JP2577754Y2 - Sludge treatment equipment in sedimentation tanks - Google Patents

Sludge treatment equipment in sedimentation tanks

Info

Publication number
JP2577754Y2
JP2577754Y2 JP1991110414U JP11041491U JP2577754Y2 JP 2577754 Y2 JP2577754 Y2 JP 2577754Y2 JP 1991110414 U JP1991110414 U JP 1991110414U JP 11041491 U JP11041491 U JP 11041491U JP 2577754 Y2 JP2577754 Y2 JP 2577754Y2
Authority
JP
Japan
Prior art keywords
scum
tank
sludge
ropes
collector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1991110414U
Other languages
Japanese (ja)
Other versions
JPH0551407U (en
Inventor
昭男 高橋
敬一 花里
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsukishima Kikai Co Ltd
Original Assignee
Tsukishima Kikai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsukishima Kikai Co Ltd filed Critical Tsukishima Kikai Co Ltd
Priority to JP1991110414U priority Critical patent/JP2577754Y2/en
Publication of JPH0551407U publication Critical patent/JPH0551407U/en
Application granted granted Critical
Publication of JP2577754Y2 publication Critical patent/JP2577754Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Removal Of Floating Material (AREA)
  • Treatment Of Sludge (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】この考案は水処理沈殿槽の底部に
溜る汚泥のかき寄せと液面部に浮遊するスカムのかき取
りを同じ駆動手段によって行えるようにした汚泥等の処
理装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an apparatus for treating sludge and the like in which sludge collected at the bottom of a water treatment sedimentation tank and scum floating on a liquid surface are scraped by the same driving means.

【0002】[0002]

【従来の技術】これまでに、上水,下水等の処理沈殿槽
において、槽底に沈殿した汚泥をかき寄せる一方、液面
に浮遊するスカムを除去する施設として、図7のような
処理装置が広く知られている。
2. Description of the Related Art Conventionally, in a treatment sedimentation tank for tap water, sewage, etc., a sludge settled at the bottom of the tank and a facility for removing scum floating on the liquid surface have been used as a facility as shown in FIG. Is widely known.

【0003】即ち、かき板3aをリンク機構3bを介し
て起伏自在に取付けたかき寄せ台車3を沈殿槽1の槽底
の前後方向(図で左側を前,右側を後とする)に敷設し
たレール5上に走行可能に配設し、又、左右一対の無端
のロープ2(図では片側だけを示していある)を前後の
槽壁に設けた複数のシーブ4にかけ渡すと共に槽前壁上
のモータM1 で駆動される一対の牽引ドラム6にそれぞ
れ巻きかけ、かつこれらのロープ2にかき板3aのリン
ク機構3bを連結し、一方、沈殿槽1の内部を、中央部
に設けた前側上部に樋10aを持ち槽底に達しない高さ
の中間壁10によって前室1Aと後室1Bとに区画し、
前室1Aの水面上には前後左右(右側のものは図示しな
い)に配置したスプロケット7aにそれぞれチエーン7
bをかけ渡し、その左右のチエーン7bの間に多数のか
き板7cを間隔をおいて取付けたスカムコレクター7を
配設し、その後方のスプロケット7aを中間壁10上に
設けたモータM2 及び伝動機構により作動するようにし
ている。
[0003] That is, a rake plate 3a is attached via a link mechanism 3b so as to be able to move up and down, and a trolley 3 is laid in the longitudinal direction of the bottom of the settling tank 1 (the left side is the front and the right side is the back in the figure). 5 and a pair of left and right endless ropes 2 (only one side is shown in the figure) are passed over a plurality of sheaves 4 provided on the front and rear tank walls, and a motor on the tank front wall is provided. Each of the ropes 2 is wound around a pair of traction drums 6 driven by M 1 , and the link mechanism 3 b of the shaving plate 3 a is connected to these ropes 2. An intermediate wall 10 having a height not reaching the tank bottom having a gutter 10a is divided into a front room 1A and a rear room 1B,
On the water surface of the front room 1A, there are sprockets 7a arranged in front, rear, left and right (the right one is not shown).
b, and a scum collector 7 in which a large number of shaving plates 7c are mounted at intervals between the left and right chains 7b, and a motor M 2 having a rear sprocket 7a provided on the intermediate wall 10; It operates by a transmission mechanism.

【0004】そして、処理すべき汚水は取入槽Dから槽
前壁にあるスリットを介して沈殿槽の前室1A内に入
り、汚水中の汚泥は槽底に沈降する一方、軽いスカムは
水面部に浮遊し、その他の水は中間壁10の下側を通っ
て後室1B中に入り、前室1Aで除かれなかった汚泥は
更に槽底に沈降する。上ずみ水は後室の水面部に設けた
樋9から排出槽Eに出るようになされている。
The sewage to be treated enters the front chamber 1A of the settling tank from the intake tank D through a slit in the front wall of the tank, and the sludge in the sewage settles to the bottom of the tank while the light scum is on the water surface. Other water flows into the rear chamber 1B through the lower side of the intermediate wall 10, and the sludge not removed in the front chamber 1A further sinks to the bottom of the tank. The rising water flows out to a discharge tank E from a gutter 9 provided on the water surface of the rear chamber .

【0005】上記過程での汚泥の除去作業に当たって
は、先ずかき寄せ台車3を後端(右端)におき、牽引ド
ラム6を駆動してロープ2を実線矢印aの方向に牽引
し、その牽引作用によりかき板3aを起立させて槽底に
沈積した汚泥Nをかき寄せながら前端に向かって走行さ
せ、かき寄せた汚泥Nを集泥ピット1Dに落し込み、そ
の時点で台車3の前面が前端側の検出器8aに接触する
ことになり、その上方の制御器8の動作で台車3を一定
時間停止させると共に排出弁Vを開いて汚泥を排出し、
所定時間後には牽引ドラム6を逆転させてロープ2を点
線矢印bの方向に牽引し、その牽引作用でかき板3aは
横向きに引上げられて台車3は後端側に向って走行し、
後端に至れば後端側の検出器8aが接触して制御器8が
動作してロープ2を再び実線矢印a方向に牽引し、かき
板3aにより汚泥をかき寄せながら台車3を前端側に走
行させる、という作業が繰り返えされる。
[0005] In the sludge removal operation in the above process, the scraper truck 3 is first placed at the rear end (right end), and the traction drum 6 is driven to pull the rope 2 in the direction of the solid line arrow a. The scraping plate 3a is erected, and the sludge N deposited on the bottom of the tank is moved toward the front end while being scraped, and the scraped sludge N is dropped into the sludge collection pit 1D. 8a, the truck 3 is stopped for a certain period of time by the operation of the controller 8 thereabove, and the discharge valve V is opened to discharge sludge.
After a predetermined time, the traction drum 6 is reversed to pull the rope 2 in the direction of the dotted arrow b, and by the traction action, the shaving plate 3a is pulled up sideways, and the bogie 3 travels toward the rear end side,
When the rear end is reached, the detector 8a on the rear end side comes into contact, the controller 8 operates to pull the rope 2 again in the direction of the solid arrow a, and the bogie 3 travels to the front end side while scraping sludge by the shaving plate 3a. Work is repeated.

【0006】一方水面部に配設されたスカムコレクター
7はモータM及び伝動機構により常時鎖線矢印Cの方
向に回動させられ、両サイドのチェーン7bに固定され
たかき板7cにより水面部に浮遊するスカムを槽の中央
部側にかき寄せ、中間壁10に設けられた樋10中に
排出する。
On the other hand scum collector 7 disposed in the water surface portion is rotated in the direction of constant chain line arrow C by the motor M 2 and the transmission mechanism, floating on the water surface portion by scraper 7c fixed to the chain 7b on both sides The scum to be scraped is scraped toward the center of the tank and discharged into a gutter 10 a provided on the intermediate wall 10.

【0007】[0007]

【考案が解決しようとする課題】ところで、上記従来の
装置では、汚泥かき寄せ台車の駆動系統とスカムコレク
ターの駆動系統とが別々であるため、設備費やセットス
ペースがかさみ、メンテナンスにも手間がかかり、そし
て、スカムコレクターは槽幅に等しい多数のかき板を必
要とし、設備が大がかりとなり、コスト高を招くと共に
動力消費量も大きくなっている。
However, in the above-mentioned conventional apparatus, since the drive system of the sludge scraper and the drive system of the scum collector are separate, equipment costs and set space are increased, and maintenance is troublesome. And, the scum collector requires a large number of shaving plates equal to the tank width, which requires large equipment, increases costs and increases power consumption.

【0008】そこで、この考案は駆動装置とスカムコレ
クターを部品の少ないコンパクトなものにして、セット
スペースの節約を図ると共にメンテナンスをやり易く
し、設備費や動力費を低減させることを課題とする。
[0008] Therefore, the present invention proposes a driving device and a scum collection.
It is an object of the present invention to reduce the cost of equipment and power by reducing the set space and saving the set space, facilitating maintenance, and reducing the cost of equipment.

【0009】[0009]

【課題を解決するための手段】上記課題のもとにこの考
案は、沈殿槽を中間壁により互いに底部において連通す
る二つの室に区分し、沈殿槽の底部には汚泥のかき寄せ
台車を走行可能に配設する一方、汚水が流入する側の室
の水面上にはスカムコレクターを配設して、汚泥とスカ
ムを処理するようにした装置として、沈殿槽の前端壁上
に一つのモータにより駆動される主軸を架設し、この主
軸には左右一対の第1ドラムと各第1ドラムの外側位置
に第2ドラムを設け、各第1ドラムには上記かき寄せ台
車牽引用の第1ロープ類を巻きかけると共に各第2ドラ
ムには沈殿槽の前端壁近傍の水面及び水中ならびに中間
壁の前側水面上に設けた案内シーブにかけ渡されたスカ
ムコレクター牽引用の第2ロープ類をそれぞれ巻きか
け、上記スカムコレクターを沈殿槽を横切る梁主体と車
輪を有する両端の側板及び梁主体の下側にブラケットを
介し上下に回動可能に取付けられた一枚のかき板とで形
成し、このスカムコレクターを車輪により沈殿槽の側壁
に沿って槽の前端壁と中間壁との間に設けたレール上を
走行可能となし、上記梁主体の両側部にはスリーブをそ
れぞれ横断状態に取付けて、第2ロープ類をそれぞれ挿
通し、これらの第2ロープ類にはスリーブの前側におい
てストッパを固着すると共に後側にはストッパと一定の
間隔をおいて前方に屈曲したかき板押え棒の上端管軸部
を止め具により固定し、汚泥のかき寄せ台車とスカムコ
レクターを一つの主軸により同時に前後方向に走行させ
ると共に第2ロープ類によるスカムコレクターの後方向
への牽引時には上記かき板を水面に直立させ、前方向へ
の牽引時にはかき板をかき板押え棒により水面上方に回
動させて支持するようにしたことを特徴とするものであ
る。
According to the present invention, the sedimentation tank is divided into two chambers communicating with each other at the bottom part by an intermediate wall, and a sludge scraping truck can be run on the bottom part of the sedimentation tank. On the other hand, a scum collector is installed on the water surface of the chamber on the side where sewage flows into, and as a device for treating sludge and scum, it is installed on the front end wall of the sedimentation tank.
A main shaft driven by one motor
On the shaft, a pair of left and right first drums and outer positions of each first drum
Are provided with a second drum, and the first drum is provided with
Wrap the first ropes for car towing and each second drive
Water near the front end wall of the settling tank
A ska suspended over a guide sheave on the water surface in front of the wall
Wrap the second rope of the tow collector
The scum collector above the beam and car
Brackets under the side plates at both ends with rings and the beam main body
With a single shaving plate that is rotatably mounted up and down
The scum collector is set on the side wall of the sedimentation tank by wheels.
Along the rail provided between the front end wall and the intermediate wall of the tank
It is not possible to travel, and sleeves are provided on both sides of the beam main body.
Attach them in the crossing state, and insert the second ropes respectively.
Through these second ropes, the front side of the sleeve
And secure the stopper on the rear side.
Shaft plate holding bar bent forward at a distance
Is fixed with a stopper, and the sludge scraping cart and scumco
Tractor is driven by one spindle at the same time
And the rear of the scum collector by the second ropes
When pulling to
During towing, the squid is turned upward by the
It is characterized by being moved and supported .

【0010】[0010]

【実施例】以下図1ないし図6を参照してこの考案の実
施例について説明するが、同一の部分については同じ符
号を用い、又、説明の便宜のため、図3を除く図1ない
し図5において左側を前方、右側を後方とし、図6では
上を前方、下を後方とし、これに直交する方向を左右と
する。図1,図2において1は沈殿槽で前記のように中
央部には前側上部に樋10aを持ち槽底に達しない高さ
の中間壁10が横断状態に設けられて、前室1Aと後室
1Bに区画され、処理すべき汚水は取入れ槽Dから先ず
前室1Aに入り、中間壁10の下側を通って後室1Bに
流れ、その間に汚泥は槽底に沈降すると共にスカムは水
面部に浮遊し、汚泥及びスカムは次の装置によりかき取
られ、処理ずみの水は取出し槽Eに出ていくようになさ
れている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. 1 to 6. The same parts are denoted by the same reference numerals, and for convenience of description, FIGS. In FIG. 5, the left side is the front, the right side is the rear, and in FIG. 6, the upper side is the front side, the lower side is the rear side, and the direction perpendicular to this is the left and right. In FIG. 1 and FIG. 2, reference numeral 1 denotes a sedimentation tank. As described above, an intermediate wall 10 having a height not reaching the tank bottom and having a gutter 10a at the front upper part is provided in the center part in a transverse state. The sewage to be treated is firstly divided from the intake tank D into the front chamber 1A, passes through the lower side of the intermediate wall 10, and flows into the rear chamber 1B, during which the sludge settles to the bottom of the tank and the scum is on the water surface. The sludge and the scum are scraped off by the following apparatus, and the treated water flows out to the removal tank E.

【0011】そして、沈殿槽の底部にはレール5が槽の
前後の壁の間に敷設され、レール5上には1枚(又は2
枚)のかき板3aをリンク機構3bを介して起伏自在に
連結したかき寄せ台車3が走行可能に配設され、又槽中
において図6のように左右で対をなす牽引用の無端のロ
ープ2が前後の壁部に設けられた複数の案内シーブ4に
かけ渡されると共に槽の前壁上に左右方向(紙面に垂直
方向)に架設された主軸11に軸支され、モータM及び
伝動機構Tにより駆動されるかき寄せ台車牽引用の左右
の第1ドラム6にそれぞれ巻きかけられ、それらのロー
プ2の適所に台車3のリンク機構3aが連結されてお
り、更に槽の前後の壁部には台車反転用の検出器8aと
制御器8が配設されている。
At the bottom of the sedimentation tank, a rail 5 is laid between the front and rear walls of the tank.
A trolley 3 is provided so as to be able to run up and down by connecting a shave plate 3a via a link mechanism 3b so as to be able to move up and down. In addition, as shown in FIG. Is supported over a plurality of guide sheaves 4 provided on the front and rear walls, and is supported by a main shaft 11 laid on the front wall of the tank in a left-right direction (perpendicular to the paper surface). The driven trolley is wound around the first drum 6 on the left and right sides of the trolley, and the link mechanism 3a of the trolley 3 is connected to an appropriate position of the rope 2, and the trolley is turned on the front and rear walls of the tank. Detector 8a and a controller 8 are provided.

【0012】又、沈殿槽1の前壁近傍の水面上及び水中
ならびに中間壁10の前側水面上の所要の位置に案内シ
ーブ14が左右で対をなして設けられ、それら左右の案
内シーブ14にはそれぞれ無端の第2ロープ12がかけ
渡され、それらの第2ロープ12は図6のように槽の前
壁上に架設された主軸11に台車牽引用の左右の第1ド
ラム6の各外側位置に設けられた第2のドラム13にそ
れぞれ巻きかけられており、これらの第2ドラム13の
直径は第1ドラム6の直径に対し所定の比率(図示の例
では1/2)に形成されている。
Guide sheaves 14 are provided in pairs at right and left positions on the water surface near the front wall of the settling tank 1 and on the water surface and on the front water surface of the intermediate wall 10. Endless second ropes 12 are wound around the main drums 11 on the front wall of the tank as shown in FIG. The second drums 13 are wound around the second drums 13 provided at the respective positions, and the diameters of the second drums 13 are formed at a predetermined ratio (1/2 in the illustrated example) with respect to the diameter of the first drum 6. ing.

【0013】図3,図6のように沈殿槽1の左右の側壁
1cの内側において中間壁10と前壁の間の部分には、
ブラケット21を介して第2のレール15が水面に近接
してそれぞれ敷設されており、それらのレール15上に
は次のようなスカムコレクターAが車輪20を介し走行
可能に配設されている。
As shown in FIGS. 3 and 6, a portion between the intermediate wall 10 and the front wall inside the left and right side walls 1c of the sedimentation tank 1,
The second rails 15 are respectively laid near the water surface via the brackets 21, and the following scum collector A is arranged on the rails 15 so as to be able to run via the wheels 20.

【0014】スカムコレクターAは図3ないし図6のよ
うに沈殿槽1を横切る筒状の梁主体16とその両端に固
定され前後に回転可能な車輪20を有する側板17及び
梁主体16の下側に垂設されたブラケット16aに複数
箇所で蝶番19により上下に回動可能に取付けられた1
枚のかき板18とからなり、このかき板18は図4のよ
うに垂下された際には下半部が槽内の水面に入り込むよ
うになされており、更に梁主体16の左右の第2ロープ
12が交差する位置に細いスリーブ22が中心部を横切
る状態にそれぞれ取付けられ、これらのスリーブ22に
各第2ロープ12の水面に近い側のものがそれぞれ挿通
されている。
As shown in FIGS. 3 to 6, the scum collector A has a cylindrical beam main body 16 which crosses the sedimentation tank 1, and a side plate 17 fixed to both ends thereof and having wheels 20 rotatable back and forth, and a lower side of the beam main body 16. 1 that is rotatably mounted on a bracket 16a vertically suspended at
The shaving plate 18 has a lower half part which penetrates into the water surface in the tank when it is hung down as shown in FIG. At the position where the ropes 12 intersect, thin sleeves 22 are attached so as to cross the center, respectively, and the ones of the second ropes 12 that are closer to the water surface are inserted through these sleeves 22, respectively.

【0015】そして、各スリーブ22を通る下側の第2
ロープ12には、図4,図5のようにスリーブ22を中
にして、スリーブの前側にはストツパ23がそれぞれ固
着されると共に後側にはストッパ23と一定の間隔をお
いてかき板押え棒24の上端の管軸部24aがロープの
ねじれを防ぐべくルーズにそれぞれ嵌め込まれて前後の
止め具24bにより取付けられ、前側のストッパ23が
スリーブ22の前端に当接した際には、後側の管軸部2
4aはスリーブ22の後端から一定の距離、離れるよう
になされており、各かき板押え棒24は管軸部24aか
ら垂下する直立部とその下端から前方に伸びる水平部と
でアングル状に形成され、その水平部の前端とかき板1
8の所要位置とにワイヤ25が組付けられていて、かき
寄せ作業中にかき板18が抵抗で上方に回動しないよう
になされている。
The lower second through each sleeve 22
As shown in FIG. 4 and FIG. 5, a stopper 22 is fixed to the front side of the sleeve with a sleeve 22 as shown in FIG. 4 and FIG. The tube shaft portion 24a at the upper end of the sleeve 24 is loosely fitted to prevent the rope from being twisted, and is attached by the front and rear stoppers 24b. When the front stopper 23 comes into contact with the front end of the sleeve 22, the rear shaft Tube shaft 2
Reference numeral 4a designates a predetermined distance from the rear end of the sleeve 22, and each squeezer presser bar 24 is formed in an angle shape by an upright portion hanging down from the tube shaft portion 24a and a horizontal portion extending forward from the lower end thereof. And the front end of the horizontal
A wire 25 is attached to a required position 8 so that the scraper 18 does not rotate upward due to resistance during the scraping operation.

【0016】ところで、沈殿槽1の前壁上の主軸11に
設けられる第1ドラム6と第2ドラム13の直径の比
は、かき寄せ台車3が沈殿槽1の後端から前端まで走行
する間にスカムコレクターAは中間壁10の前側位置か
ら即ち槽の中央位置から前端まで走行するように選定さ
れており、スカムコレクターAは前後の制御器8により
かき寄せ台車3に同期して制御するようになされてい
る。
Incidentally, the ratio of the diameter of the first drum 6 to the diameter of the second drum 13 provided on the main shaft 11 on the front wall of the sedimentation tank 1 is determined while the scraping truck 3 travels from the rear end to the front end of the sedimentation tank 1. The scum collector A is selected so as to travel from the front position of the intermediate wall 10, that is, from the center position of the tank to the front end. The scum collector A is controlled by the front and rear controllers 8 in synchronization with the trolley 3. ing.

【0017】しかして、処理作業の開始に当たっては、
かき寄せ台車3は図1において沈殿槽1の後端に配置さ
れると共にスカムコレクターAは中間壁10の前側位置
に配置される。その状態でモータMを始動し、伝動機構
Tを介して主軸11上の第1ドラム6及び第2ドラム1
3を時計方向に回転させれば、かき寄せ台車3及びスカ
ムコレクターAが第1ロープ2及び第2ロープ12の牽
引作用で実線矢印の方向即ち前壁の方向に走行すること
になり、その際かき寄せ台車3においてはかき板3aが
リンク機構3bを介し起立させられて、槽底に沈積した
汚泥Nをかき寄せながら前方に進み、前端に至って汚泥
Nを前壁底部に設けられた集泥ピット1Dに落し込み、
その時点で台車3の前面が前壁側の検出器8aに接触す
ることになる。
However, when starting the processing operation,
The trolley 3 is arranged at the rear end of the sedimentation tank 1 in FIG. 1 and the scum collector A is arranged at the front side of the intermediate wall 10. In this state, the motor M is started, and the first drum 6 and the second drum 1 on the main shaft 11 are driven via the transmission mechanism T.
When the trolley 3 is rotated clockwise, the trolley 3 and the scum collector A travel in the direction of the solid line arrow, that is, in the direction of the front wall due to the pulling action of the first rope 2 and the second rope 12, and at that time, In the bogie 3, the shaving plate 3a is erected through the link mechanism 3b, and moves forward while scraping the sludge N deposited on the bottom of the tank, reaches the front end, and transfers the sludge N to the collecting pit 1D provided at the bottom of the front wall. Drop,
At that time, the front surface of the carriage 3 comes into contact with the detector 8a on the front wall side.

【0018】一方、前室1Aの水面部におけるスカムコ
レクターAにおいては図4のように第2ロープ12の実
線矢印方向への牽引により、かき板押え棒24の管軸部
の止め具24bが梁主体16に取付けられたスリーブ2
2に突き当たり、それと同時にかき板押え棒24の水平
部の先端がかき板18に突き当たつてこれを水面上に折
り曲げ、その状態でスカムコレクターAは実線矢印方向
に走行して前端に至る。
On the other hand, in the scum collector A at the water surface of the front chamber 1A, the stopper 24b of the pipe shaft portion of the shaving plate holding rod 24 is moved by the pulling of the second rope 12 in the direction of the solid line arrow as shown in FIG. Sleeve 2 attached to main body 16
2 and at the same time, the tip of the horizontal portion of the squid presser bar 24 strikes the squid 18 and bends it on the water surface. In this state, the scum collector A travels in the direction of the solid line arrow to reach the front end.

【0019】上記のようにかき寄せ台車3が前壁側の検
出器8aに接触すれば、かき寄せ台車3及びスカムコレ
クターAは一時停止し、その間に集泥ピット1Dに集め
られた汚泥Nは排出弁Vが開いて系外に排出される。
When the scraping cart 3 contacts the detector 8a on the front wall side as described above, the scraping cart 3 and the scum collector A are temporarily stopped, and the sludge N collected in the mud collecting pit 1D during that time is discharged. V opens and is discharged out of the system.

【0020】所定時間後には、第1ドラム6及び第2ド
ラム13が逆転させられ、第1ロープ2及び第2ロープ
12を介しかき寄せ台車3及びスカムコレクターAが図
2の点線矢印方向に牽引走行させられ、その際には、底
部のかき寄せ台車3においては、かき板3aはリンク機
構3bにより横向き状態に引き上げられて後退し、スカ
ムコレクターAにおいては、図5のように第2ロープ1
2上のストッパ23が梁主体16のスリーブ22に当接
する一方、かき板押え棒24の管軸部24aと止め具2
4bがスリーブ22から離れることになり、そこで、か
き板18が自重及びワイヤ25の引張り動作で水面下に
垂下し、水面部に浮遊するスカムをかき寄せながら後退
し、スカムを中間壁10の前面に形成された樋10aに
流し込み、系外に排出する。
After a predetermined time, the first drum 6 and the second drum 13 are reversed, and the truck 3 and the scum collector A are towed through the first rope 2 and the second rope 12 in a direction indicated by a dotted arrow in FIG. At that time, in the scraping truck 3 at the bottom, the scraping plate 3a is pulled up in a horizontal state by the link mechanism 3b and retreats, and in the scum collector A, as shown in FIG.
2 is in contact with the sleeve 22 of the beam main body 16, while the pipe shaft portion 24 a of the
4b is separated from the sleeve 22, and the scraper plate 18 hangs below the water surface due to its own weight and the pulling operation of the wire 25, and recedes while scraping the scum floating on the water surface portion, and moves the scum to the front surface of the intermediate wall 10. It flows into the formed gutter 10a and is discharged out of the system.

【0021】そして、かき寄せ台車3が後壁側の検出器
8aに接触することによりかき寄せ台車3は後端位置に
停止すると共にスカムコレクターAは中間壁10の前側
位置に停止し、所定時間後には制御器8の動作により、
第1ロープ2及び第2ロープ12の牽引方向が変り、か
き寄せ台車3はかき板3aを起立させつつ前進する一
方、スカムコレクターAはかき板18を上に折り曲げつ
つ再び前進することになり、このような動作が一定時間
毎に繰り返される。
When the scraping cart 3 contacts the detector 8a on the rear wall side, the scraping cart 3 stops at the rear end position and the scum collector A stops at the front position of the intermediate wall 10, and after a predetermined time, By the operation of the controller 8,
The direction in which the first rope 2 and the second rope 12 are pulled changes, and the scraper truck 3 moves forward while raising the scraper plate 3a, while the scum collector A advances again while bending the scraper plate 18 upward. Such an operation is repeated at regular intervals.

【0022】なお、図示の例では中間壁10を沈殿槽1
の中央に設けるようにしたものを示したが、これは設置
場所により適宜に選定することができ、それにしたがっ
て、かき寄せ台車3の牽引用の第1ドラム6とスカムコ
レクターAの牽引用の第2ドラム13の直径の比は対応
するように決められる。又かき寄せ台車3及びスカムコ
レクターAを牽引するためのロープ2,12はチエーン
又は細幅のベルトなどとしても差支えない。
In the illustrated example, the intermediate wall 10 is connected to the settling tank 1.
Is shown at the center, but it can be appropriately selected depending on the installation location, and accordingly, the first drum 6 for towing the trolley 3 and the second drum for towing the scum collector A The ratio of the diameters of the drums 13 is determined to correspond. The ropes 2 and 12 for pulling the trolley 3 and the scum collector A may be a chain or a narrow belt.

【0023】[0023]

【考案の効果】この考案は、沈殿槽を中間壁により互い
に底部において連通する二つの室に区分し、沈殿槽の底
部には汚泥のかき寄せ台車を走行可能に配設する一方、
汚水が流入する側の室の水面上にはスカムコレクターを
配設して、汚泥とスカムを処理するようにした装置とし
て、上述のように構成されているので、これまでのもの
に比べ、駆動設備やスカムコレクターの設備及び部品が
省略され、構成が簡単でコンパクトなものとなり、セッ
トスペースや設備費を低減させることができ、メンテナ
ンスがやり易く、そして、スカムコレクターは唯一つの
かき板しか持たないので、大がかりにならず、低廉で作
り易く、しかも、その移動時には沈殿槽の側壁に設けた
レール上を走行させるため、支持が安定していて浮き沈
みせず、スカムのかき取りが確実で、又前方への帰還時
にはかき板は押え棒により水面上方に支持されるので、
汚水による抵抗を受けず、動作が軽快で、消費動力も少
ない等の利点を有する
According to the present invention, the sedimentation tank is divided into two chambers which communicate with each other at the bottom by an intermediate wall, and a sludge scraping truck is provided at the bottom of the sedimentation tank so as to be movable.
A scum collector is arranged on the water surface of the chamber on the side where sewage flows in, and it is configured as described above to treat sludge and scum.
In comparison with the drive equipment and scum collector equipment and parts
Omitted, the configuration is simple and compact,
Space and equipment costs can be reduced,
And the scum collector has only one
Since it has only a shaved board, it does not become large and can be made at low cost
Easy to move, and at the time of transfer, it was installed on the side wall of the settling tank
Because it runs on rails, the support is stable and
The scum is scraped securely without returning, and when returning to the front
Since the shaved board is supported above the water surface by the presser bar,
It does not receive resistance due to sewage, operates lightly, and consumes little power.
There are advantages such as not .

【図面の簡単な説明】[Brief description of the drawings]

【図1】この考案の実施例の汚泥をかき寄せる状態の切
断側面図。
FIG. 1 is a cut-away side view of a preferred embodiment of the present invention in which sludge is being scraped.

【図2】同じくスカムをかき寄せる状態の切断側面図。FIG. 2 is a cut-away side view of a state where the scum is being scraped.

【図3】この考案に係るスカムコレクターの半部分の正
面図。
FIG. 3 is a front view of a half portion of the scum collector according to the present invention.

【図4】かき板を横に回動した状態の図3のX−X線に
沿った側面図。
FIG. 4 is a side view taken along the line XX of FIG. 3 in a state where the shaving plate has been turned laterally.

【図5】かき板を垂下した状態の図3のX−X線に沿っ
た側面図。
FIG. 5 is a side view along the line XX of FIG. 3 in a state where the shaved board is hung down.

【図6】沈殿槽半部の平面図。FIG. 6 is a plan view of a half of a sedimentation tank.

【図7】従来装置の切断側面図。FIG. 7 is a cut-away side view of a conventional device.

【符号の説明】[Explanation of symbols]

1 沈殿槽 2 第1ロープ 3 かき寄せ台車 3a かき板 5 レール 6 第1ドラム 8 制御器 10 中間壁 11 主軸 12 第2ロープ 13 第2ドラム 15 レール 16 梁主体 17 側板 18 かき板 20 車輪 22 スリーブ 24 かき板押え棒 A スカムコレクター M モータ Reference Signs List 1 sedimentation tank 2 first rope 3 scraper truck 3a scraper board 5 rail 6 first drum 8 controller 10 intermediate wall 11 main shaft 12 second rope 13 second drum 15 rail 16 beam main body 17 side plate 18 scraper board 20 wheels 22 sleeve 24 Oyster presser bar A Scum collector M Motor

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) B01D 21/00 - 21/34──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 6 , DB name) B01D 21/00-21/34

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】沈殿槽1を中間壁10により互いに底部に
おいて連通する二つの室1A,1Bに区分し、沈殿槽1
の底部には汚泥のかき寄せ台車3を走行可能に配設する
一方、汚水が流入する側の室の水面上にはスカムコレク
ターAを配設して、汚泥とスカムを処理するようにした
装置において、沈殿槽1の前端壁上に一つのモータMに
より駆動される主軸11を架設し、この主軸11には左
右一対の第1ドラム6と各第1ドラム6の外側位置に第
2ドラム13を設け、各第1ドラム6には上記かき寄せ
台車牽引用の第1ロープ類2を巻きかけると共に各第2
ドラム13には沈殿槽1の前端壁近傍の水面及び水中な
らびに中間壁10の前側水面上に設けた案内シーブ14
にかけ渡されたスカムコレクター牽引用の第2ロープ類
12をそれぞれ巻きかけ、上記スカムコレクターAを沈
殿槽1を横切る梁主体16と車輪20を有する両端の側
板17及び梁主体16の下側にブラケット16aを介し
上下に回動可能に取付けられた一枚のかき板18とで形
成し、このスカムコレクターAを車輪20により沈殿槽
1の側壁1cに沿って槽の前端壁と中間壁10との間に
設けたレール15上を走行可能となし、上記梁主体16
の両側部にはスリーブ22をそれぞれ横断状態に取付け
て、第2ロープ類12をそれぞれ挿通し、これらの第2
ロープ類にはスリーブ22の前側においてストッパ23
を固着すると共に後側にはストッパ23と一定の間隔を
おいて前方に屈曲したかき板押え棒24の上端管軸部2
4aを止め具24bにより固定し、汚泥のかき寄せ台車
3とスカムコレクターAを一つの主軸11により同時に
前後方向に走行させると共に第2ロープ類12によるス
カムコレクターAの後方向への牽引時には上記かき板1
8を水面に直立させ、前方向への牽引時にはかき板18
をかき板押え棒24により水面上方に回動させて支持す
るようにしたことを特徴とする汚泥等の処理装置。
1. The sedimentation tanks 1 are placed at the bottom of each other by an intermediate wall 10.
And divided into two chambers 1A and 1B which communicate with each other.
At the bottom of the car, a sludge scraper 3 is installed so that it can run.
On the other hand, the scum collection
Arranger A to treat sludge and scum
In the apparatus, one motor M on the front end wall of the settling tank 1
A main shaft 11 driven by the main shaft 11 is installed.
The right pair of first drums 6 and the first
Two drums 13 are provided, and the first drum 6
Wrap the first ropes 2 for towing the trolley and each second
The drum 13 has a water surface near the front end wall of the sedimentation tank 1 and an underwater surface.
Guide sheave 14 provided on the front surface of the intermediate wall 10
Ropes towed by the scum collector passed over
12 and wind the scum collector A.
Sides at both ends having beam body 16 and wheel 20 traversing tongue 1
Under the plate 17 and the beam main body 16 via a bracket 16a
Formed with a single shaving plate 18 that can be pivoted up and down
And the scum collector A is set in a sedimentation tank by wheels 20.
1 between the front end wall of the tank and the intermediate wall 10 along the side wall 1c.
It is possible to travel on the rail 15 provided, and
Sleeves 22 are attached to both sides of
Then, each of the second ropes 12 is inserted,
For the ropes, a stopper 23 is provided at the front side of the sleeve 22.
And a certain distance from the stopper 23 on the rear side.
Upper end of the shaving plate presser bar 24 bent forward
4a is fixed by the stopper 24b, and a sludge scraping cart is provided.
3 and scum collector A by one spindle 11 at the same time
Run in the front-rear direction, and
When pulling the cam collector A backward,
8 upright on the surface of the water,
Is supported by rotating the water above the water surface with a squid presser bar 24.
An apparatus for treating sludge or the like, characterized in that:
JP1991110414U 1991-12-17 1991-12-17 Sludge treatment equipment in sedimentation tanks Expired - Lifetime JP2577754Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991110414U JP2577754Y2 (en) 1991-12-17 1991-12-17 Sludge treatment equipment in sedimentation tanks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991110414U JP2577754Y2 (en) 1991-12-17 1991-12-17 Sludge treatment equipment in sedimentation tanks

Publications (2)

Publication Number Publication Date
JPH0551407U JPH0551407U (en) 1993-07-09
JP2577754Y2 true JP2577754Y2 (en) 1998-07-30

Family

ID=14535179

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991110414U Expired - Lifetime JP2577754Y2 (en) 1991-12-17 1991-12-17 Sludge treatment equipment in sedimentation tanks

Country Status (1)

Country Link
JP (1) JP2577754Y2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4138997B2 (en) * 1999-04-02 2008-08-27 前澤工業株式会社 Mud structure of sedimentation basin
JP4766460B2 (en) * 2000-01-05 2011-09-07 義司 酒本 Solid-liquid separator in wastewater treatment equipment
JP4747331B2 (en) * 2000-11-02 2011-08-17 義司 酒本 Upflow type tilting device in wastewater treatment equipment
WO2023188390A1 (en) * 2022-03-31 2023-10-05 水道機工株式会社 Sludge treatment device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58186806U (en) * 1982-06-07 1983-12-12 神鋼フアウドラ−株式会社 Underwater towed sludge scraping device
JPH0177810U (en) * 1987-11-11 1989-05-25
JPH0730085Y2 (en) * 1989-01-17 1995-07-12 月島機械株式会社 Device for both sludge scraping and scum collection

Also Published As

Publication number Publication date
JPH0551407U (en) 1993-07-09

Similar Documents

Publication Publication Date Title
KR101980193B1 (en) Movable baffle type water treatment settling tank
KR101980192B1 (en) Midpoint sludge collecting type water treatment settling tank
KR101999743B1 (en) Scum removal apparatus for air-floatation system
KR101016488B1 (en) Sludge/Scum collector of wastewater disposal plant
KR20080008711A (en) Sludge/scum collector of wastewater disposal plant
JP2577754Y2 (en) Sludge treatment equipment in sedimentation tanks
KR200427920Y1 (en) Sludge/Scum collector of wastewater disposal plant
KR100408854B1 (en) Apparatus for inhale removing sludge by using siphon principle and method for controlling moving thereof
KR970003804Y1 (en) Scrapping device in a settling basin
KR102379976B1 (en) Sludge collecting apparatus capable of removing floating matter
KR0185297B1 (en) Rope-towed sludge-removing bogie and the system thereof
TWI326614B (en)
KR101980191B1 (en) Rotating type sludge collector for water treatment settling tank
KR20040105180A (en) location detection system of the sludge removal system composed with rope pulling
JPH0334245Y2 (en)
KR19990073461A (en) Apparatus for disposing sludge of sedimentation basin
KR200231624Y1 (en) Underwater Bogie Rope-Pulling Type Sludge Removing Device
KR100232721B1 (en) Apparatus for removing sludge in settling tank
KR100413621B1 (en) a floating hull in inhalant and remover sludge by using siphon principle
KR200325918Y1 (en) location detection system of the sludge removal system composed with rope pulling
JP2603724Y2 (en) Sludge scraper
CN215609530U (en) Truss type mud scraper
JPS6313766Y2 (en)
KR900002984Y1 (en) Sludge removal device of sedimentation basin for sewage treatment
JP3491072B1 (en) Sludge scraper