JP2574996Y2 - Column main bar holding member - Google Patents

Column main bar holding member

Info

Publication number
JP2574996Y2
JP2574996Y2 JP1993003926U JP392693U JP2574996Y2 JP 2574996 Y2 JP2574996 Y2 JP 2574996Y2 JP 1993003926 U JP1993003926 U JP 1993003926U JP 392693 U JP392693 U JP 392693U JP 2574996 Y2 JP2574996 Y2 JP 2574996Y2
Authority
JP
Japan
Prior art keywords
column
precast concrete
concrete column
main bar
holding member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1993003926U
Other languages
Japanese (ja)
Other versions
JPH0662110U (en
Inventor
達識 平田
秀雄 岡本
徹 大野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP1993003926U priority Critical patent/JP2574996Y2/en
Publication of JPH0662110U publication Critical patent/JPH0662110U/en
Application granted granted Critical
Publication of JP2574996Y2 publication Critical patent/JP2574996Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は柱主筋の保持部材に係わ
り、より具体的には角形中空筒体状に遠心成形したプレ
キャストコンクリート柱の内部空間に配置された柱主筋
を位置決めして保持するための柱主筋の保持部材に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a holding member for a column main bar, and more specifically, positions and holds a column main bar disposed in an internal space of a precast concrete column centrifugally formed into a square hollow cylindrical body. The present invention relates to a holding member for a column main bar for use.

【0002】[0002]

【従来の技術】一般に、鉄筋コンクリート構造物の柱
は、柱主筋を配し、この柱主筋にフープ筋を巻き付け、
木製の型枠を組上げてこの型枠内にコンクリートを打設
した後、型枠を取り除くことによりその構築を行ってお
り、型枠内での柱主筋の位置決めは、柱主筋に巻き付け
られたフープ筋にドーナツ型スペーサーを取り付けるな
どして行っている。しかしながら、このような型枠工事
は煩雑であって工期がかかるし、均質で高品質な鉄筋コ
ンクリート柱を安定して構築することが難しい。
2. Description of the Related Art Generally, a pillar of a reinforced concrete structure is provided with a pillar reinforcement, and a hoop is wound around the pillar reinforcement.
After constructing a wooden formwork, placing concrete in this formwork, and removing the formwork, the construction is performed by removing the formwork.The positioning of the column main reinforcement in the formwork is based on the hoop wrapped around the column main reinforcement. They do this by attaching donut-shaped spacers to the muscles. However, such formwork is complicated and takes a long time, and it is difficult to stably construct a homogeneous and high-quality reinforced concrete column.

【0003】そこで、近年、鉄筋コンクリート柱の構築
工事の省力化、短工期化、および品質向上を図れるもの
として中空筒体状のプレキャストコンクリート柱を用い
たプレカラム工法が開発されている。このプレカラム工
法におけるプレキャストコンクリート柱は、特開平2−
8011号公報に示されるように遠心コンクリート成形
機に断面矩形の型枠を取り付け、回転することにより形
成されている。この型枠の中にはドーナツ状のスペーサ
が嵌入され型枠の内壁面から適正な間隔を取ったフープ
筋が配されている。また、この型枠の中には、あらかじ
め断面直角三角形の棒体を4本挿通し、この棒体は回転
させたときの遠心力により型枠内の隅角部に納まるよう
になっている。そして、この型枠を回転させながら内部
にコンクリートを投入すると、遠心力によってコンクリ
ートは凝集され、コンクリートの固化後に脱型すると、
遠心力によって内側部に略円柱状の空間を有する四角柱
が成形され、四隅の棒体を抜き出した部位には、このプ
レキャストコンクリート柱の建て込み時に柱主筋を挿通
配置するための切り欠きが形成される。
Therefore, in recent years, a precolumn method using a hollow cylindrical precast concrete column has been developed as a means of saving labor, shortening the construction period, and improving the quality of construction work of a reinforced concrete column. The precast concrete column in this precolumn method is disclosed in
As shown in JP-A-8011, a centrifugal concrete forming machine is formed by attaching a formwork having a rectangular cross section and rotating. In this form, a donut-shaped spacer is fitted and hoop streaks arranged at an appropriate distance from the inner wall surface of the form are arranged. In addition, four rods each having a right-angled triangular cross section are inserted in advance into the mold, and the rods fit into corners of the mold by centrifugal force when rotated. And when concrete is put inside while rotating this formwork, the concrete is agglomerated by centrifugal force.
A square pillar with a substantially cylindrical space is formed on the inside by centrifugal force, and a cutout is formed in the part where the four corner rods were extracted to insert the main bar when inserting this precast concrete pillar Is done.

【0004】そして、このように形成されたプレキャス
トコンクリート柱のプレカラム工法では、図4に示され
るように、建込み後のプレキャストコンクリート柱内表
面とその内部空間に挿通配置する柱主筋との間には所定
のクリアランスをあけてコンクリートを打設充填するよ
うになっていて、このクリアランスの数値は構造計算上
また施工上、正確に保持されるべき寸法となっている。
[0004] In the pre-column method for the precast concrete column thus formed, as shown in Fig. 4, a space between the inner surface of the precast concrete column after being erected and the main bar of the column inserted into the internal space is provided. Is designed to cast and fill concrete with a predetermined clearance, and the value of this clearance is a dimension that must be accurately maintained in structural calculation and construction.

【0005】[0005]

【考案が解決しようとする課題】ところで、上記のプレ
カラム工法では、フープ筋がプレキャストコンクリート
柱の内部に打ち込まれているため、柱主筋はプレキャス
トコンクリート柱の内部空間で宙に浮いた状態となって
いる。そのため、コンクリートを打設充填するにあたっ
てこれを円滑に行うために、当該内部空間で柱主筋の平
面的な位置を確定させる特殊なガイドが必要とされてい
る。
[Problems to be Solved by the Invention] In the precolumn method described above, since the hoop bars are driven into the inside of the precast concrete columns, the main bars of the columns are suspended in the space inside the precast concrete columns. I have. Therefore, a special guide for determining the planar position of the main column in the internal space is required in order to smoothly perform the concrete filling and filling.

【0006】本考案は上記事情に鑑みてなされたもので
あり、その目的は、プレキャストコンクリート柱の内部
空間に挿通配置される柱主筋の平面的な位置を確定して
保持し得る柱主筋の保持部材を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and has as its object to hold a column main bar which can determine and hold a planar position of a column main bar inserted and arranged in an internal space of a precast concrete column. It is to provide a member.

【0007】[0007]

【課題を解決するための手段】かかる目的を達成するた
めに本考案の柱主筋の保持部材は、角形中空筒体状に遠
心成形したプレキャストコンクリート柱の建込み後にそ
の頭部に係合装着されて、該プレキャストコンクリート
柱の内部空間に挿通配置される複数の柱主筋を位置決め
して保持する柱主筋の保持部材であって、井桁状に組ま
れて固着形成された4つの辺材でなり、各辺材の両端部
はクランク状に折曲形成されて該プレキャストコンクリ
ート柱の上端面に係合するとともに、各辺材の中間部分
は該プレキャストコンクリート柱の内部空間に落とし込
まれて、その内周面から所定のクリアランスをあけて配
置された各柱主筋に接してこれを保持することを特徴と
する。
In order to achieve the above object, the holding member of the main column of the present invention is engaged with the head of a precast concrete column which is formed into a rectangular hollow cylindrical shape by centrifugal molding, and is mounted on the head thereof. And a holding member of a column main bar that positions and holds a plurality of column main bars inserted and arranged in the internal space of the precast concrete column, and is composed of four side members fixedly formed in a cross-girder shape, Both ends of each sap are bent into a crank shape to engage with the upper end surface of the precast concrete column, and an intermediate portion of each sap is dropped into the internal space of the precast concrete column, and The present invention is characterized in that each column main bar arranged at a predetermined clearance from the peripheral surface is in contact with and held by a main bar.

【0008】[0008]

【作用】柱主筋の上からプレキャストコンクリート柱を
建て込み、その頭部に井桁状に組まれて固着形成された
柱主筋の保持部材を上方から落とし込んで装着する。こ
のとき、井桁状の保持部材の各辺材はその両端部のかぎ
状部分がプレキャストコンクリート柱の頭部上端面に係
合してその脱落が防止されると共に、各辺材の中間部分
はプレキャストコンクリート柱の内部空間内に落とし込
まれて、その内側面から所定のクリアランスをあけて挿
通配置されている各柱主筋に接する。そして、各柱主筋
は各辺材に結束されることによりその平面的な位置が確
定されて保持される。
The precast concrete column is erected from above the main bar, and the holding member of the main bar, which is fixedly formed in a girder shape at the head, is dropped from above and mounted. At this time, the key portions at both ends of the spar of the girder-shaped holding member are engaged with the upper end surface of the head of the precast concrete column to prevent its falling off, and the intermediate portion of each sap is precast. It is dropped into the internal space of a concrete pillar, and comes into contact with each pillar main bar inserted and arranged with a predetermined clearance from the inner surface. Each column main bar is bound to each sap bar, so that its planar position is determined and held.

【0009】[0009]

【実施例】以下、本考案の好適な実施例を添付図面を参
照して詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings.

【0010】図1は本考案に係る柱主筋の保持部材の斜
視図を示し、図2はその平面図、図3は要部の拡大図、
図4は図3中に示すIV−IV線部の矢視図、図5は保
持部材をプレキャストコンクリート柱の頭部に装着した
状態を示す斜視図である。
FIG. 1 is a perspective view of a holding member of a pillar main bar according to the present invention, FIG. 2 is a plan view thereof, FIG.
FIG. 4 is an arrow view taken along the line IV-IV shown in FIG. 3, and FIG. 5 is a perspective view showing a state where the holding member is mounted on the head of the precast concrete column.

【0011】図1に示す柱主筋の保持部材10は、鉄筋
またはプラスチック材等で形成された4本の辺材11,
11からなっており、図2に示されるようにそれぞれ井
桁状に組み合わされて交差部分12,12が溶接により
固着されて形成されている。また、この各辺材11はそ
の両端部13,13が、図4に示されるように、上方に
折曲され、かつ外方へ再度折曲されたクランク状に形成
されている。なお、この4本の各辺材11の中間部分1
4の長さL1はプレキャストコンクリート柱20の内周
面間距離より短く形成され、かつ両端部13までの長さ
L2はプレキャストコンクリート柱20の外周面間距離
より短く形成されている。
[0011] A holding member 10 of a column main bar shown in FIG. 1 has four sap members 11, formed of a steel bar or a plastic material.
As shown in FIG. 2, the cross portions 12 and 12 are fixed to each other by welding, and are formed by welding. As shown in FIG. 4, each sap 11 is formed in the shape of a crank which is bent upward and bent outward again, as shown in FIG. In addition, the middle part 1 of each of these four sapwood 11
The length L1 of the precast concrete column 20 is shorter than the distance between the inner peripheral surfaces of the precast concrete columns 20, and the length L2 up to both ends 13 is shorter than the distance between the outer peripheral surfaces of the precast concrete columns 20.

【0012】このような柱主筋の保持部材10は、これ
を装着するプレキャストコンクリート柱20の寸法に応
じて、構造設計上指定される複数の柱主筋30,30の
位置に接するようにあらかじめ各辺材11を井桁状に組
み合わせて溶接して固着形成される。
According to the dimensions of the precast concrete column 20 to which the column main reinforcing bar is to be mounted, such a retaining member 10 of the column main reinforcing bar is provided in advance so that each side of the retaining member 10 comes into contact with a plurality of column main reinforcing bars 30 designated by structural design. The members 11 are fixedly formed by combining and welding the members 11 in a grid pattern.

【0013】このようにしてなる保持金具10は、プレ
キャストコンクリート柱20の建込み時にその頭部に装
着される。すなわち、下層から突出する柱主筋30,3
0,…の上方から建て込んだプレキャストコンクリート
柱20の切り欠き21の部分に、上方からさらに柱主筋
30,30,…が挿通されて継ぎ足された後、プレキャ
ストコンクリート柱20の頭部上端面に保持部材10を
上方から落とし込んで装着する。すると、井桁状の辺材
11の端部13がクランク状に形成されているので、こ
の端部13がプレキャストコンクリート柱20の上端面
22に当接係合し、これにより落とし込んだ保持部材1
0がプレキャストコンクリート柱20内部に落下するこ
とが防止される。
The holding metal fitting 10 thus configured is attached to the head of the precast concrete column 20 when the column is built. That is, the column main bars 30, 3 projecting from the lower layer
After the column main reinforcements 30, 30,... Are further inserted from above into the notches 21 of the precast concrete column 20 built from the top of 0,. The holding member 10 is dropped from above and mounted. Then, since the end 13 of the spar 11 in a cross-girder shape is formed in a crank shape, the end 13 abuts and engages with the upper end surface 22 of the precast concrete column 20, thereby holding the holding member 1 dropped.
0 is prevented from falling into the precast concrete column 20.

【0014】そして、プレキャストコンクリート柱20
の内部に落とし込まれた各辺材11の中間部分は、プレ
キャストコンクリート柱20の内周面から所定のクリア
ランスをあけて挿通配置される柱主筋30,30,…に
接触し、これらを係止する。これにより、プレキャスト
コンクリート柱20の建て込み時における柱主筋30,
30,…の平面的な位置が簡単に確定される。爾後、保
持部材10と柱主筋30,30,…との交点を番線で結
束して強固に固定することにより柱主筋30,30,…
を確実に保持する。
The precast concrete column 20
The intermediate portion of each sap 11 dropped into the inside of the precast concrete column 20 comes into contact with the column main reinforcing bars 30, 30,. I do. Thereby, the column main reinforcement 30, when the precast concrete column 20 is built,
The planar position of 30,... Is easily determined. After that, the intersections of the holding members 10 and the column main reinforcements 30, 30,.
Is securely held.

【0015】なお、本実施例では、柱主筋30は、保持
部材10の外側に接し、結束するようになっているが、
内側となるように保持部材10の辺材11を溶接固着し
たものでもよい。
In this embodiment, the column main bar 30 is in contact with the outside of the holding member 10 and is bound.
The sap material 11 of the holding member 10 may be fixed by welding so as to be inside.

【0016】[0016]

【考案の効果】以上のように、本考案の柱主筋の保持部
材によれば、角形中空筒体状に遠心成形したプレキャス
トコンクリート柱を柱主筋の上から建て込み、その内部
にコンクリートを充填して鉄筋コンクリート柱を構築す
るにあたって、プレキャストコンクリート柱の建て込み
時に、プレキャストコンクリート柱の頭部に保持部材を
簡易に落とし込み装着させて、柱主筋を容易に正確な平
面的な位置に確定して保持することができると共に、転
用もできるので経済効果も大きい。
[Effects of the Invention] As described above, according to the holding member of the main bar of the present invention, a precast concrete column centrifugally formed into a square hollow cylindrical body is erected from above the main bar of the column, and concrete is filled therein. When constructing a reinforced concrete column, when installing the precast concrete column, simply drop the holding member on the head of the precast concrete column and attach it, and easily fix the column main bar to the correct planar position and hold it It can also be diverted and has a large economic effect.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案に係る柱主筋の保持部材の斜視図であ
る。
FIG. 1 is a perspective view of a holding member of a pillar main bar according to the present invention.

【図2】図1に示す保持部材の平面図である。FIG. 2 is a plan view of the holding member shown in FIG.

【図3】図2の要部の拡大図であるFIG. 3 is an enlarged view of a main part of FIG. 2;

【図4】図3中に示すIV−IV線部の矢視図である。FIG. 4 is an arrow view taken along a line IV-IV shown in FIG. 3;

【図5】保持部材をプレキャストコンクリート柱の頭部
に装着した状態を示す斜視図である。
FIG. 5 is a perspective view showing a state in which a holding member is mounted on the head of a precast concrete column.

【図6】従来例を示す上面図である。FIG. 6 is a top view showing a conventional example.

【符号の説明】[Explanation of symbols]

10 柱主筋の保持部材 11 辺材 13 端部 14 中間部分 20 プレキャストコンクリート柱 30 柱主筋 DESCRIPTION OF SYMBOLS 10 Holding member of column main reinforcement 11 Sapwood 13 End part 14 Intermediate part 20 Precast concrete column 30 Column main reinforcement

フロントページの続き (72)考案者 大野 徹 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社内 (56)参考文献 実開 昭60−117951(JP,U) 実開 昭60−6025(JP,U) 実開 平6−20664(JP,U) (58)調査した分野(Int.Cl.6,DB名) E04G 21/12 105Continuing on the front page (72) Inventor Toru Ohno 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo head office (56) References Really open 60-60117951 (JP, U) Really open 60-6025 (JP, U) Japanese Utility Model 6-20664 (JP, U) (58) Fields investigated (Int. Cl. 6 , DB name) E04G 21/12 105

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 角形中空筒体状に遠心成形したプレキャ
ストコンクリート柱の建込み後にその頭部に係合装着さ
れて、該プレキャストコンクリート柱の内部空間に挿通
配置される複数の柱主筋を位置決めして保持する柱主筋
の保持部材であって、井桁状に組まれて固着形成された
4つの辺材でなり、各辺材の両端部はクランク状に折曲
形成されて該プレキャストコンクリート柱の上端面に係
合するとともに、各辺材の中間部分は該プレキャストコ
ンクリート柱の内部空間に落とし込まれて、その内周面
から所定のクリアランスをあけて配置された各柱主筋に
接してこれを保持することを特徴とする柱主筋の保持部
材。
1. A precast concrete column formed by centrifugal molding into a rectangular hollow cylindrical body, which is engaged and mounted on the head of the precast concrete column after installation, and positions a plurality of column main reinforcements to be inserted and arranged in the internal space of the precast concrete column. This is a holding member of the main bar of the pillar, which is composed of four sap bars which are assembled and fixed in a cross-girder shape, and both ends of each sap bar are bent and formed in a crank shape, and are formed on the precast concrete column. While engaging with the end face, the intermediate portion of each sap is dropped into the internal space of the precast concrete column, and contacts and holds the main bar of each column arranged with a predetermined clearance from the inner peripheral surface. A member for holding a column main bar.
JP1993003926U 1993-02-10 1993-02-10 Column main bar holding member Expired - Fee Related JP2574996Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993003926U JP2574996Y2 (en) 1993-02-10 1993-02-10 Column main bar holding member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993003926U JP2574996Y2 (en) 1993-02-10 1993-02-10 Column main bar holding member

Publications (2)

Publication Number Publication Date
JPH0662110U JPH0662110U (en) 1994-09-02
JP2574996Y2 true JP2574996Y2 (en) 1998-06-18

Family

ID=11570752

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993003926U Expired - Fee Related JP2574996Y2 (en) 1993-02-10 1993-02-10 Column main bar holding member

Country Status (1)

Country Link
JP (1) JP2574996Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102383333B1 (en) * 2020-03-16 2022-04-05 이병희 Sqaure shape steel pipe with opening for distribution of rebar and manufacturing method of the same and steel beam join structure using the same

Also Published As

Publication number Publication date
JPH0662110U (en) 1994-09-02

Similar Documents

Publication Publication Date Title
JP2574996Y2 (en) Column main bar holding member
JPH0742369A (en) Steel column construction method
JP6654918B2 (en) Fixing method and joint structure of joint steel frame in composite structure
JP2573355Y2 (en) Column main bar holding member
JPS637648Y2 (en)
JP2516653B2 (en) Exposed type fixed pedestal
JPH0784764B2 (en) A cage formwork for removing the box of the steel column base fixing part in the SRC building
JP2577069B2 (en) How to build reinforced concrete columns
JPH072866Y2 (en) Reinforcement support for column reinforcement
JPS6124735A (en) Mold frame for casting concrete
JPS5920489Y2 (en) Anchor bolt mounting structure
JPH0332579Y2 (en)
JPH0512356Y2 (en)
JPS6322241Y2 (en)
JPH0125152Y2 (en)
JPH07119232A (en) Forming method for concrete floor of steel reinforced structure and frame body used therefor
JPH0643234Y2 (en) Slope protection structure
JP2520364B2 (en) Construction method of underground structure
JP2984882B2 (en) Precast reinforced concrete column-beam joint structure
JP3225446B2 (en) Reinforced concrete columns
JPS5919090Y2 (en) Retaining fence members for concrete block walls
JP2603395B2 (en) Slope protection method and structure
JPH0320548B2 (en)
JPS6013834Y2 (en) silo
JPH09151464A (en) Support of upper part of lath net form

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees