Tower crane and climbing method thereofInfo
- Publication number
- JP2643663B2 JP2643663B2 JP3167400A JP16740091A JP2643663B2 JP 2643663 B2 JP2643663 B2 JP 2643663B2 JP 3167400 A JP3167400 A JP 3167400A JP 16740091 A JP16740091 A JP 16740091A JP 2643663 B2 JP2643663 B2 JP 2643663B2
- Authority
- JP
- Japan
- Prior art keywords
- frame
- guide frame
- crane
- mast
- tower crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Jib Cranes (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、鉄骨柱を備えた建造物
躯体を構築する際に用いるタワークレーンおよびそのク
ライミング方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tower crane used for constructing a building having a steel column and a climbing method thereof.
【0002】[0002]
【従来の技術】一般に、RC構造の高層ビルディング等
の建造物躯体を構築する際、タワークレーンと称される
塔型のクレーンが用いられている。このタワークレーン
は、地上に設置される台座と、この台座から立設される
マスト、そしてこのマストの頂部に設置されるクレーン
本体、このクレーン本体をマストに沿って昇降させるク
ライミング装置等を備えて構成されている。2. Description of the Related Art Generally, a tower-type crane called a tower crane is used when building a building such as a high-rise building having an RC structure. This tower crane includes a pedestal installed on the ground, a mast erected from the pedestal, a crane body installed on the top of the mast, a climbing device that moves the crane body up and down along the mast, and the like. It is configured.
【0003】また、前記クライミング装置は、例えば、
マストに係脱可能に取り付けた上下一対の昇降フレーム
と、これら一対の昇降フレーム間に取り付けられた油圧
シリンダ等の伸縮駆動手段とを備えて構成され、この伸
縮駆動手段を伸縮作動させると共に、一対の昇降フレー
ムをマストに交互に係止および離脱させることにより、
ビルディング建設の進行に合わせて適宜クレーン本体を
クライミング(上昇)させるようになっている。[0003] The climbing device is, for example,
A pair of upper and lower elevating frames removably attached to the mast, and telescopic driving means such as a hydraulic cylinder mounted between the pair of elevating frames. By alternately locking and releasing the lifting frame of the mast from the mast,
The crane body is climbed (elevated) as appropriate as the building construction progresses.
【0004】ところで、一般に前記タワークレーンはそ
のマストを構築しようとする高層ビルディングの外方に
立設してその側方に設置するようにしていたため、タワ
ークレーン自体の持つ有効作業範囲が充分に活用されて
おらず、その実質的な作業範囲は著しく狭められている
といった状況にあった。そこで近年、特開昭64−29
94号公報(Int.Cl.B66C 23/32 )等に開示されている
ように、高層ビルディングの骨組の内方に前記マストを
設置することによって、タワークレーンのもつ有効作業
範囲を広く活用すると共に、養生が完了した下層階にマ
ストを支持させて、その支持剛性の増大を図ることが行
われている。[0004] Generally, the tower crane is erected outside a high-rise building on which the mast is to be constructed, and is installed on the side of the tower, so that the effective working range of the tower crane itself is fully utilized. And the actual scope of work was narrowed significantly. In recent years, Japanese Patent Laid-Open No. 64-29
As disclosed in Japanese Patent Publication No. 94 (Int. Cl. B66C 23/32) and the like, by installing the mast inside the framework of a high-rise building, the effective working range of the tower crane can be widely utilized. On the other hand, the mast is supported on the lower floor after the curing is completed, and the support rigidity is increased.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、かかる
従来のタワークレーンにあっては、マストを構築しよう
とする高層ビルディングの外部又は内部に設置するいず
れのタイプにあっても、地上に台座を設けてこれにマス
トを立設する関係上、このマストは著しく長大化するこ
とになる。従って、当該マストに充分な剛性を与えれば
必然的に当該マストは著しく巨大化し、もって大幅なコ
スト高が余儀無くされるばかりか、その据え付けに時間
を要して工期の長期化が来されてしまうという各種課題
があった。However, in such a conventional tower crane, a pedestal is provided on the ground regardless of which type is installed outside or inside a high-rise building on which a mast is to be constructed. Since the mast is erected on this mast, the mast becomes extremely long. Therefore, if the mast is given sufficient rigidity, the mast inevitably becomes extremely large, which not only necessitates a great increase in cost, but also requires a long time for its installation and a long construction period. There were various issues.
【0006】本発明はかかる従来の課題に鑑みてなされ
たものであり、その目的は、建造物躯体の一部の鉄骨柱
をマストとして利用することによって、充分な剛性を確
保しつつ構造の著しい簡略化が図れ、コストの低減と工
期の短縮化とを達成し得るタワークレーンおよびそのク
ライミング方法を提供することにある。The present invention has been made in view of such a conventional problem, and an object of the present invention is to use a part of a steel frame of a building frame as a mast to secure a sufficient rigidity while securing sufficient rigidity. It is an object of the present invention to provide a tower crane and a climbing method thereof that can be simplified and can achieve a reduction in cost and a shortened construction period.
【0007】[0007]
【課題を解決するための手段】かかる目的を達成するた
めに本発明のタワークレーンは、建造物躯体の一部の鉄
骨柱を他の鉄骨柱に先行して構築し、この先行した鉄骨
柱の外側を囲繞してガイドフレームを着脱可能に取り付
け、このガイドフレームを取り付けた鉄骨柱をタワーク
レーンのマストとし、このマストの頂部にクレーン本体
を設置すると共に、このクレーン本体とガイドフレーム
との間にクライミング装置を設けることにより構成す
る。In order to achieve the above object, a tower crane according to the present invention has a structure in which a part of a steel column of a building frame is constructed before another steel column, and the steel column of the preceding steel column is constructed. A guide frame is detachably mounted around the outside, and the steel column to which the guide frame is attached is used as a mast of the tower crane.The crane body is installed on the top of the mast, and the crane body and the guide frame are located between the mast and the guide frame. It is configured by providing a climbing device.
【0008】また、前記クライミング装置はクレーン本
体の下側に取り付け、ガイドフレームに対し上下移動可
能な上部昇降フレームと、この上部昇降フレームの下側
に適宜間隔をもって配置されてガイドフレームに対し上
下移動可能な下部昇降フレームと、これら上部昇降フレ
ームおよび下部昇降フレームをガイドフレームにそれぞ
れ係脱可能に係止する係脱手段と、上部昇降フレームと
下部昇降フレームとの間に設ける伸縮駆動手段とを備え
て構成することが望ましい。The climbing device is attached to the lower side of the crane main body and is vertically movable with respect to the guide frame. The climbing device is disposed at an appropriate distance below the upper and lower frame to move vertically with respect to the guide frame. A possible lower elevating frame, disengaging means for engaging and disengaging the upper elevating frame and the lower elevating frame with the guide frame, and telescopic driving means provided between the upper elevating frame and the lower elevating frame. It is desirable to configure it.
【0009】更に、本発明のタワークレーンのクライミ
ング方法にあっては、前記下部昇降フレームをガイドフ
レームに係止した後、前記上部昇降フレームをガイドフ
レームから離脱し、この状態で前記伸縮駆動手段を伸長
して上部昇降フレームを上昇させ、次に、上部昇降フレ
ームをガイドフレームに係止した後、下部昇降フレーム
をガイドフレームから離脱し、この状態で伸縮駆動手段
を短縮して下部昇降フレームを上昇させる。Further, in the climbing method for a tower crane according to the present invention, after the lower elevating frame is locked to the guide frame, the upper elevating frame is detached from the guide frame. Extend and raise the upper lifting frame, then lock the upper lifting frame to the guide frame, then detach the lower lifting frame from the guide frame, and in this state shorten the telescopic drive means to raise the lower lifting frame Let it.
【0010】[0010]
【作用】以上の構成により本発明のタワークレーンにあ
っては、建造物躯体の一部の鉄骨柱の外側にガイドフレ
ームを取り付けることにより当該鉄骨柱をマストとして
利用するので、別途に独立したマストを設置する必要が
なく、構成の大幅な簡略化および部品点数の削減を達成
することができる。そして、前記鉄骨柱たるマストの頂
部にクレーン本体を設置することにより、このクレーン
本体の有効作業範囲を充分有効に活用することができ
る。また、前記クレーン本体のクライミングは、このク
レーン本体とガイドフレームとの間に設けたクライミン
グ装置により行うことができる。According to the tower crane of the present invention having the above-described structure, the steel column is used as a mast by attaching a guide frame to the outside of a part of the steel frame of the building frame. It is not necessary to install the components, so that the configuration can be greatly simplified and the number of parts can be reduced. By installing the crane main body on the top of the mast, which is a steel column, the effective working range of the crane main body can be utilized sufficiently effectively. The climbing of the crane body can be performed by a climbing device provided between the crane body and the guide frame.
【0011】また、前記クライミング装置は、クレーン
本体の下側に取り付け、ガイドフレームに対し上下移動
可能な上部昇降フレームと、この上部昇降フレームの下
側に適宜間隔をもって配置され、ガイドフレームに対し
上下移動可能な下部昇降フレームと、これら上部昇降フ
レームおよび下部昇降フレームを、ガイドフレームにそ
れぞれ係脱可能に取り付ける係脱手段と、上部昇降フレ
ームと下部昇降フレームとの間に設ける伸縮駆動手段と
を備えて構成することにより、簡単にクライミングを行
うことができる。The climbing device is mounted on the lower side of the crane main body, and is vertically movable with respect to the guide frame. The climbing device is disposed below the upper vertical frame with an appropriate space therebetween. A movable lower elevating frame, engaging and disengaging means for detachably attaching the upper elevating frame and the lower elevating frame to the guide frame, and telescopic driving means provided between the upper elevating frame and the lower elevating frame. With this configuration, climbing can be easily performed.
【0012】更に、かかる構成となるクライミング装置
を用いたクレーン本体のクライミング方法では、前記下
部昇降フレームをガイドフレームに係止した後、前記上
部昇降フレームをガイドフレームから離脱し、この状態
で前記伸縮駆動手段を伸長して上部昇降フレームを上昇
し、次に、上部昇降フレームをガイドフレームに係止し
た後、下部昇降フレームをガイドフレームから離脱し、
この状態で伸縮駆動手段を短縮して下部昇降フレームを
上昇することにより、クレーン本体を効率良くかつ迅速
に上昇させることができる。Further, in the method of climbing a crane body using the climbing device having the above-described structure, the lower elevating frame is locked to the guide frame, and then the upper elevating frame is detached from the guide frame. Extend the drive means to raise the upper lifting frame, and then, after locking the upper lifting frame to the guide frame, detach the lower lifting frame from the guide frame,
In this state, the crane body can be efficiently and quickly raised by shortening the telescopic drive means and raising the lower lifting frame.
【0013】[0013]
【実施例】以下本発明の実施例を図に基づいて詳細に説
明する。図1から図8は本発明にかかるタワークレーン
の一実施例を示し、図1は全体構成図、図2は要部拡大
図、図3は鉄骨柱の要部構成図、図4は図3中A−A線
断面図、図5は図2中B−B線断面図、図6は図2中C
−C線断面図、図7は図2中D−D線断面図である。
本実施例のタワークレーン10は図1,図2に示したよ
うに、建築中にある建造物躯体としてのビルディング1
2の一部の鉄骨柱14を、他の鉄骨柱14aに先行して
構築し、この先行した鉄骨柱14の外側を囲繞してガイ
ドフレーム16を着脱可能に取り付け、このガイドフレ
ーム16を取り付けた鉄骨柱14をタワークレーン10
のマスト18とする。そして、前記マスト18の頂部に
クレーン本体20を設置すると共に、このクレーン本体
20とマスト18との間にクライミング装置22を設け
る。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 8 show an embodiment of a tower crane according to the present invention, FIG. 1 is an overall configuration diagram, FIG. 2 is an enlarged view of a main part, FIG. 3 is a main part configuration diagram of a steel column, and FIG. 2 is a sectional view taken along line AA, FIG. 5 is a sectional view taken along line BB in FIG. 2, and FIG.
7 is a sectional view taken along line DD in FIG. 2.
As shown in FIGS. 1 and 2, the tower crane 10 of the present embodiment is a building 1 as a building body under construction.
A part of the steel column 14 was constructed before the other steel column 14a, and a guide frame 16 was removably attached around the outside of the preceding steel column 14 and the guide frame 16 was attached. The steel column 14 is connected to the tower crane 10
Mast 18. Then, a crane body 20 is installed on the top of the mast 18, and a climbing device 22 is provided between the crane body 20 and the mast 18.
【0014】前記鉄骨柱14は、図3,図4に示したよ
うに断面が円形となる筒状体として形成され、この鉄骨
柱14の外側には前記ガイドフレーム16が方形状に囲
繞される。前記鉄骨柱14の外側には、周方向に直角関
係をもって一体に突設する4枚のブラケット24を、上
下方向に一定間隔を保って複数設けられる。一方、前記
ガイドフレーム16は一定の長さ(例えば、1階分の階
高に等しい長さ)に形成した多数の矩形状のフレーム単
体16aを設け、このフレーム単体16aの幅方向両側
を前記ブラケット24にピン26を介して着脱可能に取
り付ける。The steel column 14 is formed as a cylindrical body having a circular cross section as shown in FIGS. 3 and 4, and the guide frame 16 is surrounded by a square outside the steel column 14. . On the outside of the steel column 14, a plurality of four brackets 24 integrally projecting at right angles in the circumferential direction are provided at regular intervals in the vertical direction. On the other hand, the guide frame 16 is provided with a large number of rectangular frame units 16a formed to have a fixed length (for example, a length equal to the height of one floor). It is detachably attached to 24 via a pin 26.
【0015】前記クレーン本体20は、クレーン本体2
0を支持する旋回受フレーム28,クレーン本体20を
回転可能に支持する旋回リング30,クレーンブーム3
2を取り付けた旋回架構34および巻上機構36等を備
えて構成する。前記旋回受フレーム28は図5に示した
ように、前記ガイドフレーム16の外側に沿って井桁状
に形成され、この旋回受フレーム28の下側には4本の
ガイドマスト38を一体に垂設し、このガイドマスト3
8の下端部に前記クライミング装置22を取り付ける。The crane body 20 includes a crane body 2
0, a swing ring 30 that rotatably supports the crane body 20, and a crane boom 3.
2 and a hoisting mechanism 36 and the like. As shown in FIG. 5, the swing receiving frame 28 is formed in a girder shape along the outside of the guide frame 16, and four guide masts 38 are integrally suspended below the swing receiving frame 28. And this guide mast 3
The climbing device 22 is attached to the lower end of the climbing device 8.
【0016】前記クライミング装置22は、前記ガイド
マスト38に取り付け、前記ガイドフレーム16に対し
上下移動可能な上部昇降フレーム40と、この上部昇降
フレーム40の下側に適宜間隔をもって配置され、ガイ
ドフレーム16に対し上下移動可能な下部昇降フレーム
42とを備える。これら上部昇降フレーム40および下
部昇降フレーム42は、ガイドフレーム16にそれぞれ
係脱可能に取り付ける係脱手段としての上部かんぬき4
4および下部かんぬき46を設ける。また、前記上部昇
降フレーム40と前記下部昇降フレーム42との間に
は、伸縮駆動手段としての油圧シリンダ48を設けてあ
る。The climbing device 22 is mounted on the guide mast 38 and is vertically movable with respect to the guide frame 16. The upper climbing frame 40 is disposed below the upper lifting frame 40 at appropriate intervals. And a lower elevating frame 42 that can move up and down. The upper lifting frame 40 and the lower lifting frame 42 are connected to the guide frame 16 so as to be removably attached to the upper latch 4 as an engaging / disengaging means.
4 and a lower latch 46 are provided. A hydraulic cylinder 48 is provided between the upper lifting frame 40 and the lower lifting frame 42 as a telescopic drive unit.
【0017】前記上部昇降フレーム40は、図6に示し
たように前記ガイドフレーム16の外側に沿って井桁状
に形成した上部フレーム本体50を備え、この井桁状の
上部フレーム本体50を介してガイドフレーム16に上
下移動可能に嵌合される。また、前記下部昇降フレーム
42は前記上部昇降フレーム40と同様に、図7に示し
たようにガイドフレーム16の外側に沿った井桁状の下
部フレーム本体52を備え、この井桁状の下部フレーム
本体52がガイドフレーム16に上下移動可能に嵌合さ
れる。As shown in FIG. 6, the upper lifting frame 40 has an upper frame main body 50 formed in a cross-girder shape along the outside of the guide frame 16, and guides through the upper girder upper frame main body 50. The frame 16 is vertically movably fitted. 7, the lower lifting frame 42 includes a cross-shaped lower frame body 52 along the outside of the guide frame 16 as shown in FIG. Are fitted to the guide frame 16 so as to be vertically movable.
【0018】前記上部かんぬき44および前記下部かん
ぬき46は、本実施例ではそれぞれ油圧シリンダとして
構成し、前記上部フレーム本体50および下部フレーム
本体52に対向させて設ける。また、前記伸縮駆動手段
としての油圧シリンダ48は、その作動ストロークが略
1階分の階高に等しく設定されている。前記上部,下部
かんぬき44,46および前記油圧シリンダ48には、
前記上部昇降フレーム40に設けた油圧制御装置54か
ら制御油圧が供給されるようになっている。尚、前記ガ
イドフレーム16には上記上部,下部かんぬき44,4
6の係合部が設けられている。The upper latch 44 and the lower latch 46 are each configured as a hydraulic cylinder in this embodiment, and are provided to face the upper frame main body 50 and the lower frame main body 52. The operating stroke of the hydraulic cylinder 48 as the telescopic drive means is set to be substantially equal to the floor height of one floor. The upper and lower latches 44 and 46 and the hydraulic cylinder 48 include:
Control hydraulic pressure is supplied from a hydraulic control device 54 provided in the upper lifting frame 40. The guide frame 16 has the upper and lower latches 44 and 4 attached thereto.
6 engaging portions are provided.
【0019】以上の構成によるタワークレーン10で
は、まず、他の鉄骨柱14aに先行して特定の鉄骨柱1
4を高く構築し、この鉄骨柱14の上端部に適宜長さに
亘ってガイドフレーム16を取り付け、これをマスト1
8とする。そして、前記マスト18の頂部にクレーン本
体20を設置すると共に、このクレーン本体20の下側
にクライミング装置22を取り付ける。この状態でクレ
ーン本体20は作業できる状態となり、各種資材を地上
から揚重してビルディングの骨組を逐次積層していく。
このとき、前記マスト18に用いた鉄骨柱14は構築し
ようとするビルディングの内部に位置するため、前記ク
レーン本体20はその周方向に沿った有効作業範囲の全
域に亘って充分に活用され得るようになり、資材の揚重
等の作業能率の著しい向上を達成できるようになる。In the tower crane 10 having the above configuration, first, a specific steel column 1 is preceded by another steel column 14a.
4 is constructed high, and a guide frame 16 is attached to the upper end of the steel column 14 over an appropriate length.
8 is assumed. Then, the crane main body 20 is installed on the top of the mast 18, and a climbing device 22 is attached below the crane main body 20. In this state, the crane body 20 is ready for work, and various materials are lifted from the ground to sequentially stack the building frames.
At this time, since the steel column 14 used for the mast 18 is located inside the building to be constructed, the crane body 20 can be fully utilized over the entire effective working range along the circumferential direction. It is possible to achieve a remarkable improvement in work efficiency such as lifting of materials.
【0020】そして、作業の進行に伴って前記クレーン
本体20を持ち上げる必要が生じたときは、まず、クレ
ーン本体20を取り付けた状態でマスト18の上端に鉄
骨柱12を接合し、この継ぎ足した鉄骨柱12の外側に
ガイドフレーム16を取り付ける。尚、この継ぎ足した
鉄骨柱12に取り付けるガイドフレーム16は、この鉄
骨柱12の下端部に取り付けてある不要になったガイド
フレーム16を取り外して用いることができる。そし
て、前記クライミング装置22を作動することにより、
クレーン本体20のクライミングを行う。When the crane body 20 needs to be lifted with the progress of the work, first, the steel column 12 is joined to the upper end of the mast 18 in a state where the crane body 20 is attached. The guide frame 16 is attached to the outside of the column 12. The guide frame 16 attached to the added steel column 12 can be used by removing the unnecessary guide frame 16 attached to the lower end of the steel column 12. Then, by operating the climbing device 22,
The climbing of the crane body 20 is performed.
【0021】前記クライミング装置22の作動は、ま
ず、下部かんぬき46をガイドフレーム16に係合して
下部昇降フレーム42をガイドフレーム16に係止した
後、上部かんぬき44をガイドフレーム16から離脱し
て上部昇降フレーム40をガイドフレーム16に対し相
対移動可能とする。この状態で油圧シリンダ48を伸長
して上部昇降フレーム40と共にクレーン本体20を上
昇させる。次に、上部昇降フレーム40を上部かんぬき
44を介してガイドフレーム16に係止した後、下部か
んぬき46を離脱して下部昇降フレーム42をガイドフ
レーム16に移動可能とする。この状態で油圧シリンダ
48を短縮して下部昇降フレーム42を上昇させる。そ
の後は下部昇降フレーム42を下部かんぬき46を介し
てガイドフレーム16に係止しておく。このクライミン
グ方法を繰り返すことによりクレーン本体20をその都
度上昇させることができる。The operation of the climbing device 22 is as follows. First, the lower latch 46 is engaged with the guide frame 16 to lock the lower lifting frame 42 to the guide frame 16, and then the upper latch 44 is detached from the guide frame 16. The upper lifting frame 40 is relatively movable with respect to the guide frame 16. In this state, the hydraulic cylinder 48 is extended to raise the crane body 20 together with the upper lifting frame 40. Next, after the upper lifting frame 40 is locked to the guide frame 16 via the upper latch 44, the lower latch 46 is detached so that the lower lifting frame 42 can be moved to the guide frame 16. In this state, the hydraulic cylinder 48 is shortened and the lower lifting frame 42 is raised. Thereafter, the lower lifting frame 42 is locked to the guide frame 16 via the lower latch 46. By repeating this climbing method, the crane body 20 can be raised each time.
【0022】以上のように本実施例のタワークレーン1
0にあっては、ビルディング12の一部の鉄骨柱14の
外側にガイドフレーム16を取り付けることにより当該
鉄骨柱14をマスト18として利用する構成としたの
で、タワークレーン10自体の本来の構成を著しく簡略
化して、部品点数の大幅な削減を達成することができ
る。また、このようにビルディング12の一部の鉄骨柱
14をマスト18として利用したので、このマスト18
の頂部に設置するクレーン本体20をビルディング12
の内部に配置することができ、タワークレーン10の有
効作業範囲の全域に亘ってこれを充分に活用して資材の
揚重等を効率良く行うことができる。更に、タワークレ
ーン10の構成を簡略化することにより、このタワーク
レーン10の設置を簡単に行い、延いては、工期の短縮
化を達成することができる。As described above, the tower crane 1 of the present embodiment
In the case of No. 0, since the steel frame 14 is used as the mast 18 by attaching the guide frame 16 to the outside of a part of the steel frame 14 of the building 12, the original structure of the tower crane 10 itself is significantly reduced. By simplification, a significant reduction in the number of parts can be achieved. Since a part of the steel column 14 of the building 12 was used as the mast 18 in this way,
Crane body 20 installed on the top of the building 12
Can be efficiently used over the entire effective working range of the tower crane 10 to efficiently lift materials and the like. Furthermore, by simplifying the configuration of the tower crane 10, the installation of the tower crane 10 can be performed easily, and the construction period can be shortened.
【0023】また、前記クレーン本体20のクライミン
グは、このクレーン本体20とマスト18との間に設け
たクライミング装置22により行うが、このクライミン
グ装置22によるクライミングは、上部昇降フレーム4
0と下部昇降フレーム42をガイドフレーム16に交互
に係脱すると共に、これら両昇降フレーム40,42間
に設けた油圧シリンダ48を伸縮するという簡単な方法
であるため、クレーン本体20のクライミングを効率良
くかつ迅速に行うことができる。The climbing of the crane body 20 is performed by a climbing device 22 provided between the crane body 20 and the mast 18. The climbing by the climbing device 22 is performed by the upper lifting frame 4
0 and the lower lifting frame 42 are alternately engaged with and disengaged from the guide frame 16 and the hydraulic cylinder 48 provided between the lifting frames 40 and 42 is expanded and contracted. Can be done well and quickly.
【0024】[0024]
【発明の効果】以上説明したように本発明のタワークレ
ーンは、建造物躯体の一部の鉄骨柱の外側にガイドフレ
ームを取り付けることにより当該鉄骨柱をマストとして
利用し、このマストの頂部にクレーン本体を設置したの
で、タワークレーンとしての構成を著しく簡単化し、部
品点数の大幅な削減を行うことができる。また、このこ
とによりタワークレーンの設置を簡単化し、工期の短縮
化を達成できる。更に、前記鉄骨柱をマストとしたその
頂部にクレーン本体を設置することにより、このクレー
ン本体の有効作業範囲の全域に亘ってこれを充分に活用
して資材の揚重等を効率良く行うことができる。As described above, the tower crane of the present invention utilizes the steel column as a mast by attaching a guide frame to the outside of a steel column of a part of the building frame, and uses the crane on the top of the mast. Since the main body is installed, the configuration as a tower crane is significantly simplified, and the number of parts can be significantly reduced. This also simplifies installation of the tower crane and shortens the construction period. Furthermore, by installing the crane main body on the top of the mast made of the steel column, the crane main body can be fully utilized over the entire effective working range of the crane body to efficiently lift materials and the like. it can.
【0025】また、前記クレーン本体のクライミング装
置を、クレーン本体の下側に取り付け、ガイドフレーム
に対し上下移動可能な上部昇降フレームと、この上部昇
降フレームの下側に適宜間隔をもって配置され、ガイド
フレームに対し上下移動可能な下部昇降フレームと、こ
れら上部昇降フレームおよび下部昇降フレームを、ガイ
ドフレームにそれぞれ係脱可能に取り付ける係脱手段
と、上部昇降フレームと下部昇降フレームとの間に設け
る伸縮駆動手段とを備えて構成し、上部昇降フレームと
下部昇降フレームをガイドフレームに交互に係脱すると
共に、前記伸縮駆動手段を伸縮するという簡単な方法で
クレーン本体をクライミングすることができるため、ク
レーン本体のクライミングを簡単かつ迅速に行うことが
できるという各種優れた効果を奏する。The climbing device of the crane main body is attached to the lower side of the crane main body, and an upper elevating frame that can move up and down with respect to the guide frame, and is disposed below the upper elevating frame at appropriate intervals. Lower frame that can be moved up and down with respect to the upper and lower frames, engaging and disengaging means for attaching and detaching the upper and lower frames to and from the guide frame, and telescopic drive means provided between the upper and lower frames and the lower frame. The upper and lower lifting frames and the lower lifting and lowering frame are alternately engaged and disengaged from the guide frame, and the crane body can be climbed by a simple method of expanding and contracting the expansion and contraction drive means. Various advantages of easy and quick climbing It was an effect.
【図1】本発明にかかるタワークレーンの一実施例を示
す全体構成図である。FIG. 1 is an overall configuration diagram showing one embodiment of a tower crane according to the present invention.
【図2】本発明にかかるタワークレーンの一実施例の要
部拡大図である。FIG. 2 is an enlarged view of a main part of one embodiment of the tower crane according to the present invention.
【図3】本発明にかかるタワークレーンの一実施例に用
いる鉄骨柱の要部構成図である。FIG. 3 is a main part configuration diagram of a steel column used in one embodiment of the tower crane according to the present invention.
【図4】図3中のA−A線断面図である。FIG. 4 is a sectional view taken along line AA in FIG. 3;
【図5】図2中のB−B線断面図である。FIG. 5 is a sectional view taken along line BB in FIG. 2;
【図6】図2中のC−C線断面図である。FIG. 6 is a sectional view taken along line CC in FIG. 2;
【図7】図2中のD−D線断面図である。FIG. 7 is a sectional view taken along line DD in FIG. 2;
10 タワークレーン 12 ビルディン
グ(建造物躯体) 14 鉄骨柱 14a 鉄骨柱 16 ガイドフレーム 18 マスト 20 クレーン本体 22 クライミン
グ装置 40 上部昇降フレーム 42 下部昇降フ
レーム 44 上部かんぬき(係脱手段) 46 下部かんぬ
き(係脱手段) 48 油圧シリンダ(伸縮駆動手段)DESCRIPTION OF SYMBOLS 10 Tower crane 12 Building (building structure) 14 Steel column 14a Steel column 16 Guide frame 18 Mast 20 Crane main body 22 Climbing device 40 Upper lifting frame 42 Lower lifting frame 44 Upper latch (disengaging means) 46 Lower latch (disengaging means) ) 48 Hydraulic cylinder (telescopic drive means)
フロントページの続き (56)参考文献 特開 昭64−2994(JP,A) 特開 昭48−65644(JP,A) 特開 昭49−77343(JP,A) 特開 昭62−240297(JP,A) 実開 昭55−113386(JP,U) 特公 昭50−18701(JP,B1)Continuation of front page (56) References JP-A-64-2994 (JP, A) JP-A-48-65644 (JP, A) JP-A-49-77343 (JP, A) JP-A-62-240297 (JP) , A) Japanese Utility Model Showa 55-113386 (JP, U) Japanese Patent Publication No. 50-18701 (JP, B1)
Claims (3)
に用いるタワークレーンにおいて、建造物躯体の一部の
鉄骨柱を他の鉄骨柱に先行して構築し、該先行した鉄骨
柱の外側を囲繞してガイドフレームを着脱可能に取り付
け該ガイドフレームを取り付けた該鉄骨柱をタワークレ
ーンのマストとして、該マストの頂部にクレーン本体を
設置すると共に、該クレーン本体と該ガイドフレームと
の間にクライミング装置を設けたことを特徴とするタワ
ークレーン。1. A tower crane for use in constructing a building frame having a steel column, wherein a part of the column of the building frame is constructed prior to another steel column, and A guide frame is removably attached around the outside, and the steel column to which the guide frame is attached is used as a mast of a tower crane. A crane body is installed on the top of the mast, and a crane body and the guide frame A tower crane comprising a climbing device.
体の下側に取り付けられ、前記ガイドフレームに対し上
下移動可能な上部昇降フレームと、該上部昇降フレーム
の下側に適宜間隔をもって配置されて該ガイドフレーム
に対し上下移動可能な下部昇降フレームと、これら上部
昇降フレームおよび下部昇降フレームを該ガイドフレー
ムにそれぞれ係脱可能に係止する係脱手段と、該上部昇
降フレームと該下部昇降フレームとの間に設けられる伸
縮駆動手段と、を備えて構成したことを特徴とする請求
項1に記載のタワークレーン。2. The climbing device according to claim 1, wherein the climbing device is attached to a lower side of the crane main body, and is vertically movable with respect to the guide frame. A lower lifting frame that can be moved up and down with respect to the upper and lower lifting frames, and an engaging and disengaging means for engaging and disengaging the upper and lower lifting frames with the guide frame, respectively, between the upper lifting frame and the lower lifting frame. The tower crane according to claim 1, further comprising: a telescopic drive unit provided.
に用いるタワークレーンにおいて、建造物躯体の一部の
鉄骨柱を他の鉄骨柱に先行して構築し、該先行した鉄骨
柱の外側を囲繞してガイドフレームを着脱可能に取り付
け、該ガイドフレームを取り付けた該鉄骨柱をタワーク
レーンのマストとして、該マストの頂部にクレーン本体
を設置し、該クレーン本体の下側に該ガイドフレームに
対し上下移動可能な上部昇降フレームを取り付けると共
に、該上部昇降フレームの下側に適宜間隔をもって配置
して該ガイドフレームに対し上下移動可能な下部昇降フ
レームを設け、該上部および下部昇降フレームと該ガイ
ドフレームとの間にはそれぞれ係脱手段を設けると共
に、該上部および下部昇降フレーム間には伸縮駆動手段
を設け、該下部昇降フレームを該ガイドフレームに係止
した後、該上部昇降フレームを該ガイドフレームから離
脱し、この状態で該伸縮駆動手段を伸長して該上部昇降
フレームを上昇させ、次に、該上部昇降フレームを該ガ
イドフレームに係止した後、該下部昇降フレームを該ガ
イドフレームから離脱し、この状態で該伸縮駆動手段を
短縮して該下部昇降フレームを上昇させることを特徴と
するタワークレーンのクライミング方法。3. A tower crane for use in constructing a building frame having a steel column, wherein a part of the column of the building frame is constructed prior to another steel column, and A guide frame is removably attached around the outside, and the steel column to which the guide frame is attached is used as a mast of a tower crane. A crane body is installed on the top of the mast, and the guide frame is provided below the crane body. A vertically movable upper elevating frame is attached to the guide frame, and a lower elevating frame that is vertically movable with respect to the guide frame is provided below the upper elevating frame at appropriate intervals. An engaging and disengaging means is provided between the guide frame and the upper and lower elevating frames, and a telescopic driving means is provided between the upper and lower elevating frames. After the frame is locked to the guide frame, the upper elevating frame is detached from the guide frame, and in this state, the telescopic driving means is extended to raise the upper elevating frame. A climbing method for a tower crane, wherein the lower elevating frame is detached from the guide frame after being locked to the guide frame, and in this state, the telescopic driving means is shortened to raise the lower elevating frame.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3167400A JP2643663B2 (en) | 1991-06-13 | 1991-06-13 | Tower crane and climbing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3167400A JP2643663B2 (en) | 1991-06-13 | 1991-06-13 | Tower crane and climbing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH04365794A JPH04365794A (en) | 1992-12-17 |
JP2643663B2 true JP2643663B2 (en) | 1997-08-20 |
Family
ID=15849002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3167400A Expired - Lifetime JP2643663B2 (en) | 1991-06-13 | 1991-06-13 | Tower crane and climbing method thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2643663B2 (en) |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE418627B (en) * | 1973-05-22 | 1981-06-15 | Defibrator Ab | SET TO MANUFACTURE GRINDING |
JPS564718Y2 (en) * | 1979-02-05 | 1981-02-02 |
-
1991
- 1991-06-13 JP JP3167400A patent/JP2643663B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH04365794A (en) | 1992-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101734560B (en) | High-altitude dismantling method of inside-climbing tower crane for towering structure construction | |
JP4838284B2 (en) | Tower crane | |
JP5914203B2 (en) | Disassembly method, disassembly assistance device | |
US20130263549A1 (en) | Safety screen system for steel erection work | |
JP5365854B2 (en) | Tower crane support structure and climbing method | |
JP4247851B2 (en) | How to use a climbing crane | |
JP2643663B2 (en) | Tower crane and climbing method thereof | |
JPH08311818A (en) | Climbing type lift-up construction method of building and device thereof | |
JPH06323503A (en) | Assembling method for large size suspension type boiler | |
JP4354046B2 (en) | Climbing crane floor climbing method | |
JP3348030B2 (en) | Construction method of Ohbari frame | |
JP5773343B2 (en) | Method for constructing multi-story building and lifting device for multi-story scaffold used therefor | |
JPH04161566A (en) | Constructing apparatus for large space building | |
JPH06156982A (en) | Crane device | |
JPH04161565A (en) | Construction of large space building | |
JP3002054U (en) | Tower crane with multiple main columns as tower mast | |
JPH09137506A (en) | Construction method of building | |
JP2890341B2 (en) | Method and apparatus for lifting up top-level frame for structure construction | |
CN221422604U (en) | Movable maintenance platform | |
CN221119145U (en) | Elevator well platform with prevent weighing down function | |
JP3070438B2 (en) | Temporary frame equipment for construction | |
JP2009007129A (en) | Climbing crane | |
JP2000096828A (en) | Elevator | |
JP2572642B2 (en) | Scaffolding disassembly method | |
JP2776128B2 (en) | Lifting device for building frame |