JP2718362B2 - Construction method of concrete structure - Google Patents

Construction method of concrete structure

Info

Publication number
JP2718362B2
JP2718362B2 JP6060864A JP6086494A JP2718362B2 JP 2718362 B2 JP2718362 B2 JP 2718362B2 JP 6060864 A JP6060864 A JP 6060864A JP 6086494 A JP6086494 A JP 6086494A JP 2718362 B2 JP2718362 B2 JP 2718362B2
Authority
JP
Japan
Prior art keywords
box culvert
small
box
steel rod
view
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6060864A
Other languages
Japanese (ja)
Other versions
JPH07268854A (en
Inventor
芳秋 黒木
耕一 川畑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Materials Corp
Original Assignee
Mitsubishi Materials Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Materials Corp filed Critical Mitsubishi Materials Corp
Priority to JP6060864A priority Critical patent/JP2718362B2/en
Publication of JPH07268854A publication Critical patent/JPH07268854A/en
Application granted granted Critical
Publication of JP2718362B2 publication Critical patent/JP2718362B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はコンクリート構造物の構
築方法に係り、特にボックスカルバートの施工に適用す
るのに好適なコンクリート構造物の構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete structure, and more particularly to a method for constructing a concrete structure suitable for application to box culvert construction.

【0002】[0002]

【従来の技術】ボックスカルバート1は、第13図の如
く、2個のコ字形のボックスカルバート小割体1a,1
bを角筒状となるように当接させて両者を連結したもの
である。なお、コ字形の小割体1a,1bの間に平板状
の小割体を介在させることもある。角筒状に組み立てら
れたボックスカルバート1は、例えば第14図の如く、
地面の溝内に多数配置され、隣接するボックスカルバー
ト1同士を連結することにより暗渠が構築される。
2. Description of the Related Art As shown in FIG. 13, a box culvert 1 is composed of two small box-shaped culverts 1a, 1
b are brought into contact with each other so as to form a rectangular tube, and both are connected. In addition, a plate-shaped small split body may be interposed between the U-shaped small split bodies 1a and 1b. The box culvert 1 assembled in a rectangular tube shape is, for example, as shown in FIG.
A culvert is constructed by connecting a large number of box culverts 1 arranged in a groove on the ground and adjoining one another.

【0003】従来、ボックスカルバート小割体1a,1
b同士を結合するには、第13図の如く、一方のボック
スカルバート小割体1aの端面から突出されたPC鋼棒
2を他方のボックスカルバート小割体1bに貫通設置さ
れたシース3に通し、このPC鋼棒2を緊張させると共
にその先端にナット4を螺じ込むようにしている。な
お、ボックスカルバート小割体1a,1bの端面の間に
はエポキシ等の接着剤を塗っておく。
Conventionally, a small box culvert split body 1a, 1
In order to connect the b box members with each other, as shown in FIG. 13, the PC steel rod 2 protruding from the end face of one box culvert small body 1a is passed through the sheath 3 penetrated through the other box culvert small body 1b. The PC steel rod 2 is tensioned, and a nut 4 is screwed into the tip of the PC steel rod 2. Note that an adhesive such as epoxy is applied between the end faces of the small box culvert split bodies 1a and 1b.

【0004】[0004]

【発明が解決しようとする課題】上記従来のようにして
ボックスカルバート小割体1a,1bを連結してボック
スカルバートを組み立てる方法にあっては、接着剤が硬
化するまでは、PC鋼棒2と直交方向の応力が加えられ
ると、ボックスカルバート小割体1a,1b同士がずれ
てしまう。このため、接着剤が十分に硬化するまでは、
小割体1a,1b同士の組み立て体よりなるボックスカ
ルバート1同志を引き寄せて連結することはできなかっ
た。
In the method of assembling the box culvert by connecting the small box culvert split bodies 1a and 1b in the conventional manner, the PC steel rod 2 and the PC steel rod 2 are not connected until the adhesive is hardened. When stress in the orthogonal direction is applied, the small box culvert split bodies 1a and 1b are shifted from each other. For this reason, until the adhesive is fully cured,
The box culverts 1 composed of the assembly of the small split bodies 1a and 1b could not be attracted and connected together.

【0005】[0005]

【課題を解決するための手段】本発明のコンクリート構
造物の構築方法は、コンクリート製小部材同士を連結し
てユニットとし、このユニットを複数個連結してコンク
リート製構造物を構築する方法において、前記小部材同
士を、それらの間に接着剤を介してCHジョイントで連
結して前記ユニットとなし、該接着剤が硬化する以前に
該ユニット同士をPC鋼材で連結し、その後、小部材同
士をPC鋼材で連結することを特徴とするものである。
According to the present invention, there is provided a method for constructing a concrete structure, comprising connecting small concrete members to form a unit, and connecting a plurality of the units to form a concrete structure. The small members are connected to each other by a CH joint via an adhesive therebetween to form the unit, and before the adhesive is cured, the units are connected to each other by a PC steel material. It is characterized by being connected by a PC steel material.

【0006】[0006]

【作用】かかる本発明のコンクリート構造物の構築方法
によると、小部材同士がCHジョイントで連結されてい
るため、該小部材同士を連結した直後でも小部材同士の
結合が極めて高強度かつ剛なるものとなる。従って、ユ
ニットを構成した後、直ちにユニット同士をPC鋼材で
連結できる。
According to the method for constructing a concrete structure of the present invention, since the small members are connected by the CH joint, the connection between the small members becomes extremely high strength and rigid immediately after the small members are connected. It will be. Therefore, the units can be connected with the PC steel immediately after the units are configured.

【0007】[0007]

【実施例】以下、図面を参照して実施例について説明す
る。第1図〜第11図は本発明の実施例に係るボックス
カルバートの組立方法を示すものであり、第1図はボッ
クスカルバートの組立方法を示す全体斜視図、第2図は
第1図の要部拡大図、第3図はCHジョイントの斜視
図、第4図は第1図の作業口付近の要部拡大斜視図、第
5図はボックスカルバート同士を連結する状態を示す斜
視図、第6図は第5図のVI−VI線に沿う断面図、第7図
は第5図のVII −VII 線に沿う断面図、第8図は第5図
のVIII−VIII線に沿う断面図、第9図は複数のボックス
カルバート同士を連結した状態を示す全体図、第10図
はボックスカルバート同士を連結した状態における作業
口付近の縦断面図、第11図は上下のボックスカルバー
ト小割体同士を緊張する状態を示す縦断面図である。
Embodiments will be described below with reference to the drawings. 1 to 11 show a method of assembling a box culvert according to an embodiment of the present invention. FIG. 1 is an overall perspective view showing a method of assembling a box culvert, and FIG. FIG. 3 is a perspective view of a CH joint, FIG. 4 is an enlarged perspective view of a main part near a working port in FIG. 1, FIG. 5 is a perspective view showing a state where box culverts are connected to each other, and FIG. 5 is a sectional view taken along the line VI-VI of FIG. 5, FIG. 7 is a sectional view taken along the line VII-VII of FIG. 5, FIG. 8 is a sectional view taken along the line VIII-VIII of FIG. 9 is an overall view showing a state in which a plurality of box culverts are connected to each other, FIG. 10 is a longitudinal sectional view near a work port in a state in which the box culverts are connected to each other, and FIG. It is a longitudinal cross-sectional view which shows the state which is tense.

【0008】なお、本実施例では、ボックスカルバート
小割体がコンクリート製小部材に該当し、ボックスカル
バートがユニットに該当する。
In the present embodiment, the small box culvert corresponds to a small concrete member, and the small box culvert corresponds to a unit.

【0009】本実施例では、ボックスカルバート小割体
5,5の端面にCHジョイント10のC型継手6が埋設
されている。このC型継手6は、C字形断面形状のもの
であり、アンカー筋7が螺着されている。
In this embodiment, the C-shaped joint 6 of the CH joint 10 is embedded in the end faces of the small box culvert split bodies 5 and 5. The C-shaped joint 6 has a C-shaped cross section, and an anchor bar 7 is screwed thereto.

【0010】ボックスカルバート小割体5の端面にエポ
キシ等の接着剤を塗布した後、このボックスカルバート
小割体5同士を、それらの端面を突き合わせるようにし
て当接させ、次いで、H型継手8をC型継手6の中央孔
内6aに挿入することによりボックスカルバート小割体
5同士が連結される。
After applying an adhesive such as epoxy to the end face of the box culvert small split body 5, the box culvert small split bodies 5 are brought into contact with each other with their end faces abutting each other. By inserting 8 into the central hole 6a of the C-shaped joint 6, the box culvert small split bodies 5 are connected to each other.

【0011】なお、ボックスカルバート小割体5には、
上下方向のシース11と水平方向のシース12とが埋設
されている。ボックスカルバート小割体5の内面の隅角
部には、水平方向のシース12の途中部分に臨むように
作業口13が凹設されている。
The box culvert small split body 5 includes:
A vertical sheath 11 and a horizontal sheath 12 are embedded. At the corner of the inner surface of the small box culvert 5, a working opening 13 is formed so as to face a middle part of the sheath 12 in the horizontal direction.

【0012】かかるボックスカルバート9の組立方法に
あっては、ボックスカルバート小割体5同士をCHジョ
イント10で連結した直後においても、ボックスカルバ
ート小割体5同士の連結が極めて高強度かつ剛なるもの
であるため、ボックスカルバート9同士を直ちに引き寄
せて連結作業を行うことができる。
In the method of assembling the box culvert 9, the connection between the small box culverts 5 is extremely high in strength and rigid even immediately after the small box culverts 5 are connected by the CH joint 10. Therefore, the box culverts 9 can be immediately attracted to each other to perform the connecting operation.

【0013】この連結作業を行なうには、第5図に示す
如く、ボックスカルバート9A,9Bを突き合わせ、シ
ース12にPC鋼棒14を通す。このPC鋼棒14の両
端には雄螺子を刻設してある。ボックスカルバート9A
の作業口13に突き出されたPC鋼棒14の先端に、第
6図の如く、グラウトワッシャ15を介してナットを1
6を螺じ込む。
In order to perform this connection operation, the box culverts 9A and 9B are butted together, and the PC steel rod 14 is passed through the sheath 12 as shown in FIG. Male screws are engraved on both ends of the PC steel rod 14. Box culvert 9A
As shown in FIG. 6, a nut 1 is inserted through a grout washer 15 into the tip of the PC steel rod 14 protruding into the work opening 13 of FIG.
Screw 6 in.

【0014】ボックスカルバート9Bの作業口13aに
は、PC鋼棒14の後端が突き出すので、第7図の如
く、グラウトワッシャ15aを介してナット16aを螺
じ込む。
Since the rear end of the PC steel rod 14 protrudes into the working opening 13a of the box culvert 9B, a nut 16a is screwed through a grout washer 15a as shown in FIG.

【0015】次に、ボックスカルバート9Bの後端から
シース12にプルロッド17を通し、このプルロッド1
7の先端をカップラー(長いナット状部材)18によっ
てPC鋼棒14の後端に連結する。
Next, a pull rod 17 is passed through the sheath 12 from the rear end of the box culvert 9B.
7 is connected to the rear end of the PC steel rod 14 by a coupler (long nut-like member) 18.

【0016】ボックスカルバート9Bの後端面に、第8
図の如くセンターホールジャッキ19を取り付け、プル
ロッド17の後端にワッシャ20を介してアンカーナッ
ト21を締め込む。次いで、ジャッキ19に油圧を供給
し、プランジャ19aを後方(第8図の右方)へ突出さ
せ、プルロッド17を介してPC鋼棒14を緊張させ
る。そこで、PC鋼棒14の後端のナット16aをしっ
かりと螺じ込み、PC鋼棒14の張力を保持する。
At the rear end face of the box culvert 9B, an eighth
As shown in the figure, a center hole jack 19 is attached, and an anchor nut 21 is tightened to the rear end of the pull rod 17 via a washer 20. Next, hydraulic pressure is supplied to the jack 19, the plunger 19a is projected rearward (to the right in FIG. 8), and the PC steel bar 14 is tensioned via the pull rod 17. Therefore, the nut 16a at the rear end of the PC steel rod 14 is screwed firmly to maintain the tension of the PC steel rod 14.

【0017】その後、カップラー18を外し、プルロッ
ド17をボックスカルバート9Bから抜き出す。なお、
ボックスカルバート9A,9Bのすべてのシース12に
ついて同様にしてPC鋼棒14を通してボックスカルバ
ート9A,9B同士を連結する。これにより、ボックス
カルバート9A,9B同士が緊結される。
Thereafter, the coupler 18 is removed, and the pull rod 17 is pulled out of the box culvert 9B. In addition,
The box culverts 9A and 9B are connected to each other through the PC steel rod 14 in the same manner for all the sheaths 12 of the box culverts 9A and 9B. As a result, the box culverts 9A and 9B are tied together.

【0018】次に、第9図の如く、このボックスカルバ
ート9Bの隣りにボックスカルバート9Cを配置し、ボ
ックスカルバート9Cからボックスカルバート9Bに新
たなPC鋼棒14(14A)を通す。そして、第10図
の如く、このPC鋼棒14Aの先端にグラウトワッシャ
15を介してナット16を螺じ込んだ後、PC鋼棒14
Aの先端と前記PC鋼棒14の後端とをカップラー18
で連結する。PC鋼棒14Aの後端には、第7図と同様
にワッシャを介してナットを螺じ込んでおく。
Next, as shown in FIG. 9, a box culvert 9C is arranged adjacent to the box culvert 9B, and a new PC steel rod 14 (14A) is passed from the box culvert 9C to the box culvert 9B. Then, as shown in FIG. 10, a nut 16 is screwed into the end of the PC steel rod 14A via a grout washer 15, and then the PC steel rod 14A is screwed.
A and the rear end of the PC steel rod 14
Connect with. A nut is screwed into the rear end of the PC steel rod 14A via a washer as in FIG.

【0019】ボックスカルバート9Cの後端からプルロ
ッドを挿入し、該プルロッドの先端をボックスカルバー
ト9Cの作業口内においてPC鋼棒14Aの後端に連結
した後、同様にジャッキによりプルロッドを介してPC
鋼棒14Aを緊張させ、次いで、PC鋼棒14Aの後端
のナットを締め込む。これにより、ボックスカルバート
9Bにボックスカルバート9Cが緊結される。
A pull rod is inserted from the rear end of the box culvert 9C, and the front end of the pull rod is connected to the rear end of the PC steel rod 14A in the working opening of the box culvert 9C.
The steel rod 14A is tensioned, and then the nut at the rear end of the PC steel rod 14A is tightened. As a result, the box culvert 9C is tied to the box culvert 9B.

【0020】以下、この手順を繰り返すことにより、さ
らにボックスカルバート9D,9E,9F…(図示略)
が順次に緊結される。
Hereinafter, by repeating this procedure, box culverts 9D, 9E, 9F...
Are tied sequentially.

【0021】所定数のボックスカルバート9を緊結した
後、各ボックスカルバート9において上下の小割体5同
士を緊結する。即ち、第11図の如く、シース11にP
C鋼棒24を挿入し、PC鋼棒24の下端及び上端にそ
れぞれグラウトワッシャ15を介してナット16を締め
込む。
After a predetermined number of box culverts 9 have been tied, the upper and lower split bodies 5 are tied together in each box culvert 9. That is, as shown in FIG.
The C steel rod 24 is inserted, and the nut 16 is tightened to the lower end and the upper end of the PC steel rod 24 via the grout washers 15 respectively.

【0022】そして、ジャッキ19を介してPC鋼棒2
4を緊張させた後、上端側のナット16を締め込む。そ
の後、ジャッキ19の圧力を解放し、ジャッキ19を取
り去る。なお、このようにPC鋼棒24の緊張工完了
後、速やかにグラウト注入を行う。
Then, the PC steel rod 2 is passed through the jack 19.
After tightening the nut 4, the nut 16 on the upper end side is tightened. Thereafter, the pressure of the jack 19 is released, and the jack 19 is removed. After the tension work of the PC steel bar 24 is completed, grouting is immediately performed.

【0023】上記実施例では、コ字形のボックスカルバ
ート小割体5のみによってボックスカルバート9を組み
立てているが、該小割体5同志の間に平板状の小割体を
介在させて大型のボックスカルバートを構築する場合に
も本発明を適用できる。
In the above embodiment, the box culvert 9 is assembled only by the small box-shaped culverts 5 of the U-shape. The present invention can be applied to the case of constructing a culvert.

【0024】第12図はその一例を示すものであり、符
号25は平板状の側壁材を示す。この側壁材25にもシ
ース26が上下方向に埋設され、PC鋼棒27が挿入さ
れている。
FIG. 12 shows an example thereof, and reference numeral 25 denotes a plate-like side wall material. A sheath 26 is also buried in the side wall material 25 in the vertical direction, and a PC steel rod 27 is inserted.

【0025】上記実施例はボックスカルバートに関する
ものであるが、本発明はその他のコンクリート構造物の
構築方法にも適用できる。
Although the above embodiment relates to a box culvert, the present invention can be applied to other concrete structure construction methods.

【0026】[0026]

【発明の効果】以上の通り、本発明のコンクリート構造
物の構築方法によると、コンクリート製小部材同士を極
めて容易に、高強度かつ剛に連結できる。しかも、コン
クリート製小部材の連結直後においても両者の結合は高
強度かつ剛なるものであるため、該小部材同士を連結し
てユニットを構成した後、すぐにユニット同士をPC鋼
棒等で引き寄せて連結することができる。
As described above, according to the method of constructing a concrete structure of the present invention, small concrete members can be connected very easily, with high strength and rigidly. In addition, immediately after the connection of the small concrete members, the connection between them is high in strength and rigid. Therefore, after connecting the small members to form a unit, the units are immediately pulled together with a PC steel rod or the like. Can be connected.

【図面の簡単な説明】[Brief description of the drawings]

【図1】ボックスカルバートの組立方法を示す全体斜視
図である。
FIG. 1 is an overall perspective view showing a method of assembling a box culvert.

【図2】第1図の要部拡大図である。FIG. 2 is an enlarged view of a main part of FIG.

【図3】CHジョイントの斜視図である。FIG. 3 is a perspective view of a CH joint.

【図4】第1図の作業口付近の要部拡大斜視図である。FIG. 4 is an enlarged perspective view of a main part near a work port in FIG. 1;

【図5】ボックスカルバート同士を連結する状態を示す
斜視図である。
FIG. 5 is a perspective view showing a state in which box culverts are connected to each other.

【図6】第5図のVI−VI線に沿う断面図である。FIG. 6 is a sectional view taken along the line VI-VI in FIG. 5;

【図7】第5図のVII −VII 線に沿う断面図である。FIG. 7 is a sectional view taken along the line VII-VII in FIG. 5;

【図8】第5図のVIII−VIII線に沿う断面図である。FIG. 8 is a sectional view taken along the line VIII-VIII in FIG. 5;

【図9】複数のボックスカルバート同士を連結した状態
を示す全体図である。
FIG. 9 is an overall view showing a state where a plurality of box culverts are connected to each other.

【図10】ボックスカルバート同士を連結した状態にお
ける作業口付近の縦断面図である。
FIG. 10 is a vertical cross-sectional view of the vicinity of a work port in a state where box culverts are connected to each other.

【図11】上下のボックスカルバート小割体同士を緊張
する状態を示す縦断面図である。
FIG. 11 is a longitudinal sectional view showing a state where upper and lower box culvert small split bodies are strained.

【図12】別の実施例に係るボックスカルバートの平面
図である。
FIG. 12 is a plan view of a box culvert according to another embodiment.

【図13】従来例のボックスカルバートの分解斜視図で
ある。
FIG. 13 is an exploded perspective view of a conventional box culvert.

【図14】従来例のボックスカルバートが地面の構内に
配置された状態を示す斜視図である。
FIG. 14 is a perspective view showing a state in which a box culvert of a conventional example is arranged in a ground yard.

【符号の説明】[Explanation of symbols]

5 ボックスカルバート小割体 6 C型継手 7 アンカー筋 8 H型継手 9 ボックスカルバート 10 CHジョイント 11,12 シース 13 作業口 14 PC鋼棒 15 グラウトワッシャ 16 ナット 17 プルロッド 5 Box culvert small split body 6 C type joint 7 Anchor bar 8 H type joint 9 Box culvert 10 CH joint 11, 12 sheath 13 Work port 14 PC steel rod 15 Grout washer 16 Nut 17 Pull rod

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 コンクリート製小部材同士を連結してユ
ニットとし、このユニットを複数個連結してコンクリー
ト製構造物を構築する方法において、 前記小部材同士を、それらの間に接着剤を介してCHジ
ョイントで連結して前記ユニットとなし、 該接着剤が硬化する以前に該ユニット同士をPC鋼材で
連結し、 その後、小部材同士をPC鋼材で連結することを特徴と
するコンクリート構造物の構築方法。
1. A method for constructing a concrete structure by connecting concrete small members to each other to form a unit, and connecting the plurality of units to each other, wherein the small members are connected to each other with an adhesive therebetween. Building a concrete structure, wherein the unit is connected by a CH joint to form the unit, and before the adhesive is cured, the units are connected by a PC steel material, and then the small members are connected by a PC steel material. Method.
JP6060864A 1994-03-30 1994-03-30 Construction method of concrete structure Expired - Lifetime JP2718362B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6060864A JP2718362B2 (en) 1994-03-30 1994-03-30 Construction method of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6060864A JP2718362B2 (en) 1994-03-30 1994-03-30 Construction method of concrete structure

Publications (2)

Publication Number Publication Date
JPH07268854A JPH07268854A (en) 1995-10-17
JP2718362B2 true JP2718362B2 (en) 1998-02-25

Family

ID=13154689

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6060864A Expired - Lifetime JP2718362B2 (en) 1994-03-30 1994-03-30 Construction method of concrete structure

Country Status (1)

Country Link
JP (1) JP2718362B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100773907B1 (en) * 2006-07-21 2007-11-07 김근택 Segment for pre-tension beam manufacturing device, manufacturing device utilizing thereof and it's assembly method
KR100800308B1 (en) * 2006-08-17 2008-02-01 홍석희 Camber prestressed precast box interconnecting with prestressed precast box unit introduced with camber prestressed which a precast method thereof
CN106869174A (en) * 2017-04-18 2017-06-20 黑龙江省中信路桥材料有限公司 A kind of U-shaped Combined type concrete prefabricated box culvert

Also Published As

Publication number Publication date
JPH07268854A (en) 1995-10-17

Similar Documents

Publication Publication Date Title
US6327829B1 (en) Connecting structure for concrete block and connector used therefor
CN100414058C (en) Block for construction, panel for construction using the block, and method of molding panel for construction
JP2718362B2 (en) Construction method of concrete structure
JPH1144044A (en) Composite member for architectural structure
JP2007211507A (en) Beam structure
JPH1171860A (en) Concrete block connecting structure and connector used therefor
JPH08184121A (en) Precast flooring joint structure
JPH07268937A (en) Assembling method of box culvert
JP3544917B2 (en) Concrete block connection structure
JP2798239B2 (en) Building material fasteners
JP2920108B2 (en) Construction method of wall type precast reinforced concrete structure
JP3038574B2 (en) Connection structure of precast concrete members
JP4029749B2 (en) Joint reinforcement structure in woody structure
JPH02221535A (en) Connecting structure for pillar and beam
JPH0349145Y2 (en)
JP2599673B2 (en) Multipurpose unit materials
JP3046241B2 (en) Joint structure and joining method of steel segments
JP2839437B2 (en) Wood joint structure
JPH02308028A (en) Joining method of post or wall and precast beam
JP3466307B2 (en) How to connect concrete members
JP2024041006A (en) Reinforcement structure and reinforcement method for steel structures
JP2603137Y2 (en) Assembly PC permanent formwork
JP3722473B2 (en) Drilling element
JP3422943B2 (en) Reinforcement method for existing reinforced concrete columns
JP2001140340A (en) Brace

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19971014