JP2607210B2 - Column and beam joining method - Google Patents

Column and beam joining method

Info

Publication number
JP2607210B2
JP2607210B2 JP2474193A JP2474193A JP2607210B2 JP 2607210 B2 JP2607210 B2 JP 2607210B2 JP 2474193 A JP2474193 A JP 2474193A JP 2474193 A JP2474193 A JP 2474193A JP 2607210 B2 JP2607210 B2 JP 2607210B2
Authority
JP
Japan
Prior art keywords
joining
joint
piece
metal
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2474193A
Other languages
Japanese (ja)
Other versions
JPH06212694A (en
Inventor
直樹 田中
宏一 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2474193A priority Critical patent/JP2607210B2/en
Publication of JPH06212694A publication Critical patent/JPH06212694A/en
Application granted granted Critical
Publication of JP2607210B2 publication Critical patent/JP2607210B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、建築や土木、橋梁の分
野において、鉄骨構造材である柱とはりの接合工法に関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for joining a column and a beam, which are steel structural members, in the fields of construction, civil engineering, and bridges.

【0002】[0002]

【従来の技術】先に発明者は、極力数少ない溶接箇所及
びボルトの締め付け箇所で接合できるので、いわばワン
タッチで接合できる鉄骨構造材の接合金物を考案し、こ
れを実願平2-106139号(実開平4-62804 号公報)として
出願した。
2. Description of the Prior Art The inventor of the present invention has devised a metal joint of a steel structure material which can be joined with one-touch, so that the joint can be made with a few welding spots and bolt tightening spots as much as possible. No. 4-62804).

【0003】かかる鉄骨構造材の接合金物を使用したは
りと柱の接合工法を図11〜図13に示すと、図中1は鉄骨
のはり、2は鉄骨の柱で、ボルトが貫通する透孔4を形
成した接合片3を小間隔で櫛の歯状に突設した接合金物
5をはり1のフランジ1a端と柱2の側面とにそれぞれ
設ける。
FIGS. 11 to 13 show a joining method of a beam and a column using such a metal joint of a steel structure material. In the drawings, reference numeral 1 denotes a steel beam, 2 denotes a steel column, and a through hole through which a bolt penetrates. Bonding pieces 3 each having a joint piece 4 formed thereon and projecting at small intervals in a comb-teeth shape are provided on the end of the flange 1 a of the beam 1 and the side surface of the column 2, respectively.

【0004】これらはり1や柱2への接合金物5の設置
は、工場サイドで行い、図11に示すように接合金物5付
きのものとしてはり1や柱2は出荷・運搬される。
The metal fittings 5 are installed on the beams 1 and the columns 2 at the factory side, and the beams 1 and the columns 2 are shipped and transported with the metal fittings 5 as shown in FIG.

【0005】そして現場では、図12に示すように先に建
込んだ柱2間にはり1をクレーンで吊り込み、その際に
接合金物5の接合片3同士を噛合わせ、図13に示すよう
に、透孔4に高力ボルト6を挿通してナット止めで締め
付けることにより、はり1と柱2とを接合金物5同士の
結合を介して接合する。
At the site, as shown in FIG. 12, the beam 1 is hung by a crane between the pillars 2 previously built, and at this time, the joining pieces 3 of the joining hardware 5 are engaged with each other, as shown in FIG. Then, the beam 1 and the column 2 are joined to each other by joining the metal fittings 5 by inserting a high-strength bolt 6 into the through hole 4 and tightening with a nut.

【0006】このようにすることにより、接合金物5相
互は櫛の歯状の接合片3同士が交互に位置して噛合い、
しかもこの噛合いを直交方向に高力ボルト6で締め付け
るので、各櫛の歯状の接合片3は2面摩擦によりボルト
の軸力の90%以上を伝達することができる。
In this manner, the metal joints 5 are interdigitated with the comb-shaped joint pieces 3 alternately positioned.
In addition, since this meshing is fastened in the orthogonal direction by the high-strength bolt 6, the comb-shaped joint piece 3 of each comb can transmit 90% or more of the axial force of the bolt by two-sided friction.

【0007】また、各接合片3は櫛の歯状に極力小さく
細分化されているので、各接合片3の断面軸方向耐力は
前記摩擦力より小さい。すなわち、各接合片3は高力ボ
ルト6で摩擦力が与えられると、その断面耐力を100 %
発揮できるようになり、2冊の本を頁を絡ませて組み合
わせるように接合金物5同士は分離しにくいものとな
る。
Further, since each joining piece 3 is subdivided as small as possible in the shape of a comb, the sectional axial strength of each joining piece 3 is smaller than the frictional force. That is, when the frictional force is given to each joint piece 3 by the high-strength bolt 6, its sectional proof strength is 100%.
Thus, the metal joints 5 are hardly separated from each other so that the two books are entangled with pages and combined.

【0008】なお、図示の例では柱2は内ダイヤフラム
7を有する鋼管柱として記載したが、H型鉄骨の柱でも
よい。また、接合金物5は各接合片3が寄せ集まる基部
8を設け、この基部8をはり1や柱2に溶接するが、基
部8は一連のものでもよいが図示のごとく各接合片3に
膨出部9を設け、この膨出部9を並べて構成するもので
もよい。
In the illustrated example, the column 2 is described as a steel tube column having the inner diaphragm 7, but may be an H-shaped steel column. Also, the metal joint 5 is provided with a base 8 on which the joint pieces 3 are gathered, and the base 8 is welded to the beam 1 or the pillar 2. The base 8 may be a series, but as shown in FIG. The projecting portion 9 may be provided, and the projecting portion 9 may be arranged side by side.

【0009】[0009]

【発明が解決しようとする課題】しかし、前記図11〜図
13に示す従来工法では高力ボルト6で接合片3同士を締
め付けるまでは、吊り込んだはり1をクレーンで支えて
いなければならず、その分クレーンの稼働時間が長くな
る。
However, FIG. 11 to FIG.
In the conventional method shown in FIG. 13, the suspended beam 1 must be supported by the crane until the joint pieces 3 are fastened with the high-strength bolt 6, and the operating time of the crane is lengthened accordingly.

【0010】本発明の目的は前記従来例の不都合を解消
し、ボルトが貫通する透孔を形成した接合片を小間隔で
櫛の歯状に突設した接合金物をはり端部側と柱側面側と
にそれぞれ設け、これら接合金物の接合片同士を噛合わ
せ、透孔にボルトを挿通して締め付けることにより、は
りと柱とを接合金物同士の結合を介して接合する柱とは
りとの接合工法において、簡単に仮受けできるようにし
てクレーンの稼働時間を短縮することができる柱とはり
の接合工法を提供することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to solve the above-mentioned disadvantages of the prior art, and to form a joint metal member having a through hole through which a bolt penetrates and projecting at small intervals in a comb-teeth shape, and to form a beam end side and a column side surface. The joint between the beam and the column is joined by joining the joint pieces of the joint hardware, inserting the bolts into the through holes and tightening, and joining the beam and the column through the joint of the joint hardware. It is an object of the present invention to provide a method of joining a column and a beam that can be temporarily temporarily received and shorten the operating time of a crane.

【0011】[0011]

【課題を解決するための手段】本発明は前記目的を達成
するため、柱側面側の接合金物は接合片間下方にこの接
合片間下端を開放面としないような仮受け金物を配設
し、はりを吊り込み、柱側面側の接合金物の接合片には
り端部側の接合金物の接合片を噛み合わせる際に、該は
り端部側の接合金物の接合片下端を前記柱側面側の接合
金物の仮受け金物で仮支承すること、もしくは、はり端
部側の接合金物は接合片間上方にこの接合片間上端を開
放面としないような仮受け金物を配設し、はりを吊り込
み、柱側面側の接合金物の接合片にはり端部側の接合金
物は接合片を噛み合わせる際に、該はり端部側の接合金
物の接合片は前記仮受け金物を介して柱側面側の接合金
物の接合片で仮支承されること、および、仮受け金物は
鋼棒もしくはプレートであり、これを接合片上端にこれ
ら接合片と交差方向に溶接すること、または、仮受け金
物は、接合金物の接合片のうち、特定のものを他より高
いものとし、その突出部から側方への張出材であること
を要旨とするものである。
According to the present invention, in order to attain the above object, a temporary metal fitting is provided below the joint piece so that the lower end between the joint pieces is not an open surface. When the beam is suspended, and the joining piece of the joining metal piece at the beam end side is engaged with the joining piece of the joining metal piece at the pillar side, the lower end of the joining piece of the joining metal piece at the beam end side is attached to the pillar side. Temporarily support with the temporary metal fittings of the joint metal, or arrange the temporary metal fitting on the beam end side such that the upper end between the joint pieces does not become an open surface above the joint pieces, and suspend the beam. When the joining piece of the beam end side is engaged with the joining piece of the joining piece of the joining piece on the column side, the joining piece of the joining piece on the beam end side is connected to the side of the column via the temporary receiving piece. Temporarily supported with the joint piece of the joint metal of the This is welded to the upper end of the joining piece in the direction crossing these joining pieces, or the temporary receiving metal part is made higher than the other one of the joining pieces of the joining metal piece, It is intended that the material should be an overhanging material.

【0012】[0012]

【作用】本発明によれば、先に建込んだ柱間にはりをク
レーンで吊り込んで、柱側面側の接合金物の接合片とは
り端部側の接合金物の接合片同士を噛合わせるように建
込むが、その際に仮受け金物を介してはり端部側の接合
金物の接合片は柱側面側の接合金物の接合片で仮支承さ
れ、その結果、はり全体が仮支承され、クレーンを撤去
しても落下するとはない。
According to the present invention, a beam between columns previously built is suspended by a crane so that the joint pieces of the metal joints on the side surfaces of the columns and the joint pieces of the metal joints on the beam end side are engaged with each other. At this time, the joint piece of the joint at the beam end is temporarily supported by the joint piece of the joint at the column side via the temporary fitting, and as a result, the entire beam is temporarily supported and the crane It will not fall if you remove it.

【0013】このような仮支承の状態で透孔に高力ボル
トを挿通してナット止めで締め付けて、はりと柱とを接
合金物の接合片同士の結合を介して完全に接合する。
In this state of the temporary support, a high-strength bolt is inserted into the through-hole and fastened with a nut, so that the beam and the column are completely joined through joining of joining pieces of joining hardware.

【0014】[0014]

【実施例】以下、本発明の実施例を図面について詳細に
説明する。図1〜図3は本発明の柱とはりの接合工法の
1実施例を示すもので、前記従来例を示す図11〜図13と
同一構成要素には同一参照符号を付したものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. FIGS. 1 to 3 show an embodiment of a method for joining a pillar and a beam according to the present invention, in which the same components as those in FIGS. 11 to 13 showing the conventional example are denoted by the same reference numerals.

【0015】前記従来例と同じく、ボルトが貫通する透
孔4を形成した接合片3を小間隔で櫛の歯状に突設した
接合金物5をはり1のフランジ1a端と柱2の側面とに
それぞれ設ける。
In the same manner as in the conventional example, a joining piece 3 having a through hole 4 through which a bolt penetrates is formed so as to protrude at small intervals in the form of teeth of a comb. To be provided respectively.

【0016】本発明は、このうち柱2の側面側に溶接す
る接合金物5は鋼棒としての鉄筋10を接合片3の下端に
これら接合片3と交差方向に溶接した。該鉄筋10を溶接
する接合片3は図3に示すように並列するもののうち一
番外側に位置するものでよい。このようにして、前記鉄
筋10は接合片3間の下方にこの接合片3間下端を開放面
としないような底板状の仮受け金物として取付られる。
In the present invention, a metal joint 5 to be welded to the side surface of the column 2 is formed by welding a reinforcing bar 10 as a steel rod to a lower end of the joint piece 3 in a direction crossing the joint piece 3. As shown in FIG. 3, the joining pieces 3 for welding the reinforcing bars 10 may be located at the outermost side among the juxtaposed ones. In this way, the reinforcing bar 10 is attached below the joint pieces 3 as a temporary support in the form of a bottom plate such that the lower end between the joint pieces 3 is not an open surface.

【0017】また、柱2にははり1との仕口で上下に接
合金物5が取付けられるが、かかる鉄筋10による仮受け
金物を設ける接合金物5は下方のもののみでよい。
The metal joints 5 are attached to the column 2 at the connection with the beam 1 up and down at the connection with the beam 1, but the metal joints 5 provided with the temporary metal fittings by the reinforcing bars 10 may be only lower ones.

【0018】図4は本発明の第2実施例を示すもので、
前記鉄筋10に代えて鋼製のプレート11を底板状の仮受け
金物として取付てもよい。
FIG. 4 shows a second embodiment of the present invention.
Instead of the rebar 10, a steel plate 11 may be attached as a bottom plate-shaped temporary receiving hardware.

【0019】先に建込んだ柱2間にはり1をクレーンで
吊り込んで、柱2側面側の接合金物5の接合片3間には
り1の端部側の接合金物5の接合片3を上方から落とし
込んで差し入れるようにし、これら接合片3同士を噛合
わせるように建込む。
The beam 1 is suspended by a crane between the pillars 2 previously built, and the joining piece 3 of the joining metal piece 5 at the end of the beam 1 is joined between the joining pieces 3 of the joining metal piece 5 on the side surface of the pillar 2. It is dropped from above and inserted, and the joint pieces 3 are built so as to mesh with each other.

【0020】その際に、はり1の端部側の接合金物5の
接合片3は鉄筋10もしくはプレート11上に載り、これを
介してはり側の接合金物5の接合片3は柱1側の接合金
物5の接合片3で仮支承される。
At this time, the joint piece 3 of the metal joint 5 on the end side of the beam 1 rests on the reinforcing bar 10 or the plate 11, and the joint piece 3 of the metal joint 5 on the beam side passes through this. Temporarily supported by the joint pieces 3 of the joint hardware 5.

【0021】図5は本発明の第3実施例を示すもので、
柱1側の接合金物5の並列する接合片3のうち、特定の
もの例えば一番外側に位置する接合片3は他の中側の接
合片3より高さのあるものとし、各接合片3は上端を合
致させた場合、この高さのある接合片3は下方に突出す
る。
FIG. 5 shows a third embodiment of the present invention.
Of the joining pieces 3 arranged in parallel with the joining hardware 5 on the column 1 side, a specific one, for example, the outermost joining piece 3 is supposed to be higher than the other middle joining pieces 3. When the upper ends are matched, the joining piece 3 having this height projects downward.

【0022】そこで、この突出部に側方への張出材12を
設け、これを接合片3間下端を開放面としないような底
板状の仮受け金物とした。
In view of the above, the projecting portion 12 is provided with a lateral overhang 12 which is used as a bottom plate-shaped temporary receiving metal such that the lower end between the joining pieces 3 is not an open surface.

【0023】該張出材12ではり1の端部側の接合金物5
の接合片3を仮支承することは、前記第1、第2実施例
と同様である。
The metal fitting 5 at the end of the beam 1
Temporarily supporting the joint piece 3 is the same as in the first and second embodiments.

【0024】図6は本発明の第4〜第6実施例として、
はり1の端部側の接合金物5の接合片3間上方にこの接
合片3間上端を開放面としないような仮受け金物を配設
した。
FIG. 6 shows a fourth to sixth embodiments of the present invention.
Above the joint pieces 3 of the joint piece 5 on the end side of the beam 1, a temporary receiving piece was arranged such that the upper end between the joint pieces 3 did not become an open surface.

【0025】この仮受け金物は、第4実施例としては図
7、図8に示すように前記第1実施例と同じく鋼棒とし
ての鉄筋10を接合片3の上端にこれら接合片3と交差方
向に溶接したもの、第5実施例としては図9に示すよう
に、前記第2実施例と同じく鉄筋10に代えて鋼製のプレ
ート11を天板状の仮受け金物として取付けたもの、およ
び、第6実施例としては図10に示すように、接合金物5
の並列する接合片3のうち、特定のものの突出部分に設
ける側方への張出材12を仮受け金物とする。
As shown in FIGS. 7 and 8, this temporary receiving metal piece has a reinforcing bar 10 as a steel rod at the upper end of the joining piece 3, as shown in FIGS. In the fifth embodiment, as shown in FIG. 9, a steel plate 11 is attached as a top plate-like temporary holding member instead of the reinforcing bar 10 as in the second embodiment, as shown in FIG. As a sixth embodiment, as shown in FIG.
Of the joining pieces 3 arranged side by side, a laterally extending material 12 provided on a protruding portion of a specific thing is used as a temporary receiving hardware.

【0026】なお、はり1には上下にフランジ1aのそ
れぞれの端に接合金物5が取付けられるが、かかる仮受
け金物を設ける接合金物5は上フランジに設けるものの
みでよい。
Note that the metal fittings 5 are attached to the upper and lower ends of the beam 1 at the respective ends of the flanges 1a. However, the metal fittings 5 for providing such temporary metal fittings need only be provided on the upper flange.

【0027】先に建込んだ柱2間にはり1をクレーンで
吊り込んで、柱2側面側の接合金物5の接合片3間には
り1の端部側の接合金物5の接合片3を上方から落とし
込んで差し入れるようにし、これら接合片3同士を噛合
わせるように建込む。
The beam 1 is suspended between the previously built columns 2 by a crane, and the joint pieces 3 of the joint metal 5 at the end of the beam 1 are joined between the joint pieces 3 of the joint metal 5 on the side surface of the column 2. It is dropped from above and inserted, and the joint pieces 3 are built so as to mesh with each other.

【0028】その際に、はり1の端部側の接合金物5の
接合片3間の上端を開放面としないような仮受け金物で
ある前記鉄筋10、プレート11、張出材12が柱2側面側の
接合金物5の接合片3の上端に当たり、これを介しては
り1側の接合金物5の接合片3は柱1側の接合金物5の
接合片3で仮支承される。
At this time, the reinforcing bar 10, the plate 11, and the overhang 12, which are temporary receiving metal members such that the upper end between the bonding pieces 3 of the metal bonding member 5 on the end side of the beam 1 do not become an open surface, are used. The joining piece 3 of the joining piece 5 on the beam 1 is temporarily supported by the joining piece 3 of the joining piece 5 on the column 1 through the upper end of the joining piece 3 of the joining piece 5 on the side surface.

【0029】[0029]

【発明の効果】以上述べたように本発明の柱とはりの接
合工法は、ボルトが貫通する透孔を形成した接合片を小
間隔で櫛の歯状に突設した接合金物をはり端部側と柱側
面側とにそれぞれ設け、これら接合金物の接合片同士を
噛合わせ、透孔にボルトを挿通して締め付けることによ
り、はりと柱とを接合金物同士の結合を介して接合する
柱とはりとの接合工法において、簡単に仮受けできるよ
うにしてクレーンの稼働時間を短縮することができるも
のである。
As described above, in the method of joining a column and a beam according to the present invention, a joining piece having a through hole through which a bolt penetrates is formed by protruding at a small interval into a comb-teeth shape. The column and the column that are provided on the side and the column side, respectively, engage the joint pieces of these metal joints, insert bolts into the through holes and tighten, thereby joining the beam and the column through the joint between the metal joints. In the joining method with a beam, the crane operation time can be shortened by making it possible to easily receive the beam temporarily.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の柱とはりの接合工法の第1実施例を示
す正面図である。
FIG. 1 is a front view showing a first embodiment of a method for joining a column and a beam according to the present invention.

【図2】本発明の柱とはりの接合工法の第1実施例を示
す要部の正面図である。
FIG. 2 is a front view of a main part showing a first embodiment of the method of joining a column and a beam according to the present invention.

【図3】本発明の柱とはりの接合工法の第1実施例を示
す要部の側面図である。
FIG. 3 is a side view of a main part showing a first embodiment of the method of joining a column and a beam according to the present invention.

【図4】本発明の柱とはりの接合工法の第2実施例を示
す要部の正面図である。
FIG. 4 is a front view of a main part showing a second embodiment of the method of joining a column and a beam according to the present invention.

【図5】本発明の柱とはりの接合工法の第3実施例を示
す要部の側面図である。
FIG. 5 is a side view of a main part showing a third embodiment of the method of joining a column and a beam according to the present invention.

【図6】本発明の柱とはりの接合工法の第4実施例を示
す正面図である。
FIG. 6 is a front view showing a fourth embodiment of the method of joining columns and beams according to the present invention.

【図7】本発明の柱とはりの接合工法の第4実施例を示
す要部の正面図である。
FIG. 7 is a front view of a main part showing a fourth embodiment of the method of joining a column and a beam according to the present invention.

【図8】本発明の柱とはりの接合工法の第4実施例を示
す要部の側面図である。
FIG. 8 is a side view of a main part showing a fourth embodiment of the method of joining a column and a beam according to the present invention.

【図9】本発明の柱とはりの接合工法の第5実施例を示
す要部の正面図である。
FIG. 9 is a front view of a main part showing a fifth embodiment of the method of joining columns and beams according to the present invention.

【図10】本発明の柱とはりの接合工法の第6実施例を
示す要部の側面図である。
FIG. 10 is a side view of a main part showing a sixth embodiment of the method of joining a column and a beam according to the present invention.

【図11】従来例を示す建方前の平面図である。FIG. 11 is a plan view showing a conventional example before erecting.

【図12】従来例を示す建方中の正面図である。FIG. 12 is a front view of a conventional example during construction.

【図13】従来例を示す建方後の平面図である。FIG. 13 is a plan view showing a conventional example after erecting.

【符号の説明】[Explanation of symbols]

1…はり 1a…フランジ 2…柱 3…接合片 4…透孔 5…接合金物 6…高力ボルト 7…ダイヤフラム 8…基部 9…膨出部 10…鉄筋 11…プレート 12…張出材 DESCRIPTION OF SYMBOLS 1 ... Beam 1a ... Flange 2 ... Column 3 ... Joint piece 4 ... Through-hole 5 ... Joint metal 6 ... High-strength bolt 7 ... Diaphragm 8 ... Base 9 ... Swelling part 10 ... Reinforcing bar 11 ... Plate 12 ... Overhanging material

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ボルトが貫通する透孔を形成した接合片
を小間隔で櫛の歯状に突設した接合金物をはり端部側と
柱側面側とにそれぞれ設け、これら接合金物の接合片同
士を噛合わせ、透孔にボルトを挿通して締め付けること
により、はりと柱とを接合金物同士の結合を介して接合
する柱とはりとの接合工法において、柱側面側の接合金
物は接合片間下方にこの接合片間下端を開放面としない
ような仮受け金物を配設し、はりを吊り込み、柱側面側
の接合金物の接合片にはり端部側の接合金物の接合片を
噛み合わせる際に、該はり端部側の接合金物の接合片下
端を前記柱側面側の接合金物の仮受け金物で仮支承する
ことを特徴とした柱とはりの接合工法。
1. A joining piece having a through hole through which a bolt penetrates is formed by protruding at small intervals in a comb-teeth shape on a beam end side and a column side face, respectively, and joining pieces of these joining pieces are provided. In the method of joining the beam and the column through the joint of the joint metal by joining the bolts and inserting the bolts into the through holes and tightening, the joint metal on the column side is a joint piece. A temporary metal fitting is arranged below the joint piece so that the lower end of the joint piece does not become an open surface, the beam is suspended, and the joint piece of the joint metal piece on the side of the pillar side is engaged with the joint piece of the metal joint piece at the end of the beam. A joining method of a column and a beam, wherein a lower end of a joining piece of a joining metal piece at a beam end side is temporarily supported by a temporary receiving metal piece of the joining metal piece at a side of the column when joining.
【請求項2】 ボルトが貫通する透孔を形成した接合片
を小間隔で櫛の歯状に突設した接合金物をはり端部側と
柱側面側とにそれぞれ設け、これら接合金物の接合片同
士を噛合わせ、透孔にボルトを挿通して締め付けること
により、はりと柱とを接合金物同士の結合を介して接合
する柱とはりとの接合工法において、はり端部側の接合
金物は接合片間上方にこの接合片間上端を開放面としな
いような仮受け金物を配設し、はりを吊り込み、柱側面
側の接合金物の接合片にはり端部側の接合金物は接合片
を噛み合わせる際に、該はり端部側の接合金物の接合片
は前記仮受け金物を介して柱側面側の接合金物の接合片
で仮支承されることを特徴とした柱とはりの接合工法。
2. A joint piece having a through-hole through which a bolt penetrates and formed in a comb-like shape at small intervals is provided on each of the beam end side and the column side face, and a joint piece of these joint pieces is provided. In the method of joining the beam and the column through the joint of the joint metal by joining the bolts and inserting bolts into the through holes and tightening, the joint metal on the beam end side A temporary metal fitting is arranged above the piece so that the upper end between the pieces does not become an open surface, a beam is suspended, and the metal piece at the end of the beam is joined to the metal piece at the column side. A method of joining a column and a beam, wherein, at the time of engagement, a joint piece of a metal joint on the beam end side is temporarily supported by a joint piece of a metal joint on the side of the column via the temporary receiving metal.
【請求項3】 仮受け金物は鋼棒もしくはプレートであ
り、これを接合片上端にこれら接合片と交差方向に溶接
する請求項1および請求項2記載の柱とはりの接合工
法。
3. The method according to claim 1, wherein the temporary metal fitting is a steel bar or a plate, and the steel bar or the plate is welded to an upper end of the joining piece in a direction crossing the joining piece.
【請求項4】 仮受け金物は、接合金物の接合片のう
ち、特定のものを他より高いものとし、その突出部から
側方への張出材である請求項1および請求項2記載の柱
とはりの接合工法。
4. The temporary holding member according to claim 1, wherein a specific one of the joining pieces of the joining metal member is higher than the other, and the temporary receiving member is an overhanging material protruding laterally from a protruding portion thereof. Column and beam joining method.
JP2474193A 1993-01-19 1993-01-19 Column and beam joining method Expired - Lifetime JP2607210B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2474193A JP2607210B2 (en) 1993-01-19 1993-01-19 Column and beam joining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2474193A JP2607210B2 (en) 1993-01-19 1993-01-19 Column and beam joining method

Publications (2)

Publication Number Publication Date
JPH06212694A JPH06212694A (en) 1994-08-02
JP2607210B2 true JP2607210B2 (en) 1997-05-07

Family

ID=12146579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2474193A Expired - Lifetime JP2607210B2 (en) 1993-01-19 1993-01-19 Column and beam joining method

Country Status (1)

Country Link
JP (1) JP2607210B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113789855B (en) * 2021-07-15 2023-03-21 山东昌源材料科技有限公司 Connecting device of high-strength steel structure node

Also Published As

Publication number Publication date
JPH06212694A (en) 1994-08-02

Similar Documents

Publication Publication Date Title
JP2607210B2 (en) Column and beam joining method
JP2001172913A (en) Elevated bridge and its construction method
JP2702365B2 (en) Building construction method using precast concrete members
KR20080020915A (en) Bolted moment resist connection of steel column and steel beams for easy site job
JPH06248722A (en) Joining method for precast reinforcement concrete earthquake resisting wall and steel frame beam
JPH0673203U (en) Beam-column joint structure
JPH02221535A (en) Connecting structure for pillar and beam
JPH09177365A (en) Mounting structure for steel plate damper in steel structure or steel encased reinforced concrete
JP3135037B2 (en) Wall structure body and wall structure
JPH0715922Y2 (en) Joining hardware for reinforced concrete columns and steel beams
JP2662760B2 (en) Joint structure between steel pipe column and beam
JPH06136858A (en) Method of connecting precast concrete member
JPH0649895A (en) Joint structure between reinforced concrete pillar and steel frame beam
JPH0434147A (en) Connecting structure for precast concrete column and beam
JP2600411Y2 (en) Column-beam joint structure
JP2023149165A (en) Reinforcement connection part structure for existing frame member
JP3125165B2 (en) Warehouse frame
JPH06995B2 (en) Method for joining columns and PC beams
JPH09317000A (en) Connection method and structure of column and beam
JPH0637128Y2 (en) Joint structure of columns and beams
JPS63251542A (en) Connection structure of pillar and beam
JPH0732113U (en) Temporary prop
JPS61196036A (en) Connection of precast pillar and precast beam
KR101376782B1 (en) Joint structure of steel beam and precast concrete beam