JP2609809B2 - building - Google Patents

building

Info

Publication number
JP2609809B2
JP2609809B2 JP8618194A JP8618194A JP2609809B2 JP 2609809 B2 JP2609809 B2 JP 2609809B2 JP 8618194 A JP8618194 A JP 8618194A JP 8618194 A JP8618194 A JP 8618194A JP 2609809 B2 JP2609809 B2 JP 2609809B2
Authority
JP
Japan
Prior art keywords
wall
eaves
building
eave
story
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP8618194A
Other languages
Japanese (ja)
Other versions
JPH07292833A (en
Inventor
忠司 谷
Original Assignee
ナショナル住宅産業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ナショナル住宅産業株式会社 filed Critical ナショナル住宅産業株式会社
Priority to JP8618194A priority Critical patent/JP2609809B2/en
Publication of JPH07292833A publication Critical patent/JPH07292833A/en
Application granted granted Critical
Publication of JP2609809B2 publication Critical patent/JP2609809B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Steps, Ramps, And Handrails (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、建物本体に平屋部を
接合し、建物本体と平屋部の外壁に沿って軒屋根を設け
てなる建物に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a building in which a one-story part is joined to a building body and an eaves roof is provided along the outer wall of the building body and the one-story part.

【0002】[0002]

【従来の技術】従来、図30に示すように、2階建ての
建物本体150に平屋部151を接合してなる建物があ
る。平屋部151上はベランダ152になっている。
2. Description of the Related Art Conventionally, as shown in FIG. 30, there is a building in which a one-story portion 151 is joined to a two-story building body 150. FIG. A veranda 152 is provided on the one-story portion 151.

【0003】[0003]

【発明が解決しようとする課題】しかしながら上記従来
の構成によれば、建物本体150と平屋部151は専用
の接合金物にて接合されており、当該接合金物には軒固
定部はなく、建物本体150と平屋部151の接合部分
において軒屋根を支持することはできなかった。このた
め、建物本体150の外壁153から平屋部151の外
壁154に渡って連続して軒を設けることができないと
いう問題があった。
However, according to the above-mentioned conventional structure, the building main body 150 and the one-story portion 151 are joined by a special joint metal, and the joint metal has no eave fixing portion, and has no eaves fixing portion. The eaves roof could not be supported at the junction between 150 and the one-story section 151. Therefore, there is a problem that the eaves cannot be provided continuously from the outer wall 153 of the building body 150 to the outer wall 154 of the one-story portion 151.

【0004】この発明の目的は、建物本体から平屋部に
渡って連続して軒を設けることができる建物を提供する
ことである。
An object of the present invention is to provide a building in which eaves can be continuously provided from a building body to a one-story part.

【0005】[0005]

【課題を解決するための手段】この発明の建物は、建物
本体と平屋部の接合部に柱を立設し、柱の一側方に建物
本体の外壁を並設し、外壁と平行に柱の他側方に平屋部
の外壁を並設し、柱上に軒梁接合金物を固定し、軒梁接
合金物は、下端に柱固定部を形成し、この柱固定部の一
側面下端に平屋部外壁固定部を形成し、前面下端に軒梁
固定部を形成し、前面に壁横束固定部を形成してなり、
外壁固定部に平屋部の外壁を固定し、軒梁固定部に前方
に突出した軒梁を固定し、壁横束固定部に壁横束を固定
し、軒屋根を建物本体ならびに平屋部の外壁に沿って配
置し、軒屋根の建物側端部を壁横束に固定するとともに
軒屋根の軒先を軒梁で支持したことを特徴とするもので
ある。
In the building of the present invention, a pillar is erected at the junction between the building body and the one-story building, the outer wall of the building body is juxtaposed on one side of the pillar, and the pillar is parallel to the outer wall. The outer wall of the one-story part is juxtaposed on the other side, and the eave beam joint hardware is fixed on the pillar, and the eave beam joint hardware forms a column fixing part at the lower end, and the one side lower end of this pillar fixing part is Form the outer wall fixing part, form the eaves beam fixing part at the lower front, and form the wall horizontal bundle fixing part at the front,
The outer wall of the one-story part is fixed to the outer wall fixing part, the eaves projecting forward is fixed to the eaves fixing part, the horizontal wall bundle is fixed to the wall horizontal bundle fixing part, and the eaves roof is the building body and the outer wall of the one-story part. The eaves roof is fixed along the side wall of the eaves roof, and the eaves of the eaves roof are supported by eaves beams.

【0006】また、軒梁接合金物の他側方に胴差固定部
を形成し、胴差固定部に建物本体の外壁の上端面に沿っ
て配設した胴差を固定してもよい。さらに、軒梁接合金
物の一側方にベランダ床固定部を形成し、平屋部上のベ
ランダ床をベランダ床固定部に固定してもよい。
[0006] Further, a body difference fixing portion may be formed on the other side of the eave beam joint hardware, and a body difference disposed along the upper end surface of the outer wall of the building body may be fixed to the body difference fixing portion. Furthermore, a veranda floor fixing portion may be formed on one side of the eave beam joint hardware, and the veranda floor on the one-story portion may be fixed to the veranda floor fixing portion.

【0007】[0007]

【作用】請求項1ないし3の建物によれば、建物本体と
平屋部の接合部に立設した柱上に軒梁接合金物を固定
し、軒梁接合金物の軒梁固定部に軒梁を固定し、壁横束
固定部に壁横束を固定し、軒屋根の建物側端部を壁横束
に固定しかつ軒先を軒梁で支持して、建物本体ならびに
平屋部の外壁に渡って連続して軒を設けることができ
る。
According to the first to third aspects of the present invention, the eaves beam fitting is fixed on a pillar erected at the junction between the building body and the one-story building, and the eaves beam is fixed to the eave beam fixing portion of the eaves beam fitting. Fix the wall horizontal bundle to the wall horizontal bundle fixing part, fix the eave roof building side end to the wall horizontal bundle and support the eaves with the eaves beam, over the building body and the outer wall of the one-story building. Eaves can be provided continuously.

【0008】[0008]

【実施例】この発明の一実施例を図1ないし図27に基
づいて説明する。図1および図2に建物の外観図を示
す。図1は建物の正面図であり、図2は図1のII矢視
図である。図において、10は2階建ての建物本体、1
1は平屋部であり、平屋部11上にはベランダ12が設
けられている。13は、建物本体10の外壁21から平
屋部11の外壁15に渡って設けた軒屋根である。図3
は、建物の軒設置側面における外壁構成図を示してお
り、16,17は建物本体の屋根を示している。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described with reference to FIGS. 1 and 2 show the appearance of the building. FIG. 1 is a front view of the building, and FIG. 2 is a view as viewed in the direction of the arrow II in FIG. In the figure, 10 is a two-story building body, 1
Reference numeral 1 denotes a one-story portion, on which a veranda 12 is provided. Reference numeral 13 denotes an eave roof provided from the outer wall 21 of the building body 10 to the outer wall 15 of the one-story section 11. FIG.
Shows the outer wall configuration on the eaves installation side of the building, and 16 and 17 show the roof of the building body.

【0009】図3のA部分(建物本体10と平屋部11
の接合部)の構造を、図4ないし図6に示す。図4は正
面図、図5は側面図、図6は平面図である。図におい
て、20は補強柱、21aは建物本体の1階の外壁、2
1bは建物本体の2階の外壁、23は上下の外壁21
a,21b間に設けた補強胴差、24は補強柱20上に
設けた軒梁接合金物、25は壁横束、26は軒梁であ
る。
Part A in FIG. 3 (the building body 10 and the one-story section 11)
FIGS. 4 to 6 show the structure of the joint portion of FIG. 4 is a front view, FIG. 5 is a side view, and FIG. 6 is a plan view. In the figure, reference numeral 20 denotes a reinforcing column, 21a denotes an outer wall of the first floor of a building body, 2
1b is the outer wall of the second floor of the building body, 23 is the upper and lower outer walls 21
Reference numeral 24 denotes an eave beam joint hardware provided on the reinforcing column 20, 25 denotes a horizontal bundle of walls, and 26 denotes an eave beam.

【0010】図7ないし図12に、補強柱20の詳細構
造を示す。図7は補強柱20の正面図、図8は図7の左
側面図、図9は図7の右側面図、図10は平面図を示し
ている。補強柱20は、角筒状の本体30の上下にプレ
ート33,34を介して断面コ字形の折曲材31,32
を溶接し、折曲材31,32の上下端にプレート35,
36を溶接してなる。折曲材31の正面には軒梁固定用
のボルト挿通孔38が形成され、両側面にはそれぞれ外
壁21aおよび外壁15を固定するためのボルト挿通孔
39a,39bが形成されている。また、プレート35
には軒梁接合金物固定用のボルト挿通孔37が形成され
ている。なお、図11は図9のXI部分の拡大図、図1
2は図9のXII−XII断面図を示している。
FIGS. 7 to 12 show a detailed structure of the reinforcing column 20. FIG. 7 is a front view of the reinforcing column 20, FIG. 8 is a left side view of FIG. 7, FIG. 9 is a right side view of FIG. 7, and FIG. 10 is a plan view. The reinforcing pillars 20 are formed by bending members 31 and 32 having a U-shaped cross section via plates 33 and 34 above and below a rectangular cylindrical main body 30.
Are welded, and plates 35,
36 is welded. A bolt insertion hole 38 for fixing the eaves beam is formed on the front surface of the bent member 31, and bolt insertion holes 39a and 39b for fixing the outer wall 21a and the outer wall 15 are formed on both side surfaces. In addition, plate 35
Is formed with a bolt insertion hole 37 for fixing the eave beam joint hardware. FIG. 11 is an enlarged view of an XI part in FIG.
2 shows a sectional view taken along the line XII-XII in FIG.

【0011】図13ないし図16に、軒梁接合金物24
の詳細構造を示す。軒梁接合金物24は、L字形の底板
40上に、外周L形辺に沿って垂直姿勢の折曲材41な
らびにプレート42,43を溶接し、かつ水平姿勢のプ
レート44,45,46を溶接したものである。底板4
0には柱固定用のボルト挿通孔50,平屋部外壁固定用
のボルト挿通孔51,軒梁固定用のボルト挿通孔52が
形成されており、ボルト挿通孔50部分にはナット53
が溶接してある。また、折曲材41にはそれぞれ5個ず
つ上下に並んで胴差固定用のボルト挿通孔54,55が
形成されており、当該下4つのボルト挿通孔54,55
部分にはナット56,57が溶接してあり、かつプレー
ト45,46間において折曲材41にベランダ床固定用
の一対のボルト挿通孔64が形成されている。さらに、
プレート42には上下に並んで壁横束固定用の4つのボ
ルト挿通孔58ならびにナット59が溶接してある。
FIG. 13 to FIG.
Shows the detailed structure of. The eave beam joining hardware 24 is formed by welding a bent member 41 and plates 42 and 43 in a vertical position on an L-shaped bottom plate 40 along an outer L-shaped side, and welding plates 44, 45 and 46 in a horizontal position. It was done. Bottom plate 4
A bolt insertion hole 50 for fixing a pillar, a bolt insertion hole 51 for fixing an outer wall of a one-story section, and a bolt insertion hole 52 for fixing an eaves beam are formed in the bolt insertion hole 50.
Is welded. In addition, five bolt insertion holes 54 and 55 for fixing the body difference are formed in the bent material 41 in a line up and down by five each, and the lower four bolt insertion holes 54 and 55 are formed.
Nuts 56 and 57 are welded to the portions, and a pair of bolt insertion holes 64 for fixing the veranda floor are formed in the bent material 41 between the plates 45 and 46. further,
The plate 42 has four bolt insertion holes 58 and a nut 59 welded to the plate 42 in a line up and down for fixing the wall horizontal bundle.

【0012】図17は、補強胴差23の正面図を示して
いる。補強胴差23は、溝形鋼60の両端にボルト挿通
孔を有したエンドプレート61,62を溶接し、かつ途
中に補強プレート63を溶接してなる。図18ないし図
22に、軒梁26の詳細構造を示す。図18は軒梁26
の正面図、図19は平面図を示しており、図20は図1
8のXX−XX矢視図、図21は図18のXXI−XX
I断面図、図22は図18のXXII部分の拡大図を示
している。軒梁26は、溝形鋼65の両端にエンドプレ
ート66,67を溶接してなり、エンドプレート66,
67にはそれぞれ上下に並んで2個のボルト挿通孔68
が形成されており、エンドプレート66,67の近傍に
て溝形鋼65の上下フランジにそれぞれボルト挿通孔6
9,70が形成されている。
FIG. 17 is a front view of the reinforcing gap 23. As shown in FIG. The reinforcing body gap 23 is formed by welding end plates 61 and 62 having bolt insertion holes at both ends of a channel steel 60 and welding a reinforcing plate 63 in the middle. 18 to 22 show the detailed structure of the eaves beam 26. FIG. 18 shows the eaves beam 26
19 is a plan view, FIG. 20 is a plan view, and FIG.
8 taken along the line XX-XX, and FIG. 21 is a view taken along the line XXI-XX in FIG.
FIG. 22 is an enlarged view of a section XXII in FIG. The eaves beam 26 is formed by welding end plates 66 and 67 to both ends of a channel steel 65.
67, two bolt insertion holes 68 arranged vertically.
Are formed in the upper and lower flanges of the channel steel 65 near the end plates 66 and 67, respectively.
9, 70 are formed.

【0013】図23ないし図25に、壁横束25の詳細
構造を示す。図23は壁横束25の正面図、図24は平
面図、図25は側面図である。壁横束25は、角パイプ
状の束本体75の上端に片流れの束上金物76を溶接
し、下端に断面コ字形の束下金物77を溶接してある。
束上金物76には左右にそれぞれボルト挿通孔78が形
成され、束下金物77には上下に並んでボルト挿通孔7
9が形成されている。
FIGS. 23 to 25 show a detailed structure of the horizontal wall bundle 25. FIG. 23 is a front view of the wall horizontal bundle 25, FIG. 24 is a plan view, and FIG. 25 is a side view. The wall horizontal bundle 25 has a single-piece bundle upper metal piece 76 welded to the upper end of a square pipe-shaped bundle main body 75 and a lower bundle metal piece 77 having a U-shaped cross section to the lower end.
Bolt insertion holes 78 are respectively formed on the left and right of the upper bundle metal member 76, and the bolt insertion holes 7 are vertically arranged on the lower bundle metal member 77.
9 are formed.

【0014】つぎに、図4ないし図6に基づいて、軒梁
接合金物24による各部材の接合構造について説明す
る。まず、補強柱20上に軒梁接合金物24を載置し、
補強柱20の上端のボルト挿通孔37と軒梁接合金物2
4の底板40のボルト挿通孔50にボルト(図示せず)
を挿通し、ナット53に締結する。補強胴差23のエン
ドプレート61のボルト挿通孔(図示せず)にボルト9
0を挿通し、軒梁接合金物24の折曲材41のボルト挿
通孔54に挿通してナット56に締結する。軒梁接合金
物24の底板40のボルト挿通孔51にボルト(図示せ
ず)を挿通し、平屋部外壁15の上枠に締結する。軒梁
26のエンドプレート66のボルト挿通孔にボルト93
を挿通し、補強柱20の折曲材31のボルト挿通孔38
に挿通してナット(図示せず)を締結する。軒梁接合金
物24の底板40のボルト挿通孔52にボルト91を挿
通し、軒梁26のボルト挿通孔69に挿通してナット9
2を締結する。壁横束25の束下金物77のボルト挿通
孔79にボルト94を挿通し、軒梁接合金物24のプレ
ート42のボルト挿通孔58に挿通してナット59に締
結する。外壁15の上端面に沿って溝形鋼のベランダ床
梁80を配設し、平屋部11上にベランダ床81を設
け、ベランダ床81の外枠のボルト挿通孔(図示せず)
および軒梁接合金物24の折曲材41のボルト挿通孔6
4ならびにベランダ床梁80に溶接したプレート82の
ボルト挿通孔(図示せず)にボルト83を挿通してナッ
トを締結する。
Next, a description will be given of a joining structure of each member by the eave beam joining hardware 24 with reference to FIGS. First, the eaves beam fitting 24 is placed on the reinforcing column 20,
Bolt insertion hole 37 at the upper end of reinforcing column 20 and eave beam joint hardware 2
4 bolts (not shown) in the bolt insertion holes 50 of the bottom plate 40
And fastened to the nut 53. A bolt 9 is inserted into a bolt insertion hole (not shown) of the end plate 61 of the reinforcing gap 23.
0, and is inserted into the bolt insertion hole 54 of the bent member 41 of the eaves beam joint hardware 24 and fastened to the nut 56. A bolt (not shown) is inserted into a bolt insertion hole 51 of the bottom plate 40 of the eave beam joint hardware 24 and fastened to the upper frame of the one-story outer wall 15. A bolt 93 is inserted into the bolt insertion hole of the end plate 66 of the eave beam 26.
Into the bolt insertion hole 38 of the bent material 31 of the reinforcing column 20.
And a nut (not shown) is fastened. A bolt 91 is inserted into the bolt insertion hole 52 of the bottom plate 40 of the eave beam joint hardware 24, and the bolt 9 is inserted through the bolt insertion hole 69 of the eave beam 26.
2 is concluded. A bolt 94 is inserted into the bolt insertion hole 79 of the lower metal fitting 77 of the horizontal wall bundle 25, and is inserted into the bolt insertion hole 58 of the plate 42 of the eave beam joint hardware 24 and fastened to the nut 59. A veranda floor beam 80 of channel steel is provided along the upper end surface of the outer wall 15, a veranda floor 81 is provided on the one-story portion 11, and a bolt insertion hole (not shown) of an outer frame of the veranda floor 81 is provided.
And bolt insertion hole 6 of bent material 41 of eaves beam fitting 24
4 and a bolt 83 is inserted into a bolt insertion hole (not shown) of a plate 82 welded to the veranda floor beam 80 to fasten a nut.

【0015】つぎに、図4および図5,図26および図
27を用いて、軒屋根13の取付構造について説明す
る。まず、図26に示すように、軒梁26の先端に軒先
に沿って延びる溝形鋼の継ぎ梁96を配設し、ボルト・
ナット85にて軒梁26のエンドプレート67のボルト
挿通孔68に固定する。継ぎ梁96の上フランジの所定
箇所に屋根金物86を設置する。屋根金物86は、図2
7に示すように、溝形鋼の金物本体88内に一対の補強
板87を溶接し、金物本体88の上下のフランジにボル
ト挿通孔89,90を形成し、さらに金物本体88のウ
ェブ外面にトラス固定片91ならびに軒梁固定部材92
を溶接したものである。屋根金物86は、継ぎ梁96上
に載置し、下フランジのボルト挿通孔90にボルト13
0挿通し継ぎ梁96の上フランジに形成したねじ孔(図
示せず)に締結して固定する。さらに、軒梁固定部材9
2のボルト挿通孔(図示せず)ならびに軒梁26の上フ
ランジのボルト挿通孔69にボルト131を挿通しナッ
トを締結する。
Next, the mounting structure of the eaves roof 13 will be described with reference to FIG. 4, FIG. 5, FIG. 26, and FIG. First, as shown in FIG. 26, a channel-shaped joint beam 96 extending along the eaves is provided at the tip of the eaves beam 26,
The nut 85 is fixed to the bolt insertion hole 68 of the end plate 67 of the eaves beam 26. The roof hardware 86 is installed at a predetermined location on the upper flange of the connection beam 96. The roof hardware 86 is shown in FIG.
As shown in FIG. 7, a pair of reinforcing plates 87 are welded in a metal body 88 of a channel steel, bolt insertion holes 89 and 90 are formed in upper and lower flanges of the metal body 88, and further, on the outer surface of the web of the metal body 88. Truss fixing piece 91 and eave beam fixing member 92
Are welded. The roof hardware 86 is placed on the joint beam 96, and the bolt 13 is inserted into the bolt insertion hole 90 of the lower flange.
It is fastened and fixed to a screw hole (not shown) formed in the upper flange of the 0 insertion seam 96. Further, the eave beam fixing member 9
A bolt 131 is inserted into a bolt insertion hole (not shown) of No. 2 and a bolt insertion hole 69 of an upper flange of the eaves beam 26 to fasten a nut.

【0016】また、壁横束25と屋根金物86の間にト
ラス132を掛け渡す。すなわち、トラス132の建物
側端部は、壁横束25の束下金物77内に差込み溶接等
にて固定し、軒先側端部はトラス固定片91に載置して
トラス固定片91のボルト挿通孔(図示せず)にボルト
・ナット133にて固定する。そして、壁横束25の束
上金物76および屋根金物86に軒屋根13を掛け渡し
て傾斜配置する。すなわち、軒屋根13の建物側端部を
壁横束25の束上金物76に載置して、束上金物76の
ボルト挿通孔78にボルト・ナット(図示せず)にて固
定し、軒先側を屋根金物86に載置して金物本体88の
上フランジのボルト挿通孔89にボルト・ナット134
にて固定する。
A truss 132 is extended between the horizontal wall bundle 25 and the roof hardware 86. That is, the building-side end of the truss 132 is fixed in the lower metal fitting 77 of the horizontal wall bundle 25 by welding or the like, and the eave-side end is mounted on the truss fixing piece 91 and the bolt of the truss fixing piece 91 is bolted. It is fixed to an insertion hole (not shown) with a bolt / nut 133. Then, the eaves roof 13 is hanged over the bundle hardware 76 and the roof hardware 86 of the wall horizontal bundle 25 and is inclinedly arranged. That is, the building-side end of the eave roof 13 is placed on the bundled hardware 76 of the horizontal wall bundle 25, and is fixed to the bolt insertion hole 78 of the bundled metal hardware 76 with a bolt and nut (not shown). The side is placed on the roof hardware 86, and the bolt / nut 134 is inserted into the bolt insertion hole 89 of the upper flange of the hardware body 88.
Fix with.

【0017】なお、図3に示すように、建物本体10と
平屋部11の接合部において補強柱20に軒梁26を突
設する他、平屋部11の出隅部においても軒梁95を突
設し、継ぎ梁96を架設して、建物本体10の外壁21
から平屋部11の外壁15に渡って軒屋根13を配設す
る。また、継ぎ梁96は垂れ壁(図示せず)にて化粧
し、かつ継ぎ梁96の3か所を化粧柱97,98,99
にて支持する。
As shown in FIG. 3, an eaves beam 26 is provided on the reinforcing column 20 at the joint between the building body 10 and the one-story portion 11, and an eaves beam 95 is also provided at the corner of the one-story portion 11. And the connecting beam 96 is erected, and the outer wall 21 of the building body 10 is
The eaves roof 13 is arranged over the outer wall 15 of the one-story section 11 from the beginning. Further, the joint beam 96 is decorated with a hanging wall (not shown), and three places of the joint beam 96 are decorated columns 97, 98, 99.
Supported by

【0018】このように構成された建物によると、建物
本体10と平屋部11の接合部分に立設した補強柱20
上に軒梁接合金物24を固定し、軒梁接合金物24に壁
横束25ならびに軒梁26を固定し、壁横束25および
軒梁26にて軒屋根13を支持するので、建物本体10
と平屋部11の接合部分においても軒屋根13を支持す
ることができ、建物本体10から平屋部11に渡って軒
を形成することができる。
According to the thus constructed building, the reinforcing columns 20 erected at the joint between the building body 10 and the one-story section 11 are provided.
The eave beam joint hardware 24 is fixed on the upper side, the wall horizontal bundle 25 and the eave beam 26 are fixed to the eave beam joint hardware 24, and the eave roof 13 is supported by the wall horizontal bundle 25 and the eave beam 26.
The eave roof 13 can also be supported at the junction between the building and the one-story section 11, and an eave can be formed from the building body 10 to the one-story section 11.

【0019】この発明の他の実施例を図28および図2
9に示す。図28は、第1の実施例の軒梁接合金物24
の代わりに適用することができる軒梁接合金物100の
分解斜視図を示しており、本体金物101と補助金物1
02とから構成されている。本体金物101は、柱固定
用のボルト挿通孔124および軒梁固定用のボルト挿通
孔121を形成した底板103上に、柱固定用のボルト
挿通孔124を囲んで各辺にボルト挿通孔115,12
3,125,126を形成した角パイプ104を溶接
し、角パイプ104上端ならびに側面にプレート10
5,106,107を溶接したものである。補助金物1
02は、下フランジに平屋部の外壁固定用のボルト挿通
孔119を形成し、かつウェブにベランダ床固定用のボ
ルト挿通孔110を形成したコ字形金物108の一側
に、ボルト挿通孔116を形成したプレート109を溶
接してなる。
FIGS. 28 and 2 show another embodiment of the present invention.
9 FIG. 28 shows the eave beam joint hardware 24 of the first embodiment.
FIG. 2 shows an exploded perspective view of an eaves beam joint hardware 100 that can be applied instead of the main body hardware 101 and the auxiliary hardware 1.
02. The metal body 101 has a bolt insertion hole 115 on each side surrounding the bolt insertion hole 124 for fixing the column on the bottom plate 103 in which the bolt insertion hole 124 for fixing the column and the bolt insertion hole 121 for fixing the eaves beam are formed. 12
3, 125, 126 are welded to the square pipe 104, and a plate 10
5, 106, 107 are welded. Subsidy 1
02, a bolt insertion hole 116 is formed on one side of a U-shaped metal member 108 in which a bolt insertion hole 119 for fixing an outer wall of a one-story portion is formed in a lower flange, and a bolt insertion hole 110 for fixing a veranda floor is formed in a web. The formed plate 109 is welded.

【0020】つぎに、図29を用いて、軒梁接合金物1
00の取付けについて説明する。まず、本体金物101
を補強柱20上に載置し、底板103のボルト挿通孔1
24ならびにナット(底板103上にあらかじめ溶接)
を介して補強柱20にボルト止めする。本体金物101
のボルト挿通孔115ならびに補助金物102のボルト
挿通孔116にボルト117を挿通して角パイプ104
内にあらかじめ溶接しておいたナット(図示せず)に締
結して、本体金物101と補助金物102を接合する。
本体金物101の側面に補強胴差23,118を接合す
る。補強胴差23,118は、それぞれのエンドプレー
トのボルト挿通孔(図示せず)ならびに角パイプ104
のボルト挿通孔125,126にボルト(図示せず)を
挿通し、角パイプ104内にあらかじめ溶接しておいた
ナット(図示せず)に締結する。補助金物102のボル
ト挿通孔119にボルト120を挿通し、平屋部外壁1
5の上枠に挿通して上枠内にあらかじめ溶接しておいた
ナット(図示せず)に締結する。軒梁26をボルト93
にて補強柱20に固定し、かつ本体金物101の底板1
03に形成したボルト挿通孔121にボルト122を挿
通し、軒梁26の上フランジのボルト挿通孔に挿通して
ナットを締結する。さらに、本体金物101のボルト挿
通孔123に壁横束(図示せず)をボルト止めして、軒
屋根を設置すると共に、補助金物102のボルト挿通孔
110に平屋部上のベランダ床(図示せず)ならびに外
壁15の上面に沿って設けたベランダ床梁(図示せず)
をボルト・ナットにて固定する。
Next, referring to FIG.
00 will be described. First, the main body hardware 101
Is placed on the reinforcing column 20, and the bolt insertion hole 1 of the bottom plate 103 is
24 and nut (welded on bottom plate 103 in advance)
Is bolted to the reinforcing column 20 via. Body hardware 101
The bolt 117 is inserted through the bolt insertion hole 115 of the
The main hardware 101 and the auxiliary hardware 102 are joined together by fastening to a nut (not shown) which has been welded in advance.
The reinforcing body gaps 23 and 118 are joined to the side surface of the main body metal fitting 101. The reinforcing gaps 23, 118 are provided with bolt insertion holes (not shown) of the respective end plates and the square pipe 104.
Bolts (not shown) are inserted through the bolt insertion holes 125 and 126, and fastened to nuts (not shown) welded in the square pipe 104 in advance. The bolt 120 is inserted into the bolt insertion hole 119 of the auxiliary hardware 102, and the one-story outer wall 1
5 and fastened to a nut (not shown) that has been welded into the upper frame in advance. Bolt 93 with eaves beam 26
And the bottom plate 1 of the metal body 101.
The bolt 122 is inserted into the bolt insertion hole 121 formed in the bolt 03 and the nut is fastened by inserting the bolt 122 into the bolt insertion hole of the upper flange of the eaves beam 26. Further, a horizontal wall bundle (not shown) is bolted to the bolt insertion hole 123 of the main hardware 101 to install an eaves roof, and the bolt insertion hole 110 of the auxiliary hardware 102 is provided with a veranda floor (shown in FIG. And veranda floor beams (not shown) provided along the upper surface of the outer wall 15
With bolts and nuts.

【0021】このように構成された軒梁接合金物100
においても、第1の実施例と同様の効果が得られる。さ
らに、平屋部11の屋根形状が変わっても、軒梁接合金
物100の補助金物102のみを変更するだけで対応で
きる。
The eaves beam fitting 100 thus constructed
In this case, the same effect as in the first embodiment can be obtained. Furthermore, even if the roof shape of the one-story portion 11 changes, it can be dealt with only by changing only the auxiliary hardware 102 of the eave beam metal fitting 100.

【0022】[0022]

【発明の効果】請求項1ないし3の建物によれば、建物
本体と平屋部の接合部に立設した柱上に軒梁接合金物を
固定し、軒梁接合金物の軒梁固定部に軒梁を固定し、壁
横束固定部に壁横束を固定し、軒屋根の建物側端部を壁
横束に固定しかつ軒先を軒梁で支持して、建物本体なら
びに平屋部の外壁に渡って連続して軒を設けることがで
きるという効果が得られる。
According to the first to third aspects of the present invention, the eave beam joint hardware is fixed on a pillar erected at the joint between the building body and the one-story building, and the eave beam joint is fixed to the eave beam joint of the eave beam joint hardware. Fix the beam, fix the horizontal wall bundle to the wall horizontal bundle fixing part, fix the eaves roof side end of the building to the horizontal wall bundle, and support the eaves with the eaves beam, on the building body and the outer wall of the one-story building The effect is obtained that the eaves can be provided continuously over the area.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本願発明の建物の外観正面図である。FIG. 1 is an external front view of a building according to the present invention.

【図2】図1のII矢視図である。FIG. 2 is a view taken in the direction of the arrow II in FIG.

【図3】本願発明の外壁構成図である。FIG. 3 is an external wall configuration diagram of the present invention.

【図4】図3のA部分の正面図である。FIG. 4 is a front view of a portion A in FIG. 3;

【図5】図3のA部分の側面図である。FIG. 5 is a side view of a portion A in FIG. 3;

【図6】図3のA部分の平面図である。FIG. 6 is a plan view of a portion A in FIG. 3;

【図7】補強柱の正面図である。FIG. 7 is a front view of a reinforcing column.

【図8】図7の左側面図である。FIG. 8 is a left side view of FIG. 7;

【図9】図7の右側面図である。FIG. 9 is a right side view of FIG. 7;

【図10】図7の平面図である。FIG. 10 is a plan view of FIG. 7;

【図11】図9のXI部分の拡大図である。FIG. 11 is an enlarged view of a portion XI of FIG. 9;

【図12】図9のXII−XII断面図である。FIG. 12 is a sectional view taken along the line XII-XII of FIG. 9;

【図13】軒梁接合金物の斜視図である。FIG. 13 is a perspective view of an eave beam joint hardware.

【図14】軒梁接合金物の正面図である。FIG. 14 is a front view of an eave beam joint hardware.

【図15】軒梁接合金物の平面図である。FIG. 15 is a plan view of the eave beam joint hardware.

【図16】軒梁接合金物の側面図である。FIG. 16 is a side view of the eave beam joint hardware.

【図17】補強胴差の正面図である。FIG. 17 is a front view of a reinforcing trunk difference.

【図18】軒梁の正面図である。FIG. 18 is a front view of an eave beam.

【図19】軒梁の平面図である。FIG. 19 is a plan view of an eave beam.

【図20】図18のXX−XX矢視図である。FIG. 20 is a view taken along the line XX-XX in FIG. 18;

【図21】図18のXXI−XXI断面図である。21 is a sectional view taken along the line XXI-XXI in FIG.

【図22】図18のXXII部分の拡大図である。FIG. 22 is an enlarged view of a part XXII in FIG. 18;

【図23】壁横束の正面図である。FIG. 23 is a front view of the horizontal wall bundle.

【図24】壁横束の平面図である。FIG. 24 is a plan view of a horizontal wall bundle.

【図25】壁横束の側面図である。FIG. 25 is a side view of a horizontal wall bundle.

【図26】軒先部分の側面図である。FIG. 26 is a side view of an eaves portion.

【図27】屋根金物の斜視図である。FIG. 27 is a perspective view of a roof hardware.

【図28】この発明の他の実施例の軒梁接合金物の分解
斜視図である。
FIG. 28 is an exploded perspective view of a metal fitting for eaves beam according to another embodiment of the present invention.

【図29】この発明の他の実施例の軒梁接合金物による
接合部分の斜視図である。
FIG. 29 is a perspective view of a joint portion of another embodiment of the present invention using the eaves beam joint hardware.

【図30】従来の建物の外観正面図である。FIG. 30 is an external front view of a conventional building.

【符号の説明】[Explanation of symbols]

10 建物本体 11 平屋部 13 軒屋根 15,21a,21b 外壁 20 補強柱 23 補強胴差 24,100 軒梁接合金物 25 壁横束 26 軒梁 81 ベランダ床 DESCRIPTION OF SYMBOLS 10 Building main body 11 One-story part 13 Eave roof 15, 21a, 21b Outer wall 20 Reinforcement pillar 23 Reinforcement trunk difference 24,100 Eave joint 25 Metal horizontal bundle 26 Eaves 81 Veranda floor

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 建物本体(10)と平屋部(11)の接
合部に柱(20)を立設し、前記柱(20)の一側方に
前記建物本体(10)の外壁(21a)を並設し、前記
外壁(21a)と平行に前記柱(20)の他側方に前記
平屋部(11)の外壁(15)を並設し、前記柱(2
0)上に軒梁接合金物(24,100)を固定し、 前記軒梁接合金物(24,100)は、下端に柱固定部
(50,124)を形成し、この柱固定部(50,12
4)の一側面下端に平屋部外壁固定部(51,119)
を形成し、前面下端に軒梁固定部(52,121)を形
成し、前面に壁横束固定部(58,123)を形成して
なり、 前記外壁固定部(51,119)に前記平屋部(11)
の前記外壁(15)を固定し、前記軒梁固定部(52,
121)に前方に突出した軒梁(26)を固定し、前記
壁横束固定部(58,123)に壁横束(25)を固定
し、 軒屋根(13)を前記建物本体(10)ならびに前記平
屋部(11)の外壁(15,21a)に沿って配置し、
前記軒屋根(13)の建物側端部を前記壁横束(25)
に固定するとともに前記軒屋根(13)の軒先を前記軒
梁(26)で支持したことを特徴とする建物。
1. A pillar (20) is erected at a junction between a building body (10) and a one-story section (11), and an outer wall (21a) of the building body (10) is provided on one side of the pillar (20). The outer wall (15) of the one-story portion (11) is juxtaposed on the other side of the column (20) in parallel with the outer wall (21a).
0) An eaves beam joint (24, 100) is fixed on the eaves beam joint (24, 100). The eaves beam joint (24, 100) forms a column fixing portion (50, 124) at a lower end, and the column fixing portion (50, 124). 12
4) At the lower end of one side surface, the one-story outer wall fixing part (51, 119)
The eaves beam fixing portion (52, 121) is formed at the lower end of the front surface, and the horizontal wall bundle fixing portion (58, 123) is formed at the front surface, and the flat house is formed at the outer wall fixing portion (51, 119). Department (11)
The outer wall (15) is fixed, and the eave beam fixing portion (52,
121), an eaves beam (26) protruding forward is fixed to the wall horizontal bundle fixing portion (58, 123), and a horizontal wall bundle (25) is fixed to the eave roof (13). And arranged along the outer wall (15, 21a) of the one-story section (11),
The building-side end of the eave roof (13) is connected to the wall horizontal bundle (25).
The eaves roof (13) is supported by the eaves beam (26) and the eaves roof (13) is supported by the eaves beam (26).
【請求項2】 前記軒梁接合金物(24,100)の他
側面に胴差固定部(54,125)を形成し、前記建物
本体(10)の前記外壁(21a)の上端面に沿って配
設した胴差(23)を前記胴差固定部(54,125)
に固定したことを特徴とする請求項1記載の建物。
2. A body gap fixing portion (54, 125) is formed on the other side surface of the eave beam joint hardware (24, 100), and extends along an upper end surface of the outer wall (21a) of the building body (10). The arranged body difference (23) is fixed to the body difference fixing part (54, 125).
The building according to claim 1, wherein the building is fixed to the building.
【請求項3】 前記軒梁接合金物(24,100)の一
側面にベランダ床固定部(64,110)を形成し、前
記平屋部(11)上のベランダ床(81)を前記ベラン
ダ床固定部(64,110)に固定したことを特徴とす
る請求項1記載の建物。
3. A veranda floor fixing portion (64, 110) is formed on one side surface of the eave beam joint hardware (24, 100), and a veranda floor (81) on the one-story portion (11) is fixed to the veranda floor. 2. The building according to claim 1, wherein the building is fixed to the section (64, 110).
JP8618194A 1994-04-25 1994-04-25 building Expired - Lifetime JP2609809B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8618194A JP2609809B2 (en) 1994-04-25 1994-04-25 building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8618194A JP2609809B2 (en) 1994-04-25 1994-04-25 building

Publications (2)

Publication Number Publication Date
JPH07292833A JPH07292833A (en) 1995-11-07
JP2609809B2 true JP2609809B2 (en) 1997-05-14

Family

ID=13879602

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8618194A Expired - Lifetime JP2609809B2 (en) 1994-04-25 1994-04-25 building

Country Status (1)

Country Link
JP (1) JP2609809B2 (en)

Also Published As

Publication number Publication date
JPH07292833A (en) 1995-11-07

Similar Documents

Publication Publication Date Title
JP2609809B2 (en) building
JP3978067B2 (en) Unit building
JP3989274B2 (en) Underground structure for buildings
JP2514578B2 (en) Mansard roof hut structure and construction method
JP2675758B2 (en) Pillar corner cover
JP2614021B2 (en) Roof panel support structure at doorway
JPS5834882Y2 (en) Assembly structure of verandas, balconies, etc.
JPS631682Y2 (en)
JPH0513792Y2 (en)
JP2955188B2 (en) Prefabricated building
JP2742029B2 (en) Roof structure
JPS6217527Y2 (en)
JPS6236883Y2 (en)
JP3037195B2 (en) Eave ceiling mounting structure
JP2506717B2 (en) Building with balcony
JPS6143846Y2 (en)
JPH0738494Y2 (en) Bearing wall panel mounting structure
JP2539997B2 (en) Beam mounting
JP3130352B2 (en) Beam-to-column joints for building units and method of manufacturing the same
JP2532912Y2 (en) Staircase equipment
JP2893321B2 (en) Assembly buildings such as approaches
JPH07207873A (en) Outdoor retaining wall structure
JPH03158539A (en) External wall panel
JPS63883Y2 (en)
JPH0670336B2 (en) External wall panel mounting structure

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970107