JP2563570Y2 - Side excavation boom - Google Patents

Side excavation boom

Info

Publication number
JP2563570Y2
JP2563570Y2 JP5054692U JP5054692U JP2563570Y2 JP 2563570 Y2 JP2563570 Y2 JP 2563570Y2 JP 5054692 U JP5054692 U JP 5054692U JP 5054692 U JP5054692 U JP 5054692U JP 2563570 Y2 JP2563570 Y2 JP 2563570Y2
Authority
JP
Japan
Prior art keywords
boom
cover member
cover
pin
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5054692U
Other languages
Japanese (ja)
Other versions
JPH0634057U (en
Inventor
英一 佐和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP5054692U priority Critical patent/JP2563570Y2/en
Publication of JPH0634057U publication Critical patent/JPH0634057U/en
Application granted granted Critical
Publication of JP2563570Y2 publication Critical patent/JP2563570Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Shovels (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、側辺掘削用油圧ショベ
ルに装備している側辺掘削用ブームの構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a side excavation boom provided on a side excavation hydraulic excavator.

【0002】[0002]

【従来の技術】図5は、従来技術の側辺掘削用油圧ショ
ベルの側面図である。図において、1は下部走行体、2
は上部旋回体、3は上部旋回体2のフロント部に装着し
ている側辺掘りアタッチメント、4は側辺掘りアタッチ
メント3のリアブーム、5はフロントブーム、6はアッ
パブーム、7はアーム、8はバケット、9はブームシリ
ンダ、10はオフセットシリンダ、11はアームシリン
ダ、12はバケットシリンダである。図5に示す側辺掘
削用油圧ショベルでは、上部旋回体2のフロント部にリ
アブーム4を取付け、そのリアブーム4先端部にフロン
トブーム5、アッパブーム6をそれぞれ左右方向に回動
可能に順次連結し、そのアッパブーム6に対してアーム
7、バケット8をそれぞれ前後方向に回動可能に順次連
結して側辺掘りアタッチメント3を構成し、オフセット
シリンダ10を伸縮調整操作することによりアーム7を
オフセット移動できるようにしている。
2. Description of the Related Art FIG. 5 is a side view of a conventional hydraulic excavator for side excavation. In the figure, 1 is a lower traveling body, 2
Is an upper swing body, 3 is a side digging attachment attached to the front portion of the upper swing body 2, 4 is a rear boom of the side digging attachment 3, 5 is a front boom, 6 is an upper boom, 7 is an arm, and 8 is a bucket. , 9 are a boom cylinder, 10 is an offset cylinder, 11 is an arm cylinder, and 12 is a bucket cylinder. In the hydraulic excavator for side excavation shown in FIG. 5, a rear boom 4 is attached to a front portion of the upper revolving superstructure 2, and a front boom 5 and an upper boom 6 are sequentially connected to a front end portion of the rear boom 4 so as to be rotatable left and right, The side digging attachment 3 is formed by sequentially connecting the arm 7 and the bucket 8 to the upper boom 6 so as to be rotatable in the front-rear direction, and the arm 7 can be offset-moved by adjusting the offset cylinder 10 to expand and contract. I have to.

【0003】図6は、図5における側辺掘りアタッチメ
ント3をオフセット操作した状態を示す平面図である。
図において、13はロッド、14はリアブーム4の先端
側面部に固設されているロッド用ブラケット、15はア
ッパブーム6の側面部に固設されているロッド用ブラケ
ット、0ー0はリアブーム4の前後方向の中心線、WL
は中心線0ー0から左側のオフセット量、WRは右側の
オフセット量である。図7は、図6における側辺掘りア
タッチメント3が平行リンクを形成している状態を示す
平面図である。図において、16はフロントブーム5の
先端部たてピン、aは先端部たてピン16の軸心、17
はフロントブーム5の基端部たてピン、bは基端部たて
ピン17の軸心、18はロッド13前端部をブラケット
15に枢支している前部ロッドピン、cは前部ロッドピ
ン18の軸心、19はロッド13後端部をブラケット1
4に枢支している後部ロッドピン、dは後部ロッドピン
である。それで軸心aからbまでの距離abはab=L
1、軸心cからdまでの距離cdはcd=L1、軸心a
からcまでの距離acはac=L2、軸心bからdまで
の距離bdはbd=L2である。したがって軸心cーd
ーbーaーcを結ぶ四辺形が平行四辺形となる平行リン
クが形成されるので、アーム7を中心線0ー0に対して
平行にオフセット移動させて側辺掘りを行うことができ
る。なお図8は、従来技術の側辺掘りアタッチメント3
に配設した油圧配管群イを示す要部斜視図である。この
油圧配管群イは、上部旋回体2に装備しているコントロ
ールバルブ(図示しない)から各種油圧アクチュエータ
(バケットシリンダ12,アームシリンダ11,オフセ
ットシリンダ10など)に至るまで配設されている。
FIG. 6 is a plan view showing a state where the side digging attachment 3 in FIG. 5 has been subjected to an offset operation.
In the drawing, 13 is a rod, 14 is a rod bracket fixed to the side surface of the tip of the rear boom 4, 15 is a rod bracket fixed to the side surface of the upper boom 6, and 0-0 are front and rear of the rear boom 4. Center line of direction, WL
Is an offset amount on the left side from the center line 0-0, and WR is an offset amount on the right side. FIG. 7 is a plan view showing a state where the side digging attachment 3 in FIG. 6 forms a parallel link. In the drawing, reference numeral 16 denotes a vertical pin at the front end of the front boom 5;
Is a vertical pin at the base end of the front boom 5, b is the axis of the vertical pin 17 at the base end, 18 is a front rod pin that pivotally supports the front end of the rod 13 to the bracket 15, and c is a front rod pin 18 19 is the bracket 1 at the rear end of the rod 13.
A rear rod pin pivotally supported at 4 is a rear rod pin. Therefore, the distance ab from the axis a to the axis b is ab = L
1. Distance cd from axis c to d is cd = L1, axis a
Is ac = L2, and the distance bd from the axis b to d is bd = L2. Therefore, the axis cd
Since a parallel link is formed in which the quadrilateral connecting -b-a-c is a parallelogram, the side digging can be performed by offset-moving the arm 7 in parallel with the center line 0-0. FIG. 8 shows a conventional side digging attachment 3.
FIG. 2 is a perspective view of a main part showing a hydraulic piping group a disposed in the apparatus. The hydraulic piping group A is provided from a control valve (not shown) mounted on the upper swing body 2 to various hydraulic actuators (bucket cylinder 12, arm cylinder 11, offset cylinder 10, etc.).

【0004】[0004]

【考案が解決しようとする課題】従来技術の側辺掘りア
タッチメントでは、上部旋回体に装備しているコントロ
ールバルブから各種油圧アクチュエータ(バケットシリ
ンダ,アームシリンダ,オフセットシリンダなど)に至
るまでの油圧配管を露出状態に配置している。そのため
に、上記油圧配管を外部の障害物に衝突させたり、ある
いは引掛けたりして破損することがあった。また上記油
圧配管がごちゃごちゃした感じで露出しているので、側
辺掘りアタッチメントの見映えが悪かった。本考案は、
上記の問題点を解決することを目的とする。
In the prior art side excavation attachment, hydraulic piping from a control valve mounted on the upper swing body to various hydraulic actuators (bucket cylinder, arm cylinder, offset cylinder, etc.) is provided. It is arranged in an exposed state. For this reason, the hydraulic piping may be damaged by colliding with or catching on an external obstacle. Also, since the hydraulic piping was exposed in a mess-like manner, the appearance of the side digging attachment was poor. The present invention
An object is to solve the above problems.

【0005】[0005]

【課題を解決するための手段】本考案のブーム(リアブ
ーム、フロントブーム、アッパブームを連結したものを
ブームという)をそなえた側辺掘りアタッチメントは、
オフセットシリンダをフロントブームとアッパブームの
それぞれ同じ側の側面部に固設した双方のブラケット間
に介設し、そのオフセットシリンダの外側の側面側にカ
バー部材を設け、そのカバー部材の前端部を、アッパブ
ームのオフセットシリンダ取付側のブラケットに対して
上下方向のカバー前部たてピンにて枢支し,かつカバー
部材の後端部をリアブームのオフセットシリンダ取付側
のブラケットに対して上下方向のカバー後部たてピンに
て枢支し、オフセットシリンダを伸縮操作したとき、カ
バー前部たてピン、カバー後部たてピン、フロントブー
ム基端部たてピン、フロントブーム先端部たてピンを結
ぶ平面視四辺形が常に平行四辺形となるように構成した
側辺堀りアタッチメントであって、上部旋回体より油圧
アクチュエータに至る油圧配管の配管通路としてカバー
部材の内部側を通すように設定した。また、カバー部材
の内部側に補強板を設け、カバー部材の長手方向に作用
する荷重に対し座屈をおこさないようにした。そして、
上部旋回体より油圧アクチュエータに至る油圧配管を、
カバー部材の内側コーナ部と補強板との間の空間部に配
置して構成した。
Means for Solving the Problems A side digging attachment provided with a boom (a combination of a rear boom, a front boom, and an upper boom) is provided.
An offset cylinder is interposed between the two brackets fixed to the same side surface of the front boom and the upper boom, and a cover member is provided on the outer side surface of the offset cylinder, and the front end of the cover member is connected to the upper boom. The vertical cover front pivot pin supports the bracket on the offset cylinder mounting side, and the rear end of the cover member is the rear cover in the vertical direction relative to the offset cylinder mounting side bracket on the rear boom. When the offset cylinder is extended and retracted by pivoting with an extension pin, the front side of the cover, the rear end of the cover, the front end of the front boom, and the front end of the front boom are connected. This is a side excavation attachment that is configured so that the shape is always a parallelogram. That it was set to pass the inner side of the cover member as a pipe passage in the hydraulic pipe. In addition, a reinforcing plate is provided inside the cover member so that buckling is not caused by a load acting in the longitudinal direction of the cover member. And
Hydraulic piping from the upper structure to the hydraulic actuator
The cover member was arranged in a space between the inner corner portion and the reinforcing plate.

【0006】[0006]

【実施例】以下、本考案の実施例を図面に基づいて詳細
に説明する。図1は、本考案のブーム(リアブーム2
1,フロントブーム22、アッパブーム23を連結した
ものを本考案のブームという)をそなえた側辺掘りアタ
ッチメント20の要部側面図である。図において、7’
はアーム、8’はバケット、9’はブームシリンダ、2
4はオフセットシリンダ、11’はアームシリンダ、1
2’はバケットシリンダ、16’はフロントブーム22
の先端部たてピン、17’はフロントブーム22の基端
部たてピン、25はカバー部材、26,27,28はリ
アブーム21,フロントブーム22,アッパブーム23
のそれぞれ同じ側の側面部に固設した各ブラケット、2
9はカバー前部たてピン、30はカバー後部たてピン、
31は上部旋回体(図示しない)に装備したコントロー
ルバルブからバケットシリンダ12’に至る油圧配管、
32はアームシリンダ11’に至る油圧配管、33はオ
フセットシリンダ24に至る油圧配管である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows the boom (rear boom 2) of the present invention.
1, a front boom 22 and an upper boom 23 connected to each other are referred to as a boom of the present invention). In the figure, 7 '
Is an arm, 8 'is a bucket, 9' is a boom cylinder, 2
4 is an offset cylinder, 11 'is an arm cylinder, 1
2 'is a bucket cylinder, 16' is a front boom 22
Of the front end of the front boom 22; 25 of the cover member; 26, 27 and 28, the rear boom 21, the front boom 22, and the upper boom 23;
Each bracket fixed to the side of the same side of each, 2
9 is a vertical pin on the front of the cover, 30 is a vertical pin on the rear of the cover,
31 is a hydraulic pipe extending from a control valve mounted on an upper rotating body (not shown) to the bucket cylinder 12 ′,
Reference numeral 32 denotes a hydraulic pipe leading to the arm cylinder 11 ′, and reference numeral 33 denotes a hydraulic pipe leading to the offset cylinder 24.

【0007】図2は、図1における側辺掘りアタッチメ
ント20をオフセット操作した状態を示す要部平面図で
ある。図において、34はカバー部材25の内部側に設
けた補強板、0’ー0’はリアブーム21の前後方向の
中心線、a’は先端部たてピン16’の軸心、b’は基
端部たてピン17’の軸心、c’はカバー前部たてピン
29の軸心、d’はカバー後部たてピン30の軸心、3
5はリアブーム21の側面側に設けたカバーである。図
3は、図1におけるカバー部材25のAーA矢視断面図
である。
FIG. 2 is a plan view of a main part showing a state where the side digging attachment 20 in FIG. 1 has been subjected to an offset operation. In the figure, 34 is a reinforcing plate provided inside the cover member 25, 0'-0 'is a center line in the front-rear direction of the rear boom 21, a' is an axis of the vertical pin 16 ', and b' is a base. The axis of the end vertical pin 17 ', the axis of c' is the axis of the front cover pin 29, the axis of d 'is the axis of the rear cover pin 30, and 3;
Reference numeral 5 denotes a cover provided on the side surface of the rear boom 21. FIG. 3 is a cross-sectional view of the cover member 25 in FIG.

【0008】次に、本考案の側辺掘削用ブームの構成を
図1〜図3について述べる。本考案のブームをそなえた
側辺掘りアタッチメント20は、オフセットシリンダ2
4をフロントブーム22とアッパブーム23のそれぞれ
同じ側の側面部に固設した双方のブラケット27と28
との間に介設し、そのオフセットシリンダ24の外側の
側面側にカバー部材25を設け、そのカバー部材25の
前端部を、アッパブーム23のブラケット28に対して
上下方向のカバー前部たてピン29にて枢支し、かつカ
バー部材25の後端部をリアブーム21のオフセットシ
リンダ取付側のブラケット26に対して上下方向のカバ
ー後部たてピン30にて枢支し、オフセットシリンダ2
4を伸縮操作したとき、カバー前部たてピン29の軸心
C’、カバー後部たてピン30の軸心d’、フロントブ
ーム基端部たてピン17’の軸心b’、フロントブーム
先端部たてピン16’の軸心a’を結ぶ平面視四辺形が
常に平行四辺形となるように構成した側辺掘りアタッチ
メントであって、上部旋回体より油圧アクチュエータ
(バケットシリンダ12’、アームシリンダ11’、オ
フセットシリンダ24をいう)に至る油圧配管31、3
2、33の配設通路としてカバー部材25の内部側を通
すように設定した。また、カバー部材25の内部側に補
強板34を設け、カバー部材25の長手方向に作用する
荷重に対し座屈をおこさないようにした。そして、上部
旋回体よりバケットシリンダ12’,アームシリンダ1
1’に至る油圧配管を、カバー部材25の内側コーナ部
と補強板34との間の空間部36,37(図3に示す)
に配置して構成した。
Next, the structure of the side excavation boom of the present invention will be described with reference to FIGS. The side digging attachment 20 with the boom of the present invention is an offset cylinder 2
4 are fixed to the same side surface of the front boom 22 and the upper boom 23.
A cover member 25 is provided on the outer side surface of the offset cylinder 24, and the front end of the cover member 25 is vertically pinched with respect to the bracket 28 of the upper boom 23. 29, and the rear end of the cover member 25 is pivotally supported by a vertical cover rear vertical pin 30 with respect to a bracket 26 on the offset cylinder mounting side of the rear boom 21.
4 when the cover 4 is extended and retracted, the axis C 'of the front cover pin 29, the axis d' of the cover rear pin 30, the axis b 'of the front boom base pin 17', the front boom. A side digging attachment in which a quadrilateral in plan view connecting an axis a 'of the vertical pin 16' is always a parallelogram, wherein a hydraulic actuator (bucket cylinder 12 ', arm Hydraulic pipes 31 and 3 leading to the cylinder 11 'and the offset cylinder 24).
The passages 2 and 33 were set to pass through the inside of the cover member 25. In addition, a reinforcing plate 34 is provided inside the cover member 25 so as not to buckle a load acting on the cover member 25 in the longitudinal direction. Then, the bucket cylinder 12 'and the arm cylinder 1
Hydraulic piping reaching 1 'is connected to spaces 36, 37 between the inner corner of the cover member 25 and the reinforcing plate 34 (shown in FIG. 3).
And arranged.

【0009】次に、本考案の側辺掘削用ブームの作用に
ついて述べる。上部旋回体のコントロールバルブからバ
ケットシリンダ12’に至る油圧配管31は、リアブー
ム21の側面側に設けたカバー35(図2に示す)の内
側、リアブーム(21)先端側の内部、ブラケット26
の内側、カバー部材25の空間部37(図3に示す)、
アッパブーム23の内部側、アーム7’の基端側の内側
を通って、バケットシリンダ12’に接続される。また
油圧配管32は、リアブーム21の側面側に設けたカバ
ー35の内側、リアブーム(21)先端側の内部、ブラ
ケット26の内側、カバー部材25の空間部36、アッ
パブーム23の内部側を通って、アームシリンダ11’
に接続される。また油圧配管33は、リアブーム21の
側面側に設けたカバー35の内側、リアブーム(21)
先端側の内部、ブラケット26の内側、カバー部材25
の内部側を通って、オフセットシリンダ25に接続され
る。したがって本考案の側辺掘削用ブームでは、上部旋
回体より油圧アクチュエータに至る油圧配管が露出状態
にならないように、リアブーム21、カバー部材25、
アッパブーム23の内側を通すことができる。
Next, the operation of the side excavating boom of the present invention will be described. The hydraulic piping 31 extending from the control valve of the upper swing body to the bucket cylinder 12 ′ is provided inside a cover 35 (shown in FIG. 2) provided on the side surface of the rear boom 21, inside the front end side of the rear boom (21), and a bracket 26.
Inside, a space portion 37 of the cover member 25 (shown in FIG. 3),
The inner side of the upper boom 23 and the inside of the base end side of the arm 7 ′ are connected to the bucket cylinder 12 ′. The hydraulic piping 32 passes through the inside of the cover 35 provided on the side surface of the rear boom 21, the inside of the front end side of the rear boom (21), the inside of the bracket 26, the space 36 of the cover member 25, and the inside of the upper boom 23, Arm cylinder 11 '
Connected to. The hydraulic piping 33 is provided inside the cover 35 provided on the side surface of the rear boom 21 and the rear boom (21).
Inside of the tip side, inside of bracket 26, cover member 25
Is connected to the offset cylinder 25 through the inside of the cylinder. Therefore, in the boom for side excavation of the present invention, the rear boom 21, the cover member 25, the cover member 25, and the hydraulic pipe from the upper swing body to the hydraulic actuator are not exposed.
It can pass through the inside of the upper boom 23.

【0010】次に図4は、本考案におけるカバー部材2
5に設けた他実施例補強板34’を示す断面図である。
図において、36’,37’はカバー部材25の内側コ
ーナ部と補強板34’との間のそれぞれ空間部である。
補強板34’の断面形状は半円形である。なおカバー部
材25に設ける補強板は、カバー部材25の長手方向に
作用する荷重に対し座屈を防止するものであるから、補
強板34’以外の断面形状を有するものでもよい。
Next, FIG. 4 shows a cover member 2 according to the present invention.
It is sectional drawing which shows the reinforcement plate 34 'of the other Example provided in 5.
In the figure, reference numerals 36 'and 37' denote space portions between the inner corner portion of the cover member 25 and the reinforcing plate 34 '.
The cross-sectional shape of the reinforcing plate 34 'is semicircular. Since the reinforcing plate provided on the cover member 25 prevents buckling against a load acting in the longitudinal direction of the cover member 25, the reinforcing plate may have a cross-sectional shape other than the reinforcing plate 34 '.

【0011】[0011]

【考案の効果】従来技術では、側辺掘りアタッチメント
に装備しているバケットシリンダ,アームシリンダ,オ
フセットシリンダに至るまでの油圧配管を露出状態に配
置している。そのために上記油圧配管を外部の障害物に
衝突させたり、あるいは引掛けたりして破損することが
あった。また上記油圧配管はごちゃごちゃした感じで、
外観上の見映えが悪かった。しかし本考案の側辺掘削用
ブームでは、上部旋回体より油圧アクチュエータに至る
油圧配管を、リアブームの内側より、オフセットシリン
ダの外側の側面側に設けたカバー部材の内部側を通すよ
うにした。それにより、上記油圧配管を外部の障害物に
衝突させたり、引掛けたりすることはなくなった。また
上記油圧配管が外部に対して露出状態になっていないの
で、側辺掘削用ブームはシンプルな感じとなり見映えが
良くなった。また上記カバー部材の内側に補強板を設け
たので、オフセット操作時にカバー部材に作用する荷重
に対し、カバー部材の座屈を防止することができる。し
たがって本考案の側辺掘削用ブームをそなえた側辺掘り
アタッチメントでは、メンテナンス性と強度を向上し、
外見上の美観をたかめることができる。
According to the prior art, the hydraulic piping extending to the bucket cylinder, arm cylinder, and offset cylinder provided in the side excavation attachment is arranged in an exposed state. For this reason, the hydraulic piping may be damaged by colliding with or catching with an external obstacle. Also, the above hydraulic piping is messy,
The appearance was bad. However, in the boom for side excavation of the present invention, the hydraulic piping from the upper swing body to the hydraulic actuator is passed through the inside of the cover member provided on the side surface outside the offset cylinder from the inside of the rear boom. As a result, the hydraulic piping does not collide with or be caught by an external obstacle. Also, since the hydraulic piping was not exposed to the outside, the boom for side excavation became simple and the appearance improved. Further, since the reinforcing plate is provided inside the cover member, it is possible to prevent the cover member from buckling against a load acting on the cover member during the offset operation. Therefore, the side digging attachment with the side digging boom of the present invention improves the maintainability and strength,
The appearance can be enhanced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案のブームをそなえた側辺掘りアタッチメ
ントの要部側面図である。
FIG. 1 is a side view of a main part of a side digging attachment having a boom of the present invention.

【図2】図1における側辺掘りアタッチメントをオフセ
ット操作した状態を示す要部平面図である。
FIG. 2 is a main part plan view showing a state where an offset operation has been performed on a side digging attachment in FIG. 1;

【図3】図1におけるカバー部材のAーA矢視断面図で
ある。
FIG. 3 is a cross-sectional view of the cover member taken along line AA in FIG.

【図4】本考案におけるカバー部材に設けた他実施例補
強板を示す断面図である。
FIG. 4 is a cross-sectional view illustrating a reinforcing plate provided on a cover member according to another embodiment of the present invention.

【図5】従来技術の側辺掘削用油圧ショベルの側面図で
ある。
FIG. 5 is a side view of a conventional hydraulic excavator for side excavation.

【図6】図5における側辺掘りアタッチメントをオフセ
ットした状態を示す平面図である。
FIG. 6 is a plan view showing a state where a side digging attachment in FIG. 5 is offset.

【図7】図6における側辺掘りアタッチメントが平行リ
ンクを形成している状態を示す平面図である。
FIG. 7 is a plan view showing a state in which the side digging attachment in FIG. 6 forms a parallel link.

【図8】従来技術の側辺掘りアタッチメントに配設した
油圧配管群イを示す要部斜視図である。
FIG. 8 is a perspective view of a main part showing a hydraulic piping group a disposed in a conventional side excavation attachment.

【符号の説明】[Explanation of symbols]

3,20 側辺掘りアタッチメント 4,21 リアブーム 5,22 フロントブーム 6,23 アッパブーム 7,7’ アーム 10,24 オフセットシリンダ 11,11’ アームシリンダ 12,12’ バケットシリンダ 16,16’ 先端部たてピン 17,17’ 基端部たてピン 25 カバー部材 29 カバー前部たてピン 30 カバー後部たてピン 31,32,33 油圧配管 34,34’ 補強板 36,36’,37,37’ 空間部 3,20 Side digging attachment 4,21 Rear boom 5,22 Front boom 6,23 Upper boom 7,7 'Arm 10,24 Offset cylinder 11,11' Arm cylinder 12,12 'Bucket cylinder 16,16' Pin 17, 17 'Base end vertical pin 25 Cover member 29 Cover front vertical pin 30 Cover rear vertical pin 31, 32, 33 Hydraulic piping 34, 34' Reinforcement plate 36, 36 ', 37, 37' Space Department

Claims (3)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 上部旋回体のフロント部にリアブームを
取付け、そのリアブーム先端部にフロントブーム、アッ
パブームをそれぞれ左右方向に回動可能に順次連結し、
そのアッパブームに対してアーム、バケットをそれぞれ
前後方向に回動可能に順次連結し、オフセットシリンダ
をフロントブームとアッパブームのそれぞれ同じ側の側
面部に固設した双方のブラケット間に介設し、そのオフ
セットシリンダの外側の側面側にカバー部材を設け、そ
のカバー部材の前端部をアッパブームのオフセットシリ
ンダ取付側のブラケットに対して上下方向のカバー前部
たてピンにて枢支し、かつカバー部材の後端部をリアブ
ームのオフセットシリンダ取付側のブラケットに対して
上下方向のカバー後部たてピンにて枢支し、オフセット
シリンダを伸縮操作したとき、カバー前部たてピン、カ
バー後部たてピン、フロントブーム基端部たてピン、フ
ロントブーム先端部たてピンを結ぶ平面視四辺形が常に
平行四辺形となるように構成した側辺掘りアタッチメン
トにおいて、上部旋回体より油圧アクチュエータに至る
油圧配管の配設通路としてカバー部材の内部側を通すよ
うに設定したことを特徴とする側辺掘削用ブーム。
1. A rear boom is attached to a front portion of an upper swing body, and a front boom and an upper boom are sequentially connected to a front end portion of the rear boom so as to be rotatable left and right, respectively.
An arm and a bucket are sequentially connected to the upper boom so as to be rotatable in the front-rear direction, and an offset cylinder is interposed between both brackets fixed to the same side surface of the front boom and the upper boom. A cover member is provided on the outer side surface of the cylinder, and the front end of the cover member is pivotally supported by a vertical cover front vertical pin with respect to a bracket on the offset cylinder mounting side of the upper boom. The end of the rear boom is pivoted to the bracket on the side where the offset cylinder is mounted by the vertical cover rear pin, and when the offset cylinder is extended or contracted, the cover front vertical pin, cover rear vertical pin, front The quadrilateral in plan view that connects the boom base end pin and front boom tip end pin is always a parallelogram In the side digging attachment that urchin configuration, boom sides drilling, characterized in that set to pass the inner side of the cover member as placement channel hydraulic pipes leading to the hydraulic actuator from the upper rotating body.
【請求項2】 実用新案登録請求の範囲請求項1記載の
側辺掘削用ブームにおいて、カバー部材の内部側に補強
板を設け、カバー部材の長手方向に作用する荷重に対し
座屈をおこさないようにしたことを特徴とする側辺掘削
用ブーム。
2. A side excavating boom according to claim 1, wherein a reinforcing plate is provided inside the cover member so as not to buckle against a load acting in the longitudinal direction of the cover member. A side excavation boom characterized in that:
【請求項3】 実用新案登録請求の範囲請求項2記載の
側辺掘削用ブームにおいて、上部旋回体より油圧アクチ
ュエータに至る油圧配管を、カバー部材の内側コーナ部
と補強板との間の空間部に配置したことを特徴とする側
辺掘削用ブーム。
3. The side excavation boom according to claim 2, wherein a hydraulic pipe extending from the upper swing body to the hydraulic actuator is provided in a space between an inner corner portion of the cover member and the reinforcing plate. A boom for side excavation, wherein the boom is disposed on a side.
JP5054692U 1992-06-24 1992-06-24 Side excavation boom Expired - Fee Related JP2563570Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5054692U JP2563570Y2 (en) 1992-06-24 1992-06-24 Side excavation boom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5054692U JP2563570Y2 (en) 1992-06-24 1992-06-24 Side excavation boom

Publications (2)

Publication Number Publication Date
JPH0634057U JPH0634057U (en) 1994-05-06
JP2563570Y2 true JP2563570Y2 (en) 1998-02-25

Family

ID=12862015

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5054692U Expired - Fee Related JP2563570Y2 (en) 1992-06-24 1992-06-24 Side excavation boom

Country Status (1)

Country Link
JP (1) JP2563570Y2 (en)

Also Published As

Publication number Publication date
JPH0634057U (en) 1994-05-06

Similar Documents

Publication Publication Date Title
WO2006100823A1 (en) Loading device for working machine
JP2563570Y2 (en) Side excavation boom
JPH10331184A (en) Working machine for hydraulic shovel
JP2563588Y2 (en) Side digging attachment structure
JP2565537Y2 (en) Hydraulic excavator boom offset structure
JPH03180628A (en) Front structure for construction machine
JPH0728206Y2 (en) Boom offset type excavator
JPH0614244U (en) Arm structure
JP2563568Y2 (en) Hydraulic excavator for gutter excavation
JPH077400Y2 (en) Backhoe
JP4299952B2 (en) Folding arm of work machine
JP3822841B2 (en) Ultra-small turning work vehicle
JP3213201B2 (en) Backhoe
JP2563578Y2 (en) Side digging attachment
JP2563577Y2 (en) Hydraulic excavator for side excavation
JP2613141B2 (en) Construction machine swivel frame
JP2563567Y2 (en) Hydraulic excavator for gutter excavation
JP4086172B2 (en) Boom offset hydraulic excavator
JPS6319405Y2 (en)
JP6102965B2 (en) Boom foot part of work machine
JPH0619149B2 (en) Arm device for power shovel work machine
JP2554928Y2 (en) Gutter excavator boom structure
JP2504595Y2 (en) Cylinder cover mounting structure
JPH0213563Y2 (en)
JP2563574Y2 (en) Side digging attachment

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees