose at the joint of the double steel pipe for propulsion.
Let'sBy the filler,Double steel pipe for propulsionConnecting part
Inner tubeAnd outsideFifth step of filling the space between pipesConsists ofSpecially
It is a sign.
【0010】 また、複数の推進用二重鋼管に亘って前記
第1工程、前記第2工程、前記第3工程、及び前記第4
工程を繰り返す途中の一箇所に、前記第1工程の後に前
記第2工程を省略して前記第3工程を実行する工程を置
き、前記第5工程が、順次接続された推進用二重鋼管の
うちの最先端に位置する推進用二重鋼管が到達坑に達し
た後、前記グラウトホースを推進方向前方と後方との双
方から抜き取る工程であってもよい。[0010] Further, over a plurality of double steel pipes for propulsion,
The first step, the second step, the third step, and the fourth step
At one point in the middle of repeating the process, after the first process,
The step of executing the third step by omitting the second step is provided.
The fifth stepOf the double steel pipe for propulsion
The double steel pipe for propulsion located at the forefront of the
AfterConnect the grout hose to the front and rear
Withdraw fromProcessIs also good.
【0011】[0011]
【作用】本発明に用いられる推進用二重鋼管は、中間材
と外管との間が摺動する構成を備えており、外管のみに
推力を作用させることにより、内管の後端面に傷をつけ
ることなく、また内管に内部応力を生じさせることな
く、推進工法を採用してこの推進用二重鋼管を土中に埋
設することができ、これにより使用中においても内管に
ピンホールや亀裂等が生じることが防止され、信頼度の
高い施工が可能となる。The double steel pipe for propulsion used in the present invention has a structure in which the intermediate material slides between the outer pipe and the inner pipe by applying a thrust only to the outer pipe. The double-pipe steel pipe for propulsion can be buried in the soil by using the propulsion method without causing any damage and without causing internal stress in the inner pipe. Holes and cracks are prevented from being generated, and highly reliable construction can be performed.
【0012】本発明の推進用二重鋼管のグラウト方法
は、上記の推進用二重鋼管どおしを接続する際にグラウ
トホース同士を連結しておき、推進した後でこのグラウ
トホースにセメントミルク等の充填剤を流し込んで推進
用二重鋼管の連結部分を充填するようにしたため、この
連結部分を完全に充填することができ、十分な強度を持
った埋設管となる。In the method for grouting a double steel pipe for propulsion according to the present invention, the grout hoses are connected to each other when the double steel pipes for propulsion are connected to each other, and after the propulsion, cement milk is added to the grout hose. The joint portion of the double steel pipe for propulsion is filled by pouring a filler such as the above, so that the joint portion can be completely filled, and a buried pipe having sufficient strength can be obtained.
【0013】この際、外管の一端部側に外管の内側から
外側に向かってのみ開く逆止弁を備えておくと、推進の
際にもし内管と外管との間に水や土砂等が入り込んでし
まった場合であっても、充填材の充填の際にその水や土
砂等が充填圧により外管の外部に一方的に押し出される
こととなり、充填材が内管と外管とに挾まれた空間内に
十分行き渡ることとなる。またこの充填材自身もこの逆
止弁を通って外管の外方に流れ出し、外管の外壁付近の
余掘り空間も充填材で満たされることとなり、一層強固
な埋設管となる。At this time, if one end of the outer pipe is provided with a check valve which opens only from the inside to the outside of the outer pipe, water or earth and sand may be interposed between the inner pipe and the outer pipe during propulsion. Even if water has entered, the water, earth and sand, etc. will be unilaterally pushed out of the outer tube due to the filling pressure when the filler is filled, and the filler will be removed from the inner tube and the outer tube. Will be spread enough in the space between the two. Further, the filler itself flows out of the outer pipe through the check valve, so that the surplus space near the outer wall of the outer pipe is filled with the filler, and the buried pipe becomes stronger.
【0014】ここで、上記グラウトホースは一般的には
順次抜き取りながら連結部分を充填していくが、推進ス
パンが長い場合にはこのグラウトホースは推進方向前方
に抜き取ってもよく、後方に抜き取ってもよいが、中央
付近の1箇所だけグラウトホースどおしを連結しないで
おき、先端の推進用二重鋼管が到達坑に達した後、この
グラウトホースを推進方向前方と後方との双方に抜き取
るようにした場合、充填の作業を並行して行うことがで
き好ましい。Here, the above grout hose generally fills the connecting portion while sequentially withdrawing, but when the propulsion span is long, the grout hose may be withdrawn in the forward direction of the propulsion direction, and may be withdrawn in the rear direction. Although it is good, do not connect the grout hoses at only one point near the center, and after the propulsion double steel pipe reaches the reaching pit , pull out the grout hose both forward and backward in the propulsion direction In this case, the filling operation can be performed in parallel, which is preferable.
【0015】[0015]
【実施例】以下、本発明の実施例について説明する。図
1は、本発明の一実施例に係る推進用二重鋼管の長手方
向に沿う側面図、図2は図1に示す推進用二重鋼管を図
1の右方から見た断面図、図3は、図1に円Aで示す部
分の拡大側面図である。ここでは、一例として、ガス用
の推進用二重鋼管について説明する。Embodiments of the present invention will be described below. 1 is a side view along a longitudinal direction of a double steel pipe for propulsion according to one embodiment of the present invention. FIG. 2 is a cross-sectional view of the double steel pipe for propulsion shown in FIG. 3 is an enlarged side view of a portion indicated by a circle A in FIG. Here, a double steel pipe for gas propulsion will be described as an example.
【0016】図1および図3には、既に土中に推進さ
れ、後端側の一部のみが立坑内に突出した状態の推進用
二重鋼管1’とこの推進用二重鋼管1’の後端に接続さ
れ、この推進用二重鋼管1’とともに土中に推進される
新たな推進用二重鋼管1とが図示されている。これらの
推進用二重鋼管1,1’は同一の構造を備えたものであ
る。FIG. 1 and FIG. 3 show a double steel pipe for propulsion 1 'and a double steel pipe for propulsion 1' in a state where it has already been propelled into the soil and only a part of the rear end projects into the shaft. A new double steel pipe 1 for propulsion connected to the rear end and propelled into the soil together with the double steel pipe 1 'for propulsion is shown. These double steel pipes 1 and 1 'for propulsion have the same structure.
【0017】この推進用二重鋼管1は、鋼管からなる約
900mmφの内管2と、やはり鋼管からなる、約12
00mmφの外管3と、これら内管2と外管3との間を
埋める中間材としての、コンクリート4とから構成され
ている。ここでこのコンクリート4には、図2に示すよ
うに、本発明にいうグラウトホース挿通孔を形成するエ
ンビ管5が埋め込まれており、このエンビ管5にはグラ
ウトホース6が挿通されている。The double steel pipe 1 for propulsion has an inner pipe 2 of about 900 mmφ made of steel pipe and an inner pipe 2 of about 12 mm also made of steel pipe.
It comprises an outer pipe 3 having a diameter of 00 mm and concrete 4 as an intermediate material for filling between the inner pipe 2 and the outer pipe 3. Here, as shown in FIG. 2, an embi tube 5 forming a grout hose insertion hole according to the present invention is embedded in the concrete 4, and a grout hose 6 is inserted through the embi tube 5.
【0018】また、図3に示すように、外管3の推進方
向前端部付近には、管の内側から押されたときには開く
とともに管の外側から押されたときには閉じる逆止弁9
が備えられている。また、コンクリート4の外周にはポ
リプロピレン管7が備えられており、外管3の内壁とポ
リプロピレン管7の外壁との間には潤滑剤が塗布されて
いる。これにより外管3がその長手方向に押されると外
管3がコンクリート4に対し摺動する構造となってい
る。また外管3の前端にはガイドリング10,後端部の
内壁側にストップリング11が備えられており、後述す
るようにして推進用二重鋼管1がコンクリート4上を摺
動して前方に進んだときにガイドリング10が推進用二
重鋼管1’の外管3’の内側にその後端面3c’側から
入り込みその先端がストップリング11に当接する。ま
たこれとともに推進用二重鋼管1の外管3の前端面3b
と推進用二重鋼管1’の外管3’の後端面3c’とが当
接する。このようにガイドリング10を備えたため、外
管3,3’どおしに多少の位置ずれがあってもその誤差
が吸収され、外管3,3’どおしが正確に当接する。As shown in FIG. 3, a check valve 9 near the front end of the outer tube 3 in the propulsion direction is opened when pushed from inside the tube and closed when pushed from outside the tube.
Is provided. Further, a polypropylene pipe 7 is provided on the outer periphery of the concrete 4, and a lubricant is applied between an inner wall of the outer pipe 3 and an outer wall of the polypropylene pipe 7. Thereby, when the outer tube 3 is pushed in the longitudinal direction, the outer tube 3 slides against the concrete 4. The front gas Idoringu 10 in the outer tube 3 is provided with a stop ring 11 on the inner wall of the rear portion, the forward propulsion Double Tube 1 as described later is slid over the concrete 4 When the vehicle advances, the guide ring 10 enters the inside of the outer pipe 3 ′ of the double steel pipe 1 ′ for propulsion from the rear end face 3 c ′ side, and the tip thereof contacts the stop ring 11. Also, the front end face 3b of the outer pipe 3 of the double steel pipe 1 for propulsion.
And the rear end face 3c 'of the outer pipe 3' of the double steel pipe 1 'for propulsion abuts. Since the guide ring 10 is provided in this manner, even if there is a slight displacement between the outer tubes 3 and 3 ', the error is absorbed, and the outer tubes 3 and 3' abut accurately.
【0019】また内管2の外面2aはポリエチレンで被
覆されている。図1、図3に示すように、推進用二重鋼
管1の内管2の前端面2bと推進用二重鋼管1’の内管
2’の後端面2c’が当接した後、この当接部の内管ど
おしが溶接される。この溶接の後、溶接部には、ポリエ
チレンチューブが新たに外面より被覆される。図4は、
図1〜図3に示す構造を備えた推進用二重鋼管を土中に
埋設するための推進工法をその工程に沿って示した模式
図である。The outer surface 2a of the inner tube 2 is coated with polyethylene. As shown in FIGS. 1 and 3, after the front end face 2b of the inner pipe 2 of the double steel pipe 1 for propulsion and the rear end face 2c 'of the inner pipe 2' of the double steel pipe 1 'for propulsion come into contact with each other, this contact is made. The inner pipe at the contact is welded. After this welding, the welded portion is newly covered with a polyethylene tube from the outer surface. FIG.
FIG. 4 is a schematic view showing a propulsion method for burying a double steel pipe for propulsion having the structure shown in FIGS.
【0020】図4(a)に示すように推進用二重鋼管
1’が推進工法により既に土中に推進されその後端の一
部が立坑内に突出した状態にあるものとする。この後端
の一部が立坑内に突出した推進用二重鋼管1’に対し、
新たに推進用二重鋼管1を準備し、その内管2の前端面
2bと既に推進された推進用二重鋼管1’の後端面2
c’とが当接する状態となる(図1,図3参照)ように
推進用二重鋼管1を配置する。As shown in FIG. 4 (a), it is assumed that the double steel pipe for propulsion 1 'has already been propelled into the soil by the propulsion method and a part of the rear end thereof has protruded into the shaft. For the double steel pipe for propulsion 1 'whose part of this rear end protrudes into the shaft,
A new double steel pipe 1 for propulsion is prepared, and the front end face 2b of the inner pipe 2 and the rear end face 2 'of the double steel pipe 1' for propulsion have already been propelled.
The double steel pipe 1 for propulsion is arranged so that c ′ comes into contact with the pipe (see FIGS. 1 and 3).
【0021】次に図4(b)に示すように、互いに当接
された推進用二重鋼管1’の後端面2c’と推進用二重
鋼管1の前端面2bとが溶接され、この溶接後の状態が
X線を用いて検査され、この検査に合格するとこの溶接
部がポリエチレンチューブ20で被覆される。尚、前述
したように、内管2の外壁2aのコンクリート4に隠れ
た部分にもポリエチレンの被覆が形成されている。Next, as shown in FIG. 4 (b), the rear end face 2c 'of the propulsion double steel pipe 1' and the front end face 2b of the propulsion double steel pipe 1 which are in contact with each other are welded. The later condition is inspected using X-rays, and if this inspection is passed, the weld is covered with a polyethylene tube 20. As described above, the portion of the outer wall 2a of the inner pipe 2 that is hidden by the concrete 4 is also coated with polyethylene.
【0022】次に図4(c)に示すように、推進用二重
鋼管1,1’の、図2に示すグラウトホース挿入用の管
5の中に挿通されたグラウトホース6どおしが接続され
る。ただし、長距離の場合、ここでは多数本接続されて
推進されることにより最終的に中央付近に位置すること
になる一箇所については、接続されたグラウトホースを
推進方向前方(到達坑側)と後方(発進坑側)から半々
ずつ引き抜くことができるように、接続しないでおく。Next, as shown in FIG. 4 (c), the grout hose 6 is inserted into the grout hose insertion tube 5 shown in FIG. 2 of the propulsion double steel tube 1, 1 '. Connected. However, in the case of long distances, here, a large number of cables will be connected and propelled, so that one point that will eventually be located near the center will be connected to the grout hose in the propulsion direction forward (the arrival pit side) . Leave unconnected so that it can be pulled out half-by-half from the rear (starting pit side) .
【0023】さらにその後、図4(c)に示す状態から
図4(d)に示す状態となるまで外管3がコンクリート
4に対し前方に摺動され、これによりこの外管3の前端
面3bが外管3’の後端面3c’と当接する。その後、
図4(e)に示すように、推進用二重鋼管1の後端に、
その外管3の後端面3cのみに当接するように押輪21
があてがわれ、この押輪21を押すように推進油圧ジャ
ッキ22がセットされ、外管3に推力を作用させて推進
用二重鋼管1を推進用二重鋼管1’および該推進用二重
鋼管1’よりもさらに前方に接続された同種の推進用二
重鋼管とともに土中に推進する。ここで、最前段の推進
用二重鋼管の前端部には、図示しない掘削ヘッドが装着
されており、これにより掘り進みながら推進する。Thereafter, the outer pipe 3 is slid forward with respect to the concrete 4 from the state shown in FIG. 4 (c) to the state shown in FIG. 4 (d), whereby the front end face 3b of the outer pipe 3 is moved. Abuts on the rear end face 3c 'of the outer tube 3'. afterwards,
As shown in FIG. 4 (e), at the rear end of the double steel pipe 1 for propulsion,
A pressing wheel 21 is provided so as to contact only the rear end face 3c of the outer tube 3.
The propulsion hydraulic jack 22 is set so as to press the pressing wheel 21, and a thrust is applied to the outer pipe 3 to transform the propulsion double steel pipe 1 into the propulsion double steel pipe 1 ′ and the propulsion double steel pipe 1 ′. It is propelled into the soil together with the same type of double steel pipe for propulsion connected further forward than 1 '. Here, a not-shown excavation head is attached to the front end of the foremost double steel pipe for propulsion, whereby the propulsion is performed while digging.
【0024】多数本の推進用二重鋼管に亘って上記のよ
うな各工程を経た推進が行われた後、グラウトホース6
(図2参照)にモルタルを流し込み、グラウトホースの
先端が推進用二重鋼管の接続部に順次配置されるように
例えば引き抜き取りながら、この接続部の内管2と外管
3との間に充填する。この場合において、グラウトホー
ス6を推進方向後方に引き抜く際は、推進方向前端に配
置された推進用二重鋼管のグラウトホース挿入用管5の
前端の開口からセメントミルクが流れ出てしまわないよ
うにこの開口を閉鎖することが好ましい。またグラウト
ホース6を引き抜く際、グラウトホース挿入用の管5の
内部もセメントミルクで充填されるように、このグラウ
トホース6にセメントミルクを流し込みながら引き抜く
ことが好ましい。接続部の内管2と外管3との間をセメ
ントミルクで充填する際、このセメントミルクはこの内
管2と外管3との間に入り込んだ水や土砂等を逆止弁9
を経由して外管3の外に流し出すとともに、セメントミ
ルク自身もこの逆止弁を経由して外に流れ出て、図4
(f)に示すように、外管3の外壁もセメントミルクで
覆われる。これによりこの埋設管がより強固なものとな
る。更に地表面の沈下を防止することもできる。After the propulsion through the above-described steps is performed over a large number of propulsion double steel pipes, the grout hose 6
A mortar is poured into the connection portion (see FIG. 2), and the grout hose is pulled out, for example, so as to be sequentially arranged at the connection portion of the double steel pipe for propulsion, while being drawn between the inner tube 2 and the outer tube 3 of the connection portion. Fill. In this case, when the grout hose 6 is pulled backward in the propulsion direction, the cement milk does not flow out from the opening at the front end of the grout hose insertion tube 5 of the double steel tube for propulsion arranged at the front end in the propulsion direction. Preferably, the opening is closed. When the grout hose 6 is pulled out, it is preferable to pull out the grout hose 6 while pouring the cement milk into the grout hose 6 so that the inside of the grout hose insertion tube 5 is also filled with the cement milk. When the space between the inner pipe 2 and the outer pipe 3 of the connecting portion is filled with the cement milk, the cement milk removes water, earth and sand, etc., which have entered between the inner pipe 2 and the outer pipe 3.
4 and the cement milk itself also flows out through this check valve and flows out of the outer pipe 3 as shown in FIG.
As shown in (f), the outer wall of the outer tube 3 is also covered with cement milk. This makes the buried pipe more robust. Further, the settlement of the ground surface can be prevented.
【0025】土中に埋設されたこの二重鋼管の内管の内
部には一例として70kg/cm2のガス圧のガスが流
される。尚、ここではガス用の推進用二重鋼管およびそ
の推進工法について説明したが、本発明はガス用のもの
に限られるものでないことはいうまでもない。As an example, a gas having a gas pressure of 70 kg / cm 2 is passed through the inner pipe of the double steel pipe buried in the soil. Here, the double steel pipe for gas propulsion and its propulsion method have been described, but it goes without saying that the present invention is not limited to the gas type.
【0026】[0026]
【発明の効果】以上説明したように、本発明の推進用二
重鋼管のグラウト方法は、推進用二重鋼管にグラウトホ
ース挿通孔を備えその中にグラウトホースを備えてお
き、推進用二重鋼管を連結した際にグラウトホースどお
しも接続しておき、推進後に連結されたグラウトホース
に充填剤を流し込んで推進用二重鋼管等どおしの連結部
分を充填するようにしたため、この連結部分を完全に充
填することができ、強固な埋設管となる。As described above, according to the method for grouting a double steel pipe for propulsion of the present invention, a grout hose insertion hole is provided in the double steel pipe for propulsion, and a grout hose is provided therein. The grout hose was connected when the steel pipes were connected, and the filler was poured into the connected grout hose after propulsion to fill the connected portion of the propulsion double steel pipe and the like. The connection part can be completely filled, and becomes a strong buried pipe.
【図1】本発明の一実施例に係る推進用二重鋼管の長手
方向に沿う側面図である。FIG. 1 is a side view along a longitudinal direction of a double steel pipe for propulsion according to an embodiment of the present invention.
【図2】図1に示す推進用二重鋼管を図1の右方から見
た断面図である。FIG. 2 is a cross-sectional view of the double steel pipe for propulsion shown in FIG. 1 as viewed from the right side in FIG.
【図3】図1の円Aで示す部分の拡大側面図である。FIG. 3 is an enlarged side view of a portion indicated by a circle A in FIG. 1;
【図4】図1〜図3に示す構造を備えた推進用二重鋼管
を土中に埋設するための推進工法をその工程に沿って示
した模式図である。FIG. 4 is a schematic diagram showing a propulsion method for burying a double steel pipe for propulsion having the structure shown in FIGS.
【図5】推進工法を採用した際に用いられる従来の推進
用二重鋼管の一例を示した側面図(a)および断面図
(b)である。FIG. 5 is a side view (a) and a cross-sectional view (b) showing an example of a conventional double steel pipe for propulsion used when adopting the propulsion method.
1,1’ 推進用二重鋼管 2 内管 3 外管 4 コンク
リート 5 エンビ管 7 ポリプ
ロピレン管 9 逆止弁 10 ガイ
ドリング 11 ストップリング1, 1 'double steel pipe for propulsion 2 inner pipe 3 outer pipe 4 concrete 5 embi pipe 7 polypropylene pipe 9 check valve 10 guide ring 11 stop ring
───────────────────────────────────────────────────── フロントページの続き (72)発明者 藤田 明孝 横浜市鶴見区末広町1丁目7番7号 東 京瓦斯株式会社 導管技術センター内 (72)発明者 長島 伸吾 横浜市鶴見区末広町1丁目7番7号 東 京瓦斯株式会社 導管技術センター内 (72)発明者 足立 明 千葉市松波3丁目17番8号 (72)発明者 藤本 智也 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社 東京本社内 (72)発明者 森下 重 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社 東京本社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Akitaka Fujita 1-7-7 Suehirocho, Tsurumi-ku, Yokohama-shi Inside the Tokyo Gas Co., Ltd. Pipe Technology Center (72) Inventor Shingo Nagashima 1 Suehirocho, Tsurumi-ku, Yokohama-shi 7-7-7 Tokyo Gas Co., Ltd. Conduit Technology Center (72) Inventor Akira Adachi 3-17-18 Matsunami, Chiba City (72) Inventor Tomoya Fujimoto 2-3-2 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel (72) Inventor Shigeru Morishita 2-2-2 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation
Claims (2)
に該内管の外周を覆う中間材と、該中間材に設けられた
長手方向に伸びるグラウトホース挿通孔と、前記中間材
との間で摺動する外管とを備えた推進用二重鋼管どおし
の連結部分を充填する推進用二重鋼管のグラウト方法で
あって、 既に推進された後端部が立坑に突出した前記推進用二重
鋼管の前記内管の後端面に新たな前記推進用二重鋼管の
前記内管の前端面を当接させてこれらの内管どおしを接
続する第1工程と、 既に推進された前記推進用二重鋼管の前記グラウトホー
ス挿入孔の後端の開口から露出したグラウトホースの後
端と新たな前記推進用二重鋼管の前記グラウトホース挿
入孔の前端の開口から露出したグラウトホースの前端と
を接続する第2工程と、 前記新たな推進用二重鋼管の前記外管を前記中間材に対
して前方に摺動させて該外管の前端面を既に推進された
前記推進用二重鋼管の前記外管の後端面に当接させる第
3工程と、 新たな前記推進用二重鋼管の前記外管に推力を作用させ
て該推進用二重鋼管を推進させる第4工程と、 複数の推進用二重鋼管に亘って前記第1工程、前記第2
工程、前記第3工程、及び前記第4工程を繰り返した
後、順次接続されたグラウトホースを順次抜き取りなが
ら該グラウトホースに充填材を流し込んで、該グラウト
ホースの端部を推進用二重鋼管の連結部分に位置させて
は、該充填材により、推進用二重鋼管の連結部分の内管
と外管との間を充填する第5工程とからなることを特徴
とする推進用二重鋼管のグラウト方法。1. An inner tube, an intermediate material covering the outer periphery of the inner tube so that both ends of the inner tube are exposed, a grout hose insertion hole extending in a longitudinal direction provided in the intermediate material, and A grouting method for a propulsion double steel pipe that fills a connection part of a propulsion double steel pipe with an outer pipe that slides between the propulsion material and a rear end that has already been propelled to a shaft. A first step in which the front end face of the new inner pipe of the double steel pipe for propulsion is brought into contact with the rear end face of the inner pipe of the double steel pipe for protruding to connect these inner pipes together; From the rear end of the grout hose exposed from the rear end opening of the grout hose insertion hole of the already propelled double steel pipe and from the front end opening of the grout hose insertion hole of the new double steel pipe for propulsion. A second step of connecting the exposed front end of the grout hose to the new propulsion hose; A third step of sliding the outer pipe of the heavy steel pipe forward with respect to the intermediate material to bring the front end face of the outer pipe into contact with the rear end face of the outer pipe of the already propelled double steel pipe; A fourth step of applying a thrust to the outer pipe of the new double steel pipe for propulsion to propel the double steel pipe for propulsion, and the first step over a plurality of double steel pipes for propulsion, Second
After repeating the steps, the third step, and the fourth step , sequentially pull out the grout hoses sequentially connected.
By pouring filler Luo the grout hose, the grout
Position the end of the hose at the connection of the double steel pipe for propulsion.
It is by the filling material, the inner tube coupling portion of the propulsion Double Tube
Grout method of propulsion Double Tube characterized by comprising a fifth step of filling the space between the outer tube and.
工程、前記第2工程、前記第3工程、及び前記第4工程
を繰り返す途中の一箇所に、前記第1工程の後に前記第
2工程を省略して前記第3工程を実行する工程を置き、 前記第5工程が、順次接続された推進用二重鋼管のうち
の最先端に位置する推進用二重鋼管が到達坑に達した
後、前記グラウトホースを推進方向前方と後方との双方
から抜き取る工程 であることを特徴とする請求項1記載
の推進用二重鋼管のグラウト方法。2. The method according to claim 1 , wherein the first steel pipe extends over a plurality of double steel pipes for propulsion.
Step, the second step, the third step, and the fourth step
Is repeated at one point during the repetition,
The step of executing the third step is omitted by omitting two steps, and the fifth step is performed in the sequentially connected double steel pipes for propulsion.
Double steel pipe for propulsion, which is located at the forefront of Japan, has reached the reaching pit
After that, the grout hose is moved in both the forward and backward directions in the propulsion direction.
2. The method for grouting a double steel pipe for propulsion according to claim 1, wherein the step is a step of extracting the double steel pipe from a propulsion pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5500192A JP2719265B2 (en) | 1992-03-13 | 1992-03-13 | Grout method of double steel pipe for propulsion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5500192A JP2719265B2 (en) | 1992-03-13 | 1992-03-13 | Grout method of double steel pipe for propulsion |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05256085A JPH05256085A (en) | 1993-10-05 |
JP2719265B2 true JP2719265B2 (en) | 1998-02-25 |
Family
ID=12986421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5500192A Expired - Fee Related JP2719265B2 (en) | 1992-03-13 | 1992-03-13 | Grout method of double steel pipe for propulsion |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2719265B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101636261B1 (en) * | 2015-12-29 | 2016-07-07 | 우경기술주식회사 | Pipe roof tunnel construction method using guide beam and protrusion-type steel rib which enables pressurization |
-
1992
- 1992-03-13 JP JP5500192A patent/JP2719265B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH05256085A (en) | 1993-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO1994020730A1 (en) | Double wall pipe for propulsion technique and construction of pipe end of leading pipe | |
JP2719265B2 (en) | Grout method of double steel pipe for propulsion | |
JP2719264B2 (en) | Double steel pipe for propulsion | |
JP2887280B2 (en) | Double steel pipe for propulsion | |
JP2728598B2 (en) | Double steel pipe for propulsion | |
JP2728617B2 (en) | Double propulsion pipe for burial | |
JP3247788B2 (en) | Construction method of underground piping | |
JP2982843B2 (en) | Double propulsion pipe for burial | |
JPH0236758B2 (en) | ||
JP3120017B2 (en) | Medium push structure of double steel pipe for propulsion method | |
JPH0711863A (en) | Method of ground improvement construction in shield excavation | |
JP2672242B2 (en) | Double propulsion pipe for burial | |
JP2952105B2 (en) | Piping materials used in mud pressurized propulsion method | |
JPH04114773A (en) | Providing a lining to the inside of pipe to be arranged | |
JPS5938476B2 (en) | Intermediate pushing method using steel pipes | |
JPH11182745A (en) | Ductile cast iron pipe for jacking method | |
JP2719299B2 (en) | Forward conduit | |
JP3789331B2 (en) | Propulsion method and pipe joint structure used therefor | |
JP2672234B2 (en) | Double steel pipe for propulsion | |
JPH0322392Y2 (en) | ||
JPH0711864A (en) | Injector with double packer for curved pipe | |
TWM645093U (en) | Concrete jacking pipe | |
JP2905677B2 (en) | Excavator for burying small-diameter pipe and method and apparatus for pulling back buried pipe | |
JPH08151894A (en) | Steel pipe for propulsion burial and propulsion burial construction method for steel pipe | |
JPS6131594A (en) | Bypass tunnel construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19971028 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |