Automatic setting method of centre and automatic setting device of centr used for it

Info

Publication number
JP2607342B2
JP2607342B2 JP5195489A JP19548993A JP2607342B2 JP 2607342 B2 JP2607342 B2 JP 2607342B2 JP 5195489 A JP5195489 A JP 5195489A JP 19548993 A JP19548993 A JP 19548993A JP 2607342 B2 JP2607342 B2 JP 2607342B2
Authority
JP
Japan
Prior art keywords
center
inclination
electric
lowering
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP5195489A
Other languages
Japanese (ja)
Other versions
JPH0726897A (en
Inventor
勝美 早坂
昌治 尚和
中島  博
Original Assignee
株式会社福田組
佐賀工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社福田組, 佐賀工業株式会社 filed Critical 株式会社福田組
Priority to JP5195489A priority Critical patent/JP2607342B2/en
Publication of JPH0726897A publication Critical patent/JPH0726897A/en
Application granted granted Critical
Publication of JP2607342B2 publication Critical patent/JP2607342B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、掘削されたトンネルの
内壁面にコンクリートを打設する際に、門型構に取り付
けられているセントルを自動的にトンネルの内壁面にセ
ットさせるセントルの自動セット方法とそれに使用する
セントルの自動セット装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an automatic centrifuge for automatically setting a centur attached to a portal structure to an inner wall of a tunnel when placing concrete on the inner wall of an excavated tunnel. The present invention relates to a setting method and an automatic setting device of a sentence used therein.

【0002】[0002]

【従来の技術】従来より、掘削したトンネルの内壁面に
覆工コンクリートを打設する場合、図10に示すように
門型構Aによって支持されるセントルB(全長9m〜1
2m)が用いられている。前記門型構Aは予めトンネル
内に敷設してあるレールCの上を移動できるようになっ
ており、セントルBはその門型構Aと共に移動できるよ
うにしてあると共に、同セントルBと門型構Aとの間に
設けられている電動ジャッキF、横送り装置H、ターン
バックIによりセントルBを上下昇降させたり、横スラ
イドさせたりすることができるようになっている。な
お、前記セントルBは上部セントル、側壁部セントル等
に分割されており、各部セントルは図示されていないヒ
ンジにより回動できるようになっている。
2. Description of the Related Art Conventionally, when lining concrete is cast on the inner wall surface of an excavated tunnel, as shown in FIG.
2m) is used. The portal structure A can be moved on a rail C previously laid in the tunnel, and the center B can be moved together with the portal structure A. An electric jack F, a lateral feeding device H, and a turnback I provided between the structure A and the center A can vertically move the sentry B up and down and slide it laterally. The sentence B is divided into an upper sentence, a side wall sentry, and the like, and each sentence can be rotated by a hinge (not shown).

【0003】そしてこのセントルBはトンネルの内壁D
に適宜間隔離して対向され、この内壁DとセントルBと
の間の空隙Eへコンクリートを打設し、同コンクリート
が固化したら前記電動ジャッキF、横送り装置H、ター
ンバックIを操作してセントルBを内側に収縮させて打
設済コンクリートから離脱し、その状態で図11に示さ
れるように門型構Aをトンネルの掘削方向へ移動させて
セントルBも同方向に移動させる{但しセントルBの進
行方向後方側の部分(セントルBの後部に突き出すよう
に取り付けられているオーバーラップフランジ)Pが打
設済コンクリートQの先端部と10cm程度重なり合う
ように移動させる}。
[0003] The center B is the inner wall D of the tunnel.
The concrete is poured into the space E between the inner wall D and the centre B, and when the concrete has solidified, the electric jack F, the traversing device H and the turnback I are operated to operate the centrifuge. B is contracted inward to separate from the poured concrete, and in that state, the portal structure A is moved in the direction of excavation of the tunnel as shown in FIG. 11 and the centre B is also moved in the same direction. Is moved so that the portion P (overlap flange attached so as to protrude to the rear of the center B) on the rear side in the traveling direction of P overlaps with the tip of the poured concrete Q by about 10 cm.

【0004】この状態で前記電動ジャッキF、横送り装
置H、ターンバックIを操作してセントルBを外側に広
げてトンネルの内壁Dに適性の空隙Eを設けて対向する
ようにセットさせ、この空隙Eにコンクリートを打設
し、以後、コンクリートの硬化、セントルBの収縮、門
型構A及びセントルBの移動を繰り返してトンネルの掘
削方向へ順次コンクリートの打設を行うものである。
[0004] In this state, the electric jack F, the traversing device H and the turnback I are operated to spread the centrule B outward, and an appropriate gap E is provided in the inner wall D of the tunnel so as to be set to face each other. Concrete is poured into the gap E, and thereafter, concrete hardening, contraction of the center B, and movement of the portal structure A and the center B are repeated, and concrete is sequentially placed in the tunnel excavation direction.

【0005】ところで打設済コンクリートから離脱し、
移動させたセントルBを外側に広げてトンネルの内壁D
に適性の空隙Eを設けて対向するようにセットさせるセ
ット作業は、従来すべて作業員の手による手動操作で行
われていた。以下にその作業手順を説明する。
[0005] By the way, detached from the poured concrete,
Spread the moved centure B outward and expand the inner wall D of the tunnel.
In the related art, the setting operation of providing the appropriate gap E and setting them so as to face each other has conventionally been performed manually by an operator. The operation procedure will be described below.

【0006】.作業員がセントル(上部セントル)B
の前後方向の向きと前後左右方向の傾きとを細かく計測
する。 .計測して得られたデータを基に門型構A上で作業員
が電動ジャッキFと横送り装置Hを操作し、セントル
(上部セントル)Bの前後方向の向き及び前後左右方向
の傾きをトンネルに合わせる。 .作業員が電動ジャッキFを上昇させてセントル(上
部セントル)Bを平行に上昇させ、同セントルBの後端
のオーバーラップフランジPが打設済コンクリ ートQの先端部Rと密着したところで停止させる。.
作業員がターンバックルIを操作して側壁部セントルを
開かせる。
[0006] Worker is Centr (upper centr) B
And the inclination in the front-rear direction and the left-right direction are finely measured. . Based on the data obtained by the measurement, the worker operates the electric jack F and the traversing device H on the portal structure A, and tunnels the front-rear direction and the front-rear left-right inclination of the center (upper center) B. Adjust to . The worker raises the electric jack F to raise the centr (upper centr) B in parallel, and stops when the overlap flange P at the rear end of the centr B comes into close contact with the tip R of the concrete Q in place. Let it. .
The operator operates the turnbuckle I to open the side wall center.

【0007】[0007]

【発明が解決しようとする課題】しかしながら前記のセ
ントルのセット方法には下記のような問題があった。 .通常セントルBには少なくともその前後左右に合計
4本の電動ジャッキFが取り付けられているが、これら
の電動ジャッキFの操作を操作してセントルBの前後左
右方向の傾きを調整したり、平行にセントルBの上昇を
行うためには数人の作業員が必要となる。
However, the above-mentioned method of setting a centre has the following problems. . Usually, at least four electric jacks F are attached to the front and back and left and right of the centre B. By operating these electric jacks F, the inclination of the front and rear and left and right directions of the centre B can be adjusted, and In order to raise the center B, several workers are required.

【0008】.電動ジャッキFが複数あるにもかかわ
らず、各電動ジャッキFは連動していないため、セント
ルBの前後左右方向の傾きを調整した後に同セントルB
を平行に上昇させる際、各電動ジャッキFを操作する作
業員のタイミングが合わないと、先に傾きを調整したセ
ントルBがその上昇中に傾いてしまうことがある。
[0008] Even though there are a plurality of electric jacks F, since each electric jack F is not linked, the center B is adjusted after adjusting the inclination of the center B in the front-rear and left-right directions.
When the operators operating the electric jacks F are not aligned with each other, the centrifuge B whose inclination has been previously adjusted may be inclined during the ascent.

【0009】.作業員が電動ジャッキFを止めるタイ
ミングを見誤ると、セントルBのオーバーラップフラン
ジPの外周が打設済コンクリートQの先端部Rの内周と
きちんと密着しないだけでなく、場合によってはオーバ
ーラップフランジPと打設済コンクリートQとがぶつか
って同コンクリートQにひびが入ることがある。このよ
うなことは重大な工事ミスにつながる虞もあるのでぜひ
ともなくさなければならないことである。
[0009] If the worker mistakes the timing of stopping the electric jack F, not only does the outer periphery of the overlap flange P of the centre B not tightly adhere to the inner periphery of the tip R of the poured concrete Q, but also in some cases, the overlap flange There is a case where the concrete Q is cracked due to the collision between the P and the cast concrete Q. Such a situation may lead to a serious construction error and must be eliminated.

【0010】本発明は、コンクリートの打設に際してセ
ントルの位置調整をできるだけ電動化して、その調整時
間の短縮を可能にするセントルの自動セット方法を提供
すると共に、その位置調整の自動化を可能にするセント
ルの自動セット装置を提供することにある。
The present invention provides a method for automatically setting the centre, which makes it possible to reduce the time required for adjusting the position of the centre when the concrete is poured, thereby minimizing the time required for the adjustment, and also enables the position adjustment to be automated. It is an object of the present invention to provide an automatic setting device of a center.

【0011】[0011]

【課題を解決するための手段】本発明のうち請求項1の
セントルの自動セット方法は図1及び図5〜9に示され
るように、トンネル1内を入口側から奥に向かって移動
する門型構2の上にセットされるセントル3を、同セン
トル3と門型構2との間に取り付けられた昇降用電動ジ
ャッキ4と同昇降用電動ジャッキ4をセントル3の幅方
向に横スライドさせる電動横送り装置5により所望方向
に可動させて、同セントル3をトンネル1の内壁面との
間にコンクリート打設用の空隙6を設けるようにセット
するセントルのセット方法において、以下の〜の作
業工程を行うことを特徴とするものである。
According to a first aspect of the present invention, there is provided a method for automatically setting a sentence, as shown in FIG. 1 and FIGS. The centrifuge 3 set on the mold structure 2 is horizontally slid in the width direction of the centre 3 with the electric jack 4 for lifting and lowering and the electric jack 4 for raising and lowering attached between the same and the portal structure 2. In the method of setting a centre, which is moved in a desired direction by an electric traversing device 5 so as to provide a gap 6 for placing concrete between the inner wall of the tunnel 1 and the center 3, the following operations 1 to 3 are performed. It is characterized by performing a process.

【0012】.前記空隙6へのコンクリート打設終了
の度に、セントル3の側面部を内側に収縮させ、天端部
を降下させてセントル3を打設したコンクリートから離
脱する工程。
[0012] A step of shrinking the side portion of the centur 3 inward each time the concrete placement into the gap 6 is completed, and lowering the top end to separate from the concrete on which the sentre 3 is placed.

【0013】.その状態でセントル3を門型構2によ
りトンネル1内を進行させると共に、同セントル3の進
行方向後方側の周縁7が打設済コンクリート8の先端部
9と上下にオーバーラップする位置に停止させる工程。
[0013] In this state, the center 3 is advanced in the tunnel 1 by the portal structure 2 and stopped at a position where the peripheral edge 7 on the rear side in the direction of travel of the center 3 vertically overlaps the tip 9 of the poured concrete 8. Process.

【0014】.セントル3の前後方向の向きとトンネ
ル1の向きとを一致させる工程。
[0014] A step of matching the front-rear direction of the center 3 with the direction of the tunnel 1;

【0015】.前記昇降用電動ジャッキ4がセントル
3に設けた横傾斜計10の検知データに基づいてセント
ル3をその幅方向の傾きが所定の角度になるように可動
させて同セントル3の幅方向の傾きを自動的に調整する
工程。
[0015] Based on the detection data of the lateral inclinometer 10 provided on the centru 3, the electric jack 4 for raising and lowering moves the centru 3 so that its inclination in the width direction becomes a predetermined angle, and changes the inclination of the centru 3 in the width direction. The process of adjusting automatically.

【0016】.前記昇降用電動ジャッキ4がセントル
3に設けた前後傾斜計11の検知データに基づいてセン
トル3をその前後方向の傾きが所定の角度になるように
可動させて同セントル3の前後方向の傾きを自動的に調
整する工程。
[0016] The lifting / lowering electric jack 4 moves the centr 3 based on the detection data of the front / rear inclinometer 11 provided on the center 3 so that the front / back inclination thereof becomes a predetermined angle, and determines the front / back inclination of the center 3. The process of adjusting automatically.

【0017】.前記昇降用電動ジャッキ4がセントル
3を平行に上昇させて、セントル3の前記周縁7に設け
た接触センサ12が打設済コンクリート8の先端部9と
の接触を感知したところでセントル3の上昇を停止させ
る工程。
[0017] The lifting electric jack 4 raises the sentry 3 in parallel, and when the contact sensor 12 provided on the peripheral edge 7 of the sentry 3 detects the contact with the tip 9 of the poured concrete 8, the sentry 3 is raised. The step of stopping.

【0018】本発明のうち請求項1のセントルの自動セ
ット方法は、トンネル1内を移動する門型構2の上にセ
ットされるセントル3を、同セントル3と門型構2との
間に取り付けられた昇降用電動ジャッキ4と同昇降用電
動ジャッキ4をセントル3の幅方向に横スライドさせる
電動横送り装置5により所望方向に可動させて、同セン
トル3をトンネル1の内壁面との間にコンクリート打設
用の空隙6を設けるようにセットするセントルのセット
方法において、以下の〜の作業工程を行うことを特
徴とするものである。
According to the method for automatically setting a sentry of the present invention, a sentry 3 set on a portal 2 moving in a tunnel 1 is moved between the sentry 3 and the portal 2. The electric jack 4 for lifting and lowering and the electric jack 4 for lifting and lowering the electric jack are moved in a desired direction by an electric traversing device 5 which slides laterally in the width direction of the center 3, and the center 3 is moved between the center 1 and the inner wall surface of the tunnel 1. In the method of setting a sentence for setting a gap 6 for placing concrete in the center, the following steps (1) to (3) are performed.

【0019】.前記空隙6へのコンクリート打設終了
の度に、セントル3の側面部を内側に収縮させ、天端部
を降下させてセントル3を打設したコンクリートから離
脱する工程。
[0019] A step of shrinking the side portion of the centur 3 inward each time the concrete placement into the gap 6 is completed, and lowering the top end to separate from the concrete on which the sentre 3 is placed.

【0020】.その状態でセントル3を門型構2によ
りトンネル1の奥へ進行させると共に、同セントル3の
進行方向後方側の周縁7が打設済コンクリート8の先端
部9と上下にオーバーラップする位置に停止させる工
程。
[0020] In this state, the center 3 is advanced to the back of the tunnel 1 by the portal structure 2 and stopped at a position where the peripheral edge 7 on the rear side in the advancing direction of the center 3 vertically overlaps the tip 9 of the poured concrete 8. Process to make it.

【0021】.セントル3の前後方向の向きとトンネ
ル1の向きとを一致させる工程。
[0021] A step of matching the front-rear direction of the center 3 with the direction of the tunnel 1;

【0022】.前記昇降用電動ジャッキ4がセントル
3に設けた横傾斜計10の検知データに基づいてセント
ル3をその幅方向の傾きが所定の角度になるように可動
させて同セントル3の幅方向の傾きを自動的に調整する
工程。
[0022] Based on the detection data of the lateral inclinometer 10 provided on the centru 3, the electric jack 4 for raising and lowering moves the centru 3 so that its inclination in the width direction becomes a predetermined angle, and changes the inclination of the centru 3 in the width direction. The process of adjusting automatically.

【0023】.前記昇降用電動ジャッキ4がセントル
3に設けた前後傾斜計11の検知データに基づいてセン
トル3をその前後方向の傾きが所定の角度になるように
可動させて同セントル3の前後方向の傾きを自動的に調
整する工程。
[0023] The lifting / lowering electric jack 4 moves the centr 3 based on the detection data of the front / rear inclinometer 11 provided on the center 3 so that the front / back inclination thereof becomes a predetermined angle, and determines the front / back inclination of the center 3. The process of adjusting automatically.

【0024】.前記昇降用電動ジャッキ4がセントル
3を平行に上昇させて、セントル3の前記周縁7に設け
た接触センサ12が打設済コンクリート8の先端部9と
の接触を感知したところでセントル3の上昇を停止させ
る工程。
[0024] The lifting electric jack 4 raises the sentry 3 in parallel, and when the contact sensor 12 provided on the peripheral edge 7 of the sentry 3 detects the contact with the tip 9 of the poured concrete 8, the sentry 3 is raised. The step of stopping.

【0025】.その状態で接触センサ12により周縁
7のコンクリート接触位置がセントル3の幅方向一方に
片寄っていると判別されると、電動横送り装置5がセン
トル3を前記片寄り方向と反対側に横移動させて接触セ
ンサ12を打設済コンクリート8に接触させ、次にこの
横移動距離の1/2だけセントル3を逆方向に横移動さ
せて停止させ、その後に昇降用電動ジャッキ4がセント
ル3を平行に上昇させると共に、セントル3の周縁7の
接触センサ12が打設済コンクリート8との接触を感知
したところでセントル3を停止させる工程が一回以上。
[0025] In this state, when it is determined by the contact sensor 12 that the concrete contact position of the peripheral edge 7 is deviated to one side in the width direction of the centre 3, the electric traverse device 5 laterally moves the centre 3 to the side opposite to the deviation direction. The contact sensor 12 is brought into contact with the placed concrete 8 and then the centrifuge 3 is laterally moved in the reverse direction by half of the lateral movement distance to stop the centrifuge. And the step of stopping the center 3 when the contact sensor 12 on the periphery 7 of the center 3 detects contact with the poured concrete 8 at least once.

【0026】本発明のうち請求項3のセントルの自動セ
ット装置は、トンネル1内を移動する門型構2の上にセ
ットされるセントル3を、同セントル3と門型構2との
間に取り付けられた昇降用電動ジャッキ4と同昇降用電
動ジャッキ4をセントル3の幅方向に横スライドさせる
電動横送り装置5により所望方向に可動させて、同セン
トル3をトンネル1の内壁面との間にコンクリート打設
用の空隙6を設けてセットするセントルのセット装置に
おいて、前記セントル3に、その幅方向の傾きを検知す
る横傾斜計10と、その前後方向の傾きを検知する前後
傾斜計11と、セントル3の移動方向手前側の周縁7に
ものが当たるとそれを感知し且つそれがセントル3の幅
方向のどちら側に当たっているかを判別する接触センサ
12と、セントル3のセット開始の指令を送ると、横傾
斜計10、前後傾斜計11、接触センサ12の検知デー
タに基づいて昇降用電動ジャッキ4と電動横送り装置5
とに指令を送り、同昇降用電動ジャッキ4と電動横送り
装置5とを可動させる制御装置13を備えたことを特徴
とするものである。
According to a third aspect of the present invention, there is provided an automatic centre setting device, wherein a centrifuge 3 set on a portal structure 2 moving in a tunnel 1 is provided between the central 3 and the portal structure 2. The electric jack 4 for lifting and lowering and the electric jack 4 for lifting and lowering the electric jack are moved in a desired direction by an electric traversing device 5 which slides laterally in the width direction of the center 3, and the center 3 is moved between the center 1 and the inner wall surface of the tunnel 1. In the centrifugal setting device for setting and setting a gap 6 for placing concrete in the centrifuge, a lateral inclinometer 10 for detecting the inclination in the width direction and a front and rear inclinometer 11 for detecting the inclination in the front and rear direction are provided on the centre 3. A contact sensor 12 that senses when an object hits the peripheral edge 7 on the near side in the moving direction of the sentence 3 and determines which side in the width direction of the sentence 3 is applied; Sending a command to set the start, transverse inclinometer 10, longitudinal inclination meter 11, the detected data electric transverse feeder and lift the electric jack 4 based on the contact sensor 12 5
And a control device 13 for moving the lifting electric jack 4 and the electric traversing device 5.

【0027】本発明のうち請求項4のセントルの自動セ
ット装置は図2に示されるように、前記横傾斜計10は
セントル3の幅方向に離して配置された液体の入った2
つの横傾斜計測用シリンダ14と、両横傾斜計測用シリ
ンダ14間でそれらの内部の液体が行き来できるように
両シリンダ14を連結する横連結管15と、各横傾斜計
測用シリンダ14内の液体の高さを検出するセンサ16
とで構成され、前記前後傾斜計11はセントル3の前後
方向に離して配置された液体の入った2つの前後斜計測
用シリンダ17と、両前後斜計測用シリンダ17間でそ
れらの内部の液体が行き来できるように両シリンダ17
を連結する横連結管18と、各前後傾斜計測用シリンダ
17内の液体の高さを検出するセンサ19とで構成され
ていることを特徴とするものである。
As shown in FIG. 2, in the automatic centrifugal setting device according to the fourth aspect of the present invention, the lateral inclinometer 10 is provided with a liquid containing liquid 2 which is arranged at a distance from the center 3 in the width direction.
Two horizontal tilt measuring cylinders 14, a horizontal connecting pipe 15 connecting the two cylinders 14 so that the liquid therein can flow between the two horizontal tilt measuring cylinders 14, and a liquid in each of the horizontal tilt measuring cylinders 14. 16 for detecting the height of the
The front-rear inclinometer 11 is composed of two front-rear inclination measuring cylinders 17 each containing a liquid, which are disposed apart from each other in the front-rear direction of the center 3, and a liquid contained in the two front-rear inclination measuring cylinders 17 therebetween. Cylinders 17 so that
And a sensor 19 for detecting the height of the liquid in each of the front-back tilt measurement cylinders 17.

【0028】[0028]

【作用】本発明のうち請求項1のセントルの自動セット
方法では、可動するセントル3の幅方向の傾きとその前
後方向の傾きとが横傾斜計10と前後傾斜計11とによ
り計測されるようになっており、セントル3を打設済の
コンクリート8から離脱させ、移動させて、セントル3
の前後方向の向きとトンネル1の向きとを一致させれ
ば、前記横傾斜計10と前後傾斜計11の検知データに
基づいて昇降用電動ジャッキ4がセントル3の前後左右
方向の傾きを自動的に調整し、その状態でセントル3を
平行に上昇させる。そして接触センサ12が打設済コン
クリート8との接触を感知すると自動的にセントル3の
昇降が停止し、セントル3が自動セットされる。
According to the method for automatically setting a centre of the present invention, the inclination of the movable centre 3 in the width direction and the inclination in the front-back direction are measured by the lateral inclinometer 10 and the front-back inclinometer 11. The center 3 is separated from the concrete 8 already placed and moved to move the center 3
When the direction of the front and rear directions of the tunnel 1 and the direction of the tunnel 1 match, the electric jack 4 for raising and lowering automatically adjusts the inclination of the front and rear directions of the center 3 based on the detection data of the lateral inclinometer 10 and the front and rear inclinometer 11. , And in this state, the sentry 3 is raised in parallel. When the contact sensor 12 detects contact with the poured concrete 8, the ascent and descent of the sentry 3 are automatically stopped, and the sentry 3 is automatically set.

【0029】本発明のうち請求項2のセントルの自動セ
ット方法では、セントル3を打設済のコンクリート8か
ら離脱させ、移動させて、セントル3の前後方向の向き
とトンネル1の向きとを一致させるが、その際に、セン
トル3の軸がトンネルの中心軸から横に位置ずれをして
いても、セントル3が上昇して打設済コンクリート8と
片寄った状態で接触するとそれを接触センサ12が検知
する。しかもセントル3の片寄りが検知されると、電動
横送り装置5が前記セントル3を片寄り方向と反対側に
横移動させ、さらに接触センサ12を打設済コンクリー
ト8に接触させ、次にこの横移動距離の1/2だけセン
トル3を逆方向に横移動させて停止させてセントル3を
トンネル1のセンタに寄せる。この状態で昇降用電動ジ
ャッキ4がセントル3を上昇させるのでセントル3がト
ンネル1のセンタに自動的にセットされる。
In the method for automatically setting a sentry according to the second aspect of the present invention, the sentry 3 is detached from the concrete 8 on which it has been cast, and is moved so that the front-back direction of the sentry 3 matches the direction of the tunnel 1. At this time, even if the axis of the centru 3 is displaced laterally from the central axis of the tunnel, if the centru 3 rises and comes into contact with the poured concrete 8 in a one-sided state, it is detected by the contact sensor 12. Is detected. In addition, when the shift of the sentre 3 is detected, the electric traversing device 5 moves the sentre 3 laterally in the direction opposite to the shift direction, and further causes the contact sensor 12 to come into contact with the poured concrete 8. The center 3 is moved laterally in the reverse direction by half of the lateral movement distance and stopped, and the center 3 is moved to the center of the tunnel 1. In this state, the lifting electric jack 4 raises the sentry 3, so that the sentry 3 is automatically set to the center of the tunnel 1.

【0030】本発明のうち請求項3のセントルの自動セ
ット装置では、昇降用電動ジャッキ4と電動横送り装置
5とによって可動されるセントル3に、その幅方向の傾
きを検知する横傾斜計10と、その前後方向の傾きを検
知する前後傾斜計11と、セントル3の移動方向手前側
の周縁7にものが当たるとそれを感知し且つそれがセン
トル3の幅方向のどちら側に当たっているかを判別する
接触センサ12が取り付けられており、横傾斜計10、
前後傾斜計11、接触センサ12によって検出された検
知データが制御装置15に送られると、同制御装置15
が前記検知データを基に昇降用電動ジャッキ4と電動横
送り装置5とに指令を送りセントル3を可動させてトン
ネル1内に自動的にセットする。
In the automatic centrifugal setting device according to the third aspect of the present invention, the lateral inclinometer 10 for detecting the inclination in the width direction of the centre 3 movable by the electric jack 4 for lifting and lowering and the electric horizontal traversing device 5 is provided. And a front and rear inclinometer 11 for detecting the inclination in the front-rear direction, and detecting when an object hits the peripheral edge 7 on the front side in the moving direction of the sentre 3 and determining which side in the width direction of the sentre 3 is applied. Contact sensor 12 is mounted, and the lateral inclinometer 10
When the detection data detected by the front and rear inclinometer 11 and the contact sensor 12 are sent to the control device 15, the control device 15
Sends a command to the lifting electric jack 4 and the electric traversing device 5 based on the detection data to move the center 3 and automatically set it in the tunnel 1.

【0031】本発明のうち請求項4のセントルの自動セ
ット装置では、前記横傾斜計10がセントル3の幅方向
に離して配置された液体の入った2つの横傾斜計測用シ
リンダ14と、両横傾斜計測用シリンダ14間でそれら
の内部の液体が行き来できるように両シリンダ14を連
結する横連結管15と、各横傾斜計測用シリンダ14内
の液体の高さを検出するセンサ16とで構成されている
ため、セントル3がその幅方向に傾くと、傾いて持ち上
がった方の横傾斜計測用シリンダ14の水位は下がり、
また傾いて下がった方の横傾斜計測用シリンダ14の水
位は上がる。この水位の変化がセンサ15によって検出
されるため、同センサ15によりセントル3の幅方向の
傾きがわかる。
In the automatic centrifugal setting device according to a fourth aspect of the present invention, the lateral inclinometer 10 includes two lateral inclination measuring cylinders 14 each containing a liquid, which are disposed apart from each other in the width direction of the centrifuge 3. A horizontal connecting pipe 15 that connects the two cylinders 14 so that the liquid inside the cylinders 14 can move between the horizontal tilt measuring cylinders 14 and a sensor 16 that detects the height of the liquid in each of the horizontal tilt measuring cylinders 14. When the center 3 is tilted in the width direction, the water level of the side tilt measuring cylinder 14 that is tilted and lifted is lowered,
In addition, the water level of the side tilt measuring cylinder 14 that is tilted down is raised. Since the change in the water level is detected by the sensor 15, the inclination of the center 3 in the width direction can be determined by the sensor 15.

【0032】また、前記前後傾斜計11はセントル3の
前後方向に離して配置された液体の入った2つの前後斜
計測用シリンダ17と、両前後斜計測用シリンダ17間
でそれらの内部の液体が行き来できるように両シリンダ
17を連結する横連結管18と、各前後傾斜計測用シリ
ンダ17内の液体の高さを検出するセンサ19とで構成
されているため、セントル3がその前後方向に傾くと、
傾いて持ち上がった方の前後傾斜計測用シリンダ17の
水位は下がり、また傾いて下がった方の前後傾斜計測用
シリンダ17の水位は上がる。この水位の変化がセンサ
19によって検出されるため、同センサ19によりセン
トル3の前後方向の傾きがわかる。
The front and rear inclinometer 11 is provided between two front and rear oblique measurement cylinders 17 each containing a liquid, which is arranged in the front and rear direction of the center 3, and a liquid inside the two front and rear oblique measurement cylinders 17. Is constituted by a horizontal connecting pipe 18 that connects the two cylinders 17 so that the cylinders 17 can move back and forth, and a sensor 19 that detects the height of the liquid in each of the cylinders 17 for measuring the forward and backward inclination. When tilted,
The water level of the front-rear inclination measuring cylinder 17 that is tilted and raised is lowered, and the water level of the front-rear inclined measurement cylinder 17 that is tilted and lowered is raised. Since the change in the water level is detected by the sensor 19, the inclination of the center 3 in the front-rear direction can be determined by the sensor 19.

【0033】[0033]

【実施例】本発明のセントルの自動セット方法とそれに
使用するセントルの自動セット装置の一実施例を図1〜
9に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the automatic centre setting method of the present invention and an automatic centre setting device used therein are shown in FIGS.
9 will be described.

【0034】図1における1は掘削されたばかりのトン
ネル、2は同トンネル1に敷設されたレール20の上を
トンネル1内を移動する門型構、3は同門型構2の上に
セットされ、同門型構2と共にトンネル1内を移動して
同トンネル1の内壁面21との間に形成された空隙6に
コンクリート8を打設するアーチ形のセントルである。
ちなみに同セントル3は上部セントル25、側壁部セン
トル26とに分割されており、各セントル25、26は
図示されていないヒンジによって回動できるように連結
されている。
In FIG. 1, 1 is a tunnel that has just been excavated, 2 is a portal structure that moves in the tunnel 1 on rails 20 laid in the tunnel 1, 3 is set on the portal structure 2, It is an arch-shaped centre that moves inside the tunnel 1 together with the gate-type structure 2 and places concrete 8 in the gap 6 formed between the tunnel 1 and the inner wall surface 21 of the tunnel 1.
Incidentally, the center 3 is divided into an upper center 25 and a side wall center 26, and the respective centers 25 and 26 are connected by a hinge (not shown) so as to be rotatable.

【0035】前記セントル3は、その前後左右の四隅の
4本の昇降用電動ジャッキ4と、前方の昇降用電動ジャ
ッキ4、後方の昇降用電動ジャッキ4の下部に取り付け
られて前方にある昇降用電動ジャッキ4と後方にある昇
降用電動ジャッキ4とを個別にセントル3の幅方向に横
スライドさせるの電動横送り装置5とにより門型構2上
に取り付けられている。なお、昇降用電動ジャッキ4は
従来から使用されているモータ駆動のジャッキ、電動横
送り装置5は本件出願人が先に開発し出願したセントル
の電動横送り装置(実願平4−66827号:実開平6
−24098号公報)と同一のものである。
The center 3 is attached to the lower portions of four electric jacks 4 for lifting and lowering at the front, rear, left and right corners, a front electric jack 4 for lifting and lower, and a rear electric jack 4 for lifting and lowering the front. The electric jack 4 and the lifting electric jack 4 at the rear are individually mounted on the portal type structure 2 by an electric traversing device 5 which slides laterally in the width direction of the center 3. Incidentally, the lift electric jack 4 jack motor drive that is conventionally used, the electric traversing device 5 electric transverse feeder Sentoru the present applicant has previously developed application (Jitsugantaira No. 4-66827: Heikai 6
-24098) .

【0036】前記セントル3の天井裏には、その前方部
分における幅方向の傾きを計測する第一の横傾斜計10
と、その後方部分における幅方向の傾きを計測する第二
の横傾斜計10と、セントル3の前後方向の傾きを計測
する前後傾斜計11とが取り付けられている。
A first lateral inclinometer 10 for measuring a widthwise inclination at a front portion of the ceiling of the center 3 is provided above the ceiling.
And a second lateral inclinometer 10 for measuring the inclination in the width direction at the rear portion thereof, and a front and rear inclinometer 11 for measuring the inclination of the center 3 in the front and rear direction.

【0037】前記両横傾斜計10は図2に示されるよう
に、セントル3の幅方向に離して配置された液体(水)
の入った2つの横傾斜計測用シリンダ14と、両横傾斜
計測用シリンダ14間でそれらの内部の液体が行き来で
きるように両シリンダ14を連結する横連結管15と、
各横傾斜計測用シリンダ14内の液体の高さを検出する
センサ16とで構成されている。この横傾斜計10は図
2に示されるようにセントル3の幅方向に伸びた梁(H
型鋼)に取付治具28でしっかりと、且つセントル3と
平行になるように固定されている。
As shown in FIG. 2, the two inclinometers 10 are liquid (water) arranged in the width direction of the center 3.
A horizontal connecting pipe 15 that connects the two cylinders 14 so that the liquid inside them can flow back and forth between the two horizontal tilt measuring cylinders 14,
A sensor 16 for detecting the height of the liquid in each lateral inclination measuring cylinder 14. As shown in FIG. 2, the lateral inclinometer 10 is a beam (H) extending in the width direction of the center 3.
(The steel plate) with an attachment jig 28 so as to be firmly parallel to the center 3.

【0038】前記センサ(静電容量型近接スイッチ)1
6は図2(b)に示されるように、各横傾斜計測用シリ
ンダ14の外周側に少し離して各シリンダ14と向かい
合うように取付治具29で固定されている。そして各横
傾斜計測用シリンダ14の静電容量型近接スイッチ16
が、セントル3を水平にした状態で各々の横傾斜計測用
シリンダ14内の水位と同じ高さになるように位置調整
されている。
The sensor (capacitance type proximity switch) 1
As shown in FIG. 2B, 6 is fixed with a mounting jig 29 so as to face each cylinder 14 at a slight distance from the outer peripheral side of each lateral inclination measuring cylinder 14. Then, the capacitance type proximity switch 16 of each cylinder 14 for measuring the lateral inclination
However, the position is adjusted so that the water level in each of the lateral inclination measuring cylinders 14 is equal to the water level in a state where the centre 3 is horizontal.

【0039】このためセントル3がその横幅方向に傾く
と、その両端にある横傾斜計測用シリンダ14内の水の
水位が変化し、傾いて上に上がった方の横傾斜計測用シ
リンダ14では水位が下がり、傾いて下に下がった方の
横傾斜計測用シリンダ14では水位が上り、上がった方
の静電容量型近接スイッチ16では水の検出がなくな
り、一方の下がった方の静電容量型近接スイッチ16で
は引き続いて水の検出がある。これにより、両端の超音
波センサ16の検出信号からセントル3がその横幅方向
のどちら側に傾いているかを検出することができるよう
になっている。
When the center 3 tilts in the lateral width direction, the water level in the horizontal tilt measuring cylinders 14 at both ends thereof changes, and the water level in the horizontal tilt measuring cylinder 14 that is tilted upward is changed. The water level rises in the cylinder 14 for measuring the lateral inclination, which is tilted and lowered, and the water is no longer detected in the capacitance-type proximity switch 16 that has been raised, and the capacitance-type switch whose capacitance is lowered in one of them is used. Proximity switch 16 subsequently detects water. With this, it is possible to detect which side in the lateral width direction the sentry 3 is inclined from the detection signals of the ultrasonic sensors 16 at both ends.

【0040】前記前後傾斜計11は、図2に示した横傾
斜計10と同じ構成で、セントル3の前後方向に離して
配置された液体(水)の入った2つの前後傾斜計測用シ
リンダ17と、両前後傾斜計測用シリンダ17間でそれ
らの内部の液体が行き来できるように両シリンダ17を
連結する横連結管18と、各前後傾斜計測用シリンダ1
7内の液体の高さを検出するセンサ(静電容量型近接ス
イッチ)19とで構成されている。この前後傾斜計11
でも前記横傾斜計10と同様の作用でセントル3の前後
方向の傾きを検出できるようになっている。
The front and rear inclinometer 11 has the same configuration as the lateral inclinometer 10 shown in FIG. 2, and has two front and rear inclination measuring cylinders 17 containing a liquid (water) which are arranged in the front and rear direction of the center 3. A horizontal connecting pipe 18 connecting the two cylinders 17 so that the liquid inside the cylinders 17 can flow back and forth between the two cylinders 17;
And a sensor (capacitance-type proximity switch) 19 for detecting the height of the liquid in 7. This front and rear inclinometer 11
However, the inclination of the center 3 in the front-rear direction can be detected by the same operation as that of the lateral inclinometer 10.

【0041】但し、この前後傾斜計11は前記横傾斜計
10のようにセントル3の梁に完全に固定されておら
ず、必要に応じて前後傾斜計11をセントル3の前後方
向の軸線に対して上下に少しずつ傾かせることができる
ようにセントル3の梁に取り付けられている。これはト
ンネル1にその進行方向に沿って上り或は下りの傾斜が
つけられている場合に、セントル3もトンネル1の傾斜
と同じように傾斜させてコンクリートの打設を行うが、
このときセントル3の前後傾斜計11を予めトンネル1
の傾斜分だけ傾斜させ、セントル3がトンネル1の傾斜
と一致した時に前後傾斜計11が水平になるようにする
ためである。
However, the front and rear inclinometer 11 is not completely fixed to the beam of the centru 3 as in the horizontal inclinometer 10, and the front and rear inclinometer 11 is moved with respect to the longitudinal axis of the centre 3 as necessary. It is attached to the beam of the center 3 so that it can be tilted up and down little by little. This is because when the tunnel 1 is inclined upward or downward along the traveling direction, the center 3 is also inclined and concrete is poured in the same manner as the tunnel 1,
At this time, the front and rear inclinometer 11 of the center 3 was previously set in the tunnel 1
The inclination of the front and rear inclinometer 11 becomes horizontal when the center 3 coincides with the inclination of the tunnel 1.

【0042】前記セントル3の進行方向手前側の周縁7
{同周縁7は図3(a)に示すようにセントル3の後端
に板材36を取り付けて10cm程後ろ側に突き出させ
たオーバラップフランジである}の表面には、細長い棒
状の接触センサ(以後コードSWと記載する)12がセ
ントル3の横幅方向に4つ間隔を空けて取り付けられて
いる。
Peripheral edge 7 on the near side in the traveling direction of the center 3
As shown in FIG. 3A, the peripheral edge 7 is an overlap flange in which a plate member 36 is attached to the rear end of the center 3 and protrudes rearward by about 10 cm. (Hereinafter referred to as a code SW) 12 are attached at four intervals in the lateral width direction of the center 3.

【0043】前記コードSW12は、同図(c)に示さ
れるように2枚の平編線(極細束銅線)30をその間に
加圧導電ゴム(シリコンゴムに金属微粒子を加えたも
の)31を挟んで対向させ、さらにこれらを(絶縁性、
難燃性、耐圧性に富んだ)シリコンゴム32で被覆して
棒状にし、さらにこれを同図(b)に示すようにゴム製
の保護カバー33内に納めてたもので、これを同図
(a)に示すようにオーバーラップフランジ7に細長い
スリット34を形成して、同スリット34内に保護カバ
ー33の上端部分が5mm程突き出るように取り付けて
ある。
As shown in FIG. 3C, the cord SW12 is composed of two flat braided wires (ultrafine bundled copper wires) 30 and a pressurized conductive rubber (silicone rubber to which metal fine particles are added) 31 interposed therebetween. Facing each other, and furthermore, these (insulating,
This is covered with a silicone rubber 32 (rich in flame retardancy and pressure resistance) and formed into a rod shape, which is further housed in a protective cover 33 made of rubber as shown in FIG. As shown in (a), an elongated slit 34 is formed in the overlap flange 7 and the upper end of the protective cover 33 is mounted in the slit 34 so as to protrude by about 5 mm.

【0044】このコードSW12は上部にものが当たる
と、その押圧で保護カバー33、シリコンゴム32が押
され、シリコンゴム32の中にある加圧導電ゴム31に
その押圧が付与されると、同加圧導電ゴム31が絶縁状
態から導電状態に変化し、2枚の平編線30が電気的に
接触した状態になりONとなる。
When the cord SW12 hits the upper part, the protective cover 33 and the silicone rubber 32 are pushed by the pressure, and when the pressure is applied to the pressurized conductive rubber 31 in the silicone rubber 32, the same is applied. The pressurized conductive rubber 31 changes from the insulated state to the conductive state, and the two flat braided wires 30 are brought into an electrically contacting state and turned on.

【0045】なお、オーバーラップフランジ7の付け根
側にはそのアーチ状の外周面に沿ってシール材35を取
り付けてあり、コンクリート打設時に生コンがコードS
W12側に流出しないようにしてある。
A sealing material 35 is attached to the base of the overlap flange 7 along the arch-shaped outer peripheral surface thereof.
It does not flow out to the W12 side.

【0046】前記門型構2の横には前記横傾斜計10、
前後傾斜計11、コードSW12からの検知信号を受け
て昇降用電動ジャッキ4や電動横送り装置5に動作制御
の信号を送り出し、セントル3を可動させる制御装置
(制御盤)13が取り付けられている。この制御盤13
の正面パネルには、図4に示すように多数の表示燈や押
釦がA〜Eにグループ分けされて配置されている。以下
にこの制御盤13の機能をグループ毎に詳細に説明す
る。
Next to the portal type structure 2, the lateral inclinometer 10,
A control device (control panel) 13 that receives a detection signal from the front / rear inclinometer 11 and the detection signal from the code SW 12, sends an operation control signal to the electric lifting jack 4 and the electric traversing device 5, and moves the center 3 is attached. . This control panel 13
As shown in FIG. 4, a large number of indicator lights and push buttons are arranged in groups A to E on the front panel. Hereinafter, the function of the control panel 13 will be described in detail for each group.

【0047】グループAには5つの表示燈があり、図4
中の左側から順に、受電表示燈、コードSW作動表示燈
(L下)、コードSW作動表示燈(L上)、コードSW
作動表示燈(R上)、コードSW作動表示燈(R下)と
なっている。受電表示燈は制御盤に電源(AC200
V)が供給されると点灯するランプ、コードSW作動表
示燈はコードSW12にものが当たると点灯するランプ
であり、L下はオーバーラップフランジ7の左下に取り
付けられているコードSW12、L上はオーバーラップ
フランジ7の左上に取り付けられているコードSW1
2、R上はオーバーラップフランジ7の右上に取り付け
られているコードSW12、R下はオーバーラップフラ
ンジ7の右下に取り付けられているコードSW12の状
態をモニタしている。
Group A has five indicator lights.
Power reception indicator, code SW operation indicator (lower L), code SW operation indicator (upper L), code SW
An operation indicator light (R upper) and a code SW operation indicator light (R lower) are provided. The power receiving indicator lights the power supply (AC200
The lamp which lights up when V) is supplied, the code SW operation indicator light is a lamp which lights up when something hits the code SW12, and the lower part of L is the code SW12 attached to the lower left of the overlap flange 7 and the upper part of L is the code SW12. Code SW1 attached to the upper left of the overlap flange 7
The upper part of R monitors the state of the code SW12 attached to the upper right of the overlap flange 7, and the lower part R monitors the state of the code SW12 attached to the lower right of the overlap flange 7.

【0048】グループBには5つの押釦があり、図4中
の左側から順に、非常停止押釦、手動・自動切替押釦、
自動−上押釦、自動ストップ押釦、自動−下押釦となっ
ている。以下に各押釦を押した時の色々な動作を順を追
って説明する。
There are five push buttons in group B. An emergency stop push button, a manual / automatic switch push button,
An automatic-up push button, an automatic stop push button, and an automatic-down push button. Hereinafter, various operations when each push button is pressed will be described in order.

【0049】前記非常停止押釦は、押すとシーケンサの
全出力が停止する。復帰は同押釦を図中の矢印方向へ摘
みを回して行う(押釦が手前に突き出す)。
When the emergency stop push button is pressed, all outputs of the sequencer are stopped. The return is performed by turning the push button in the direction of the arrow in the figure (the push button protrudes forward).

【0050】前記手動・自動切替押釦は手動、自動の切
替を行うスイッチであり、手動を選択すると昇降用電動
ジャッキ4や電動横送り装置5を各部に設けられている
ペンダントスイッチでマニュアル操作可能となる。自動
を選択すると自動−上押釦、自動ストップ押釦、自動−
下押釦によるセントル3の自動操作が行えるようにな
る。
The manual / automatic switching push button is a switch for switching between manual and automatic. When manual is selected, the electric jack 4 for elevation and the electric transverse feeder 5 can be manually operated by pendant switches provided in each part. Become. When Auto is selected, Auto-up push button, Auto stop push button, Auto-
The automatic operation of the center 3 by the lower push button can be performed.

【0051】前記自動−上押釦は、押すと以下に説明す
る第一ステップから第六ステップまでの動作を行い、セ
ントル3の上昇セットを行う。
When the automatic-up push button is pressed, the operation from the first step to the sixth step, which will be described below, is performed, and the ascent setting of the center 3 is performed.

【0052】第一ステップは、セントル3の前方にある
横傾斜計10の検知信号に基づいて、同セントル3の前
方部分の横幅方向の傾きを調べ、水平になっていない時
は、前側にある昇降用電動ジャッキ4に制御信号を出力
し、同昇降用電動ジャッキ4を可動させて同セントル3
の前方部分の横幅方向の傾きを水平にする。
In the first step, the inclination in the width direction of the front part of the center 3 is checked based on the detection signal of the lateral inclinometer 10 in front of the center 3, and when it is not horizontal, it is on the front side. A control signal is output to the electric jack 4 for lifting and lowering, and the electric jack 4 for lifting and lowering is
The horizontal inclination of the front part is horizontal.

【0053】続いて、セントル3の後方にある横傾斜計
10の検知信号に基づいて、同セントル3の後方部分の
横幅方向の傾きを調べ、水平になっていない時は、後側
にある昇降用電動ジャッキ4に制御信号を出力し、同昇
降用電動ジャッキ4を可動させて同セントル3の後方部
分の横幅方向の傾きを水平にする。
Subsequently, based on the detection signal of the lateral inclinometer 10 behind the center 3, the inclination of the rear part of the center 3 in the width direction is checked. A control signal is output to the electric jack 4, and the electric jack 4 is moved to make the inclination of the rear part of the center 3 horizontal in the horizontal direction.

【0054】続いて、セントル3の前後傾斜計11の検
知信号に基づいて、同セントル3の前後方向の傾きを調
べ、水平になっていない時は、前後の昇降用電動ジャッ
キ4に制御信号を出力し、同昇降用電動ジャッキ4を可
動させて同セントル3の前後方向の傾きを水平にする。
なお、トンネル1が傾斜している場合に、それに合わせ
て前後傾斜計11を傾かせてある時は、セントル3もト
ンネル1の傾斜と同じように傾いてセットされる。この
間にセントル3のコードSW12がどれかひとつでもO
Nになると、全昇降用電動ジャッキ4に制御信号を送
り、これら昇降用電動ジャッキ4を30秒間降下させて
セントル3を降下させ、再度これまでの動作を繰り返
す。
Subsequently, based on the detection signal of the front / rear inclinometer 11 of the center 3, the front / rear inclination of the center 3 is checked, and when the center 3 is not horizontal, a control signal is sent to the front / back electric jacks 4 for elevation. Then, the electric jack 4 is moved to make the tilt of the center 3 in the front-rear direction horizontal.
If the front and rear inclinometer 11 is tilted in accordance with the inclination of the tunnel 1, the center 3 is also set to be tilted in the same manner as the tunnel 1. During this time, if any one of the code SW12 of the center 3 is O
When the value reaches N, a control signal is sent to all the electric jacks 4 for raising and lowering, and the electric jacks 4 for lowering and lowering are lowered for 30 seconds to lower the sentry 3, and the above operation is repeated again.

【0055】続いて、セントル3の前後左右にある4つ
の昇降用電動ジャッキ4に制御信号を出力し、全昇降用
電動ジャッキ4を同調させて可動させ、セントル3を平
行に上昇させる。
Subsequently, a control signal is output to the four lifting / lowering electric jacks 4 at the front, rear, left and right of the center 3, so that all the lifting / lowering electric jacks 4 are tuned and moved, and the center 3 is raised in parallel.

【0056】第二ステップは、第一ステップが完了して
セントル3のオーバーラップフランジ7が打設済コンク
リート8に接触した時、コードSW12がどれかひとつ
でもONになると、タイマーによりその後継続して1秒
間だけ昇降用電動ジャッキ4を可動させ、セントル3全
体を上昇させる(1秒後にセントル3の上昇が停止す
る)。
In the second step, when any one of the cords SW12 is turned on when the overlap flange 7 of the center 3 comes into contact with the poured concrete 8 after the completion of the first step, the timer continues thereafter. The lifting electric jack 4 is moved for only one second to raise the whole sentry 3 (the rising of the sentry 3 stops after one second).

【0057】続いて、各コードSW12のON/OFF
状態を調べ、少なくとも左右両側のコードSW12が1
つづつONになっている時は、第五ステップに進む。
Subsequently, ON / OFF of each code SW12
Check the status and make sure that at least the code SW12
If it is ON, the process proceeds to the fifth step.

【0058】第三ステップは、第二ステップで図7に示
すように左側のコードSW12のみがONになっている
場合に、電動横送り装置5に制御信号を出力し、セント
ル3を右側に横スライドさせる。そして図8に示すよう
に右側のコードSW12がONになるまでセントル3の
右方向への横スライドを行うと共に、この間の移動時間
Tをカウントし、メモリしておき、前記移動時間の半分
T/2だけセントル3を左側に横スライドさせ、停止さ
せる(この状態で通常はセントル3がトンネル1のセン
タに配置される)。続いて第5ステップに進む。
In the third step, as shown in FIG. 7, when only the code SW12 on the left side is turned on as shown in FIG. Slide. Then, as shown in FIG. 8, the center 3 is slid rightward until the right code SW12 is turned on, and the moving time T during this time is counted and stored in a memory. The center 3 is laterally slid to the left by 2 and stopped (in this state, the center 3 is usually arranged at the center of the tunnel 1). Then, it proceeds to the fifth step.

【0059】第四ステップは、第二ステップで最初に右
側のコードSWのみがONになっている場合に、電動横
送り装置5に制御信号を出力し、セントル3を左側に横
スライドさせる。そして左側のコードSW12がONに
なるまでセントル3の左方向への横スライドを行うと共
に、この間の移動時間Tをカウントし、メモリしてお
き、前記移動時間の半分T/2だけセントル3を右側に
横スライドさせ、停止させる(この状態で通常はセント
ル3がトンネル1のセンタに配置される)。続いて第5
ステップに進む。
In the fourth step, when only the code SW on the right side is initially turned on in the second step, a control signal is output to the electric traversing device 5 to slide the sentr 3 to the left side. The center 3 is horizontally slid to the left until the code SW12 on the left side is turned on, the movement time T during this time is counted and stored, and the center 3 is moved to the right by half T / 2 of the movement time. To stop (in this state, the center 3 is usually located at the center of the tunnel 1). Then the fifth
Proceed to step.

【0060】第五ステップは、全昇降用電動ジャッキ4
を同調して上昇させ、セントル3を平行に上昇させる。
コードSW12が1つONになったら、その後1秒間だ
けセントル3の上昇を行う。この間にONになったコー
ドSW12と反対側にセントル3を電動横送り装置5に
より横スライドさせ、少なくとも左右両側のコードSW
12が1つづつONになれば第一次のセット完了となり
第六ステップに進む。しかし左右両側のコードSW12
が1つづつONにならなければ第一ステップに戻り再度
これまでの動作を行う。
The fifth step is the electric lifting and lowering jack 4
Are raised in synchronism, and the center 3 is raised in parallel.
When one of the codes SW12 is turned on, the sentence 3 is raised for only one second thereafter. The center 3 is slid laterally by the electric traversing device 5 on the side opposite to the code SW 12 turned on during this time, and at least the left and right code SWs are turned on.
When 12 is turned on one by one, the first set is completed and the process proceeds to the sixth step. However, the code SW12 on both sides
If is not turned on one by one, the process returns to the first step and the operation up to this point is performed again.

【0061】第六ステップは、第五ステップ完了後に全
昇降用電動ジャッキ4を1秒間同調させて上昇させる。
この間に4つのコードSW12がすべてONになればセ
ントル3の最終的なセットが完了する(この後所望の時
間だけセントル3を上昇させてオーバーラップフランジ
7を打設済コンクリート8に密着させても良い)。もし
4つのコードSW12がすべてONにならない時は作業
員による点検作業を行う。
In the sixth step, after the completion of the fifth step, the entire lifting electric jack 4 is synchronized and raised for one second.
If all the four cords SW12 are turned on during this time, the final setting of the sentry 3 is completed (then, the sentry 3 is raised for a desired time and the overlap flange 7 is brought into close contact with the poured concrete 8). good). If all of the four codes SW12 are not turned on, an inspection is performed by an operator.

【0062】前記自動ストップ押釦は、押すとその時点
で自動操作が停止してセントル3を一時停止させる。
When the automatic stop push button is pressed, the automatic operation is stopped at that point and the sentence 3 is temporarily stopped.

【0063】前記自動−下押釦は、押すと自動的に昇降
用電動ジャッキ4が連動して降下し、セントル3を約1
0cm降下させる。
When the automatic-lower push button is pressed, the electric jack 4 for elevating and lowering automatically lowers in conjunction therewith, and the center 3
Lower by 0 cm.

【0064】グループCには9つの表示燈があり、図4
中の上段左から、前−左下がり表示燈、前レベルOK表
示燈、前−右下がり表示燈、図4中の中段左から、後−
左下がり表示燈、後レベルOK表示燈、後−右下がり表
示燈、図4中の下段左から、前後前下がり表示燈、前後
レベルOK表示燈、前後後下がり表示燈となっている。
Group C has nine indicator lights.
From the upper left of the middle, the front-lower left indicator light, the previous level OK indicator light, the front-lower right indicator light, from the middle left in FIG.
The lower left indicator light, the rear level OK indicator light, the rear-right lower indicator light, the front / rear front lower indicator light, the front / rear level OK indicator light, and the front / rear lower indicator light from the lower left of FIG.

【0065】前記前−左下がり表示燈は、セントル3の
前方にある横傾斜計10が左下がりになっている時、即
ちセントル3の前方左側の昇降用電動ジャッキ4部分が
他の部分より下がっているときに点灯する(自動−上釦
が押されていない場合のみ)。自動−上釦が押されてい
る場合に、自動上昇時にレベル補正のため、前方左側の
昇降用電動ジャッキ4が上昇作動中は0.2秒間隔で点
滅する。
The front-left descending indicator light indicates that the inclinometer 10 in front of the center 3 is lowering left, that is, the electric jack 4 for lifting and lowering the front left side of the center 3 is lower than the other parts. Lights when the button is on (auto-up only when the up button is not pressed). When the automatic-up button is pressed, the electric jack 4 for raising and lowering on the front left blinks at intervals of 0.2 seconds during the ascending operation for level correction at the time of automatic ascent.

【0066】前記前レベルOK表示燈は、セントル3の
前方にある横傾斜計10が水平になっている時、即ちセ
ントル3の前方側の左右方向が水平になっているときに
点灯する(自動−上釦が押されていない場合のみ)。
The front level OK indicator light is turned on when the lateral inclinometer 10 in front of the center 3 is horizontal, that is, when the horizontal direction in front of the center 3 is horizontal (automatically). -Only when the up button is not pressed).

【0067】前記前−右下がり表示燈は、セントル3の
前方にある横傾斜計10が右下がりになっている時、即
ちセントル3の前方右側の昇降用電動ジャッキ4部分が
他の部分より下がっているときに点灯する(自動−上釦
が押されていない場合のみ)。自動−上釦が押されてい
る場合に、自動上昇時にレベル補正のため、前方右側の
昇降用電動ジャッキ4が上昇作動中は0.2秒間隔で点
滅する。
The forward-downward-indicating indicator light indicates that the inclinometer 10 in front of the center 3 is down-sloping, that is, the electric jack 4 for lifting and lowering the front right side of the center 3 is lower than the other parts. Lights when the button is on (auto-up only when the up button is not pressed). When the automatic-up button is pressed, the front right lifting electric jack 4 blinks at intervals of 0.2 seconds during the ascending operation for level correction during automatic ascent.

【0068】前記後−左下がり表示燈は、セントル3の
後方にある横傾斜計10が左下がりになっている時、即
ちセントル3の後方左側の昇降用電動ジャッキ4部分が
他の部分より下がっているときに点灯する(自動−上釦
が押されていない場合のみ)。自動−上釦が押されてい
る場合に、自動上昇時にレベル補正のため、後方左側の
昇降用電動ジャッキ4が上昇作動中は0.2秒間隔で点
滅する。
The rear-left descending indicator light is used when the lateral inclinometer 10 behind the center 3 is down-sloping, that is, the portion of the electric jack 4 on the left side behind the center 3 is lower than the other portions. Lights when the button is on (auto-up only when the up button is not pressed). When the automatic-up button is pressed, the rear left electric jack 4 blinks at intervals of 0.2 seconds during the ascending operation for level correction during automatic ascent.

【0069】前記後レベルOK表示燈は、セントル3の
後方にある横傾斜計10が水平になっている時、即ちセ
ントル3の後方側の左右方向が水平になっているときに
点灯する(自動−上釦が押されていない場合のみ)。
The rear level OK indicator light is turned on when the lateral inclinometer 10 behind the center 3 is horizontal, that is, when the horizontal direction behind the center 3 is horizontal (automatically). -Only when the up button is not pressed).

【0070】前記後−右下がり表示燈は、セントル3の
後方にある横傾斜計10が右下がりになっている時、即
ちセントル3の後方右側の昇降用電動ジャッキ4部分が
他の部分より下がっているときに点灯する(自動−上釦
が押されていない場合のみ)。自動−上釦が押されてい
る場合に、自動上昇時にレベル補正のため、後方右側の
昇降用電動ジャッキ4が上昇作動中は0.2秒間隔で点
滅する。
The rear-downward-indicating indicator lights when the inclinometer 10 behind the center 3 is down-sloping, that is, the portion of the electric jack 4 for raising and lowering right behind the center 3 is lower than the other portions. Lights when the button is on (auto-up only when the up button is not pressed). When the automatic-up button is pressed, the rear right lifting electric jack 4 blinks at intervals of 0.2 seconds during the ascending operation for level correction during automatic ascent.

【0071】前記前後前下がり表示燈は、セントル3の
前後にある前後傾斜計11が前下がりになっている時、
即ちセントル3の前側の昇降用電動ジャッキ4部分が後
側の部分より下がっているときに点灯する(自動−上釦
が押されていない場合のみ)。自動−上釦が押されてい
る場合に、自動上昇時にレベル補正のため、前方の昇降
用電動ジャッキ4が上昇作動中は0.2秒間隔で点滅す
る。
The front / rear down indicator light indicates that the front / rear inclinometers 11 before and after the center 3 are in front down.
That is, the light is turned on when the electric lifting jack 4 on the front side of the center 3 is lower than the rear part (only when the automatic-up button is not pressed). When the automatic-up button is pressed, the front elevation electric jack 4 blinks at an interval of 0.2 seconds during the ascending operation for level correction during automatic ascent.

【0072】前記前後レベルOK表示燈は、セントル3
の前後にある前後傾斜計11が水平になっている時、即
ちセントル3の前後方向が水平になっているときに点灯
する(自動−上釦が押されていない場合のみ)。
The front and rear level OK indicator lights indicate that the center 3
Is lit when the front and rear inclinometers 11 before and after are horizontal, that is, when the front and rear direction of the center 3 is horizontal (only when the auto-up button is not pressed).

【0073】前記前後後下がり表示燈は、セントル3の
前後にある前後傾斜計11が後下がりになっている時、
即ちセントル3の後側の昇降用電動ジャッキ4部分が前
側の部分より下がっているときに点灯する(自動−上釦
が押されていない場合のみ)。自動−上釦が押されてい
る場合に、自動上昇時にレベル補正のため、後方の昇降
用電動ジャッキ4が上昇作動中は0.2秒間隔で点滅す
る。
The front / rear down indicator light indicates that the front / rear inclinometers 11 before and after the center 3 are down.
That is, the light is turned on when the lifting electric jack 4 on the rear side of the center 3 is lower than the front part (only when the automatic-up button is not pressed). When the automatic-up button is pressed, the rear elevation electric jack 4 blinks at an interval of 0.2 seconds during the ascending operation for the level correction at the time of automatic ascent.

【0074】グループDには3つの表示燈があり、図4
中の左側から、前−水不足表示燈、後−水不足表示燈、
前後水不足表示燈となっている。
Group D has three indicator lights.
From left inside, front-water shortage indicator light, rear-water shortage indicator light,
Water shortage indicator lights around.

【0075】前記前−水不足表示燈はセントル3の前方
側にある横傾斜計10のシリンダ12に水が不足してい
ると1秒間隔で点灯する。
The front-water shortage indicator light is illuminated at one-second intervals when the cylinder 12 of the lateral inclinometer 10 in front of the center 3 is short of water.

【0076】前記後−水不足表示燈はセントル3の後方
側にある横傾斜計10のシリンダ12に水が不足してい
ると1秒間隔で点灯する。
The rear-water shortage indicator light is turned on at one-second intervals when the cylinder 12 of the lateral inclinometer 10 at the rear side of the center 3 is short of water.

【0077】前記前後水不足表示燈はセントル3の前後
傾斜計11のシリンダ12に水が不足していると1秒間
隔で点灯する。
The water shortage indicator lights up at intervals of one second when the cylinder 12 of the front and rear inclinometer 11 of the center 3 is short of water.

【0078】グループEには7つの表示燈があり、下か
ら上に順番に第一ステップ表示燈、第二ステップ表示
燈、第三ステップ表示燈、第四ステップ表示燈、第五ス
テップ表示燈、第六ステップ表示燈、セット完了表示燈
となっている。
Group E has seven indicator lights, a first step indicator light, a second step indicator light, a third step indicator light, a fourth step indicator light, a fifth step indicator light, in order from bottom to top. The sixth step indicator light and the setting completion indicator light.

【0079】前記の各ステップ表示燈は、グループBに
ある自動−上押釦が押された時に、各ステップが完了す
る度に点灯する。そして最終的にセントル3のセットが
完了するとセット完了表示燈が点灯する。
Each of the above-mentioned step indicators is turned on each time each step is completed when the automatic-up push button in the group B is pressed. When the setting of the center 3 is finally completed, the setting completion indicator light is turned on.

【0080】[0080]

【発明の効果】本発明のセントルの自動セット方法とそ
れに使用するセントルの自動セット装置によれば、初回
のコンクリート打設時のみ、前記昇降用電動ジャッキ4
と電動横送り装置5とを任意の手段でコントロールして
セントル3のセットを行い、以後は、トンネル1の内壁
面とセントル3との間に形成された空隙6へのコンクリ
ート打設終了の度に、セントル3を内側に収縮、降下さ
せて脱型し、その状態でセントル3を門型構2によりト
ンネル1の奥へ進行させると共に、同セントル3の進行
方向手前側の周縁7と打設コンクリート8の先端部9と
がオーバーラップするようにし、その後に同セントル3
の前後方向の向きとトンネル1の向きとを一致させる
と、後はトンネル1とセントル3との位置調整が自動的
に行われるので従来のマニュアル操作によるセットに比
べて格段に作業性が良い。また、セントル3がコンクリ
ートと強くぶつかるような事故も起こらないので、安全
性も高い。
According to the method for automatically setting a centre of the present invention and the apparatus for automatically setting a centre used therein, the electric jack 4 for elevating and lowering only during the first concrete placement.
The centrifuge 3 is set by controlling the electric traverse device 5 and the electric traverse device 5 by any means, and thereafter, every time the concrete is poured into the gap 6 formed between the inner wall surface of the tunnel 1 and the centur 3 Then, the centrelle 3 is contracted inward, lowered, and removed from the mold. In this state, the centrelle 3 is advanced to the depth of the tunnel 1 by the portal structure 2, and is driven into the perimeter 7 on the front side in the traveling direction of the centrelle 3. The tip 9 of the concrete 8 overlaps, and then the center 3
When the direction of the front and rear directions of the tunnel 1 and the direction of the tunnel 1 are made to coincide with each other, the position of the tunnel 1 and the center 3 is automatically adjusted thereafter, so that the workability is remarkably improved as compared with the conventional manual operation. In addition, there is no accident in which the center 3 hits the concrete strongly, so that the safety is high.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のセントルの自動セット装置の一実施例
を示す斜視図。
FIG. 1 is a perspective view showing an embodiment of an automatic setting device of a sentence of the present invention.

【図2】(a)は図1のセントルの自動セット装置に取
り付けられている左右傾斜計の静電容量型近接スイッチ
を外した状態での正面図、(b)は左右傾斜計の側面
図。
2 (a) is a front view of the left and right inclinometer attached to the automatic center setting device of FIG. 1 with a capacitance type proximity switch removed, and FIG. 2 (b) is a side view of the left and right inclinometer. .

【図3】(a)は接触センサの取り付け例を示した断面
図、(b)は前記接触センサの保護カバーを含んだ断面
図、(c)は前記接触センサの構造を示す斜視図。
3A is a cross-sectional view showing an example of mounting a contact sensor, FIG. 3B is a cross-sectional view including a protective cover of the contact sensor, and FIG. 3C is a perspective view showing the structure of the contact sensor.

【図4】図1のセントルの自動セット装置に取り付けら
れている制御装置の斜視図。
FIG. 4 is a perspective view of a control device attached to the automatic setting device of the center of FIG. 1;

【図5】本発明のセントルの自動セット方法を説明する
図であって、コンクリート打設後、脱型したセントルを
トンネルの掘削方向に引き出したところの状態を示して
いる図。そして(a)はその正面図、(b)はその上面
図である。
FIG. 5 is a view for explaining the automatic centre setting method of the present invention, and is a view showing a state in which after removing the concrete, the removed centur is pulled out in the tunnel excavation direction. (A) is a front view thereof, and (b) is a top view thereof.

【図6】本発明のセントルの自動セット方法を説明する
図であって、引き出したセントルを次のコンクリート打
設に備えて軸合わせしているところの状態を示している
図。そして(a)はその正面図、(b)は上面図であ
る。
FIG. 6 is a view for explaining the automatic centre setting method of the present invention, showing a state in which the pulled-out centur is aligned for the next concrete casting. (A) is a front view, and (b) is a top view.

【図7】本発明のセントルの自動セット方法を説明する
図であって、図1のセット装置によりセントルを横スラ
イドさせているところの状態を示している図。そして
(a)はその正面図、(b)は上面図である。
FIG. 7 is a view for explaining a method of automatically setting a sentence according to the present invention, showing a state in which the sentence is slid laterally by the setting device of FIG. 1; (A) is a front view, and (b) is a top view.

【図8】本発明のセントルの自動セット方法を説明する
図であって、図1のセット装置によりセントルを図7と
は逆向きに横スライドさせてセンタリングをしていると
ころの状態を示している図。そして(a)はその正面
図、(b)は上面図である。
FIG. 8 is a view for explaining a method of automatically setting a sentence of the present invention, showing a state in which the sentry is horizontally slid in a direction opposite to that of FIG. 7 by the setting device of FIG. 1 to perform centering; Figure. (A) is a front view, and (b) is a top view.

【図9】本発明のセントルの自動セット方法を説明する
図であって、図1のセット装置によりセントルの上昇セ
ットを行うところの状態を示している図。そして(a)
はその正面図、(b)は上面図である。
FIG. 9 is a diagram illustrating a method of automatically setting a sentence according to the present invention, and is a diagram illustrating a state where the sentence is set to be raised by the setting device of FIG. And (a)
Is a front view, and (b) is a top view.

【図10】従来のトンネル覆工コンクリート打設工事に
用いられるセントルの正面図。
FIG. 10 is a front view of a center used for a conventional tunnel lining concrete placing work.

【図11】図10のセントルのセット方法を説明する説
明図であり、(a)はその正面図、(b)はその上面
図。
FIGS. 11A and 11B are explanatory diagrams for explaining a method of setting the sentence in FIG. 10, wherein FIG. 11A is a front view and FIG. 11B is a top view.

【符号の説明】[Explanation of symbols]

1 トンネル 2 門型構 3 セントル 4 昇降用電動ジャッキ 5 電動横送り装置 6 空隙 7 周縁 8 打設済コンクリート 9 先端部 10 横傾斜計 11 前後傾斜計 12 接触センサ 13 制御装置 14 横傾斜計測用シリンダ 15 横連結管 16 センサ 17 前後斜計測用シリンダ 18 横連結管 19 センサ DESCRIPTION OF SYMBOLS 1 Tunnel 2 Gate type structure 3 Center 4 Electric jack for raising and lowering 5 Electric transverse feeder 6 Air gap 7 Perimeter 8 Concrete poured 9 Tip part 10 Lateral inclinometer 11 Front and rear inclinometer 12 Contact sensor 13 Control device 14 Lateral inclination measuring cylinder 15 Horizontal connecting pipe 16 Sensor 17 Cylinder for front and rear inclination measurement 18 Horizontal connecting pipe 19 Sensor

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中島 博 富山県高岡市荻布209 佐賀工業株式会 社内 (56)参考文献 実開 平6−24098(JP,U) ────────────────────────────────────────────────── ─── Continuing on the front page (72) Inventor Hiroshi Nakajima 209 Ogifu, Takaoka-shi, Toyama In-house Saga Industrial Co., Ltd. (56) References Hikaru Hei 6-24098 (JP, U)

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 トンネル(1)内を移動する門型構
(2)の上にセットされるセントル(3)を、同セント
ル(3)と門型構(2)との間に取り付けられた昇降用
電動ジャッキ(4)と同昇降用電動ジャッキ(4)をセ
ントル(3)の幅方向に横スライドさせる電動横送り装
置(5)により所望方向に可動させて、同セントル
(3)をトンネル(1)の内壁面との間にコンクリート
打設用の空隙(6)を設けるようにセットするセントル
のセット方法において、以下の〜の作業工程を行う
ことを特徴とするセントルの自動セット方法。 .前記空隙(6)へのコンクリート打設終了の度に、
セントル(3)の側面部を内側に収縮させ、天端部を降
下させてセントル(3)を打設したコンクリートから離
脱する工程。 .その状態でセントル(3)を門型構(2)によりト
ンネル(1)の奥へ進行させると共に、同セントル
(3)の進行方向後方側の周縁(7)が打設済コンクリ
ート(8)の先端部(9)と上下にオーバーラップする
位置に停止させる工程。 .セントル(3)の前後方向の向きとトンネル(1)
の向きとを一致させる工程。 .前記昇降用電動ジャッキ(4)がセントル(3)に
設けた横傾斜計(10)の検知データに基づいてセント
ル(3)をその幅方向の傾きが所定の角度になるように
可動させて同セントル(3)の幅方向の傾きを自動的に
調整する工程。 .前記昇降用電動ジャッキ(4)がセントル(3)に
設けた前後傾斜計(11)の検知データに基づいてセン
トル(3)をその前後方向の傾きが所定の角度になるよ
うに可動させて同セントル(3)の前後方向の傾きを自
動的に調整する工程。 .前記昇降用電動ジャッキ(4)がセントル(3)を
平行に上昇させて、セントル(3)の前記周縁(7)に
設けた接触センサ(12)が打設済コンクリート(8)
の先端部(9)との接触を感知したところでセントル
(3)の上昇を停止させる工程。
1. A center (3) set on a portal (2) moving in a tunnel (1) is mounted between the center (3) and the portal (2). The electric jack for elevating and lowering (4) and the electric jack for elevating and lowering (4) are moved in a desired direction by an electric traversing device (5) which slides laterally in the width direction of the sentre (3), and the sentre (3) is tunneled. (1) A method for automatically setting a centur, comprising the steps of the following (1) to (4), wherein the method comprises the steps of: . Each time the concrete is poured into the space (6),
A step of shrinking the side of the centur (3) inward and lowering the top end to separate from the concrete on which the centur (3) is cast. . In this state, the center (3) is advanced to the depth of the tunnel (1) by the portal structure (2), and the peripheral edge (7) of the center (3) on the rear side in the traveling direction is formed of concrete (8). A step of stopping at a position that vertically overlaps the tip (9). . Front and back direction of the center (3) and tunnel (1)
A step of matching the direction of the object. . The lifting / lowering electric jack (4) moves the center (3) based on the detection data of the lateral inclinometer (10) provided in the center (3) so that the inclination in the width direction becomes a predetermined angle. A step of automatically adjusting the inclination of the center (3) in the width direction. . The lifting / lowering electric jack (4) moves the center (3) based on the detection data of the front-rear inclinometer (11) provided on the center (3) so that the front-rear inclination becomes a predetermined angle. A step of automatically adjusting the inclination of the center (3) in the front-rear direction. . The lifting electric jack (4) raises the sentry (3) in parallel, and the contact sensor (12) provided on the periphery (7) of the sentry (3) drives the concrete (8).
Stopping the rise of the sentence (3) when the contact with the front end (9) is detected.
【請求項2】 トンネル(1)内を移動する門型構
(2)の上にセットされるセントル(3)を、同セント
ル(3)と門型構(2)との間に取り付けられた昇降用
電動ジャッキ(4)と同昇降用電動ジャッキ(4)をセ
ントル(3)の幅方向に横スライドさせる電動横送り装
置(5)により所望方向に可動させて、同セントル
(3)をトンネル(1)の内壁面との間にコンクリート
打設用の空隙(6)を設けるようにセットするセントル
のセット方法において、以下の〜の作業工程を行う
ことを特徴とするセントルの自動セット方法。 .前記空隙(6)へのコンクリート打設終了の度に、
セントル(3)の側面部を内側に収縮させ、天端部を降
下させてセントル(3)を打設したコンクリートから離
脱する工程。 .その状態でセントル(3)を門型構(2)によりト
ンネル(1)の奥へ進行させると共に、同セントル
(3)の進行方向後方側の周縁(7)が打設済コンクリ
ート(8)の先端部(9)と上下にオーバーラップする
位置に停止させる工程。 .セントル(3)の前後方向の向きとトンネル(1)
の向きとを一致させる工程。 .前記昇降用電動ジャッキ(4)がセントル(3)に
設けた横傾斜計(10)の検知データに基づいてセント
ル(3)をその幅方向の傾きが所定の角度になるように
可動させて同セントル(3)の幅方向の傾きを自動的に
調整する工程。 .前記昇降用電動ジャッキ(4)がセントル(3)に
設けた前後傾斜計(11)の検知データに基づいてセン
トル(3)をその前後方向の傾きが所定の角度になるよ
うに可動させて同セントル(3)の前後方向の傾きを自
動的に調整する工程。 .前記昇降用電動ジャッキ(4)がセントル(3)を
平行に上昇させて、セントル(3)の前記周縁(7)に
設けた接触センサ(12)が打設済コンクリート(8)
の先端部(9)との接触を感知したところでセントル
(3)の上昇を停止させる工程。 .その状態で接触センサ(12)により周縁(7)の
コンクリート接触位置がセントル(3)の幅方向一方に
片寄っていると判別されると、電動横送り装置(5)が
セントル(3)を前記片寄り方向と反対側に横移動させ
て接触センサ(12)を打設済コンクリート(8)に接
触させ、次にこの横移動距離の1/2だけセントル
(3)を逆方向に横移動させて停止させ、その後に昇降
用電動ジャッキ(4)がセントル(3)を平行に上昇さ
せると共に、セントル(3)の周縁(7)の接触センサ
(12)が打設済コンクリート(8)との接触を感知し
たところでセントル(3)を停止させる工程が一回以
上。
2. A center (3) set on a portal structure (2) moving in a tunnel (1) is mounted between the center (3) and the portal structure (2). The electric jack for elevating and lowering (4) and the electric jack for elevating and lowering (4) are moved in a desired direction by an electric traversing device (5) which slides laterally in the width direction of the sentre (3), and the sentre (3) is tunneled. (1) A method for automatically setting a centur, comprising the steps of the following (1) to (4), wherein the method comprises the steps of: . Each time the concrete is poured into the space (6),
A step of shrinking the side of the centur (3) inward and lowering the top end to separate from the concrete on which the centur (3) is cast. . In this state, the center (3) is advanced to the depth of the tunnel (1) by the portal structure (2), and the peripheral edge (7) of the center (3) on the rear side in the traveling direction is formed of concrete (8). A step of stopping at a position that vertically overlaps the tip (9). . Front and back direction of the center (3) and tunnel (1)
A step of matching the direction of the object. . The lifting / lowering electric jack (4) moves the center (3) based on the detection data of the lateral inclinometer (10) provided in the center (3) so that the inclination in the width direction becomes a predetermined angle. A step of automatically adjusting the inclination of the center (3) in the width direction. . The lifting / lowering electric jack (4) moves the center (3) based on the detection data of the front-rear inclinometer (11) provided on the center (3) so that the front-rear inclination becomes a predetermined angle. A step of automatically adjusting the inclination of the center (3) in the front-rear direction. . The lifting electric jack (4) raises the sentry (3) in parallel, and the contact sensor (12) provided on the periphery (7) of the sentry (3) drives the concrete (8).
Stopping the rise of the sentence (3) when the contact with the front end (9) is detected. . In this state, when it is determined by the contact sensor (12) that the concrete contact position of the periphery (7) is offset to one side in the width direction of the centre (3), the electric traverse device (5) moves the centre (3) to the aforementioned position. The contact sensor (12) is moved laterally in the direction opposite to the one-sided direction so that the contact sensor (12) contacts the cast concrete (8), and then the centur (3) is laterally moved in the opposite direction by half of the lateral movement distance. After that, the electric jack (4) for raising and lowering raises the center (3) in parallel, and the contact sensor (12) on the periphery (7) of the center (3) is connected to the concrete (8). The step of stopping the center (3) once the contact is detected is performed once or more.
【請求項3】 トンネル(1)内を移動する門型構
(2)の上にセットされるセントル(3)を、同セント
ル(3)と門型構(2)との間に取り付けられた昇降用
電動ジャッキ(4)と同昇降用電動ジャッキ(4)をセ
ントル(3)の幅方向に横スライドさせる電動横送り装
置(5)により所望方向に可動させて、同セントル
(3)をトンネル(1)の内壁面との間にコンクリート
打設用の空隙(6)を設けてセットするセントルのセッ
ト装置において、前記セントル(3)に、その幅方向の
傾きを検知する横傾斜計(10)と、その前後方向の傾
きを検知する前後傾斜計(11)と、セントル(3)の
移動方向手前側の周縁(7)にものが当たるとそれを感
知し且つそれがセントル(3)の幅方向のどちら側に当
たっているかを判別する接触センサ(12)と、セント
ル(3)のセット開始の指令を送ると、横傾斜計(1
0)、前後傾斜計(11)、接触センサ(12)の検知
データに基づいて昇降用電動ジャッキ(4)と電動横送
り装置(5)とに指令を送り、同昇降用電動ジャッキ
(4)と電動横送り装置(5)とを可動させる制御装置
(13)を備えたことを特徴とするセントルの自動セッ
ト装置。
3. A center (3) set on a portal structure (2) moving in a tunnel (1) is mounted between the center (3) and the portal structure (2). The electric jack for elevating and lowering (4) and the electric jack for elevating and lowering (4) are moved in a desired direction by an electric traversing device (5) which slides laterally in the width direction of the sentre (3), and the sentre (3) is tunneled. In a centrifugal setting device for setting and setting a gap (6) for placing concrete between the inner wall surface of (1) and a lateral inclinometer (10) for detecting a tilt in a width direction of the centur (3). ), A front and rear inclinometer (11) for detecting the inclination in the front and rear direction, and when an object hits the peripheral edge (7) on the front side in the moving direction of the sentre (3), it is detected and detected. Contact to determine which side in the width direction is hit When a command to start setting of the sensor (12) and the center (3) is sent, the inclinometer (1) is sent.
0), a command is sent to the electric lifting jack (4) and the electric traversing device (5) based on the detection data of the front and rear inclinometer (11) and the contact sensor (12), and the electric lifting jack (4) is sent. An automatic setting device for a centr, comprising: a control device (13) for moving a motor and an electric traverse device (5).
【請求項4】 前記横傾斜計(10)はセントル(3)
の幅方向に離して配置された液体の入った2つの横傾斜
計測用シリンダ(14)と、両横傾斜計測用シリンダ
(14)間でそれらの内部の液体が行き来できるように
両シリンダ(14)を連結する横連結管(15)と、各
横傾斜計測用シリンダ(14)内の液体の高さを検出す
るセンサ(16)とで構成され、前記前後傾斜計(1
1)はセントル(3)の前後方向に離して配置された液
体の入った2つの前後斜計測用シリンダ(17)と、両
前後斜計測用シリンダ(17)間でそれらの内部の液体
が行き来できるように両シリンダ(17)を連結する横
連結管(18)と、各前後傾斜計測用シリンダ(17)
内の液体の高さを検出するセンサ(19)とで構成され
ていることを特徴とする請求項3のセントルの自動セッ
ト装置。
4. The lateral inclinometer (10) comprises a sentence (3).
The two cylinders (14) for measuring the lateral inclination, which contain the liquid and are arranged in the width direction of the cylinder (14), and the two cylinders (14) for allowing the liquid inside to move between the cylinders (14) for measuring the lateral inclination. ), And a sensor (16) for detecting the height of the liquid in each of the cylinders for measuring the lateral inclination (16).
1) is a front / rear oblique measurement cylinder (17) containing a liquid which is arranged at a distance in the front / rear direction of the center (3), and the liquid inside the front / rear oblique measurement cylinder (17) flows between the two cylinders. Horizontal connecting pipe (18) connecting both cylinders (17) so that they can be measured, and cylinders (17) for measuring the forward and backward inclination
4. The automatic centr setting device according to claim 3, further comprising a sensor for detecting a height of the liquid in the centrifuge.
JP5195489A 1993-07-13 1993-07-13 Automatic setting method of centre and automatic setting device of centr used for it Expired - Lifetime JP2607342B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5195489A JP2607342B2 (en) 1993-07-13 1993-07-13 Automatic setting method of centre and automatic setting device of centr used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5195489A JP2607342B2 (en) 1993-07-13 1993-07-13 Automatic setting method of centre and automatic setting device of centr used for it

Publications (2)

Publication Number Publication Date
JPH0726897A JPH0726897A (en) 1995-01-27
JP2607342B2 true JP2607342B2 (en) 1997-05-07

Family

ID=16341941

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5195489A Expired - Lifetime JP2607342B2 (en) 1993-07-13 1993-07-13 Automatic setting method of centre and automatic setting device of centr used for it

Country Status (1)

Country Link
JP (1) JP2607342B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4522596B2 (en) * 2001-02-07 2010-08-11 岐阜工業株式会社 Method and apparatus for placing concrete in tunnel widening work
ITBG20060050A1 (en) 2006-10-06 2008-04-07 Abb Service S Rl LOW VOLTAGE SWITCH WITH INTERCHANGEABLE POLES
CN108894803B (en) * 2018-09-14 2024-04-05 中交第二公路工程局有限公司 Tunnel primary support steel frame installation auxiliary equipment and construction method thereof
CN114086793B (en) * 2021-12-14 2023-03-03 南京康泰建筑灌浆科技有限公司 Intelligent grouting equipment for two-component epoxy resin

Also Published As

Publication number Publication date
JPH0726897A (en) 1995-01-27

Similar Documents

Publication Publication Date Title
JP3048027B2 (en) Mobile formwork device for tunnel and method of positioning the formwork
CN110905003B (en) Automatic well lid replacing equipment for flaw detection
JP2607342B2 (en) Automatic setting method of centre and automatic setting device of centr used for it
CN110632475A (en) Track slab steel reinforcement cage insulating property detection equipment
KR0162000B1 (en) Central mechanism for tire valcanizer
CN111255484B (en) Trolley with automatic positioning system and positioning method thereof
JP3481532B2 (en) Form lifting control method and apparatus
CN114475867B (en) Leveling equipment for automobile skylight mechanical group
JPH062495A (en) Vibration giving device for placed concrete
KR101628335B1 (en) high place operation car
KR100234098B1 (en) Backup apparatus and its method for part mounter
JPS5869915A (en) Working platform moving on curved face
JPH0740508Y2 (en) Lance pipe moving device synchronized with tilting of electric furnace
JPH0332721B2 (en)
JP3132948B2 (en) Piping positioning device
JPH10310378A (en) Spad shift length measuring device for pin roller jack device
JPH07300801A (en) Holding device for rail and sleeper
JP2021193267A (en) Automatic setting system for form for tunnel lining and automatic setting method
JPS5848254Y2 (en) Coil center position detection device
JP2610511B2 (en) Automatic woodpecker
KR20220152608A (en) Laser device
JPH07314452A (en) Tire transport loader
JP2023135140A (en) Tunnel lining formwork and localization method of tunnel lining formwork
JPH06270060A (en) Grinding reference surface position detector for grinding robot
JPH07100974B2 (en) Concrete compaction equipment

Legal Events

Date Code Title Description
S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080213

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090213

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090213

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100213

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110213

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120213

Year of fee payment: 15

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130213

Year of fee payment: 16

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140213

Year of fee payment: 17

EXPY Cancellation because of completion of term