JP2691698B2 - Foundation pile - Google Patents
Foundation pileInfo
- Publication number
- JP2691698B2 JP2691698B2 JP7178274A JP17827495A JP2691698B2 JP 2691698 B2 JP2691698 B2 JP 2691698B2 JP 7178274 A JP7178274 A JP 7178274A JP 17827495 A JP17827495 A JP 17827495A JP 2691698 B2 JP2691698 B2 JP 2691698B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- bag
- woven
- grout
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Piles And Underground Anchors (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、送電鉄塔や電波中継塔
などの大型の構造物を地盤に固定する基礎杭であって、
構造物から加わる引張力と圧縮力の両方に強く抵抗でき
る、基礎杭に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation pile for fixing a large structure such as a power transmission tower or a radio relay tower to the ground,
The present invention relates to a foundation pile that can strongly resist both tensile force and compressive force applied from a structure.
【0002】[0002]
【従来の技術】送電鉄塔や電波中継塔などの大型の構造
物を地盤に固定する基礎としては、構造物から下向きの
圧縮力と上向きの引張力が同時複合的に加わることか
ら、杭基礎が用いられることが多かった。杭基礎は、上
部で台座の役目を果たすコンクリート基礎部分と下部で
地盤に深く食い込んだ基礎杭からなっていた。従来、送
電鉄塔用に、基礎杭に鋼管杭を用いた杭基礎が使用され
たが、構造物からの圧縮力には基礎杭底面を地盤に支持
させて抵抗し、引張力にはコンクリート基礎の自重で抵
抗するといった状態で、ほとんど圧縮力は基礎杭で、引
張力はコンクリート基礎でそれぞれ個別に対応して抵抗
を受け持つようになっていた。このため、圧縮と引張の
両方の設計荷重を満足させるためには、基礎杭とコンク
リート基礎両方を十分な大きさにしなければならないた
め、杭基礎は大型化せざるを得ず、効率の悪い構造でコ
ストも高くついた。2. Description of the Related Art As a foundation for fixing large structures such as power transmission towers and radio relay towers to the ground, a pile foundation is used because a downward compressive force and an upward tensile force are simultaneously applied from the structure. Often used. The pile foundation consisted of a concrete foundation part that served as a pedestal at the top and a foundation pile that digs deep into the ground at the bottom. Conventionally, pile foundations using steel pipe piles have been used for power transmission towers, but the compressive force from the structure is supported by supporting the bottom of the foundation pile on the ground, and the tensile force of the concrete foundation is used. In the state of resisting by its own weight, most of the compressive force was the foundation pile, and the tensile force was that of the concrete foundation, which individually corresponded to the resistance. For this reason, both the foundation pile and the concrete foundation must be made large enough to satisfy both the design load of compression and tension. And the cost was high.
【0003】[0003]
【発明が解決しようとする課題】本発明が解決しようと
する課題は、上記した問題点を解決し、圧縮力と引張力
の両方に対応して、高い抵抗力を有し、安全で信頼性が
高く、杭基礎全体を小型で経済的とすることができる基
礎杭を提供することにある。The problem to be solved by the present invention is to solve the above-mentioned problems and to have a high resistance force in correspondence with both compressive force and tensile force, which is safe and reliable. The purpose of the present invention is to provide a foundation pile which is high in cost and can be made small in size and economical.
【0004】[0004]
【課題を解決するための手段】かかる課題を解決した本
発明の構成は、 1) 大型構造物の杭基礎に用いる中空の杭の地盤への
有効付着長部分の外周面に、環状の織布袋を所定間隔に
複数取付け、杭内側から各織布袋内に通じるグラウト注
入用の孔を設けると共に、この孔に杭内側から織布袋内
への流入のみ許容する逆止弁を取付け、前記杭内側から
織布袋のない部分の外周面にグラウト注入用の孔を複数
設けると共に、この孔に杭内側から外側への流入のみ許
容する逆止弁を取付けたことを特徴とする基礎杭 2) 大型構造物の杭基礎に用いる中空の杭の地盤への
有効付着長部分の外周面に、長尺の織布袋をらせん状に
巻付けて取付け、杭内側から織布袋内に通じるグラウト
注入用の孔を複数設けると共に、この孔に杭内側から織
布袋内への流入のみ許容する逆止弁を取付けたことを特
徴とする基礎杭 3) 杭内側から織布袋のない部分の外周面にグラウト
注入用の孔を複数設けると共に、この孔に杭内側から外
側への流入のみ許容する逆止弁を取付けた、前記2)に
記載の基礎杭 4) 前記織布袋をたたんでコンパクトにした状態に上
下から軽く保持すると共に、織布袋の杭外周方向への膨
張は妨げない、上下一対の袋保持枠を杭外周の織布袋取
付部分の上側と下側にそれぞれ設けた、前記1)に記載
の基礎杭 5) 織布袋をたたんでコンパクトにした状態に上下か
ら軽く保持すると共に、織布袋の杭外周方向への膨張は
妨げない、上下一対の袋保持枠を杭外周の織布袋取付部
分の上側と下側にそれぞれ設けた、前記2)または3)
に記載の基礎杭にある。[Means for Solving the Problems] The structure of the present invention which has solved the above problems is as follows: 1) An annular woven bag is provided on the outer peripheral surface of the effective adhesion length part of the hollow pile used for the pile foundation of a large structure to the ground. multiple attachment at predetermined intervals, provided with a hole for grouting leading to each woven in a cloth bag from the pile inside, mounted a check valve that allows flow only into the cloth bag in woven into the hole from the pile inside, from the pile inside
Multiple holes for grout injection on the outer peripheral surface of the part without the woven bag
In addition to being installed, only the inflow from the inside to the outside of the pile is allowed in this hole.
Foundation pile characterized by mounting a non- return valve to accommodate 2) Spiral long woven fabric bag on the outer peripheral surface of the effective attachment length of hollow pile used for pile foundation of large structure to the ground A foundation characterized in that it is wound around and installed with a plurality of holes for grout injection that lead from the inside of the pile to the inside of the woven bag, and a check valve that allows only inflow from the inside of the pile into the inside of the woven bag. Pile 3) Grout from the inside of the pile to the outer surface of the part without the woven bag
A plurality of holes for injection are provided, and the holes are inserted from the inside to the outside of the pile.
The check valve that allows only the inflow to the side is attached to the above 2)
The foundation pile described above 4) Put the woven fabric bag up in the compacted state.
Hold the bag lightly from below and inflate the woven bag toward the outer circumference of the pile.
The pair of upper and lower bag holding frames does not interfere with the
The above 1) provided on the upper side and the lower side of the attached part respectively.
Compact to the state on whether the upper and lower were folded the foundation piles 5) woven cloth bag
And hold it lightly, and the expansion of the woven bag toward the outer circumference of the pile
A pair of upper and lower bag holding frames that do not interfere
2) or 3) provided on the upper side and the lower side of the minute, respectively.
It is in the foundation pile described in .
【0005】[0005]
【作用】本発明の基礎杭は、鉄塔等の基礎設置地盤の、
あらかじめ削孔機で掘削した基礎杭建込み用の孔へ上か
ら吊して挿入する。基礎杭を地盤に対し正しい姿勢に保
持した状態で、杭本体上部の中空部分開口にグラウトの
圧入装置を接続し、基礎杭内部にグラウトを圧入してい
く。圧入されたグラウトは、中空部分から杭本体上の逆
止弁付の孔を通って外周の織布袋内に入り、織布袋を基
礎杭外周方向へ膨張させる。織布袋は杭本体と地盤との
隙間で膨張して、表面が地盤に密着する。このままグラ
ウト圧入を続けると、織布袋の内圧が高まり、織布袋を
挟んで杭本体と地盤の間にプレストレスが発生すると共
に、加圧により織布袋内のグラウトが脱水され、硬化成
分を含んだ余剰水分が織布袋外へ絞り出されて周辺の地
盤に浸透する。この時織布袋の織目は密であるためセメ
ント粒子が流出することはない。織布袋内の圧力が所定
量に達し、杭本体および地盤へのプレストレスが十分な
ものとなったら、グラウト圧入を止め、圧入装置を取外
す。グラウトで満たされた袋内の圧力は杭本体の孔に取
付けた逆止弁により保たれ、グラウトは織布袋が地盤に
密着し、プレストレスを与えた状態でそのまま硬化す
る。周辺地盤も、浸透した織布袋からの硬化成分を含む
余剰水分により多少硬化して織布袋と一体的に密着す
る。加圧脱水されたために硬化した後の強度が大幅に高
まったグラウトと織布袋が地盤にプレストレスを与えな
がら、杭本体の引張補強材として働き、この基礎杭に引
張力が加わった時、地盤に対するせん断引抜き抵抗力を
大幅に増大させて、引張力に抵抗することを可能にす
る。[Operation] The foundation pile of the present invention is used for the foundation installation ground such as a steel tower.
It is hung from the top and inserted into the hole for foundation pile construction that was previously excavated with a boring machine. While holding the foundation pile in the correct posture with respect to the ground, a grout press-fitting device is connected to the hollow part opening in the upper part of the pile body to press the grout into the foundation pile. The press-fitted grout enters the woven cloth bag on the outer circumference from the hollow portion through the hole with the check valve on the pile body, and expands the woven cloth bag in the outer circumferential direction of the foundation pile. The woven bag expands in the gap between the pile body and the ground, and the surface adheres to the ground. If the grout press-in is continued as it is, the internal pressure of the woven cloth bag will increase, and prestress will occur between the pile body and the ground with the woven cloth bag sandwiched between them, and the grout in the woven cloth bag will be dehydrated by the pressurization, and the hardened component will be contained. Excess water is squeezed out of the woven bag and penetrates into the surrounding ground. At this time, since the woven cloth bag has a tight weave, cement particles do not flow out. When the pressure inside the woven bag reaches a predetermined amount and the prestress to the pile body and the ground becomes sufficient, stop the grout press-fitting and remove the press-fitting device. The pressure inside the bag filled with grout is maintained by the check valve attached to the hole of the pile body, and the grout hardens as it is in the state where the woven cloth bag adheres to the ground and is prestressed. The surrounding ground is also hardened to some extent by the excess moisture containing the hardening component from the permeated woven cloth bag, and adheres integrally with the woven cloth bag. The grout and woven bag, which have significantly increased strength after hardening due to pressure dehydration, act as tensile reinforcements for the pile body while prestressing the ground, and when tensile force is applied to this foundation pile, It significantly increases the shear pull-out resistance to and allows it to resist tensile forces.
【0006】杭本体の織布袋のない部分にグラウト注入
用の孔を設けた構成では、基礎杭内部にグラウトを圧入
していくと、グラウトは中空部分から各孔を通って外周
の織布袋内および杭本体と地盤との隙間に流入する。織
布袋は膨張して地盤に密着し、杭本体と地盤へプレスト
レスを与えるようになる。一方、杭本体と地盤との隙間
に入ったグラウトは、この隙間部分を完全に満たし、地
盤の表面から内部に浸透する。織布袋内圧力が所定量に
達し、杭本体および地盤へのプレストレスが十分なもの
となったら、グラウト圧入を止め、圧入装置を取外す。
各孔の逆止弁により、圧入したグラウトが中空部分に逆
流することはない。杭本体と地盤との隙間が、織布袋と
グラウトで全て埋められることにより、織布袋の地盤に
接していない部分からの圧力の逃げがなく、硬化した
後、織布袋部分から地盤により強力にプレストレスを与
えると共に、各織布袋間のグラウトが直接地盤と一体化
した状態で硬化して、地盤から杭側に突き出された突起
として作用し、杭本体と強力に接合している各織布袋が
これとかみ合うことで上方への引張力に対し強く抵抗で
きる。In the structure in which a hole for grouting is provided in a portion of the pile body where there is no woven bag, when the grout is pressed into the inside of the foundation pile, the grout passes through each hole from the hollow portion to the inside of the woven bag. And it flows into the gap between the pile body and the ground. The woven bag expands and adheres to the ground, prestressing the pile body and the ground. On the other hand, the grout that has entered the gap between the pile body and the ground completely fills the gap and penetrates from the surface of the ground to the inside. When the pressure inside the woven bag reaches the specified amount and the prestress to the pile body and ground becomes sufficient, stop the grout press-fitting and remove the press-fitting device.
The check valve in each hole prevents the press-fitted grout from flowing back into the hollow portion. The gap between the pile body and the ground is completely filled with the woven bag and the grout, so there is no relief of pressure from the part of the woven bag that is not in contact with the ground, and after hardening, the woven bag is more strongly pretended by the ground. In addition to applying stress, the grout between each woven bag hardens directly in the state of being integrated with the ground, acts as a protrusion protruding from the ground to the pile side, and each woven bag strongly joined to the pile body By engaging with this, it is possible to strongly resist the upward pulling force.
【0007】杭本体外周に織布袋用の上下一対の袋保持
枠を取付けた構成では、基礎杭を建込み用の孔に挿入す
る際は、織布袋をたたんで上下の袋保持枠に保持させ、
織布袋が垂れ下がって挿入の妨げになるのを防ぐ。基礎
杭挿入後、グラウトの圧入を行なうと、織布袋内の圧力
が高まって外周方向に膨張し広がる。織布袋はこれに伴
い袋保持枠から徐々に外れていき、保持状態から脱す
る。織布袋は膨張して最終的に地盤に表面が密着してプ
レストレスを与える状態となる。織布袋が外れた後の袋
保持枠は、織布袋には何の影響も与えず、膨張を妨げな
い。In the structure in which a pair of upper and lower bag holding frames for woven bags are attached to the outer periphery of the pile body, when the foundation pile is inserted into the building hole, the woven bag is folded and held by the upper and lower bag holding frames. Let
Prevent the woven bag from hanging and obstructing insertion. When the grout is pressed in after the foundation pile is inserted, the pressure inside the woven fabric bag increases and expands and spreads in the outer peripheral direction. Along with this, the woven bag gradually comes off from the bag holding frame and comes out of the holding state. The woven bag is inflated, and the surface finally comes into close contact with the ground to give a prestress. The bag holding frame after the woven bag is removed does not affect the woven bag and does not hinder the expansion.
【0008】杭本体の各孔と連結したグラウト注入用パ
イプを設けた構成では、パイプ開口にグラウトの圧入装
置を接続し、グラウトを圧入する。グラウトはパイプを
通り、逆止弁付の孔から杭本体外周へ達する。パイプ外
側の杭本体中空部分には別にグラウトやコンクリート等
を充填する場合と、中空のままにしておく場合の両方が
可能で、後者の場合は全体のグラウト量が減らせ、注入
も短時間で行なえる。In the construction in which the grout injection pipe connected to each hole of the pile body is provided, the grout press-fitting device is connected to the pipe opening to press the grout. The grout passes through the pipe and reaches the outer periphery of the pile body from the hole with check valve. It is possible to separately fill the hollow part of the pile body outside the pipe with grout or concrete, or to leave it in the hollow state.In the latter case, the total amount of grout can be reduced and injection can be done in a short time. It
【0009】[0009]
【実施例】本発明の実施例を図面に基づいて説明する。
本実施例は、織布袋を所定間隔に取付け、織布袋のない
部分へ通じるグラウト注入用孔も設け、各グラウト注入
用孔にパイプを連結すると共に、上下一対の袋保持枠を
取付けた例である。図1は実施例の杭建込み作業を示す
説明図、図2は実施例のグラウト圧入状態を示す説明
図、図3は実施例のグラウト注入用孔を示す説明図、図
4は実施例の杭断面を示す説明図、図5は実施例の織布
袋保持状態を示す説明図、図6は実施例の使用状態を示
す説明図、図7は実施例の織布袋の他の例を示す説明図
である。An embodiment of the present invention will be described with reference to the drawings.
This example is an example in which woven bags are attached at predetermined intervals, grout injection holes leading to a portion without a woven bag are also provided, a pipe is connected to each grout injection hole, and a pair of upper and lower bag holding frames are attached. is there. FIG. 1 is an explanatory view showing a pile erection work of an embodiment, FIG. 2 is an explanatory view showing a grout press-fitting state of the embodiment, FIG. 3 is an explanatory view showing a grout injection hole of the embodiment, and FIG. 5 is an explanatory view showing a cross section of a pile, FIG. 5 is an explanatory view showing a woven cloth bag holding state of the embodiment, FIG. 6 is an explanatory view showing a usage state of the embodiment, and FIG. 7 is an explanation showing another example of the woven cloth bag of the embodiment. It is a figure.
【0010】本実施例の基礎杭1は、杭本体として直径
400mm、長さ約30mの鋼管杭2を用いている。鋼
管杭2外周には、膨張した時上下方向幅約1m、周方向
の幅50mm以上となるアラミド繊維製の環状の織布袋
5を1mピッチで取付けている。織布袋5の上縁および
下縁と鋼管杭2は高引張強度を有する接着剤で水密に接
合している。また、織布袋5上縁の上方と下縁の下方の
鋼管杭2外周上には、たたんでコンパクトにした織布袋
5の端を入れ込んで、織布袋5が垂れ下がらないよう保
持する断面L字形で環状の袋保持枠6をそれぞれ設けて
いる。鋼管杭2には、その中空部分2bから外側に通じ
る孔2aを、織布袋5のある部分とない部分のそれぞれ
中央にくるよう等ピッチで設け、さらに各孔2aの中空
部分2b側に、鋼管杭2上方から延ばしたグラウト7注
入用のパイプ3をそれぞれ分岐させて接続している。各
孔2aには、これに加えて、パイプ3から外周方向への
グラウト流入は許容し、逆向きの流れは完全に止める逆
止弁4を取付けている。The foundation pile 1 of this embodiment uses a steel pipe pile 2 having a diameter of 400 mm and a length of about 30 m as a pile body. On the outer circumference of the steel pipe pile 2, an annular woven cloth bag 5 made of aramid fiber having a width of about 1 m in the vertical direction when expanded and a width of 50 mm or more in the circumferential direction is attached at a pitch of 1 m. The upper and lower edges of the woven cloth bag 5 and the steel pipe pile 2 are water-tightly joined with an adhesive having high tensile strength. Further, a cross section in which the ends of the woven fabric bag 5 which are folded and compact are put on the outer periphery of the steel pipe pile 2 above the upper edge of the woven fabric bag 5 and below the lower edge to prevent the woven fabric bag 5 from hanging down. An L-shaped annular bag holding frame 6 is provided. The steel pipe pile 2 is provided with holes 2a communicating from the hollow portion 2b to the outside at equal pitches so as to be located at the center of the portion having the woven cloth bag 5 and the portion not having the woven fabric bag 5, respectively. Pipes 3 for injecting the grout 7 extending from above the pile 2 are branched and connected. In addition to this, each hole 2a is provided with a check valve 4 which allows the grout from the pipe 3 to the outer peripheral direction and completely stops the reverse flow.
【0011】本実施例の織布袋5の他の例として、らせ
ん状に鋼管杭2の外周を取り巻くように取付けた織布袋
5の例を示す(図5参照)。この場合、袋保持枠6も織
布袋5の上下でらせん状に設ける。As another example of the woven cloth bag 5 of the present embodiment, an example of the woven cloth bag 5 attached in a spiral shape so as to surround the outer circumference of the steel pipe pile 2 is shown (see FIG. 5). In this case, the bag holding frame 6 is also provided spirally above and below the woven cloth bag 5.
【0012】本実施例の基礎杭1を鉄塔10の杭基礎9
に使用する場合は、まず杭基礎9を設置する地盤8の所
定の位置に、基礎杭1の建込み用孔8aを削孔機等で掘
削しておく。掘削し終えた建込み用孔8aに、基礎杭1
を自走式クレーン11で上から吊り下げて挿入する。こ
の時、基礎杭1の織布袋5は袋保持枠6で上下から保持
されて垂れ下がったり横に広がったりしないので、基礎
杭1挿入の妨げにならず、挿入しやすい。挿入後基礎杭
1を建込み用孔8aの中心位置で保持した状態で、杭本
体である鋼管杭2上部の中空部分2b開口から突き出た
グラウト7注入用のパイプ3に、グラウト7の圧入装置
12を接続し、圧入装置12からグラウト7を圧入す
る。圧入されたグラウト7はパイプ3を通り、鋼管杭2
の孔2aの逆止弁4を押し開いて各織布袋5内および織
布袋5のない部分の鋼管杭2と地盤8との隙間に流入す
る。織布袋5は、グラウト7圧入により基礎杭1外周方
向へ膨張し、袋保持枠6に保持された部分が、膨張に伴
なって外周方向へ広がろうとする力で袋保持枠6から外
れ、織布袋5全体が保持状態から脱する。そして織布袋
5は鋼管杭2と地盤8の間で膨張を続け、その表面が地
盤8に密着する。このままグラウト7圧入を続けると、
織布袋5の内圧が高まり、織布袋5内部から鋼管杭2と
地盤8に対する向きにプレストレスが発生すると共に、
加圧状態となった織布袋5内のグラウト7が脱水され
て、セメントミルク等硬化成分を含んだ余剰水が織布袋
5の外へ絞り出され、その一部が密着部分から周辺の地
盤8に浸透する。この時、織布袋5の織目は密になって
いるために、織布袋5からセメント粒子が流出すること
はない。一方、織布袋5のない部分の鋼管杭2と地盤8
との隙間に流出したグラウト7は織布袋5内と同様にこ
の隙間部分を完全に満たし、地盤8表面の亀裂や空隙か
ら一部が地盤8内部に浸透する。織布袋5内の圧力が所
定量に達し、鋼管杭2および地盤8へのプレストレスが
十分な作用になったなら、圧入装置12によるグラウト
7圧入を停止し、圧入装置12とパイプ3の接続を外
す。グラウト7で満たされた織布袋5内の圧力は鋼管杭
2の孔2aの逆止弁4により保持される。織布袋5以外
の部分からも逆止弁4の働きでグラウト7のパイプ3へ
の逆流はない。グラウト7は、こうして織布袋5が地盤
8に密着しプレストレスを与えた状態のまま硬化する。
織布袋5内のグラウト7は加圧脱水されているために、
他の部分のグラウト7に比べ硬化後の強度が大幅に高ま
る。周辺の地盤8も、浸透した余剰水により多少硬化し
て織布袋5と一体的に密着する。The foundation pile 1 of this embodiment is used as a pile foundation 9 of a steel tower 10.
In the case of using it, first, the building hole 8a of the foundation pile 1 is excavated at a predetermined position of the ground 8 on which the pile foundation 9 is installed by a boring machine or the like. The foundation pile 1 is placed in the building hole 8a that has been excavated.
Is hung from the top by the self-propelled crane 11 and inserted. At this time, since the woven fabric bag 5 of the foundation pile 1 is held from above and below by the bag holding frame 6 and does not hang down or spread laterally, it does not hinder the insertion of the foundation pile 1 and is easy to insert. After the insertion, the foundation pile 1 is held at the center position of the building hole 8a, and the grout 7 is inserted into the pipe 3 for injecting the grout 7 protruding from the opening of the hollow portion 2b in the upper portion of the steel pipe pile 2 which is the pile body. 12 is connected, and the grout 7 is press-fitted from the press-fitting device 12. The press-fitted grout 7 passes through the pipe 3 and the steel pipe pile 2
The check valve 4 of the hole 2a is pushed open and flows into the gap between the steel pipe pile 2 and the ground 8 in each woven bag 5 and in the portion where the woven bag 5 is not present. The woven cloth bag 5 expands in the outer peripheral direction of the foundation pile 1 by press-fitting the grout 7, and the portion held by the bag holding frame 6 comes off the bag holding frame 6 by the force of expanding in the outer peripheral direction with the expansion, The entire woven cloth bag 5 is released from the holding state. Then, the woven cloth bag 5 continues to expand between the steel pipe pile 2 and the ground 8, and the surface thereof comes into close contact with the ground 8. If you continue to press grout 7 as it is,
The internal pressure of the woven cloth bag 5 increases, pre-stress is generated in the direction from the inside of the woven cloth bag 5 to the steel pipe pile 2 and the ground 8, and
The grout 7 in the woven cloth bag 5 in the pressurized state is dehydrated, and excess water containing a hardening component such as cement milk is squeezed out of the woven cloth bag 5, and a part of it is adhered to the surrounding ground 8 Penetrate into. At this time, since the texture of the woven cloth bag 5 is dense, the cement particles do not flow out from the woven cloth bag 5. On the other hand, the steel pipe pile 2 and the ground 8 where there is no woven bag 5
The grout 7 that has flowed out into the gap between and completely fills the gap portion as in the woven bag 5, and a part of the grout 7 penetrates into the ground 8 through the cracks and voids on the surface of the ground 8. When the pressure in the woven bag 5 reaches a predetermined amount and the prestress to the steel pipe pile 2 and the ground 8 becomes sufficient, the press-fitting device 12 stops the press-fitting of the grout 7, and the press-fitting device 12 and the pipe 3 are connected. Remove. The pressure in the woven bag 5 filled with the grout 7 is retained by the check valve 4 in the hole 2 a of the steel pipe pile 2. There is no backflow of the grout 7 to the pipe 3 from the part other than the woven bag 5 by the function of the check valve 4. The grout 7 is thus cured while the woven bag 5 is in close contact with the ground 8 and is prestressed.
Since the grout 7 in the woven bag 5 has been dehydrated under pressure,
The strength after curing is significantly higher than that of the grout 7 in other portions. The surrounding ground 8 is also hardened to some extent by the permeated excess water, and is brought into close contact with the woven bag 5 integrally.
【0013】上記同様にして所要本数分の基礎杭1を打
設し終えたら、基礎杭1上側に、これら基礎杭1と連結
するコンクリート基礎9aを打設する。このコンクリー
ト基礎9aと基礎杭1が鉄塔10を支える杭基礎9とな
る。基礎杭1においては、織布袋5内のグラウト7が地
盤8に強力にプレストレスを与えると共に、織布袋5以
外の部分でもグラウト7が地盤8と一体化して、地盤8
からの突起として働き、各織布袋5とかみ合った状態と
なる。よって杭基礎9に上方への引張力が加わっても、
下部の基礎杭1は鋼管杭2のみの時に比べ、地盤8に対
するせん断引抜き抵抗力を大幅に増大させて、この引張
力に確実に抵抗できる。When the required number of foundation piles 1 have been placed in the same manner as above, a concrete foundation 9a connected to the foundation piles 1 is placed above the foundation piles 1. The concrete foundation 9a and the foundation pile 1 serve as a pile foundation 9 that supports the steel tower 10. In the foundation pile 1, the grout 7 in the woven cloth bag 5 strongly prestresses the ground 8, and the grout 7 is integrated with the ground 8 even in a portion other than the woven cloth bag 5 to form the ground 8
It functions as a protrusion from the tongue and is in a state of being meshed with each woven fabric bag 5. Therefore, even if upward tensile force is applied to the pile foundation 9,
The lower foundation pile 1 significantly increases the shear pull-out resistance force to the ground 8 as compared with the case of only the steel pipe pile 2, and can reliably resist this tensile force.
【0014】[0014]
【発明の効果】本発明は、上記した構成を採用すること
により、上方の構造物から作用する引張力に対する抵抗
を高めて、圧縮力と引張力の両方に同時に対応でき、コ
ンクリート基礎部分の抵抗分担を減らし、軽量小型化と
低コスト化を実現する。また、グラウトが流失しやすい
地盤においても施工が行え、設置箇所を選ばず、安全で
信頼性が高い。According to the present invention, by adopting the above-mentioned structure, the resistance to the tensile force acting from the upper structure can be increased, and both the compressive force and the tensile force can be dealt with at the same time. We will reduce the burden, realize lighter weight, smaller size, and lower cost. In addition, construction can be performed even on the ground where the grout is likely to be washed away, and the installation location is not chosen, so it is safe and highly reliable.
【0015】杭本体の織布袋のない部分にグラウト注入
用の孔を設けた構成を採用すると、杭本体と地盤がより
一体的に密着して引張力に対する抵抗が高まり、杭基礎
全体の一層の軽量小型化がはかれる。If a structure is provided in which a hole for grouting is provided in a portion of the pile body where there is no woven bag, the pile body and the ground are more closely adhered to each other to increase the resistance to tensile force and to further increase the strength of the pile foundation. Lightweight and compact.
【0016】杭本体外周に織布袋用の上下一対の袋保持
枠を取付けた構成を採用すると、建込み用の孔への基礎
杭挿入の際、織布袋が垂れ下がったり広がったりして挿
入の妨げになるのを防いで、作業しやすい。If a structure is adopted in which a pair of upper and lower bag holding frames for the woven cloth bag are attached to the outer periphery of the pile body, the woven cloth bag hangs down or spreads when the foundation pile is inserted into the building hole, which hinders the insertion. Is easy to work with.
【0017】杭本体の各孔と連結したグラウト注入用パ
イプを設けた構成を採用すると、杭中空部分にグラウト
等を入れずに済ますこともでき、使うグラウトを減らし
て、グラウト圧入も短時間で行え、作業能率がよくな
る。By adopting a construction in which a grout injection pipe connected to each hole of the pile body is provided, it is possible to eliminate grout in the hollow part of the pile, reduce the grout to be used, and press the grout in a short time. It can be done and work efficiency is improved.
【図1】実施例の杭建込み作業を示す説明図である。FIG. 1 is an explanatory diagram showing a pile erection work of an embodiment.
【図2】実施例のグラウト圧入状態を示す説明図であ
る。FIG. 2 is an explanatory view showing a grout press-fitting state of the embodiment.
【図3】実施例のグラウト注入用孔を示す説明図であ
る。FIG. 3 is an explanatory view showing a grout injection hole of an example.
【図4】実施例の杭断面を示す説明図である。FIG. 4 is an explanatory view showing a cross section of a pile of an example.
【図5】実施例の織布袋保持状態を示す説明図である。FIG. 5 is an explanatory view showing a woven bag holding state of the embodiment.
【図6】実施例の使用状態を示す説明図である。FIG. 6 is an explanatory diagram showing a use state of the embodiment.
【図7】実施例の織布袋の他の例を示す説明図である。FIG. 7 is an explanatory diagram showing another example of the woven fabric bag of the embodiment.
1 基礎杭 2 鋼管杭 2a 孔 2b 中空部分 3 パイプ 4 逆止弁 5 織布袋 6 袋保持枠 7 グラウト 8 地盤 8a 建込み用孔 9 杭基礎 9a コンクリート基礎 10 鉄塔 10a アンカー 11 自走式クレーン 12 圧入装置 1 Foundation pile 2 Steel pipe pile 2a Hole 2b Hollow part 3 Pipe 4 Check valve 5 Woven cloth bag 6 Bag holding frame 7 Grout 8 Ground 8a Construction hole 9 Pile foundation 9a Concrete foundation 10 Steel tower 10a Anchor 11 Self-propelled crane 12 Press-fitting apparatus
───────────────────────────────────────────────────── フロントページの続き (72)発明者 上原 弘生 福岡県春日市一の谷6丁目32番地 新技 術工営株式会社内 (56)参考文献 特開 昭63−251519(JP,A) 実開 昭58−69037(JP,U) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hiroo Uehara 6-32, Ichinoya, Kasuga-shi, Fukuoka Inside New Technology Koei Co., Ltd. (56) References JP-A-63-251519 (JP, A) 58-69037 (JP, U)
Claims (5)
地盤への有効付着長部分の外周面に、環状の織布袋を所
定間隔に複数取付け、杭内側から各織布袋内に通じるグ
ラウト注入用の孔を設けると共に、この孔に杭内側から
織布袋内への流入のみ許容する逆止弁を取付け、前記杭
内側から織布袋のない部分の外周面にグラウト注入用の
孔を複数設けると共に、この孔に杭内側から外側への流
入のみ許容する逆止弁を取付けたことを特徴とする基礎
杭。1. A grout which is provided with a plurality of annular woven cloth bags at predetermined intervals on the outer peripheral surface of the effective length of attachment of hollow piles used for pile foundations of large-sized structures at predetermined intervals, and which communicates from the inside of the piles into each woven cloth bag. provided with a hole for injection, mounting a check valve that allows flow only into the cloth bag in woven into the hole from the pile inside the pile
For grout injection from the inside to the outer peripheral surface of the part without the woven bag
Along with the provision of multiple holes, the flow from the inside to the outside of the pile
A foundation pile that is equipped with a check valve that allows only entry .
地盤への有効付着長部分の外周面に、長尺の織布袋をら
せん状に巻付けて取付け、杭内側から織布袋内に通じる
グラウト注入用の孔を複数設けると共に、この孔に杭内
側から織布袋内への流入のみ許容する逆止弁を取付けた
ことを特徴とする基礎杭。2. A long woven cloth bag is spirally wound around the outer peripheral surface of the effective attachment length portion of the hollow pile used for the pile foundation of a large structure to the ground, and the inside of the pile is put into the woven cloth bag. A foundation pile, characterized in that a plurality of holes for injecting grout are provided, and a check valve that allows only inflow into the woven bag from the inside of the pile is attached to the holes.
グラウト注入用の孔を複数設けると共に、この孔に杭内
側から外側への流入のみ許容する逆止弁を取付けた、請
求項2に記載の基礎杭。3. From the inside of the pile to the outer peripheral surface of the portion without the woven bag
There are multiple holes for grout injection, and the holes in the pile
With a check valve that allows only inflow from side to outside,
The foundation pile according to claim 2 .
状態に上下から軽く保持すると共に、織布袋の杭外周方
向への膨張は妨げない、上下一対の袋保持枠を杭外周の
織布袋取付部分の上側と下側にそれぞれ設けた、請求項
1に記載の基礎杭。 4. The woven fabric bag is folded to make it compact.
Lightly from above and below, and at the outer periphery of the woven bag pile
The pair of upper and lower bag holding frames are
The woven bag mounting portion is provided on the upper side and the lower side, respectively.
Foundation pile according to 1 .
に上下から軽く保持すると共に、織布袋の杭外周方向へ
の膨張は妨げない、上下一対の袋保持枠を杭外周の織布
袋取付部分の上側と下側にそれぞれ設けた、請求項2ま
たは3に記載の基礎杭。5. A state in which a woven bag is folded to be compact.
And hold it lightly from above and below, and
The pair of upper and lower bag holding frames do not prevent the expansion of the
The method according to claim 2, wherein the bag mounting portion is provided on each of the upper side and the lower side.
Or the foundation pile described in 3 .
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7178274A JP2691698B2 (en) | 1995-06-20 | 1995-06-20 | Foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP7178274A JP2691698B2 (en) | 1995-06-20 | 1995-06-20 | Foundation pile |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH093882A JPH093882A (en) | 1997-01-07 |
JP2691698B2 true JP2691698B2 (en) | 1997-12-17 |
Family
ID=16045613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP7178274A Expired - Lifetime JP2691698B2 (en) | 1995-06-20 | 1995-06-20 | Foundation pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2691698B2 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4532755B2 (en) * | 2001-02-02 | 2010-08-25 | 芦森工業株式会社 | Embedded pile bag and construction method thereof |
NL1026057C2 (en) * | 2004-04-27 | 2005-11-03 | Franki Grondtechnieken B V | Pile-shaped foundation element with inflatable body. |
JP4758463B2 (en) * | 2008-08-22 | 2011-08-31 | 芦森工業株式会社 | Pile driving method and pile with bag body directly under the structure |
CN104179170A (en) * | 2014-07-10 | 2014-12-03 | 大连大金马基础建设有限公司 | Supporting and protecting double-convex and single-concave occluded water stopping pile |
CN106968159A (en) * | 2017-04-01 | 2017-07-21 | 徐冲 | A kind of bridge structure of town airbus |
CN107190737A (en) * | 2017-07-04 | 2017-09-22 | 福建省水利水电科学研究院 | A kind of construction technology of high intensity mould bag stake |
CN114045834B (en) * | 2021-12-03 | 2023-06-20 | 中国人民解放军陆军工程大学 | Sand soil rapid solidification slip casting pile forming device |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5869037U (en) * | 1981-10-27 | 1983-05-11 | 株式会社 技研製作所 | temporary drag pile |
JPH0826544B2 (en) * | 1987-04-04 | 1996-03-13 | 応用地質株式会社 | Friction pile |
-
1995
- 1995-06-20 JP JP7178274A patent/JP2691698B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH093882A (en) | 1997-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20220380996A1 (en) | Methods for constructing tensionless concrete pier foundations and foundations constructed thereby | |
KR100488118B1 (en) | Compressive and Extensive Fixture of Earth Anchor | |
CN113123332B (en) | Post-tensioned slow-setting main reinforcement pressure type uplift action pile and preparation method thereof | |
JP2691698B2 (en) | Foundation pile | |
CN106638655A (en) | Conical-head tendon body post-tensioning pile foundation and construction process thereof | |
JPS6149029A (en) | Underwater foundation fixer | |
CN102677670A (en) | Dismountable-anchor type recoverable anchor rod | |
JP4758463B2 (en) | Pile driving method and pile with bag body directly under the structure | |
JP3649717B2 (en) | Joints and structures for joining steel pipe pile heads to concrete foundations | |
US3483707A (en) | Method for reinforcing steel pipe piling in situ and the resultant piling | |
CN112095586A (en) | Prestressed post-inserted composite anchor cable uplift pile and preparation method thereof | |
CN113622707B (en) | Pre-tensioned crossed steel pull rod supporting and reinforcing reinforced concrete frame structure | |
KR101689781B1 (en) | Pile pressing apparatus using foundation fixing member and horizontal reinforcing member for pile pressing and the construction method therefor | |
KR100823603B1 (en) | Casket anchor | |
JP2002061201A (en) | Foundation structure and its construction method | |
JPH0522771B2 (en) | ||
KR20030052871A (en) | Retaining wall and its construction method of steel panel | |
KR200431272Y1 (en) | The foundation fixing anchor and this which consisted of fixing supporter | |
JP4951254B2 (en) | Leg frame structure and method for constructing the frame structure | |
KR100583983B1 (en) | Method for constructing air dome on soft ground | |
JP2884268B2 (en) | Construction method of cast-in-place concrete pile | |
US4355927A (en) | Piling structure and methods | |
JPH0336315A (en) | Pile for concurrently serving as earth anchor | |
JP4204735B2 (en) | Pile driving method and pile with bag body directly under the structure | |
CN116378057A (en) | Foundation pit guard pile construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080905 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090905 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090905 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100905 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110905 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120905 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120905 Year of fee payment: 15 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130905 Year of fee payment: 16 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |