JP2701729B2 - Sand compaction pile method - Google Patents

Sand compaction pile method

Info

Publication number
JP2701729B2
JP2701729B2 JP126894A JP126894A JP2701729B2 JP 2701729 B2 JP2701729 B2 JP 2701729B2 JP 126894 A JP126894 A JP 126894A JP 126894 A JP126894 A JP 126894A JP 2701729 B2 JP2701729 B2 JP 2701729B2
Authority
JP
Japan
Prior art keywords
sand
pile
ground
casing pipe
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP126894A
Other languages
Japanese (ja)
Other versions
JPH07207653A (en
Inventor
幸義 北本
聰 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP126894A priority Critical patent/JP2701729B2/en
Publication of JPH07207653A publication Critical patent/JPH07207653A/en
Application granted granted Critical
Publication of JP2701729B2 publication Critical patent/JP2701729B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、軟弱地盤上で建設行
為を行う場合に沈下および強度の面から必要となる、地
盤改良として用いるサンドコンパクションパイル工法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a sand compaction pile method used for ground improvement, which is required in terms of settlement and strength when performing construction on soft ground.

【0002】[0002]

【従来の技術およびこの発明が解決しようとする課題】
透水係数の小さい粘土層では、間隙水の流出する速さが
小さいことから、荷重を載せると沈下が非常に長い期間
継続するという、所謂、圧密現象を呈する。また、この
ような軟弱な粘土層は、その強度が小さいことから、載
荷時に破壊を招く恐れもある。従って、このような軟弱
地盤上で建設行為を行う場合は、沈下の面および強度の
面から地盤改良が必要とされている。
2. Prior Art and Problems to be Solved by the Invention
In a clay layer having a small permeability, the speed at which pore water flows out is low, so that a so-called consolidation phenomenon is exhibited in which subsidence continues for a very long period when a load is applied. Further, such a soft clay layer has a low strength, and thus may be broken at the time of loading. Therefore, when a construction operation is performed on such soft ground, ground improvement is required in terms of settlement and strength.

【0003】そして、このような地盤改良としては、前
述したような軟弱地盤中に、よく締固められた大口径の
砂杭を形成して、砂杭と粘性土とからなる複合地盤を造
成することにより、(1) 砂杭自体による支持力や剪断強
度の増加と、(2) 砂杭を排水層とした圧密による粘性土
の強度増加とを期待する、サンドコンパクションパイル
(以下、SCP)工法が用いられている。
[0003] As such a ground improvement, a well-compacted large-sized sand pile is formed in the soft ground as described above, and a composite ground composed of the sand pile and the cohesive soil is formed. The sand compaction pile (hereinafter referred to as SCP) method is expected to (1) increase the bearing capacity and shear strength of the sand pile itself and (2) increase the strength of the cohesive soil due to consolidation using the sand pile as a drainage layer. Is used.

【0004】そして、このSCP工法は、主として前記
(1) の改良効果を期待して、砂置換率を70%程度とする
「高置換率」での施工が一般的であった。しかし、上部
構造物が比較的小規模であったり、工期を長くとれる場
合には、砂置換を30%程度に抑えた「低置換率」による
施工の方が、前記(2) の効果も期待されると共に、経済
的にも有利といえる。
[0004] This SCP method is mainly
Expecting the improvement effect of (1), construction with "high replacement rate", where sand replacement rate is about 70%, was common. However, if the superstructure is relatively small or the construction period can be prolonged, the effect of the above (2) is expected to be achieved by "low replacement ratio" in which sand displacement is suppressed to about 30%. It is also economically advantageous.

【0005】従って、最近では、この低置換率のSCP
工法が多用されている。ところが、この低置換率におい
ても圧密時間の短縮を図り、各砂杭間粘性土の強度増加
効果を速やかに達成することができれば、施工上もより
効果的であるといえる。
[0005] Therefore, recently, the SCP having a low substitution rate has been developed.
The construction method is heavily used. However, if the consolidation time can be shortened and the effect of increasing the strength of the cohesive soil between sand piles can be quickly achieved even at this low displacement rate, it can be said that the construction is more effective.

【0006】しかし、従来から一般的に行われているS
CP工法では、地盤改良を実施すべく形成する各砂杭間
に、前述した圧密時間短縮という課題の達成を困難にす
る、大量の粘土が存在することとなる。
However, the conventional S
In the CP method, a large amount of clay exists between each of the sand piles formed to perform the ground improvement, which makes it difficult to achieve the above-described task of shortening the consolidation time.

【0007】詳述すると、従来から一般的に行われてい
るSCP工法では、図3に示すように、砂杭20用の砂21
の供給を、バイブロハンマー等の振動機22が設けられて
いる断面略円形状のケーシングパイプ23を通して行って
いるので、図4に示すように、打設された砂杭群24にお
ける各砂杭20の断面形状も同様に円形となる。そのた
め、砂杭群24における各砂杭20間には、大量の粘土が存
在することになる。
[0007] In detail, in the SCP method which has been generally performed conventionally, as shown in FIG.
Is supplied through a casing pipe 23 having a substantially circular cross-section provided with a vibrator 22 such as a vibratory hammer, and as shown in FIG. Also has a circular cross section. Therefore, a large amount of clay exists between each of the sand piles 20 in the sand pile group 24.

【0008】そして、この各砂杭20間に存在する大量の
粘土は、前述した圧密時間の短縮という課題を達成する
ことを困難に、即ち、各砂杭間粘性土の強度増加効果を
速やかに達成するのに要する圧密時間の短縮を困難にし
ている。
The large amount of clay between the sand piles 20 makes it difficult to achieve the above-mentioned problem of shortening the consolidation time, that is, the effect of increasing the strength of the cohesive soil between the sand piles quickly. This makes it difficult to shorten the consolidation time required to achieve it.

【0009】この発明は前述した事情に鑑みて創案され
たもので、その目的は砂杭群を形成する地盤改良時にお
いて、各砂杭間に存在する粘性土の強度増加効果を速や
かに達成すべく、圧密時間の短縮を確実に実施できると
共に、液状化対策として緩い砂地盤の改良にもSCP工
法が多用されているが、この時の各杭間の緩い砂に対し
てより大きな締固め効果を及ぼすことのできるサンドコ
ンパクションパイル工法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to quickly achieve the effect of increasing the strength of the cohesive soil existing between sand piles during soil improvement for forming sand pile groups. Therefore, while the consolidation time can be shortened reliably, the SCP method is often used to improve loose sand ground as a countermeasure against liquefaction. It is an object of the present invention to provide a sand compaction pile method capable of exerting an effect.

【0010】[0010]

【課題を解決するための手段】この発明によれば、改良
すべき地盤内へ砂杭形成用の砂を供給するケーシングパ
イプにおける断面略円形状のパイプ本体先端部に、放射
状に延びる複数の突起を設け、ケーシングパイプで形成
された各砂杭の断面形状にも円形状の基部に複数の突出
部分が形成されるようにする。
According to the present invention, a plurality of radially extending projections are provided at the tip of a pipe body having a substantially circular cross section in a casing pipe for supplying sand for forming a sand pile into the ground to be improved. Is provided so that a plurality of projecting portions are formed on the circular base in the cross-sectional shape of each sand pile formed by the casing pipe.

【0011】そして、このようにな本発明方法により、
前述した各砂杭の複数の突出部分により、粘土地盤の場
合には集水面積を拡大すると共に、各砂杭間の粘土の排
水距離を短縮し、各砂杭を形成した地盤において高い圧
密促進効果を得られるようにする。一方、緩い砂地盤の
場合には、各砂杭の突出部分によって、杭間の砂につい
ても締固め効果を及ぼすことができるようにする。
According to the method of the present invention,
The multiple projecting portions of each sand pile described above increase the water collection area in the case of clay ground, shorten the clay drainage distance between each sand pile, and promote high compaction in the ground where each sand pile is formed. Be effective. On the other hand, in the case of a loose sandy ground, the protruding portion of each sand pile makes it possible to exert the compaction effect also on the sand between the piles.

【0012】[0012]

【実施例】以下、この発明のサンドコンパクションパイ
ル工法を、図示する実施例(粘土地盤に用いる場合)に
よって説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The sand compaction pile method according to the present invention will be described below with reference to the illustrated embodiment (when used on clay ground).

【0013】先ず、本発明の工法で使用するケーシング
パイプを説明すると、ケーシングパイプ1(図1の(a)
および(b) 参照)は、断面略円形状であるパイプ本体1a
の先端部に、放射状に延びる複数(この実施例では90°
毎に四箇所)の突起1bを設けてなっている。そして、こ
のケーシングパイプ1で形成した各砂杭2の断面形状に
は、図1の(c) に示すように、円形状の基部2aに複数の
突出部分2bが形成される。
First, the casing pipe used in the method of the present invention will be described. The casing pipe 1 (FIG. 1A)
And (b)) is a pipe body 1a having a substantially circular cross section.
A plurality of radially extending portions (in this embodiment, 90 °
(Four places each) 1b. In the sectional shape of each sand pile 2 formed by the casing pipe 1, a plurality of projecting portions 2b are formed on a circular base 2a as shown in FIG. 1 (c).

【0014】なお、この図1の実施例では、図1の(c)
に示すように、各砂杭2を略正方形状に配置した正方形
配置型の砂杭群3としている。これに対して、図2の
(a) および(b) に示す実施例のケーシングパイプ1は、
図2の(b) に示すように、突起1bを 270°毎に三箇所に
設けて、図2の(c) に示すように、各砂杭2を略千鳥状
に配置した千鳥配置型の砂杭群3とするものである。
In the embodiment of FIG. 1, (c) of FIG.
As shown in FIG. 1, a square pile type sand pile group 3 in which each sand pile 2 is arranged in a substantially square shape. In contrast, FIG.
The casing pipe 1 of the embodiment shown in (a) and (b)
As shown in FIG. 2 (b), protrusions 1b are provided at three positions every 270 °, and as shown in FIG. 2 (c), the sand piles 2 are arranged in a staggered manner. Sand pile group 3.

【0015】このような構成からなるケーシングパイプ
1を使用して、サンドコンパクションパイル工法を施す
には、地盤改良すべき地盤内に、バイブロハンマー等の
振動機(図示せず)が設けられているケーシングパイプ
1を通して、砂杭形成用の砂を供給して行う。
In order to perform the sand compaction pile method using the casing pipe 1 having such a configuration, a vibrator (not shown) such as a vibro hammer is provided in the ground to be improved. This is performed by supplying sand for forming a sand pile through the casing pipe 1.

【0016】この時に、ケーシングパイプ1における断
面略円形状のパイプ本体1aの先端部に、放射状に延びる
複数の突起1bを設け(図1の(a) および(b) 参照)、ケ
ーシングパイプ1で形成された各砂杭2の断面形状にも
円形状の基部2aに複数の突出部分2bが形成されるように
する(図1の(c) 参照)。
At this time, a plurality of projections 1b extending radially are provided at the tip of the pipe body 1a having a substantially circular cross section in the casing pipe 1 (see FIGS. 1A and 1B). A plurality of projecting portions 2b are formed on the circular base 2a also in the sectional shape of each formed sand pile 2 (see FIG. 1 (c)).

【0017】そして、この各砂杭2の複数の突出部分2b
により、集水面積を拡大すると共に、形成された砂杭群
3での各砂杭2間に大量の粘土が存在しないようにす
る。このことから、砂杭2間の粘土の排水距離が突出部
分2bでより短縮できるようにして、各砂杭2を形成した
地盤において高い圧密促進効果を得られる。
The plurality of projecting portions 2b of each of the sand piles 2
Thereby, the water collecting area is enlarged, and a large amount of clay does not exist between the sand piles 2 in the formed sand pile group 3. From this, the drainage distance of the clay between the sand piles 2 can be further reduced at the protruding portion 2b, and a high consolidation promoting effect can be obtained in the ground on which each sand pile 2 is formed.

【0018】[0018]

【発明の効果】この発明のサンドコンパクションパイル
工法によれば、ケーシングパイプの先端部に放射状に延
びる複数の突起を設けることにより、そのケーシングパ
イプで形成される各砂杭にも突出部分が形成され、集水
面積を拡大することがてきる。
According to the sand compaction pile method of the present invention, by providing a plurality of projections extending radially at the tip of the casing pipe, a projecting portion is also formed on each sand pile formed by the casing pipe. , The area of the catchment can be expanded.

【0019】即ち、砂杭群における各砂杭間の粘土の排
水距離がより短縮され、さらなる圧密促進効果を得るこ
とがてきる。
That is, the drainage distance of the clay between the sand piles in the sand pile group is further shortened, and a further consolidation promoting effect can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a) はこの発明のサンドコンパクションパイル
工法で使用するケーシングパイプを示す概略断面図で、
(b) は(a) のA−A線断面図で、(c) は(a) のケーシン
グパイプで形成した砂杭群を示す概略図である。
FIG. 1 (a) is a schematic sectional view showing a casing pipe used in a sand compaction pile method of the present invention.
(b) is a sectional view taken along line AA of (a), and (c) is a schematic view showing a group of sand piles formed by the casing pipe of (a).

【図2】(a) はこの発明のサンドコンパクションパイル
工法で使用するケーシングパイプの別態様を示す概略断
面図で、(b) は(a) のB−B線断面図で、(c) は(a) の
ケーシングパイプで形成した砂杭群を示す概略図であ
る。
2A is a schematic sectional view showing another embodiment of a casing pipe used in the sand compaction pile method of the present invention, FIG. 2B is a sectional view taken along line BB of FIG. 2A, and FIG. It is the schematic which shows the sand pile group formed of the casing pipe of (a).

【図3】サンドコンパクションパイル工法を示す概略図
である。
FIG. 3 is a schematic view showing a sand compaction pile method.

【図4】従来のサンドコンパクションパイル工法におけ
るケーシングパイプで形成した砂杭群を示す概略図であ
る。
FIG. 4 is a schematic view showing a group of sand piles formed by casing pipes in a conventional sand compaction pile method.

【符号の説明】[Explanation of symbols]

1…ケーシングパイプ、1a…パイプ本体、1b…突起、2
…砂杭、2a…基部、2b…突出部分、3…砂杭群。
1 ... casing pipe, 1a ... pipe body, 1b ... protrusion, 2
... sand piles, 2a ... base, 2b ... projecting parts, 3 ... sand piles.

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 バイブロハンマー等の振動機が設けられ
ているケーシングパイプを通して、地盤改良すべき地盤
内へ砂杭形成用の砂を供給するサンドコンパクションパ
イル工法において、 前記ケーシングパイプにおける断面略円形状のパイプ本
体先端部に、放射状に延びる複数の突起を設け、ケーシ
ングパイプで形成された各砂杭の断面形状にも円形状の
基部に複数の突出部分が形成されるようにして、 この各砂杭の複数の突出部分により、集水面積を拡大す
ると共に、形成された砂杭群での各砂杭間に原地盤とし
ての大量の粘土や緩い砂が存在しないようにし、このこ
とから、砂杭間の粘土の排水距離が前記突出部分でより
短縮できるようにして、各砂杭を形成した地盤において
高い圧密促進効果を得られるようにしたことおよび緩い
砂地盤の締固め効果を効率的にしたことを特徴とするサ
ンドコンパクションパイル方法。
1. A sand compaction pile method for feeding sand for forming a sand pile into a ground to be improved through a casing pipe provided with a vibrator such as a vibro hammer. A plurality of projections extending radially are provided at the tip of the pipe main body, and a plurality of protrusions are formed at a circular base in the cross-sectional shape of each sand pile formed by the casing pipe. The multiple projecting portions of the piles increase the catchment area and prevent large amounts of clay or loose sand as the ground between each sand pile in the formed sand pile group. The drainage distance of the clay between the piles can be further reduced at the protruding portion so that a high consolidation promoting effect can be obtained in the ground where each sand pile is formed, and Sand compaction pile method characterized in that the compaction effect and efficiently.
JP126894A 1994-01-11 1994-01-11 Sand compaction pile method Expired - Lifetime JP2701729B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP126894A JP2701729B2 (en) 1994-01-11 1994-01-11 Sand compaction pile method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP126894A JP2701729B2 (en) 1994-01-11 1994-01-11 Sand compaction pile method

Publications (2)

Publication Number Publication Date
JPH07207653A JPH07207653A (en) 1995-08-08
JP2701729B2 true JP2701729B2 (en) 1998-01-21

Family

ID=11496715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP126894A Expired - Lifetime JP2701729B2 (en) 1994-01-11 1994-01-11 Sand compaction pile method

Country Status (1)

Country Link
JP (1) JP2701729B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6881013B2 (en) * 2003-06-19 2005-04-19 Fudo Construction Co., Ltd. Sand pile driving method
JP5068624B2 (en) * 2007-10-19 2012-11-07 Jfeスチール株式会社 Method for producing material for low displacement sand compaction pile

Also Published As

Publication number Publication date
JPH07207653A (en) 1995-08-08

Similar Documents

Publication Publication Date Title
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN101838984A (en) Afforestation ecological fabric reinforcing method and structure
JP2701729B2 (en) Sand compaction pile method
JPH03158525A (en) High horizontal load bearing foundation practice using solidification method
JP3444393B2 (en) Quay remodeling method
JP2002363980A (en) Steel pipe pile and pile construction method with drain layer using the same
JP2000136541A (en) Liquefaction preventing construction method
KR101884663B1 (en) Construction method for soil retaining wall using cap slab
JPH07119549B2 (en) Twin tunnel
JP2001098542A (en) Soil cement composite taper pile
CN215252932U (en) Deep foundation pit PC steel pipe combination Larsen steel sheet pile double row pile supporting system
JP3401567B2 (en) Direct foundation method
CN210529683U (en) A tubular pile for soft soil foundation
JPH03202598A (en) Reinforced structure of eye-glass shaped tunnel
JP2004332262A (en) Edge ground improving pile and its execution method
CN207633197U (en) Damping bridge pier
JP2004211502A (en) Foundation reinforcing structure
CN212927743U (en) Wear-resistant ring for rotary drilling rod
JPH08338027A (en) Construction of slope of embankment
JP3059058U (en) Solid foundation structure with stabilizer
KR100374200B1 (en) Reinforcement method fot tip of still pile
CN1034233C (en) Closed arch ring retaining structure and its construction method
JP3063540U (en) Concrete pile
JP2001011848A (en) Gravel drain
KR200212745Y1 (en) A apparatus for horizontal resistance for reinforcement breast wall use useless tire

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970902