JP2673484B2 - Gutter block - Google Patents
Gutter blockInfo
- Publication number
- JP2673484B2 JP2673484B2 JP5267370A JP26737093A JP2673484B2 JP 2673484 B2 JP2673484 B2 JP 2673484B2 JP 5267370 A JP5267370 A JP 5267370A JP 26737093 A JP26737093 A JP 26737093A JP 2673484 B2 JP2673484 B2 JP 2673484B2
- Authority
- JP
- Japan
- Prior art keywords
- block
- drainage
- curb
- block body
- gutter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Sewage (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は道路端に配置されて雨
水、生活雑排水、工場排水などの排水路を形成する断面
逆U字状の側溝用ブロックに関する。詳細には縁石ブロ
ックとしての機能を兼備した側溝用ブロックに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gutter block having an inverted U-shaped cross section, which is arranged at the end of a road to form a drainage channel for rainwater, household wastewater, factory drainage and the like. More specifically, the present invention relates to a gutter block that also functions as a curb block.
【0002】[0002]
【従来の技術】従来、図4に示すように、道路端には、
道路端部を保護し、かつ運転者に道路端を明示すること
を目的として縁石ブロック5を配置して縁石が形成され
ている。この縁石ブロック5を配置した後、当該縁石ブ
ロック5側面にはエプロンコンクリート6が打設されて
道路Mの舗装がなされている。こうして舗装された道路
端には、前記縁石ブロック5とエプロンコンクリート6
とからなる断面略L字状の溝7ができ、路面に降った雨
水はこの溝7に集水されるようになっていた。Conventionally, as shown in FIG. 4, the road end,
A curb block is formed by arranging a curb block 5 for the purpose of protecting the road edge and clearly showing the road edge to the driver. After arranging the curb block 5, an apron concrete 6 is placed on the side surface of the curb block 5 to pave the road M. At the end of the paved road, the curb block 5 and apron concrete 6
A groove 7 having a substantially L-shaped cross section was formed, and rainwater that fell on the road surface was collected in this groove 7.
【0003】縁石には所定間隔にブロック5背後に貫通
する排水孔8を有する縁石ブロック5が配置されてお
り、この排水孔8には、歩道W内に埋設された排水パイ
プ3の一端が接続され、さらに排水パイプ3の他端は歩
道Wを隔てた反対側に配置され排水路Rを形成する断面
逆U字状の側溝用ブロック1に接続され、断面略L字状
の溝7に集水された雨水が、排水孔8、排水パイプ3を
介して排水路Rに排水されるようになっていた。A curb block 5 having a drain hole 8 penetrating behind the block 5 at a predetermined interval is arranged on the curb, and one end of a drain pipe 3 buried in the sidewalk W is connected to the drain hole 8. Further, the other end of the drainage pipe 3 is connected to a gutter block 1 having an inverted U-shaped cross section which is arranged on the opposite side across the sidewalk W and forms a drainage channel R, and is collected in a groove 7 having a substantially L-shaped cross section. The drained rainwater was drained to the drainage channel R through the drainage hole 8 and the drainage pipe 3.
【発明が解決しようとする課題】ところが、従来の施工
例では、上記図4に示すように、縁石ブロック5の排水
孔8から排水パイプ3、排水路Rに至る排水経路を作製
するのに、排水孔8を有する縁石ブロック5を配置し、
この排水孔8に通ずる排水パイプ3の一端を接続すると
共に同排水パイプ3の他端を排水路Rを形成する側溝用
ブロック1に接続し、当該排水パイプ3を歩道W内に埋
設するといった作業を必要とするため、当該排水経路の
作製には多くの手間と費用とが掛かり、現状では20〜
30m毎に1つの割合で排水経路を設けるのが一般的で
あった。However, in the conventional construction example, as shown in FIG. 4 , in order to prepare a drainage route from the drainage hole 8 of the curb block 5 to the drainage pipe 3 and the drainage route R, Arrange a curb block 5 with drainage holes 8,
Work for connecting one end of the drainage pipe 3 leading to the drainage hole 8 and connecting the other end of the drainage pipe 3 to the gutter block 1 forming the drainage route R, and burying the drainage pipe 3 in the sidewalk W. Therefore, it takes a lot of time and money to produce the drainage route, and it is currently 20-
It was common to provide one drainage channel every 30 m.
【0004】このため、路面上の雨水は20〜30m毎
に1つの排水経路からのみ排水されるので、排水効率が
悪く、排水しきれない水が道路側に溢れ出てしまうこと
があり、これが原因でスリップ事故などが発生すること
もあった。For this reason, rainwater on the road surface is drained from only one drainage path every 20 to 30 m, so that the drainage efficiency is poor and the water that cannot be drained may overflow to the road side. Sometimes slip accidents occurred due to the cause.
【0005】また、前記排水経路の設置数の不足による
排水効率の低さに加えて、縁石ブロック5とエプロンコ
ンクリート6とからなる断面略L字状の溝7には、道路
M上のゴミや落葉などが溜り易く、これにより当該断面
略L字状の溝7が詰まって集水が妨げられることもあ
り、現状の道路端における雨水の集水、排水機能は満足
のいくものではなかった。In addition to the low drainage efficiency due to the shortage of the number of drainage paths, the groove 7 having a substantially L-shaped cross section, which is composed of the curb block 5 and the apron concrete 6, causes dust on the road M. Fallen leaves and the like are likely to accumulate, and this may cause the groove 7 having a substantially L-shaped cross section to be clogged to prevent water collection. Therefore, the current rainwater collection and drainage functions at the road edge are not satisfactory.
【0006】本発明は、このような事情に鑑みなされた
ものであり、路面上に降った雨水を効率よく集水、排水
することができ、しかもその施工作業及び時間を大幅に
削減することができる縁石ブロックとしての機能を兼備
した側溝用ブロックを提供することを目的とするもので
ある。The present invention has been made in view of the above circumstances, and it is possible to efficiently collect and drain rainwater that has fallen on the road surface, and to significantly reduce the construction work and time. The object is to provide a gutter block having a function as a curb block that can be formed.
【0007】[0007]
【課題を解決するための手段】上記目的を達成するた
め、請求項1記載の発明は、道路端に配置される断面逆
U字状の側溝用ブロックにおいて、前記ブロック本体肩
部に縁石部を突設し、縁石部下方位置にブロック本体内
部に貫通する排水口を設けると共に、前記排水口に接続
する集水路を形成した延設部を排水口外方に設けたこと
を特徴とする側溝用ブロックをその要旨とした。Means for Solving the Problems] To achieve the above object, a first aspect of the present invention, in cross section an inverted U-shaped groove for blocks arranged in the road end, curb section to the block body shoulder portion And a drainage port penetrating inside the block main body at a position below the curb, and an extension part having a water collecting channel connected to the drainage port is provided outside the drainage port. The block was the gist.
【0008】請求項2記載の発明にあっては、ブロック
本体両肩部に縁石部を突設し、各縁石部下方位置にブロ
ック本体内部に貫通する排水口を設けると共に、前記各
排水口に接続する集水路を形成した延設部を各排水口外
方に設けたことを特徴とする側溝用ブロックをその要旨
とした。According to the second aspect of the invention, curb portions are provided on both shoulders of the block main body so as to project a drainage port penetrating into the block main body at a position below each curbstone portion, and each of the drainage ports is provided with a drainage port. The gist is a gutter block, which is characterized in that an extension part which forms a water collection channel to be connected is provided outside each drainage port.
【0009】[0009]
【作用】請求項1記載の側溝用ブロックにあっては、道
路端に溝Sを堀り、この溝S内にコンクリート21を打
設して排水路Rの底面となし、このコンクリート21上
に断面逆U字状の側溝用ブロックを配置することで、断
面ロ字型の排水路Rが形成されるようになっている。In the gutter block according to the first aspect of the present invention, the groove S is dug at the end of the road , and the concrete 21 is placed in the groove S to form the bottom surface of the drainage path R. By arranging a gutter block having an inverted U-shaped cross section on this concrete 21, a drainage channel R having a square cross section is formed.
【0010】また、ブロック本体11肩部には縁石部1
2が突設されており、当該側溝用ブロックを道路端に配
置することで、各縁石部12により縁石が形成されるよ
うになっている。この縁石部12と縁石部12背後のブ
ロック本体11上面とは断面L字状をなし、ここにレン
ガ等の舗装材22を敷設したり、コンクリートを打設し
たりあるいはアスファルト層を設けたりすることで、歩
道や中央分離帯の端部が形成されるようになっている。Further, the curb portion 1 is provided on the shoulder of the block body 11.
2 is projected, and the curb is formed by each curb portion 12 by arranging the gutter block at the road end. The curb 12 and the upper surface of the block body 11 behind the curb 12 have an L-shaped cross section, and a paving material 22 such as bricks is laid, concrete is cast, or an asphalt layer is provided on the block. The edges of the sidewalk and median strip are now formed.
【0011】また、道路端に配置した側溝用ブロックの
ブロック本体11側面にエプロンコンクリート15を打
設することで、ブロック本体11側面とエプロンコンク
リート15とからなる断面略L字状の溝17ができ、路
面に降った雨水がこの溝17に集水されるようになって
いる。Further, by placing an apron concrete 15 on the side surface of the block body 11 of the gutter block arranged at the road end, a groove 17 having a substantially L-shaped cross section formed by the side surface of the block body 11 and the apron concrete 15 is formed. The rainwater that has fallen on the road surface is collected in this groove 17.
【0012】また、前記縁石部12下方位置に設けたブ
ロック本体11内部に貫通する排水口13の外方には、
排水口13に接続する集水路16を形成した延設部14
が設けられており、前記断面略L字状の溝17により集
水された雨水はこの延設部14の集水路16を通って集
水路16の接続する排水口13へと導かれ、排水口13
を通して当該側溝用ブロックにより形成された排水路R
に排水されるようになっている。Further, on the outside of the drain port 13 penetrating inside the block body 11 provided at the lower position of the curb 12,
An extension portion 14 having a water collection channel 16 connected to the drainage port 13
Is provided, and the rainwater collected by the groove 17 having a substantially L-shaped cross section is guided to the drain port 13 connected to the water channel 16 through the water channel 16 of the extended portion 14, Thirteen
Through the drainage channel R formed by the gutter block
It is designed to be drained to.
【0013】請求項2記載の側溝用ブロックは、中央分
離帯Tの集水、排水に適用するブロックであり、ブロッ
ク本体11両肩部に縁石部12、12が突設されてお
り、当該側溝用ブロックの配置後、ブロック本体11の
両側面にエプロンコンクリート15、15を打設するこ
とで、ブロック本体11の両側方に断面略L字状の溝1
7、17ができ、各路面に降った雨水が各ブロック本体
11の両側方の溝17、17に集水されるようになって
いる。また、ブロック本体11の各縁石部12、12の
下方位置にはブロック本体11内部に貫通する排水口1
3、13が設けられ、かつ前記排水口13、13の外方
には排水口13に接続する集水路16を形成した延設部
14、14が各々設けられており、前記各溝17、17
により集水された雨水は、図3矢印の如くこれら各延設
部14、14の集水路16、16を通って集水路16、
16の接続する排水口13、13へと導かれ、各排水口
13、13を通して当該側溝用ブロックにより形成され
た排水路Rに排水されるようになっている。A gutter block according to a second aspect is a block applied to water collection and drainage of the median strip T, and curb portions 12, 12 are projectingly provided on both shoulders of the block body 11, and the gutter is concerned. After placing the blocks, the apron concrete 15, 15 is placed on both side surfaces of the block body 11 so that the groove 1 having a substantially L-shaped cross section is formed on both sides of the block body 11.
7 and 17 are formed, and the rainwater that has fallen on each road surface is collected in the grooves 17 and 17 on both sides of each block body 11. A drain port 1 penetrating into the block body 11 is provided below the curb portions 12, 12 of the block body 11.
3 and 13 are provided, and extending portions 14 and 14 each having a water collecting passage 16 connected to the drainage port 13 are provided outside the drainage ports 13 and 13, respectively, and the grooves 17 and 17 are provided.
Collecting rainwater, the water collecting route 16 through the water collecting route 16, 16 of each extending portion 14, 14 as shown in FIG. 3 arrow by,
The water is led to the drainage ports 13 and 13 connected to 16 and is drained through the drainage ports 13 and 13 to the drainage channel R formed by the gutter block.
【0014】[0014]
【実施例】以下、本発明の側溝用ブロックを図面に示し
た一実施例に従って詳細に説明する。本発明の側溝用ブ
ロックは、ブロック本体11肩部に縁石部12を突設
し、縁石部12下方位置にブロック本体11内部に貫通
する排水口13を設けると共に、前記排水口13に接続
する集水路16を形成した延設部14を排水口13外方
に設けたものである。 DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A gutter block of the present invention will be described in detail below with reference to an embodiment shown in the drawings. In the gutter block of the present invention , the curb portion 12 is provided on the shoulder of the block body 11 in a protruding manner.
Then, penetrate the inside of the block body 11 at the lower position of the curb portion 12.
A drainage port 13 is provided and is connected to the drainage port 13.
The extended portion 14 having the water collecting channel 16 formed outside the drainage port 13
It is provided in.
【0015】図1及び図2に示すように、ブロック本体
11は、断面逆U字状をなすコンクリートブロックであ
り、道路端に溝Sを堀り、この溝S内にコンクリート2
1を打設して排水路Rの底面となし、このコンクリート
21上に当該側溝用ブロックを配置することで、断面ロ
字型の排水路Rが形成されるようになっている。As shown in FIGS. 1 and 2 , the block main body 11 is a concrete block having an inverted U-shaped cross section. A groove S is dug at the end of the road, and the concrete 2 is placed in the groove S.
1 Da設to drainage R of the bottom surface and without this on concrete 21 by arranging the gutter block, so that the cross-section B-shaped drainage channel R are formed.
【0016】このブロック本体11上面には、ブロック
本体11内部に貫通する孔20が設けられており、例え
ばブロック本体11上面にレンガ等の舗装材22を敷設
したりしたときに舗装材22上面に溜った水を排水路R
へ排水するための水抜き孔として利用できるようになっ
ている。また、同じくブロック本体11上面には開口2
3が設けられており、この開口23を利用して排水路R
内のゴミ等を取り除くことができるようになっている。
また、側溝用ブロックの配置後、ブロック本体11側面
にエプロンコンクリート15を打設したとき、ブロック
本体11側方にはブロック本体11側面とエプロンコン
クリート15とからなる断面略L字状の溝17が形成さ
れ、この溝17に路面に降った雨水が集水されるように
なる。また、図2に示すように、ブロック本体11側面
下部には支持部18を設けることもでき、この支持部1
8上に盛土することにより当該側溝用ブロックの安定化
を計ることができる。このブロック本体11肩部に縁石
部12が突設されている。A hole 20 penetrating into the block body 11 is provided on the upper surface of the block body 11. For example, when a paving material 22 such as brick is laid on the upper surface of the block body 11, the paving material 22 has an upper surface. Drain channel R
It can be used as a drainage hole for draining water. Similarly, the opening 2 is formed on the upper surface of the block body 11.
3 is provided, and the drainage channel R is utilized by utilizing this opening 23.
It is possible to remove dust inside.
Further, when the apron concrete 15 is placed on the side surface of the block body 11 after the gutter block is arranged, a groove 17 having a substantially L-shaped cross section, which is composed of the side surface of the block body 11 and the apron concrete 15, is formed on the side of the block body 11. Rainwater that has been formed and has fallen on the road surface will be collected in this groove 17. Further, as shown in FIG. 2 , a supporting portion 18 may be provided on the lower portion of the side surface of the block body 11, and the supporting portion 1
By embankment on top of 8, the gutter block can be stabilized. A curb portion 12 is provided so as to project from a shoulder portion of the block body 11.
【0017】縁石部12は、ブロック本体11肩部に突
設された片側に傾斜した面を持つ断面略台形状の突出部
であり、当該側溝用ブロックを道路端に配置したときに
縁石を構成するものである。この縁石部12と縁石部1
2背後のブロック本体11上面とは断面L字状をなし、
ここにレンガ等の舗装材22を敷設したり、コンクリー
トを打設したりあるいはアスファルト層を形成したりす
ることができ、これにより歩道Wや中央分離帯Tの端部
が形成されるようになっている。The curb portion 12 is a protrusion having a substantially trapezoidal cross section having a surface inclined to one side and protruding from the shoulder portion of the block body 11, and constitutes a curb when the gutter block is arranged at the road end. To do. Curb 12 and curb 1
2 has an L-shaped cross section with the upper surface of the block body 11 behind
A paving material 22 such as a brick can be laid here, concrete can be cast, or an asphalt layer can be formed, whereby the sidewalk W and the end of the median strip T are formed. ing.
【0018】この縁石部12の下方位置にはブロック本
体11内部に貫通する排水口13が設けられており、前
記ブロック本体11側面とエプロンコンクリート15と
からなる断面略L字状の溝17により集水された雨水
が、この排水口13を通してブロック本体11内部の排
水路Rに排水されるようになっている。A drainage port 13 penetrating the inside of the block body 11 is provided below the curb 12, and is gathered by a groove 17 having a substantially L-shaped cross section, which is composed of a side surface of the block body 11 and an apron concrete 15. The drained rainwater is drained to the drainage channel R inside the block body 11 through the drainage port 13.
【0019】尚、排水口13の大きさ、数は任意であ
り、施工場所の状況に応じて大きくしたり、数を増減さ
せたりすることができるが、余りに大きな排水口とした
ときには、水以外に落葉やゴミなどもこの排水口から排
水路内に入り込み易くなる。また、1つのブロック本体
11に3つ、4つといった具合いに多くの排水口を設け
ることもできるが、その分ブロック自体の成形が複雑と
なるので、排水口13の大きさ、数の決定に際してはこ
れらの点を考慮する必要がある。It should be noted that the size and number of the drainage ports 13 are arbitrary, and can be increased or increased or decreased depending on the situation of the construction site. Even leaves and dust easily enter the drainage channel through this drainage port. Also, one block main body 11 can be provided with a large number of drainage outlets such as three or four, but the molding of the block itself becomes complicated accordingly, so that when determining the size and number of drainage outlets 13. Need to consider these points.
【0020】また、水以外の落葉やゴミなどがこの排水
口13から排水路R内に入り込むのを防止するため、排
水口13にグレーチングや金網を取り付けてもよく、ま
た、図2に示すように、排水口13とほぼ同じ開口形状
を有する籠24を排水口13に取り外し可能に取り付け
ることもできる。これらグレーチングや金網、あるいは
籠を取り付けることで落葉やゴミなどの排水路内への侵
入を確実に防止することができるので、ブロック本体1
1上面の開口23を利用して排水路R内のゴミ等を取り
除くといった作業をなくしたり、その回数を減らしたり
することができる。Further, since such litter and dirt than water is prevented from entering the drainage channel R from the discharge port 13 may be fitted with a grating or wire mesh to drain outlet 13, also as shown in FIG. 2 In addition, the basket 24 having substantially the same opening shape as the drain port 13 can be detachably attached to the drain port 13. By attaching these gratings, wire nets, or baskets, it is possible to reliably prevent fallen leaves and dust from entering the drainage channel.
It is possible to eliminate the work of removing dusts and the like in the drainage channel R by using the opening 23 on the upper surface of the first surface, or to reduce the number of times.
【0021】図1及び図2に示すように、ブロック本体
11側方には延設部14が延設されており、この延設部
14側面にエプロンコンクリート15を打設することに
より、道路端にはブロック本体11側面と延設部14と
エプロンコンクリート15とからなる断面略L字状の溝
17が形成され、路面上の雨水が集水されるようにな
る。また、延設部14上面には排水口13に接続する集
水路16が形成されており、断面略L字状の溝17によ
って集水された雨水を当該集水路16が排水口13へと
導くようになっている。また、延設部14には、舗装後
道路面が沈下したときに、道路端と延設部14との間に
段差ができ、ここに水が溜るのを防止するための切欠1
9が設けられている。As shown in FIGS. 1 and 2, an extension portion 14 is extended to the side of the block body 11, and an apron concrete 15 is placed on the side surface of the extension portion 14 to form a road end. A groove 17 having a substantially L-shaped cross section, which is formed by the side surface of the block body 11, the extending portion 14, and the apron concrete 15, is formed in the groove 17 so that rainwater on the road surface can be collected. Further, a water collection channel 16 connected to the drainage port 13 is formed on the upper surface of the extension portion 14, and the rainwater collected by the groove 17 having a substantially L-shaped cross section is guided to the drainage port 13 by the water collection channel 16. It is like this. In addition, in the extension portion 14, when the road surface sinks after paving, a step is formed between the road edge and the extension portion 14, and a notch 1 for preventing water from accumulating there.
9 are provided.
【0022】尚、前記延設部14の集水路16は、断面
略L字状の溝17によって集水された雨水を排水口13
へ導く水路であり、その幅、深さ、断面形状など特に限
定されるものではない。例えば成形し易さという点では
断面四角状のものがよく、水の通過時における抵抗が小
さく、ゴミや汚れが付着しにくく、清掃し易いという点
では断面円弧状のものがよい。水路の幅、深さについて
は、広幅であって深ければ深いほど通過する水量も多く
なるが、反面ゴミ等が入り易く水路が詰まってしまうこ
とにもなるので、その決定に際しては設置場所や道路の
種類などを考慮するのが望ましい。また、集水路16は
道路端に位置するので、ゴミ、土砂、落葉等が入り易
く、詰まってしまうことがあるので、集水路16の開口
をグレーチングや金網、あるいはこれらグレーチングや
金網の裏面に粗目の濾過シートを貼り付けたもので、集
水路16の開口を覆ってゴミ等の侵入を阻止するように
してもよい。The water collecting passage 16 of the extending portion 14 drains rainwater collected by a groove 17 having a substantially L-shaped cross section.
It is a water channel leading to, and its width, depth, and cross-sectional shape are not particularly limited. For example, in terms of easiness of molding, a square cross section is preferable, resistance when water passes through is small, dust and dirt are less likely to adhere, and an arc cross section is preferable in terms of easy cleaning. Regarding the width and depth of the water channel, the wider and deeper it will be, the more water will pass through it, but on the other hand, it will be more prone to the entry of dust, etc. It is desirable to consider the type of Further, since the water collection channel 16 is located at the end of the road, dust, earth and sand, fallen leaves, etc. may easily get stuck in the water collection channel 16. The filter sheet may be attached to cover the opening of the water collection channel 16 to prevent dust and the like from entering.
【0023】次に、上記側溝用ブロックを配置して道路
端に排水路を形成する過程について説明する。図1及び
図2に示すように、まず、道路端に溝Sを堀り、この溝
S内にコンクリート21を打設して排水路Rの底面とす
る。この後、このコンクリート21上に断面逆U字状の
側溝用ブロックを配置して断面ロ字型の排水路Rを形成
する。同時に側溝用ブロックを道路端に配置することに
より、ブロック本体11肩部の縁石部12により道路端
には縁石が形成されることになる。Next, the process of arranging the above-mentioned gutter block and forming a drainage channel at the road end will be described. 1 and
As shown in FIG. 2 , first, a groove S is dug at the road end, and concrete 21 is placed in the groove S to form the bottom of the drainage channel R. Thereafter, a gutter block having an inverted U-shaped cross section is arranged on the concrete 21 to form a drainage channel R having a rectangular cross section. At the same time, by arranging the gutter block at the road end, the curbstone is formed at the road end by the curb portion 12 of the shoulder of the block body 11.
【0024】次いで、ブロック本体11の延設部14側
面にエプロンコンクリート15を打設する。これにより
エプロンコンクリート15と延設部14側面とブロック
本体11側面とからなる断面略L字状の溝17が形成さ
れ、路面に降った雨水が集水され、延設部14上面に形
成された集水路16を通ってブロック本体11内部に貫
通する排水口13へと導かれ、排水口13を通って排水
路Rへと排水されるようになる。尚、延設部14側面に
はエプロンコンクリート15を打設することなく、直接
アスファルト層26を設けてもよい。Next, an apron concrete 15 is placed on the side surface of the extending portion 14 of the block body 11. As a result, the apron concrete 15 and the side surface of the extension portion 14 and the block
A groove 17 having a substantially L-shaped cross section formed by the side surface of the main body 11 is formed, and rainwater that has fallen on the road surface is collected and penetrates into the block main body 11 through a water collection path 16 formed on the upper surface of the extension portion 14. The water is guided to the drainage port 13 and is drained to the drainage channel R through the drainage port 13. The asphalt layer 26 may be directly provided on the side surface of the extension portion 14 without placing the apron concrete 15.
【0025】次に、ブロック本体11上面に前記縁石部
12の高さとほぼ同じ高さ位置にレンガ等の舗装材22
を敷設して歩道Wや中央分離帯Tの端部を形成する。
尚、ブロック本体11上面にはレンガ等の舗装材22に
代えてコンクリートを打設したりアスファルト層を設け
たりすることもできる。Next, the paving material 22 such as bricks is provided on the upper surface of the block body 11 at a position substantially the same as the height of the curb portion 12.
Is laid to form the end of the sidewalk W and the median strip T.
Note that concrete or a asphalt layer may be provided on the upper surface of the block body 11 in place of the paving material 22 such as bricks.
【0026】また、ブロック本体11の反対側の側面に
は盛土し、さらにその上に前記縁石部12及び舗装材2
1の高さとほぼ同じ高さとなるようにアスファルト層2
6を設けて歩道Wを形成する。尚、盛土した上にはアス
ファルト層26に代えてレンガ等の舗装材21を敷設し
てもよい。On the other side of the block main body 11, an embankment is laid, and the curb 12 and the paving material 2 are further formed on the embankment.
Asphalt layer 2 so that it is almost the same height as 1
6 is provided to form a sidewalk W. Note that a paving material 21 such as bricks may be laid on the embankment instead of the asphalt layer 26.
【0027】次に、本発明の別の態様について説明す
る。図3には、ブロック本体11の両肩部に縁石部1
2、12を突設したものを用いて中央分離帯Tを施工し
た例を示した。図面に示すように、中央分離帯Tに設け
た溝S内にコンクリート21を打設して排水路Rの底面
となし、このコンクリート21上に当該側溝用ブロック
を配置することで断面ロ字型の排水路Rを形成する。同
時に当該側溝用ブロックを配置することにより、ブロッ
ク本体11両肩部の縁石部12により各道路端には縁石
が形成されることになる。この後、ブロック本体11両
側方に延設した延設部14、14の両側面にエプロンコ
ンクリート15、15を打設することで、延設部14、
14の両側方に断面略L字状の溝17、17を形成す
る。これにより、各路面に降った雨水は各々延設部1
4、14両側方の溝17、17に集水されるようにな
る。また、延設部14、14上面には集水路16が形成
されており、この集水路16はブロック本体11の各縁
石部12、12の下方位置に設けたブロック本体11内
部に貫通する排水口13、13に接続されているので、
これら集水路16、16、排水口13、13を介して雨
水が当該側溝用ブロックにより形成された排水路Rに排
水されるようになる。Next, another aspect of the present invention will be described. In FIG. 3, the curb portion 1 is provided on both shoulders of the block body 11.
An example was shown in which the median strip T was constructed by using the two and the two projecting. As shown in the drawing, bottom and without grooves S drainage by Da設concrete 21 into the R provided on the median strip T, sectional roughly rectangular shape by arranging the gutter block on the concrete 21 To form the drainage channel R. By arranging the gutter blocks at the same time, a curb is formed at each road end by the curb portions 12 on both shoulders of the block body 11. After that, by placing apron concrete 15, 15 on both side surfaces of the extending portions 14, 14 extending on both sides of the block body 11, the extending portion 14,
Grooves 17 having a substantially L-shaped cross section are formed on both sides of 14. As a result, the rainwater that has fallen on each road surface is extended 1
Water will be collected in the grooves 17, 17 on both sides of the surfaces 4, 14. Further, a water collecting channel 16 is formed on the upper surfaces of the extending portions 14 and 14, and the water collecting channel 16 is provided at a position below the curb portions 12 of the block body 11 and penetrates the inside of the block body 11. Because it is connected to 13, 13,
Rainwater is drained to the drainage channel R formed by the gutter block through the water collection channels 16 and 16 and the drainage ports 13 and 13.
【0028】[0028]
【発明の効果】上記構成を備えたことにより、請求項1
記載の側溝用ブロックにあっては、ブロック本体肩部に
縁石部が突設されているので、当該ブロックを道路端に
配置することで排水路を形成し、かつ同じく道路端に縁
石を形成することができ、排水路の形成と縁石の形成と
を別々に施工していた従来の施工法に比べて、その作業
に要する手間と時間とを大幅に削減することができる。 According to the present invention, the above-mentioned structure is provided.
In the block for gutters described, since the curb portion is protrudingly provided on the shoulder portion of the block body, the drainage channel is formed by arranging the block at the road end, and the curb is also formed at the road end. it can, and formation and curb formation of drainage as compared with the conventional construction methods that were construction separately, Ru can be reduced and the time required for the working time significantly.
【0029】またこの側溝用ブロックにあっては、路端
に配置した側溝用ブロックの延設部と延設部側面に打設
したエプロンコンクリートとからなる断面略L字状の溝
に路面に降った雨水が集水され、延設部上面の集水路に
よって縁石部下方位置に設けたブロック本体内部に貫通
する排水口へと導かれ、この排水口を通して当該側溝用
ブロックにより形成された排水路に排水されるので、排
水効率がきわめて良好であり、排水しきれない水が道路
側に溢れ出てしまったりすることがなく、これが原因で
のスリップ事故の発生を未然に防止することができる。In addition, in this gutter block, the groove having a substantially L-shaped cross section, which is composed of an extended portion of the gutter block arranged at the road end and an apron concrete cast on the side surface of the extended portion, descends on the road surface. Collected rainwater is guided by a water collection channel on the upper surface of the extension part to a drain port penetrating inside the block body provided at the lower position of the curb, and through this drain port to a drain channel formed by the gutter block. Since the water is drained, the drainage efficiency is extremely good, and the water that cannot be drained does not overflow to the road side, and it is possible to prevent the occurrence of a slip accident due to this.
【0030】請求項2記載の側溝用ブロックは、ブロッ
ク本体の延設部両側面にエプロンコンクリートを打設す
ることで、ブロック本体の延設部両側方に路面の雨水を
集水する溝と集水された水を排水口へと導く集水路とを
形成でき、道路端における集水、排水機能を大いに向上
されることができる。しかも従来の施工法のように、中
央分離帯の各道路端に各々縁石を設けるとともに排水路
を形成し、これらを排水パイプで接続するといった面倒
で時間のかかる作業をする必要がなく排水経路の作製作
業を大幅に簡略化することができる。In the gutter block according to a second aspect of the present invention, apron concrete is cast on both side surfaces of the extension portion of the block main body so that rainwater on the road surface can be collected on both sides of the extension portion of the block main body. It is possible to form a water collecting channel for guiding the water that has been supplied to the drainage port, and it is possible to greatly improve the water collecting and draining functions at the road edge. Moreover, unlike the conventional construction method, it is not necessary to perform a troublesome and time-consuming work such as forming a drainage channel at each road end of the median strip and forming a drainage channel, and connecting these with a drainage pipe. The manufacturing work can be greatly simplified.
【図1】 本発明の側溝用ブロックを示した斜視図。FIG. 1 is a perspective view showing a gutter block of the present invention.
【図2】 図2に示した側溝用ブロックを道路端に配置
した状態を示す断面図。2 is a cross-sectional view showing a state in which the gutter block shown in FIG . 2 is arranged at a road end.
【図3】 本発明の側溝用ブロックのさらに別の態様の
ものを道路端に配置した状態を示す断面図。FIG. 3 is a cross-sectional view showing a state in which a gutter block according to still another aspect of the present invention is arranged at a road end.
【図4】 従来の側溝用ブロックを道路端に配置した状
態を示す断面図。FIG. 4 is a cross-sectional view showing a state in which a conventional gutter block is arranged at a road end.
11・・・ブロック本体 12・・・縁石部 13・・・排水口 14・・・延設部 15・・・エプロンコンクリート 16・・・集水路 17・・・溝 R ・・・排水路 W ・・・歩道 M ・・・道路 11 ... Block body 12 ... Curb part 13 ... Drainage port 14 ... Extension part 15 ... Apron concrete 16 ... Water collection channel 17 ... Groove R ... Drainage channel W ... ..Sidewalks M ... Roads
Claims (2)
用ブロックにおいて、前記ブロック本体肩部に縁石部を
突設し、縁石部下方位置にブロック本体内部に貫通する
排水口を設けると共に、前記排水口に接続する集水路を
形成した延設部を排水口外方に設けたことを特徴とする
側溝用ブロック。1. In a gutter block having an inverted U-shaped cross section arranged at a road end, a curb portion is projected from a shoulder portion of the block body, and a drain port penetrating into the block body is provided at a position below the curb portion. At the same time, the gutter block is characterized in that an extension portion which forms a water collecting channel connected to the drain port is provided outside the drain port.
各縁石部下方位置にブロック本体内部に貫通する排水口
を設けると共に、前記各排水口に接続する集水路を形成
した延設部を各排水口外方に設けたことを特徴とする請
求項1記載の側溝用ブロック。2. A curb part is projected on both shoulders of the block body,
Provided with a water outlet penetrating internal block body to each curb section the lower position, according to claim 1, characterized in that the extended portion forming the water collecting route that connects to the respective drain outlet provided in each drainage extraoral side Block for gutter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5267370A JP2673484B2 (en) | 1993-10-26 | 1993-10-26 | Gutter block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP5267370A JP2673484B2 (en) | 1993-10-26 | 1993-10-26 | Gutter block |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH07119201A JPH07119201A (en) | 1995-05-09 |
JP2673484B2 true JP2673484B2 (en) | 1997-11-05 |
Family
ID=17443897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP5267370A Expired - Fee Related JP2673484B2 (en) | 1993-10-26 | 1993-10-26 | Gutter block |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2673484B2 (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58180980U (en) * | 1982-05-29 | 1983-12-02 | 遠藤 隆昭 | Variable slope gutter block for road curbs |
JPH0242990U (en) * | 1988-09-09 | 1990-03-26 |
-
1993
- 1993-10-26 JP JP5267370A patent/JP2673484B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH07119201A (en) | 1995-05-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2006257739A (en) | Water channel block with curbstone, and drain structure of paved road surface using the same | |
JP3944518B2 (en) | Drainage structure of road using boundary block | |
KR101282914B1 (en) | Drainage system of pavement | |
JP2006132320A5 (en) | ||
JP2673484B2 (en) | Gutter block | |
JP3728635B2 (en) | Drainage channel for drainage pavement | |
CN214005306U (en) | Landscape drainage road surface of mating formation | |
JPH07102623A (en) | Block for gutter | |
JP2565884Y2 (en) | Curb concrete block | |
JP2662823B2 (en) | Rainwater penetration structure | |
JP3215687U (en) | Water conveyance member | |
JPH09158304A (en) | Culvert for surface drainage and method for constructing the same | |
JP2003268861A (en) | Side ditch | |
JP2000045212A (en) | Boundary block | |
JP3861205B2 (en) | Pedestrian boundary waterway building block | |
JP3930825B2 (en) | Road drainage structure | |
CN216042931U (en) | Ecological parking space | |
JP3154698U (en) | Drainage equipment structure | |
JP2529892B2 (en) | Road rainwater infiltration structure | |
JP3862493B2 (en) | Boundary block | |
CN212984134U (en) | Highway drainage device | |
JP2018003353A (en) | Sidewalk-roadway boundary block | |
JP2619805B2 (en) | Road side block | |
JP4154503B2 (en) | Drainage filter for drainage pavement | |
JPS627734Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |