JP2561094Y2 - Building board mounting device - Google Patents

Building board mounting device

Info

Publication number
JP2561094Y2
JP2561094Y2 JP1991028955U JP2895591U JP2561094Y2 JP 2561094 Y2 JP2561094 Y2 JP 2561094Y2 JP 1991028955 U JP1991028955 U JP 1991028955U JP 2895591 U JP2895591 U JP 2895591U JP 2561094 Y2 JP2561094 Y2 JP 2561094Y2
Authority
JP
Japan
Prior art keywords
building board
locking
building
base bar
projections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1991028955U
Other languages
Japanese (ja)
Other versions
JPH0514347U (en
Inventor
良一 松島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP1991028955U priority Critical patent/JP2561094Y2/en
Publication of JPH0514347U publication Critical patent/JPH0514347U/en
Application granted granted Critical
Publication of JP2561094Y2 publication Critical patent/JP2561094Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、主として浴室や台所等
の壁材、天井材等として使用される建築板を保持する建
築板取付け装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a building board mounting apparatus for holding a building board mainly used as a wall material or a ceiling material of a bathroom or a kitchen.

【0002】[0002]

【従来の技術】従来からこの種の建築板取付け装置とし
ては、図3に示すように、天面開口に一定の間隔で平行
に複数本の野縁(イ),(イ),・・・を架設し、該野
縁(イ)に同野縁(イ)と直交させて複数枚の下地バー
材(ロ),(ロ),・・・を所定間隔をあけて固定し、
該下地バー材(ロ)に一定間隔をあけて垂設してある係
止片部(ハ),(ハ)間に該下地バー材(ロ)と直交し
て建築板(ニ),(ニ),・・・を並設して使用するも
のが汎く知られていた。
2. Description of the Related Art Conventionally, as this type of building board mounting apparatus, as shown in FIG. 3, a plurality of field edges (a), (a),. , And a plurality of base bar materials (b), (b), ... are fixed at predetermined intervals to the field edge (a) at right angles to the field edge (a),
Building plates (d), (d) and (d) intersecting at right angles to the base bar material (b) between the locking pieces (c) and (c) which are suspended from the base bar material (b) at regular intervals. ), ... are widely used.

【0003】下地バー材(ロ)は、細長い平板状をした
板体(ホ)の一側端の全長に亘って垂下片(ヘ)を一体
に形成した断面略L字状の長尺な金属製のものであっ
て、該垂下片(ヘ)の下端には、長さ方向に一定間隔を
あけて複数の係止片部(ト),(ト),・・・が下方に
向かって突設されている。尚、係止片部(ト)は、下端
両側に外方に向かって突出する突起部(チ),(チ)を
形成したものであって、該突起部(チ)の上辺と垂下片
(ヘ)の下辺との間隔は、建築板(ニ)が楽に挿入でき
るように建築板(ニ)の厚さ寸法より大きくなってい
る。又、建築板(ニ)は、長尺な板状のものであって、
建築板本体(リ)と断熱材(ヌ)とから構成されてい
る。建築板本体(リ)は上面開口の断面略コ字状をした
ものであって、その凹部には断熱材(ヌ)が充填されて
いる。尚、建築板(ニ)の幅寸法は、下地バー材(ロ)
の対向する係止片部(ト),(ト)の垂下する両側端間
の寸法よりやや小さくなっている。
The base bar material (b) is a long metal having a substantially L-shaped cross-section in which a hanging piece (f) is integrally formed over the entire length of one side end of an elongated flat plate-shaped body (e). , At the lower end of the hanging piece (f), a plurality of locking pieces (g), (g),. Has been established. The locking piece (g) has projections (h) and (h) projecting outward on both sides of the lower end, and the upper side of the projection (h) and the hanging piece (h) are formed. F) The distance from the lower side is larger than the thickness of the building board (d) so that the building board (d) can be easily inserted. Also, the building plate (d) is a long plate,
It is composed of a building board body (R) and a heat insulating material (N). The building board main body (i) has a substantially U-shaped cross section of the upper surface opening, and a concave portion thereof is filled with a heat insulating material (nu). The width of the building board (d) is based on the base bar material (b)
Are slightly smaller than the distance between the opposite hanging ends of the opposite locking pieces (g) and (g).

【0004】そして、このような建築板取付け装置を使
用する場合には、先ず、天井開口に野縁(イ),
(イ),・・・を所定の間隔をあけて平行に架設した
後、該野縁(イ)に同野縁(イ)と直交して、一定間隔
をあけて平行に下地バー材(ロ),(ロ),・・・を、
その垂下片(ヘ)を下方へ向けて板体(ホ)を接触させ
てねじ(ル)でもって固定する。そして、下地バー材
(ロ)の各係止片部(ト),(ト)間に該下地バー材
(ロ)と直交して建築板(ニ),(ニ),・・・をそれ
ぞれ係着し、並設するのである。尚、建築板(ニ)を下
地バー材(ロ)に係着した状態では、建築板(ニ)の両
側端が、下地バー材(ロ)の対向する突起部(チ),
(チ)の上辺と垂下片(ヘ)の下辺との間にそれぞれ挿
入され、突起部(チ)に載設される。
[0004] When such a building board mounting apparatus is used, first, a field edge (a),
(A),... Are laid in parallel at a predetermined interval, and then the base bar material (b) is perpendicular to the field edge (a) at a certain interval and parallel to the field edge (a). ), (B), ...
The hanging piece (f) is directed downward and the plate body (e) is brought into contact with the hanging piece (f), and is fixed with the screw (lu). And, between the locking pieces (g) and (g) of the base bar material (b), the building boards (d), (d),. They wear and juxtapose. In addition, in the state where the building board (d) is engaged with the base bar material (b), both ends of the building board (d) are opposed to the protrusions (h),
It is inserted between the upper side of (h) and the lower side of the hanging piece (f), respectively, and is mounted on the projection (h).

【0005】[0005]

【考案が解決しようとする課題】しかしながら、上記の
ような従来の技術にあっては、建築板(ニ)を下地バー
材(ロ)の突起部(チ)に載設されているだけであり、
建築板(ニ)と下地バー材(ロ)の垂下片(ヘ)との間
に隙間あるので、建築板(ニ)に外力が加わると該建築
板(ニ)ががたつくという問題があった。
However, in the prior art as described above, the construction board (d) is merely mounted on the projection (h) of the base bar material (b). ,
Since there is a gap between the building board (d) and the hanging piece (f) of the base bar material (b), there is a problem that the building board (d) rattles when an external force is applied to the building board (d).

【0006】本考案は、係る上記の問題を解決するため
に考案されたものである。すなわち、その課題は、建築
板ががたつきにくい建築板取付け装置を提供することで
ある。
The present invention has been devised to solve the above-mentioned problem. That is, an object of the present invention is to provide a building board mounting device in which a building board is less likely to rattle.

【0007】[0007]

【課題を解決するための手段】本考案の建築板取付け装
置は、上述した問題を解決するものであり、下地バー材
に一定間隔をあけて形成してある係止片間に建築板を係
着保持する建築板取付け装置において、係止片の下端両
側に係止突片を突設して該両側の係止突片上に、建築板
の上面側端から外方へ突出形成される係着突片を各々係
着すると共に、同両側の建築板の下面側端から外方へ突
出形成される突出片の先端部を相互に重合密接させて、
同両側の建築板の間でその厚み範囲内に形成されて上側
の両係着突片と下側の両突出片とで囲まれるスペース内
に係止片の下端両側の係止突片を納め、下地バー材と建
築板との間に建築板を下方へ押圧する弾性体を設けて成
るものである。
SUMMARY OF THE INVENTION The building board mounting apparatus according to the present invention solves the above-mentioned problem, and engages the building board between locking pieces formed at regular intervals on a base bar material. In a building plate mounting apparatus for attaching and holding, engagement projections are formed on both lower ends of the engagement pieces so as to protrude outward from the upper surface side end of the construction board on the engagement projections on both sides. Attaching the protruding pieces respectively, and making the tips of the protruding pieces formed to protrude outward from the lower side end of the building board on the same both sides closely overlap each other,
The locking projections on both sides at the lower end of the locking piece are placed in a space formed between the building boards on both sides within the thickness range and surrounded by the upper engaging projections and the lower projections, and An elastic body is provided between the bar material and the building board to press the building board downward.

【0008】[0008]

【作用】本考案の建築板取付け装置は、上記した構成を
しており、下地バー材に一定間隔をあけて形成してある
係止片間に建築板を係着保持し、その際に、係止片の下
端両側に突設される係止突片上に建築板の上面側端から
外方へ突出形成される係着突片を各々係着すると共に、
同両側の建築板の下面側端から外方へ突出形成される突
出片の先端部を相互に重合密接させて、同両側の建築板
の間でその厚み範囲内に形成されて上側の両係着突片と
下側の両突出片とで囲まれるスペース内に係止片の下端
両側の係止突片を納め、下地バー材と建築板との間に設
けてある弾性体でもって建築板を下方へ押圧する。
The construction board mounting device of the present invention has the above-described configuration, and engages and holds the construction board between the locking pieces formed at regular intervals on the base bar material. Attaching the engaging protrusions formed to project outward from the upper side end of the building board on the locking protrusions protruding from the lower end sides of the locking pieces, respectively,
The tips of the projecting pieces projecting outward from the lower surface side ends of the building boards on both sides are brought into close contact with each other, and are formed within the thickness range between the building boards on both sides to form both upper and lower engaging projections. Place the locking projections on both sides of the lower end of the locking piece in the space surrounded by the piece and the lower projecting piece, and lower the building board with the elastic body provided between the base bar material and the building board. Press

【0009】[0009]

【実施例】以下、本考案を図面に示した実施例に基づい
て詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail with reference to the embodiments shown in the drawings.

【0010】図1及び図2に示す建築板取付け装置は、
本考案の一実施例であり、下地バー材1に一定間隔をあ
けて形成してある係止片1a,1a間に建築板2を係着
保持する建築板取付け装置において、係止片1aの下端
両側に係止突片1d,1dを突設して該両側の係止突片
1d,1d上に、建築板2,2の上面側端から外方へ突
出形成される係着突片2b,2bを各々係着すると共
に、同両側の建築板2,2の下面側端から外方へ突出形
成される突出片2d,2dの先端部を相互に重合密接さ
せて、同両側の建築板2,2の間でその厚み範囲内に形
成されて上側の両係着突片2b,2bと下側の両突出片
2d,2dとで囲まれるスペース内に係止片1aの下端
両側の係止突片1d,1dを納め、下地バー材1と建築
板2との間に建築板2を下方へ押圧する弾性体8を設け
て成るものである。
[0010] The building board mounting apparatus shown in FIGS.
This is an embodiment of the present invention, in a building board mounting apparatus for engaging and holding a building board 2 between locking pieces 1a, 1a formed on a base bar material 1 at regular intervals. Engaging projections 1d, 1d are protrudingly provided on both sides of the lower end, and engaging projections 2b are formed on the engagement projections 1d, 1d on both sides so as to protrude outward from the upper surface side ends of the building boards 2, 2. , 2b, respectively, and the tips of the projecting pieces 2d, 2d formed to project outward from the lower surface side ends of the building boards 2, 2 on both sides are brought into close contact with each other by superimposition. Form within the thickness range between 2,2
The locking projections 1d, 1d on both sides at the lower end of the locking piece 1a are placed in a space surrounded by the upper engagement projections 2b, 2b and the lower projections 2d, 2d. An elastic body 8 for pressing the building board 2 downward is provided between the material 1 and the building board 2.

【0011】小屋ばりや小ばり等に取着され天井開口へ
垂下している高さ調整用ねじ4,4,・・・の下端部に
螺合されて同じ高さに調整をしてあるナット5,5間に
は、ハンガープレート6の上端部の屈曲している水平な
取付け片6aがそれぞれ挟着されており、該ハンガープ
レート6の下端部の略U字状をした野縁受け保持部6
には、野縁受け3が差し込まれ係着されている。そし
て、天井開口面に適宜間隔をあけて平行に野縁受け3,
3,・・・が並設されるのである。
A nut which is screwed to a lower end of height adjusting screws 4, 4,... Which are attached to a shed or a small beam and are suspended from a ceiling opening and adjusted to the same height. A bent horizontal mounting piece 6a at the upper end of the hanger plate 6 is sandwiched between the upper and lower hanger plates 6, and a substantially U-shaped field edge holder holding portion at the lower end of the hanger plate 6 is provided. 6 e
, The field receiver 3 is inserted and engaged. Then, at an appropriate interval in the ceiling opening surface, parallel to the edge support 3,
3, ... are juxtaposed.

【0012】ハンガープレート6は、弾性を有する金属
板を折り曲げ加工して作成されたものであって、上端部
には水平に屈曲している取付け片6aが形成され、該取
付け片6aの中央部には高さ調整用ねじ4が挿入可能な
取付け孔が形成されており、下端部には縦長の略U字状
をした野縁受け保持部6eが形成されている。又、取付
け片6aの一側端と野縁受け保持部6eの一方の上端と
が垂下片6bで接続されており、取付け片6aの外方に
位置する野縁受け保持部6eの他方の上端には、挿入ガ
イド片6cが外側の斜め上方に向かって突出している。
又、野縁受け保持部6eの一方の上端側の垂下片6bに
は、挿入ガイド片6cに向かって半円状の抜け止め突部
6dが形成されている。そして、ハンガープレート6の
野縁受け保持部6eに縦長の一側面を開口した断面略コ
字状の金属製の野縁受け3が挿入保持されるようになっ
ている。
The hanger plate 6 is formed by bending a metal plate having elasticity, and has a horizontally bent attachment piece 6a formed at the upper end thereof, and a central portion of the attachment piece 6a. Is formed with a mounting hole into which the height adjusting screw 4 can be inserted, and at the lower end thereof is formed a vertically-elongated substantially U-shaped field edge receiving holding portion 6e. One end of the mounting piece 6a and one upper end of the field receiving holder 6e are connected by a hanging piece 6b, and the other upper end of the field receiving holding part 6e located outside the mounting piece 6a. , The insertion guide piece 6c protrudes obliquely upward and outward.
In addition, a semicircular retaining protrusion 6d is formed on the hanging piece 6b on one upper end side of the field edge holding part 6e toward the insertion guide piece 6c. The metal edge support 3 having a substantially U-shaped cross section and having a vertically open one side face is inserted and held in the edge support holder 6 e of the hanger plate 6.

【0013】野縁受け3には、長手方向にスライド自在
なばね性を有する金属製のクリップ7が着脱自在に係着
されており、その垂下している一片の下端部に形成して
ある係着片7a,7aは野縁受け3の下端よりも下方へ
突出している。クリップ7は板状のものを略L字状に折
曲したものであって、その一片が野縁受け3の側面に、
その他片が野縁受け3の上面に、それぞれ接触するよう
になっており、他片の先端には係着片7aに向かって斜
め下方に突出する保持片7bが形成されている。又、ク
リップ7の一片の先端には、係着片7a,7aが野縁受
け3の長さ方向と平行に外方に向かって突出していると
ともに、該クリップ7の一片の幅方向の中央部の上部か
ら下端まで開口部7cが形成されている。そして、クリ
ップ7の係着片7a,7aに下地バー材1の奥側拡大の
吊下溝1cを引っ掛けて、各下地バー材1,1,・・・
を野縁受け3と直交させ、必要に応じてクリップ7をス
ライド調整して一定間隔をあけて並設するようになって
いる。
A metal clip 7 having a spring property which is slidable in the longitudinal direction is detachably attached to the field edge receiver 3, and is formed at a lower end of a hanging piece. The attachment pieces 7a, 7a protrude below the lower end of the field margin receiver 3. The clip 7 is formed by bending a plate-like member into a substantially L-shape, and one of the clips 7
The other piece comes into contact with the upper surface of the ridge receiver 3, and a holding piece 7b projecting obliquely downward toward the engaging piece 7a is formed at the tip of the other piece. At the tip of one piece of the clip 7, an engaging piece 7 a, 7 a protrudes outward in parallel with the length direction of the field margin receiver 3, and a central part of the one piece of the clip 7 in the width direction is provided. An opening 7c is formed from the upper part to the lower end. Then, the hanging groove 1c of the back bar material 1 is enlarged by hooking the engaging pieces 7a of the clip 7, and the back bar materials 1, 1,.
Are arranged perpendicular to the field margin receiver 3, and the clips 7 are slidably adjusted as necessary to be juxtaposed at a certain interval.

【0014】下地バー材1は、アルミニウムを押出し加
工したものを所定の長さ寸法に切断して作成した断面略
四角形の筒状をしたものであって、その上面にはクリッ
プ挿入口が全長に亘って形成されている。又、下地バー
材1の一側端には一定間隔をあけて、下方に向かって突
出する板状の係止片1a,1a,・・・が形成されてお
り、係止片1aの下端両側には、下地バー材1の長さ方
向と平行に係止突片1d,1dが突出している。尚、係
止突片1dの上辺には、係止凹部1eが形成されてい
る。更に、下地バー材1の下面には、長さ方向の全長に
亘って板状の長尺な弾性を有する軟質の発泡合成樹脂製
の弾性体8が貼着されている。そして、弾性体8の厚さ
寸法は、下地バー材1の係止片1a,1a間に建築板2
を係着した際の下地バー材1の下面と建築板2の上面と
の隙間寸法より大きくなっており、建築板2を下方に向
けて押圧するようになっている。もちろん下地バー材1
の係止片1a,1a間に建築板2を係着する際に建築板
2の裏面で弾性体8を圧縮しても作業性には影響がない
ようになっている。
The base bar material 1 is formed by extruding aluminum and cutting it into a predetermined length to form a tube having a substantially quadrangular cross section. It is formed over. Further, plate-like locking pieces 1a, 1a,... Protruding downward are formed at one side end of the base bar material 1 at regular intervals, and both lower end sides of the locking piece 1a are formed. , Locking projections 1d, 1d protrude in parallel with the longitudinal direction of the base bar material 1. Note that a locking recess 1e is formed on the upper side of the locking protrusion 1d. Further, a plate-shaped elastic body 8 made of a soft foamed synthetic resin having a long elasticity is attached to the lower surface of the base bar 1 over the entire length in the length direction. The thickness of the elastic body 8 is set between the locking pieces 1a of the base bar material 1 and the building board 2 between the locking pieces 1a.
Is larger than the gap between the lower surface of the base bar material 1 and the upper surface of the building board 2 when it is engaged, and the building board 2 is pressed downward. Of course the base bar material 1
The workability is not affected even if the elastic body 8 is compressed on the back surface of the building board 2 when the building board 2 is engaged between the locking pieces 1a, 1a.

【0015】そして、このような下地バー材1の対向す
る係止片1a,1a間に建築板2の上面両側端から外方
へ突出している係着突片2b,2bを挿入し、係着突片
2bの先端に垂設してある位置決め片2cを下地バー材
1の係止凹部1eに係着して、下地バー材1に建築板2
を直交して係着するようになっている。尚、このように
下地バー材1に建築板2を係着した際に、下地バー材1
に貼着してある弾性体8で建築板2を裏側から前方へ押
圧して建築板2を係止するようになっている。
Then, engaging projections 2b, 2b protruding outward from both side ends of the upper surface of the building board 2 are inserted between the opposite engaging pieces 1a, 1a of the base bar material 1 to engage. The positioning piece 2c hanging from the tip of the protruding piece 2b is engaged with the locking concave portion 1e of the base bar material 1, and the building board 2 is attached to the base bar material 1.
Are orthogonally engaged. When the building board 2 is attached to the base bar 1 as described above, the base bar 1
The building board 2 is pressed forward from the back side by the elastic body 8 stuck to the building board 2 to lock the building board 2.

【0016】建築板2は、アルミニウム材を上面開口の
断面略コ字状の薄肉に押し出し成形したものを所定の長
さ寸法に切断して作成したものであり、内面には発泡ウ
レタン樹脂や発泡フェノール樹脂等でできた断熱材2a
が充填されている。又、建築板2の上面両側端には、係
着突片2b,2bが外方に向かって突出しており、係着
突片2b,2bの先端には、下方に向かって突出する位
置決め片2c,2cが形成されている。更に、建築板2
の下面両側端には、突出片2d,2dが外方に向けて突
設している。そして、建築板2,2,・・・の係着突片
2b,2bを下地バー材1の対向する係止片1a,1a
に係着して、建築板2,2,・・・を下地バー材1の長
さ方向と直交して並設するが、このとき、下地バー材1
の係止凹部1eに建築板2の位置決め片2cを差し込む
ことによって、下地バー材1から建築板2が移動しにく
く、外れにくくなるのである。更に、このようにして並
設された建築板2,2,・・・の隣合う建築板2,2同
志では、お互いの突出片2d,2dが先端部で重なりあ
い接触して気密性を有するようになっている。
The building board 2 is formed by extruding an aluminum material into a thin wall having a substantially U-shaped cross section with an upper opening and cutting the aluminum material into a predetermined length. Thermal insulation 2a made of phenolic resin
Is filled. At both ends of the upper surface of the building board 2, engaging projections 2b, 2b protrude outward, and at the tip of the engagement projections 2b, 2b, positioning pieces 2c projecting downward. , 2c are formed. Furthermore, building board 2
Projecting pieces 2d, 2d protrude outward from both lower ends of the lower surface. Then, the engaging projections 2b, 2b of the building boards 2, 2,.
Are arranged side by side at right angles to the longitudinal direction of the base bar material 1 at this time.
By inserting the positioning pieces 2c of the building board 2 into the locking recesses 1e, the building board 2 hardly moves from the base bar material 1 and hardly comes off. Further, in the adjacent building boards 2, 2 of the building boards 2, 2,... Arranged side by side in this way, the protruding pieces 2d, 2d overlap with each other at the tip portions and have airtightness. It has become.

【0017】このような建築板取付け装置を使用する場
合には、先ず、天面開口の上方に位置する小屋ばりや小
ばり等に高さ調整用ねじ4,4,・・・を所定の間隔で
縦横に下方に向けて取着し、該高さ調整用ねじ4,4,
・・・の下端部に螺合されている天面開口に位置する二
個のナット5,5の上方のナット5をそれぞれ同じ高さ
に調整する。次に、下方のナット5を外して、高さ調整
用ねじ4の下端からハンガープレート6の取付け片6a
の取付け孔を挿入させた後、外したナット5を高さ調整
用ねじ4に再度螺着してナット5,5間にハンガープレ
ート6の取付け片6aを挟着する。このとき、ハンガー
プレート6の野縁受け保持部6eの向きを、野縁受け
3,3,・・・がそれぞれ平行に並設されるように一方
向にそれぞれ向けて挟着する。そして、直線上に位置す
るハンガープレート6,6,・・・の野縁受け保持部6
e,6e,・・・に、野縁受け3をハンガープレート6
の挿入ガイド片6cと抜け止め突部6dとの間から野縁
受け保持部6e部分を押し広げながら該野縁受け保持部
6eに差し込む。尚、ハンガープレート6の野縁受け保
持部6eに野縁受け3を係着した状態では、野縁受け3
の両側面をハンガープレート6でもって押圧して野縁受
け3が容易にスライドしないようになっており、しか
も、野縁受け3の上方に近接してハンガープレート6の
抜け止め突部6dが位置しており、野縁受け3が上方へ
移動して野縁受け保持部6eから外れ難いようになって
いる。次いで、野縁受け3の開口側の上端縁にクリップ
7の保持片7bを引っ掛けて、野縁受け3の側面にクリ
ップ7の垂下している開口部7c側を接触させるととも
に係着片7aを下方に向けてクリップ7を押し下げて、
野縁受け3,3,・・・にクリップ7,7,・・・を所
定の位置に嵌着する。このとき、クリップ7,7,・・
・のそれぞれの係着片7a,7aに下地バー材1の吊下
げ溝1cが差し込まれて野縁受け3と下地バー材1が直
交するように係着保持され、それぞれの下地バー材1が
一定間隔をおいて平行に並設できるように、クリップ
7,7,・・・を野縁受け3,3,・・・に係着する。
そして、前述のようにクリップ7,7,・・・のそれぞ
れの係着片7a,7aに下地バー材1の吊下げ溝1cを
差し込んで下地バー材1,1,・・・を野縁受け3,
3,・・・と直交するように並設する。更に、下地バー
材1,1,・・・の垂設する係止片1a,1a,・・・
が、お互い隣合う下地バー材1,1,・・・の長さ方向
と直交して一直線上になるように、下地バー材1,1,
・・・をスライドさせて調整する。次に、下地バー材1
の対向する係止片1a,1aの係止突片1d,1d間に
建築板2の係着突片2b,2bを下地バー材1の長さ方
向と直交させて引っ掛け、建築板2,2,・・・を並設
する。このとき、建築板2の裏面でもって弾性体8を圧
縮して下地バー材1の係止片1a,1a間に引っ掛けた
後、該弾性体8でもって建築板2の裏面を押圧して建築
板2が動かないように保持するようになっている。
In the case of using such a building board mounting apparatus, first, height adjusting screws 4, 4,... Attach it vertically and horizontally downward with the height adjusting screws 4, 4,
.. Are adjusted to the same height, respectively, above the two nuts 5, 5 located at the top opening, which are screwed to the lower ends of. Next, the lower nut 5 is removed, and the mounting piece 6 a of the hanger plate 6 is attached from the lower end of the height adjusting screw 4.
After the mounting holes are inserted, the removed nuts 5 are screwed again to the height adjusting screws 4 so that the mounting pieces 6 a of the hanger plate 6 are sandwiched between the nuts 5. At this time, the direction of the edge support holder 6e of the hanger plate 6 is clamped in one direction so that the edge supports 3, 3,... The hanger plates 6, 6,...
e, 6e,...
While being expanded between the insertion guide piece 6c and the retaining projection 6d, the field edge holder 6e is inserted into the field edge holder 6e. In a state in which the field support 3 is engaged with the field support holding portion 6e of the hanger plate 6, the field support 3
Are pressed by the hanger plate 6 so that the rim receiving member 3 does not slide easily, and the retaining protrusion 6d of the hanger plate 6 is positioned close to the upper side of the rim receiving member 3. Therefore, the ridge receiver 3 does not easily move upward and come off the ridge receiver holding portion 6e. Next, the holding piece 7b of the clip 7 is hooked on the upper end edge on the opening side of the field receiver 3, and the side of the field receiver 3 is brought into contact with the hanging opening 7c side of the clip 7, and the attachment piece 7a is attached. Press down the clip 7 downward,
The clips 7, 7,... Are fitted to predetermined positions in the field receivers 3, 3,. At this time, clips 7, 7, ...
The hanging groove 1c of the base bar material 1 is inserted into each of the engaging pieces 7a, 7a, and the field edge receiver 3 and the base bar material 1 are engaged and held so as to be orthogonal to each other. The clips 7, 7, ... are engaged with the field receivers 3, 3, ... so that they can be juxtaposed in parallel at regular intervals.
As described above, the hanging grooves 1c of the base bar material 1 are inserted into the engaging pieces 7a, 7a of the clips 7, 7,. 3,
Are arranged side by side so as to be orthogonal to 3,. Furthermore, the locking pieces 1a, 1a,.
Are arranged on a straight line perpendicular to the length direction of the adjacent base bar materials 1, 1,.
Adjust by sliding. Next, base bar material 1
The engaging projections 2b, 2b of the building board 2 are hooked between the locking projections 1d, 1d of the opposite locking pieces 1a, 1a perpendicularly to the length direction of the base bar material 1, and the building boards 2, 2 , ... are juxtaposed. At this time, after the elastic body 8 is compressed on the back surface of the building board 2 and hooked between the locking pieces 1 a of the base bar 1, the back surface of the building board 2 is pressed with the elastic body 8 to construct the building. The plate 2 is held so as not to move.

【0018】尚、上記実施例においては、下地バー材1
や建築板2をアルミニウム製のものとしたが、他の金属
製のものや硬質な合成樹脂材のものであっても良い。
In the above embodiment, the base bar material 1
Although the building board 2 is made of aluminum, it may be made of another metal or a hard synthetic resin material.

【0019】又、上記実施例においては、弾性体8を長
尺な板状の発泡合成樹脂製としたが、弾性体8を略く字
状や波状をした金属製のばね材としても良いし、チュー
ブ状の長尺なゴム製としても良い。更に、上記実施例に
おいては、弾性体8を下地バー材1の下面に貼着した
が、短尺な弾性体8を建築板2の裏面に貼着しても良い
し、下地バー材1の係止片1a,1a間に建築板2を係
着した後、下地バー材と建築板との間に弾性体8を挿入
しても良い。
In the above embodiment, the elastic body 8 is made of a long plate-shaped foamed synthetic resin. However, the elastic body 8 may be made of a substantially rectangular or corrugated metal spring material. Alternatively, it may be made of a long rubber tube. Further, in the above embodiment, the elastic body 8 is stuck on the lower surface of the base bar 1, but the short elastic body 8 may be stuck on the back of the building board 2, After attaching the building board 2 between the stopper pieces 1a, 1a, the elastic body 8 may be inserted between the base bar material and the building board.

【0020】[0020]

【考案の効果】本考案の建築板取付け装置は、上記した
ような構成をしており、下地バー材に一定間隔をあけて
形成してある係止片間に建築板を係着保持する建築板取
付け装置において、下地バー材と建築板との間に建築板
を押圧する弾性体を設けたので、建築板を下地バー材に
係着するだけで容易に建築板をがたつきなく係止するこ
とができるという効果がある。又、係止片の下端両側に
突設される係止突片上に両側の建築板の下面側端から外
方へ突出形成される突出片の先端部が相互に重合密接さ
れ、この場合に、下地バー材と建築板との間に設けられ
る弾性体でもって建築板が下方へ押圧されるので、弾圧
力によって係止片の両側に建築板の側端が外れないよう
に確実に係着される。しかも、この場合、建築板の表側
が突出片の先端部が相互に弾圧力をもって重合密接され
ると共に同突出片の裏側に係止片等の支持構造が覆い隠
され、隙間なく外観良好に両側の建築板を接続支持する
ことができ、すなわち、両側の建築板の間でその厚み範
囲内に形成されて上側の両係着突片と下側の両突出片と
で囲まれるスペース内に係止片の下端両側の係止突片が
納められるので、建築板から裏側上方へ突出する障害物
が存在せず同裏側で弾圧力が支障なく作用して、係止片
の両側に建築板がバランス良く確実に支持されるもので
ありながら、該係止片による支持部分が前記大きなスペ
ース内に余裕をもって楽に体裁良く納め隠されるもので
ある。
[Effects of the Invention] The building board mounting apparatus of the present invention has the above-described configuration, and is a building for engaging and holding the building board between the locking pieces formed at regular intervals on the base bar material. In the board mounting device, an elastic body that presses the building board is provided between the base bar material and the building board, so the building board can be easily locked without rattling simply by attaching the building board to the base bar material. There is an effect that can be. In addition, the tips of the projecting pieces formed to project outward from the lower surface side ends of the building boards on both sides on the locking projecting pieces projecting from both sides of the lower end of the engaging piece are overlapped and closely contacted with each other. Since the building board is pressed downward by the elastic body provided between the base bar material and the building board, it is securely engaged so that the side edges of the building board do not come off on both sides of the locking piece due to elastic pressure. You. Moreover, in this case, the front ends of the projecting pieces are superimposed and tightly contacted with each other with resilient pressure on the front side of the building board, and a supporting structure such as a locking piece is concealed behind the projecting pieces so that there is no gap and both sides have good appearance. Can be connected and supported, that is, the thickness range between the
The locking projections on both sides at the lower end of the locking piece are accommodated in a space formed in the enclosure and surrounded by the upper engaging projections and the lower projections, so that the projection protrudes rearward and upward from the building board. Obstacle
There suppression force acts without any trouble at the same backside absent, yet those building boards on both sides of the locking piece is balanced and reliably supported, the large space is supported portion by engaging piece
It is easily and conveniently stored and hidden within the source .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の建築板取付け装置の一実施例を示す斜
視図である。
FIG. 1 is a perspective view showing an embodiment of a building board mounting device of the present invention.

【図2】本考案の建築板取付け装置の一実施例を示す断
面図である。
FIG. 2 is a sectional view showing an embodiment of the building board mounting device of the present invention.

【図3】従来例の建築板取付け装置の斜視図である。FIG. 3 is a perspective view of a conventional building board mounting apparatus.

【符号の説明】[Explanation of symbols]

1 下地バー材 1a 係止片 2 建築板 8 弾性体 DESCRIPTION OF SYMBOLS 1 Base bar material 1a Locking piece 2 Building board 8 Elastic body

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 下地バー材に一定間隔をあけて形成して
ある係止片間に建築板を係着保持する建築板取付け装置
において、係止片の下端両側に係止突片を突設して該両
側の係止突片上に、建築板の上面側端から外方へ突出形
成される係着突片を各々係着すると共に、同両側の建築
板の下面側端から外方へ突出形成される突出片の先端部
を相互に重合密接させて、同両側の建築板の間でその厚
み範囲内に形成されて上側の両係着突片と下側の両突出
片とで囲まれるスペース内に係止片の下端両側の係止突
片を納め、下地バー材と建築板との間に建築板を下方へ
押圧する弾性体を設けて成る建築板取付け装置。
1. A building board mounting apparatus for engaging and holding a building board between locking pieces formed at regular intervals on a base bar material, wherein locking projections project from both lower ends of the locking pieces. On the locking projections on both sides, engaging projections formed to project outward from the upper surface side end of the building board are respectively engaged, and project outward from the lower surface side ends of the building boards on both sides. The tips of the formed protruding pieces are overlapped closely with each other, and the thickness between the building boards on the same side is
In the space formed between the upper engaging projections and the lower projections, the locking projections on both sides of the lower end of the locking piece are placed in the space defined by A building board mounting device comprising an elastic body that presses the building board downward.
JP1991028955U 1991-04-24 1991-04-24 Building board mounting device Expired - Fee Related JP2561094Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991028955U JP2561094Y2 (en) 1991-04-24 1991-04-24 Building board mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991028955U JP2561094Y2 (en) 1991-04-24 1991-04-24 Building board mounting device

Publications (2)

Publication Number Publication Date
JPH0514347U JPH0514347U (en) 1993-02-23
JP2561094Y2 true JP2561094Y2 (en) 1998-01-28

Family

ID=12262840

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991028955U Expired - Fee Related JP2561094Y2 (en) 1991-04-24 1991-04-24 Building board mounting device

Country Status (1)

Country Link
JP (1) JP2561094Y2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5491492A (en) * 1977-12-29 1979-07-19 Matsuo Kogyo Spinning reel for fishing
JPS568714U (en) * 1979-07-03 1981-01-26
JPS583524U (en) * 1981-06-30 1983-01-11 太平洋セメント株式会社 suspended ceiling board
JPS5913620A (en) * 1982-07-09 1984-01-24 Central Glass Co Ltd Manufacture of silica gel
JPS6245057A (en) * 1985-08-22 1987-02-27 Toshiba Corp Manufacture of semiconductor device
JPH069164Y2 (en) * 1987-05-30 1994-03-09 九州アコン株式会社 Ceiling panel retainer bar on the ceiling frame

Also Published As

Publication number Publication date
JPH0514347U (en) 1993-02-23

Similar Documents

Publication Publication Date Title
CA1214618A (en) Movable partition base attachment
WO2004052151A1 (en) Shelf-receiving metal element
JP2561094Y2 (en) Building board mounting device
US3179257A (en) Demountable post and panel and shelf supporting connections
JPH0570363B2 (en)
GB2237729A (en) A supported assembly
JP3358652B2 (en) Fluorescent tube holder mounting structure
JPS5943661Y2 (en) Installation device for wiring equipment
JPH0514346U (en) Building board mounting device
JP5540999B2 (en) Side panel mounting device
JPH0514345U (en) Building board mounting device
JP3518298B2 (en) Instrument case mounting device
JP4180419B2 (en) Ceiling hanger
JP4590251B2 (en) Member fixing structure
JP2568910Y2 (en) Joint cover device
JP4669850B2 (en) Panel body holder
JP3938641B2 (en) Equipment panel structure
JP2008061721A (en) Hanger rail unit for wall
JPH0445573Y2 (en)
JPH0415070Y2 (en)
JPS6025455Y2 (en) Plate locking structure
JP3357400B2 (en) Fixing clip for opening member attached body
JP3012322U (en) Long press
JPS6233918Y2 (en)
JP3513741B2 (en) Kasagi device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees