JP2579457Y2 - Garbage storage pit - Google Patents
Garbage storage pitInfo
- Publication number
- JP2579457Y2 JP2579457Y2 JP1992088374U JP8837492U JP2579457Y2 JP 2579457 Y2 JP2579457 Y2 JP 2579457Y2 JP 1992088374 U JP1992088374 U JP 1992088374U JP 8837492 U JP8837492 U JP 8837492U JP 2579457 Y2 JP2579457 Y2 JP 2579457Y2
- Authority
- JP
- Japan
- Prior art keywords
- pit
- garbage
- waste
- refuse
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Description
【0001】[0001]
【産業上の利用分野】本考案は、ごみ焼却設備における
ごみ貯留ピットに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a waste storage pit in a waste incineration plant.
【0002】[0002]
【従来の技術】従来、例えば、ごみ焼却炉のごみ貯留ピ
ットについては、例えば図14に示すものが知られてい
る。2. Description of the Related Art Conventionally, for example, a waste storage pit of a waste incinerator as shown in FIG. 14 is known.
【0003】図において、101は進入して来たごみ収
集車102によりごみが投入されるプラットフォーム、
103はごみを貯留するためのごみピット、104はご
みクレーン、105はごみホッパをそれぞれ示す。[0003] In the figure, reference numeral 101 denotes a platform on which refuse is to be thrown in by a garbage truck 102 that has entered,
103 is a waste pit for storing waste, 104 is a waste crane, and 105 is a waste hopper.
【0004】ここで、ごみ貯留ピットは、敷地面積,プ
ラントの建築取合等から平面が決められ、ごみピット1
03のごみ貯留容積は、2日〜3日分の容量が一般的と
されているが、ごみ焼却炉の敷地面積が制限されている
ので、ごみピット103は一般には面積を広く取れず、
ごみ貯留容積を確保するため地下掘削により深さが得ら
れていた。Here, the flat surface of the refuse storage pit is determined based on the site area, the construction of the plant, and the like.
The garbage pit 103 generally has a capacity of two to three days, but the area of the garbage incinerator is limited.
The depth was obtained by underground drilling to secure the waste storage volume.
【0005】かかる構造のごみ貯留ピットでは、ごみク
レーン104が故障しても、ごみ収集車102からのご
み受け入れは、極端にごみピット103内にごみを貯留
していない限り、1日分程度は問題なく受け入れること
ができ、また、ごみクレーン104の操作室を2階レベ
ル(ごみを投入する位置を1階レベルとすした場合)に
まで下げることができ、中央操作室と併設することがで
きるという長所がある。[0005] In the garbage storage pit having such a structure, even if the garbage crane 104 breaks down, the garbage from the garbage collection vehicle 102 is received for about one day unless garbage is extremely stored in the garbage pit 103. It can be accepted without any problem, and the operation room of the garbage crane 104 can be lowered to the second floor level (in the case where the position where the refuse is charged is at the first floor level), and can be installed together with the central operation room. There is an advantage.
【0006】その反面、ごみピット103の深さが深い
ので、地下水位が高い所での施工は困難となる。また、
防水対策を充分に施す必要がある。さらに、ごみ収集車
102からのごみ投入に危険性がある。ごみピット10
3が深いので、恐怖感を抱くこともあり、ごみピット1
03の施工がコスト高となり、工期もかかる。1階から
上方の空間が無駄になり、有効利用できないという短所
もある。On the other hand, since the depth of the refuse pit 103 is deep, it is difficult to construct the pit 103 at a place where the groundwater level is high. Also,
It is necessary to take sufficient waterproof measures. In addition, there is a risk that refuse is input from the refuse collection vehicle 102. Garbage pit 10
3 is deep, so you may be afraid.
The construction of No. 03 is costly and takes a lot of time. There is also a disadvantage that the space above the first floor is wasted and cannot be used effectively.
【0007】そこで、実開平4−57032号公報に示
すごみ貯留ピットが図15に示すように提案されてい
る。図において、201はプラットフォーム、202は
ごみ収集部、203はごみを貯留するためのごみピッ
ト、204はごみホッパをそれぞれ示す。Therefore, a waste storage pit disclosed in Japanese Utility Model Laid-Open No. 4-57032 has been proposed as shown in FIG. In the figure, 201 is a platform, 202 is a refuse collection unit, 203 is a refuse pit for storing refuse, and 204 is a refuse hopper.
【0008】ごみ収集部202の底面202Aは、ごみ
収集車205が進入して来るプラットフォーム201の
レベルよりも低くなっている。ごみピット203は、ご
み収集部202に隣接し、上記プラットフォーム201
のレベルよりも高い壁206で全周に亘って囲まれてい
る。The bottom surface 202A of the refuse collection unit 202 is lower than the level of the platform 201 on which the refuse collection vehicle 205 enters. The garbage pit 203 is adjacent to the garbage collection unit 202,
Is surrounded all around by a wall 206 higher than the level.
【0009】ごみピット203に隣接してごみホッパ2
04が配置されている。そして、ごみピット203の上
方にごみ用メインクレーン207が配置され、ごみ用メ
インクレーン207は、予め投入されたごみ収集部20
2のごみをごみピット203に移送するとともに、ごみ
収集部202に、ごみピット203内のごみをごみホッ
パ204内に投入するようになっている。[0009] Waste hopper 2 adjacent to the waste pit 203
04 is arranged. Then, a garbage main crane 207 is disposed above the garbage pit 203, and the garbage main crane 207 includes
The second refuse is transferred to the refuse pit 203, and the refuse in the refuse pit 203 is thrown into the refuse hopper 204 into the refuse collection unit 202.
【0010】かかるごみ貯留ピットでは、ごみホッパ2
04の地下ピットの深さは3〜4m程度で済み、また、
ごみ収集車205は、通常昼間しか作業しないので、夜
間、ごみ焼却炉側のごみピット203に移されたごみ
を、焼却する場合、夜間のクレーン全自動システム等が
用いられる。In the waste storage pit, the waste hopper 2
The depth of the underground pit of 04 is about 3-4m,
Since the garbage truck 205 normally works only in the daytime, when the garbage transferred to the garbage pit 203 on the garbage incinerator side is incinerated at night, a fully automatic crane system at night is used.
【0011】そして、ごみピット203の地下部分が大
幅に浅くなるので、ごみクレーン207の高さ方向の移
動範囲を少なくでき、一方、投入側では、いつもごみが
殆どない状態の所へ投入する作業となり、仕切壁がない
場合にごみの山を見て気分を害することもなくなる等の
長所がある。Since the underground portion of the garbage pit 203 is significantly shallower, the moving range of the garbage crane 207 in the height direction can be reduced. There is also an advantage that, when there is no partition wall, it does not hurt to see the garbage pile.
【0012】[0012]
【考案が解決しようとする課題】ところが、1つのごみ
クレーン207が、ごみ収集部202からごみピット2
03へのごみの移送作業と、ごみピット203からごみ
ホッパ204へのごみの移送作業の2箇所での移送作業
に用いられているので、ごみクレーン207の、ごみピ
ット203からごみホッパ204へのごみの移送作業に
対する運転の稼働率が低いという問題があった。[Problem to be Solved by the Invention] However, one waste crane 207 is moved from the waste collection unit 202 to the waste pit 2
03, and the waste transfer from the waste pit 203 to the waste hopper 204. There is a problem that the operation rate of the operation for the waste transfer operation is low.
【0013】本考案は、上述の問題点を解決するために
なされたもので、その目的は、ごみクレーンの、ごみピ
ットからごみホッパへのごみの移送作業に対する運転の
稼働率を向上させることができるごみ貯留ピットを提供
することである。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object of the present invention is to improve the operation rate of the operation of a waste crane for transferring waste from a waste pit to a waste hopper. The goal is to provide a waste storage pit that can be used.
【0014】[0014]
【課題を解決するための手段】請求項1記載の考案は、
底面がごみ収集車のプラットフォームのレベルよりも低
いごみ収集部と、ごみ収集部に隣接し、上記プラットフ
ォームのレベルよりも高い壁で囲まれたごみピットと、
ごみピットに隣接して配置されたごみホッパと、ごみピ
ットの上方に配置されてごみピット内のごみをごみホッ
パ内に移送することが可能なごみ用メインクレーンとを
有するごみ貯留ピットにおいて、ごみ収集部の上方に、
該ごみ収集部のごみをごみピットに移送するごみ用サブ
クレーンが設置され、ごみ用サブクレーンは、水平に設
けられたレール部と、レール部上を走行する走行装置
と、走行装置に吊り下げられたホッパとから構成されて
いることを特徴とする。請求項2記載の考案は、請求項
1記載のごみ貯留ピットにおいて、ごみ収集部とごみピ
ットは、該ごみ収集部と該ごみピットの間に形成された
開口部を介して連通しており、レール部の開口部寄りの
先端部は、ごみピット内の開口部付近の上方にまで伸
び、ごみピット内の開口部付近におけるレール部の先端
部の下方には、ごみピット内方に向けた傾斜面が底面か
ら所定の高さで設けられていることを特徴とする。 請求
項3記載の考案は、請求項1記載のごみ貯留ピットにお
いて、ごみ収集部とごみピットは、該ごみ収集部と該ご
みピットの間に形成された開口部を介して連通してお
り、ごみ収集部の底面とごみピットの底面は、同一平面
に形成され、ごみ汚水ピット側に下り勾配で傾斜してい
ることを特徴とする。 Means for Solving the Problems The invention according to claim 1 is:
A garbage collection section whose bottom is lower than the level of the garbage truck platform, and a garbage pit adjacent to the garbage collection section and surrounded by a wall higher than the platform level;
Garbage collection at a garbage storage pit that has a garbage hopper located adjacent to the garbage pit and a garbage main crane that is located above the garbage pit and that can transfer the garbage in the garbage pit to the garbage hopper Above the department,
A garbage sub-crane is installed to transfer the garbage from the garbage collection section to the garbage pit.
Rail section and traveling device running on the rail section
And a hopper suspended from the traveling device
And said that you are. The invention described in claim 2 is the claim.
In the waste storage pit described in 1 above, the waste collection
The waste was formed between the waste collection part and the waste pit.
It communicates through the opening, and the rail is near the opening.
The tip extends upward near the opening in the waste pit.
Of the rail near the opening in the waste pit
Is the bottom of the dirt pit facing the bottom
And at a predetermined height. Claim
The device described in Item 3 is applied to the waste storage pit described in Item 1.
The garbage collection unit and the garbage pit are
Through the openings formed between the pits
The bottom of the waste collection unit and the bottom of the waste pit are flush
Formed on the sewage pit side
It is characterized by that.
【0015】[0015]
【作用】請求項1記載の考案においては、ごみ用サブク
レーンにより、ごみ収集部のごみがごみピットに移送さ
れ、ごみ用メインクレーンにより、ごみピット内のごみ
がごみホッパ内に投入される。請求項2記載の考案にお
いては、ごみがごみピット内に投入される時、ごみは傾
斜面に案内されることによって、開口部附近から遠くに
飛ばされ、ごみピット内の開口部附近にはごみが堆積し
難くなっている。 請求項3記載の考案においては、ごみ
収集部とごみピットは開口部を介して連通し、且つ、ご
み収集部の底面とごみピットの底面は、ごみ汚水ピット
側に下り勾配で傾斜しているので、ごみ汚水は、ごみ汚
水ピットに流出する。 According to the first aspect of the present invention, the waste in the waste collection section is transferred to the waste pit by the waste sub-crane, and the waste in the waste pit is thrown into the waste hopper by the waste main crane. In the invention of claim 2,
Therefore, when garbage is thrown into the garbage pit, the garbage is tilted.
By being guided on the slope, it is far from near the opening
The garbage is blown away and garbage accumulates near the opening in the garbage pit.
It has become difficult. In the device according to claim 3,
The collection unit and the garbage pit communicate with each other through the opening, and
The bottom of the garbage collection section and the bottom of the refuse pit
Sewage is sewage
Spills into the water pit.
【0016】[0016]
【実施例】以下、図面により本考案の実施例について説
明する。図1ないし図13は本考案の実施例に係わるご
み貯留ピットを示す。BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 to 13 show a waste storage pit according to an embodiment of the present invention.
【0017】図において、1はプラットフォーム、2は
ごみ収集部、3はごみを貯留するためのごみピット、4
はごみホッパをそれぞれ示す。ごみ収集部2は、細長空
間に構成され、底面2Aがごみ収集車5が進入して来る
プラットフォーム1のレベルよりも低くなっている。In the figure, 1 is a platform, 2 is a waste collection unit, 3 is a waste pit for storing waste, 4
The garbage hoppers are shown respectively. The refuse collection unit 2 is configured in a slender space, and the bottom surface 2A is lower than the level of the platform 1 from which the refuse collection vehicle 5 enters.
【0018】ごみピット3は、ごみ収集部2に隣接し、
上記プラットフォーム1のレベルよりも高い第1仕切壁
3A,第2仕切壁3B,奥壁3C,手前壁3Dで囲まれ
ている。第1仕切壁3Aの端部3Eと奥壁3Cの間は、
開口部3Fとなり、開口部3Fの下部を介してごみピッ
ト3とごみ収集部2とは連通している。なお、ごみ収集
部2とごみピット3の底面は、同一平面に形成され、後
述するごみ汚水ピット13側に下り勾配で傾斜してい
る。The waste pit 3 is adjacent to the waste collection unit 2,
It is surrounded by a first partition wall 3A, a second partition wall 3B, a back wall 3C, and a front wall 3D higher than the level of the platform 1. Between the end 3E of the first partition wall 3A and the back wall 3C,
An opening 3F is formed, and the garbage pit 3 and the garbage collection unit 2 communicate with each other via a lower portion of the opening 3F. In addition, the bottom surfaces of the refuse collection unit 2 and the refuse pit 3 are formed on the same plane, and are inclined with a downward slope toward the refuse wastewater pit 13 described later.
【0019】第1仕切壁3Aの端部3Eと左側壁6の間
には、ごみ投入扉7,7,7が設置されている。そし
て、第1仕切壁3Aの左側にプラットフォーム1が位置
しており、ごみピット3に隣接して第2仕切壁3Bで仕
切られた状態でごみホッパ4,4が配置されている。Between the end 3E of the first partition wall 3A and the left side wall 6, refuse input doors 7, 7, 7 are provided. The platform 1 is located on the left side of the first partition wall 3A, and the dust hoppers 4, 4 are arranged adjacent to the waste pit 3 in a state of being separated by the second partition wall 3B.
【0020】奥壁3Cの中央部分には、第1仕切壁3A
の端部3Eより右側付近に位置して傾斜面8A,8Bで
形成されて鈍角をなす突起部8が設けられている。突起
部8の上端の高さ位置は、第1仕切壁3Aの上端の高さ
位置と略同じになっている。At the center of the back wall 3C, there is a first partition wall 3A.
The projection 8 is formed near the right side of the end 3E and is formed by the inclined surfaces 8A and 8B and forms an obtuse angle. The height position of the upper end of the projection 8 is substantially the same as the height position of the upper end of the first partition wall 3A.
【0021】そして、9はごみ用メインクレーンで、ご
みピット3の上方に配置され、奥行き方向に走行可能な
レール部9Aと、レール部9A上を左右方向に走行する
走行装置9Bと、走行装置9Bに吊り下げられたホッパ
9Cとから構成され、縦横に走行するようになってい
る。Reference numeral 9 denotes a main crane for refuse, which is disposed above the refuse pit 3 and is capable of traveling in the depth direction, a traveling device 9B traveling on the rail 9A in the left-right direction, and a traveling device. The hopper 9C is suspended from the hopper 9C and runs horizontally and vertically.
【0022】また、ごみ収集部2の上方に、該ごみ収集
部2のごみをごみピット3に移送するごみ用サブクレー
ン10が設置され、天井部11に垂設されたレール支持
部12と左側壁6の間に水平に架け渡されたたレール部
10Aと、レール部10A上を走行する走行装置10B
と、走行装置10Bに吊り下げられたホッパ10Cとか
ら構成されている。レール支持部12は、傾斜して構成
され、その先端は、ごみピット3の上方に突き出てい
る。そして、レール部10Aの開口部3F寄りの先端部
は、ごみピット3内の開口部3F付近の上方にまで伸び
ており、ごみピット3内の開口部3F付近におけるレー
ル部10Aの先端部の下方には、ごみピット3内方に向
けた上述の傾斜面8Aが底面3Gから所定の高さで設け
られている。 A garbage sub-crane 10 for transferring garbage from the garbage collection unit 2 to the garbage pit 3 is installed above the garbage collection unit 2, and a rail support unit 12 suspended from a ceiling 11 and a left side support unit 12. A rail portion 10A suspended horizontally between the walls 6, and a traveling device 10B traveling on the rail portion 10A
And a hopper 10C suspended from the traveling device 10B. The rail support portion 12 is configured to be inclined, and its tip projects above the dust pit 3. And the tip of the rail 10A near the opening 3F
Extends upward near the opening 3F in the garbage pit 3.
In the garbage pit 3, the lane near the opening 3F
Below the tip of the garbage part 10A, inward of the garbage pit 3.
The above-mentioned inclined surface 8A is provided at a predetermined height from the bottom surface 3G.
Have been.
【0023】なお、図9ないし図13に示すように、ご
みピット3の壁外側にはごみ汚水ピット13が設置さ
れ、ごみピット3とごみ汚水ピット13の間にはスクリ
ーン14が設けられている。スクリーン14は、多数の
断面3角形の柱材14Aを、所定の隙間を隔てて立設し
て構成され、このスクリーン14の隣接する柱材14
A,14Aの間に約30mm程度の隙間14Bが形成さ
れ、スクリーン14の隙間14Bの後方部分は、広くな
っている。As shown in FIGS. 9 to 13, a waste pit 13 is provided outside the wall of the waste pit 3, and a screen 14 is provided between the waste pit 3 and the waste pit 13. . The screen 14 is composed of a number of pillars 14A having a triangular cross section and standing upright with a predetermined gap therebetween.
A gap 14B of about 30 mm is formed between A and 14A, and the rear portion of the gap 14B of the screen 14 is wide.
【0024】しかして、本実施例においては、ごみ収集
車5がプラットフォーム1に進入し、ごみ投入扉7から
ごみがごみ収集部2に投入される。そして、ごみ用サブ
クレーン10により、ごみ収集部2のごみがごみピット
3のレール支持部12の下方附近に移送される。In this embodiment, the refuse collection vehicle 5 enters the platform 1 and refuse is introduced into the refuse collection unit 2 from the refuse input door 7. Then, the refuse sub-crane 10 transfers the refuse of the refuse collection unit 2 to a position below the rail support unit 12 of the refuse pit 3.
【0025】ごみピット3内にごみが高く積まれるに至
ると、多少のごみの量がごみピット3から開口部3Fを
介してごみ収集部2に崩れ落ちるが、右側の1つの投入
扉が塞がっても、左側の2つのごみ投入扉7,7からご
みを投入できる。また、ごみ用サブクレーン10のホッ
パ10Cで掴まれたごみが、ごみピット3内に投入され
る時、突起部8の傾斜面8Aに案内されることによっ
て、開口部3F附近から遠くに飛ばされるので、開口部
3F附近にはごみが堆積せず、ごみ収集部2にごみピッ
ト3からの侵入を少なくしている。When the garbage pit 3 is highly loaded with garbage, a small amount of garbage falls from the garbage pit 3 to the garbage collection unit 2 through the opening 3F, but one input door on the right side is closed. Also, refuse can be input from the two refuse input doors 7 on the left side. In addition, when the garbage caught by the hopper 10C of the garbage sub-crane 10 is thrown into the garbage pit 3, the garbage is guided away by the inclined surface 8A of the projection 8 and thus is thrown away from the vicinity of the opening 3F. Therefore, dust does not accumulate near the opening 3F, and the ingress of the dust pit 3 into the dust collection unit 2 is reduced.
【0026】そして、ごみは、その流動性で、ごみピッ
ト3に堆積しながら全面に亘って行き渡る。堆積したご
みは、ごみ用メインクレーン9により、ごみピット3内
のごみがごみホッパ4内に投入される。The dust spreads over the entire surface while being deposited in the dust pit 3 due to its fluidity. As for the deposited waste, the waste in the waste pit 3 is thrown into the waste hopper 4 by the waste main crane 9.
【0027】また、ごみ収集部2とごみピット3は連通
しているので、ごみ汚水は、ごみ汚水ピット13に集め
られる。即ち、ごみ収集部2の底面2Aとごみピット3
の底面3Gは、ごみ汚水ピット13側へ傾けて傾斜して
いるので、ごみ汚水は、図10の矢印に示すようにごみ
汚水ピット13に集められる。そして、このスクリーン
14の隙間14Bからごみピット3内のごみ汚水がスク
リーン14を通過してごみ汚水ピット13に流出する一
方、ごみがスクリーン14により堰き止められ、ごみと
ごみ汚水が分離される。スクリーン14で堰き止められ
たごみは、メイン用ごみクレーン9により除去されるの
で、詰まって閉塞されることはない。[0027] In addition, since the dust collection unit 2 Togomi pit 3 is in communication with, refuse sewage is collected in garbage sewage pit 13. That is, the bottom 2A of the waste collection unit 2 and the waste pit 3
Since the bottom surface 3G is inclined toward the waste sewage pit 13, the sewage is collected in the sewage pit 13 as shown by an arrow in FIG. Then, while the garbage in the garbage pit 3 flows out of the gap 14B of the screen 14 to the garbage pit 13 through the screen 14, the garbage is blocked by the screen 14, and the garbage and the garbage are separated. The refuse blocked by the screen 14 is removed by the main refuse crane 9, so that the refuse is not clogged and blocked.
【0028】以上の如き構成によれば、ごみ用サブクレ
ーン10により、ごみ収集部2のごみをごみピット3に
移送することができるので、ごみ用サブクレーン10の
運転とは関係なく、ごみピット3内のごみをごみホッパ
4内に投入する運転にごみ用メインクレーン9を使用で
き、従って、ごみ用メインクレーン9の(ごみピット3
からごみホッパ4への)運転の稼働率を向上させること
ができる。According to the above configuration, the refuse sub-crane 10 can transfer the refuse of the refuse collection unit 2 to the refuse pit 3 , so that the refuse pit is independent of the operation of the refuse sub-crane 10. The waste main crane 9 can be used for the operation of throwing the waste in the waste hopper 3 into the waste hopper 4.
The operating rate of the operation (from the waste hopper 4) can be improved.
【0029】また、細長のごみ収集部2はごみピット3
に対して、直角に配置されているので、ごみピット3の
第1仕切壁3Aの位置を左方にずらしてごみピット3の
面積を広く取れることを可能にすることにより、ごみ用
メインクレーン9の、ごみを均一になるように攪拌する
機能を満足させ、ごみピット3内のごみの攪拌を容易
し、ごみの攪拌効率を良くできる。また、従来において
は図10に示すようにごみ収集部202とごみピット2
03を分割しても、ごみピット203の仕切壁の左側に
ごみ収集部202が配置されているので、ごみピット2
03の平面が制限を受け、容積を確保するためには、地
下にピットを掘ることを余儀なくされることもあるが、
本実施例では、上述のように、ごみピット3の面積を広
くとれるので、かかる懸念を解消できる。Further, the slender waste collection unit 2 includes a waste pit 3
Is disposed at a right angle, the position of the first partition wall 3A of the garbage pit 3 can be shifted to the left so that the area of the garbage pit 3 can be widened, so that the garbage main crane 9 can be obtained. In addition, the function of stirring the waste so as to be uniform can be satisfied, the stirring of the waste in the waste pit 3 can be facilitated, and the stirring efficiency of the waste can be improved. Further, conventionally, as shown in FIG.
Even if 03 is divided, the garbage pit 2 is located on the left side of the partition wall of the garbage pit 203.
The plane of 03 is restricted, and it may be necessary to dig a pit underground to secure the volume,
In this embodiment, as described above, the area of the dust pit 3 can be made large, so that such a concern can be solved.
【0030】さらに、従来は、ごみクレーンが1個であ
ったので、ごみ収集部に投入されたごみを、そのまま、
ごみ焼却炉に投入する場合もあり、燃えやすいものや燃
え難いものが固まってごみ焼却炉へ送られる確率が高
く、燃焼が安定しない原因となっていたが、本実施例で
は、ごみ用メインクレーン9は、ごみ収集部2のごみを
拾い上げない構造となっており、従って、必ず、ごみ収
集部2→ごみピット3→ごみホッパ4の順番でごみが送
られるので、ごみは、ごみピット3内で混合されて、ご
みホッパ4に移送されるので、ごみ焼却炉における燃焼
を安定にすることができる。Further, conventionally, since there is only one garbage crane, the garbage input to the garbage collection unit can be used as it is.
In some cases, flammable and non-flammable materials are solidified and sent to the refuse incinerator, which may cause unstable combustion. Reference numeral 9 denotes a structure that does not pick up the refuse of the refuse collection unit 2 and, therefore, refuse is always sent in the order of the refuse collection unit 2 → the refuse pit 3 → the refuse hopper 4. And transferred to the refuse hopper 4, so that combustion in the refuse incinerator can be stabilized.
【0031】また、ごみ用サブクレーン10は、レール
部10Aに沿って走行のみを行なうクレーンであるの
で、レール部10Aの下部のごみ層の高さを検知するセ
ンサを1〜2m置きに設置するだげで、ごみを移送すべ
き位置を決めることができ、投入扉7が開けられた場
合、その位置を通過しないよう、また、その位置にある
場合は、上方へ巻き上げ、投入扉7が閉まるまでは待機
するようなプログラムを組むことにより、全自動化が簡
単にできる。Since the refuse sub-crane 10 is a crane that only travels along the rail portion 10A, sensors for detecting the height of a refuse layer below the rail portion 10A are provided at intervals of 1 to 2 m. The position where garbage should be transported can be determined with a burst, so that when the input door 7 is opened, it does not pass through that position, and when it is at that position, it is rolled up and the input door 7 is closed. By setting up a program that waits until fully automated, it can be easily automated.
【0032】[0032]
【考案の効果】以上説明したように、請求項1記載の考
案によれば、ごみ用サブクレーンにより、ごみ収集部の
ごみをごみホッパに移送することができるので、ごみ用
サブクレーンの運転とは関係なく、ごみピット内のごみ
をごみホッパ内に投入する運転にごみ用メインクレーン
を使用でき、従って、ごみ用メインクレーンの運転の稼
働率を向上させることができる効果を奏する。請求項2
記載の考案によれば、傾斜面によりごみピット内の開口
部付近でのごみの堆積を防止し、ごみ収集部にごみピッ
トからのごみの侵入を少なくすることができる。 請求項
3記載の考案によれば、ごみ収集部とごみピットは連通
し、且つ、ごみ収集部の底面とごみピットの底面は、同
一平面に形成され、ごみ汚水ピット側に下り勾配で傾斜
しているので、ごみ汚水をごみ汚水ピットに集めること
ができる。 As has been described above devised], according to the considered <br/> draft according to claim 1, the dust sub crane, since the dust of the dust collection unit can be transferred to the dust hopper for dust Regardless of the operation of the sub-crane, the waste main crane can be used for the operation of putting the waste in the waste pit into the waste hopper, thus improving the operation rate of the operation of the waste main crane. Play. Claim 2
According to the described invention, the opening in the garbage pit due to the inclined surface
To prevent the accumulation of waste near the waste collection area,
Waste can be reduced. Claim
According to the device described in 3, the waste collection unit and the waste pit communicate.
And the bottom of the waste collection unit and the bottom of the waste pit
Formed on a flat surface and sloped down on the sewage pit side
Collecting waste sewage in the waste pit
Can be.
【図1】本考案の実施例に係わるごみ貯留ピットの断面
図である。FIG. 1 is a sectional view of a waste storage pit according to an embodiment of the present invention.
【図2】同ごみ貯留ピットの地階を示す平面図である。FIG. 2 is a plan view showing a basement of the refuse storage pit.
【図3】同ごみ貯留ピットの1階を示す平面図である。FIG. 3 is a plan view showing the first floor of the refuse storage pit.
【図4】同ごみ貯留ピットの2階を示す平面図である。FIG. 4 is a plan view showing the second floor of the waste storage pit.
【図5】同ごみ貯留ピットの3階を示す平面図である。FIG. 5 is a plan view showing the third floor of the garbage storage pit.
【図6】図3のI線に沿った断面図である。FIG. 6 is a sectional view taken along the line I of FIG. 3;
【図7】図4のII−II線に沿った断面図である。FIG. 7 is a sectional view taken along the line II-II of FIG.
【図8】図4のIII −III 線に沿った断面図である。FIG. 8 is a sectional view taken along the line III-III in FIG. 4;
【図9】ごみ汚水ピットを示すごみ貯留ピットの断面図
である。FIG. 9 is a sectional view of the waste storage pit showing the waste pit.
【図10】ごみ汚水ピットを示すごみ貯留ピットの平面
図である。FIG. 10 is a plan view of a waste storage pit showing a waste pit.
【図11】図9のスクリーンを示す斜視図である。FIG. 11 is a perspective view showing the screen of FIG. 9;
【図12】同スクリーンを示す平面図である。FIG. 12 is a plan view showing the screen.
【図13】ごみとごみ汚水の分離作用を示す説明図であ
る。FIG. 13 is an explanatory diagram showing a separation operation between refuse and refuse sewage.
【図14】第1の従来におけるごみ貯留ピットの断面図
である。FIG. 14 is a sectional view of a first conventional waste storage pit.
【図15】第2の従来におけるごみ貯留ピットの断面図
である。FIG. 15 is a sectional view of a second conventional waste storage pit.
1 プラットフォーム 2 ごみ収集部 2A 底面 3 ごみピット 4 ごみホッパ 9 ごみ用サブクレーン 10 ごみ用サブクレーン DESCRIPTION OF SYMBOLS 1 Platform 2 Garbage collection part 2A Bottom surface 3 Garbage pit 4 Garbage hopper 9 Garbage sub crane 10 Garbage sub crane
Claims (3)
レベルよりも低いごみ収集部と、 ごみ収集部に隣接し、上記プラットフォームのレベルよ
りも高い壁で囲まれたごみピットと、 ごみピットに隣接して配置されたごみホッパと、 ごみピットの上方に配置されてごみピット内のごみをご
みホッパ内に移送することが可能なごみ用メインクレー
ンとを有するごみ貯留ピットにおいて、 ごみ収集部の上方に、該ごみ収集部のごみをごみピット
に移送するごみ用サブクレーンが設置され、 ごみ用サブクレーンは、水平に設けられたレール部と、
レール部上を走行する走行装置と、走行装置に吊り下げ
られたホッパとから構成されている ことを特徴とするご
み貯留ピット。1. A garbage collection unit having a bottom surface lower than the platform of the garbage truck, a garbage pit adjacent to the garbage collection unit, surrounded by a wall higher than the platform level, and adjacent to the garbage pit. A refuse storage pit having a refuse hopper arranged above the refuse pit and a main crane for refuse disposed above the refuse pit and capable of transferring the refuse in the refuse pit into the refuse hopper; A garbage sub-crane for transferring the garbage of the garbage collection unit to the garbage pit is installed, and the garbage sub-crane includes a horizontally provided rail portion,
A traveling device that travels on rails and suspended from the traveling device
A garbage storage pit characterized by comprising a hopper .
部と該ごみピットの間に形成された開口部を介して連通
しており、 レール部の開口部寄りの先端部は、ごみピット内の開口
部付近の上方にまで伸び、 ごみピット内の開口部付近におけるレール部の先端部の
下方には、ごみピット内方に向けた傾斜面が底面から所
定の高さで設けられている ことを特徴とする請求項1記
載のごみ貯留ピット。 2. The garbage collection section and the garbage pit are provided for collecting the garbage.
Through the opening formed between the pit and the waste pit
To have the tip of the opening side of the rail portion has an opening in the waste pit
To the top of the rail, near the opening in the garbage pit.
At the bottom, the slope facing the inside of the garbage pit is located from the bottom.
2. The device according to claim 1, wherein the device is provided at a constant height.
Garbage storage pit.
部と該ごみピットの間に形成された開口部を介して連通
しており、 ごみ収集部の底面とごみピットの底面は、同一平面に形
成され、ごみ汚水ピット側に下り勾配で傾斜している こ
とを特徴とする請求項1記載のごみ貯留ピット。 3. The garbage collection section and the garbage pit are provided for collecting the garbage.
Through the opening formed between the pit and the waste pit
The bottom of the waste collection section and the bottom of the waste pit are flush with each other.
Been made, call the garbage sewage pit side is inclined at a downward slope
The refuse storage pit according to claim 1, characterized in that:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1992088374U JP2579457Y2 (en) | 1992-12-24 | 1992-12-24 | Garbage storage pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1992088374U JP2579457Y2 (en) | 1992-12-24 | 1992-12-24 | Garbage storage pit |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0655019U JPH0655019U (en) | 1994-07-26 |
JP2579457Y2 true JP2579457Y2 (en) | 1998-08-27 |
Family
ID=13941023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1992088374U Expired - Lifetime JP2579457Y2 (en) | 1992-12-24 | 1992-12-24 | Garbage storage pit |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2579457Y2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3804045B2 (en) * | 2001-12-18 | 2006-08-02 | 太平洋セメント株式会社 | Waste treatment method and waste treatment equipment |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS646615A (en) * | 1987-06-29 | 1989-01-11 | Takuma Kk | Method of conveying refuse into pit in incinerator plant and refuse conveying elevator |
-
1992
- 1992-12-24 JP JP1992088374U patent/JP2579457Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0655019U (en) | 1994-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202828658U (en) | Sewage treatment unit for rubbish transfer trolley | |
JP2579457Y2 (en) | Garbage storage pit | |
JP2007217104A (en) | Waste processing facility | |
CN216334348U (en) | Intelligent landscape underground garbage can system | |
CN212053623U (en) | Self-closing door system for high-rise building garbage channel | |
JPH0372158A (en) | Dust chute | |
JP2010255225A (en) | Mechanical parking device having refuse collection function | |
JP2001324118A (en) | Refuse treatment facility | |
JPS62290602A (en) | Method of collecting refuse | |
CN109854026A (en) | A kind of tunneling increasing expansion formula underground three-dimensional garage | |
CN112727482B (en) | Large-diameter shield tunnel and complete equipment and method for construction of internal prefabricated structure of large-diameter shield tunnel | |
JP2563484Y2 (en) | Waste transport system | |
CN216402597U (en) | Landscape station | |
CN218664907U (en) | Material elevator | |
CN218757190U (en) | Carriage of sanitation vehicle | |
JP2002098314A (en) | Refuse treatment equipment | |
JPS6011156Y2 (en) | diagonal gutter | |
JP2517629Y2 (en) | Gate opening / closing structure | |
JPS6028315Y2 (en) | horizontal toilet tank | |
JP2632258B2 (en) | Storage device for asphalt pavement waste | |
JPH047251Y2 (en) | ||
JP2000177804A (en) | Garbage receiving and storing facility in garbage treatment facility | |
JPH07151324A (en) | Dust incineration facility | |
JPH036411B2 (en) | ||
JPH085927Y2 (en) | Garbage carrier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R323531 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term | ||
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080612 Year of fee payment: 10 |