JP2549261Y2 - Switch breaker lifting tool for construction - Google Patents

Switch breaker lifting tool for construction

Info

Publication number
JP2549261Y2
JP2549261Y2 JP447692U JP447692U JP2549261Y2 JP 2549261 Y2 JP2549261 Y2 JP 2549261Y2 JP 447692 U JP447692 U JP 447692U JP 447692 U JP447692 U JP 447692U JP 2549261 Y2 JP2549261 Y2 JP 2549261Y2
Authority
JP
Japan
Prior art keywords
cable
mounting
construction
switch
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP447692U
Other languages
Japanese (ja)
Other versions
JPH0560118U (en
Inventor
敏夫 斎藤
輝昭 吉田
善孝 兼平
幸雄 清水
清 上野
裕 古舘
幸治 中村
均 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujii Denko Co Ltd
Original Assignee
Fujii Denko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujii Denko Co Ltd filed Critical Fujii Denko Co Ltd
Priority to JP447692U priority Critical patent/JP2549261Y2/en
Publication of JPH0560118U publication Critical patent/JPH0560118U/en
Application granted granted Critical
Publication of JP2549261Y2 publication Critical patent/JP2549261Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本案は主に、高圧配電線の建設、
保修工事を停電作業で行うにあたり、停電範囲の縮小、
工事時間短縮を図るため、あらかじめ工事径間電柱に工
事用開閉器を取付けるための吊り上げ工具である。
[Industrial applications] This invention is mainly for the construction of high-voltage distribution lines,
When performing maintenance work during power outage work, reduction of the power outage range,
It is a lifting tool for installing a switchgear for construction in advance on construction span poles to shorten construction time.

【0002】[0002]

【従来の技術及び考案が解決するための課題】上記した
工事の際には、図7に示す様に、工事用開閉器を直接電
柱に配置していたために、開閉器,高圧引下ケーブル,
ケーブル引留金具等を単体で吊り上げ、取付作業のため
作業者が何度も電柱に昇降して行っていた。又取付中は
活線でもあり、感電の恐れと、墜落の危険性があった。
2. Description of the Related Art At the time of the above-mentioned construction, as shown in FIG. 7, a construction switch was directly arranged on a utility pole, so that the switch, a high-voltage pull-down cable,
The cable retaining fittings were lifted by itself, and the worker had to go up and down the telephone pole many times for installation work. Also, it was a live line during installation, and there was a risk of electric shock and a risk of crash.

【0003】[0003]

【課題を解決するための手段】上記したよう、工事用開
閉器の取付工事には多くの危険が存在しているので、ま
ず電柱への昇降回数をへらすために、地上で開閉器,高
圧引下ケーブル,ケーブル引留金具を一つの工具にまと
めて取付け、ユニット化して工事用作業車で一気に吊り
上げ、電柱にセットすることにより課題の解決を図るも
のであり、又ユニット化することで作業工程を省き、作
業時間の短縮をも計るものである。
As described above, since there are many dangers in the installation of a construction switch, there are many dangers. Attach the lower cable and cable anchorage to a single tool, unitize them, lift them at once with a construction work vehicle, and set them on a utility pole to solve the problem. It also saves time and shortens the working time.

【0004】[0004]

【実施例】本案の一実施例について詳記すると、下部に
は電柱締着部2 ,アーム3 ,開閉器取付部4 を設け、下
部より支柱6 を立ち上げ、該支柱6 上にケーブル引留金
具8 とケーブル巻取部9 を設けたものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described in detail. A telephone pole fastening portion 2, an arm 3, and a switch mounting portion 4 are provided at a lower portion, and a column 6 is set up from the lower portion. 8 and a cable winding section 9.

【0005】電柱締着部2 は、コ字状に折曲した取付フ
レーム1 の上下に取付板11を溶着し、該取付板11の一端
にチェイン,締付ハンドルを取付けた締付ボルトを回動
自在に軸止し、他端にチェイン受具を同じく回動自在に
軸止し、該取付フレーム1 の上部(上取付板11の下に)
より水平に角パイプ製アーム3 を突出して設け、該アー
ム3 の両側面に係止ピン嵌合穴31を等間隔に設け、先端
部に抜け止め金具32を設けた構造を有している。
[0005] The electric pole fastening portion 2 is obtained by welding a mounting plate 11 on the upper and lower sides of a mounting frame 1 bent in a U-shape, and turning a tightening bolt having a chain and a tightening handle on one end of the mounting plate 11. The shaft is movably fixed, and the other end of the chain receiving member is also rotatably fixed to the other end, and the upper part of the mounting frame 1 (below the upper mounting plate 11).
An arm 3 made of a square pipe is provided so as to protrude more horizontally, locking pin fitting holes 31 are provided at equal intervals on both side surfaces of the arm 3, and a stopper metal fitting 32 is provided at a distal end portion.

【0006】開閉器取付部4 は、前記したアーム3 に移
動自在に挿通して使用するもので、外筒41の両側面に係
止ピン42を4個取付け、中央部に支柱6 の取付金具43を
設けた構造を有している。
The switch mounting portion 4 is used by being movably inserted into the arm 3 described above. Four locking pins 42 are mounted on both side surfaces of the outer cylinder 41, and a mounting bracket for the column 6 is provided at the center. 43 is provided.

【0007】高さ調節部5 は、丸棒をコ字状に折曲して
係止ピン51とし、該係止ピン51に挿通し所定位置で溶着
するL字状のプレート53を設け、該プレート53の他片に
抜け止めピン52を同じく溶着した構造を有している。
The height adjusting section 5 is formed by bending a round bar into a U-shape to form a locking pin 51, and providing an L-shaped plate 53 which is inserted through the locking pin 51 and welded at a predetermined position. The retaining pin 52 is similarly welded to the other piece of the plate 53.

【0008】支柱6 は、内支柱7 を設け、該支柱6 には
調節部5 の係止ピン51の貫通穴61を等間隔に設けると共
に、係止ピン51の抜け止めピン52の嵌合穴62を貫通穴61
面でなく、側面に等間隔に設ける。又、内支柱7 にも同
じく貫通穴71を等間隔に設け、支柱6 の貫通穴61と共
に、係止ピン51を貫通して支柱の高さを調節する構造を
有している。尚支柱6 ,内支柱7 はFRP製の角パイプ
を使用している。
The column 6 has an inner column 7. The column 6 is provided with through holes 61 of locking pins 51 of the adjusting section 5 at regular intervals, and a fitting hole of a retaining pin 52 of the locking pin 51. 62 through hole 61
Provide at equal intervals on the side surface, not on the surface. Also, through holes 71 are provided in the inner support 7 at equal intervals, and together with the through holes 61 of the support 6, the structure is such that the height of the support is adjusted by passing through the locking pin 51. The support 6 and the inner support 7 use FRP square pipes.

【0009】ケーブル引留金具8 は、ケーブル受け81を
取付ける取付板82と、作業車の吊り上げフックを掛ける
吊り環83と、内支柱7 の上部に嵌脱自在に取付けるキャ
ップ84とから成る。ケーブル受け81は筒状の一部を欠切
し、筒状中央に取付鍔を設けたものであり、左右の取付
板82に計6個取付ける。取付板82は鋼板をV字状に折曲
し、一片に前記ケーブル受け81を設け、他片はキャップ
84に溶着し、左右一対設ける。吊り環83は、前記した取
付板82の間に設け、該取付板82とキャップ84に当る面を
溶着結合した構造を有している。キャップ84は、内支柱
7 が入る大きさの角パイプを用い、該角パイプの前後に
係止ピン85を溶着して設けた構造を有している。
The cable retaining member 8 comprises a mounting plate 82 for mounting a cable receiver 81, a suspension ring 83 for hanging a lifting hook of a working vehicle, and a cap 84 which is removably mounted on the upper part of the inner support column 7. The cable receiver 81 is formed by cutting off a part of the cylindrical shape and providing a mounting flange at the center of the cylindrical shape. A total of six cable receivers 81 are mounted on the left and right mounting plates 82. The attachment plate 82 is formed by bending a steel plate into a V-shape, and the cable receiver 81 is provided on one piece, and the cap is provided on the other piece.
Welded to 84 and provided a pair of left and right The suspension ring 83 is provided between the above-mentioned mounting plates 82, and has a structure in which the surfaces of the mounting plate 82 and the cap 84 are welded and connected. Cap 84 is an inner support
It has a structure in which a square pipe large enough to accommodate 7 is used, and locking pins 85 are welded to the front and rear of the square pipe.

【0010】ケーブル巻取部9 は、前記ケーブル引留金
具8 の下部位置に取付台91を介して嵌脱自在に設けるも
ので、内支柱7 の左右に一対設ける。取付台91には、上
下2個のダルマ穴92を設け、該台部をボルトで内支柱7
に固定するものである。ケーブル巻取部9 は、中央に、
アルミ板をコ字状に折曲した逆L字状の取付金具93の基
端部に段付ボルト94を所定間隔をあけて配すると共に、
軸4本の貫通穴95を設ける。該貫通穴95に軸96を貫通す
るのであるが、軸96にスペーサーカラー97を嵌入し、図
1において左右均等の長さにし、両サイドに側板98を設
けた構造を有している。
The cable take-up portion 9 is provided at the lower position of the cable retaining fitting 8 so as to be detachable via a mounting base 91, and is provided in a pair on the left and right sides of the inner support column 7. The mounting base 91 is provided with two upper and lower daruma holes 92, and the base is bolted to the inner support 7.
It is fixed to. The cable winding section 9 is
Stepped bolts 94 are arranged at predetermined intervals at the base end of an inverted L-shaped mounting bracket 93 obtained by bending an aluminum plate into a U-shape,
Four shaft holes 95 are provided. The shaft 96 is penetrated through the through hole 95. A spacer collar 97 is fitted into the shaft 96, the length is equal in the left and right directions in FIG. 1, and side plates 98 are provided on both sides.

【0011】[0011]

【使用方法】本案を使用するには、まず開閉器取付部4
を開閉器10のハンガー部に持って行きナットにより締付
け取付ける。次に高圧引下ケーブルの一端を開閉器に取
付け、中央部の余長分をケーブル巻取部9 に2回巻きを
限度として巻付け、他端はケーブル引留金具8 のケーブ
ル受け81に嵌合する。そしてアーム3 を開閉器取付部4
の外筒41に挿入し、係止ピン42を嵌合穴31に挿入し固定
する。これで地上での取付は完了するものである。
[How to use] In order to use the present invention, first, the switch mounting part 4
To the hanger of the switch 10 and tighten it with the nut. Next, one end of the high-voltage pull-down cable is attached to the switch, the excess length of the central part is wound around the cable take-up part 9 up to two turns, and the other end is fitted to the cable receiver 81 of the cable retaining fitting 8. I do. Then, attach the arm 3 to the switch mounting part 4
And the locking pin 42 is inserted into the fitting hole 31 and fixed. This completes the installation on the ground.

【0012】次に作業車のウインチより吊り下げたフッ
クを吊環83に掛けて、吊り上げ、電柱締着部2 のチェイ
ン等により電柱に強固に取付けする。これで電柱上での
取付は完了するものである。
Next, a hook suspended from the winch of the working vehicle is hung on a suspension ring 83, lifted, and firmly attached to a utility pole by a chain or the like of a utility pole fastening portion 2. This completes the installation on the utility pole.

【0013】[0013]

【考案の効果】本案の工具を使用することにより、従来
工事の様に何度も電柱昇降しなくてもよく、又電柱上に
何度も機材や工具を吊り上げなくてもよいので作業者の
墜落の危険性が減少すると共に、疲労軽減にもなり、又
活線の複雑な装柱場所での作業が削減されるので感電事
故が減少し、安全作業が行えると共に作業工程の削減に
よって、作業時間の短縮を図れるものである。
[Effect of the Invention] By using the tool of the present invention, it is not necessary to go up and down the telephone pole many times as in the conventional construction, and it is not necessary to lift the equipment and tools on the telephone pole many times. This reduces the risk of crashes, reduces fatigue, and reduces work at complicated pole locations, reducing the risk of electric shock, enabling safer work and reducing work processes. The time can be reduced.

【0014】又従来工事の場合は、電柱上に1人,ウイ
ンチ操作に1人,機材の吊り上げ時の支持ロープ保持に
1人、これは軽量時で、開閉器が重量物の場合は2人、
そして監督者1人と4〜5人で作業を行っていたが、本
案の工具を使用すると、2人が地上で取付作業をしてお
き、次に1人が作業車のウインチを操作し、他の1人が
フックを吊環に掛けた後、電柱へ昇り、吊り上がって来
た工具の電柱締着部2のチェイン等で取付ければ2人で
作業が出来る。又監督者を入れても3人でよく、作業者
の削減が可能となる等の実用的効果がある。
[0014] In the case of conventional construction, one person on the utility pole, one person for the winch operation, and one person for holding the supporting rope when lifting the equipment. This is a lightweight case, and two people when the switch is heavy. ,
And one supervisor and four or five people were working, but using the tool of the present invention, two people worked on the ground and then one person operated the winch of the work vehicle, If another person puts the hook on the suspension ring, then climbs up to the utility pole and attaches it with the chain of the utility pole fastening part 2 of the tool that has been lifted, two people can work. In addition, the number of supervisors may be three, and there is a practical effect that the number of workers can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本案の左側面図。FIG. 1 is a left side view of the present invention.

【図2】本案の開閉器取付部の一部分正面図。FIG. 2 is a partial front view of the switch mounting portion of the present invention.

【図3】本案の支柱高さ調節部の斜視図。FIG. 3 is a perspective view of a column height adjusting unit according to the present invention.

【図4】本案のケーブル引留金具の一部分右側面図。FIG. 4 is a partial right side view of the cable stay fitting of the present invention.

【図5】本案のケーブル巻取部の斜視図。FIG. 5 is a perspective view of a cable winding section of the present invention.

【図6】本案の取付状態正面図。FIG. 6 is a front view of the mounting state of the present invention.

【図7】従来工事の一例を示す正面装柱図。FIG. 7 is a front pole diagram showing an example of conventional construction.

【符号の説明】[Explanation of symbols]

1 取付フレーム 2 電柱締着部 3 アーム 4 開閉器取付部 5 高さ調節部 6 支 柱 7 内支柱 8 ケーブル引留金具 9 ケーブル巻取部 10 開閉器 11 取付板 31 嵌合穴 32 抜け止め金具 41 外 筒 42 係止ピン 43 取付金具 51 係止ピン 52 抜け止めピン 53 プレート 61 貫通穴 62 嵌合穴 71 貫通穴 72 嵌合穴 81 ケーブル受け 82 取付板 83 吊 環 84 キャップ 85 係止ピン 91 取付台 92 ダルマ穴 93 取付金具 94 段付ボルト 95 貫通穴 96 軸 97 スペーサーカラー 98 側 板 1 Mounting frame 2 Power pole tightening part 3 Arm 4 Switch mounting part 5 Height adjustment part 6 Post 7 Inner post 8 Cable retaining bracket 9 Cable take-up unit 10 Switch 11 Mounting plate 31 Fitting hole 32 Retaining stopper 41 Outer cylinder 42 Locking pin 43 Mounting bracket 51 Locking pin 52 Retaining pin 53 Plate 61 Through hole 62 Fitting hole 71 Through hole 72 Fitting hole 81 Cable receiver 82 Mounting plate 83 Suspension ring 84 Cap 85 Locking pin 91 Mounting Stand 92 Dharma hole 93 Mounting bracket 94 Step bolt 95 Through hole 96 Shaft 97 Spacer collar 98 Side plate

───────────────────────────────────────────────────── フロントページの続き (72)考案者 清水 幸雄 仙台市青葉区一番町二丁目6番21号 株 式会社ユアテック内 (72)考案者 上野 清 仙台市青葉区一番町二丁目6番21号 株 式会社ユアテック内 (72)考案者 古舘 裕 仙台市青葉区一番町二丁目6番21号株式 会社ユアテック内 (72)考案者 中村 幸治 仙台市青葉区一番町二丁目6番21号株式 会社ユアテック内 (72)考案者 井上 均 兵庫県加東郡滝野町下滝野4丁目62番地 藤井電工株式会社内 審査官 宮島 潤 (56)参考文献 実開 昭57−130513(JP,U) ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Yukio Shimizu 2-6-1 Ichibancho, Aoba-ku, Sendai City Inside Yurtec Co., Ltd. (72) Inventor Kiyoshi Ueno 2-6-1, Ichibancho, Aoba-ku, Sendai City No. 21 Inside Yutec Co., Ltd. (72) Inventor Hiroshi Furudate 2-6-1 Ichibancho, Aoba-ku, Sendai-shi Intranet Co., Ltd. (72) Koji Nakamura 2-6-1 Ichibancho, Aoba-ku, Sendai-shi (72) Inventor Hitoshi Inoue 4-62 Shimotakino, Takino-cho, Kato-gun, Hyogo Pref.

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】 取付フレーム1 の上下に電柱締着部2 を
設け、該取付フレーム1 より水平にアーム3 を突設し、
該アーム3 に、スライド可能な開閉器取付部4 を設け、
該開閉器取付部4 中央上に、高さ調節部5 を設けた支柱
6 を設け、該支柱6 の内支柱7 の先端に、ケーブル受け
81と吊環83を備えたケーブル引留金具8 を嵌脱自在に設
け、その下部にケーブル巻取部9 を嵌脱自在に設けたこ
とを特徴とする工事用開閉器吊り上げ工具。
An electric pole fastening portion is provided above and below a mounting frame, and an arm is protruded horizontally from the mounting frame.
The arm 3 is provided with a slidable switch mounting portion 4,
A support provided with a height adjusting part 5 on the center of the switch mounting part 4
6 and a cable support is provided at the tip of the inner support 7 of the support 6.
A switch lifting tool for construction, comprising: a cable retaining member 8 provided with a cable 81 and a suspension ring 83, which is detachably provided, and a cable winding portion 9 is detachably provided at a lower portion thereof.
JP447692U 1992-01-10 1992-01-10 Switch breaker lifting tool for construction Expired - Fee Related JP2549261Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP447692U JP2549261Y2 (en) 1992-01-10 1992-01-10 Switch breaker lifting tool for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP447692U JP2549261Y2 (en) 1992-01-10 1992-01-10 Switch breaker lifting tool for construction

Publications (2)

Publication Number Publication Date
JPH0560118U JPH0560118U (en) 1993-08-06
JP2549261Y2 true JP2549261Y2 (en) 1997-09-30

Family

ID=11585172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP447692U Expired - Fee Related JP2549261Y2 (en) 1992-01-10 1992-01-10 Switch breaker lifting tool for construction

Country Status (1)

Country Link
JP (1) JP2549261Y2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2759752B2 (en) * 1994-04-14 1998-05-28 中部電力株式会社 Installation equipment for distribution equipment
JP6344778B2 (en) * 2016-11-01 2018-06-20 株式会社四電工 Material attachment unit for overhead wire bypass construction and carriage for transporting material attachment unit for overhead wire bypass construction
CN118040540A (en) * 2024-04-12 2024-05-14 国网山东省电力公司新泰市供电公司 Power supply connecting device is maintained in transformer

Also Published As

Publication number Publication date
JPH0560118U (en) 1993-08-06

Similar Documents

Publication Publication Date Title
JP2549261Y2 (en) Switch breaker lifting tool for construction
CN111467701A (en) Portable high-altitude anti-falling anchorage suitable for steel structure part
CN214899827U (en) High-altitude outdoor cable terminal operation platform
CN213027206U (en) Electric overhead ground wire lifting device
JP2897002B2 (en) Mast device for utility pole work
CN114221260A (en) Insulator maintenance frame of electric power pylon
JPH0722452Y2 (en) Stand type column tool
CN217974077U (en) A assembled mounting platform for bridge rigidity jib
CN216841400U (en) Wall panel installation is with supplementary cat ladder
JP2767013B2 (en) Hanging scaffold for deep foundation
CN213231328U (en) Portable portable high altitude construction accessory hoisting machine constructs
CN212374717U (en) Electric power optical cable hoisting device
CN220998884U (en) Assembled superimposed sheet adjustable angle hoist device
CN211172997U (en) Scaffold based on hang steel sheet
JPH075183U (en) Pole
JP2000134741A (en) Cross arm hanging metal sheave attachment tool
JPH0440353Y2 (en)
JP2525987Y2 (en) Construction support bracket
CN117339136A (en) Auxiliary device for safety belt of high-altitude operation
JP2782043B2 (en) Auxiliary equipment for overhead cable installation
JP3031142U (en) Attaching / detaching device for main rope
JPH0633102Y2 (en) Steel tower work scaffolding
JPS6114523Y2 (en)
JP2767012B2 (en) Scaffolding
JPH0756564Y2 (en) Cable pulling tool

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees