JP2577393B2 - Automatic recovery system for power system accidents - Google Patents

Automatic recovery system for power system accidents

Info

Publication number
JP2577393B2
JP2577393B2 JP62197542A JP19754287A JP2577393B2 JP 2577393 B2 JP2577393 B2 JP 2577393B2 JP 62197542 A JP62197542 A JP 62197542A JP 19754287 A JP19754287 A JP 19754287A JP 2577393 B2 JP2577393 B2 JP 2577393B2
Authority
JP
Japan
Prior art keywords
procedure
operation command
transmitted
power system
command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62197542A
Other languages
Japanese (ja)
Other versions
JPS6443021A (en
Inventor
茂 飯塚
武 永田
幸夫 中井
汎 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Hitachi Ltd
Mitsubishi Electric Corp
Tokyo Electric Power Co Holdings Inc
Original Assignee
Toshiba Corp
Tokyo Electric Power Co Inc
Hitachi Ltd
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Electric Power Co Inc, Hitachi Ltd, Mitsubishi Electric Corp filed Critical Toshiba Corp
Priority to JP62197542A priority Critical patent/JP2577393B2/en
Publication of JPS6443021A publication Critical patent/JPS6443021A/en
Application granted granted Critical
Publication of JP2577393B2 publication Critical patent/JP2577393B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は電力系統の事故時自動復旧方式に係り、特に
電子計算機を用いて広域的な系統情報により自動的に開
閉器を操作する事故復旧信号(以下、操作指令手順と称
する)の作成終了後、実際に当該信号に対する開閉器の
動作状況を確認しながら自動的に操作指令手順を伝達す
る電力系統の事故時自動復旧装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Purpose of the Invention] (Industrial application field) The present invention relates to an automatic recovery system in the event of an accident in a power system, and in particular, a switch automatically based on wide-area system information using an electronic computer. After the completion of the creation of an accident recovery signal (hereinafter referred to as the operation command procedure) for operating the power system, the power system automatically transmits the operation command procedure while actually checking the operation status of the switch corresponding to the signal. Related to the device.

(従来の技術) 従来、電力系統事故により停電した系統の復旧の際に
は、まず給電所の運転員が事故により動作したしゃ断器
や保護継電器の動作状況を確認して、その動作状況から
得られた情報を用いて事故分析を行ない、一連の操作指
令手順(手順番号、操作対象となる電気所名、操作対象
となる設備・機器名、指令用語、および備考等から構成
される)を表形式で作成する。つぎに、この作成した操
作指令手順表の手順番号の若番順に運転員が指令実行の
指示を行ない、当該手順をオンライン情報入出力装置を
介して伝送することにより、現地の操作装置では当該手
順の妥当性をチェックし、その結果が良好であれば操作
を実行する。そして、この操作実行が完了すると“操作
終了”連絡情報を返信する。すると、この“操作終了”
連絡情報と、当該操作による開閉器の状態変化情報(以
下、応動状変情報と称する)は、オンライン情報入出力
装置を介して当該手順の送出元で検出された運転員に通
知される。
(Prior art) Conventionally, when restoring a system that has failed due to a power system accident, the operator at the power station first checks the operating status of the circuit breaker and protection relay that operated due to the accident, and obtains from the operating status. An accident analysis is performed using the information obtained, and a series of operation command procedures (consisting of procedure numbers, names of electric stations to be operated, names of facilities and equipment to be operated, command terms, remarks, etc.) are displayed. Create in format. Next, the operator instructs the execution of the command in ascending order of the procedure number in the created operation command procedure table, and the procedure is transmitted via the online information input / output device. Is checked, and if the result is good, the operation is performed. When the execution of the operation is completed, "operation end" notification information is returned. Then, this “operation end”
The contact information and the status change information of the switch due to the operation (hereinafter referred to as “responsive change information”) are notified to the operator detected at the transmission source of the procedure via the online information input / output device.

一方、上記応動状変情報が検出されると停電設備の判
定を行ない、電力系統の充停電状態を更新して運転員に
通知する。これにより、運転者は充停電状態を確認しな
がら次の手順番号の手順を選択して指令実行の指示を行
なうため、指令実行の指示を行なった手順の手順番号よ
り2ステップ以上後の手順番号に対する指令実行がたと
え可能であっても指令実行を行なうことができないこと
になり、指令実行に対して多くの時間を要している。
On the other hand, when the above-mentioned responsive change information is detected, the power outage equipment is determined, and the power supply state of the power system is updated and notified to the operator. Thus, the driver selects the procedure of the next procedure number and gives the instruction to execute the command while confirming the charging / discharging state, so the procedure number two or more steps later than the procedure number of the procedure that issued the instruction execution is given. Even if the execution of the command is possible, the command cannot be executed, and it takes much time to execute the command.

(発明が解決しようとする問題点) すなわち、従来の電力系統の事故復旧は給電所の運転
員の判断により行なわれているので、操作指令手順の作
成には熟練した運転員が必要であり、また操作指令手順
の伝達は操作指令手順表に従って運転員が1手順づつ指
示しながら、当該操作指令手順に対する開閉器の動作状
況を確認しながら行なっているために、運転員の負担が
非常に大きい。特に、最近の巨大化、複雑化する傾向に
ある電力系統において多重事故が発生すると、事故によ
る停電の範囲が広域となり、作成した操作指令手順数も
相当数となる。そして、運転員はその作成された操作指
令手順に従って開閉器の動作状況を監視しながら操作指
令手順を伝達する必要があるため、事故復旧には長時間
(数十分〜数時間)を要し、その間緊張を維持しなけれ
ばならないことになる。
(Problems to be Solved by the Invention) That is, since the accident recovery of the conventional power system is performed at the discretion of the operator of the power supply station, a skilled operator is required to create the operation command procedure, Further, the transmission of the operation command procedure is performed by the operator while instructing one step at a time in accordance with the operation command procedure table while confirming the operation state of the switch for the operation command procedure, so that the burden on the operator is very large. . In particular, when multiple accidents occur in a power system that has recently become enormous and complicated, the range of power failure due to the accident becomes wide, and the number of operation command procedures created becomes considerable. Since the operator needs to transmit the operation command procedure while monitoring the operation state of the switch according to the created operation command procedure, it takes a long time (tens of minutes to several hours) to recover from the accident. You will have to maintain tension during that time.

本発明は上記のような事情を考慮して成されたもの
で、その目的は電子計算機を用いて事故により停電した
系統を復旧するために作成された操作指令手順に対する
開閉器の動作状況を監視しながら自動的に一手順ずつ伝
達し、事故復旧を高速度にかつ的確に実施して運転員の
負担軽減を図ることが可能な電力系統の事故時自動復旧
装置を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and has as its object to monitor the operation status of a switch in response to an operation command procedure created to restore a power outage caused by an accident using an electronic computer. Another object of the present invention is to provide an automatic recovery system for power system accidents that can automatically transmit one procedure at a time while recovering the accident at high speed and accurately and reduce the burden on the operator.

[発明の構成] (問題点を解決するための手段および作用) 上記目的を達成するために本発明では、電力系統の事
故時該系統から送られている開閉器や保護継電器の動作
状況を情報入出力手段を通して取込み、これらの情報を
もとに停電系統を復旧させるための操作指令手順を作成
する操作手順作成手段と、この操作手順作成手段で作成
された操作指令手順を保存する操作指令手順保存手段
と、この操作指令手順保存手段に保存された操作指令手
順を取込み、最初の操作指令に着目して操作指令手順の
伝達順位を決定する伝達順位決定処理手段と、この伝達
順位決定処理手段により決定された伝達順位で操作指令
手順を前記情報入出力手段を介して前記電力系統側に伝
送する操作指令手順伝達手段と、この操作指令手順伝達
手段により伝達された操作指令手順に対する開閉器の動
作状況を監視し、当該操作指令手順の操作の完了が確認
されると前記伝達順位決定処理手段に次に伝達すべき手
順を決める旨の信号を与える操作指令手順実行監視手段
とを備え、前記伝達順位決定処理手段は、前記操作指令
手順実行監視手段より次に伝達すべき手順を決める旨の
信号が与えられると、前記操作指令手順保存手段のデー
タをもとに次に伝達可能な指令手段を検索し、伝達可能
な操作指令手順を全て前記操作指令手順伝達手段に送出
して操作指令の伝達を行うようにしたものである。
[Structure of the Invention] (Means and Actions for Solving the Problems) In order to achieve the above object, according to the present invention, at the time of an accident in a power system, the operation status of switches and protection relays sent from the system is reported. Operation procedure creation means for taking in through the input / output means and creating an operation command procedure for restoring the power failure system based on the information, and an operation command procedure for storing the operation command procedure created by the operation procedure creation means Storage means; transmission order determination processing means for fetching the operation instruction procedure stored in the operation instruction procedure storage means and determining the transmission order of the operation instruction procedure by focusing on the first operation instruction; and transmission order determination processing means An operation command procedure transmitting means for transmitting an operation command procedure to the power system side via the information input / output means in the transmission order determined by the operation command procedure; An operation command for monitoring the operation status of the switch for the set operation command procedure and, when the completion of the operation of the operation command procedure is confirmed, sending a signal to the transmission order determination processing means to determine a procedure to be transmitted next. Procedure execution monitoring means, wherein the transmission order determination processing means also receives data from the operation command procedure storage means when a signal to determine the next procedure to be transmitted is given from the operation command procedure execution monitoring means. Then, the next transmittable command means is searched, and all transmittable operation command procedures are sent to the operation command procedure transmitting means to transmit the operation command.

従って、このような構成の電力系統の事故時自動復旧
装置にあっては、電力系統の事故発生時に作成された事
故復旧操作指令手段を伝達する場合に、まず無条件に伝
達可能な操作指令手順を全て伝達し、次に伝達済みの手
順に対する操作終了情報および応動状変情報が検出され
ると、直ちに当該手順の操作の完了に伴って伝達可能と
なった全ての操作指令手順を検索し、この検索された手
順に対する操作対象開閉器が復旧操作対象系統上で少な
くともその片端が充電状態にあることを確認しながら検
索された操作指令手順を順次伝達し、いずれかの手順に
対する操作終了情報および応動状変情報を確認すると再
び同一の処理を繰り返して操作指令手順を実行すること
により、事故復旧に要する時間の高速化を図ることがで
きる。
Therefore, in the automatic recovery system for an accident of the power system having such a configuration, when transmitting the accident recovery operation command means created at the time of the occurrence of the power system accident, the operation command procedure which can be transmitted unconditionally first. When the operation completion information and the response change information for the transmitted procedure are detected, all operation command procedures that can be transmitted immediately after the completion of the operation of the procedure are searched, The operation target switch for the retrieved procedure sequentially transmits the retrieved operation command procedures while confirming that at least one end thereof is in a charged state on the restoration operation target system, and performs operation completion information and When the response change information is confirmed, the same process is repeated again to execute the operation command procedure, so that the time required for accident recovery can be shortened.

(実施例) 以下、本発明の一実施例について図面を参照して説明
する。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図は、本発明による電力系統の事故時自動復旧方
式のシステム構成例を示すブロック図である。図におい
て、1は制御対象としての電力系統、2はオンライン情
報入出力装置、3は電子計算機を夫々示す。また、電子
計算機3において4は電力系統の事故による停電系統を
復旧するための操作指令手順作成部、5はこの作成され
た操作指令手順を保存する操作指令手順保存部、6は操
作指令手順実行監視部、7は操作指令手順伝達順位決定
処理部、8は操作指令手順伝達部である。
FIG. 1 is a block diagram showing an example of a system configuration of an automatic recovery system at the time of a power system accident according to the present invention. In the figure, 1 is a power system as a control object, 2 is an online information input / output device, and 3 is an electronic computer. Also, in the electronic computer 3, reference numeral 4 denotes an operation command procedure creation unit for restoring a power failure caused by a power system accident; 5, an operation command procedure storage unit for storing the created operation command procedure; and 6, an operation command procedure execution unit. A monitoring unit, 7 is an operation command procedure transmission order determination processing unit, and 8 is an operation command procedure transmission unit.

かかる構成において、いま電力系統1で事故が発生し
た場合には、これにより動作したしゃ断器や保護継電器
の動作状況が、オンライン情報入出力装置2を介して電
子計算機3に取り込まれ、当該事故による停電系統を復
旧するために操作指令手順作成部4によりその操作指令
手順を作成し、これを操作指令手順保存部5に保存す
る。この保存が完了すると、まず操作指令手順伝達順位
決定処理部7において第1番目の操作指令手順に着目
し、操作指令手順伝達部8によりオンライン情報入出力
装置2を介して伝達する。また、この伝達した操作指令
手順に対する操作終了情報と対応する応動状変情報操作
指令手順実行監視部6で監視し、当該操作指令手順の操
作の完了が確認されると、次に伝達すべき手順を決める
ために操作指令手順伝達順位決定処理部7に対してその
旨の信号を与える。これにより、操作指令手順伝達順位
決定処理部7では操作指令手順保存部のデータをもとに
次に伝達可能に指令手順を検索し、伝達可能な操作指令
手順を全て操作指令手順伝達部8に送出して操作指令手
順の伝達を行なう。以上の動作を操作指令手順保存部5
の全ての手順について、それらの操作指令手順に対する
操作の完了が確認されるまで行なう。
In this configuration, if an accident occurs in the power system 1, the operating status of the circuit breaker or the protection relay operated by the accident is taken into the computer 3 via the online information input / output device 2, and In order to restore the power failure system, the operation command procedure creating unit 4 creates the operation command procedure, and saves the operation command procedure in the operation command procedure saving unit 5. When the storage is completed, first, the operation command procedure transmission order determination processing unit 7 pays attention to the first operation command procedure, and transmits the first operation command procedure via the online information input / output device 2 by the operation command procedure transmission unit 8. In addition, the operation change information corresponding to the transmitted operation command procedure is monitored by the corresponding operation change information operation command procedure execution monitoring unit 6, and when the completion of the operation of the operation command procedure is confirmed, the next procedure to be transmitted is performed. Is given to the operation command procedure transmission order determination processing section 7 to determine the order. Thus, the operation command procedure transmission order determination processing unit 7 searches for the next transmittable command procedure based on the data in the operation command procedure storage unit, and transmits all the transmittable operation command procedures to the operation command procedure transmission unit 8. It sends out and transmits the operation command procedure. The above operation is stored in the operation command procedure storage unit 5
Are performed until it is confirmed that the operation for the operation command procedure is completed.

次に、上記操作指令手順の伝達の方法について第2図
に示すフローチャートを用いて述べる。
Next, a method of transmitting the operation command procedure will be described with reference to a flowchart shown in FIG.

まずステップS1は、事故により停電系統を復旧するた
めに作成された操作指令手順において、それ自身無条件
で伝達可能な手順(すなわち、ある手順の操作完了を待
たずして指令実行可能な手順のことであり、以下親手順
の無い手順と称する)を全て抽出する。
First, in step S1, an operation command procedure created for restoring a power failure system due to an accident is a procedure that can be transmitted unconditionally itself (that is, a procedure that can execute a command without waiting for the completion of an operation of a certain procedure). This is referred to as a procedure without a parent procedure).

ステップS2では、上記親手順のない手順として抽出さ
れた全ての手順が伝達済みであるか否かを判定し、伝達
済みであればステップS5へ分岐し、伝達済みでなけれ
ば、ステップS3で親手順が無くかつ伝達済みでない1つ
の手順に着目する。
In step S2, it is determined whether or not all procedures extracted as procedures without the parent procedure have been transmitted.If transmitted, the process branches to step S5. Focus on one procedure that has no procedure and has not been transmitted.

ステップS4では、着目手順を伝達し、伝達済みの旨を
記憶して再びステップS2へ戻り、全ての親手順の無い手
順が伝達済みか否かを判定する。
In step S4, the procedure of interest is transmitted, the fact that transmission has been completed is stored, and the process returns to step S2 again to determine whether or not the procedure without all parent procedures has been transmitted.

次にステップS5は、事故による停電系統を復旧させる
ために作成された操作指令手順において、全ての手順が
処理済みか否かを後述する他のステップ(S10)で記憶
している処理済みの旨を示す情報により判定し、全ての
手順が処理済みであれば終了し、処理済みでなければス
テップS6へ移行する。
Next, in step S5, in the operation command procedure created for restoring the power failure system due to the accident, whether or not all procedures have been processed is stored in another step (S10) to be described later. Is determined, the process is terminated if all the procedures have been processed, and if not, the process proceeds to step S6.

ステップS6では、作成されている全ての手順に対して
ステップS7〜S10の処理を実行したか否かを判定し、全
ての手順に対して実行していればステップS11へ分岐す
る。すなわち、ステップS6へ制御が移った場合には毎回
必ずステップS7〜S10が作成されている全ての手順に対
して実行される。
In step S6, it is determined whether or not the processes in steps S7 to S10 have been executed for all the created procedures. If the processes have been executed for all the procedures, the process branches to step S11. That is, every time control is transferred to step S6, steps S7 to S10 are always executed for all the created procedures.

ステップS7は、作成されている手順の若番順に順次着
目する。
In step S7, attention is paid to the created procedures in ascending order.

ステップS8では、この着手手順に対して処理済みが記
憶されておらず、かつ操作指令手順の操作が完了してい
るか否かを判定する。その結果、条件が成立すれば飛越
実行が可能な手順を検索するためにステップS9へ移行
し、条件が不成立であれば再びステップS6へ戻って次の
手順に着目する。この場合、操作指令手順の操作が完了
しているか否かは、伝達済みとなっている操作指令手順
に対する操作終了情報および応動状変情報を用いて、第
1図の操作指令手順実行監視部6により決定し、操作指
令手順ごとに操作完了の旨を記憶してあるものとする。
In step S8, it is determined whether or not the processed state is stored for the start procedure, and whether the operation of the operation instruction procedure is completed. As a result, if the condition is satisfied, the process proceeds to step S9 in order to search for a procedure that can execute jumping. If the condition is not satisfied, the process returns to step S6 and focuses on the next procedure. In this case, whether or not the operation of the operation command procedure has been completed is determined by using the operation completion information and the response status change information for the transmitted operation command procedure, and using the operation command procedure execution monitoring unit 6 in FIG. , And the fact that the operation is completed is stored for each operation command procedure.

ステップS9では、抽出した手順の操作完了により実行
可能となった全ての手順を、保存されている操作指令手
順の検索により抽出する。この実行可能となる手順は、
操作指令手順の作成過程において認識できるため、操作
指令手順ステップ単位に当該手順ステップの完了によっ
て実行可能となる手順を記憶してあるものとする。
In step S9, all the procedures that become executable due to the completion of the operation of the extracted procedure are extracted by searching the stored operation command procedure. The steps that can be taken are:
It is assumed that a procedure that can be executed upon completion of the procedure step is stored for each operation command procedure step because the procedure can be recognized in the process of creating the operation command procedure.

ステップS10では、当該手順に対して処理済みの旨を
記憶しステップS5,S8での判定条件とする。
In step S10, the fact that the procedure has been processed is stored, and the determination is made in steps S5 and S8.

以上のステップをS7〜S10について全手順に対して行
なうとステップS11へ分岐する。
When the above steps are performed for all the procedures in S7 to S10, the process branches to step S11.

ステップS11では、ステップS6〜S10で抽出された飛び
越し実行可能な全手順に対する伝達が完了しているか否
かを判定し、完了していなければステップS12で未伝達
の手順と1つに着目し、完了していれば再びステップS5
へ戻り、操作完了となった手順があるか否かを判定す
る。
In step S11, it is determined whether or not transmission to all of the jump executable procedures extracted in steps S6 to S10 has been completed, and if not completed, attention is paid to one of the untransmitted procedures in step S12, Step S5 again if completed
Then, it is determined whether or not there is a procedure whose operation has been completed.

ステップS13では、飛び越し実行可能となった操作指
令手順に対して、当該手順に対する操作対象開閉器が復
旧操作対象系統上で少なくともその片端が充電状態にあ
ることを確認しながら伝達し、伝達済みの旨を記憶す
る。
In step S13, in response to the operation command procedure that has become possible to execute the jump, the operation target switch for the procedure is transmitted while confirming that at least one end of the operation target switch is in a charged state on the restoration operation target system, and the transmission has been completed. To the effect.

以上のステップをS11〜S13について飛び越し実行可能
な全手順に対して行なう。
The above steps are performed for all of the procedures that can be skipped and executed for S11 to S13.

次に、上述した本発明の事故時自動復旧方式について
具体的に述べる。
Next, the above-mentioned automatic recovery system at the time of an accident of the present invention will be specifically described.

まず第3図は、電力系統で事故が発生した場合に開閉
器を順次開から閉に操作していく過程をモデル的に表し
たものであり、2ケ所の送電線において同時にF1,F2の
事故が発生し、それぞれT1,T2のしゃ断器がトリップし
た状況を示している。第3図において、A,A1…A22,B,B
1,B11は事故により停電した発変電所を示し、K1,K2,…K
5は操作指令手順により開から閉に操作される開閉器を
示している。
First, Fig. 3 schematically shows the process of sequentially opening and closing switches when an accident occurs in the power system. Occurred, and the circuit breakers of T1 and T2 respectively tripped. In FIG. 3, A, A1 ... A22, B, B
1, B11 indicates the substations where the power outage occurred due to the accident, and K1, K2,… K
Reference numeral 5 denotes a switch that is operated from open to closed by an operation command procedure.

また下表は、第3図の事故ケースに対して作成された
操作指令手順を示すものである。例えば、表に示すよう
に操作指令手順は、各手順単位にその操作指令の内容と
当該手順に対する操作完了により実行可能となる手順番
号と親手順の有無を記憶しており、さらに当該手順に対
する伝達済みの旨の記憶エリヤ、操作完了の旨を記憶す
るエリア、および処理済みの旨を記憶するエリアを設け
れば、第2図に示した本発明方式の原理を示すフローチ
ャートに従って操作指令手順の伝達を行ない、事後によ
る停電系統の復旧を完了することができる。
The following table shows the operation command procedure created for the accident case shown in FIG. For example, as shown in the table, the operation command procedure stores the content of the operation command, the procedure number that can be executed upon completion of the operation for the procedure, and the presence / absence of a parent procedure for each procedure unit, and further transmits the transmission to the procedure. If an area for storing the completion of the operation, an area for storing the completion of the operation, and an area for storing the completion of the processing are provided, the transmission of the operation command procedure is performed in accordance with the flow chart showing the principle of the present invention shown in FIG. To complete the restoration of the power failure system after the fact.

以下、第3図の事故ケースについて第2図のフローチ
ャートと対応させながら説明する。
Hereinafter, the accident case of FIG. 3 will be described in correspondence with the flowchart of FIG.

まず、第1図の操作指令手順伝達順位決定処理部7に
より、ステップS1において親手順のない手順として、手
順番号1(K1−ON)と手順番号2(K2−ON)の2つの手
順を抽出する。これらの抽出した手順は伝達済みでない
ため、ステップS4において第1図の操作指令手順伝達部
8により伝達され、その各々に対して伝達済みの旨を記
憶する。
First, in step S1, two procedures of procedure number 1 (K1-ON) and procedure number 2 (K2-ON) are extracted by the operation command procedure transmission order determination processing unit 7 in FIG. I do. Since these extracted procedures have not been transmitted, they are transmitted by the operation command procedure transmitting section 8 in FIG. 1 in step S4, and the fact that they have been transmitted is stored for each of them.

以上で親手順のない手順は全て伝達済みの旨が記憶さ
れるため、ステップS7において改めて処理済みの旨が記
憶されていない手順番号1の手順に着目する。当該手順
はすでに伝達済みであるため、操作終了情報およば応動
状変により、第1図の操作指令手順実行監視部6により
操作完了となったか否かが監視されている。そして、今
手順番号1に対する操作の完了が確認されたとすると、
表に示した復旧指令手順データを参照して第1図の操作
指令手順伝達順位決定部7により、ステップS9において
着目手順の操作終了に伴う伝達可能手順として、手順番
号3の手順(K3−ON)と手順番号4の手順(K4−ON)が
抽出される。
As described above, since all procedures without a parent procedure are stored as having been transmitted, attention is paid to the procedure of procedure number 1 in which the processed is not stored again in step S7. Since the procedure has already been transmitted, whether or not the operation has been completed is monitored by the operation command procedure execution monitoring unit 6 in FIG. 1 based on the operation completion information and the response change. Then, if it is confirmed that the operation for the procedure number 1 has been completed,
Referring to the restoration command procedure data shown in the table, the operation command procedure transmission order determining unit 7 shown in FIG. 1 determines in step S9 that the procedure of procedure number 3 (K3-ON ) And procedure number 4 (K4-ON) are extracted.

次に、ステップS13において飛越し実行可能となった
手順番号3と手順番号4の手順に対する操作対象開閉器
が、現在系統上で少なくともその片端が充電状態にある
ことを、第1図の操作指令手順実行監視部6により確認
した後操作指令手順伝達部8により伝達し、伝達済みの
旨を記憶する。この場合、現時点では手順番号1の手順
は伝達済み、操作完了および処理済みの旨が記憶されて
おり、手順番号2,3,4の手順は伝達済みの旨のみが記憶
されている。
Next, the operation command switch shown in FIG. 1 confirms that the switch to be operated for the procedure of the procedure number 3 and the procedure number 4 which can be skipped in step S13 is currently charged at least at one end on the system. After being confirmed by the procedure execution monitoring unit 6, it is transmitted by the operation command procedure transmitting unit 8, and the fact that the transmission has been completed is stored. In this case, the fact that the procedure of procedure number 1 has been transmitted, the operation has been completed and the processing has been completed is stored at this time, and only the fact that the procedure of procedure numbers 2, 3, and 4 has been transmitted is stored.

次に再びステップS5へ戻り、上記操作指令手順表の手
順番号の若番から順次着目する。手順番号1の手順は処
理済みとなっているため、処理対象とせず(ステップS
8)、ステップS7において手順番号2の手順(K2−ON)
に着目する。今、手順番号2に対する操作の完了が確認
されたとすると、ステップS9において復旧指令手順デー
タを参照して、手順番号2の操作完了に伴って伝達可能
となった手順として、手順番号5(K5−ON)を抽出し、
ステップS10において手順番号2の手順を処理済みとす
る。更に、すでに伝達済みとなっている手順番号3,4に
対する操作の完了が確認されたとすると、上表の復旧指
令手順データを参照して手順番号3,4の操作完了に伴っ
て伝達可能となった手順を抽出しようとするが、本例で
はこれが存在しないため、ステップS10において各々の
手順に対して処理済みの旨のみを記憶し、ステップS11
へ移行する。そして、ステップS13において手順番号5
の手順を伝達して伝達済みの旨を記憶する。この時点に
おいて、手順番号1〜4は伝達済み、操作完了および処
理済みの旨が記憶されており、手順番号5は伝達済み、
操作完了となっている。
Next, the process returns to step S5 again, and focuses on the operation command sequence table in ascending order of the sequence numbers. Since the procedure of procedure number 1 has been processed, it is not processed (step S
8), the procedure of procedure number 2 in step S7 (K2-ON)
Pay attention to. Now, assuming that the completion of the operation for the procedure number 2 is confirmed, in step S9, the restoration command procedure data is referred to, and as the procedure that can be transmitted with the completion of the operation of the procedure number 2, the procedure number 5 (K5− ON)
In step S10, it is assumed that the procedure of procedure number 2 has been processed. Furthermore, if it is confirmed that the operation for the already transmitted procedure numbers 3 and 4 has been completed, it will be possible to transmit with the completion of the operation of procedure numbers 3 and 4 with reference to the restoration command procedure data in the above table. In this example, since there is no such procedure, only the fact that each procedure has been processed is stored in step S10, and step S11 is performed.
Move to. Then, in step S13, procedure number 5
Is transmitted and the fact that the transmission has been completed is stored. At this point, the procedure numbers 1 to 4 have been transmitted, and the fact that the operation has been completed and processed has been stored. The procedure number 5 has been transmitted,
The operation has been completed.

次に再びステップS5へ戻り、操作指令手順の若番から
順次着目する。手順番号1〜4は処理済みとなっている
ため、ステップS8において処理対象とはせず、手順番号
5の操作完了を確認する。今、手順番号5の操作完了が
確認されたとすれば、上表の復旧指令手順データを参照
して、手順番号5の操作完了により実行可能となる手順
を検索しようとするが、本例ではこれが存在しないた
め、ステップS10において処理済みの旨のみを記憶す
る。
Next, the process returns to step S5 again, and focuses on the operation command procedure from the youngest one. Since the procedure numbers 1 to 4 have been processed, they are not processed in step S8, and the completion of the operation of procedure number 5 is confirmed. Now, if the completion of the operation of the procedure number 5 is confirmed, it is attempted to search for a procedure that can be executed by the completion of the operation of the procedure number 5 by referring to the restoration command procedure data in the above table. Since it does not exist, only the fact that processing has been completed is stored in step S10.

以上により、手順番号1〜5は全て処理済みとなるた
め、ステップS5において、終了する。
As described above, since all the procedure numbers 1 to 5 have been processed, the process ends in step S5.

上述したように本発明による電力系統の事故時自動復
旧方式は、事故により停電した系統を復旧するために作
成された一連の操作指令手順を指令実行するに際して、
まず無条件に伝達可能な操作指令手順を全て伝達し、次
に、伝達済みの手順に対する操作終了情報および応動状
変情報が検出されると、直ちに当該手順の操作完了に伴
って伝達可能となった全ての操作指令手順を検索し、こ
の検索された手順に対する操作対象開閉器が復旧操作対
象系統上で少なくともその片端が充電状態にあることを
確認しながら検索された操作指令手順を順次伝達し、い
ずれかの手順に対する操作完了が確認されると再び同一
の処理を繰り返して操作指令手順を飛越し実行するよう
にしたものである。
As described above, the power system automatic recovery system according to the present invention, when executing a series of operation command procedures created to restore the system that has been powered down due to the accident,
First, all the operation command procedures that can be transmitted unconditionally are transmitted, and then, when the operation end information and the response state change information for the transmitted procedure are detected, transmission is possible immediately upon completion of the operation of the procedure. Search all the operation command procedures that have been performed, and sequentially transmit the searched operation command procedures while confirming that the switch to be operated for the searched procedure is at least one end charged in the recovery operation target system. When the operation completion for any of the procedures is confirmed, the same processing is repeated again to skip and execute the operation instruction procedure.

従って、従来の電力系統事故時の復旧のような、作成
された一連の操作指令手順の指令実行に際して、操作指
令手順表の手順番号の若番順に前手順の操作終了を運転
員が確認した後でないと次の手順の指令実行を行なうこ
とができなかった場合に比べて、事故復旧操作を格段に
高速にしかも的確に実施することが可能となり、運転員
の負担も激減することが期待されるものである。
Therefore, when executing a series of created operation command procedures, such as the recovery from a conventional power system accident, after the operator confirms the end of the previous procedure in ascending order of the procedure numbers in the operation command procedure table, Otherwise, the accident recovery operation can be performed much faster and more accurately than when the next step command could not be executed, and the burden on the operator is expected to be drastically reduced. Things.

尚、上記実施例では2重事故における停電系統を復旧
するために13の手順ステップS1〜S13から構成される復
旧指令手順を用いた事故復旧方式について述べたが、本
方式はその他のいかなる形態の事故に対する復旧指令手
順を用いた事故復旧の場合についても同様に適用するこ
とができるものである。
In the above embodiment, the accident recovery method using the restoration command procedure composed of 13 procedure steps S1 to S13 for restoring the power failure system in the case of a double accident has been described, but this method is not limited to any other form. The same can be applied to the case of accident restoration using the restoration order procedure for accidents.

[発明の効果] 以上説明したように本発明によれば、電子計算機を用
いて事故により停電した系統を復旧するために作成され
た操作指令手順に対する開閉器の動作状況を監視しなが
ら自動的に一手順ずつ伝達し、事故復旧を高速度にかつ
的確に実施した運転員の負担軽減を図ることが可能な信
頼性の高い電力系統の事故時自動復旧装置が提供でき
る。
[Effects of the Invention] As described above, according to the present invention, an electronic computer is used to automatically monitor the operation status of a switch for an operation command procedure created for restoring a power outage caused by an accident while automatically monitoring the status. It is possible to provide a highly reliable automatic recovery system for an electric power system which can transmit the procedure one by one and reduce the burden on the operator who has performed the accident recovery at high speed and accurately.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明の一実施例を示すシステム構成図、第2
図は本発明の方式を説明するためのフローチャート図、
第3図は本発明の一実施例を説明するための事故ケース
モデル図である。 1……電力系統、2……オンライン情報入出力装置、3
……電子計算機、4……操作指令手順作成部、5……操
作指令手順保存部、6……操作指令手順実行監視部、7
……操作指令手順伝達順位決定処理部、8……操作指令
手順伝達部。
FIG. 1 is a system configuration diagram showing one embodiment of the present invention, and FIG.
The figure is a flowchart for explaining the method of the present invention,
FIG. 3 is an accident case model diagram for explaining one embodiment of the present invention. 1 ... power system, 2 ... online information input / output device, 3
... Electronic computer, 4 ... Operation command procedure creation unit, 5 ... Operation command procedure storage unit, 6 ... Operation command procedure execution monitoring unit, 7
... Operation command procedure transmission order determination processing section, 8... Operation command procedure transmission section.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 飯塚 茂 東京都千代田区内幸町1丁目1番3号 東京電力株式会社内 (72)発明者 永田 武 東京都府中市東芝町1番地 株式会社東 芝府中工場内 (72)発明者 中井 幸夫 兵庫県神戸市兵庫区和田崎町1の1の2 三菱電機株式会社制御製作所内 (72)発明者 井上 汎 茨城県日立市大みか町5の2の1 株式 会社日立製作所大みか工場内 (56)参考文献 特開 昭56−145732(JP,A) ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Shigeru Iizuka 1-3-1 Uchisaiwaicho, Chiyoda-ku, Tokyo Inside Tokyo Electric Power Company (72) Inventor Takeshi Nagata 1st Toshiba-cho, Fuchu-shi, Tokyo Inside the factory (72) Inventor Yukio Nakai 1-1-2, Wadazakicho, Hyogo-ku, Kobe-shi, Hyogo Mitsubishi Electric Corporation Control Factory (72) Inventor Hitoshi Inoue 5-2-1, Omikamachi, Hitachi City, Ibaraki Pref. (56) References JP-A-56-145732 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】電力系統の事故時該系統から送られてる開
閉器や保護継電器の動作状況を情報入出力手段を通して
取込み、これらの情報をもとに停電系統を復旧させるた
めの操作指令手順を作成する操作手順作成手段と、 この操作手順作成手段で作成された操作指令手順を保存
する操作指令手順保存手段と、 この操作指令手順保存手段に保存された操作指令手順を
取込み、最初の操作指令に着目して操作指令手順の伝達
順位を決定する伝達順位決定処理手段と、 この伝達順位決定処理手段により決定された伝達順位で
操作指令手順を前記情報入出力手段を介して前記電力系
統側に伝送する操作指令手順伝達手段と、 この操作指令手順伝達手段により伝達された操作指令手
順に対する開閉器の動作状況を監視し、当該操作指令手
順の操作の完了が確認されると前記伝達順位決定処理手
段に次に伝達すべき手順を決める旨の信号を与える操作
指令手順実行監視手段とを備え、 前記伝達順位決定処理手段は、前記操作指令手順実行監
視手段より次に伝達すべき手順を決める旨の信号が与え
られると、前記操作指令手順保存手段のデータをもとに
次に伝達可能な指令手順を検索し、伝達可能な操作指令
手順を全て前記操作指令手順伝達手段に送出して操作指
令の伝達を行うことを特徴とする電力系統の事故時自動
復旧装置。
An operation command procedure for restoring a power failure system based on information obtained by taking in the operation status of switches and protection relays sent from the power system in the event of a power system accident through information input / output means. An operation procedure creating means to be created, an operation instruction procedure storing means for storing the operation instruction procedure created by the operation procedure creating means, and an operation instruction procedure stored in the operation instruction procedure saving means, the first operation instruction Transmission order determination processing means for determining the transmission order of the operation instruction procedure by focusing on the operation instruction procedure in the transmission order determined by the transmission order determination processing means to the power system side via the information input / output means. Means for transmitting the operation command procedure to be transmitted, and monitoring the operation status of the switch for the operation command procedure transmitted by the operation command procedure transmission means, and completing the operation of the operation command procedure And an operation command procedure execution monitoring means for giving a signal to the transmission order determination processing means to determine a procedure to be transmitted next, wherein the transmission order determination processing means comprises the operation command procedure execution monitoring means When a signal indicating that a procedure to be transmitted next is determined is given, a command procedure that can be transmitted next is searched based on the data of the operation command procedure storage unit, and all of the operation command procedures that can be transmitted are subjected to the operation. An automatic recovery system at the time of a power system accident, wherein an operation command is transmitted by transmitting it to a command procedure transmitting means.
JP62197542A 1987-08-07 1987-08-07 Automatic recovery system for power system accidents Expired - Lifetime JP2577393B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62197542A JP2577393B2 (en) 1987-08-07 1987-08-07 Automatic recovery system for power system accidents

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62197542A JP2577393B2 (en) 1987-08-07 1987-08-07 Automatic recovery system for power system accidents

Publications (2)

Publication Number Publication Date
JPS6443021A JPS6443021A (en) 1989-02-15
JP2577393B2 true JP2577393B2 (en) 1997-01-29

Family

ID=16376211

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62197542A Expired - Lifetime JP2577393B2 (en) 1987-08-07 1987-08-07 Automatic recovery system for power system accidents

Country Status (1)

Country Link
JP (1) JP2577393B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56145732A (en) * 1980-04-10 1981-11-12 Tokyo Shibaura Electric Co Method of automatically forming systematic operation sequence in power system
JPS57170401U (en) * 1981-04-15 1982-10-27
JP2532357B2 (en) * 1983-05-02 1996-09-11 株式会社日立製作所 Control method of operation sequence

Also Published As

Publication number Publication date
JPS6443021A (en) 1989-02-15

Similar Documents

Publication Publication Date Title
USRE40037E1 (en) Electric power system protection and control system
JPS61285569A (en) Program control method for multi-computer system
JP2577393B2 (en) Automatic recovery system for power system accidents
CN105388882A (en) Preliminary plan determining method and apparatus of power grid accident
JP3282368B2 (en) Remote monitoring control device
JPH0879370A (en) Operation system for exchange
JPH0946894A (en) Protective method for distribution wire
CN114079322A (en) Breaker data management method and smart grid system
JP2003174724A (en) Power system monitor/control apparatus and program for making the apparatus operate
JPS6248257B2 (en)
JPS583249B2 (en) buffer device
JPH0341004B2 (en)
JP2577392B2 (en) Pre-accident grid status creation method for automatic recovery in the event of a power grid accident
JP2520307B2 (en) Substation accident equipment judgment system
JPH02299424A (en) Trouble restoring operation for electric power system
JP2921034B2 (en) System failure section judgment device
JPH06165380A (en) Distribution system operation device
JPH0662472A (en) Combinational processing system
JPH02299425A (en) Trouble restoration operation of electric power system
JPH03183323A (en) Power system trouble recovering apparatus
JPH0467726A (en) Recovery control system for power system
JP3227761B2 (en) Temporary procedure pre-created automatic recovery method
JP3376068B2 (en) Distribution system operating device
JPS62225127A (en) Power system failure restoration system
JP2635858B2 (en) Distribution system monitoring device

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071107

Year of fee payment: 11