JP2659482B2 - Resource occupation method in money handling system - Google Patents

Resource occupation method in money handling system

Info

Publication number
JP2659482B2
JP2659482B2 JP27580891A JP27580891A JP2659482B2 JP 2659482 B2 JP2659482 B2 JP 2659482B2 JP 27580891 A JP27580891 A JP 27580891A JP 27580891 A JP27580891 A JP 27580891A JP 2659482 B2 JP2659482 B2 JP 2659482B2
Authority
JP
Japan
Prior art keywords
resource
online
state
resources
occupation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP27580891A
Other languages
Japanese (ja)
Other versions
JPH05182059A (en
Inventor
晃久 千葉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laurel Bank Machine Co Ltd
Original Assignee
Laurel Bank Machine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laurel Bank Machine Co Ltd filed Critical Laurel Bank Machine Co Ltd
Priority to JP27580891A priority Critical patent/JP2659482B2/en
Publication of JPH05182059A publication Critical patent/JPH05182059A/en
Application granted granted Critical
Publication of JP2659482B2 publication Critical patent/JP2659482B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、貨幣を効率良く処理で
きる貨幣処理システムにおける資源占有方式に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a resource occupation system in a money handling system capable of efficiently handling money.

【0002】[0002]

【従来の技術】金融機関等の後方に配置されて、貨幣を
総合的に入出金処理することができる出納システムとし
て特開平2−135593号公報に示すような貨幣入出
金システムが提案されている。この貨幣入出金システム
は、紙幣の入出金を行なわせる紙幣入出金整理機と、該
紙幣入出金整理機内の紙幣を100枚単位で結束して放
出する紙幣結束放出機と、硬貨の入出金を行わせるとと
もに該硬貨を50枚単位(日本国内の場合)で包装する
硬貨入出金整理機と、50枚単位に包装した硬貨(棒
金)を放出する棒金収納放出機と、これら整理機及び放
出機を制御するための取引制御装置と、該取引制御装置
に接続された2台の操作ターミナルとから構成されてい
る。そして、この2台の操作ターミナルでは、各オペレ
ータの操作により、前記紙幣入出金整理機に対して「紙
幣の入金」、「紙幣の出金」が指示され、前記硬貨入出
金整理機に対して「硬貨の入金」、「硬貨の出金」が指
示され、前記紙幣結束放出機に対して「紙幣束の出金」
が指示され、前記棒金収納放出機に対して「棒金の出
金」が指示されるようになっている。
2. Description of the Related Art A money receiving and dispensing system as disclosed in Japanese Patent Application Laid-Open No. 2-135593 has been proposed as an accounting system disposed behind a financial institution or the like and capable of comprehensively processing money. . This money depositing and dispensing system includes a banknote depositing / dispensing machine for depositing / dispensing banknotes, a banknote binding / discharging machine for binding and discharging the banknotes in the banknote depositing / dispensing machine in units of 100, and depositing / dispensing coins. A coin depositing / dispensing sorter that packs the coins in units of 50 sheets (in the case of Japan), a coin-roll storing / discharging machine that discharges coins (sticks) packed in units of 50 sheets, It comprises a transaction control device for controlling the dispenser and two operation terminals connected to the transaction control device. In these two operation terminals, "payment of banknotes" and "payment of banknotes" are instructed to the banknote depositing / dispensing machine by the operation of each operator, and the coin receiving / dispensing machine is operated. "Payment of coins" and "withdrawal of coins" are instructed, and "withdrawal of bill bundle"
Is instructed, and "dispensing of coin-roll" is instructed to the coin-roll storing and discharging machine.

【0003】なお、以下の説明では、操作ターミナルに
より「紙幣の入金」が指示された場合に、この「紙幣の
入金」を行わせるために占有される紙幣入出金整理機の
占有部分を「入金資源」といい、また、操作ターミナル
により「紙幣の出金」が指示された場合に、この「紙幣
の出金」を行わせるために占有される紙幣入出金整理機
の占有部分を「出金資源」という。硬貨入出金整理機、
紙幣結束放出機、棒金収納放出機についても同様であ
る。
[0003] In the following description, when "payment of banknotes" is instructed by the operation terminal, the occupied portion of the banknote pay-in / pay-out arrangement machine occupied for performing "payment of banknotes" is referred to as "payment." This is referred to as “resources.” Also, when “dispensing bills” is instructed by the operation terminal, the occupied portion of the bill depositing / dispensing sorter that is occupied to perform the “dispensing bills” is referred to as “dispensing” Resources. " Coin deposit and withdrawal sorting machine,
The same applies to the banknote binding and discharging machine and the coin-roll storing and discharging machine.

【0004】[0004]

【発明が解決しようとする課題】ところで、上記のよう
に構成された貨幣入出金システムでは、紙幣入出金整理
機、硬貨入出金整理機のように1台の貨幣処理機内に2
つの資源、すなわち「入金資源」と「出金資源」が含ま
れている場合があり、更に、このような各貨幣処理機
は、単体として設けられた場合には「入金資源」と「出
金資源」とが同時並行に使用できて(入出金平行処
理)、貨幣処理機の多機能化が図られている。しかしな
がら、上記の貨幣入出金システムでは、操作ターミナル
の指示により、「紙幣の入金」をオンライン占有状態に
すると、「紙幣の入金」に係わる資源のみならず、他の
資源も全てオンライン状態となり、これによって他の資
源をオフライン状態で使用したい場合であっても、「紙
幣の入金」のオンライン占有状態が解除されないかぎ
り、他の資源をオフライン状態で使用することはできな
いという問題があった。同様に、操作ターミナルの指示
により、「紙幣の入金」をオフライン占有状態にする
と、「紙幣の入金」に係わる資源のみならず、他の資源
も全てオフライン状態となり、これによって他の資源を
オンライン状態で使用したい場合であっても、「紙幣の
入金」のオフライン占有状態が解除されないかぎり、他
の資源をオンライン状態で使用することはできないとい
う問題があった。
By the way, in the money receiving and dispensing system configured as described above, two money storing and dispensing devices, such as a banknote dispensing and dispensing device, are provided in one money processing machine.
Resources may be included, namely, a "deposit resource" and a "withdrawal resource". Further, when such a money handling machine is provided as a single unit, the "deposit resource" and the "withdrawal resource" Resources ”can be used simultaneously in parallel (parallel deposit / withdrawal processing), and a multi-function currency processing machine is being planned. However, in the above money receiving / dispensing system, when the “payment of banknotes” is set to the online occupation state by an instruction of the operation terminal, not only the resources related to “payment of banknotes” but also all other resources are online. Therefore, even if it is desired to use other resources offline, there is a problem that other resources cannot be used offline unless the online occupation state of “Payment of banknotes” is released. Similarly, when the “payment of banknotes” is set to the offline occupation state according to the instruction of the operation terminal, not only the resources related to the “payment of banknotes” but also all other resources are offline, thereby putting other resources online. However, there is a problem that other resources cannot be used online unless the offline occupation state of "Payment of banknotes" is released.

【0005】従って、上記の貨幣入出金システムでは、
紙幣入出金整理機、硬貨入出金整理機といった貨幣処理
機に、入金と出金という2つの処理が行える機能が備え
られていても、例えば入金資源がオンライン占有状態に
ある場合には出金資源がオフライン状態で使用できず、
また、入金資源がオフライン占有状態にある場合には出
金資源がオンライン状態で使用できず、これによって貨
幣処理機の機能を効率よく運用することができず、この
点において改良されることが期待されていた。なお、上
記説明において、「オンライン(占有)状態」とは、資
源が例えば店舗内の全ての貨幣量の入出金を管理する中
央制御部と連結され、かつこの中央制御部の管理の下で
貨幣の入出金がなされている状態をいい、また、「オフ
ライン(占有)状態」とは、資源がこの中央制御部と連
結されず、単独で資源が使用されている状態をいう。よ
って、この「オフライン(占有)状態」で資源が使用さ
れている場合にはこの資源で入出金された貨幣の取引金
額データは中央制御部には送られない。また、このよう
な「オフライン(占有)状態」が設定される例として
は、紙幣を入金させず、該紙幣の結束のみを行いたいと
いう場合などがある。
[0005] Therefore, in the above money receiving and dispensing system,
Even if a money handling machine such as a banknote depositing / dispensing sorter or a coin depositing / dispensing sorter is provided with a function capable of performing two processes of depositing and dispensing, for example, if a depositing resource is in an online occupied state, a withdrawal resource Is offline and unavailable,
In addition, when the deposit resource is in the offline occupied state, the withdrawal resource cannot be used in the online state, thereby making it impossible to efficiently operate the function of the money handling machine, and is expected to be improved in this respect. It had been. In the above description, the “online (occupied) state” means that the resources are connected to, for example, a central control unit that manages the deposit and withdrawal of all monetary amounts in a store, and that money is managed under the control of the central control unit. The "offline (occupied) state" refers to a state in which resources are not connected to the central control unit and resources are used alone. Therefore, when a resource is used in this “offline (occupied) state”, the transaction amount data of money deposited and withdrawn from the resource is not sent to the central control unit. Further, as an example in which such an “offline (occupied) state” is set, there is a case where the user wants only to bind the banknotes without depositing the banknotes.

【0006】本発明は、上記の事情に鑑みてなされたも
のであって、資源がオンライン占有状態あるいはオフラ
イン占有状態にある場合に、これら占有状態にある未使
用資源を有効利用できる効率の良い貨幣処理システムに
おける資源占有方式の提供を目的とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and has an efficient currency that can effectively use unused resources in these occupied states when the resources are in an online occupied state or an offline occupied state. The purpose is to provide a resource occupation method in a processing system.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、本発明に係る貨幣処理システムにおける資源占有方
式は、バラ硬貨、バラ紙幣、硬貨ロール、紙幣束の出
金、入金をそれぞれ行う複数の資源と、これら資源を操
作する操作手段と、該操作手段の操作に基づいて資源の
入出金をオンライン状態で管理するオンライン占有状態
又は資源の入出金をオンライン状態から切り放してオフ
ライン状態で管理するオフライン占有状態にそれぞれ設
して制御する制御部とを有する貨幣処理システムであ
って、前記操作手段は、複数の資源のうちの1以上を指
定する資源指定キーと、該資源指定キーで指定された資
源をオンライン状態とするオンライン占有ファンクショ
ンキーと、資源指定キーで指定された資源をオフライン
状態とするオフライン占有ファンクションキーと、入出
金する金額を入力する金額入力キー及び前記資源の占有
状態を表示する表示部を備え、前記オンライン占有ファ
ンクションキーとオフライン占有ファンクションキーの
同種及び異種の並行操作が可能とされ、前記制御部は
占有状態に指定した資源が所定時間以上未使用である場
合に、前記オンライン占有ファンクションキー又はオフ
ライン占有ファンクションキーが並行操作されたことを
条件として、該未使用資源の占有状態を解除し、該解除
資源を含む非占有状態の資源をオンライン占有状態又は
オフライン占有状態に設定可能とする構成とした。
To achieve the above object, a method for occupying resources in a money handling system according to the present invention is described.
Expression, loose coins, rose bills, coins roll, dispensing the bill bundle, a plurality of resources for performing deposit, respectively, and operating means for operating these resources, the withdrawal of resources based on the operation of the operation means Online occupancy status managed online
Or a control unit for setting and controlling each of the resources withdrawal and disbursement from the online state and the offline occupation state in which the resources are managed in the offline state, wherein the operation unit is one of a plurality of resources. Finger over
Resource specification key to be specified and the resource specified by the resource specification key.
Online occupancy function to bring source online
Key and the resource specified by the resource specification key are offline
Offline occupancy function keys to enter the state and entry / exit
Amount input key to enter the amount to be paid and occupation of the resource
A display unit for displaying a status, wherein the online occupied file is displayed.
Function key and offline dedicated function key
The same type and different types of parallel operations are enabled, and the control unit includes :
When the resource designated as the occupation state is unused for a predetermined time or more, the occupation state of the unused resource is changed on condition that the online occupation function key or the offline occupation function key is operated in parallel. Release and release
The configuration is such that resources in a non-occupied state including resources can be set to an online occupied state or an offline occupied state .

【0008】[0008]

【作用】本発明に示す貨幣処理システムにおける資源占
有方式によれば、占有状態(オンライン、オフラインの
どちらでも可)にある資源が未使用である場合に、操作
部のオンライン/オフライン占有ファンクションキーが
並行操作で押下されたことを条件として、占有状態にあ
所定時間以上未使用の資源の占有状態を解除させるこ
とができる。すなわち、未使用の資源の占有状態を、該
資源を占有状態に設定したオペレータとは異なるオペレ
ータにより解除させることができ、更にこの占有状態が
解除された資源を、他のオペレータにオンライン占有状
態、オフライン占有状態で使用させることができる。一
例を挙げると、他のオペレータが、オフライン占有状態
で、急きょ紙幣を結束しなければならない場合に、オン
ライン占有状態にあって使用されていない資源のオンラ
イン占有状態を解除して、資源をオフライン占有状態と
することができ、これによって従来のようにオンライン
占有状態の設定をしたオペレータがオンライン占有状態
の解除を行うまで、他のオペレータが待つ必要はなく、
その結果、使用されていない資源A〜Hが活用できない
という不具合を未然に防止できる。
According to the resource occupation method in the money handling system according to the present invention, when the resource in the occupied state (either online or offline) is unused, the online / offline occupation function key of the operation unit is not used.
It is possible to release the occupation state of the unused resources for a predetermined time or more in the occupation state on condition that they are pressed by the parallel operation . That is, the occupation state of the unused resource can be released by an operator different from the operator who has set the resource to the occupation state, and the resource whose occupation state has been released can be released to another operator by the online occupation state, Can be used in offline occupation state. As an example, if another operator needs to quickly bind banknotes in the offline occupation state, release the online occupation state of the unused resources that are in the online occupation state and occupy the resources offline. State, so that another operator does not need to wait until the operator who has set the online occupation state as in the past performs the release of the online occupation state,
As a result, it is possible to prevent a problem that the unused resources A to H cannot be utilized.

【0009】[0009]

【実施例】以下、本発明の一実施例を図1〜図3に基づ
いて説明する。図1のブロック図を参照してわかるよう
に、本発明に係わる貨幣処理システムは、8つの資源A
〜Hと、2つの操作部である第1操作部10、第2操作
部11と、これら制御しかつ統合する制御部100によ
り構成されている。なお、上記第1操作部10、第2操
作部11では、各資源A〜Hへの出金指令といくらの貨
幣を出金するかを示す取引金額データとがそれぞれ入力
され、また、各資源A〜Hへの入金指令といくらの貨幣
を入金するかを示す取引金額データとがそれぞれ入力さ
れるようになっている(操作部10・11の具体的構成
については後述する)。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. As can be seen with reference to the block diagram of FIG. 1, the money handling system according to the invention comprises eight resources A
To H, two operation units, a first operation unit 10 and a second operation unit 11, and a control unit 100 that controls and integrates them. In the first operation unit 10 and the second operation unit 11, a withdrawal command to each of the resources A to H and transaction amount data indicating how much money is to be dispensed are input, respectively. A deposit instruction to A to H and transaction amount data indicating how much money is to be deposited are respectively input (specific configurations of the operation units 10 and 11 will be described later).

【0010】これら資源A〜Hと、操作部10・11と
について順に説明する。 (A)硬貨ロール出金資源 符号Aは「硬貨ロール出金資源」であって、バラ硬貨を
所定枚数(国内においては50枚)積み重ね、積み重ね
た状態で包装紙により該硬貨をロール状に包装した後、
包装後の硬貨ロールを内部に設けられた貯留部(図示
略)に貯留し、操作部10・11から出金指令が出力さ
れたときに、その出金指令に基づいて貯留部内の硬貨ロ
ールを1ロール単位で払い出すように構成されたもので
ある。なお、前記操作部10・11においては、出金指
令とともに取引金額データが入力され、この硬貨ロール
出金資源Aでは、出金指令とともに入力された取引金額
データに基づき、硬貨ロールが出金されるようになって
いる。また、この硬貨ロール出金資源Aでは、前記貯留
部として、オフライン状態で入金された硬貨を硬貨ロー
ルにして貯留するオフライン用貯留部と、オンライン状
態で入金された硬貨を硬貨ロールにして貯留するオンラ
イン用貯留部とがそれぞれ設けられている(入金は硬貨
ロール入金資源E、硬貨バラ入金資源Fにて行う)。
The resources A to H and the operation units 10 and 11 will be described in order. (A) Coin roll disbursement resource Code A is “coin roll disbursement resource”, and a predetermined number (50 in Japan) of loose coins are stacked, and the coins are wrapped in a roll by a wrapping paper in the stacked state. After doing
The wrapped coin roll is stored in a storage unit (not shown) provided therein, and when a withdrawal command is output from the operation units 10 and 11, the coin roll in the storage unit is removed based on the withdrawal command. The payout is made in units of one roll. In the operation units 10 and 11, transaction amount data is input together with the withdrawal command. In the coin roll withdrawal resource A, coin rolls are withdrawn based on the transaction amount data input with the withdrawal instruction. It has become so. In the coin roll dispensing resource A, an off-line storage unit for storing coins deposited in an offline state as coin rolls and a coin roll deposited on-line in coins are stored as the storage unit. An online storage unit is provided (payment is made using the coin roll deposit resource E and coin loose deposit resource F).

【0011】(B)硬貨バラ出金資源 符号Bは「硬貨バラ出金資源」であって、バラ状の硬貨
を予め所定量貯留する貯留部(図示略)を有し、操作部
10・11から出金指令が出力されたときに、該出金指
令に基づいて該貯留部内の硬貨を1枚単位で払い出すよ
うに構成されたものである。また、硬貨ロール出金資源
Aでバラ硬貨が不足した場合には、この硬貨バラ出金資
源Bより硬貨ロール出金資源Aにバラ硬貨が補給される
ようになっている。また、前記操作部10・11におい
ては、出金指令とともに取引金額データが入力され、こ
の硬貨バラ出金資源Bでは、出金指令とともに入力され
た取引金額データに基づき、バラ硬貨が出金されるよう
にっている。また、この硬貨バラ出金資源Bでは、前記
貯留部として、オフライン状態で入金された硬貨を貯留
するオフライン用貯留部と、オンライン状態で入金され
た硬貨を貯留するオンライン用貯留部とがそれぞれ設け
られている(入金は硬貨バラ入金資源Fにて行う)。
(B) Coin bulk dispensing resource Code B is “coin bulk dispensing resource”, which has a storage unit (not shown) for storing a predetermined amount of loose coins in advance, and operating units 10 and 11. When a withdrawal command is output from the storage device, coins in the storage section are paid out one by one based on the withdrawal command. When the coin roll dispensing resource A runs out of loose coins, the loose coin dispensing resource B supplies loose coins to the coin roll dispensing resource A. In the operation units 10 and 11, transaction amount data is input together with the withdrawal command. In this coin dispensing resource B, loose coins are dispensed based on the transaction amount data input with the withdrawal instruction. I am doing it. In this coin dispensing resource B, an off-line storage unit for storing coins deposited in an offline state and an online storage unit for storing coins deposited in an online state are provided as the storage units. (Payment is made with coin bulk deposit resource F).

【0012】(C)紙幣束出金資源 符号Cは「紙幣束出金資源」であって、バラ紙幣を所定
枚数(100枚)ずつ集積して、結束テープにより該集
積紙幣を帯封して結束した後、その紙幣束を内部に設け
られた貯留部(図示略)に貯留し、操作部10・11か
ら出金指令が出されたときに、その出金指令に基づいて
貯留部内の紙幣束を1束単位で払い出すように構成され
たものである。また、前記操作部10・11において
は、出金指令とともに取引金額データが入力され、この
紙幣束出金資源Cでは、出金指令とともに入力された取
引金額データに基づき、紙幣束が出金されるようになっ
ている。また、この紙幣束出金資源Cでは、前記貯留部
として、オフライン状態で入金された紙幣を紙幣束とし
て貯留するオフライン用貯留部と、オンライン状態で入
金された紙幣を紙幣束として貯留するオンライン用貯留
部とがそれぞれ設けられている(入金は紙幣束入金資源
G、紙幣バラ入金資源Hにて行う)。
(C) Banknote disbursement resource Code C is a "banknote dispensing resource", and a predetermined number (100) of loose banknotes are stacked, and the stacked banknotes are banded and bound with a binding tape. After that, the banknote bundle is stored in a storage unit (not shown) provided therein, and when a withdrawal command is issued from the operation units 10 and 11, the banknote bundle in the storage unit is based on the withdrawal command. Are paid out in bundles. In the operation units 10 and 11, transaction amount data is input together with the withdrawal command. In the banknote bundle dispensing resource C, a banknote bundle is output based on the transaction amount data input with the withdrawal instruction. It has become so. In the banknote bundle dispensing resource C, the storage unit includes an offline storage unit that stores banknotes deposited in an offline state as a banknote bundle and an online storage unit that stores banknotes deposited online in a banknote bundle. Each of the storage units is provided (payment is performed using the banknote bundle payment resource G and the banknote bulk payment resource H).

【0013】(D)紙幣バラ出金資源 符号Dは「紙幣バラ出金資源」であって、バラ状の紙幣
を予め所定量貯留する貯留部(図示略)を有し、操作部
10・11から出金指令が出力されたときに、該出金指
令に基づいて、貯留部内の紙幣を1枚単位で払い出すよ
うに構成されたものである。なお、前記紙幣束出金資源
Cでバラ紙幣が不足した場合には、この紙幣バラ出金資
源Dより前記紙幣束出金資源Cにバラ紙幣が補給される
ようになっている。また、前記操作部10・11におい
ては、出金指令とともに取引金額データが入力され、こ
の紙幣バラ出金資源Dでは、出金指令とともに入力され
た取引金額データに基づき、バラ紙幣が出金されるよう
にっている。また、この紙幣バラ出金資源Dでは、前記
貯留部として、オフライン状態で入金された紙幣を貯留
するオフライン用貯留部と、オンライン状態で入金され
た紙幣を貯留するオンライン用貯留部とがそれぞれ設け
られている(入金は紙幣バラ入金資源Hにて行う)。
(D) Banknote Dispensing Resources Reference code D is a “banknote dispensing resource”, which has a storage unit (not shown) for storing a predetermined amount of loose banknotes in advance, and operating units 10 and 11. When the dispensing command is output from the refrigerator, the banknotes in the storage unit are dispensed one by one based on the dispensing command. When the bill bundle dispensing resource C runs short of loose bills, loose bills are supplied to the bill bundle dispensing resource C from the bill loose dispensing resource D. In the operation units 10 and 11, transaction amount data is input together with the withdrawal command. In this bill dispensing resource D, loose banknotes are dispensed based on the transaction amount data input with the withdrawal instruction. I am doing it. In the bill dispensing resource D, the storage unit includes an offline storage unit that stores banknotes deposited in an offline state and an online storage unit that stores banknotes deposited in an online state. (Payment is made with the banknote disposable deposit resource H).

【0014】(E)硬貨ロール入金資源 符号Eは「硬貨ロール入金資源」であって、操作部10
・11から出力された入金指令に基づいて、外部から、
集積硬貨が包装紙で包装されてなる硬貨ロールを受け入
れ、その後でその硬貨ロールの包装紙を取り除いて、硬
貨をバラ状にした後、バラ状になった硬貨を1枚ずつ判
別・計数処理する。また、この硬貨ロール入金資源Eで
は、前記判別・計数によって得られた判別・計数データ
を、硬貨ロールの入金に際して、操作部10・11にお
いて入力された取引金額データと比較照合し、この比較
の結果、これら判別・計数データと取引金額データとが
不一致である場合に、該操作部10・11に対して「不
一致」であるとの照合結果を出力するようにしている。
なお、硬貨ロール入金資源Eで計数判別処理されたバラ
硬貨は、硬貨ロール出金資源Aに搬送され、この硬貨ロ
ール出金資源A内に貯留されるようになっている。
(E) Coin roll deposit resource Symbol E is “coin roll deposit resource”, and the operation unit 10
・ Based on the deposit command output from 11, externally,
After receiving the coin roll in which the accumulated coins are wrapped with the wrapping paper, and then removing the wrapping paper of the coin roll to make the coins loose, the discreet coins are discriminated and counted one by one. . In addition, in the coin roll deposit resource E, the discrimination / counting data obtained by the discrimination / counting is compared with the transaction amount data input in the operation units 10 and 11 when depositing the coin rolls. As a result, if the discrimination / counting data and the transaction amount data do not match, a collation result indicating "mismatch" is output to the operation units 10 and 11.
The loose coins counted and discriminated by the coin roll deposit resource E are transported to the coin roll deposit resource A and stored in the coin roll deposit resource A.

【0015】(F)硬貨バラ入金資源 符号Fは「硬貨バラ入金資源」であって、操作部10・
11から出力された入金指令に基づいて、外部からバラ
硬貨を受け入れ、この後、該バラ硬貨を1枚ずつ判別・
計数処理する。また、この硬貨バラ入金資源Fでは、前
記バラ硬貨の判別・計数によって得られた判別・計数デ
ータを、該硬貨の入金に際して、操作部10・11にお
いて入力された取引金額データと比較照合し、この比較
の結果、これら判別・計数データと取引金額データとが
不一致である場合に、該操作部10・11に対して「不
一致」であるとの照合結果を出力するようにしている。
なお、この硬貨バラ入金資源Fで処理されたバラ硬貨
は、硬貨バラ出金資源Bに搬送され、この硬貨バラ出金
資源B内において貯留されるようになっている。
(F) Coin bulk deposit resource Reference symbol F is “coin bulk deposit resource”,
Based on the deposit command output from 11, a loose coin is received from outside, and thereafter, the loose coins are discriminated one by one.
Perform counting processing. Further, in the coin bulk deposit resource F, the discrimination / counting data obtained by discriminating / counting the above-mentioned coins is compared with the transaction amount data input in the operation units 10 and 11 when depositing the coins, As a result of the comparison, when the discrimination / counting data and the transaction amount data do not match, a collation result indicating “mismatch” is output to the operation units 10 and 11.
The loose coins processed by the coin loose deposit resource F are transported to the coin loose dispensing resource B and stored in the coin loose dispensing resource B.

【0016】(G)紙幣束入金資源 符号Gは「紙幣束入金資源」であって、操作部10・1
1から出力された入金指令に基づいて、外部から、結束
テープで結束されてなる紙幣束を受け入れ、その後でそ
の結束テープを取り除いて、バラ状になった紙幣を1枚
ずつ判別・計数処理する。また、この紙幣束入金資源G
では、前記判別・計数によって得られた判別・計数デー
タを、紙幣束の入金に際して、操作部10・11におい
て入力された取引金額データと比較照合し、この比較の
結果、これら判別・計数データと取引金額データとが不
一致である場合に、該操作部10・11に対して「不一
致」であるとの照合結果を出力するようにしている。な
お、この紙幣束入金資源Gで計数判別処理されたバラ紙
幣は、紙幣束出金資源Cに搬送されこの紙幣束出金資源
C内に貯留されるようになっている。
(G) Banknote Deposit Resource G is a “banknote debit resource”, and is the operation unit 10.1
Based on the deposit instruction output from 1, a bill bundle formed by binding with a binding tape is received from the outside, and thereafter, the binding tape is removed, and the loose bills are discriminated and counted one by one. . Also, this bill bundle deposit resource G
Then, the discrimination / counting data obtained by the discrimination / counting is compared with the transaction amount data input in the operation units 10 and 11 when depositing the banknote bundle, and as a result of this comparison, these discrimination / counting data are When the transaction amount data does not match, a comparison result indicating “mismatch” is output to the operation units 10 and 11. The loose banknotes counted and discriminated by the banknote bundle receiving resource G are transported to the banknote bundle dispensing resource C and stored in the banknote bundle dispensing resource C.

【0017】(H)紙幣バラ入金資源 符号Hは「紙幣バラ入金資源」であって、操作部10・
11から出力された入金指令に基づいて、外部から、バ
ラ紙幣を受け入れ、その後でその紙幣を1枚ずつ判別・
計数処理する。また、この紙幣バラ入金資源Hでは、前
記バラ紙幣の判別・計数によって得られた判別・計数デ
ータを、該紙幣の入金に際して、操作部10・11にお
いて入力された取引金額データと比較照合し、この比較
の結果、これら判別・計数データと取引金額データとが
不一致である場合に、該操作部10・11に対して「不
一致」であるとの照合結果を出力するようにしている。
なお、この紙幣バラ入金資源Hで処理されたバラ紙幣
は、紙幣バラ出金資源Dに搬送され該紙幣バラ出金資源
D内に貯留されるようになっている。
(H) Banknote Deposit Receipt Resource The symbol H is “banknote debit deposit resource”,
Based on the deposit command output from 11, a loose bill is accepted from the outside, and then the bills are discriminated one by one.
Perform counting processing. Further, in the bill disposable deposit resource H, the discrimination / counting data obtained by discrimination / counting of the disposable bills is compared with the transaction amount data input in the operation units 10 and 11 when depositing the bills, As a result of the comparison, when the discrimination / counting data and the transaction amount data do not match, a collation result indicating “mismatch” is output to the operation units 10 and 11.
Note that the loose bill processed by the loose bill deposit resource H is transported to the loose bill disbursement resource D and stored in the loose bill disbursement resource D.

【0018】以上説明したように、資源A〜Hは大きく
硬貨関連資源(硬貨入出金機)と、紙幣関連資源(紙幣
入出金機)とに分れており、更に、前者の硬貨関連資源
は、バラ硬貨のみを取り扱う硬貨バラ入金資源F、硬貨
バラ出金資源Bと、硬貨ロールも取り扱う硬貨ロール入
金資源E、硬貨ロール出金資源Aとから構成され、後者
の紙幣関連資源は、バラ紙幣のみを取り扱う紙幣バラ入
金資源H、紙幣バラ出金資源Dと、紙幣束も取り扱う紙
幣束入金資源G、紙幣束出金資源Cとから構成されてい
る。
As described above, the resources A to H are largely divided into coin-related resources (coin depositing / dispensing machines) and banknote-related resources (banknote depositing / dispensing machines). , A coin rose deposit resource F that handles only loose coins, a coin rose deposit resource B, and a coin roll deposit resource E that also handles coin rolls, and a coin roll disbursed resource A. The latter banknote-related resources are loose bills. It is composed of a bill rose receiving resource H and a bill dispensing resource D that handle only bills, and a bill bundle receiving resource G and a bill bundle dispensing resource C that also handle bill bundles.

【0019】次に、硬貨、紙幣の入出金に際して、上記
資源A〜Hの一つあるいは複数を占有状態にするための
操作部10・11の構成について説明する。これら各操
作部10・11は、図2に示すように各資源A〜Hを個
別指定するため「A」〜「H」からなる資源指定キー
1、オンライン占有ファンクションキー2、オフライン
占有ファンクションキー3、入出金する金額を入力する
金額入力キー4をそれぞれ有する。また、前記金額入力
キー4には、図示していないが、取引する媒体の形態を
指定するバラキー、束キー、ロールキーなどが設けられ
ている。また、前記各操作部10・11には、資源A〜
Hの占有状態を表示するための表示部12がそれぞれ設
けられている。
Next, a description will be given of the configuration of the operation units 10 and 11 for occupying one or more of the resources A to H when depositing and dispensing coins and bills. As shown in FIG. 2, these operation units 10 and 11 are used to individually designate each of the resources A to H. The resource designation key 1 is composed of "A" to "H", the online occupation function key 2, and the offline occupation function key 3. And an amount input key 4 for inputting an amount to be paid and withdrawn. Although not shown, the money input key 4 is provided with a loose key, a bundle key, a roll key, and the like for designating a form of a medium to be traded. In addition, each of the operation units 10 and 11 includes resources A to
A display unit 12 for displaying the occupation state of H is provided.

【0020】なお、図1では操作部10・11を2つと
しているが、操作部10・11の数自体は特に限定する
ものではない(1つでも良いし、更に多い数でも良
い)。また、前記各操作部10・11は、操作手段を構
成し複数のオペレータがそれぞれ共有して並行使用でき
るようになっている。また、出納システムの資源は、前
述したものに限定するものではない。例えば入金関連資
源として、現金外収納庫(ポスト)等を加えても良い。
この現金外収納庫には小切手等の有価証券類が収納され
るようになっている。
In FIG. 1, the number of the operation units 10 and 11 is two. However, the number of the operation units 10 and 11 is not particularly limited (one or more operation units may be used). The operation units 10 and 11 constitute operation means.
A plurality of operators can share and use them in parallel . The resources of the accounting system are not limited to those described above. For example, a storage (post) outside cash may be added as a deposit-related resource.
This non-cash storage is designed to store securities such as checks.

【0021】次に、図3のフローチャートを参照して、
操作部10・11の操作内容に基づき、資源A〜Hのオ
ンライン占有状態を解除するための制御部100の制御
内容を説明する。なお、以下の説明では操作部10・1
1での操作も含めて記載する。また、以下の操作は操作
部10・11のいずれで行っても良い。また、以下のフ
ローチャートは制御部100内に予め記憶されているも
のである。
Next, referring to the flowchart of FIG.
Control contents of the control unit 100 for releasing the online occupation state of the resources A to H based on the operation contents of the operation units 10 and 11 will be described. In the following description, the operation unit 10.1
The operation including step 1 is described. Further, the following operations may be performed on any of the operation units 10 and 11. The following flowchart is stored in the control unit 100 in advance.

【0022】《ステップ(SP)1》オペレータに対し
て、資源指定キー1の「A」〜「H」、オンライン占有
ファンクションキー2、オフライン占有ファンクション
キー3、金額入力キー4を操作させ、希望する資源A〜
Hの占有(オフライン占有、オンライン占有)と、該資
源A〜Hに対して取引させる貨幣の金額を入力させる。
なお、ここで、オンライン占有ファンクションキー2が
操作された後、資源指定キー1によって資源A〜Hが指
定された場合には、指定された資源A〜Hをオンライン
占有状態とし、一方オフライン占有ファンクションキー
3が操作された後、資源指定キー1によって資源A〜H
が指定された場合には、指定された資源A〜Hをオフラ
イン占有状態とする。また、このような操作により資源
A〜Hが指定され、占有された場合には、該資源の占有
状況を図2の表示部12に「○」で示すように表示させ
る。また、その占有された資源の使用状況も表示させ
る。なお、本例では、第1操作部10のオペレータによ
り、紙幣関連資源である資源C,D,G,Hがオンライ
ン占有された状態にあるものとして以下の説明をする
(図3の参照)。
<< Step (SP) 1 >> The operator operates the "A" to "H" of the resource designation key 1, the online occupation function key 2, the offline occupation function key 3, and the money amount input key 4 to make a desired operation. Resource A ~
H is occupied (offline occupation, online occupation) and the amount of money to be traded for the resources A to H is input.
When the resources A to H are designated by the resource designation key 1 after the online occupation function key 2 is operated, the designated resources A to H are set to the online occupation state, while the offline occupation function is set. After the key 3 is operated, the resources A to H are
Is designated, the designated resources A to H are placed in the offline occupation state. When the resources A to H are designated and occupied by such an operation, the occupation status of the resources is displayed on the display unit 12 in FIG. 2 as indicated by “「 ”. Also, the usage status of the occupied resource is displayed. In the present example, the following description will be made assuming that resources C, D, G, and H, which are banknote-related resources, are occupied online by the operator of the first operation unit 10 (see FIG. 3).

【0023】《ステップ2》ステップ1にてオンライン
占有状態とされた資源C,D,G,H中に指定時間以上
使用されていない未使用資源があるか否かを判断し、N
Oである場合にステップ3に進み、またYESである場
合にステップ4に進む。なお、本例では、オンライン占
有状態にある資源C,D,G,H中で、資源D,Gがオ
ペレータによって使用された状態にあり、資源C,Hが
未使用の状態にあるものとする(図3の参照)。 《ステップ3》オンライン占有状態にあり、かつ使用状
態にある資源A〜H(本例では資源D,G)のオンライ
ン占有状態を継続させる。
<< Step 2 >> It is determined whether any of the resources C, D, G, and H that have been placed in the online occupation state in step 1 includes unused resources that have not been used for a specified time or more.
If the answer is O, the process proceeds to Step 3, and if the answer is YES, the process proceeds to Step 4. In this example, it is assumed that among the resources C, D, G, and H in the online occupation state, the resources D and G are in a state used by the operator, and the resources C and H are in an unused state. (See FIG. 3). << Step 3 >> The resources A to H (the resources D and G in this example) which are in the online occupation state and in use are maintained in the online occupation state.

【0024】《ステップ4》 ステップ2にてオンライン占有状態にある資源A〜Hの
全部が所定時間未使用状態であるか否かを判断し、NO
(一部が未使用である)の場合にステップ5に進み、Y
ES(全部が未使用である)の場合にステップ8に進
む。 《ステップ5》 オンライン占有ファンクションキー2あるいはオフライ
ン占有ファンクションキー3のいずれかが並行操作で
下されたか否かを判断し、YESの場合に次のステップ
6に進む。 《ステップ6》 例えばステップ5において、オフライン状態でバラ紙幣
の結束を希望する他の操作者により、オフライン占有フ
ァンクションキー3が並行操作で押下されたことによ
り、オンライン占有状態にあって、かつ使用されていな
い資源A〜H(本例では、資源C,H)のオンライン占
有状態を解除させ(図3の参照)、ステップ7に進
む。なお、このステップ6でのオンライン占有状態の解
除は、第1操作部10のオフライン占有ファンクション
キー3、または第2操作部11のオフライン占有ファン
クションキー3のいずれにおいても行うことができる。
<< Step 4 >> In step 2, it is determined whether or not all of the resources A to H that are in the online occupied state are unused for a predetermined time.
If it is (partially unused), go to step 5 and
In the case of ES (all are unused), go to step 8. << Step 5 >> It is determined whether or not either the online occupation function key 2 or the offline occupation function key 3 has been pressed by a parallel operation . If YES, the process proceeds to the next step 6. << Step 6 >> For example, in step 5, the offline occupation function key 3 is pressed by a parallel operation by another operator who wishes to bind loose banknotes in the offline state. The resources A to H (resources C and H in this example) that have not been used are released from the online occupation state (see FIG. 3), and the process proceeds to step 7. The release of the online occupation state in step 6 can be performed using either the offline occupation function key 3 of the first operation unit 10 or the offline occupation function key 3 of the second operation unit 11.

【0025】《ステップ7》ステップ6においてオンラ
イン状態から切り放した資源を含む非占有状態の資源A
〜H(本例では、資源A,B,C,E,F,H)のオフ
ライン占有を受け付ける。すなわち、ステップ7で他の
操作者に資源指定キー1「A」〜「H」を操作させて、
希望する指定A〜Hを指定(本例では、資源C,H)さ
せると、資源C(紙幣束出金資源)と資源H(紙幣バラ
入金資源)とをオフライン占有状態に設定することがで
きる(図3の参照)。
<< Step 7 >> An unoccupied resource A including the resource released from the online state in step 6
Offline occupation of .about.H (resources A, B, C, E, F, H in this example) is accepted. That is, in step 7, another operator operates the resource designation keys 1 "A" to "H",
When the desired designations A to H are designated (resources C and H in this example), the resource C (banknote bundle disbursement resource) and the resource H (banknote disposable depositing resource) can be set to the offline occupation state. (See FIG. 3).

【0026】《ステップ8》占有されている全ての資源
A〜Hの占有状態を解除して本フローを終了する。前
記、フローに示す占有資源、及びその使用状況について
は、表示部12に図3の〜に示すように随時表示さ
れるようになっている。以上説明したように、本実施例
の貨幣処理システムにおける資源占有方式ではオンライ
ン占有状態にある資源が未使用である場合に、操作部の
オフライン占有ファンクションキーが押下されたことを
条件として、オンライン占有状態にある未使用の資源の
オンライン占有状態を解除させ、オフライン占有状態で
使用させることができるものであるが、この他に以下の
通りの資源占有切換が可能となっている。
<< Step 8 >> The occupation state of all the occupied resources A to H is released, and this flow ends. The occupied resources shown in the flow and the usage status thereof are displayed on the display unit 12 as shown in FIG. As described above, in the resource occupation method in the money handling system according to the present embodiment, when the resources in the online occupation state are not used, the online occupation function key of the operation unit is pressed, and The unused resources in the state can be released from the online occupation state and used in the offline occupation state. In addition, the following resource occupancy switching is possible.

【0027】1) 第1オペレータの操作により、オン
ライン占有状態にあった未使用資源を、第2操作者の操
作により占有解除して、第2オペレータのオンライン占
有状態に切り換える。 2) 第1オペレータの操作により、オフライン占有状
態にあった未使用資源を、第2操作者の操作により占有
解除して、第2オペレータのオンライン占有状態に切り
換える。 3) 第1オペレータの操作により、オフライン占有状
態にあった未使用資源を、第2操作者の操作により占有
解除して、第2オペレータのオフライン占有状態に切り
換える。
1) The unused resources that have been in the online occupation state are released by the operation of the second operator by the operation of the first operator, and are switched to the online occupation state of the second operator. 2) The unused resources in the offline occupation state are released by the operation of the second operator by the operation of the first operator, and are switched to the online occupation state of the second operator. 3) The unused resources in the offline occupied state are released by the operation of the second operator by the operation of the first operator, and are switched to the offline occupied state of the second operator.

【0028】[0028]

【発明の効果】以上の説明から明らかなように、本発明
に示す貨幣処理システムにおける資源占有方式によれ
ば、占有状態(オンライン、オフラインのどちらでも
可)にある資源が所定時間以上未使用である場合に、操
作部のオンライン/オフライン占有ファンクションキー
並行操作で押下されたことを条件として、占有状態に
ある未使用の資源の占有状態を解除させることができ
る。すなわち、未使用の資源の占有状態を、該資源を占
有状態に設定したオペレータとは異なるオペレータによ
り解除させることができ、更にこの占有状態が解除され
た資源を、他のオペレータにオンライン占有状態、オフ
ライン占有状態で使用させることができる。
As is apparent from the above description, according to the resource occupation method in the money handling system according to the present invention, the resources in the occupied state (either online or offline) are unused for a predetermined time or more . In some cases, the occupation state of unused resources in the occupation state can be released on condition that the online / offline occupation function key of the operation unit is pressed by a parallel operation . That is, the occupation state of the unused resource can be released by an operator different from the operator who has set the resource to the occupation state, and the resource whose occupation state has been released can be released to another operator by the online occupation state, Can be used in offline occupation state.

【0029】これにより、例えば他のオペレータが、オ
フライン占有状態で、急きょ紙幣を結束しなければなら
ない場合に、占有ファンクションキーを並行操作する
と、希望する紙幣の結束等が可能かどうかが即座に分か
り、必要な資源をオフライン占有状態とすることによ
、従来と違って、オンライン占有状態の設定をしたオ
ペレータがオンライン占有状態の解除を行うまで、他の
オペレータが待つ必要はなく、その結果、使用されてい
ない資源A〜Hが活用できないという不具合を未然に防
止でき、その結果、資源の効率良い運用が可能となる効
果を得ている。
Thus, for example, when another operator must quickly bind the banknotes in the off-line occupation state, the occupancy function keys are operated in parallel.
Whether it is possible to bind the desired bills
Ri, the resources required to offline occupied state and the child
Ri, a problem that in the prior art unlike, until the operator that the set of online occupied state to release the online occupied state, it is not necessary to other operator is wait, and as a result, can not take advantage of the resources A~H that are not being used Can be prevented beforehand, and as a result, there is an effect that efficient operation of resources becomes possible.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の貨幣処理システムにおける資源占有方
式を示すブロック図。
FIG. 1 is a block diagram showing a resource occupation method in a money handling system of the present invention.

【図2】資源占有方式の表示部12、操作部10・11
を示す図。
FIG. 2 shows a display unit 12 and operation units 10 and 11 of a resource occupation method.
FIG.

【図3】資源占有方式の制御部100の制御内容を示す
フローチャートと、該フローチャートの流れに沿った表
示部12の表示内容〜を示す図。
FIG. 3 is a flowchart showing the control contents of a control unit 100 of the resource occupation method, and the display contents of the display unit 12 along the flow of the flowchart.

【符号の説明】[Explanation of symbols]

A〜H 資源1 資源指定キー 2 オンライン占有ファンクションキー 3 オフライン占有ファンクションキー4 金額入力キー 10 操作部(操作手段) 11 操作部(操作手段) 12 表示部 100 制御部A to H resource 1 resource designation key 2 online occupation function key 3 offline occupation function key 4 amount input key 10 operation unit (operation unit) 11 operation unit (operation unit) 12 display unit 100 control unit

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 バラ硬貨、バラ紙幣、硬貨ロール、紙幣
束の出金、入金をそれぞれ行う複数の資源と、これら資
源を操作する操作手段と、該操作手段の操作に基づい
源の入出金をオンライン状態で管理するオンライン占
有状態又は資源の入出金をオンライン状態から切り放し
てオフライン状態で管理するオフライン占有状態にそれ
ぞれ設定して制御する制御部とを有する貨幣処理システ
ムであって、 前記操作手段は、複数の資源のうちの1以上を指定する
資源指定キーと、該資源指定キーで指定された資源をオ
ンライン状態とするオンライン占有ファンクションキー
と、資源指定キーで指定された資源をオフライン状態と
するオフライン占有ファンクションキーと、入出金する
金額を入力する金額入力キー及び前記資源の占有状態を
表示する表示部を備え、前記オンライン占有ファンクシ
ョンキーとオフライン占有ファンクションキーの同種及
び異種の並行操作が可能とされ、前記制御部は、占有状
態に指定した資源が所定時間以上未使用である場合に、
前記オンライン占有ファンクションキー又はオフライン
占有ファンクションキーが並行操作されたことを条件と
して、該未使用資源の占有状態を解除し、該解除資源を
含む非占有状態の資源をオンライン占有状態又はオフラ
イン占有状態に設定可能とすることを特徴とする貨幣処
理システムにおける資源占有方式。
1. A loose coins, rose bills, coins roll, dispensing the bill bundle, a plurality of resources for performing deposit, respectively, and operating means for operating these resources, based on the operation of the operation means
There in the money handling system and a control unit for controlling the withdrawal of resources by setting each receipt and payment online occupation or resource managing online state to offline occupancy for managing offline state disassociate from the online state The operating means specifies one or more of a plurality of resources.
A resource designation key and the resource designated by the resource designation key
Online occupancy function key for online status
And the resource specified by the resource specification key
Offline exclusive function key and deposit / withdraw
The amount input key for inputting the amount and the occupation state of the resource
A display unit for displaying the online occupied function.
Key and offline dedicated function key
And different types of concurrent operations are enabled, and the control unit, when the resource designated as the occupied state is unused for a predetermined time or more ,
On condition that the online occupation function key or offline occupation function key is operated in parallel , the occupation state of the unused resource is released, and the released resource is released.
A resource occupation method in a money handling system, characterized in that a resource in a non-occupied state including the resource can be set to an online occupied state or an offline occupied state.
JP27580891A 1991-10-23 1991-10-23 Resource occupation method in money handling system Expired - Lifetime JP2659482B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27580891A JP2659482B2 (en) 1991-10-23 1991-10-23 Resource occupation method in money handling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27580891A JP2659482B2 (en) 1991-10-23 1991-10-23 Resource occupation method in money handling system

Publications (2)

Publication Number Publication Date
JPH05182059A JPH05182059A (en) 1993-07-23
JP2659482B2 true JP2659482B2 (en) 1997-09-30

Family

ID=17560705

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27580891A Expired - Lifetime JP2659482B2 (en) 1991-10-23 1991-10-23 Resource occupation method in money handling system

Country Status (1)

Country Link
JP (1) JP2659482B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03156673A (en) * 1989-11-15 1991-07-04 Hitachi Ltd Automatic cash transaction device

Also Published As

Publication number Publication date
JPH05182059A (en) 1993-07-23

Similar Documents

Publication Publication Date Title
WO2009118838A1 (en) Currency handling device
EP3404628A1 (en) Money management device, money processing system, and money processing method
JP5123498B2 (en) Money transaction processing device
JP2659482B2 (en) Resource occupation method in money handling system
JP2678109B2 (en) Resource occupation method in money handling system
JP2728323B2 (en) Resource occupation method in money handling system
JP2003150793A (en) Money paying device for teller&#39;s machine
JP2678106B2 (en) Resource occupation method in money handling system
JP2010079694A (en) Automatic transaction apparatus, automatic transaction system, information management server and automatic transaction method
JP5068789B2 (en) Money transaction processing device
JP5026479B2 (en) Money transaction processing device
JP6715713B2 (en) Money deposit machine and money deposit method
JP6690303B2 (en) Automatic transaction equipment
JP3923706B2 (en) Money handling apparatus and money handling system
JP3311088B2 (en) Banknote deposit / withdrawal device
JP5352693B2 (en) Money transaction processing device
JPH02307189A (en) Coin receiving/dispensing device
JP2018036951A (en) Currency processing device, currency processing system, and currency processing method
JP2766603B2 (en) Pre-processing equipment in transaction processing equipment
JP2505162B2 (en) Operating method of automatic cash handling equipment
JP2005018709A (en) Bill handling device
JP2965770B2 (en) Cash collection control method of cash dispenser
JPH01265387A (en) Automatic transaction processor
JP3776178B2 (en) Automatic transaction equipment
JP2535647B2 (en) Initial replenishment control processing device

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970513

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120606

Year of fee payment: 15

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120606

Year of fee payment: 15