JP2625427B2 - All-weather maintenance method for sports grounds, etc. using composite buried pipes - Google Patents

All-weather maintenance method for sports grounds, etc. using composite buried pipes

Info

Publication number
JP2625427B2
JP2625427B2 JP6980887A JP6980887A JP2625427B2 JP 2625427 B2 JP2625427 B2 JP 2625427B2 JP 6980887 A JP6980887 A JP 6980887A JP 6980887 A JP6980887 A JP 6980887A JP 2625427 B2 JP2625427 B2 JP 2625427B2
Authority
JP
Japan
Prior art keywords
pipe
ground
perforated pipe
weather
maintenance method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6980887A
Other languages
Japanese (ja)
Other versions
JPS63236803A (en
Inventor
幸三 野村
良成 津野
Original Assignee
幸三 野村
良成 津野
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 幸三 野村, 良成 津野 filed Critical 幸三 野村
Priority to JP6980887A priority Critical patent/JP2625427B2/en
Publication of JPS63236803A publication Critical patent/JPS63236803A/en
Application granted granted Critical
Publication of JP2625427B2 publication Critical patent/JP2625427B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Description

【発明の詳細な説明】 〔発明の目的〕 (産業上の利用分野) この発明は、運動場、競技場及びゴルフ場等のグラウ
ンドやコースを、季節や天候の変動如何に拘らず1年を
通じて常に最適の条件で使用し得るように整備するため
の複合埋設管による全天候整備方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Purpose of the Invention] (Industrial application field) The present invention is to provide a ground, a course such as an athletic field, a stadium, a golf course, etc., regardless of seasons and weather fluctuations throughout the year. The present invention relates to an all-weather maintenance method using a composite buried pipe for maintenance so that it can be used under optimum conditions.

(従来の技術) 周知のように、運動場や競技場等のグラウンドは、降
雨が激しいと軟弱化してぬかるみ、反対に晴天が長く続
けばカサカサに乾燥して砂塵が舞い上がるので、これに
対処するため、グラウンドの泥濘化阻止には、殆どの運
動場や競技場で地中に水抜き用の有孔パイプを埋設して
水はけを良くし、また、旱天時の砂塵防止には、グラウ
ンドの各所にスプリンクラー等の撒水設備を設置する手
段で対応している。
(Prior art) As is well known, the grounds of athletic fields and stadiums become soft and muddy when the rainfall is severe, and on the other hand, if the sunny weather continues for a long time, they will dry and dry and dust will fly up. To prevent muddy ground, most sports grounds and stadiums buried perforated pipes for drainage in the ground to improve drainage. This is handled by means of installing sprinklers and other watering equipment.

(発明が解決しようとする問題点) けれども、冬季寒冷地にある運動場や競技場及びゴル
フ場等のグラウンドやコースでは、大量の降雪と積雪を
免れ得ないため、前記の水抜き設備及び撒水設備に加え
て、多額の経費を要する除雪または融雪の大問題を解決
しない限り、これらのグラウンドやコースを最適の状態
で1年を通じて使用することが出来ず、従って、多雪地
域にある運動場や競技場は冬季間全く使用不能となり、
山間丘陵地のゴルフ場では、雪が消える春先まで完全に
休業を余儀無くされる。
(Problems to be Solved by the Invention) However, at the grounds and courses such as athletic fields, stadiums, and golf courses in cold winter regions, a large amount of snowfall and snowfall cannot be escaped. In addition, these grounds and courses cannot be used optimally throughout the year unless the costly snow removal or snowmelt problems are solved, and therefore playgrounds and sports in snowy areas The place is completely unusable during winter,
Golf courses in mountainous hills have to be completely closed until early spring when the snow disappears.

この発明は、前記の問題を解決するために開発された
もので、その目的は、これらのグラウンドやゴルフコー
スの地中に埋設されている水抜き用有孔パイプを巧みに
利用し、非常に簡単な設備で前記の運動場や競技場及び
ゴルフ場等を常に最適の環境で1年中使用できる全天候
整備方法を確立することにある。
The present invention has been developed to solve the above-mentioned problems. The purpose of the invention is to use a perforated pipe for drainage buried in the ground of a ground or a golf course, and to use the pipe very well. An object of the present invention is to establish an all-weather maintenance method in which the above-mentioned athletic field, stadium, golf course, and the like can be always used in an optimum environment all year round with simple equipment.

〔発明の構成〕[Configuration of the invention]

(問題点を解決するための手段) 本発明の複合埋設管による運動場等の全天候整備方法
は、次表面から所定の深さだけ下がった位置に既設の有
孔パイプと新設の無孔パイプとを組合わせて平面方向に
等分布状態に埋設し、前記の各パイプ内に天候等の条件
に応じて適温の水と空気とを選択的に流通させて熱交換
を行なうことを特徴とする。
(Means for Solving the Problems) The all-weather maintenance method for an athletic field or the like using a composite buried pipe according to the present invention includes an existing perforated pipe and a new non-perforated pipe at a position lowered by a predetermined depth from the next surface. The combination is buried in a plane direction in an evenly distributed state, and heat exchange is performed by selectively circulating water and air at an appropriate temperature in each of the pipes according to conditions such as weather.

(実 施 例) 以下、本発明方法の代表的な実施態様の一例を図面に
ついて具体的に説明すると、図面は本発明を裏日本の多
雪地域にある学校の運動場のグラウンドに適用した実施
例を示すもので、グラウンドGの地表面1から約30〜60
cm程度下がった位置に、直径約150〜200mmの水抜き用有
孔パイプP1が既に平面方向に約50〜100cm間隔で平行に
埋設してあり、前記有孔パイプP1の周壁2には、直径約
10〜15mmの小孔3が多数穿設され、有孔パイプP1の末端
部は集水パイプを経て排水路(図示せず)に接続されて
いる。
(Example) Hereinafter, an example of a typical embodiment of the method of the present invention will be described in detail with reference to the drawings. The drawing shows an example in which the present invention is applied to the ground of a school playground in a snowy area in the back of Japan. It is about 30 to 60 from the ground surface 1 of the ground G.
a position lowered about cm, Yes in parallel buried in about 50~100cm intervals already plane direction diameter of about 150~200mm drain for perforated pipe P 1 of the peripheral wall 2 of the perforated pipe P 1 is , Diameter about
Small holes 3 10~15mm is bored a number, the distal end of the perforated pipe P 1 is connected to the drainage through the water collecting pipe (not shown).

本実施例の場合、新設の無孔パイプP2は、既設の有孔
パイプP1よりも1回り直径が小さく、その周壁4外面に
間隔片5を半径方向に突設した管体を用い、これを第2
図図示の如く既設有孔パイプP1の中心部に挿通した二重
構造の管体が基本的な複合埋設管Pになっており、外側
にある既設有孔パイプP1と、内側にある新設無孔パイプ
P2の管端部は、相隣接する複合埋設管Pの有孔パイプP1
同士及び無孔パイプP2同士がコ字形乃至U字形の接続管
P3,P4で蛇行状に連結され、このうち、最先位にある両
パイプP1,P2の管端部は、適宜の供給管路を経由し、分
流弁及び給風、給水切換弁等を介して送風機6と給水ポ
ンプ7に接続し、最後位にある両パイプP1,P2の管端部
は、適宜の排水管路を経て排水溝に接続されている。
In the case of the present embodiment, the newly installed non-perforated pipe P 2 is one diameter smaller than the existing perforated pipe P 1 , and uses a pipe body in which the spacing piece 5 is protruded in the radial direction on the outer surface of the peripheral wall 4. This is the second
As shown in the drawing, a double-structured pipe inserted into the center of the existing perforated pipe P 1 is a basic composite buried pipe P, and the existing perforated pipe P 1 on the outside and the newly installed pipe P on the inside. Non-porous pipe
Tube end of the P 2 are perforated pipe P 1 of the composite buried pipe P at which the phase adjacent
Connecting tubes to each other and non-perforated pipe P 2 between the U-shaped or U-shaped
P 3 , P 4 meanderingly connected, of which the pipe ends of the two pipes P 1 , P 2 at the forefront pass through appropriate supply pipes, and switch the flow dividing valve, air supply, and water supply. It is connected to the blower 6 and the water supply pump 7 via a valve or the like, and the pipe ends of both pipes P 1 and P 2 at the rear end are connected to drains via appropriate drain pipes.

また、第3図乃至第6図は本発明に適用する複合埋設
管Pに類型的な他の実施例を示したものであって、新設
の無孔パイプP2は、第3図図示の如く略三角形又は方形
のものを有孔パイプP1の内部に挿通したり、第4図及び
第5図のように有孔パイプP1の内部に一文字形又は人の
字形の隔壁を一体に成形し、内部空間を二室以上に区画
したものであってもよく、場合によっては、新設の有孔
パイプP2を分離して第6図のように既設の有孔パイプP1
と平行に埋設してもよい。
Further, FIG. 3 to FIG. 6 is merely indicate typological other embodiments the composite buried pipe P to be applied to the present invention, imperforate pipe P 2 of the newly opened, as Figure 3 illustrated or inserting the ones substantially triangular or square inside the perforated pipe P 1, a character type or human-shaped partition wall is formed integrally in the interior of the perforated pipe P 1 as of FIG. 4 and FIG. 5 may be obtained by partitioning the internal space into two or more chambers, in some cases, perforated pipes of the existing P as in the sixth diagram separates the perforated pipe P 2 of new 1
May be buried in parallel.

本発明による運動場等の全天候整備方法は、例えば前
記の各実施例に示すような配管をグラウンドGの地中に
施工しておき、季節や天候等の変動その他のグラウンド
Gの状況に応じ、既設の有孔パイプP1と新設の無孔パイ
プP2に最適の空気と水とを選択的に流通さてて熱交換を
行なうことによりグラウンドGの使用条件を1年を通じ
て常に最適の状態に整備する。
The all-weather maintenance method for a sports ground or the like according to the present invention includes, for example, installing a pipe as shown in each of the above-described embodiments under the ground G and changing the existing ground G according to seasonal and weather fluctuations and other conditions of the ground G. always servicing the optimal state through perforated pipes P 1 and 1 year use conditions on the ground G by which the imperforate pipe P 2 optimum air and water newly been selectively flow heat exchange .

即ち、平常の降雨時で降水量が比較的少ない時や雨が
止んで直ちにグラウンドを使用する必要がない場合に
は、特別な処置をしなくとも、地中に浸み込んだ水分が
既設の有孔パイプP1を通って排水溝に流出する。けれど
も、降水量が多かったり、雨が止んだ後、直ちにグラウ
ンドGを使用したい場合には、有孔パイプP1に空気を送
り込めば、管内の排水を促進することができ、更に有孔
パイプP1に温風を供給したり、同時に内部の無孔パイプ
P2に温水等を流通すれば、地中の温度を高めてその含水
分を急速に蒸発させることができる。
In other words, when the rainfall is relatively low during normal rainfall or when it is not necessary to use the ground immediately after the rain has stopped, the moisture that has soaked into the ground can be used without any special measures. through the perforated pipe P 1 and flows out to the drain ditch. However, it can often precipitation, after the rain having stopped, immediately if you want to use the ground G, if Okurikome the air to the perforated pipe P 1, it is possible to promote the drainage of the tube, further perforated pipe and supplies the warm air to P 1, the interior of the imperforate pipe simultaneously
If flowing hot water or the like P 2, it is possible to rapidly evaporate the water content by increasing the underground temperature.

また、夏季に晴天が続いてグラウンドGがカサカサに
乾燥し、グラウンドGに砂塵が舞い上がる時や地面の温
度が太陽熱で異状に高くなった時には、内部の無孔パイ
プP2に冷水を流通させて地中の温度を下げたり、場合に
よっては、外側の有孔パイプP1内に冷水を供給して、該
パイプP1周壁の小孔3から地中に浸透させる手段によ
り、地面に湿気を与えると共に地中の温度を低下させる
ことができる。
In addition, when the sunny day continues in the summer and the ground G dries dry, and when the dust rises to the ground G or when the temperature of the ground becomes abnormally high due to solar heat, cool water is circulated through the non-porous pipe P 2 inside. lowering the underground temperature, in some cases, by supplying cold water to the outside of the perforated pipe P 1, by means of penetration into the ground from the small hole 3 of the pipe P 1 peripheral wall, giving moisture to the ground At the same time, the temperature in the ground can be reduced.

一方、冬季寒冷地のグラウンドGに於いて、降雪があ
った時または降雪が予想される時には、内部の無孔パイ
プP2に比較的温度の高い下水道の水或いは河川水、井戸
水等を流通させ、必要があれば外側の有孔パイプP1にも
温度の高い音風を供給しながら、地中の温度を上昇させ
ることにより雪を融かし、全く積雪のないグラウンドG
を確保することが可能になる。
On the other hand, in the ground G in winter cold regions, when the time or snowfall there is snow is expected, is passed through a relatively water or river water having a high temperature sewer, well water or the like to the non-perforated pipe P 2 internal , while supplying a high sound air temperature in the perforated pipe P 1 of the outer if necessary, melted snow by raising the ground temperature, no the snow ground G
Can be secured.

〔発明の効果〕〔The invention's effect〕

以上のように、本発明の複合埋設管による全天候整備
方法を運動場及び競技場等のグラウンドやゴルフ場のコ
ースに適用すれば、地中に埋設されている既設の有孔パ
イプを巧みに利用し、これと新設の無孔パイプとを組合
わせた非常に簡単な設備により、前記の運動場や競技場
及びゴルフ場等を常に最適の環境で1年中使用できる優
れた効果を有するものである。
As described above, if the all-weather preparation method using the composite buried pipe of the present invention is applied to a ground such as an athletic field and a stadium, or a course of a golf course, the existing perforated pipe buried underground is skillfully used. A very simple facility combining this with a newly installed non-perforated pipe has an excellent effect that the above-mentioned athletic field, stadium, golf course and the like can always be used in an optimum environment all year round.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明方法に基いて運動場に設置した複合埋設
管の配列形態の一例を示す斜視図、第2図は複合埋設管
の基本的な断面形状を示す横断面図、第3図乃至第6図
は同じく複合埋設管の類型的な他の実施例を示す横断面
図である。 P……複合埋設管、P1……既設の有孔パイプ、 P2……新設の無孔パイプ、G……グラウンド、 1……地表面、2……有孔パイプの周壁、 3……小孔、4……無孔パイプの周壁、 5……間隔片、6……送風機、7……給水ポンプ、 P3,P4……接続管
FIG. 1 is a perspective view showing an example of an arrangement form of a composite buried pipe installed in a playground according to the method of the present invention, FIG. 2 is a cross-sectional view showing a basic cross-sectional shape of the composite buried pipe, and FIGS. FIG. 6 is a cross-sectional view showing another example of the type of the composite buried pipe. P: Composite buried pipe, P 1: Existing perforated pipe, P 2: New non-perforated pipe, G: Ground, 1: Ground surface, 2 ... Peripheral wall of perforated pipe, 3 ... small hole, 4 ...... imperforate wall of the pipe, 5 ...... distance piece, 6 ...... blower, 7 ...... feed water pump, P 3, P 4 ...... connecting pipe

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】地表面から所定の深さだけ下がった位置に
既設の有孔パイプと新設の無孔パイプとを組合わせて平
面方向に等分布状態に埋設し、前記の各パイプ内に天候
等の条件に応じて適温の水と空気とを選択的に流通させ
て熱交換を行なうことを特徴とする複合埋設管による運
動場等の全天候整備方法。
1. A combination of an existing perforated pipe and a new non-perforated pipe at a position lowered by a predetermined depth from the ground surface, and burying them in a plane direction so as to be uniformly distributed. A method for all-weather maintenance of an athletic field and the like using a composite buried pipe, wherein heat is exchanged by selectively circulating water and air at an appropriate temperature according to conditions such as the above.
JP6980887A 1987-03-24 1987-03-24 All-weather maintenance method for sports grounds, etc. using composite buried pipes Expired - Lifetime JP2625427B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6980887A JP2625427B2 (en) 1987-03-24 1987-03-24 All-weather maintenance method for sports grounds, etc. using composite buried pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6980887A JP2625427B2 (en) 1987-03-24 1987-03-24 All-weather maintenance method for sports grounds, etc. using composite buried pipes

Publications (2)

Publication Number Publication Date
JPS63236803A JPS63236803A (en) 1988-10-03
JP2625427B2 true JP2625427B2 (en) 1997-07-02

Family

ID=13413422

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6980887A Expired - Lifetime JP2625427B2 (en) 1987-03-24 1987-03-24 All-weather maintenance method for sports grounds, etc. using composite buried pipes

Country Status (1)

Country Link
JP (1) JP2625427B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101869376B1 (en) * 2017-09-22 2018-06-20 주식회사 로하스기술 Waterproofing composition for bridge surface and dual composite waterproofing method using the waterproofing composition for bridge surface

Also Published As

Publication number Publication date
JPS63236803A (en) 1988-10-03

Similar Documents

Publication Publication Date Title
US4462184A (en) System for improving synthetic surfaces
US7815395B1 (en) Subsurface drainage system and drain structure therefor
US20060120804A1 (en) Subsurface drainage system and drain structure therefor
US3461675A (en) Watering and drainage system
JP2002508818A (en) A method for constructing a natural grass / turf playground with a warmable grass / turf cultivation layer used for a football ground and the like, and a natural grass / turf playground made by the method
JP6266505B2 (en) Grass grid
US5163781A (en) Field construction for a sports or other field
JP2625427B2 (en) All-weather maintenance method for sports grounds, etc. using composite buried pipes
DE2840389A1 (en) Sports field heating and drainage system - has closed circuit sheathed pipes above and below ground, collectors and pump
CN213476526U (en) Mixed grass football field with heating and ventilating functions
Givoni Earth-integrated buildings—an overview
KR100572973B1 (en) The construction of turf athletic field and the method threrefor
JP3155223B2 (en) Lawn growth control method, lawn ground temperature control method, lawn ground management device, and stadium lawn ground management device
CN207699990U (en) A kind of Football Field Turf
TWI721329B (en) Netted device for paving and drainage
GB2288306A (en) Modular sports field construction
RU2263736C1 (en) Sportive ground
KR19980082050A (en) Solar complex cooling / heating forced suction / exhalation circulation type lawn stadium lawn management system
RU2706489C1 (en) Method of devyatkin of heat-air self-regulated all-year heating of subsoil layer of fields during thermal land reclamation
CN214708968U (en) Green device of planting of slope protection is prevented in view river lake
RU33955U1 (en) The cooled base of structures
KR19990037617A (en) Watering and Drainage of Lawn Field Using Volcanic Rock
JP3066038B2 (en) Integrated water supply and drainage function device
JP2018019660A (en) Heat exchange system
KR100405572B1 (en) Insulating and drainage pipes of land