JP2655762B2 - How to install concrete blocks - Google Patents

How to install concrete blocks

Info

Publication number
JP2655762B2
JP2655762B2 JP3104444A JP10444491A JP2655762B2 JP 2655762 B2 JP2655762 B2 JP 2655762B2 JP 3104444 A JP3104444 A JP 3104444A JP 10444491 A JP10444491 A JP 10444491A JP 2655762 B2 JP2655762 B2 JP 2655762B2
Authority
JP
Japan
Prior art keywords
block body
block
sides
culvert
roller device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3104444A
Other languages
Japanese (ja)
Other versions
JPH0571159A (en
Inventor
直俊 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TSURUMI KONKURIITO KK
Original Assignee
TSURUMI KONKURIITO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TSURUMI KONKURIITO KK filed Critical TSURUMI KONKURIITO KK
Priority to JP3104444A priority Critical patent/JP2655762B2/en
Publication of JPH0571159A publication Critical patent/JPH0571159A/en
Application granted granted Critical
Publication of JP2655762B2 publication Critical patent/JP2655762B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】〔発明の目的〕[Object of the invention]

【0002】[0002]

【産業上の利用分野】本発明は、暗渠、共同溝、地下道
等を形成するボックスカルバート等のコンクリートブロ
ックの据付け方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a concrete block such as a box culvert for forming a culvert, a common ditch, an underpass, and the like.

【0003】[0003]

【従来の技術】従来、暗渠、共同溝、地下道等の施工に
は、予め成形した複数のコンクリート製のカルバート体
を連続的に設置する方法がある。
2. Description of the Related Art Conventionally, for the construction of culverts, common ditches, underpasses, etc., there is a method of continuously installing a plurality of preformed concrete culverts.

【0004】この方法は、一般的には、カルバート体を
車載クレーン等により直接的に所定位置に据付けるが、
交通事情や周辺の地形等の諸条件により、現場にクレー
ン車等を移動させるスペースがないような場合、クレー
ン車等が移動できる位置でカルバート体を降ろし、この
カルバート体をその設置面上で移動して所定位置に据付
け、順次に先発のカルバート体に後発のカルバート体を
連結する引込み工法が採用される。
In this method, generally, the culvert body is directly installed at a predetermined position by a vehicle-mounted crane or the like.
If there is no space to move the crane truck etc. at the site due to traffic conditions or various conditions such as the surrounding terrain, lower the culvert at a position where the crane truck etc. can move, and move this culvert on the installation surface Then, it is installed at a predetermined position, and a retracting method is adopted in which the later culvert body is sequentially connected to the earlier culvert body.

【0005】ところで、この引込み工法では、従来、カ
ルバート体の設置面の両側部に断面L形の鋼材を設置
し、この鋼材の上にカルバート体を載置し、この鋼材の
上でカルバート体を滑らせて、所定位置まで移動してい
たが、カルバート体の重量が重かったり、移動距離が長
かったりすると、カルバート体の移動が容易でなく、作
業の安全が確保し難くなる。
In the retracting method, conventionally, an L-shaped steel material is installed on both sides of the installation surface of the culvert body, the culvert body is mounted on the steel material, and the culvert body is mounted on the steel material. It has been slid and moved to a predetermined position. However, if the weight of the culvert body is heavy or the moving distance is long, it is difficult to move the culvert body, and it is difficult to secure work safety.

【0006】[0006]

【発明が解決しようとする課題】上述したように、ボッ
クスカルバート等のコンクリート製のブロック体の施工
に際して、従来の引込み工法では、ブロック体の移動が
容易でない。そこで、ブロック体の移動に、たとえば、
実開昭62−44999号公報の第5図に記載されてい
るコロ装置、すなわち、センタープレートの前後端部及
びこのセンタープレートの上下面に無端状のチェーンで
連結した複数のコロを転動可能に配置したコロ装置を用
いることにより、ブロック体を移動することが考えられ
るが、しかし、このコロ装置はブロック体を載置したま
まで移動するものであるため、この移動時にブロック体
が不安定で転倒し易い、という問題がある。
As described above, when constructing a block made of concrete such as a box culvert, it is not easy to move the block by the conventional retracting method. So, for example, to move the block
It is described in FIG. 5 of Japanese Utility Model Application Laid-Open No. 62-44999.
Roller device, that is, the front and rear ends of the center plate and
Endless chains on the upper and lower surfaces of the center plate
Uses a roller device in which multiple connected rollers are arranged so that they can roll.
Can move the block body
However, this roller device has a block
To move up to the block
However, there is a problem that it is unstable and easily falls.

【0007】本発明は、このような点に鑑みなされたも
ので、ブロック体の移動を容易にすることを目的とする
ものである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and has as its object to facilitate movement of a block body.

【0008】〔発明の構成〕[Configuration of the Invention]

【0009】[0009]

【課題を解決するための手段】本発明は、予め成形した
複数のコンクリート製のブロック体1,1a,1bを連続的
に設置位置に据付けるコンクリートブロックの据付け方
法であって、前後縁部を円弧状に形成したセンタープ
レート24の上記前後縁部及びこのセンタープレート24
上下面に無端状のチェーン25で連結した複数のコロ26
を転動可能に配置しかつ上記複数のコロ26を介して上記
センタープレート24の上方に上記ブロック体1,1a,1b
を載置するトッププレート22を有するコロ装置21を用
い、上記ブロック体1,1a,1bを載置する設置面11の両
側部に少なくとも底面を鋼材17とした案内溝16をそれぞ
設け、この両側の案内溝16の底面に上記コロ装置21
それぞれ配置し、この両側のコロ装置21の上記トップ
プレート22上にブロック体1,1a,1bを載置し、このブ
ロック体1,1a,1bに下端部を上記設置面11に対向させ
た垂直鋼材38を両側に取外し可能に取付けた水平鋼材37
を有する転倒防止用のサポート36を固定し、このブロッ
ク体1,1a,1bを両側のコロ装置21を介して両側の案内
溝16に沿って移動し、所定の位置に移動したブロック体
1,1a,1bから上記転倒防止用のサポート36を取外し、
このブロック体1,1a,1bをジャッキアップしてこのブ
ロック体1,1a,1bの下部からコロ装置21をそれぞれ引
抜いた後、このブロック体1,1a,1bを上記設置面11に
設置し、順次に先発のブロック体1,1a,1bに後発のブ
ロック体1,1a,1bを連結する際に後発のブロック体
1,1a,1bに固定した転倒防止用のサポート36の先発の
ブロック体1,1a,1b側に位置する垂直鋼材38を取外し
て先発のブロック体1,1a,1bに連結するものである。
The present invention SUMMARY OF] is a mounting method of the preformed multiple concrete block member 1,1a were concrete blocks Ru installed 1b in a continuous installation position, the front and rear edges The front and rear edges of the center plate 24 formed in an arc shape and the center plate 24
A plurality of rollers 26 connected to the upper and lower surfaces by endless chains 25
Is arranged to be able to roll and the above-mentioned through the plurality of rollers 26
Above the center plate 24, the block bodies 1, 1a, 1b
Using the roller device 21 having a top plate 22 for placing it a guide groove 16 which at least the bottom surface was steel 17 on both sides of the installation surface 11 for supporting the block body 1, 1a, and 1b
The roller device 21 is provided on the bottom surfaces of the guide grooves 16 on both sides.
Respectively , and the above-mentioned top of the roller device 21 on both sides
Plate 22 block body 1,1a on, placing the 1b, the blanking
The lower ends of the lock bodies 1, 1a, 1b face the installation surface 11
Horizontal steel 37 with detachable vertical steel 38 attached to both sides
The block body 1, 1a, 1b is moved along the guide grooves 16 on both sides via the roller devices 21 on both sides, and the block bodies 1, 1 moved to a predetermined position are fixed . Remove the above-mentioned fall prevention support 36 from 1a, 1b ,
The block body 1,1a, 1b a jack-up to this part
Pull the roller device 21 from the lower part of the lock bodies 1, 1a, 1b respectively.
After removing, the block body 1, 1a, and placed 1b to the installation surface 11, sequentially starting block body 1, 1a of the block body 1, 1a of generic to 1b, the late when connecting 1b block body
Starter of fall prevention support 36 fixed to 1, 1a, 1b
Remove the vertical steel material 38 located on the block body 1, 1a, 1b side.
To the starting block bodies 1, 1a, 1b .

【0010】[0010]

【作用】本発明のコンクリートブロックの据付け方法で
は、ブロック体1,1a,1bの移動時に、ブロック体1,
1a,1bを支持したコロ装置21の複数のコロ26が、コロ装
置21のセンタープレート24と鋼材17の間で転動するとと
もに、チェーン25によりセンタープレート24の周囲を循
環する。すなわち、両側のコロ装置21のトッププレート
22上にブロック体1,1a,1bを載置し、このブロック体
1,1a,1bに下端部を設置面11に対向させた垂直鋼材38
を両側に取外し可能に取付けた水平鋼材37を有する転倒
防止用のサポート36を固定する。そして、このブロック
体1,1a,1bを両側のコロ装置21を介して両側の案内溝
16に沿って移動し、所定の位置に移動したブロック体
1,1a,1bから上記転倒防止用のサポート36を取外し、
このブロック体1,1a,1bをジャッキアップしてこのブ
ロック体1,1a,1bの下部からコロ装置21をそれぞれ引
抜いた後、このブロック体1,1a,1bを設置面11に設置
する。そうして、順次に先発のブロック体1,1a,1bに
後発のブロック体1,1a,1bを連結するものであるが、
この際、後発のブロック体1,1a,1bに固定した転倒防
止用のサポート36の先発のブロック体1,1a,1b側に位
置する垂直鋼材38を取外して先発のブロック体1,1a,
1bに連結する。
According to the concrete block installation method of the present invention, when the blocks 1, 1a, 1b are moved, the blocks 1, 1a, 1b are moved.
A plurality of rollers 26 of the roller device 21 supporting 1a and 1b roll between the center plate 24 and the steel material 17 of the roller device 21 and circulate around the center plate 24 by the chain 25. That is, the top plate of the roller device 21 on both sides
22. Place the blocks 1, 1a, 1b on
Vertical steel 38 with lower end facing installation surface 11 at 1, 1a, 1b
Overturned with horizontal steel 37 removably attached to both sides
Fix the support 36 for prevention. And this block
Guides on both sides of the body 1, 1a, 1b via roller devices 21 on both sides
Block body that moves along 16 and moves to a predetermined position
Remove the above-mentioned fall prevention support 36 from 1, 1a, 1b,
Jack up the blocks 1, 1a, 1b
Pull the roller device 21 from the lower part of the lock bodies 1, 1a, 1b respectively.
After pulling out, install these blocks 1, 1a, 1b on the installation surface 11.
I do. Then, in order to the starting block body 1, 1a, 1b
It connects the later blocks 1, 1a, 1b,
At this time, the fall prevention fixed to the later block body 1, 1a, 1b
On the starting block body 1, 1a, 1b side of the stop support 36
Remove the vertical steel material 38 to be placed and remove the starting block body 1, 1a,
Connect to 1b.

【0011】[0011]

【実施例】本発明のコンクリートブロックの据付け方法
を図面を参照して説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A concrete block installation method according to the present invention will be described with reference to the drawings.

【0012】図1ないし図4において、1はそれぞれブ
ロック体としてのカルバート体で、この各カルバート体
1は、コンクリートに図示しない鉄筋やアンカーボルト
等の必要な金具その他を埋設して型枠内で予め成形さ
れ、図3に示すように、底盤2と左右一対の壁盤3と頂
盤4とから成る前後の端面を開口した断面ロ字状の中空
の箱状に形成されている。
In FIGS. 1 to 4, reference numeral 1 denotes a culvert body as a block body. Each culvert body 1 embeds necessary metal fittings such as reinforcing bars and anchor bolts (not shown) in concrete, and is embedded in a formwork. As shown in FIG. 3, it is formed in advance into a hollow box shape having a rectangular cross-section with open front and rear end faces composed of a bottom plate 2, a pair of left and right wall plates 3 and a top plate 4, as shown in FIG.

【0013】このカルバート体1は、それぞれ、図2に
示すように、その前端面の開口部の周囲に凸部7が形成
されているとともに、その後端面の開口部の周囲に凹部
8が形成され、この凸部7と凹部8を嵌合することによ
り、前後に連結して連続的に設置することができ、この
凸部7と凹部8の間には設置時に一方に対して他方を上
下左右に位置調節できる程度の余裕が形成されている。
As shown in FIG. 2, each of the culvert bodies 1 has a convex portion 7 formed around an opening at a front end surface thereof and a concave portion 8 formed around an opening portion at a rear end surface thereof. By fitting the convex portion 7 and the concave portion 8, it is possible to connect the front and rear portions and to continuously install the same. An allowance is provided for adjusting the position.

【0014】なお、上記カルバート体1としては、底盤
2と左右の壁盤3と頂盤4とを始めから断面ロ字状に一
体成形するものの他、壁盤3の中間の水平な分割面Pで
上下に2分割して別個に成形した上下のブロック体とし
てのカルバート体1a,1bを後で組合わせて一体化するも
のもある。
As the culvert body 1, a bottom plate 2, left and right wall plates 3 and a top plate 4 are integrally formed into a rectangular shape in cross section from the beginning, and a horizontal dividing plane P in the middle of the wall plate 3. In some cases, the culvert bodies 1a and 1b as upper and lower block bodies which are separately formed by dividing the upper and lower parts into two parts are later combined and integrated.

【0015】11は上記カルバート体1を連続的に据付け
る設置面で、この設置面11は、栗石を所定の厚さに敷き
詰めた栗石基礎12の上に基礎コンクリート13を打設して
養生することによって形成されている。
Reference numeral 11 denotes an installation surface on which the culvert body 1 is continuously installed. The installation surface 11 is placed on a rubble stone base 12 on which a rubble stone is spread to a predetermined thickness, and is cured by being poured. It is formed by.

【0016】この基礎コンクリート13の打設時に、設置
面11の左右両側部に、補強用の鉄筋14(図1に示す)を
介してそれぞれ一対の断面L形の鋼材15を設置すること
によって、案内溝16を形成し、この左右の案内溝16の底
部に鋼材としての鋼板17を設置して一対の断面L形の鋼
材15にそれぞれ溶接しておく。
When the foundation concrete 13 is cast, a pair of L-shaped steel members 15 are installed on both left and right sides of the installation surface 11 via reinforcing steel bars 14 (shown in FIG. 1). A guide groove 16 is formed, and a steel plate 17 as a steel material is installed at the bottom of the left and right guide grooves 16 and welded to a pair of L-shaped steel materials 15 respectively .

【0017】また、この設置面11の前後方向の両端部に
は鋼材から成る支持枠18,19(図4に示す)をそれぞれ
設置しておく。
Further, keep the support frame 18, 19 at both ends in the longitudinal direction of the setting surface 11 made of steel (shown in FIG. 4) and <br/> respectively installed.

【0018】21はチルタンク(登録商標)等のコロ装置
で、このコロ装置21は、図5にも示すように、トッププ
レート22の下部に左右一対のサイドプレート23を平行に
固定し、この左右一対のサイドプレート23間に前後
部を円弧状に形成したセンタープレート24を水平に固定
し、このセンタープレート24の前後縁部及びこのセン
タープレート24の上下面に左右一対の無端状のチェーン
25で軸着連結した複数のコロ26を転動可能に配置したも
のである。
Reference numeral 21 denotes a roller device such as a chill tank (registered trademark). As shown in FIG. 5, the roller device 21 has a pair of left and right side plates 23 fixed to a lower portion of a top plate 22 in parallel. horizontally secure the center plate 24 forming the front and rear edges in an arc shape between the pair of side plates 23, the front and rear edges and the sensor of the center plate 24
A pair of left and right endless chains on the upper and lower surfaces of the tar plate 24
A plurality of rollers 26 axially connected at 25 are arranged so as to be able to roll.

【0019】このコロ装置21は、左右の案内溝16の底面
を構成する鋼板17の上に2基ずつ配置され、それぞれの
案内溝16に配置された前後一対のコロ装置21は図2に示
す連結板31で連結され、それぞれのコロ装置21のトップ
プレート22の外側部にはカルバート体1の底面を載置
る水平鋼板32が固定され、この水平鋼板32の端部には
カルバート体1の外側面を支持する垂直鋼板33が固定さ
れている。
The roller devices 21 are disposed two on each of the steel plates 17 constituting the bottom surfaces of the left and right guide grooves 16, and a pair of front and rear roller devices 21 disposed in each guide groove 16 are shown in FIG. are connected by a connecting plate 31, the outer portion of the top plate 22 of the respective roller device 21 horizontal steel plate 32 Ru <br/> be placed on the bottom of the culvert body 1 is fixed, the outer end of the horizontal steel plate 32 Is fixed to a vertical steel plate 33 supporting the outer surface of the culvert body 1.

【0020】なお、このコロ装置21は、案内溝16底面の
鋼板17の上を移動する時に、複数のコロ26が、センター
プレート24と鋼板17の間で転動するとともに、チェーン
25によりセンタープレート24の周囲を循環するため、通
常の独立したコロのように、コロ26を手作業で進行方向
の後方から前方に入れ換える必要がなく、しかも、コロ
26の間隔が一定のため、コロ26に掛かる荷重が大きく変
動することがない。
When the roller device 21 moves on the steel plate 17 on the bottom surface of the guide groove 16, the plurality of rollers 26 roll between the center plate 24 and the steel plate 17, and the chain
25 circulates around the center plate 24, so that there is no need to manually change the roller 26 from the rear in the traveling direction to the front as in the case of a normal independent roller.
Since the distance between the rollers 26 is constant, the load applied to the rollers 26 does not greatly fluctuate.

【0021】36は転倒防止用のサポートで、このサポー
ト36は、カルバート体1の底盤2上に水平に固定される
水平鋼材37の前後方向の両端の下部にそれぞれ垂直鋼材
38を取外し可能に取付けたもので、前後の垂直鋼材38の
下端部が上記設置面11に所定の間隔をおいて対向するよ
うになっており、カルバート体1の左右に1つずつ設け
られるようになっている。
Numeral 36 denotes a support for preventing the vehicle from overturning. The support 36 is provided at the lower part of both ends in the front-rear direction of a horizontal steel material 37 fixed horizontally on the bottom plate 2 of the culvert body 1.
38 in which the removable mounted, the lower end portion of the front and rear vertical steel 38 is controlled so as to face each other at predetermined intervals in the installation surface 11, as provided, one on the left and right of the culvert body 1 It has become.

【0022】そうして、上記カルバート体1の設置に際
しては、直前に、図1に示すように、設置面11の基礎コ
ンクリート13の上にカルバート体1を据付けた際の密着
性を確保するためのモルタル41を薄く敷き延ばす。
When the culvert body 1 is installed, immediately before the culvert body 1 is installed on the foundation concrete 13 on the installation surface 11, as shown in FIG. Spread mortar 41 thinly.

【0023】この状態で、図4に示すように、カルバー
ト体1を車載クレーン等のワイヤ42により、設置面11の
後端部に降ろし、予め配置しておいた4基のコロ装置21
のトッププレート22の上にトッププレート22に連結した
左右2枚ずつの垂直鋼板33によって位置合わせした状態
で載置する。
In this state, as shown in FIG. 4, the culvert body 1 is lowered to the rear end of the installation surface 11 by a wire 42 such as a vehicle-mounted crane, and the four roller devices 21 are arranged in advance.
Is placed on the top plate 22 with the two left and right vertical steel plates 33 connected to the top plate 22 in alignment.

【0024】ついで、このカルバート体1の底盤2に左
右一対のサポート36を固定する。
Next, a pair of left and right supports 36 is fixed to the bottom plate 2 of the culvert body 1.

【0025】この後、例えばウインチ等で巻上げる左右
一対のワイヤ43を、設置面11後端部の支持枠19に設けた
左右一対の滑車44から設置面11前端部の支持枠18に設け
た左右一対の滑車45に掛け回した上で、コロ装置21上の
カルバート体1の底盤2に連結し、左右一対のワイヤ43
を均等にゆっくりと巻上げる。
Thereafter, a pair of left and right wires 43 wound up by, for example, a winch is provided from the pair of right and left pulleys 44 provided on the support frame 19 at the rear end of the installation surface 11 to the support frame 18 at the front end of the installation surface 11. After being wrapped around a pair of left and right pulleys 45, it is connected to the bottom plate 2 of the culvert body 1 on the roller device 21, and
Wind slowly and evenly.

【0026】すると、コロ装置21上のカルバート体1
は、設置面11前端部の支持枠18に向かって引込まれ、左
右一対の案内溝16に沿って、コロ装置21を介して移動す
る。また、ウインチなどを用いずに押動することによっ
て左右一対の案内溝16に沿って移動させることもでき
る。
Then, the culvert body 1 on the roller device 21
Is pulled toward the support frame 18 at the front end of the installation surface 11 and moves via the roller device 21 along the pair of left and right guide grooves 16. In addition, it is possible to move along the pair of left and right guide grooves 16 by pushing without using a winch or the like.

【0027】そして、カルバート体1が所定位置まで移
動した状態で、サポート36を取外す。
Then, with the culvert body 1 moved to a predetermined position, the support 36 is removed.

【0028】この後、カルバート体1の左右の外側面に
片側ずつそれぞれ前後一対のジャッキを係合し、この4
基のジャッキを均等に作用させてカルバート体1をジャ
ッキアップして、コロ装置21をカルバート体1の下から
引抜く。
Thereafter, a pair of front and rear jacks are engaged with the culvert body 1 on the left and right outer surfaces, respectively.
The culvert body 1 is jacked up by uniformly operating the base jack, and the roller device 21 is pulled out from under the culvert body 1.

【0029】そうして、このカルバート体1の据付けが
終わったら、上記と同様に、次のカルバート体1を、車
載クレーン等のワイヤ42により設置面11の後端部に降ろ
して、コロ装置21の上に載置し、カルバート体1にサポ
ート36を固定し、カルバート体1をウインチ等で先に据
付けたカルバート体1に向かって引き込む。
After the culvert body 1 has been installed, the next culvert body 1 is lowered to the rear end of the installation surface 11 by a wire 42 such as a vehicle-mounted crane in the same manner as described above. The support 36 is fixed to the culvert body 1 and the culvert body 1 is pulled toward the culvert body 1 previously installed by a winch or the like.

【0030】そして、このカルバート体1のサポート36
が先に据付けたカルバート体1に当りそうになったら、
サポート36の前側の垂直鋼材38を水平鋼材37から取外
し、この後は、上記と同様に、このカルバート体1を所
定位置まで移動して先に据付けたカルバート体1に連結
し、サポート36を完全に取外し、このカルバート体1を
ジャッキアップして、コロ装置21を引抜き、据付け位置
の微調整を行なってカルバート体1を据付ける。
The support 36 of the culvert body 1
Is about to hit the culvert body 1 installed earlier,
The vertical steel material 38 on the front side of the support 36 is removed from the horizontal steel material 37, and thereafter, as described above, the culvert body 1 is moved to a predetermined position and connected to the culvert body 1 previously installed, and the support 36 is completely Then, the culvert body 1 is jacked up, the roller device 21 is pulled out, and the installation position is finely adjusted to install the culvert body 1.

【0031】このようにして、順次に、先発のカルバー
ト体1に後発のカルバート体1を連結する。
In this way, the later culvert 1 is connected to the earlier culvert 1 sequentially.

【0032】上述したように、クレーン車等が移動でき
る位置でカルバート体1を降ろし、このカルバート体1
をその設置面11上で移動してクレーン車等が移動できな
い位置に据付け、順次に先発のカルバート体1に後発の
カルバート体1を連結してボックスカルバートを施工す
る引込み工法において、コロ装置21を用いることによっ
て、カルバート体1の移動が容易にでき、作業の安全を
確保し易くなる。
As described above, the culvert body 1 is lowered at a position where a crane truck or the like can move, and the culvert body 1 is lowered.
In the retracting method in which the culvert body 1 is sequentially connected to the starting culvert body 1 and the box culvert is constructed by sequentially moving the starting culvert body 1 to the position where the crane truck or the like cannot move, the roller device 21 is installed. By using this, the culvert body 1 can be easily moved, and work safety can be easily ensured.

【0033】なお、上述した実施例は、底盤2と左右の
壁盤3と頂盤4とを有する断面ロ字状のカルバート体1
の施工例であるが、一体のカルバート体の据付けができ
ない現場では、断面ロ字状のカルバート体1を壁盤3の
中間の水平な分割面Pで上下に2分割して別個に成形し
た上下のカルバート体1a,1bを別々に施工する。
In the above-described embodiment, the culvert body 1 having a rectangular cross section having a bottom plate 2, left and right wall plates 3 and a top plate 4 is shown.
However, at a site where an integral culvert body cannot be installed, the culvert body 1 having a rectangular cross section is vertically divided into two parts by a middle horizontal dividing plane P of the wall panel 3 and separately formed. Culvert bodies 1a and 1b are separately constructed.

【0034】この場合、下側のカルバート体1bの施工に
ついては、上述した実施例と全く同様である。
In this case, the construction of the lower culvert body 1b is exactly the same as in the above-described embodiment.

【0035】そして、上側のカルバート体1aの施工に際
しては、下側のカルバート体1bの壁盤3の上端面つまり
水平な分割面Pに予め案内溝を形成しておき、施工を完
了して連結した多数の下側のカルバート体1bの壁盤3上
の分割面Pの案内溝に上記鋼板17を設置すると、ここに
コロ装置21を使用することが可能となるので、上側のカ
ルバート体1aの施工を行なうことができる。
When the upper culvert body 1a is constructed, a guide groove is previously formed on the upper end surface of the wall board 3 of the lower culvert body 1b, that is, a horizontal dividing plane P, and the construction is completed and the connection is established. When the steel plate 17 is installed in the guide groove of the dividing plane P on the wall 3 of the large number of lower culvert bodies 1b, the roller device 21 can be used here. Construction can be performed.

【0036】上述した実施例では、案内溝16の形成に、
一対の断面L形の鋼材15と鋼板17を用いたが、始めから
断面コ字状の鋼材を使用してもよい。
In the embodiment described above, the formation of the guide groove 16
Although a pair of L-shaped steel material 15 and steel plate 17 are used, a steel material having a U-shaped cross section may be used from the beginning.

【0037】[0037]

【発明の効果】上述したように、本発明によれば、予め
成形した複数のコンクリート製のブロック体を連続的に
設置する際のブロック体の移動に、コロ装置を用いるの
で、ブロック体の移動が容易であるがこの際、コロ装
置のトッププレート上にブロック体を載置し、このブロ
ック体の下端部を設置面に対向させた垂直鋼材を両側に
取外し可能に取付けた水平鋼材を有する転倒防止用のサ
ポートを固定したので、ブロック体の移動時にブロック
体が振動等により傾いた場合にはこのブロック体の傾い
た方向の垂直鋼材の下端部が設置面に接地してブロック
体を支え、したがって、このサポートにてブロック体の
移動時にブロック体が転倒することを確実に防止でき、
作業の安全性を確保し易くなる。また、先発のブロック
体に後発のブロック体を連結する際に後発のブロック体
に固定した転倒防止用のサポートの先発のブロック体側
に位置する垂直鋼材を取外して先発のブロック体に連結
するので、先発のブロック体に後発のブロック体を設置
位置に確実に間断なく連続的に連結して据付けることが
できる。
As described above, according to the present invention, a roller device is used for moving a plurality of preformed concrete blocks when the blocks are successively installed. While it is easy, at this time, the roller instrumentation
Place the block on the top plate of the
Vertical steel material with the lower end of the rack body facing the installation surface
Removable horizontal support with horizontal steel
Since the port is fixed, block when moving the block
If the body is tilted due to vibration, etc.
The vertical end of the vertical steel material in the direction
Supports the body, so this support
The block body can be prevented from falling over when moving,
It is easier to ensure work safety. Also, starting blocks
When connecting the late block body to the body, the late block body
Starter block side of fall prevention support fixed to the
Remove the vertical steel material located at
So, install the late block body on the first block body
It can be connected and installed continuously without interruption
it can.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のコンクリートブロックの据付け方法の
一実施例の施工状態の正面視拡大断面図である。
FIG. 1 is an enlarged front view sectional view of a concrete block installation method according to an embodiment of the present invention in a construction state.

【図2】同上実施例の施工状態の側面視拡大断面図であ
る。
FIG. 2 is an enlarged sectional view in a side view of a working state of the embodiment.

【図3】同上実施例の施工状態の正面視断面図である。FIG. 3 is a front sectional view of the working example of the embodiment.

【図4】同上実施例の施工状態の側面視断面図である。FIG. 4 is a side sectional view of the working state of the embodiment.

【図5】同上実施例の施工に用いたコロ装置の斜視図で
ある。
FIG. 5 is a perspective view of a roller device used for construction of the embodiment.

【符号の説明】[Explanation of symbols]

1,1a,1b ブロック体としてのカルバート体 11 設置面 16 案内溝 17 鋼材としての鋼板 21 コロ装置22 トッププレート 24 センタープレート 25 チェーン 26 コロ36 転倒防止用のサポート 37 水平鋼材 38 垂直鋼材 1, 1a, 1b Culvert body as block body 11 Installation surface 16 Guide groove 17 Steel plate as steel material 21 Roller device 22 Top plate 24 Center plate 25 Chain 26 Roller 36 Roller prevention support 37 Horizontal steel material 38 Vertical steel material

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 予め成形した複数のコンクリート製のブ
ロック体を連続的に設置位置に据付けるコンクリートブ
ロックの据付け方法であって、 前後縁部を円弧状に形成したセンタープレートの上記
前後縁部及びこのセンタープレートの上下面に無端状
のチェーンで連結した複数のコロを転動可能に配置し
つ上記複数のコロを介して上記センタープレートの上方
に上記ブロック体を載置するトッププレートを有する
ロ装置を用い、上記 ブロック体を載置する設置面の両側部に少なくとも
底面を鋼材とした案内溝をそれぞれ設け、この両側の案
内溝の底面に上記コロ装置をそれぞれ配置し、この
側のコロ装置の上記トッププレート上にブロック体を載
置し、このブロック体に下端部を上記設置面に対向させ
た垂直鋼材を両側に取外し可能に取付けた水平鋼材を有
する転倒防止用のサポートを固定し、このブロック体を
両側のコロ装置を介して両側の案内溝に沿って移動し、
所定の位置に移動したブロック体から上記転倒防止用の
サポートを取外し、このブロック体をジャッキアップし
このブロック体の下部からコロ装置をそれぞれ引抜い
た後、このブロック体を上記設置面に設置し、順次に先
発のブロック体に後発のブロック体を連結する際に後発
のブロック体に固定した転倒防止用のサポートの先発の
ブロック体側に位置する垂直鋼材を取外して先発のブロ
ック体に連結することを特徴とするコンクリートブロッ
クの据付け方法。
1. A preformed a plurality of concrete block member has a mounting method of continuously concrete blocks Ru installed to the installation position, said center plate to form a front and rear end edges in a circular arc shape <br / > or a plurality of rollers coupled with endless chain on the upper and lower surfaces of the front and rear edges and the center plate rollably arranged
Above the center plate through the plurality of rollers
The use of a co <br/> b device having a top plate for placing the block body, respectively at least the bottom surface of the steel with a guide groove on both sides of the installation surface disposing the block body, the sides the roller device is arranged on the bottom surface of the guide groove, the two
A block body is placed on the top plate of the roller device on the side, and the lower end of the block body is opposed to the installation surface.
Horizontal steel with detachable vertical steel on both sides
Fix the support to prevent falling
It moves along the guide grooves on both sides through the roller devices on both sides ,
From block body that has moved to a predetermined position for the anti-tip
Support removed, subsequent to the block body after the roller device was withdrawn each <br/> from the lower portion of the block body jacked up, the block body into the block body installed sequentially starting with the installation surface When connecting the block body of
Starter of fall prevention support fixed to the block body
Remove the vertical steel material located on the block body side and
A concrete block installation method characterized by being connected to a block body .
JP3104444A 1991-05-09 1991-05-09 How to install concrete blocks Expired - Lifetime JP2655762B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3104444A JP2655762B2 (en) 1991-05-09 1991-05-09 How to install concrete blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3104444A JP2655762B2 (en) 1991-05-09 1991-05-09 How to install concrete blocks

Publications (2)

Publication Number Publication Date
JPH0571159A JPH0571159A (en) 1993-03-23
JP2655762B2 true JP2655762B2 (en) 1997-09-24

Family

ID=14380818

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3104444A Expired - Lifetime JP2655762B2 (en) 1991-05-09 1991-05-09 How to install concrete blocks

Country Status (1)

Country Link
JP (1) JP2655762B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4577910B1 (en) * 2010-07-14 2010-11-10 鶴見コンクリート株式会社 Conveying device, conveying system, and method for conveying object

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3481665B2 (en) * 1994-03-24 2003-12-22 藤村ヒューム管株式会社 Laying concrete blocks
JP3453564B2 (en) * 2001-02-23 2003-10-06 安藤建設株式会社 Continuous construction method of tunnel block
JP2003129555A (en) * 2001-10-29 2003-05-08 Tsurumi Concrete Kk Carrying method for concrete block and its equipment
JP2003343001A (en) * 2002-05-27 2003-12-03 Kayaba Engineering & Service Kk Transfer structure of box culvert
JP4036178B2 (en) * 2003-10-02 2008-01-23 羽田コンクリート工業株式会社 Method and apparatus for installing concrete block
JP5970303B2 (en) * 2012-09-05 2016-08-17 ジオスター株式会社 Tubing body laying method
JP2018178668A (en) * 2017-04-21 2018-11-15 佐々木 洋二 Overturning preventing device of concrete secondary product and construction method of concrete secondary product
JP7178243B2 (en) * 2017-12-27 2022-11-25 戸田建設株式会社 Tunnel lining construction method
JP7304033B2 (en) * 2019-08-29 2023-07-06 藤村クレスト株式会社 Precast base plate and method for laying concrete block using same

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54112533A (en) * 1978-02-22 1979-09-03 Shizuka Ishiguro Box culvert connecting installing device
JPS5918830A (en) * 1982-07-21 1984-01-31 水谷建設株式会社 Installation of box culvert
JPH0111825Y2 (en) * 1985-08-08 1989-04-06
JPS6244999U (en) * 1985-08-30 1987-03-18

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4577910B1 (en) * 2010-07-14 2010-11-10 鶴見コンクリート株式会社 Conveying device, conveying system, and method for conveying object
JP2012021317A (en) * 2010-07-14 2012-02-02 Tsurumi Concrete Kk Conveyance device, conveyance system and conveyance method of object to be conveyed

Also Published As

Publication number Publication date
JPH0571159A (en) 1993-03-23

Similar Documents

Publication Publication Date Title
DE2501207A1 (en) METHOD AND DEVICE FOR THE CONSTRUCTION OF A MULTI-FLOOR BUILDING
JP2655762B2 (en) How to install concrete blocks
US3574905A (en) Device for successively building concrete structures
CN111074893B (en) Construction system and construction method for concrete cushion layer of river dike and dyke
CN211849855U (en) Gravity type slip form system for cast-in-place concrete trapezoid open trench
US3643908A (en) Apparatus for casting large monolithic structures
JPH0745800B2 (en) Method and apparatus for installing precast plate for tunnel
CN211849445U (en) Construction system of river levee dam concrete bed course
JP3166899B2 (en) Inner formwork for caisson construction and its lift-up method
JP2874573B2 (en) Rail foundation and its repair method
CN110965628A (en) Gravity type slip form system for cast-in-place concrete trapezoid open trench
JP2002146760A (en) Floating type form supporting and construction method for water-surface building
JP4748755B2 (en) Concrete formwork construction method
JPH0396598A (en) Movable form for tunnel
JP2799793B2 (en) Formwork equipment for retaining wall construction
JPH0639878B2 (en) Moving mechanism for mobile formwork for lining
JP2001164586A (en) Jack-up method for drive-into working platform and jack- up device therefor
JPS60258311A (en) Construction of high structure
CN220847182U (en) Cover plate culvert movable template device
JP3048259B2 (en) Multi-stage construction method and formwork system for concrete structures
JPH0745753B2 (en) Construction method of concrete drainage ditch
JPH0745799B2 (en) Method and apparatus for installing precast plate for tunnel
CN114251106A (en) Integral inverted arch end steel die convenient to mount and dismount and construction method
JP2000160834A (en) Step-up construction of concrete caisson
JPH0762354B2 (en) Construction method of large concrete block

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090530

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100530

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110530

Year of fee payment: 14

EXPY Cancellation because of completion of term