JP2552761B2 - Wife panel transfer hoist line in the production process of housing units - Google Patents

Wife panel transfer hoist line in the production process of housing units

Info

Publication number
JP2552761B2
JP2552761B2 JP2335175A JP33517590A JP2552761B2 JP 2552761 B2 JP2552761 B2 JP 2552761B2 JP 2335175 A JP2335175 A JP 2335175A JP 33517590 A JP33517590 A JP 33517590A JP 2552761 B2 JP2552761 B2 JP 2552761B2
Authority
JP
Japan
Prior art keywords
rail
panel
conveyor
ceiling
housing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2335175A
Other languages
Japanese (ja)
Other versions
JPH04201032A (en
Inventor
義之 福澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2335175A priority Critical patent/JP2552761B2/en
Publication of JPH04201032A publication Critical patent/JPH04201032A/en
Application granted granted Critical
Publication of JP2552761B2 publication Critical patent/JP2552761B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Automatic Assembly (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、ユニット住宅の構成要素である住宅ユニッ
トを生産する際に使用するホイストのラインに係り、特
に、住宅ユニットの妻パネルを搬送するためのホイスト
のラインに関する。
Description: TECHNICAL FIELD The present invention relates to a hoist line used for producing a housing unit which is a component of a unit housing, and more particularly to transporting a wife panel of the housing unit. For the hoist line.

〔背景技術〕[Background technology]

ユニット住宅は、予め工場で生産された複数の住宅ユ
ニットを建設現場で組み合わせるユニット工法により建
てられる。それぞれの住宅ユニットは、上下の水平な天
井パネル、床パネルと、これらの天井パネル、床パネル
の両側に接合される垂直な妻パネルとによりボックス状
に形成される。
A unit house is built by a unit construction method in which a plurality of house units produced in a factory in advance are combined at a construction site. Each housing unit is formed in a box shape by upper and lower horizontal ceiling panels and floor panels, and vertical gable panels joined to both sides of these ceiling panels and floor panels.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

ユニット住宅は各種のサイズ、構造のものが建てら
れ、このような種々のユニット住宅を建てることができ
るように、住宅ユニットは2個の妻パネルの間の寸法す
なわち長辺寸法が異なる複数種類生産される。
Unit housings of various sizes and structures are built, and in order to be able to build such various unit housings, housing units are produced in multiple types with different sizes between two gable panels, that is, long-side dimensions. To be done.

このような住宅ユニットを生産するために、それぞれ
の寸法毎に住宅ユニットの生産設備を工場に設置したの
では、生産設備コストの高騰、およびその設置スペース
の大面積化を招来し、好ましくない。
In order to produce such a housing unit, it is not preferable to install the housing unit production equipment for each size in the factory, because the production equipment cost rises and the installation space becomes large.

本発明の目的は、2個の妻パネル間の寸法が異なる各
種類の住宅ユニットを生産するために共通して使用で
き、種々の住宅ユニットに対する汎用性を備える住宅ユ
ニットの生産工程における妻パネル搬送ホイストライン
を提供するところにある。
The object of the present invention is commonly used to produce various types of housing units having different sizes between two gable panels, and has versatility for various housing units. It is in the area of providing the hoist line.

〔課題を解決するための手段〕[Means for solving the problem]

本発明に係る住宅ユニットの生産工程における妻パネ
ル搬送ホイストラインは、床パネルと天井パネルと2個
の妻パネルとで箱状に組み立てられかつ前記2個の妻パ
ネル間の寸法が異なる規格寸法となる複数の住宅ユニッ
トを生産するために用いられ、前記妻パネルを搬送して
くるコンベアの配置位置と、前記床パネルおよび天井パ
ネルの両側に2個の前記妻パネルを接合して前記住宅ユ
ニットを組み立てる住宅ユニット組立位置との間に設置
される住宅ユニットの生産工程における妻パネル搬送ホ
イストラインであって、 前記コンベアの配置位置と前記住宅ユニット組立位置
との間に天井レールを架設し、この天井レールに沿って
前記妻パネルを搬送するホイストを移動自在に設け、 前記天井レールを、前記2個の妻パネルの一方を前記
床パネルおよび天井パネルの一端側に搬送するための基
準レールと、前記2個の妻パネルの他方を前記床パネル
および天井パネルの他端側に搬送するために前記妻パネ
ル間の規格寸法に対応して設置された複数の選択レール
とで形成し、 前記各選択レールの前記住宅ユニット組立位置側をそ
れぞれ前記基準レールの前記住宅ユニット組立位置側か
ら前記妻パネル間の規格寸法に対応して離れた位置に配
置し、 前記各選択レールの前記コンベアの配置位置側を前記
基準レールの前記コンベアの配置位置側に近接した位置
に配置し、 更に、前記基準レールおよび各選択レールに沿って、
各々のうち少なくとも何れかのレールの前記住宅ユニッ
ト組立位置側で前記ホイストを受取ってこのレールの前
記コンベアの配置位置側に戻す戻りレールを設けたこと
を特徴とする。
In the production process of a housing unit according to the present invention, a gable panel transfer hoist line is a box-shaped assembly of a floor panel, a ceiling panel, and two gable panels, and the two gable panels have different standard dimensions. Is used for producing a plurality of housing units, and the two housing panels are joined to both sides of the floor panel and the ceiling panel and the arrangement position of the conveyer that conveys the wife panel. A wife panel transfer hoist line in a production process of a housing unit installed between the housing unit assembly position to be assembled, and a ceiling rail is installed between the conveyor arrangement position and the housing unit assembly position, and the ceiling rail is installed. A hoist that conveys the gable panel is movably provided along a rail, and the ceiling rail includes one of the two gable panels. A reference rail for transporting to one end side of the panel and the ceiling panel, and a standard dimension between the end panels for transporting the other of the two end panels to the other end side of the floor panel and the ceiling panel. And a plurality of selection rails installed in the housing, and the housing unit assembly position side of each of the selection rails is separated from the housing unit assembly position side of the reference rail in correspondence with a standard dimension between the end panels. Arranged at a position, the placement position side of the conveyor of each of the selection rail is arranged at a position close to the placement position side of the conveyor of the reference rail, further, along the reference rail and each selection rail,
A return rail is provided which receives the hoist at the housing unit assembly position side of at least one of the rails and returns the hoist to the conveyor arrangement position side of the rail.

ここで、前記コンベアの配置位置には、前記各選択レ
ールと基準レールと戻りレールとの各々の前記コンベア
の配置位置側に連続する位置へ移動可能な共通レールが
配置され、この共通レールは、前記戻りレールからホイ
ストを受取って前記妻パネルを搬送してくるコンベアか
ら前記妻パネルを吊上げ、このホイストを前記各選択レ
ールおよび基準レールの何れかに送出すように構成して
もよい。
Here, at the arrangement position of the conveyor, a common rail that is movable to a position that is continuous to the arrangement position side of each of the selection rail, the reference rail, and the return rail is arranged, and the common rail is The hoist may be lifted from a conveyor that receives the hoist from the return rail and conveys the wife panel, and the hoist may be sent to any of the selection rails and the reference rail.

[作用] コンベアで搬送されてきた妻パネルは、このコンベア
の配置位置から住宅ユニット組立位置に天井レールに沿
って走行するホイストで送られ、この組立位置で妻パネ
ルは天井パネル、床パネルと組み合わされて住宅ユニッ
トが生産される。
[Operation] The wife panel conveyed by the conveyor is sent from the arrangement position of the conveyor to the housing unit assembly position by the hoist that travels along the ceiling rail, and at this assembly position, the wife panel is combined with the ceiling panel and the floor panel. Then, the housing unit is produced.

ここで、天井レールを基準レールと複数の選択レール
とで構成し、各々を移動するホイストにより床パネルお
よび天井パネルの両端側にそれぞれ妻パネルを搬送する
ことで、ユニット組立位置に効率良く妻パネルを供給で
きる。
Here, the ceiling rail is composed of a reference rail and a plurality of selection rails, and the wife panel is conveyed to both end sides of the floor panel and the ceiling panel by a hoist that moves each, so that the wife panel can be efficiently installed at the unit assembly position. Can be supplied.

また、複数の選択レールは、ユニット組立位置側が、
それぞれ基準レールに対しての距離が、組立てる住宅ユ
ニットの規格寸法に対応して設定されており、各規格の
住宅ユニットを組立てる際に、その規格寸法に対応した
選択レールを選択使用することで、適切な位置へ妻パネ
ルを供給することができる。
Also, for multiple selection rails, the unit assembly position side
The distance to each standard rail is set according to the standard size of the housing unit to be assembled, and when assembling the housing unit of each standard, by selecting and using the selection rail corresponding to that standard size, The wife panel can be delivered to the proper location.

さらに、基準レールおよび選択レールでユニット組立
位置へ送られたホイストをコンベアの配置位置へ戻すた
めに専用の戻りレールを用いることで、効率よいホイス
ト搬送が可能となる。
Further, by using a dedicated return rail for returning the hoist sent to the unit assembly position by the reference rail and the selection rail to the arrangement position of the conveyor, efficient hoist transfer becomes possible.

[実施例] 以下に本発明の一実施例を添付図面に基づいて説明す
る。
[Embodiment] An embodiment of the present invention will be described below with reference to the accompanying drawings.

図1は、図2で示した天井パネル1と床パネル2と2
個の妻パネル3,4とで組み立てられる図3の住宅ユニッ
ト5の生産工程を示すブロック図である。天井パネル1
は、長辺梁生産ライン6で長辺梁7を生産した後、天井
パネル生産ライン8において2本の平行な長辺梁7を野
縁9で連結して天井用面材10を取り付けることにより作
られる。また、床パネル2は、長辺梁生産ライン6で生
産された長辺梁7を床パネル生産ライン11に送り、この
生産ライン11において2本の平行な長辺梁7を根太で連
結した後に床用面材12を取り付けることにより作られ
る。さらに、妻パネル3,4は、柱生産ライン13、短辺梁
生産ライン14で柱15、短辺梁16を生産し、妻パネル生産
ライン17において2本の平行な柱15の上端間および下端
間を短辺梁16で溶接接合することにより作られ、またそ
れぞれの柱15の上下端には短辺梁16と直角方向に仕口18
が取り付けられる。
FIG. 1 shows a ceiling panel 1 and floor panels 2 and 2 shown in FIG.
FIG. 4 is a block diagram showing a production process of the housing unit 5 of FIG. 3 assembled with individual wife panels 3 and 4. Ceiling panel 1
After the long side beam 7 is produced on the long side beam production line 6, the two parallel long side beams 7 are connected at the ceiling panel production line 8 by the ridge 9 and the ceiling panel 10 is attached. Made. In addition, the floor panel 2 sends the long side beams 7 produced in the long side beam production line 6 to the floor panel production line 11, and after connecting the two parallel long side beams 7 in this production line 11 with joists. It is made by attaching the floor panel 12. Further, the wife panels 3 and 4 produce the pillars 15 and the short side beams 16 on the pillar production line 13 and the short side beam production line 14, and the upper and lower ends of two parallel pillars 15 on the wife panel production line 17. It is made by welding and joining the short side beams 16 at the upper and lower ends of each column 15 and the connection 18 at right angles to the short side beams 16.
Is attached.

以上の天井パネル1、床パネル2、妻パネル3,4は総
組みライン19に送られ、この総組みライン19において妻
パネル3,4は天井パネル1、床パネル2の両側に配置さ
れ、それぞれの仕口18が天井パネル1、床パネル2の各
長辺梁7の両端部に嵌合されて溶接されることにより、
図3の住宅ユニット5が組み立てられる。
The above ceiling panel 1, floor panel 2, and wife panels 3, 4 are sent to the total assembly line 19, and in this total assembly line 19, the wife panels 3, 4 are arranged on both sides of the ceiling panel 1 and floor panel 2, respectively. Is fitted and welded to both ends of each long side beam 7 of the ceiling panel 1 and the floor panel 2,
The housing unit 5 of FIG. 3 is assembled.

この住宅ユニット5の所定の外面には、外壁パネル取
付ライン20において軽量気泡コンクリート製の外壁パネ
ルが取り付けられ、さらに、住宅ユニット5の内部に
は、造作・設備取付ライン21において階段ユニットやキ
ッチンユニット、バスユニット等が取り付けられ、これ
により住宅ユニットが完成する。
A light-weight cellular concrete outer wall panel is attached to the predetermined outer surface of the housing unit 5 at an outer wall panel mounting line 20, and inside the housing unit 5, a staircase unit or a kitchen unit is installed at a construction / equipment mounting line 21. , A bus unit, etc. are attached, and the housing unit is completed.

このように工場で予め生産された複数の住宅ユニット
5はトラックで建設現場に運ばれ、これらの住宅ユニッ
ト5が前後、左右、上下に組み合わされて結合されるこ
とにより、ユニット住宅が出来上がる。
The plurality of housing units 5 produced in advance in the factory in this way are transported to the construction site by truck, and these housing units 5 are combined in front and rear, right and left, and up and down to form a unit house.

図4〜図12は図1で示した総組みライン19の具体的構
造を示す。
4 to 12 show a specific structure of the total assembly line 19 shown in FIG.

図4において、Aは天井パネル1、床パネル2、妻パ
ネル3,4で住宅ユニット5が組み立てられる住宅ユニッ
ト組立位置であり、aはその組立中心である。組立位置
Aの上方まで2本の第1天井レール22が延び、このレー
ル22に沿って自走する第1走行体23で吊り下げられなが
ら天井パネル1は組立位置Aに送られてくる。床パネル
2を搬送する床パネル搬送コンベア24と妻パネル3,4を
搬送する妻パネル搬送コンベア25は組立位置Aの近くま
で延びている。
In FIG. 4, A is a housing unit assembling position where the housing unit 5 is assembled with the ceiling panel 1, the floor panel 2, and the wife panels 3, 4, and a is the center of assembly. Two first ceiling rails 22 extend above the assembling position A, and the ceiling panel 1 is sent to the assembling position A while being suspended by the first traveling body 23 running along the rails 22. A floor panel transfer conveyor 24 for transferring the floor panel 2 and a wife panel transfer conveyor 25 for transferring the wife panels 3 and 4 extend to near the assembly position A.

妻パネル搬送コンベア25の配置位置Bの上方には2本
の第2天井レール26が設けられ、この天井レール26に沿
って第2走行体27が走行可能となっている。また、組立
位置Aの上方には2本の第3天井レール28が設けられ、
この天井レール28に沿って第3および第4走行体29,30
が走行可能に配置され、第2〜第4走行体27,29,30には
レール31〜33が設けられている。配置位置Bと組立位置
Aとの間には第4天井レール34が架設され、この天井レ
ール34は合計7本35〜41ある。
Two second ceiling rails 26 are provided above the arrangement position B of the wife panel transport conveyor 25, and the second traveling body 27 can travel along the ceiling rails 26. Also, two third ceiling rails 28 are provided above the assembly position A,
Along the ceiling rail 28, the third and fourth traveling bodies 29, 30
Are arranged so as to be able to travel, and rails 31 to 33 are provided on the second to fourth traveling bodies 27, 29, 30. A fourth ceiling rail 34 is installed between the arrangement position B and the assembly position A, and there are a total of seven ceiling rails 35 to 41.

第2走行体27のレール31は、走行体27が天井レール26
に沿って走行することにより、それぞれのレール35〜41
と接続可能となっており、第3走行体29のレール32は、
走行体29が天井レール28に沿って走行することにより、
レール35〜39と接続可能であり、第4走行体30のレール
33は、同様に、レール40,41と接続可能である。レール3
1には第1ホイスト42が配置され、レール32および35〜3
9には第2、第3ホイスト43,44が配置され、レール33お
よび40,41には第4、第5ホイスト45,46が配置されてお
り、これらのホイスト43〜46はレール31に乗り移り可能
である。
The rail 31 of the second traveling body 27 is such that the traveling body 27 is
By traveling along each rail 35-41
And the rail 32 of the third traveling body 29 is
By the traveling body 29 traveling along the ceiling rail 28,
Can be connected to rails 35 to 39, and is the rail of the fourth traveling body 30.
33 is likewise connectable with rails 40, 41. Rail 3
The 1st hoist 42 is arranged in 1 and rails 32 and 35-3
The second and third hoists 43 and 44 are arranged on the rail 9, and the fourth and fifth hoists 45 and 46 are arranged on the rails 33 and 40 and 41. These hoists 43 to 46 are transferred to the rail 31. It is possible.

第2、第3ホイスト43,44は、レール31と、レール35
〜38のうちのいずれか1つのレールと、レール32とを走
行することにより、妻パネル3をコンベア25の配置位置
Bから組立位置Aの組立中心aより図4中左側に運ぶも
のとなっており、これらのホイスト43,44はレール39を
走行することによりコンベア25の配置位置Bに戻る。ま
た、第4、第5ホイスト45,46は、レール31と、レール4
1と、レール33とを走行することにより、妻パネル4を
コンベア25の配置位置Bから組立位置Aの組立中心aよ
り図4中右側に送るためのものとなっており、これらの
ホイスト45,46はレール40を走行することによりコンベ
ア25の配置位置Bに戻る。
The second and third hoists 43 and 44 are the rail 31 and the rail 35
By traveling on any one of the rails to the rail 32 and the rail 32, the gable panel 3 is carried from the arrangement position B of the conveyor 25 to the left side in FIG. The hoists 43 and 44 return to the arrangement position B of the conveyor 25 by traveling on the rail 39. The fourth and fifth hoists 45 and 46 are the rail 31 and the rail 4
1 and the rail 33 to move the wife panel 4 from the arrangement position B of the conveyor 25 to the assembly center A at the assembly position A to the right in FIG. 46 returns to the arrangement position B of the conveyor 25 by traveling on the rail 40.

このように、本実施例では、レール35〜38は、ホイス
ト43,44を組立位置Aまで移動させるための往レールと
なっており、レール39はホイスト43,44を前記配置位置
Bまで戻す復レール(戻りレール)となっており、同様
に、レール41はホイスト45,46の往レール、レール40は
復レール(戻りレール)となっている。
As described above, in this embodiment, the rails 35 to 38 are forward rails for moving the hoists 43 and 44 to the assembly position A, and the rail 39 returns the hoists 43 and 44 to the arrangement position B. The rail 41 is a return rail, and similarly, the rail 41 is a forward rail for hoists 45 and 46 and the rail 40 is a return rail (return rail).

図3の住宅ユニット5には妻パネル3,4間の長辺寸法
Lが異なる複数種類のものがあり、レール35〜38はこれ
らの寸法と対応した間隔で並べられている。このため、
ホイスト43,44で組立位置Aに送られる妻パネル3は、
ホイスト45,46で組立位置Aに送られる妻パネル4から
それぞれの寸法L分離れることになる。
There are a plurality of types of housing units 5 in FIG. 3 in which the long side dimensions L between the wife panels 3 and 4 are different, and rails 35 to 38 are arranged at intervals corresponding to these dimensions. For this reason,
The wife panel 3 sent to the assembly position A by the hoists 43, 44
Each dimension L is separated from the end panel 4 sent to the assembly position A by the hoists 45 and 46.

言い換えると、レール41は、一方の妻パネル4を組立
位置Aにおける床パネル2、天井パネル1の一端側(第
2支持台49側)へ送るための基準レールとなっている。
また、レール35〜38は、組立位置A側がそれぞれ異なる
規格の住宅ユニットの長辺寸法Lに応じて基準レールか
ら離れて配置され、組立てる住宅ユニットの規格に応じ
て何れかが選択され、他方の妻パネル3を組立位置Aに
おける床パネル2、天井パネル1の他端側(第1支持台
48側)へ送るための複数の選択レールとなっている。
In other words, the rail 41 serves as a reference rail for sending the one end panel 4 to the floor panel 2 and the ceiling panel 1 at one end side (the second support 49 side) at the assembly position A.
Further, the rails 35 to 38 are arranged apart from the reference rail in accordance with the long side dimension L of the housing unit having different standards on the assembly position A side, and one of them is selected according to the standard of the housing unit to be assembled, and the other one is selected. The gable panel 3 is attached to the other end side of the floor panel 2 and the ceiling panel 1 at the assembly position A (first support base).
There are multiple selection rails for sending to (48 side).

図5は前記床パネル搬送コンベア24と組立位置Aの部
分を示す。組立位置Aの床上にはコンベア24と平行に2
本の軌条47が敷設され、これらの軌条47に図8で示すよ
うに妻パネル3を垂直に支持する第1支持台48と妻パネ
ル4を垂直に支持する第2支持台49とが配置され、これ
らの支持台48,49は軌条47に沿って走行自在な移動台車
となっている。
FIG. 5 shows the floor panel conveyor 24 and the assembly position A. On the floor at the assembly position A, 2 parallel to the conveyor 24
As shown in FIG. 8, a first rail 48 for vertically supporting the wife panel 3 and a second support 49 for vertically supporting the wife panel 4 are arranged on these rails 47. These support bases 48 and 49 are movable carriages that can travel along the rail 47.

図5の通り、床パネル搬送コンベア24からは前部コン
ベア50が軌条47側に向かって延び、その先には中間部コ
ンベア51が配置され、さらにその先には後部コンベア52
が配置されている。軌条47に対して直角にかつ連続的に
並べられたこれらのコンベア50〜52はチェーンコンベア
であり、中間部コンベア51は2本の軌条47の間に配置さ
れ、後部コンベア52は前部コンベア50とは反対側で軌条
47の外側に配置されている。後部コンベア52は組立位置
Aで組み立てられた前記住宅ユニット5を次工程に送り
出すためのものであり、このコンベア52には排出コンベ
ア53が接続されている。
As shown in FIG. 5, a front conveyor 50 extends from the floor panel conveyor 24 toward the rail 47 side, and an intermediate conveyor 51 is disposed at the front thereof, and a rear conveyor 52 is further disposed therebefore.
Is arranged. These conveyors 50 to 52 arranged at right angles to the rail 47 and continuously are chain conveyors, the intermediate conveyor 51 is disposed between the two rails 47, and the rear conveyor 52 is a front conveyor 50. Rail on opposite side
It is located outside of 47. The rear conveyor 52 is for sending the housing unit 5 assembled at the assembly position A to the next step, and a discharge conveyor 53 is connected to the conveyor 52.

前部コンベア50、中間部コンベア51、後部コンベア52
はコンベア54〜58、59〜63、64〜68からなり、軌条47の
長手方向に並べられたこれらのコンベア54〜58、59〜6
3、64〜68により、前記寸法Lが異なる各種の床パネル
2、住宅ユニット5を確実に搬送できるようになってい
る。
Front conveyor 50, middle conveyor 51, rear conveyor 52
Consists of conveyors 54-58, 59-63, 64-68, and these conveyors 54-58, 59-6 arranged in the longitudinal direction of the rail 47.
3 and 64-68 make it possible to reliably convey various floor panels 2 and housing units 5 having different dimensions L.

図6の通り、前部コンベア50、中間部コンベア51、後
部コンベア52は昇降装置69,70,71上に取り付けられ、こ
のため、図9の通り、前部コンベア50は高位C、低位D
の2段階レベルに、中間部コンベア51は高位E、中位
F、低位Gの3段階レベルに、後部コンベア52は高位
H、低位Iの2段階レベルにそれぞれ上下動自在となっ
ている。
As shown in FIG. 6, the front conveyor 50, the intermediate conveyor 51, and the rear conveyor 52 are mounted on the elevating devices 69, 70, 71. Therefore, as shown in FIG.
, The intermediate conveyor 51 can move up and down to three levels of high E, middle F and low G, and the rear conveyor 52 can move up and down to two levels of high H and low I.

図7の通り、前部コンベア50の先端部にはガイド部材
72で摺動自在に保持された延長部材73が設けられ、この
延長部材73には図10で示したシリンダ74が連結され、前
部コンベア50が高位Cに達しているとき、延長部材73は
シリンダ74により前記軌条47を越えて中間部コンベア51
側に突出するようになっている。図7の通り、後部コン
ベア52の後端部にもガイド部材75で摺動自在に保持され
た延長部材76が設けられ、この延長部材76には図10で示
すシリンダ77が連結され、後部コンベア52が高位Hに達
しているとき、延長部材76は前記軌条47を越えて中間部
コンベア51側に突出するようになっている。
As shown in FIG. 7, a guide member is provided at the tip of the front conveyor 50.
An extension member 73 slidably held by 72 is provided, and the extension member 73 is connected to the cylinder 74 shown in FIG. 10, and when the front conveyor 50 has reached the high position C, the extension member 73 is The intermediate conveyor 51 over the rail 47 by the cylinder 74
It protrudes to the side. As shown in FIG. 7, an extension member 76 slidably held by a guide member 75 is also provided at the rear end of the rear conveyor 52, and a cylinder 77 shown in FIG. When the position 52 has reached the high position H, the extension member 76 projects beyond the rail 47 toward the intermediate conveyor 51.

図7の通り、前記第1支持台48にはモータ78が搭載さ
れ、このモータ78の動力は歯車や回転軸からなる動力伝
達経路79を介してピニオンンギヤ80に伝達され、ピニオ
ンギヤ80は前記軌条47に沿って並設されているラック部
材81と噛合しているため、第1支持台48はモータ78によ
り軌条47上を長いストロークに亘って移動するようにな
っている。一方、第2支持台49には床上に設置されたモ
ータ82の動力で前後進する送りねじ式のロッド83が連結
され、第2支持台49はモータ82の動力で軌条47上を短い
ストロークに亘って移動するようになっている。
As shown in FIG. 7, a motor 78 is mounted on the first support base 48, and the power of the motor 78 is transmitted to a pinion gear 80 via a power transmission path 79 composed of gears and a rotating shaft. The first support table 48 is moved over the rail 47 over a long stroke by the motor 78 because the first support table 48 is engaged with the rack members 81 arranged side by side. On the other hand, a feed screw type rod 83 that moves forward and backward by the power of a motor 82 installed on the floor is connected to the second support 49, and the second support 49 is driven by the power of the motor 82 to make a short stroke on the rail 47. It is designed to move across.

図8の通り、それぞれの支持台48,49の相対向する下
先端部には垂直な妻パネル3,4を載せるための妻パネル
載置部材84,85が設けられている。図3で示した住宅ユ
ニット5には短辺寸法Wが異なる複数種類のものがあ
り、妻パネル3,4もこの寸法が異なる複数種類のものが
あるため、妻パネル載置部材84,85は、図示されていな
いが、図8の紙面表裏方向にそれぞれの寸法Wと対応し
て複数設けられている。
As shown in FIG. 8, at the lower end portions of the support bases 48 and 49 opposed to each other, end panel mounting members 84 and 85 for mounting the vertical end panels 3 and 4 are provided. The housing unit 5 shown in FIG. 3 includes a plurality of types having different short side dimensions W, and the wife panels 3 and 4 also include a plurality of types having different dimensions. Although not shown in the figure, a plurality of the plurality are provided corresponding to the respective dimensions W in the front and back directions on the paper surface of FIG.

両方の支持台48,49の上部における前部コンベア50側
には、図7の通り、軸86を中心に水平方向に回動可能な
第1、第2アーム87,88が設けられ、これらのアーム87,
88は手作業でまたはロータリアクチュエータで回動可能
となっている。また、両方の支持台48,49の上部におけ
る後部コンベア52側には、ガイド棒89に沿って前記寸法
Wの方向に移動自在となったスライダ90が設けられ、ス
ライダ90には軸91を中心に水平方向に回動可能な第3、
第4アーム92,93が設けられている。図11、図12の通
り、スライダ90には孔94付きのブラケット95が取り付け
られ、ブラケット95はガイド棒89と平行に支持台48,49
に設けられた位置決めバー96の近くに配置されている。
このバー96には複数の孔97が形成され、スライダ90をガ
イド棒89に沿って移動させ、孔94,97に図12で示す位置
決めピン98を挿入することによりスライダ90はその位置
に位置決めされるようになっている。複数の孔97の位置
はそれぞれの前記寸法Wと対応した位置に設けられてお
り、スライダをこれらの寸法Wと一致した位置に位置決
めできるようになっている。
As shown in FIG. 7, first and second arms 87 and 88 are provided on the upper side of the support tables 48 and 49 on the side of the front conveyor 50, the first and second arms 87 and 88 being rotatable about an axis 86. Arm 87,
88 can be rotated manually or by a rotary actuator. Further, on the rear conveyor 52 side above the both supports 48, 49, there is provided a slider 90 which is movable along the guide rod 89 in the direction of the dimension W. The slider 90 has a shaft 91 as a center. Third, which can be horizontally rotated,
Fourth arms 92 and 93 are provided. As shown in FIGS. 11 and 12, a bracket 95 having a hole 94 is attached to the slider 90, and the bracket 95 is parallel to the guide rod 89 and is supported by the support bases 48, 49.
Is located near the positioning bar 96 provided in the finder.
A plurality of holes 97 are formed in the bar 96, the slider 90 is moved along the guide rod 89, and the slider 90 is positioned at that position by inserting the positioning pins 98 shown in FIG. It has become so. The positions of the plurality of holes 97 are provided at positions corresponding to the respective dimensions W, so that the slider can be positioned at a position corresponding to these dimensions W.

第1アーム87と第3アーム92、第2アーム88と第4ア
ーム93はそれぞれ同じ構造となっており、図11、図12で
は代表例として支持台48の第3アーム92、第4アーム93
が示されている。第3アーム92は平面ほぼL字型で、そ
の両方の先端部に孔99,100が形成され、図11において、
アーム92を手作業で二点鎖線から実線の位置まで回動さ
せ、孔99を図12で示されたスライダ90の孔101と一致さ
せ、これらの孔99,101に位置決めピン102を挿入するこ
とにより、アーム92はその位置で位置決めされる。この
ときには孔100は妻パネル3の柱15の上面に形成された
孔103と一致しており、これらの孔100,103にピン104を
挿入することにより妻パネル3はアーム92に固定され
る。
The first arm 87 and the third arm 92 have the same structure, and the second arm 88 and the fourth arm 93 have the same structure. In FIGS. 11 and 12, the third arm 92 and the fourth arm 93 of the support base 48 are representative examples.
It is shown. The third arm 92 is substantially L-shaped in a plane, and has holes 99 and 100 formed at both ends thereof.
By manually rotating the arm 92 from the two-dot chain line to the position of the solid line, aligning the holes 99 with the holes 101 of the slider 90 shown in FIG. 12, and inserting the positioning pins 102 into these holes 99, 101, The arm 92 is positioned at that position. At this time, the hole 100 coincides with the hole 103 formed on the upper surface of the pillar 15 of the wife panel 3, and the wife panel 3 is fixed to the arm 92 by inserting the pins 104 into these holes 100 and 103.

第4アーム93は図12で示すロータリアクチュエータ10
5で図11の二点鎖線から実線の位置まで回動し、その先
端には前記天井パネル1の長辺梁7の端部を載せる天井
パネル載置部材106が設けられている。
The fourth arm 93 is the rotary actuator 10 shown in FIG.
At 5, it is rotated from the two-dot chain line to the position indicated by the solid line in FIG. 11, and a top end thereof is provided with a ceiling panel mounting member 106 on which the end of the long side beam 7 of the ceiling panel 1 is mounted.

図8の通り、第1支持台48の下部先端には床パネル2
の一方の端部を載せる床パネル載置部材107が設けら
れ、この部材107は、図7の通り、3種類の前記寸法W
に対応して合計4個108〜111ある。図8の通り、第2支
持台49の前進限近くの床上には、床パネル2の他方の端
部を載せる床パネル載置部材112が設けられ、この部材1
12も図7の通り合計4個113〜116ある。床パネル載置部
材108〜111,113〜116のうち、前部コンベア50に最も近
い部材108と113には位置決め部材117,118(117は図8、
図9、図10に示され、118は図7、図8に示されてい
る。)が設けられ、これらの位置決め部材117,118に床
パネル2の前部コンベア50側の長辺梁7の外側面が当接
されると、床パネル2は図9、図10の左右方向に位置決
めされ、前記組立位置Aの組立中心aの位置と正確に一
致するようになっている。
As shown in FIG. 8, a floor panel 2 is provided at the lower end of the first support base 48.
A floor panel mounting member 107 for mounting one end of the floor panel mounting member 107 is provided, and the member 107 has three types of the dimension W as shown in FIG.
There are a total of four 108 to 111 corresponding to. As shown in FIG. 8, a floor panel mounting member 112 for mounting the other end of the floor panel 2 is provided on the floor near the forward end of the second support base 49.
As shown in FIG. 7, there are a total of 12 12-113. Of the floor panel placing members 108 to 111 and 113 to 116, positioning members 117 and 118 (117 are shown in FIGS.
9 and 10, and 118 is shown in FIGS. ) Is provided, and when the outer surface of the long-side beam 7 of the front panel 50 of the floor panel 2 is brought into contact with these positioning members 117 and 118, the floor panel 2 is positioned in the left-right direction in FIGS. The assembly position A exactly matches the position of the assembly center a.

図10の通り、前記2本の軌条47の間には位置決め手段
119が配置され、この手段119は、シリンダ120と、シリ
ンダ120で軸121を中心に垂直面内で揺動するレバー122
とを有し、レバー122により床パネル2の前部コンベア5
0側の長辺梁7の内側面が位置決め部材117,118に押し付
けられ、これにより床パネル2の位置決めがなされるよ
うになっている。位置決め手段119は、図7の通り、中
間部コンベア51のコンベア59〜63毎に設けられている。
As shown in FIG. 10, positioning means is provided between the two rails 47.
119 is arranged, and this means 119 includes a cylinder 120 and a lever 122 which swings in the cylinder 120 about a shaft 121 in a vertical plane.
And the lever 122 controls the front conveyor 5 of the floor panel 2
The inner surface of the long-side beam 7 on the 0 side is pressed against the positioning members 117 and 118, whereby the floor panel 2 is positioned. As shown in FIG. 7, the positioning means 119 is provided for each of the conveyors 59 to 63 of the intermediate conveyor 51.

次に作用について説明する。 Next, the operation will be described.

図4で示した天井パネル1は第1走行体23で組立位置
Aの上方まで送られ、床パネル2は床パネル搬送コンベ
ア24で、妻パネル3,4は妻パネル搬送コンベア25でそれ
ぞれコンベア24,25の端部まで送られてくる。
The ceiling panel 1 shown in FIG. 4 is sent to a position above the assembling position A by the first traveling body 23, the floor panel 2 is a floor panel transport conveyor 24, and the wife panels 3, 4 are a wife panel transport conveyor 25, respectively. , 25 ends.

第2走行体27は第4天井レール34の復レール39の位置
まで走行し、レール39に達している第2ホイスト43がレ
ール39を介して第2走行体27のレール31に乗り移る。図
6の通り、このレール31に配置されていた第1ホイスト
42と第2ホイスト43のワイヤー42A,43Aが妻パネル3に
掛けられる。コンベア25で水平に倒されて送られてきた
妻パネル3はホイスト42,43の初めの均等な吊り上げ量
により水平姿勢のまま所定高さまで吊り上げられ、二点
鎖線3′で示す通りコンベア25から離れる。次いで、第
2ホイスト43だけが吊り上げ量を次第に大きくし、これ
により妻パネル3は二点鎖線3″で示す通り水平姿勢か
ら垂直姿勢に次第にその姿勢を変更する。ホイスト43の
吊り上げ量が所定の大きさまで達した後、第1ホイスト
42のワイヤー42Aは妻パネル3から分離され、これによ
り妻パネル3は垂直姿勢となる。
The second traveling body 27 travels to the position of the return rail 39 of the fourth ceiling rail 34, and the second hoist 43 reaching the rail 39 transfers to the rail 31 of the second traveling body 27 via the rail 39. As shown in FIG. 6, the first hoist arranged on this rail 31.
The wires 42A and 43A of the second hoist 43 are hung on the wife panel 3. The wife panel 3, which has been fed down by the conveyor 25 horizontally, is lifted up to a predetermined height in a horizontal posture by the initial uniform lifting amount of the hoists 42, 43, and separates from the conveyor 25 as shown by a two-dot chain line 3 '. . Next, only the second hoist 43 gradually increases the lifting amount, whereby the wife panel 3 gradually changes its posture from the horizontal posture to the vertical posture as shown by the two-dot chain line 3 ". The lifting amount of the hoist 43 is a predetermined amount. After reaching the size, the first hoist
The 42 wires 42A are separated from the wife panel 3, whereby the wife panel 3 is in a vertical posture.

このように、本実施例では妻パネル搬送コンベア25で
水平に倒されて送られてきた妻パネル3を水平姿勢から
垂直姿勢に姿勢変更する作業は、2台のホイスト42,43
を使用することにより、妻パネル3がコンベア25から離
れた空中において行うようにしたため、この姿勢変更作
業時に妻パネル3とコンベア25とが擦れることはなく、
このため、妻パネル3およびコンベア25が損傷する事故
の発生を防止できる。
As described above, in the present embodiment, the operation of changing the posture of the wife panel 3 sent from the wife panel transport conveyor 25 from the horizontal posture to the vertical posture is performed by the two hoists 42 and 43.
By using this, the wife panel 3 is performed in the air away from the conveyor 25, so that the wife panel 3 and the conveyor 25 do not rub during this posture change work,
Therefore, it is possible to prevent the occurrence of an accident in which the wife panel 3 and the conveyor 25 are damaged.

次いで、第2走行体27は第2天井レール26に沿って走
行し、第2走行体27が第4天井レール34を構成している
往レール35〜38のうちのいずれか1つであって生産しよ
うとする住宅ユニット5の寸法Lと対応した位置に配置
されているレールの位置に達すると、第2ホイスト43は
このレールに乗り移り、さらに、このレールの位置まで
第3天井レール28に沿って走行してきている第3走行体
29のレール32に乗り移る。これにより、妻パネル3は組
立位置Aにおける第1支持台48の前方に配置されたこと
になる。
Next, the second traveling body 27 travels along the second ceiling rail 26, and the second traveling body 27 is any one of the forward rails 35 to 38 constituting the fourth ceiling rail 34, When the second hoist 43 reaches the position of the rail located at a position corresponding to the dimension L of the housing unit 5 to be produced, the second hoist 43 transfers to this rail, and further along the third ceiling rail 28 to the position of this rail. The third traveling body that is traveling
Transfer to rail 32 at 29. As a result, the wife panel 3 is disposed in front of the first support base 48 at the assembly position A.

このように第2ホイスト43が往レール35〜38のいずれ
か1つのレールから第3走行体29のレール32に向かって
走行している間に、第2走行体27は第4天井レール34の
復レール40の位置まで移動する。これにより第2走行体
27の第1ホイスト42が配置されているレール31には復レ
ール40を通って第4ホイスト45が乗り移り、これらのホ
イスト42,45でもう1つの妻パネル4が前記妻パネル3
と同様に吊り上げられ、空中において水平姿勢から垂直
姿勢に姿勢変更される。この後、第2走行体27は第4天
井レール34の往レール41の位置まで移動し、第1ホイス
ト42から分離された妻パネル4は、第4ホイスト45が往
レール41を通って第4走行体30のレール33まで達するこ
とにより、組立位置Aにおける第2支持台49の前方に配
置される。
Thus, while the second hoist 43 is traveling from any one of the outgoing rails 35 to 38 toward the rail 32 of the third traveling body 29, the second traveling body 27 is Move to the position of the return rail 40. Thereby, the second traveling body
The fourth hoist 45 is transferred to the rail 31 on which the first hoist 42 of the 27 is disposed through the return rail 40, and another wife panel 4 is connected to the wife panel 3 by these hoists 42, 45.
It is lifted in the same manner as above, and its posture is changed from a horizontal posture to a vertical posture in the air. Thereafter, the second traveling body 27 moves to the position of the forward rail 41 of the fourth ceiling rail 34, and the wife panel 4 separated from the first hoist 42 is moved by the fourth hoist 45 through the forward rail 41 to the fourth position. By reaching the rail 33 of the traveling body 30, the traveling body 30 is disposed in front of the second support table 49 at the assembly position A.

後退限に達していた第1支持台48は軌条47に沿って前
進し、第2ホイスト43に吊り下げられている妻パネル3
の位置まで達する。この妻パネル3は作業者により図8
で示された支持台48の妻パネル載置部材84上に載せられ
る。また、支持台48に登った作業者は図11で示したスラ
イダ90を前記寸法Wと対応する位置までガイド棒89に沿
って移動させ、前記位置決めピン98を孔94,97に挿入す
ることによりスライダ90をその位置に位置決めする。そ
して作業者は第1アーム87、第3アーム92を前記軸86,9
1を中心に図11の二点鎖線から実線の位置まで回動さ
せ、図12の位置決めピン102を孔99,101に挿入すること
によりアーム87,92を回転不能とし、さらに位置決めピ
ン104を孔100,103に挿入することによりアーム87,92に
妻パネル3を固定する。
The first support 48 that has reached the retreat limit advances along the rail 47 and the wife panel 3 suspended by the second hoist 43.
To the position of. This wife panel 3 is shown in FIG.
Is placed on the wife panel placement member 84 of the support base 48 indicated by. Further, the worker climbing the support base 48 moves the slider 90 shown in FIG. 11 along the guide rod 89 to a position corresponding to the dimension W, and inserts the positioning pins 98 into the holes 94 and 97. The slider 90 is positioned at that position. Then, the operator attaches the first arm 87 and the third arm 92 to the shafts 86 and 9.
11 is rotated from the chain double-dashed line in FIG. 11 to the position indicated by the solid line, and the positioning pins 102 in FIG. 12 are inserted into the holes 99 and 101 to make the arms 87 and 92 non-rotatable. The gable panel 3 is fixed to the arms 87 and 92 by inserting.

以上により妻パネル3は第1支持台48に垂直な姿勢で
支持されたことになる。
Thus, the wife panel 3 is supported in a posture perpendicular to the first support base 48.

以上と同じ作業は第2支持台49についても行われ、こ
の第2支持台49に妻パネル4は垂直な姿勢で支持され
る。
The same operation as described above is performed on the second support 49, and the end panel 4 is supported by the second support 49 in a vertical posture.

以上の作業により妻パネル3,4はそれぞれの支持台48,
49で支持され、これらの妻パネル3,4は水平方向に対向
配置され、第2、第4ホイスト43,45は妻パネル3,4から
分離される。
With the above work, the wife panels 3 and 4 are supported
49, these wife panels 3 and 4 are horizontally opposed to each other, and the second and fourth hoists 43 and 45 are separated from the wife panels 3 and 4.

以上のように支持台48,49に妻パネル3,4を支持させる
作業を行っている間に、図4で示された第2走行体27は
第4天井レール34の復レール39の位置まで走行し、この
レール39における第3ホイスト44が第2走行体27のレー
ル31に乗り移る。これにより第1、第3ホイスト42,44
で次の住宅ユニット5を作るために使用する妻パネル3
の吊り上げ作業が前述と同様に行われ、第2走行体27が
走行することによりこの妻パネル3は第3ホイスト44で
往レール35〜38のいずれか1つに送られる。
As described above, while performing the work of supporting the wife panels 3 and 4 on the support bases 48 and 49, the second traveling body 27 shown in FIG. 4 is moved to the position of the return rail 39 of the fourth ceiling rail 34. The vehicle travels, and the third hoist 44 on the rail 39 transfers to the rail 31 of the second traveling body 27. Thereby, the first and third hoists 42,44
Wife panel 3 used to make the next residential unit 5 in
Is carried out in the same manner as described above, and the end panel 3 is sent to any one of the forward rails 35 to 38 by the third hoist 44 as the second traveling body 27 travels.

この妻パネル3と対をなす妻パネル4についても以上
と同じ作業が第5ホイスト46と復レール40、往レール41
を使用することにより行われる。
The same work as above is performed for the wife panel 4 which is paired with the wife panel 3, the fifth hoist 46, the return rail 40, and the forward rail 41.
This is done by using

以上のように本実施例によれば、妻パネル搬送コンベ
ア25の配置位置Bと住宅ユニット5の組立位置Aとをつ
なぐ第4天井レール34にホイスト43,44と45,46が移動す
る往レール35〜38,41、復レール39,40を設けたため、ホ
イスト43,45で吊り下げられた妻パネル3,4を組立位置A
において支持台48,49に支持させる作業および住宅ユニ
ット5の組立作業を行っている間に、ホイスト42,44,46
により次の住宅ユニット5を作るための妻パネル3,4を
コンベア25から垂直に吊り上げる作業および組立位置A
に送る準備を整えておく作業を行えるようになり、この
ため作業の連続性を確保でき、住宅ユニット5の生産効
率の向上を達成できる。
As described above, according to the present embodiment, the forward rail on which the hoists 43,44 and 45,46 are moved to the fourth ceiling rail 34 that connects the disposition position B of the end panel transport conveyor 25 and the assembly position A of the housing unit 5. Since 35 to 38,41 and return rails 39,40 are provided, the wife panels 3,4 suspended by the hoists 43,45 are assembled at the assembly position A.
While supporting the supporting units 48, 49 and assembling the housing unit 5 at the hoist 42, 44, 46
Work and assembling position A for vertically lifting the wife panels 3, 4 from the conveyor 25 to make the next housing unit 5
Work to prepare for sending to the home unit can be performed, so that continuity of work can be ensured, and improvement in production efficiency of the housing unit 5 can be achieved.

また、本実施例では第4天井レール34には妻パネル3
を組立位置Aに送るためのレールが複数35〜38あり、こ
れらのレール35〜38の間隔は住宅ユニット5のそれぞれ
の前記寸法Lと対応したものになっているため、寸法L
が異なる各種の住宅ユニット5を作るための妻パネル3
を組立位置Aのそれぞれの所定の位置に送ることがで
き、本実施例に係る住宅ユニット生産設備は各種の住宅
ユニットに対する汎用性を有するものとなっている。
In this embodiment, the fourth ceiling rail 34 has a wife panel 3.
There are a plurality of rails 35 to 38 for sending the rails to the assembling position A, and the intervals between these rails 35 to 38 correspond to the respective dimensions L of the housing units 5.
Panel 3 for making various housing units 5 of different sizes
Can be sent to each predetermined position of the assembling position A, and the housing unit production equipment according to the present embodiment has versatility for various housing units.

図5で示された床パネル搬送コンベア24でこのコンベ
ア24の端部まで送られてきた床パネル2は、前部コンベ
ア50が昇降装置69で低位Dから高位Cに上昇することに
より前部コンベア50に受け渡され、さらにコンベア50に
より前記軌条47に向かって搬送される。このとき、コン
ベア50の先端部に設けられた延長部材73は中間部コンベ
ア51に向かって突出し、また、中間部コンベア51は昇降
装置70で高位Eまで上昇している。
The floor panel 2 sent to the end of the conveyor 24 by the floor panel conveyor 24 shown in FIG. 5 is moved up from the low position D to the high position C by the elevating device 69 so that the front conveyor 50 The belt is transferred to the rail 50 by the conveyor 50. At this time, the extension member 73 provided at the leading end of the conveyor 50 projects toward the intermediate conveyor 51, and the intermediate conveyor 51 is raised to the high position E by the elevating device 70.

このため、前部コンベア50と中間部コンベア51との間
に前記支持台48,49を走行させるための軌条47が設けら
れ、コンベア50と51とが大きく離れていても、軌条47の
上方を越えて突出する延長部材73により床パネル2は前
部コンベア50から中間部コンベア51に確実に受け渡され
る。
For this reason, a rail 47 for running the support tables 48 and 49 is provided between the front conveyor 50 and the intermediate conveyor 51, and even if the conveyors 50 and 51 are largely separated, the rail 47 is moved above the rail 47. The extension member 73 projecting over the floor panel 2 ensures that the floor panel 2 is transferred from the front conveyor 50 to the intermediate conveyor 51.

中間部コンベア51上に床パネル2が乗り移った後、中
間部コンベア51は中位Fまで下降する。この高さ位置
は、床パネル2が支持台48に設けられた床パネル載置部
材107と床上に設けられた床パネル載置部材112から上方
に僅かに離れた位置である。この後、中間部コンベア51
は逆方向に回転し、これにより床パネル2は図9中にお
いて左移動し、これにより床パネル2の前部コンベア50
側の長辺梁7の外側面が図10の通り前記位置決め部材11
7,118に当接し、床パネル2は正確に位置決めされ、組
立位置Aの組立中心aと一致した位置に配置される。
After the floor panel 2 is transferred onto the intermediate conveyor 51, the intermediate conveyor 51 descends to the intermediate level F. This height position is a position where the floor panel 2 is slightly separated upward from a floor panel mounting member 107 provided on the support base 48 and a floor panel mounting member 112 provided on the floor. After this, the intermediate conveyor 51
Rotate in the opposite direction, whereby the floor panel 2 moves to the left in FIG.
The outer surface of the long side beam 7 on the side is the positioning member 11 as shown in FIG.
7 and 118, the floor panel 2 is accurately positioned, and is located at a position coinciding with the assembly center a of the assembly position A.

この後、中間部コンベア51は低位Gまで下降し、これ
により床パネル2は位置決め状態のまま床パネル載置部
材107,112上に載る。次いで、前記位置決め手段119のシ
リンダ120が作動し、これにより揺動するレバー122で床
パネル2は位置決め部材117,118に押し付けられた状態
となり、床パネル2の位置決めが確実なものとなる。
Thereafter, the intermediate conveyor 51 descends to the low position G, whereby the floor panel 2 is placed on the floor panel placing members 107 and 112 in the positioned state. Next, the cylinder 120 of the positioning means 119 is operated, whereby the floor panel 2 is pressed against the positioning members 117 and 118 by the swinging lever 122, and the positioning of the floor panel 2 is ensured.

以上のように本実施例では、中間部コンベア51を高位
E、中位F、低位Gの3段階レベルに上下動自在とした
ため、前部コンベア50から床パネル2を受け取ること、
床パネル2を位置決め部材117,118に当接させるまで移
動させて位置決めすること、床パネル2を床パネル載置
部材107,112に載置すること、の各作業を中間部コンベ
ア51の上下動により行える。
As described above, in this embodiment, since the intermediate conveyor 51 can be moved up and down in three levels of high E, middle F, and low G, the floor panel 2 is received from the front conveyor 50.
The operations of moving and positioning the floor panel 2 until it comes into contact with the positioning members 117 and 118 and mounting the floor panel 2 on the floor panel mounting members 107 and 112 can be performed by moving the intermediate conveyor 51 up and down.

以上のようにして組立位置Aに送り込まれた妻パネル
3,4、床パネル2に対して天井パネル1を所定の位置に
配置するためには、支持台48,49の第2アーム88、第4
アーム93を軸86,91を中心に図12のロータリアクチュエ
ータ105で図11の二点鎖線から実線の位置まで回動させ
る。次いで、図4の第1走行体23で組立位置Aの上方ま
で送られてきている天井パネル1をこのパネル1を吊り
下げている図6のワイヤー23Aの繰り出しにより下降さ
せ、天井パネル1をアーム88,93の天井パネル載置部材1
06上に載せる。このとき、ロータリアクチュエータ105
によるアーム88,93の回動により天井パネル1は組立位
置Aの組立中心aと一致した位置に位置決め配置される
ことになる。この後、ワイヤー23Aを天井パネル1から
解き放す。
Wife panel sent to assembly position A as above
In order to arrange the ceiling panel 1 at a predetermined position with respect to the floor panel 2, the second arm 88 of the support bases 48, 49,
The arm 93 is rotated about the shafts 86 and 91 by the rotary actuator 105 shown in FIG. 12 from the two-dot chain line to the solid line in FIG. Next, the ceiling panel 1 that has been sent to above the assembly position A by the first traveling body 23 in FIG. 4 is lowered by feeding out the wire 23A in FIG. 6 that suspends the panel 1, and the ceiling panel 1 is armed. 88,93 ceiling panel mounting members 1
Put on 06. At this time, the rotary actuator 105
Due to the rotation of the arms 88 and 93, the ceiling panel 1 is positioned and arranged at a position coinciding with the assembly center a of the assembly position A. Then, the wire 23A is released from the ceiling panel 1.

これにより、天井パネル1は妻パネル3,4を垂直に支
持するための支持台48,49に支持されることになり、支
持台48,49は天井パネル1を支持するためのものともな
る。
As a result, the ceiling panel 1 is supported by the supports 48, 49 for vertically supporting the wife panels 3, 4, and the supports 48, 49 also serve to support the ceiling panel 1.

図8は以上の作業後の状態を示している。 FIG. 8 shows a state after the above operation.

この後、第2支持台49は図8中において左側に低速で
移動し、これにより妻パネル4の前記仕口18は天井パネ
ル1および床パネル2の長辺梁7の一方の端部に嵌合す
る。支持台49がさらに移動することにより、天井パネル
1および床パネル2は押されて移動し、これらのパネル
1,2の長辺梁7の他方の端部が妻パネル3の仕口18に嵌
合する。この結果、妻パネル3,4と、これらの妻パネル
3,4の間に配置された天井パネル1、床パネル2とは接
続状態となる。
After that, the second support base 49 moves to the left side in FIG. 8 at a low speed, so that the joint 18 of the end panel 4 is fitted to one end of the long side beam 7 of the ceiling panel 1 and the floor panel 2. To meet. When the support base 49 moves further, the ceiling panel 1 and the floor panel 2 are pushed and moved, and these panels are moved.
The other ends of the long-side beams 7 are fitted into the connection 18 of the end panel 3. As a result, wife panels 3, 4 and these wife panels
The ceiling panel 1 and the floor panel 2 arranged between 3 and 4 are connected.

このように本実施例では、支持台49を移動させるだけ
で天井パネル1、床パネル2、妻パネル3,4を接続状態
にでき、これらは仮組立状態となる。
As described above, in the present embodiment, the ceiling panel 1, the floor panel 2, and the end panels 3 and 4 can be connected only by moving the support table 49, and these are in a tentatively assembled state.

なお、支持台49に移動により床パネル2を図8中左移
動させても、床パネル2は位置決め手段119のレバー122
で位置決め部材117,118に常に押圧されているため、床
パネル2の位置決め状態を確保できる。
Even if the floor panel 2 is moved to the left in FIG. 8 by moving it to the support base 49, the floor panel 2 still has the lever 122 of the positioning means 119.
Therefore, the positioning state of the floor panel 2 can be ensured because the positioning members 117 and 118 are constantly pressed.

天井パネル1、床パネル2、妻パネル3,4が接続され
るとき、床パネル2、天井パネル1は前述のように組立
位置Aの組立中心aと一致する位置に位置決めされてい
るため、妻パネル3,4は図8中紙面の表裏方向に僅かに
移動しながら床パネル2、天井パネルと接続され、妻パ
ネル3,4も正確な位置に位置決めされた状態となる。
When the ceiling panel 1, the floor panel 2, and the wife panels 3 and 4 are connected, the floor panel 2 and the ceiling panel 1 are positioned at the position corresponding to the assembly center a of the assembly position A as described above. The panels 3 and 4 are connected to the floor panel 2 and the ceiling panel while slightly moving in the direction of the front and back of the paper in FIG. 8, and the end panels 3 and 4 are also positioned at the correct positions.

このようにして天井パネル1、床パネル2、妻パネル
3,4は互いに正しい位置関係となり、このような関係と
なった後、作業者は仕口18の部分で天井パネル1、床パ
ネル2と妻パネル3,4とを溶接で接合する。これによっ
て組立位置Aにおいて住宅ユニット5が組み立てられ
る。
In this way ceiling panel 1, floor panel 2, wife panel
3, 4 are in the correct positional relationship with each other, and after such a relationship, the worker welds the ceiling panel 1, the floor panel 2 and the end panels 3, 4 at the portion of the joint 18. Thus, the housing unit 5 is assembled at the assembly position A.

この後、位置決め手段119による位置決めが解除さ
れ、また、図12で示されたピン102,104が抜かれ、アー
ム87,88,92,93が図11の二点鎖線の位置まで回動され
る。
Thereafter, the positioning by the positioning means 119 is released, and the pins 102, 104 shown in FIG. 12 are removed, and the arms 87, 88, 92, 93 are rotated to the positions indicated by the two-dot chain line in FIG.

中間部コンベア51は低位Gから高位Eまで上昇し、こ
れにより住宅ユニット5はコンベア51上に乗る。このと
きには、後部コンベア52は高位Hまで上昇しており、か
つ、このコンベア52の前記延長部材76は図9の通り中間
部コンベア51側に突出している。次いで、住宅ユニット
5は中間部コンベア51の回転により延長部材76を介して
後部コンベア52に乗り移り、中間部コンベア51と後部コ
ンベア52の間が前記軌条47のために大きく離れていて
も、住宅ユニット5は延長部材76により確実に後部コン
ベア52に移行し、この住宅ユニット5は図5で示された
排出コンベア53の位置まで達する。後部コンベア52が低
位Iまで下降することにより、住宅ユニット5は図5で
示された排出コンベア53上に乗り移る。これ以後、住宅
ユニット5はコンベア53により次工程、すなわち、図1
で示した外壁パネル取付ライン20に送られる。
The intermediate conveyor 51 rises from the low position G to the high position E, whereby the housing unit 5 rides on the conveyor 51. At this time, the rear conveyor 52 has risen to the high position H, and the extension member 76 of the conveyor 52 projects toward the intermediate conveyor 51 as shown in FIG. Next, the housing unit 5 is transferred to the rear conveyor 52 through the extension member 76 by the rotation of the intermediate conveyor 51, and even if the intermediate conveyor 51 and the rear conveyor 52 are largely separated due to the rail 47, the housing unit 5 5 is reliably transferred to the rear conveyor 52 by the extension member 76, and the housing unit 5 reaches the position of the discharge conveyor 53 shown in FIG. As the rear conveyor 52 descends to the lower position I, the housing unit 5 moves onto the discharge conveyor 53 shown in FIG. Thereafter, the housing unit 5 is moved to the next step by the conveyor 53, that is, FIG.
It is sent to the outer wall panel mounting line 20 indicated by.

本実施例では、前述した通り、床パネル載置部材107,
112は前記寸法Wの方向に配置された複数の部材108〜11
1,113〜116からなり、また、第3、第4アーム92,93は
スライダ90により寸法Wの方向に移動自在となっている
ため、寸法Wが異なる複数の住宅ユニットを生産するた
めにも、本実施例に係る装置は適用できる。
In the present embodiment, as described above, the floor panel placing member 107,
112 is a plurality of members 108 to 11 arranged in the direction of the dimension W.
Since the third and fourth arms 92 and 93 are movable in the direction of the dimension W by the slider 90, the third and fourth arms 92 and 93 can be used to produce a plurality of housing units having different dimensions W. The device according to the embodiment can be applied.

〔発明の効果〕 本発明によれば、妻パネルを搬送してくるコンベアの
配置位置と、床パネル、天井パネルの両側に2個の妻パ
ネルを接合して住宅ユニットを組み立てる組立位置との
間に天井レールを架設し、この天井レールに沿って妻パ
ネルを組立位置に搬送するホイストを移動自在とすると
ともに、天井レールを、2個の妻パネル間の寸法が異な
って複数種類生産される住宅ユニットの各寸法と対応し
た間隔で複数本設けたため、2個の妻パネル間の寸法が
異なる種々の住宅ユニットを生産するために共通して使
用できるようになり、種々の住宅ユニットに対する汎用
性を有するようになる。
EFFECTS OF THE INVENTION According to the present invention, between the arrangement position of the conveyor that conveys the end panel and the assembly position where the two end panels are joined to both sides of the floor panel and the ceiling panel to assemble the housing unit. A ceiling rail is erected in the housing, and a hoist that conveys the end panel to the assembly position is movable along the top rail, and a plurality of types of ceiling rails are produced with different dimensions between the end panels. Since multiple units are provided at intervals corresponding to each unit size, they can be commonly used to produce various housing units with different sizes between the two end panels, which makes them versatile for various housing units. To have.

【図面の簡単な説明】[Brief description of drawings]

図1は本発明の一実施例に係る住宅ユニットの生産工程
を示すブロック図、図2は住宅ユニットを構成する天井
パネル、床パネル、妻パネルを示す斜視図、図3は住宅
ユニットの斜視図、図4は図1の総組みラインにおける
住宅ユニット組立位置の周辺の天井レールを主に示した
平面図、図5は同組立位置の周辺のコンベアを主に示し
た平面図、図6は図4のVI-VI線断面図、図7は妻パネ
ルを垂直に支持する2台の支持台を示す平面図、図8は
図7の正断面図、図9は図7で示された中間部コンベア
を示す側断面図、図10は図7で示された位置決め手段を
示す側断面図、図11は図7で示されたアームの部分の拡
大平面図、図12は図11の正断面図である。 1……天井パネル、2……床パネル、3……妻パネル、
22,26,28,34……天井レール、23,27,29,30……走行体、
24……床パネル搬送コンベア、25……妻パネル搬送コン
ベア、35〜38,41……往レール、39,40……復レール、42
〜46……ホイスト、47……軌条、48,49……支持台、50
……前部コンベア、51……中間部コンベア、52……後部
コンベア、73,76……延長部材、106……天井パネル載置
部材、107,112……床パネル載置部材、117,118……位置
決め部材、A……住宅ユニット組立位置、B……妻パネ
ル搬送コンベア配置位置、C,E,H……高位、F……中
位、D,G,I……低位。
FIG. 1 is a block diagram showing a production process of a house unit according to one embodiment of the present invention, FIG. 2 is a perspective view showing a ceiling panel, a floor panel, and a wife panel constituting the house unit, and FIG. 3 is a perspective view of the house unit. 4, FIG. 4 is a plan view mainly showing a ceiling rail around the housing unit assembling position in the total assembly line of FIG. 1, FIG. 5 is a plan view mainly showing a conveyor around the assembling position, and FIG. 4 is a cross-sectional view taken along the line VI-VI, FIG. 7 is a plan view showing two support bases for vertically supporting the wife panel, FIG. 8 is a front cross-sectional view of FIG. 7, and FIG. 9 is an intermediate portion shown in FIG. 10 is a side sectional view showing the conveyor, FIG. 10 is a side sectional view showing the positioning means shown in FIG. 7, FIG. 11 is an enlarged plan view of the arm part shown in FIG. 7, and FIG. 12 is a front sectional view of FIG. It is. 1 ... Ceiling panel, 2 ... Floor panel, 3 ... Wife panel,
22,26,28,34 …… Ceiling rail, 23,27,29,30 …… Traveling body,
24 ... Conveyor for floor panel, 25 ... Conveyor for wife panel, 35-38,41 ... Outgoing rail, 39,40 ... Return rail, 42
~ 46 …… Hoist, 47… Rail, 48,49… Support, 50
... front conveyor, 51 ... intermediate conveyor, 52 ... rear conveyor, 73, 76 ... extension member, 106 ... ceiling panel mounting member, 107, 112 ... floor panel mounting member, 117, 118 ... positioning member A: Housing unit assembling position, B: Wife panel conveyor position, C, E, H: High, F: Medium, D, G, I: Low.

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】床パネルと天井パネルと2個の妻パネルと
で箱状に組み立てられかつ前記2個の妻パネル間の寸法
が異なる規格寸法となる複数の住宅ユニットを生産する
ために用いられ、前記妻パネルを搬送してくるコンベア
の配置位置と、前記床パネルおよび天井パネルの両側に
2個の前記妻パネルを接合して前記住宅ユニットを組み
立てる住宅ユニット組立位置との間に配置される住宅ユ
ニットの生産工程における妻パネル搬送ホイストライン
であって、 前記コンベアの配置位置と前記住宅ユニット組立位置と
の間に天井レールを架設し、この天井レールに沿って前
記妻パネルを搬送するホイストを移動自在に設け、 前記天井レールを、前記2個の妻パネルの一方を前記床
パネルおよび天井パネルの一端側に搬送するための基準
レールと、前記2個の妻パネルの他方を前記床パネルお
よび天井パネルの他端側に搬送するために前記妻パネル
間の規格寸法に対応して設置された複数の選択レールと
で形成し、 前記各選択レールの前記住宅ユニット組立位置側をそれ
ぞれ前記基準レールの前記住宅ユニット組立位置側から
前記妻パネル間の規格寸法に対応して離れた位置に配置
し、 前記各選択レールの前記コンベアの配置位置側を前記基
準レールの前記コンベアの配置位置側に近接した位置に
配置し、 更に、前記基準レールおよび各選択レールに沿って、各
々のうち少なくとも何れかのレールの前記住宅ユニット
組立位置側で前記ホイストを受取ってこのレールの前記
コンベアの配置位置側に戻す戻りレールを設けたことを
特徴とする住宅ユニットの生産工程における妻パネル搬
送ホイストライン。
1. A plurality of housing units which are assembled in a box shape from a floor panel, a ceiling panel and two gable panels and have standard dimensions in which the dimensions between the two gable panels are different. And is arranged between a position where a conveyor that conveys the gable panel is arranged and a housing unit assembly position where the two gable panels are joined to both sides of the floor panel and the ceiling panel to assemble the housing unit. A gable panel transfer hoist line in a production process of a housing unit, wherein a ceiling rail is installed between an arrangement position of the conveyor and an assembly position of the housing unit, and a hoist that conveys the gable panel along the ceiling rail. A reference rail for movably providing the ceiling rail for transporting one of the two end panels to one end side of the floor panel and the ceiling panel. The other of the two end panels is formed by a plurality of selection rails installed corresponding to the standard dimensions between the end panels for transporting the other end side of the floor panel and the ceiling panel, and each selection The housing unit assembly position side of the rail is arranged at a position distant from the housing unit assembly position side of the reference rail corresponding to the standard dimension between the end panels, and the conveyor arrangement position side of each of the selection rails. Is arranged at a position close to the arrangement position side of the conveyor of the reference rail, and further, along the reference rail and each selection rail, the hoist at the housing unit assembly position side of at least one of the rails. And a return panel for receiving and returning the rail to the side where the conveyor is arranged. Hoist line.
【請求項2】特許請求の範囲第1項に記載した住宅ユニ
ットの生産工程における妻パネル搬送ホイストラインに
おいて、前記コンベアの配置位置には、前記各選択レー
ルと基準レールと戻りレールとの各々の前記コンベアの
配置位置側に連続する位置へ移動可能な共通レールが配
置され、この共通レールは、前記戻りレールからホイス
トを受取って前記妻パネルを搬送してくるコンベアから
前記妻パネルを吊上げ、このホイストを前記各選択レー
ルおよび基準レールの何れかに送出すように構成されて
いることを特徴とする住宅ユニットの生産工程における
妻パネル搬送ホイストライン。
2. In a gable panel transfer hoist line in the production process of a housing unit according to claim 1, the selection rail, the reference rail, and the return rail are arranged at the positions where the conveyors are arranged. A common rail that is movable to a continuous position is disposed on the arrangement position side of the conveyor, and the common rail lifts the wife panel from a conveyor that receives the hoist from the return rail and conveys the wife panel, A gable panel transfer hoist line in a production process of a residential unit, wherein the hoist is configured to be delivered to any of the selection rails and the reference rail.
JP2335175A 1990-11-29 1990-11-29 Wife panel transfer hoist line in the production process of housing units Expired - Lifetime JP2552761B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2335175A JP2552761B2 (en) 1990-11-29 1990-11-29 Wife panel transfer hoist line in the production process of housing units

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2335175A JP2552761B2 (en) 1990-11-29 1990-11-29 Wife panel transfer hoist line in the production process of housing units

Publications (2)

Publication Number Publication Date
JPH04201032A JPH04201032A (en) 1992-07-22
JP2552761B2 true JP2552761B2 (en) 1996-11-13

Family

ID=18285601

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2335175A Expired - Lifetime JP2552761B2 (en) 1990-11-29 1990-11-29 Wife panel transfer hoist line in the production process of housing units

Country Status (1)

Country Link
JP (1) JP2552761B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5766830A (en) * 1980-10-02 1982-04-23 Natl House Ind Co Ltd Panel framing equipment

Also Published As

Publication number Publication date
JPH04201032A (en) 1992-07-22

Similar Documents

Publication Publication Date Title
US4856698A (en) Installation for automatic assembly of components and, in particular, components of motor vehicle bodies
CN112982786B (en) Truss floor plate production line and production method
KR20180121971A (en) Device for robot assisted manufacture of support structures for passenger transport systems
CN207386783U (en) The production equipment of steel plate wall member
CN113909918B (en) Production line for steel bar truss floor bearing plate
CN107498163A (en) A kind of production technology and production equipment of steel plate wall member
US4719328A (en) Touch-up welding apparatus for motorcar body
JP2552761B2 (en) Wife panel transfer hoist line in the production process of housing units
JP2512233B2 (en) Wife panel transfer hoist line in the production process of housing units
JP2618532B2 (en) Transport equipment in the production process of housing units
JP2552760B2 (en) House unit wife panel support equipment
CN108213793B (en) Automobile rear side wall assembly welding production line and rear side wall assembly welding method
US5297483A (en) Work conveyor
JP2011212696A (en) Welding line
JPH0815696B2 (en) Transport equipment in the production process of housing units
JPH04201029A (en) Manufacture of housing unit
JPH04201028A (en) Manufacture of housing unit
KR20130091162A (en) Side panel align device of system for assembling body
CN218109790U (en) H-shaped steel turnover welding device
CN220921243U (en) Intelligent end frame welding production line
JP2608344B2 (en) Cart for conveying and processing long materials
EP1110680A1 (en) Portal wagon robot-carrier structure
JP2534800B2 (en) Housing unit production line
JP2577279B2 (en) Work supply device
JPH0723485Y2 (en) Housing frame assembly device