JP2573355Y2 - Column main bar holding member - Google Patents
Column main bar holding memberInfo
- Publication number
- JP2573355Y2 JP2573355Y2 JP1993003927U JP392793U JP2573355Y2 JP 2573355 Y2 JP2573355 Y2 JP 2573355Y2 JP 1993003927 U JP1993003927 U JP 1993003927U JP 392793 U JP392793 U JP 392793U JP 2573355 Y2 JP2573355 Y2 JP 2573355Y2
- Authority
- JP
- Japan
- Prior art keywords
- precast concrete
- column
- concrete column
- holding member
- main bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Description
【0001】[0001]
【産業上の利用分野】本考案は柱主筋の保持部材に係わ
り、より具体的には角形中空筒体状に遠心成形したプレ
キャストコンクリート柱の内部空間に配置された柱主筋
を位置決めして保持するための柱主筋の保持部材に関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a holding member for a column main bar, and more specifically, positions and holds a column main bar disposed in an internal space of a precast concrete column centrifugally formed into a square hollow cylindrical body. The present invention relates to a holding member for a column main bar for use.
【0002】[0002]
【従来の技術】一般に、鉄筋コンクリート構造物の柱
は、柱主筋を配し、この柱主筋にフープ筋を巻き付け、
木製の型枠を組上げてこの型枠内にコンクリートを打設
した後、型枠を取り除くことによりその構築を行ってお
り、型枠内での柱主筋の位置決めは、柱主筋に巻き付け
られたフープ筋にドーナツ型スペーサーを取り付けるな
どして行っている。しかしながら、このような型枠工事
は煩雑であって工期がかかるし、均質で高品質な鉄筋コ
ンクリート柱を安定して構築することが難しい。2. Description of the Related Art Generally, a pillar of a reinforced concrete structure is provided with a pillar reinforcement, and a hoop is wound around the pillar reinforcement.
After constructing a wooden formwork, placing concrete in this formwork, and removing the formwork, the construction is performed by removing the formwork.The positioning of the column main reinforcement in the formwork is based on the hoop wrapped around the column main reinforcement. They do this by attaching donut-shaped spacers to the muscles. However, such formwork is complicated and takes a long time, and it is difficult to stably construct a homogeneous and high-quality reinforced concrete column.
【0003】そこで、近年、鉄筋コンクリート柱の構築
工事の省力化、短工期化、および品質向上を図れるもの
として中空筒体状のプレキャストコンクリート柱を用い
たプレカラム工法が開発されている。このプレカラム工
法におけるプレキャストコンクリート柱は、特開平2−
8011号公報に示されるように遠心コンクリート成形
機に断面矩形の型枠を取り付け、回転することにより形
成されている。この型枠の中にはドーナツ状のスペーサ
が嵌入され型枠の内壁面から適正な間隔を取ったフープ
筋が配されている。また、この型枠の中には、あらかじ
め断面直角三角形の棒体を4本挿通し、この棒体は回転
させたときの遠心力により型枠内の隅角部に納まるよう
になっている。そして、この型枠を回転させながら内部
にコンクリートを投入すると、遠心力によってコンクリ
ートは凝集され、コンクリートの固化後に脱型すると、
遠心力によって内側部に略円柱状の空間を有する四角柱
が成形され、四隅の棒体を抜き出した部位には、このプ
レキャストコンクリート柱の建て込み時に柱主筋を挿通
配置するための切り欠きが形成される。Therefore, in recent years, a precolumn method using a hollow cylindrical precast concrete column has been developed as a means of saving labor, shortening the construction period, and improving the quality of construction work of a reinforced concrete column. The precast concrete column in this precolumn method is disclosed in
As shown in JP-A-8011, a centrifugal concrete forming machine is formed by attaching a formwork having a rectangular cross section and rotating. In this form, a donut-shaped spacer is fitted and hoop streaks arranged at an appropriate distance from the inner wall surface of the form are arranged. In addition, four rods each having a right-angled triangular cross section are inserted in advance into the mold, and the rods fit into corners of the mold by centrifugal force when rotated. And when concrete is put inside while rotating this formwork, the concrete is agglomerated by centrifugal force.
A square pillar with a substantially cylindrical space is formed on the inside by centrifugal force, and a cutout is formed in the part where the four corner rods were extracted to insert the main bar when inserting this precast concrete pillar Is done.
【0004】そして、このように形成されたプレキャス
トコンクリート柱のプレカラム工法では、図7に示され
るように、建込み後のプレキャストコンクリート柱内表
面とその内部空間に挿通配置する柱主筋との間には所定
のクリアランスをあけてコンクリートを打設充填するよ
うになっていて、このクリアランスの数値は構造計算上
また施工上、正確に保持されるべき寸法となっている。[0004] In the pre-column method of the precast concrete column thus formed, as shown in Fig. 7, between the inner surface of the precast concrete column after being erected and the main bar of the column inserted into the internal space. Is designed to cast and fill concrete with a predetermined clearance, and the value of this clearance is a dimension that must be accurately maintained in structural calculation and construction.
【0005】[0005]
【考案が解決しようとする課題】ところで、上記のプレ
カラム工法では、フープ筋がプレキャストコンクリート
柱の内部に打ち込まれているため、柱主筋はプレキャス
トコンクリート柱の内部空間で宙に浮いた状態となって
いる。そのため、コンクリートを打設充填するにあたっ
てこれを円滑に行うために、当該内部空間で柱主筋の平
面的な位置を確定させる特殊なガイドが必要とされてい
る。[Problems to be Solved by the Invention] In the precolumn method described above, since the hoop bars are driven into the inside of the precast concrete columns, the main bars of the columns are suspended in the space inside the precast concrete columns. I have. Therefore, a special guide for determining the planar position of the main column in the internal space is required in order to smoothly perform the concrete filling and filling.
【0006】本考案は上記事情に鑑みてなされたもので
あり、その目的は、プレキャストコンクリート柱の内部
空間に挿通配置される柱主筋の平面的な位置を確定して
保持し得る柱主筋の保持部材を提供することにある。SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and has as its object to hold a column main bar which can determine and hold a planar position of a column main bar inserted and arranged in an internal space of a precast concrete column. It is to provide a member.
【0007】[0007]
【課題を解決するための手段】かかる目的を達成するた
めに本考案は、角形中空筒体状に遠心成形したプレキャ
ストコンクリート柱の建込み後にその頭部に係合装着さ
れて、該プレキャストコンクリート柱の内部空間に挿通
配置される複数の柱主筋を位置決めして保持する柱主筋
の保持部材であって、4本のフレームがその各両端部に
ボルトで締結固定された十字状のストッパ金具を介して
相互に連結されて、寸法変更可能な井桁状に形成される
とともに、並行に配置される2組みのフレームのそれぞ
れの間隔はプレキャストコンクリート柱の内周面から所
定のクリアランスをあけて配置される各柱主筋に接する
間隔とされ、かつ該各ストッパ金具の外方に突出する部
分には上方に向けてクランク状に折曲されて該プレキャ
ストコンクリート柱の上端面に係合されるストッパ部が
形成されたことを特徴とする。SUMMARY OF THE INVENTION In order to achieve the above object, the present invention relates to a precast concrete column which is engaged with a head of a precast concrete column which is formed into a rectangular hollow cylindrical shape by centrifugal molding, and which is mounted thereon. A plurality of pillar main bars that are positioned and held in the inner space of the main frame, the four main frames being fixed via bolt-shaped cross-shaped stopper fittings fastened to both ends thereof by bolts. Are connected to each other to form a spar shape that can be changed in size, and the intervals between the two sets of frames arranged in parallel are arranged with a predetermined clearance from the inner peripheral surface of the precast concrete column. The precast concrete is bent upward in the shape of a crank at the portion protruding outward from each of the stopper fittings at intervals between the column main reinforcements. Wherein the stopper portion is engaged with the upper end surface of the formed.
【0008】[0008]
【作用】柱主筋の上から建て込んだプレキャストコンク
リート柱の頭部に、井桁状に組まれて形成された柱主筋
の保持部材を上方から落とし込んで装着する。このと
き、保持部材はフレーム両端部の各ストッパ金具のクラ
ンク状のストッパ部がプレキャストコンクリート柱の頭
部上端面に係合してその脱落が防止されると共に、各フ
レームはプレキャストコンクリート柱の内部空間内に落
とし込まれて、その内側面から所定のクリアランスをあ
けて挿通配置されている各柱主筋に接触され、各柱主筋
は各フレームによりその平面的な位置が確定されて保持
される。[Function] A holding member of a column main reinforcement formed in a cross-girder shape is mounted on the head of a precast concrete column built from above the column main reinforcement by dropping from above. At this time, the holding member is configured such that the crank-shaped stoppers of the stoppers at both ends of the frame are engaged with the upper end surface of the head of the precast concrete column to prevent the precast concrete column from falling off, and each frame is formed in the internal space of the precast concrete column. It is dropped into the inside and is brought into contact with each of the column main bars inserted through a predetermined clearance from the inner surface thereof, and each column main bar has its planar position determined and held by each frame.
【0009】[0009]
【実施例】以下、本考案の好適な実施例を添付図面を参
照して詳細に説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings.
【0010】図1は本考案に係る柱主筋の保持部材の斜
視図を示し、図2はその平面図、図3は要部の拡大図、
図4は図3中に示すIV−IV線部の矢視図、図5は図
3中に示すV−V線部の矢視図、図6は保持部材をプレ
キャストコンクリート柱の頭部に装着した状態を示す斜
視図である。FIG. 1 is a perspective view of a holding member of a pillar main bar according to the present invention, FIG. 2 is a plan view thereof, FIG.
4 is a view taken along the line IV-IV shown in FIG. 3, FIG. 5 is a view taken along the line VV shown in FIG. 3, and FIG. 6 attaches the holding member to the head of the precast concrete column. It is a perspective view showing the state where it did.
【0011】図1〜図6に示すように、柱主筋の保持部
材10は、鉄板またはプラスチック材等で形成された4
本のフレーム11,11,…と、2本の端部プレート1
2,13を直交させて十字状に固着形成した4つのスト
ッパー金具14,…とからなる。各フレーム11,…は
それぞれストッパ金具14,…を介して相互に連結され
て井桁状に形成され、建込み後のプレキャストコンクリ
ート柱20の頭部に装着されて、ストッパ金具14の外
方に突出する部分が上記頭部上端面に係合するようにな
っている。As shown in FIGS. 1 to 6, the holding member 10 for the column main bar is made of a steel plate or a plastic material.
, And two end plates 1
And four stopper metal fittings 14,.. Each of the frames 11,... Is connected to each other through stoppers 14,... To form a girder, and is mounted on the head of the precast concrete column 20 after being built, and protrudes outward from the stoppers 14. A portion to be engaged with the upper end surface of the head.
【0012】ストッパー金具14の直交する2本の端部
プレート12,13は交差部分で溶接されており、この
直交する2本の端部プレート12,13のそれぞれ一端
12a,13aは上方にクランク状に折曲されていて、
ここにプレキャストコンクリート柱20の頭部上端面に
係合させるためのストッパ部が形成されている。The two orthogonal end plates 12 and 13 of the stopper metal fitting 14 are welded at intersections, and one end 12a and 13a of each of the two orthogonal end plates 12 and 13 are cranked upward. Is folded into
Here, a stopper portion for engaging with the upper end surface of the head of the precast concrete column 20 is formed.
【0013】また、この直交する2本の端部プレート1
2,13のそれぞれ他端12b,13b側は水平に延
び、ここに複数のネジ穴16,16,…が所定間隔をあ
けて穿設されている。さらに、一方の端部プレート13
の一端13a側は段部を介して略U字状に形成され、こ
のU字状部分17の深さは、端部プレート12の肉厚分
と等しくなっており、端部プレート12との重なり部分
を形成している。また、各フレーム11には両端部にボ
ルト挿通穴15,15が所定間隔(上記ボルト孔16,
16,…の間隔とは異なる。)をあけて複数穿設されて
いる。The two orthogonal end plates 1
Each of the other ends 12b, 13b of the second 2, 13 extends horizontally, and a plurality of screw holes 16, 16,... Are formed at predetermined intervals. Further, one end plate 13
Is formed in a substantially U-shape through a step, and the depth of the U-shaped portion 17 is equal to the thickness of the end plate 12 and overlaps with the end plate 12. Forming part. Further, bolt insertion holes 15, 15 are provided at both ends of each frame 11 at predetermined intervals (the bolt holes 16, 15).
16,... Are different from each other. ) Are drilled.
【0014】そして、上記のように十字状に形成された
ストッパ金具14の各端部プレート12,13には、そ
の他端12b,13bの上面にフレーム11の端部下面
が合わされて載置されるとともにボルト挿通穴15とネ
ジ穴16とが一致され、これに六角ボルト18が挿通螺
合されて締結固定される。そして、これにより4本のフ
レーム11,11,…を、ストッパー金具14を介して
相互に連結し、柱主筋の保持部材10を井桁状に形成す
る。On the end plates 12 and 13 of the stopper 14 formed in a cross shape as described above, the lower surface of the end of the frame 11 is mounted on the upper surfaces of the other ends 12b and 13b. At the same time, the bolt insertion hole 15 and the screw hole 16 are aligned with each other, and a hexagon bolt 18 is inserted and screwed into this, and fastened and fixed. The four frames 11, 11,... Are connected to each other via the stopper fittings 14, thereby forming the holding members 10 of the column main bars in a cross-girder shape.
【0015】この際、平行に配置される2組のフレーム
間隔は、プレキャストコンクリート20内にその内面か
ら所定のクリアランスをあけて挿通配置される柱主筋3
0,30,…(構造設計上から決定される)に接するよ
うに設定される。すなわち、そのフレーム間隔の調節は
ストッパ金具14のネジ穴16とフレーム11のボルト
挿通穴15とを任意に選択することにより行われる。At this time, the interval between the two sets of frames arranged in parallel is determined by the column main reinforcement 3 inserted through the precast concrete 20 with a predetermined clearance from the inner surface thereof.
0, 30,... (Determined from the structural design). That is, the adjustment of the frame interval is performed by arbitrarily selecting the screw hole 16 of the stopper fitting 14 and the bolt insertion hole 15 of the frame 11.
【0016】次に、このようにしてなる保持部材10の
作用について説明する。まず、下層から突出する柱主筋
30,30,…の上にプレキャストコンクリート柱20
を建て込んで、このプレキャストコンクリート柱20の
切り欠き21の部分に上方からさらに柱主筋30,3
0,…を挿通して継ぎ足す。そして、保持部材10をプ
レキャストコンクリート柱20の頭部に上方から落とし
込む。すると、ストッパー金具14の端部プレート1
2,13の一端12a,13aにクランク状に形成した
ストッパ部が、プレキャストコンクリート柱20の頭部
上端面22に当接して係合し、これにより落とし込んだ
保持部材10がプレキャストコンクリート柱20内部に
落下することが防止される。このとき、各フレーム1
1,11,…は柱主筋30,30,…に接し、これらを
プレキャストコンクリートの内周面から所定のクリアラ
ンスをあけて支持する。爾後、保持部材10のフレーム
11,11,…と柱主筋30,30,…との各交点を番
線で結束してこれらを強固に固定する。従って、プレキ
ャストコンクリート柱20の建て込み時に柱主筋30,
30,…の平面的な位置を簡単に確定して、かつこれら
を確実に保持することができる。Next, the operation of the holding member 10 will be described. First, the precast concrete column 20 is placed on the column main bars 30, 30,.
From the upper part of the notch 21 of the precast concrete column 20 from above.
Insert 0, ... and add. Then, the holding member 10 is dropped into the head of the precast concrete column 20 from above. Then, the end plate 1 of the stopper fitting 14
A stopper formed in a crank shape at one end 12a, 13a of each of the precast concrete columns 20 comes into contact with and engages with an upper end surface 22 of the head of the precast concrete column 20, whereby the dropped holding member 10 is inserted into the inside of the precast concrete column 20. Falling is prevented. At this time, each frame 1
Are in contact with the column main bars 30, 30, and support them with a predetermined clearance from the inner peripheral surface of the precast concrete. After that, the intersections of the frames 11, 11,... Of the holding member 10 and the main pillars 30, 30,. Therefore, when the precast concrete column 20 is built, the column main reinforcement 30,
.. Can be easily determined and held securely.
【0017】なお、本実施例では、柱主筋30は、保持
部材10の各フレーム11,11,…の外側に接して結
束されるようになっているが、内側となるよう保持部材
10のボルト取り付け位置を変えても良い。In this embodiment, the main pillar 30 is bound and bound to the outside of each of the frames 11, 11,... Of the holding member 10, but the bolt of the holding member 10 is positioned inside. The mounting position may be changed.
【0018】また、本実施例では、端部プレート12,
13の他端12b,13bとフレーム11とにそれぞれ
複数のボルト挿通穴15,…及びネジ穴16,…を設け
て、それらボルト挿通穴15とネジ穴16との相互の結
合穴を任意に選択することにより、井桁状の保持部材1
0を種々の寸法形状に対応可能にしているが、ボルト挿
通穴15を長穴にすれば、より緻密に寸法形状に対応で
きるようになる。またネジ穴16をボルト挿通穴に変え
てナットで締結するようにしても良い。In the present embodiment, the end plates 12,
A plurality of bolt insertion holes 15,... And screw holes 16,... Are provided in the other end 12b, 13b of the frame 13 and the frame 11, respectively, and mutual connection holes between the bolt insertion holes 15 and the screw holes 16 are arbitrarily selected. By doing so, the cross-girder holding member 1
Although 0 can correspond to various dimensions and shapes, if the bolt insertion hole 15 is made to be an elongated hole, it becomes possible to correspond to the dimensions and shapes more precisely. Alternatively, the screw hole 16 may be replaced with a bolt insertion hole and fastened with a nut.
【0019】[0019]
【考案の効果】以上のように、本考案の柱主筋の保持部
材によれば、角形中空筒体状に遠心成形したプレキャス
トコンクリート柱を柱主筋の上から建て込み、その内部
にコンクリートを充填して鉄筋コンクリート柱を構築す
るにあたって、プレキャストコンクリート柱の建て込み
時に、プレキャストコンクリート柱の頭部に保持部材を
簡易に落とし込み装着させて、柱主筋を正確な平面的な
位置に簡単に確定して保持することができる。[Effects of the Invention] As described above, according to the holding member of the main bar of the present invention, a precast concrete column centrifugally formed into a square hollow cylindrical body is erected from above the main bar of the column, and concrete is filled therein. When constructing a reinforced concrete column, when installing the precast concrete column, simply drop the holding member on the head of the precast concrete column and attach it, and easily fix the column main bar to the correct planar position and hold it be able to.
【0020】また、ストッパー金具とフレームとをボル
トで寸法変更可能に締結するようにしているので、構造
設計上から決められる柱主筋の位置に合わせて、並行に
配置されるフレーム間隔を任意に調節することができ、
従って種々の寸法のプレキャストコンクリート柱に対応
し得、転用もできるので経済効果が高い。Further, since the stopper fitting and the frame are fastened by bolts so as to be dimensionally changeable, the interval between the frames arranged in parallel can be arbitrarily adjusted in accordance with the position of the column main bar determined from the structural design. Can be
Therefore, it is possible to cope with precast concrete columns of various sizes, and the diversion can be performed, so that the economic effect is high.
【図1】本考案に係る柱主筋の保持部材の斜視図であ
る。FIG. 1 is a perspective view of a holding member of a pillar main bar according to the present invention.
【図2】図1に示す保持部材の平面図である。FIG. 2 is a plan view of the holding member shown in FIG.
【図3】図2の要部の拡大図であるFIG. 3 is an enlarged view of a main part of FIG. 2;
【図4】図3中に示すIV−IV線部の矢視図である。FIG. 4 is an arrow view taken along a line IV-IV shown in FIG. 3;
【図5】図3中に示すV−V線部の矢視図である。FIG. 5 is a view taken along a line VV shown in FIG. 3;
【図6】保持部材をプレキャストコンクリート柱の頭部
に装着した状態を示す斜視図である。FIG. 6 is a perspective view showing a state where a holding member is mounted on a head of a precast concrete column.
【図7】従来例を示す上面図である。FIG. 7 is a top view showing a conventional example.
10 柱主筋の保持部材 11 フレーム 12,13 端部プレート 12a,13a
ストッパ部たる端部 12b,13b 端部 14 ストッパー
金具 15,16 ボルト穴 18 六角ボルト 20 プレキャストコンクリート柱 30 柱主筋DESCRIPTION OF SYMBOLS 10 Main column holding member 11 Frame 12, 13 End plate 12a, 13a
Stopper end 12b, 13b End 14 Stopper metal fitting 15, 16 Bolt hole 18 Hexagon bolt 20 Precast concrete column 30 Column main reinforcement
───────────────────────────────────────────────────── フロントページの続き (72)考案者 大野 徹 東京都千代田区神田司町2丁目3番地 株式会社大林組東京本社 (56)参考文献 特開 平2−8011(JP,A) 特開 平2−229364(JP,A) 特開 平1−125469(JP,A) 実開 平6−62110(JP,U) 実開 平6−20664(JP,U) 実開 昭53−112914(JP,U) 実開 昭52−30612(JP,U) (58)調査した分野(Int.Cl.6,DB名) E04G 21/12 105──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Toru Ohno 2-3-3 Kandaji-cho, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo Head Office (56) References JP-A-2-8011 (JP, A) JP-A-2 229364 (JP, A) JP-A-1-125469 (JP, A) JP-A-6-62110 (JP, U) JP-A-6-20664 (JP, U) JP-A-53-112914 (JP, U) 52) 30612 (JP, U) (58) Field surveyed (Int. Cl. 6 , DB name) E04G 21/12 105
Claims (1)
ストコンクリート柱の建込み後にその頭部に係合装着さ
れて、該プレキャストコンクリート柱の内部空間に挿通
配置される複数の柱主筋を位置決めして保持する柱主筋
の保持部材であって、4本のフレームがその各両端部に
ボルトで締結固定された十字状のストッパ金具を介して
相互に連結されて、寸法変更可能な井桁状に形成される
とともに、並行に配置される2組みのフレームのそれぞ
れの間隔はプレキャストコンクリート柱の内周面から所
定のクリアランスをあけて配置される各柱主筋に接する
間隔とされ、かつ該各ストッパ金具の外方に突出する部
分には上方に向けてクランク状に折曲されて該プレキャ
ストコンクリート柱の上端面に係合されるストッパ部が
形成されたことを特徴とする柱主筋の保持部材。1. A precast concrete column formed by centrifugal molding into a rectangular hollow cylindrical body, which is engaged and mounted on the head of the precast concrete column after being built, and positions a plurality of column main reinforcements to be inserted and arranged in the internal space of the precast concrete column. The main frame is a holding member of a pillar main bar. The four frames are connected to each other via cross-shaped stopper fittings fastened and fixed to both ends of each of the frames by forming a cross-shaped cross-girder. And the interval between the two sets of frames arranged in parallel is the interval in contact with each pillar main bar arranged with a predetermined clearance from the inner peripheral surface of the precast concrete column, and The part protruding outward has a stopper portion which is bent upward in a crank shape and is engaged with the upper end surface of the precast concrete column. Column main bar holding member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1993003927U JP2573355Y2 (en) | 1993-02-10 | 1993-02-10 | Column main bar holding member |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1993003927U JP2573355Y2 (en) | 1993-02-10 | 1993-02-10 | Column main bar holding member |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0662042U JPH0662042U (en) | 1994-09-02 |
JP2573355Y2 true JP2573355Y2 (en) | 1998-05-28 |
Family
ID=11570777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1993003927U Expired - Fee Related JP2573355Y2 (en) | 1993-02-10 | 1993-02-10 | Column main bar holding member |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2573355Y2 (en) |
-
1993
- 1993-02-10 JP JP1993003927U patent/JP2573355Y2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0662042U (en) | 1994-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2573355Y2 (en) | Column main bar holding member | |
JP3131816B2 (en) | How to build a steel column | |
JP2634573B2 (en) | Concrete formwork equipment | |
JP2574996Y2 (en) | Column main bar holding member | |
JPH11229402A (en) | Foundation and construction for steel frame structure | |
JPS6129891Y2 (en) | ||
JP2630623B2 (en) | Anchor bolt installation method and anchor bolt support device used for it | |
JP2004019303A (en) | Anchor bolt fixing device | |
JPS5920489Y2 (en) | Anchor bolt mounting structure | |
JPH0784764B2 (en) | A cage formwork for removing the box of the steel column base fixing part in the SRC building | |
JPH08128200A (en) | Form device for concrete | |
JP3019766B2 (en) | Method of constructing formwork for concrete structures | |
JP3072294B1 (en) | Formwork equipment for manufacturing hollow PCa members | |
JPH07292683A (en) | Anchor frame and foundation construction method using the frame | |
JP2516653B2 (en) | Exposed type fixed pedestal | |
CN221346303U (en) | Assembled cast-in-situ beam column node template fixed knot constructs | |
JP2001011868A (en) | Column base joint method and blockout device | |
JPH08109745A (en) | Construction of reinforced concrete pole and reinforcement positioning jig used for its execution | |
JP2001348882A (en) | Foundation construction method for building | |
JPS60250145A (en) | Anchor structure of iron wire pillar | |
JPH0125152Y2 (en) | ||
JPH0332579Y2 (en) | ||
JPH06129102A (en) | Pillar form | |
JPS5919090Y2 (en) | Retaining fence members for concrete block walls | |
JP3014179U (en) | Two column base anchor bolts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |