JP2543065Y2 - Pipe support - Google Patents

Pipe support

Info

Publication number
JP2543065Y2
JP2543065Y2 JP1991028024U JP2802491U JP2543065Y2 JP 2543065 Y2 JP2543065 Y2 JP 2543065Y2 JP 1991028024 U JP1991028024 U JP 1991028024U JP 2802491 U JP2802491 U JP 2802491U JP 2543065 Y2 JP2543065 Y2 JP 2543065Y2
Authority
JP
Japan
Prior art keywords
pipe
tube
support
cross
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1991028024U
Other languages
Japanese (ja)
Other versions
JPH04122879U (en
Inventor
圀男 形川
雅文 西村
俊夫 井田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP1991028024U priority Critical patent/JP2543065Y2/en
Publication of JPH04122879U publication Critical patent/JPH04122879U/en
Application granted granted Critical
Publication of JP2543065Y2 publication Critical patent/JP2543065Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は下水道や敷地内排水路等
の地中埋設管の施工において、管埋め戻し前の段階での
管の支持に使用する管支持台に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe support used for supporting pipes at a stage before backfilling pipes in the construction of underground pipes such as sewers and drains in premises.

【0002】[0002]

【従来の技術】地中埋設管においては、断面に方向性を
有する管を所定の断面方向で配設しなければならないこ
とがある。例えば、下水管においては、断面卵形の管
(卵形管)をその断面長軸方向を垂直方向に向けて配管
することにより、水深を深くし、それだけ水流を速くし
て汚物,固形物の堆積を軽減することが知られており、
この場合、卵形管をその断面長軸方向を垂直にして地中
に埋設することが必要である。 そこで、本出願人にお
いては、図4の(イ)並びに(ロ)に示すように、断面
逆U字形1’の両側下端に水平部21’,22’を設け
た管支持台B’を卵形管A’に弾性的に嵌合し、この管
を配設中の前の管に接続すると共に管支持台B’の管布
設基礎面E’への載置により卵形管A’の断面長軸方向
を垂直方向に向けることを既に提案した(実用新案出願
公告昭57−20934号)。
2. Description of the Related Art In underground pipes, it is sometimes necessary to arrange pipes having a directional cross section in a predetermined cross section direction. For example, in a sewer pipe, a pipe having an oval cross section (an oval pipe) is piped with the longitudinal axis of the cross section directed vertically, so that the water depth is deepened, and the water flow is accelerated accordingly to remove dirt and solids. Known to reduce sedimentation,
In this case, it is necessary to bury the oval tube in the ground with the longitudinal direction of its cross section vertical. Therefore, as shown in FIGS. 4A and 4B, the present applicant attaches a tube support base B ′ having horizontal portions 21 ′ and 22 ′ at lower ends on both sides of an inverted U-shaped cross section 1 ′. The cross-section of the oval tube A 'is resiliently fitted to the tube A', connected to the previous tube being installed, and placed on the tube laying base surface E 'of the tube support B'. It has already been proposed to orient the long axis direction in the vertical direction (U.S. Pat. No. 5,783,849).

【0003】[0003]

【考案が解決しようとする課題】しかしながら、この管
支持台においては、図4の(ロ)に示すように受口外周
の最下端箇所m並びに水平部下面箇所n,nの3箇所と
管布設基礎面E’との接触によって管A’の断面長軸方
向を垂直方向に向けるものであり、管布設基礎面の厳格
な平面出しを行わなければ、高精度の管断面方向出しを
行い難い。又、支点n,nが管A’の重心Gよりも下側
にあり、支持状態も不安定である。
However, in this pipe support, as shown in FIG. 4 (b), three pipes, ie, the lowermost point m on the outer periphery of the receiving port and the lower part n, n of the horizontal part, and the pipe laying. The longitudinal direction of the cross-section of the pipe A 'is directed in the vertical direction by contact with the base surface E'. Unless a strict flat-out of the pipe-laying base surface is performed, it is difficult to perform a high-precision pipe cross-sectional direction. Further, the fulcrums n, n are below the center of gravity G of the tube A ', and the supporting state is unstable.

【0004】上記のように、卵形管をその断面長軸方向
を垂直方向に向けて配設していく間、既に配設した管が
その後に配設する管の負荷で管断面が傾くことのないよ
うに、上記管支持台とその近傍の管部分を盛土中に埋設
しておく必要がある。又、管の埋め戻し前に管断面方向
にずれが生じていることが判明すれば、既に盛土した管
支持台において、管断面の傾き方向の修正が必要とな
る。しかしながら、上記した管支持台においては、管布
設基礎面が現れるまで盛土を除去しなければならず、そ
の修正作業がやっかいである。
[0004] As described above, while the oval tube is disposed with the longitudinal axis of the cross section oriented in the vertical direction, the already disposed tube is inclined by the load of the tube disposed thereafter. It is necessary to bury the above-mentioned pipe support and the pipe part in the vicinity thereof in the embankment so as not to cause the problem. In addition, if it is found that a deviation has occurred in the pipe cross-section direction before backfilling the pipe, it is necessary to correct the inclination direction of the pipe cross-section in the already-filled pipe support base. However, in the above-described pipe support, the embankment must be removed until the pipe laying foundation surface appears, and the repair work is troublesome.

【0005】また、自然流下方式の下水道、排水路にお
いては、所定の勾配で管を配設する必要があるが、上記
管支持台を盛土で埋め込む以上、この勾配修正の場合
も、盛土を管布設記面が現れるまで除去する必要があ
り、この修正作業もやっかいである。
[0005] In the sewer system and drainage channel of the natural flow system, it is necessary to arrange pipes at a predetermined slope. This must be removed until the laying surface appears, which is a troublesome task.

【0006】本考案の目的は管断面の方向出しを正確に
行い得、その方向出しを行った管の支持状態が安定であ
り、しかも、盛土で埋設するにもかかわらず、管断面方
向の修正、勾配修正等を容易に行い得る管支持台を提供
することにある。
An object of the present invention is to accurately determine the direction of the cross section of a pipe, to stabilize the support state of the pipe in which the direction has been set, and to correct the cross section of the pipe despite embedding it with embankment. It is an object of the present invention to provide a pipe support which can easily perform a gradient correction and the like.

【0007】[0007]

【課題を解決するための手段】本考案の管支持台は管が
嵌合される略U字形部の両側上端に、水平方向に延在す
る安定板が設けられていることを特徴とする構成であ
る。
The tube support according to the present invention is characterized in that a horizontally extending stabilizer is provided at the upper end on both sides of a substantially U-shaped portion into which the tube is fitted. It is.

【0008】[0008]

【作用】安定板を水平にして全体を盛土中に埋設するこ
とにより、卵形管の断面長軸方向を垂直方向に向けるこ
とができ、管布設基礎面の平面性に関係なく、管断面の
方向出しを正確に行い得る。また、管の支持が、実質
上、上端両側の安定板で行われ、その支持箇所が管の重
心点よりも上方にあるから、支持状態が安定である。更
に、安定板までの盛土を除去し、安定板の水平出しを行
うことによって管断面の方向修正をなし得、修正作業が
簡単である。
[Function] By laying the stabilizer horizontally and embedding the whole in the embankment, the longitudinal direction of the cross section of the oval tube can be oriented vertically, regardless of the flatness of the pipe laying base surface. The direction can be accurately set. In addition, the support of the tube is substantially performed by the stabilizers on both sides of the upper end, and the supporting position is above the center of gravity of the tube, so that the support state is stable. Furthermore, by removing the embankment up to the stabilizing plate and leveling out the stabilizing plate, the direction of the pipe section can be corrected, and the correcting operation is simple.

【0009】[0009]

【実施例】以下、本考案の実施例を図面により説明す
る。図1の(イ)は本考案の実施例を卵形管に取着した
状態を示す上面図、図1の(ロ)は図1の(イ)におけ
るロ−ロ断面図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below with reference to the drawings. FIG. 1A is a top view showing a state in which the embodiment of the present invention is attached to an oval tube, and FIG. 1B is a cross-sectional view taken along a line in FIG.

【0010】図1において、Aは合成樹脂製の卵形管で
ある。Bは本考案の管支持管であり、管Aに嵌合される
略U時形部1と、その両側上端から外側に水平に延在す
る安定板21,22とを備えている。31,32は各安
定板21,22の先端部に形成した下方向傾斜部であ
る。
In FIG. 1, A is an oval tube made of synthetic resin. B is a tube supporting tube of the present invention, which has a substantially U-shaped portion 1 fitted to the tube A, and stabilizers 21 and 22 extending horizontally outward from upper ends on both sides thereof. Numerals 31 and 32 denote downward inclined portions formed at the tips of the stabilizers 21 and 22, respectively.

【0011】上記において、略U時形部1の深さは、そ
の上端が卵形管Aの最大幅箇所に位置するように設定す
ることが好ましい。上記安定板21,22の平面積は、
取扱に支障をきたさない範囲内で大きくすることが望ま
しく、その幅並びに長さを上記の管最大幅の略2分の1
にすることが好ましい。
In the above description, the depth of the substantially U-shaped portion 1 is preferably set so that the upper end thereof is located at the maximum width of the oval tube A. The plane areas of the stabilizers 21 and 22 are as follows:
It is desirable to increase the size within a range that does not hinder the handling, and the width and the length are set to approximately one half of the maximum width of the pipe.
Is preferable.

【0012】上記管支持台Bは、通常、合成樹脂例え
ば、塩化ビニル樹脂から成形されるが、セラミックス、
金属等を使用することもできる。上記の管支持台Bにお
いては、管Aを所定の断面方向で埋設するために、掘削
溝埋め戻しの際まで、管を所定の断面方向に保持するた
めに使用され、図2の(イ)は管のその保持状態の上面
図を、図2の(ロ)は図2の(イ)におけるロ−ロ断面
図をそれぞれ示し、管Aが管支持台Bの略U字形部1に
結着され、管支持台Bとその近傍の管A部分が盛土C中
に埋設され、安定板21,22が盛土C中に水平に延在
している。この安定板21,22が実質上、管Aの支持
部材として作用し、支点が管Aの重心Gよりも上方に位
置するから、支持状態が頗る安定である。
The pipe support B is usually formed of a synthetic resin, for example, vinyl chloride resin.
Metals and the like can also be used. In the above-mentioned pipe support B, in order to bury the pipe A in a predetermined cross-sectional direction, it is used to hold the pipe in a predetermined cross-sectional direction until backfilling of a digging groove, and FIG. 2 shows a top view of the tube in its holding state, and FIG. 2B shows a cross-sectional view taken along the line B in FIG. 2A. The tube A is connected to the substantially U-shaped portion 1 of the tube support B. Then, the pipe support B and the pipe A in the vicinity thereof are buried in the embankment C, and the stabilizers 21 and 22 extend horizontally in the embankment C. Since the stabilizers 21 and 22 substantially function as support members for the tube A, and the fulcrum is located above the center of gravity G of the tube A, the support state is extremely stable.

【0013】上記図2の(ロ)において、管Aに管断面
を傾けようとするモ−メント外力M1,(M2)が作用す
ると、安定板21(22)と盛土Cとの間に反力P
1(P2)が発生し、各安定板の幅をb,各安定板中央と
管下端箇所との距離をLとすれば、反力モ−メントP1
bL(P2bL)が上記のモ−メント外力M1,(M2
に釣り合って管Aの固定状態が維持される。
[0013] of FIG. 2 in (b), mode and try to tilt the tube cross-section to the tube A - Placement external force M 1, the (M 2) is applied, between the stabilizer plate 21 (22) and embankments C Reaction force P
1 (P 2 ) occurs, and if the width of each stabilizer is b and the distance between the center of each stabilizer and the lower end of the pipe is L, the reaction force moment P 1
bL (P 2 bL) of the motor - Placement external force M 1, (M 2)
And the fixed state of the pipe A is maintained.

【0014】本考案の管支持台を使用して管を埋設する
には、管施工現場において、管に管支持台を取着する。
この取着には、速乾性の接着剤を使用することがことが
望ましく、また、管を掘削溝内に搬入する直前(通常1
0〜15分前)に、その取着を行うことが好ましい。
In order to bury a pipe using the pipe support of the present invention, the pipe support is attached to the pipe at a pipe construction site.
It is desirable to use a quick-drying adhesive for this attachment, and it is also necessary to use a quick-drying adhesive just before loading the pipe into the digging pit (usually 1-pitch).
(0 to 15 minutes before) the attachment is preferably performed.

【0015】次いで、管支持台取着管を掘削溝内に搬入
し、前の管の受口(又は挿口)にその搬入した管の挿口
(又は受口)を、管断面を所定の方向に向けつつ挿入
し、この挿入時に管支持台の安定板の裏側に保護砂或い
は良質土を盛り込み、該安定板の水平出しを行う。この
保護砂或いは良質土は、図2の(ィ)に示すように、掘
削溝内に予め、点在させておくことが便利である(一箇
所当たり、スコップ5〜6パイ分程度)。
Next, the pipe attached to the pipe support base is carried into the excavation groove, and the insertion port (or reception port) of the introduced pipe is inserted into the reception port (or insertion port) of the previous pipe, and the cross section of the pipe is set to a predetermined value. In this direction, protective sand or high-quality soil is put on the back side of the stabilizer of the tube support at the time of this insertion, and the stabilizer is leveled out. As shown in FIG. 2 (a), it is convenient that the protective sand or good-quality soil is previously scattered in the excavation trench (about 5 to 6 pies per scoop).

【0016】上記安定板の水平出しを行う場合、安定板
の平面積を充分に広くしておくことにより、安定板の水
平度を充分に高精度で確認でき、安定板の水平出しによ
り、卵形管の断面長軸方向を正確に垂直方向に向けるこ
とができる。
When the stabilizer is leveled, the flatness of the stabilizer can be sufficiently widened so that the level of the stabilizer can be checked with sufficiently high accuracy. The longitudinal axis of the cross section of the shaped pipe can be accurately oriented in the vertical direction.

【0017】上記管断面の長軸方向の垂直出しと共に管
支持台の左右方向の位置調整を行って、管受口と管挿口
との管芯合わせも行う。このようにして、管断面の長軸
方向の垂直出し並びに管芯合わせを行ったのちは、管支
持台の安定板上並びにその近傍の管側部と管上部に上記
の保護砂或いは良質土を盛り上げ、その管の固定状態を
次ぎの管の接続時の負荷に対して強化しておく。以後
は、上記の繰返しによって、管を管断面の長軸方向の垂
直出し並びに管芯合わせを行いつつ接続配設していき、
全管の配設終了後に、掘削溝の埋め戻しを行う。
The vertical position of the tube support table in the left and right direction is adjusted together with the vertical positioning of the tube cross section in the longitudinal direction, and the tube center between the tube receiving port and the tube insertion port is also adjusted. In this way, after vertical alignment of the pipe section in the long axis direction and alignment of the pipe core, the protective sand or the high quality soil described above is placed on the stabilizer of the pipe support base and on the side and upper portions of the pipe in the vicinity thereof. The tube is raised, and the fixed state of the tube is strengthened against the load when the next tube is connected. Thereafter, by repeating the above, the pipes are connected and arranged while performing vertical alignment in the longitudinal direction of the pipe cross section and pipe core alignment,
After the installation of all pipes, the trenches will be backfilled.

【0018】上記において、管への管支持台の取着は、
通常管の一本おきに行う。通常の場合、マンホ−ルの取
付用短管の受口に挿口を挿入した管の受口近傍に一番目
の管支持台を取着し、以後3本目ごとにその管の受口近
傍に管支持台を取着していく。
In the above, the attachment of the tube support to the tube is as follows:
This is usually performed every other tube. In the normal case, the first pipe support is attached near the mouth of the pipe in which the insertion hole is inserted into the mouth of the short pipe for attaching the manhole, and thereafter, every third wire, near the mouth of the pipe. Attach the pipe support.

【0019】上記において、掘削溝内での管の配設中、
管断面の方向性にずれのあることが判明し、ある管支持
台での管断面の方向を修正する必要が生じた場合、その
修正を行うべき管支持台上の盛土を、安定板の位置まで
除去し、そのずれの方向に応じて左右の両安定板の何れ
かを押し込むことにより、その修正を容易に行うことが
できる。
In the above, during the installation of the pipe in the trench,
If it is found that the direction of the pipe section is misaligned and it becomes necessary to correct the direction of the pipe section at a certain pipe support, the embankment on the pipe support to be corrected should be placed on the stabilizer plate. By removing one of the stabilizers and pressing either one of the left and right stabilizers according to the direction of the shift, the correction can be easily performed.

【0020】上記の管施工においては、管への管支持台
の取着に接着剤を使用したが、管支持台の略U字形部内
面にセパレ−タ−付き粘着シ−トを貼着しておき、管へ
の取着時、セパレ−タ−付き粘着シ−トのセパレ−タ−
を剥離し、粘着面において管に取着すること、管に管支
持台をバンドやバインド線の緊締によって取着するこ
と、或いは、図3に示すように、管支持台Bの略U字形
部1を卵形管Aの最大幅部よりもやや上方に達する口絞
りの形状とし、この略U字形部を管に弾性的に嵌着する
こと等も可能である。
In the above-mentioned pipe construction, an adhesive was used for attaching the pipe support to the pipe, but an adhesive sheet with a separator was attached to the inner surface of the substantially U-shaped portion of the pipe support. When attaching to a pipe, separate the adhesive sheet with separator
And attaching the tube support to the tube on the adhesive surface, attaching the tube support to the tube by tightening a band or a binding wire, or, as shown in FIG. 3, a substantially U-shaped portion of the tube support B. It is also possible to make 1 a shape of a mouth restrictor that extends slightly above the maximum width of the oval tube A, and to elastically fit this substantially U-shaped portion to the tube.

【0021】本考案の管支持台は、上記した卵形管以外
に、断面に方向性があってその断面を所定の方向に向け
て管を配設する場合、例えば、楕円形管をその断面の長
軸方向を垂直方向に向けて配設する場合にも使用でき
る。又、下水管の勾配を取るための管のレベル出しにも
有用であり、円形管にも使用できる。
[0021] In addition to the above-mentioned oval tube, the tube support of the present invention has a directional cross-section and a cross-section oriented in a predetermined direction. It can also be used when the long axis direction is arranged in the vertical direction. It is also useful for leveling pipes to take the slope of sewer pipes, and can be used for circular pipes.

【0022】[0022]

【考案の効果】本考案の管支持台は上述した通りの構成
であり、管断面の方向を傾けようとするモ−メント外力
が作用すると、安定板と盛土との接触面に発生する反力
に基づくモ−メント反力が作用し、両者の釣合いによっ
て管断面の方向を元の状態に保持できる。又、安定板が
実質上支持部材として機能し、支持点を管の重心よりも
上方に位置させ得るから、管の支持状態が安定であり、
しかも、管布設基礎面の平面性に左右されることなく、
この安定な支持状態を保証できる。更に、左右の安定板
の何れか一方を押さ込むことによって、管断面の方向性
を修正し得、盛土を安定板の位置まで除去することによ
り、その修正作業を容易に行い得る。
The pipe support of the present invention has the same structure as described above, and the reaction force generated on the contact surface between the stabilizer and the embankment when a moment external force acts to incline the cross section of the pipe. , A moment reaction force based on the above is applied, and the direction of the tube cross section can be maintained in the original state by the balance between the two. Further, since the stabilizer plate functions substantially as a support member, and the support point can be positioned above the center of gravity of the tube, the support state of the tube is stable,
Moreover, without being affected by the flatness of the pipe laying base surface,
This stable support state can be guaranteed. Further, by pressing one of the left and right stabilizers, the directionality of the pipe cross section can be corrected, and the correction work can be easily performed by removing the embankment to the position of the stabilizer.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の実施例を管に結着した状態を示す説明
図(イ)と(イ)のロ−ロ断面図である(ロ)。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an explanatory view showing a state in which an embodiment of the present invention is connected to a pipe, and FIGS.

【図2】本考案の実施例の使用状態を示す上面説明図
(イ)と(イ)のロ−ロ断面図である(ロ)。
FIGS. 2A and 2B are top cross-sectional views showing the state of use of the embodiment of the present invention; FIGS.

【図3】本考案の別実施例を管に結着した状態を示す説
明図である。
FIG. 3 is an explanatory view showing a state in which another embodiment of the present invention is connected to a pipe.

【図4】従来例を管に結着した状態を示す説明図(イ)
と(イ)のロ−ロ断面図である(ロ)。
FIG. 4 is an explanatory view showing a state in which the conventional example is attached to a pipe (a).
FIG. 2 is a cross-sectional view of FIG.

【符号の説明】[Explanation of symbols]

1 略U字形部 21 安定板 22 安定板 A 管 DESCRIPTION OF SYMBOLS 1 U-shaped part 21 Stabilizer 22 Stabilizer A Tube

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】管が嵌合される略U字形部の両側上端に、
水平方向に延在する安定板が設けられていることを特徴
とする管支持台。
At least one of the upper ends of both sides of a substantially U-shaped portion into which a pipe is fitted,
A tube support provided with a horizontally extending stabilizer.
JP1991028024U 1991-04-23 1991-04-23 Pipe support Expired - Lifetime JP2543065Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1991028024U JP2543065Y2 (en) 1991-04-23 1991-04-23 Pipe support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1991028024U JP2543065Y2 (en) 1991-04-23 1991-04-23 Pipe support

Publications (2)

Publication Number Publication Date
JPH04122879U JPH04122879U (en) 1992-11-05
JP2543065Y2 true JP2543065Y2 (en) 1997-08-06

Family

ID=31912196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1991028024U Expired - Lifetime JP2543065Y2 (en) 1991-04-23 1991-04-23 Pipe support

Country Status (1)

Country Link
JP (1) JP2543065Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5121293B2 (en) * 2007-04-24 2013-01-16 独立行政法人農業・食品産業技術総合研究機構 Shallow burial method of underground structure by geotextile

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58122087U (en) * 1982-02-12 1983-08-19 積水化成品工業株式会社 tube support body

Also Published As

Publication number Publication date
JPH04122879U (en) 1992-11-05

Similar Documents

Publication Publication Date Title
US4790690A (en) Stabilised earth structures
KR101662053B1 (en) Paved road construction method using pile precast cantilever slab
JP2543065Y2 (en) Pipe support
KR101010333B1 (en) Level surveying using a assembly level point device
JP2003113960A (en) Buried pipe supporting apparatus
KR100827009B1 (en) Earth retaining for lay supply pipe and drain pipe
JP6542587B2 (en) Manhole levitation prevention method
KR20060133304A (en) Fixing apparatus of reinforced earth retraining wall
JP2009275358A (en) Improvement structure of building bearing ground, and construction method
JP2009203672A (en) Method of repairing settlement of building
KR100680247B1 (en) Device for adjusting the height of underground pipe and preventing it from inequablly sinking
JP2848475B2 (en) Earth retaining method
JPS5815566B2 (en) Method to prevent lifting of lightweight pipes
JPS609179B2 (en) Large diameter pipe buried turning method
JPH0210873Y2 (en)
JPH0681981A (en) Burying method for pipe with fibs
JPH0324673Y2 (en)
JPH10183660A (en) Foundation structure of building
JPS5914513Y2 (en) Earth retaining device for excavated trenches
JP2002054162A (en) Concrete block for l-shaped retaining wall and retaining wall
JPH0613881Y2 (en) Gutter
JP3053270U (en) Support member receiving piece used for simple earth retaining method
JP2515001Y2 (en) Manhole and pipe connection structure
JPS5840122Y2 (en) Earth retention shoring device for excavated trenches
JPH0380215B2 (en)