JP2686445B2 - Soil cement water blocking wall construction method and its equipment - Google Patents

Soil cement water blocking wall construction method and its equipment

Info

Publication number
JP2686445B2
JP2686445B2 JP23288489A JP23288489A JP2686445B2 JP 2686445 B2 JP2686445 B2 JP 2686445B2 JP 23288489 A JP23288489 A JP 23288489A JP 23288489 A JP23288489 A JP 23288489A JP 2686445 B2 JP2686445 B2 JP 2686445B2
Authority
JP
Japan
Prior art keywords
drilling
cement
stirring
water blocking
blocking wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23288489A
Other languages
Japanese (ja)
Other versions
JPH0396514A (en
Inventor
雅明 広瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP23288489A priority Critical patent/JP2686445B2/en
Publication of JPH0396514A publication Critical patent/JPH0396514A/en
Application granted granted Critical
Publication of JP2686445B2 publication Critical patent/JP2686445B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明はソイルセメント止水壁の構築方法及びその構
築装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION <Industrial field of application> The present invention relates to a method for constructing a soil cement water blocking wall and an apparatus for constructing the same.

〈従来の技術〉 ソイルセメント止水壁は、地盤に削孔した溝内に、泥
土とポルトランドセメントあるいは高炉セメント等を混
合、硬化させて、止水性を有する壁体を構築するもので
ある。
<Prior Art> A soil cement water blocking wall is one that constructs a water blocking wall by mixing mud and Portland cement or blast furnace cement in a groove formed in the ground and curing the mixture.

従来、この止水壁の構築には、所謂シャトル工法と呼
ばれる工法が利用されている。
Conventionally, a construction method called a so-called shuttle construction method has been used to construct the water blocking wall.

シャトル工法は、先ず、削孔専用の装置によって、地
盤に等しい間隔をおいて柱列杭を先行削孔する。
In the shuttle method, first, a column row pile is pre-drilled with a device dedicated to drilling at equal intervals to the ground.

次に、垂直のオーガスクリューを三体並列させた撹拌
削孔装置によって、上記柱列杭間の未削孔の地盤を、中
央のオーガスクリューで後行削孔すると同時に、両側の
柱列杭内の泥土を、セメントを注入しながら撹拌する。
Next, by using a stirring drilling device with three vertical auger screws in parallel, the undrilled ground between the above pillar row piles is drilled backward with the central auger screw, and at the same time, inside the pillar row piles on both sides. The mud of is stirred while pouring cement.

そして、泥土とセメントを混合、硬化させて、ソイル
セメント止水壁を構築するものである。
Then, mud and cement are mixed and hardened to construct a soil cement water blocking wall.

〈本発明が解決しようとする問題点〉 従来の上記のようなソイルセメント止水壁の構築技術
には、次のような問題点が存在する。
<Problems to be Solved by the Present Invention> The conventional construction techniques for soil cement water blocking walls as described above have the following problems.

〈イ〉柱列杭間の未削孔地盤を後行削孔する場合、撹拌
削孔装置の中央のオーガスクリューによって、削孔を行
うことになる。
<B> When the undrilled ground between the pillar rows is to be drilled subsequently, the auger screw in the center of the stirring drilling device is used for drilling.

しかし、オーガスクリューでは、地山内の転石や玉石
層を破砕することが困難である。
However, it is difficult for the auger screw to crush the boulders and boulders in the ground.

そのため、柱列杭内にH鋼等の杭芯材を建て込む際に
は、比重の大きいセメントを杭底部に沈殿させ、転石等
を浮遊させた状態で、杭芯材によって浮遊する転石等を
かき分けて建て込んでいた。
Therefore, when building a pile core material such as H steel in a pillar row pile, cement with a large specific gravity is settled at the bottom of the pile, and while the boulders are floating, the boulders floating by the pile core material are separated and built up. I was out.

従って、作業が煩雑になるのを避けられない。 Therefore, the work is inevitably complicated.

また、柱列杭の削孔に時間がかかると、浮遊していた
転石等が杭底に沈下してしまう。
In addition, if it takes time to drill a pillar row pile, floating boulders will sink to the bottom of the pile.

そのため、杭芯材を建て込んだ場合に、杭芯材の下端
が転石等の上に載置され、杭底に到達せず、杭底の削孔
のやり直しの原因となる。
Therefore, when the pile core material is built in, the lower end of the pile core material is placed on a boulder or the like, does not reach the pile bottom, and causes re-drilling of the pile bottom.

〈ロ〉オーガスクリューを三体並列させた撹拌削孔装置
の他に、先行削孔専用の削孔装置が必要となり、不経済
である。
<B> In addition to the agitation drilling device in which three auger screws are arranged in parallel, a dedicated drilling device for preceding drilling is required, which is uneconomical.

〈本発明の目的〉 本発明は上記のような問題点を解決するためになされ
たもので、先行、後行両削孔時に、地盤内の転石や玉石
層を破砕することができ、しかも一つの削孔装置を、先
行、後行削孔に共用することができるソイルセメント止
水壁構築法及びその装置を提供することを目的とする。
<Purpose of the present invention> The present invention has been made to solve the above problems, it is possible to crush the rocks and cobblestone layers in the ground at the time of both preceding and trailing boring, and An object of the present invention is to provide a method for constructing a soil cement water-blocking wall and a device therefor, in which one drilling device can be commonly used for leading and trailing drilling.

〈問題点を解決するための手段〉 即ち本発明は、先端に削孔爪を有する回転可能な外管
内に、スクリューを内挿した削孔装置によって、地盤に
等しい間隔をおいて柱列杭を削孔し、この柱列杭内には
泥水を充填しておき、中央に前記削孔装置を装着し、そ
の両側に撹拌装置及びセメントの注入装置を有する三連
式の削孔撹拌装置によって、前記柱列杭間の未削孔の地
盤を削孔装置によって削孔すると同時に、削孔装置の両
側の柱列杭内の泥土を、セメントを注入しながら、撹拌
装置によって撹拌し、泥土とセメントを混合、硬化させ
て、壁体を構築することを特徴とするソイルセメント止
水壁の構築方法である。
<Means for Solving the Problems> That is, the present invention, in a rotatable outer tube having a drilling claw at the tip, by a drilling device having a screw inserted, the pillar row piles at equal intervals to the ground. Drilling, filling muddy water in this pillar row pile, installing the drilling device in the center, by a triple drilling stirring device having a stirring device and a cement injection device on both sides thereof, At the same time as drilling the undrilled ground between the pillar row piles by a hole drilling device, the mud in the column row piles on both sides of the hole drilling device is stirred by a stirring device while injecting cement, and the mud and the cement. Is a method for constructing a soil cement water blocking wall, which comprises mixing and curing the above to construct a wall body.

また本発明は、上記ソイルセメント止水壁の構築方法
において用いる装置であって、先端に削孔爪を有する回
転可能な外管内に、スクリューを内挿した削孔装置と、
この削孔装置を装着する部分と、その両側の撹拌部と、
この撹拌部に設けたセメント注入部よりなる撹拌装置と
によって構成したことを特徴とするソイルセメント止水
壁の構築装置である。
Further, the present invention is a device used in the method for constructing the soil cement water blocking wall, wherein a rotatable outer tube having a hole-piercing claw at the tip, a hole-piercing device having a screw inserted thereinto
The part to which this drilling device is attached, the stirring parts on both sides of it,
The soil cement water blocking wall construction device is characterized by being configured with a stirring device including a cement injection part provided in the stirring part.

〈本発明の説明〉 以下、本発明を詳細に説明をする。<Description of the Present Invention> The present invention will be described in detail below.

〈イ〉削孔装置の構造(第1、2図) 削孔装置1は、外管2と、この外管2内に内挿した内
スクリュー3よりなる。
<A> Structure of Drilling Device (FIGS. 1 and 2) The drilling device 1 includes an outer pipe 2 and an inner screw 3 inserted in the outer pipe 2.

外管2は、先端に転石や玉石等を破砕可能な削孔爪21
を有する。
The outer tube 2 has a drilling claw 21 at the tip that can crush boulders or boulders.
Having.

内スクリュー3は、公知のオーガスクリュー等を用
い、外管2内に挿入可能なスクリュー径を有する。
The inner screw 3 is a known auger screw or the like and has a screw diameter that can be inserted into the outer tube 2.

また、内スクリュー3の回転時には、セメントミルク
の注入路31が設けられており、その注入路31は内スクリ
ュー3の下端に開口し、注入口32とする。
Further, when the inner screw 3 is rotated, a cement milk injection path 31 is provided, and the injection path 31 is opened at the lower end of the inner screw 3 and serves as an injection port 32.

そして、外管2及び内スクリュー3の上部には駆動装
置(図示せず)を取り付け、外管2と内スクリュー3
を、互いに逆方向に回転させて削孔するよう構成する。
Then, a driving device (not shown) is attached to the upper portions of the outer tube 2 and the inner screw 3, and the outer tube 2 and the inner screw 3 are attached.
Are configured to rotate in opposite directions to drill holes.

〈ロ〉撹拌装置の構造(第1、3図) 撹拌装置は4は、管体を垂直に立ち上げたケーシング
41を装置中央に配置し、その両側に連結板42を介して油
圧モータ43を取り付ける。
<B> Stirrer structure (Figs. 1 and 3) The stirrer 4 is a casing in which the pipe body is vertically raised.
41 is arranged in the center of the device, and hydraulic motors 43 are attached to both sides of the device via connecting plates 42.

ケーシング41の内径は、削孔装置1の外管2の外径よ
り僅かに大きく形成し、ケーシング41内に削孔装置1を
装着可能に構成する。
The inner diameter of the casing 41 is formed to be slightly larger than the outer diameter of the outer pipe 2 of the drilling device 1, so that the drilling device 1 can be mounted in the casing 41.

また、ケーシング41は、削孔時のガイド管ともなるた
め、剛性部材によって形成する。
Further, the casing 41 also serves as a guide pipe at the time of drilling, and thus is formed of a rigid member.

両側の油圧モータ43には、撹拌羽根44を複数取り付け
た回転軸45を、ケーシング41と並行に回転可能に連結す
る。
A rotary shaft 45 having a plurality of stirring blades 44 attached thereto is rotatably connected to the hydraulic motors 43 on both sides in parallel with the casing 41.

また、回転軸45は中空孔を有しており、この中空孔の
上端部は、スイベル46を介して、セメントミルクを注入
するための注入管47と連通し、中空孔の下端部は、回転
軸45の下端部に開口して、注入口48とする。
Further, the rotating shaft 45 has a hollow hole, the upper end portion of this hollow hole communicates with an injection pipe 47 for injecting cement milk through the swivel 46, and the lower end portion of the hollow hole rotates. The lower end of the shaft 45 is opened to serve as an injection port 48.

〈ハ〉柱列杭の先行削孔(第4図) 次に、上記のように構成した装置を用いて、ソイルセ
メント止水壁の施工方法について説明する。
<C> Pre-drilling of pillar row piles (Fig. 4) Next, a method for constructing a soil cement water blocking wall using the apparatus configured as described above will be described.

先ず、撹拌装置4と分離した削孔装置1によって、地
盤に等しい間隔をおいて柱列杭5を先行削孔し、排土す
る。
First, the drilling device 1 separated from the agitation device 4 drills the column piles 5 at an equal interval to the ground to remove the soil.

このとき、柱列杭5内には泥水6を充填しておき、杭
壁の崩壊を防止する。
At this time, muddy water 6 is filled in the pillar row pile 5 to prevent the pile wall from collapsing.

〈ニ〉柱列杭の後行削孔(第5、6図) 次に、削孔装置1を、撹拌装置4のケーシング41内に
装着し、三連式の削孔撹拌装置を組み立てる。
<D> Trailing Drilling of Pillar Piles (Figs. 5 and 6) Next, the drilling device 1 is mounted in the casing 41 of the stirring device 4, and a triple drilling stirring device is assembled.

装置中央に装着した削孔装置1によって、柱列杭5間
の未削孔の地盤の削孔を開始する。
The hole boring device 1 mounted at the center of the device starts boring of the undrilled ground between the column piles 5.

このとき、撹拌装置4の回転軸45は、削孔装置1の両
側の柱列杭5内に挿入しておく。
At this time, the rotary shaft 45 of the stirring device 4 is inserted into the pillar row piles 5 on both sides of the hole drilling device 1.

削孔と同時に、削孔装置1の両側の柱列杭5内に、注
入口32及び48よりセメントミルクを注入しながら、柱列
杭5内の泥土を撹拌羽根44によって撹拌する。
Simultaneously with the drilling, while the cement milk is being injected into the column row piles 5 on both sides of the hole making apparatus 1 from the inlets 32 and 48, the mud in the column row piles 5 is stirred by the stirring blades 44.

柱列杭5内の泥土とセメントを十分に撹拌、混合し、
ソイルセメント7を練り上げる。
Mix and mix the mud and cement in the pillar row pile 5,
Knead soil cement 7.

そして、ソイルセメント7を養生、硬化させて、ソイ
ルセメント止水壁8の構築を完了する。
Then, the soil cement 7 is cured and cured to complete the construction of the soil cement water blocking wall 8.

〈本発明の効果〉 本発明によれば、次のような効果を得ることができ
る。
<Effects of the Present Invention> According to the present invention, the following effects can be obtained.

〈イ〉従来はオーガスクリューによって、後行削孔を行
うため、地山内の転石や玉石層を破砕することが困難で
あり、杭芯材を建て込む作業が煩雑になるのを避けられ
ない。
<B> Conventionally, since the auger screw is used for the subsequent drilling, it is difficult to crush the boulders and cobblestone layers in the ground, and it is inevitable that the work of building the pile core material becomes complicated.

また、杭芯材を正確に建て込むことができず、杭底の
削孔のやり直しの原因となる。
In addition, the pile core material cannot be built correctly, which causes re-drilling of the pile bottom.

それに対して本発明は、先行、後行の両削孔ともに、
ドーナツオーガ等の外管と内スクリューよりなる削孔装
置を用いるものである。
On the other hand, the present invention, both the leading and trailing drilling,
It uses a drilling device consisting of an outer tube such as a donut auger and an inner screw.

そのため、後行削孔時においても、地山内の転石や玉
石層を破砕することができる。
Therefore, it is possible to crush the boulders and cobblestone layers in the ground even during the subsequent drilling.

従って、杭芯材は杭内にそのまま建て込むだけでよ
く、建て込み作業を容易かつ正確に行うことができる。
Therefore, the pile core material only needs to be built in the pile as it is, and the building work can be performed easily and accurately.

また、杭底の削孔のやり直しをしなくて済む。 Also, it is not necessary to re-drill the bottom of the pile.

〈ロ〉従来は、オーガスクリューを三体並列させた撹拌
削孔装置の他に、先行削孔専用の削孔装置が必要とな
り、不経済である。
<B> Conventionally, it is uneconomical since a drilling device dedicated to the preceding drilling is required in addition to the stirring drilling device in which three auger screws are arranged in parallel.

それに対して本発明は、独立した削孔装置を、撹拌装
置に合体することができる。
In contrast, the present invention allows a separate drilling device to be integrated with the agitator.

そのため、一つの削孔装置を先行、後行削孔に共用す
ることができ、経済的である。
Therefore, one drilling device can be commonly used for leading and trailing drilling, which is economical.

〈ハ〉削孔装置を装着するためのケーシングは、剛性を
有するため、削孔装置の削孔ずれを防止でき、杭の削孔
精度が向上する。
<C> Since the casing for mounting the hole drilling device has rigidity, it is possible to prevent the hole drilling device from misaligning the holes and improve the drilling accuracy of the pile.

〈ニ〉転石等のない普通地盤においても、杭の削孔精度
が向上するため、止水性が良くなる。
<D> Even on normal ground without boulders, etc., the drilling accuracy of the pile is improved, and therefore the waterproofness is improved.

【図面の簡単な説明】[Brief description of the drawings]

第1図:本発明の装置の説明図 第2図:削孔装置の説明図 第3図:撹拌装置の説明図 第4図:先行削孔の施工方法を示す説明図 第5図:後行削孔の施工方法を示す説明図 第6図:止水壁の完成状態の説明図 Fig. 1: Explanatory diagram of the device of the present invention Fig. 2: Explanatory diagram of the boring device Fig. 3: Explanatory diagram of the stirring device Fig. 4: Explanatory diagram showing the construction method of the pre-drilling process Fig. 5: Trailing Explanatory drawing showing construction method of drilling Fig. 6: Explanatory drawing of completed state of water blocking wall

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】先端に削孔爪を有する回転可能な外管内
に、スクリューを内挿した削孔装置によって、 地盤に等しい間隔をおいて柱列杭を削孔し、 この柱列杭内には泥水を充填しておき、 中央に前記削孔装置を装着し、その両側に撹拌装置及び
セメントの注入装置を有する三連式の削孔撹拌装置によ
って、 前記柱列杭間の未削孔の地盤を削孔装置によって削孔す
ると同時に、 削孔装置の両側の柱列杭内の泥土を、セメントを注入し
ながら、撹拌装置によって撹拌し、 泥土とセメントを混合、硬化させて、壁体を構築するこ
とを特徴とした、 ソイルセメント止水壁の構築方法。
1. A column row pile is drilled at an interval equal to the ground by a hole drilling device having a screw inserted in a rotatable outer tube having a hole drilling claw at its tip. Is filled with muddy water, the hole drilling device is installed in the center, and a triple hole drilling and stirring device having a stirring device and a cement injection device on both sides of the drilling device At the same time when the ground is drilled by the drilling device, the mud in the pillar piles on both sides of the drilling device is agitated by the stirring device while injecting cement, and the mud and cement are mixed and hardened to form the wall. A method for constructing a soil cement water blocking wall, characterized by being constructed.
【請求項2】請求項1記載のソイルセメント止水壁の構
築方法において用いる装置であって、 先端に削孔爪を有する回転可能な外管内に、スクリュー
を内挿した削孔装置と、 この削孔装置を装着する部分と、その両側の撹拌部と、
この撹拌部に設けたセメント注入部よりなる撹拌装置と
によって構成した、 ソイルセメント止水壁の構築装置。
2. A device used in the method for constructing a soil cement water blocking wall according to claim 1, wherein a screw is inserted into a rotatable outer tube having a hole-piercing claw at its tip, and The part where the drilling device is installed, and the stirring parts on both sides of it.
An apparatus for constructing a soil cement waterproof wall, which is configured by a stirring device including a cement injection part provided in this stirring part.
JP23288489A 1989-09-11 1989-09-11 Soil cement water blocking wall construction method and its equipment Expired - Lifetime JP2686445B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23288489A JP2686445B2 (en) 1989-09-11 1989-09-11 Soil cement water blocking wall construction method and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23288489A JP2686445B2 (en) 1989-09-11 1989-09-11 Soil cement water blocking wall construction method and its equipment

Publications (2)

Publication Number Publication Date
JPH0396514A JPH0396514A (en) 1991-04-22
JP2686445B2 true JP2686445B2 (en) 1997-12-08

Family

ID=16946353

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23288489A Expired - Lifetime JP2686445B2 (en) 1989-09-11 1989-09-11 Soil cement water blocking wall construction method and its equipment

Country Status (1)

Country Link
JP (1) JP2686445B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2700765B2 (en) * 1994-06-22 1998-01-21 株式会社丸徳基業 Underground wall construction method
JP2698768B2 (en) * 1995-03-08 1998-01-19 成幸工業株式会社 Method of forming underground continuous wall
JP2700781B2 (en) * 1995-09-13 1998-01-21 株式会社丸徳基業 Construction method of soil cement pile
KR100476894B1 (en) * 2002-06-07 2005-03-17 주식회사 동아지질 The method of simultaneous mixing construction using a steel pipe and its device
JP4550792B2 (en) * 2006-10-30 2010-09-22 株式会社丸徳基業 Construction method of underground wall
CN110453736B (en) * 2019-08-13 2024-04-12 浙江大学台州研究院 Contact net pillar foundation pit excavation equipment

Also Published As

Publication number Publication date
JPH0396514A (en) 1991-04-22

Similar Documents

Publication Publication Date Title
JPH0791930B2 (en) Underground drilling machine cement soil equipment
JP2686445B2 (en) Soil cement water blocking wall construction method and its equipment
EP0853162A2 (en) Device and process for foundation piling with drilling machines
JP2000073354A (en) Preparating method of ground improving body and preparating method of continuous walls
JPH03125712A (en) Poor subsoil improvement method and device
JP2001140251A (en) Composite pile and execution method therefor
JPS5837220A (en) Drilling and kneading device and amending method for ground using said device
JPS6351515A (en) Excavator for ground improvement
JP2000144727A (en) Construction method of footing pile
GB2137678A (en) Method and apparatus for pile construction
JPH018587Y2 (en)
JP2698768B2 (en) Method of forming underground continuous wall
JPH0978571A (en) Execution method for soil cement pile
JP2000104245A (en) Execution method of diaphragm wall and device thereof
JP2700765B2 (en) Underground wall construction method
JPH06193045A (en) Ground improvement method by multishaft type forced stirring device
JPH018585Y2 (en)
JPS60159213A (en) Method of building wall body in ground and apparatus therefor
JPH086104Y2 (en) Drilling rig
JPH09296440A (en) Ground improvement device
JP2000104246A (en) Constructing method of erath retaining wall and tree- axle auger excavator used for its method
JPS61113925A (en) Rod for excavation of pile
JPS5976324A (en) Method and apparatus for construction of underground wall by stirring and mixing
CN115788285A (en) Double-shaft stirring drilling machine for viscous soil layer and construction process thereof
JPS5880028A (en) Excavating kneader