JP2507875Y2 - Pillar building equipment - Google Patents

Pillar building equipment

Info

Publication number
JP2507875Y2
JP2507875Y2 JP4330693U JP4330693U JP2507875Y2 JP 2507875 Y2 JP2507875 Y2 JP 2507875Y2 JP 4330693 U JP4330693 U JP 4330693U JP 4330693 U JP4330693 U JP 4330693U JP 2507875 Y2 JP2507875 Y2 JP 2507875Y2
Authority
JP
Japan
Prior art keywords
floor
pillar
building
push
build
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4330693U
Other languages
Japanese (ja)
Other versions
JPH0713996U (en
Inventor
亮 水谷
昭郎 上田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP4330693U priority Critical patent/JP2507875Y2/en
Publication of JPH0713996U publication Critical patent/JPH0713996U/en
Application granted granted Critical
Publication of JP2507875Y2 publication Critical patent/JP2507875Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は、建物全体を順次押上げ
て構築する工法において、柱を建込むのに用いる柱建込
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pillar erection device used for erection of a pillar in a construction method of sequentially pushing up the entire building.

【0002】[0002]

【従来の技術】従来の建物の構築方法は、クレーンを使
って下層階から上層階へと順番に階を積み重ねる工法が
取られており、柱の建込には、クレーンが使用されてい
た。
2. Description of the Related Art A conventional building construction method employs a method of stacking floors in order from a lower floor to an upper floor using a crane, and a crane is used to build a pillar.

【0003】[0003]

【考案が解決しようとする課題】前述の従来の建物の構
築工法による場合、生産設備は可及的固定しておきたい
ものであるが、上方へと移動し、また地上から生産階
(最上部)までの工事用エレベータ、建設用リフトなど
の搬送設備が必要であり、かつそのための開口部が各階
に残る。
[Problems to be Solved by the Invention] In the conventional building construction method described above, it is desirable to keep the production equipment fixed as much as possible. It is necessary to have a transportation facility such as a construction elevator and a construction lift up to), and an opening for that is left on each floor.

【0004】そこで。本出願人は、先に従来の建物の構
築方法のかかる問題点を解決するために、建物の上層階
から組立てクレーンを使用させずに、油圧式の押上げ装
置により建物全体を順次押上げて構築する工法を提案し
た。
There. In order to solve the above-mentioned problems of the conventional building construction method, the present applicant sequentially pushes up the entire building with a hydraulic lifting device without using an assembly crane from the upper floors of the building. A construction method was proposed.

【0005】この工法による場合は、クレーンを使用し
ないので、クレーンに代って柱を建込む適切な装置の開
発が望まれる。
In the case of this construction method, since a crane is not used, it is desired to develop an appropriate device for constructing a pillar instead of the crane.

【0006】したがって、本考案の目的は、クレーンに
代って適切に柱の建込を行うことのできる柱建込装置を
提供するにある。
Therefore, an object of the present invention is to provide a pillar erection device capable of appropriately erection of a pillar instead of a crane.

【0007】[0007]

【課題を解決するための手段】このため本考案によれ
ば、基盤となる地上部においてまず建物の屋上及び最上
階の躯体組立てを行い、プッシュアップ装置により屋上
及び最上階を1階分プッシュアップし、次いで基盤とな
る地上部において最上階より1つ下の階の階層の躯体組
立てを行い、それを1階分プッシュアップし、以下同様
に順次1つ階の階層の躯体組立及びプッシュアップを行
って所定階層の建物を構築する際に躯体を構成する柱を
建込む装置であって、その装置は建物の床に固定される
昇降テーブルと、昇降テーブル上に設けられ前後、左右
に移動するXYテーブルと、XYテーブル上に設けられ
柱を支持案内する柱支持案内治具とからなる柱建込装置
が提供される。
For this reason, according to the present invention, the structure of the roof and the top floor of the building is first assembled in the above-ground part as the base, and the roof and the top floor are pushed up by one floor by the push-up device. Then, in the above-ground floor that is the base, assemble the skeleton of the floor one floor below the top floor, push it up for one floor, and then assemble and push up the skeleton of the first floor in the same manner. This is a device that builds the pillars that make up the building when building a building of a predetermined level. The device is a lifting table that is fixed to the floor of the building, and that is installed on the lifting table and moves back and forth, left and right. Provided is a pillar erection device including an XY table and a pillar support guide jig provided on the XY table to support and guide a pillar.

【0008】[0008]

【作用】柱を建込むには、まず微調整データを入力し、
そのデータに基づきXYテーブルのXY微調整を行う。
次いで昇降テーブルを上昇し、柱支持案内治具により柱
を案内支持する。次いで昇降テーブルを上昇し、柱を取
付ける。次いで、テーブルを下降し、柱建込み終了。
[Operation] To build a pillar, first input the fine adjustment data,
Based on the data, XY fine adjustment of the XY table is performed.
Next, the elevating table is raised, and the pillar is guided and supported by the pillar supporting guide jig. Next, the elevating table is raised and the columns are attached. Next, descend the table and finish building the pillar.

【0009】[0009]

【実施例】本考案に係る柱建込装置の説明に先立ち、ま
ず本考案に係る柱建込装置が使用される建物全体を順次
押上げて構築する工法を図9ないし図11にしたがい説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Prior to the description of the pillar erection device according to the present invention, first, a construction method for sequentially pushing up the entire building in which the pillar erection device according to the present invention is used will be described with reference to FIGS. 9 to 11. .

【0010】ここでは、10階建ての建物を構築するも
のとする。地中GLに土留杭1を打設し、土留杭1内に
おいて地中GLに基礎杭2を打設する。次いで1階の梁
3、床4を取付ける。次いで柱5を建て、梁3、床4を
取付けて屋上階Rの工事を行う次いでプッシュアップ装
置7を設置する。次いで地下階Bの梁3、床4、柱5、
壁6を取付ける。さらに10階の梁3を組立てる(図
9)。
Here, it is assumed that a ten-story building is constructed. Soil retaining piles 1 are placed in the underground GL, and foundation piles 2 are placed in the underground GL in the soil retaining piles 1. Next, the beam 3 and the floor 4 on the first floor are attached. Next, the pillar 5 is built, the beam 3 and the floor 4 are attached, and the work of the rooftop floor R is performed. Then the beam 3, floor 4, pillar 5 of basement B,
Install wall 6. Further, the beam 3 on the 10th floor is assembled (Fig. 9).

【0011】10階の組立を終えたらプッシュアップ装
置7により1階分プッシュアップする(図10)。
When the assembly of the 10th floor is completed, the pushup device 7 pushes up the first floor (FIG. 10).

【0012】プッシュアップを完了したら9階の組立を
行う(図11)。以下、同様に各階の組立て、プッシュ
アップを行って10階建ての建物を構築する。
After the push-up is completed, the ninth floor is assembled (FIG. 11). Thereafter, similarly, each floor is assembled and push-up is performed to build a 10-story building.

【0013】次に、前記の建物の構築工法で使用される
柱建込装置について説明する。
Next, a pillar building device used in the building construction method will be described.

【0014】柱建込装置は図1に示すように、建物の床
4に固定される昇降テーブル11と、昇降テーブル11
上に設けられ前後・左右に移動するXYテーブル12
と、XYテーブル上に設けられた柱5を支持案内する柱
支持案内治具13とから構成されている。昇降テーブル
11はパンタグラフ式のものであって、油圧シリンダ1
4により昇降する。また、XYテーブル12は図示は省
略したが制御装置に入力された微調整データによりXY
微調整されて位置決めし、図示は省略したが油圧シリン
ダにより作動させる。
As shown in FIG. 1, the pillar erection device includes an elevating table 11 fixed to a floor 4 of a building, and an elevating table 11.
XY table 12 that is installed on top and moves back and forth and left and right
And a column support guide jig 13 for supporting and guiding the column 5 provided on the XY table. The lifting table 11 is of the pantograph type and includes the hydraulic cylinder 1.
Move up and down by 4. Although not shown in the figure, the XY table 12 is adjusted according to the fine adjustment data input to the control device.
It is finely adjusted and positioned, and although not shown, it is operated by a hydraulic cylinder.

【0015】次に、図2ないし図8にしたがい前記の柱
建込装置を用いての柱の建込手順について説明する。
Next, with reference to FIGS. 2 to 8, a procedure for constructing a column using the above-mentioned column constructing apparatus will be described.

【0016】柱建込開始(S−1)。微調整データを制
御装置に入力する(S−2、図3)。微調整データに基
づきXYテーブル12をXY微調整する(S−3、図
4)。昇降テーブル11を上昇する(S−4、図5)。
柱5を治具13で案内、支持する(S−5、図6)。昇
降テーブル11を上昇し、柱5を取り付ける(S−6、
図7)。昇降テーブル11を下降する(S−7、図
8)。柱建込み終了(S−8)。
Start of pillar installation (S-1). The fine adjustment data is input to the control device (S-2, FIG. 3). XY fine adjustment of the XY table 12 is performed based on the fine adjustment data (S-3, FIG. 4). The lifting table 11 is raised (S-4, FIG. 5).
The pillar 5 is guided and supported by the jig 13 (S-5, FIG. 6). Raise the lifting table 11 and attach the pillar 5 (S-6,
(Fig. 7). The elevating table 11 is lowered (S-7, FIG. 8). End of pillar construction (S-8).

【0017】図1に示す柱建込装置は1本ずつ柱を建込
むものであったが、複数本の柱、例えば2本の柱を同時
に建込む柱建込装置であってもよい。
Although the pillar erection device shown in FIG. 1 is for arranging one pillar at a time, it may be a pillar erection device for simultaneously arranging a plurality of pillars, for example, two pillars.

【0018】又、昇降テーブルの昇降方法はパンタグラ
フ方式でなく例えば図12に示すように油圧ジャッキ
(CY)で直接に昇降テーブル11を押し上げてもよ
い。
The raising / lowering method of the raising / lowering table is not limited to the pantograph method, but the raising / lowering table 11 may be directly pushed up by a hydraulic jack (CY) as shown in FIG.

【0019】[0019]

【考案の効果】建物全体を順次押し上げて所定の階層の
建物を構築する工法において、クレーンを使用すること
なく昇降テーブルと、その上部に設けたXYテーブル
と、その上部に設けた柱支持案内治具とよりなる簡単な
構成の装置でもって柱の建込みを行うことができ、特に
微調整データに基づき前後・左右を微調整されるXYテ
ーブルを用いているので、柱の取付け位置の正確な位置
決めを行うことができる。
[Effects of the Invention] In a construction method of sequentially pushing up the entire building to construct a building of a predetermined hierarchy, a lifting table, an XY table provided on the upper part, and a pillar support guide jig provided on the upper part without using a crane. It is possible to build a pillar with a device with a simple structure consisting of tools, and especially because an XY table that is finely adjusted in the front and back and left and right based on the fine adjustment data is used, the position of the pillar can be accurately adjusted. Positioning can be performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の実施例に係る柱建込装置の正面図。FIG. 1 is a front view of a pillar erection device according to an embodiment of the present invention.

【図2】柱建込手順を示す行程図。FIG. 2 is a process diagram showing a pillar erection procedure.

【図3】柱建込行程における微調整データ入力を示す
図。
FIG. 3 is a diagram showing fine adjustment data input in a pillar erection process.

【図4】図3のXYテーブルのXY微調整を示す図。FIG. 4 is a diagram showing XY fine adjustment of the XY table of FIG. 3;

【図5】図3の昇降テーブル上昇を示す図。FIG. 5 is a view showing the lifting of the lifting table of FIG.

【図6】柱支持案内治具により柱の案内支持を示す図。FIG. 6 is a view showing the guide support of a column by a column support guide jig.

【図7】昇降テーブルを上昇し柱の取付けを示す図。FIG. 7 is a view showing how the lifting table is lifted and the columns are attached.

【図8】柱の取付けを終え昇降テーブルの下降を示す
図。
FIG. 8 is a view showing the descending of the elevating table after mounting the columns.

【図9】建物全体を順次押上げる1の工程を示す正面
図。
FIG. 9 is a front view showing a step 1 of sequentially pushing up the entire building.

【図10】建物全体を順次押上げる2の工程を示す正面
図。
FIG. 10 is a front view showing a step 2 of sequentially pushing up the entire building.

【図11】建物全体を順次押上げる3の工程を示す正面
図。
FIG. 11 is a front view showing a step 3 of sequentially pushing up the entire building.

【図12】油圧シリンダによる例を示す説明図。FIG. 12 is an explanatory view showing an example using a hydraulic cylinder.

【符号の説明】 4・・・床 5・・・柱 11・・・昇降テーブル 12・・・XYテーブル 13・・・柱支持案内治具 14・・・油圧シリンダ[Explanation of reference symbols] 4 ... Floor 5 ... Pillar 11 ... Lifting table 12 ... XY table 13 ... Pillar support guide jig 14 ... Hydraulic cylinder

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 基盤となる地上部においてまず建物の屋
上及び最上階の躯体組立てを行い、プッシュアップ装置
により屋上及び最上階を1階分プッシュアップし、次い
で基盤となる地上部において最上階より1つ下の階の階
層の躯体組立てを行い、それを1階分プッシュアップ
し、以下同様に順次1つ階の階層の躯体組立及びプッシ
ュアップを行って所定階層の建物を構築する際に躯体を
構成する柱を建込む装置であって、その装置は建物の床
に固定される昇降テーブルと、昇降テーブル上に設けら
れ前後、左右に移動するXYテーブルと、XYテーブル
上に設けられ柱を支持案内する柱支持案内治具とからな
ることを特徴とする柱建込装置。
1. In the above-ground part which becomes a base, first, the building roof and the top floor of the building are assembled, the roof and the top floor are pushed up by one floor by a push-up device, and then the top part of the above-ground part becomes the top floor. Build the structure of the next lower floor, push it up for one floor, and in the same way, perform the frame assembly and push-up of the next lower floor in order to build the building of the predetermined floor. A device for constructing a pillar that constitutes a building, and the device is a lifting table fixed to a floor of a building, an XY table provided on the lifting table and moving back and forth, and left and right, and a column provided on the XY table. A pillar erection device comprising a pillar support guide jig for supporting and guiding.
JP4330693U 1993-08-06 1993-08-06 Pillar building equipment Expired - Lifetime JP2507875Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4330693U JP2507875Y2 (en) 1993-08-06 1993-08-06 Pillar building equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4330693U JP2507875Y2 (en) 1993-08-06 1993-08-06 Pillar building equipment

Publications (2)

Publication Number Publication Date
JPH0713996U JPH0713996U (en) 1995-03-10
JP2507875Y2 true JP2507875Y2 (en) 1996-08-21

Family

ID=12660115

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4330693U Expired - Lifetime JP2507875Y2 (en) 1993-08-06 1993-08-06 Pillar building equipment

Country Status (1)

Country Link
JP (1) JP2507875Y2 (en)

Also Published As

Publication number Publication date
JPH0713996U (en) 1995-03-10

Similar Documents

Publication Publication Date Title
JP4012974B2 (en) Wind turbine tower assembly apparatus and assembly method
JP2002242483A (en) Method and device for constructing towerlike structure
JP2507875Y2 (en) Pillar building equipment
CN114541785A (en) Positioning structure and positioning method for pc component on cast-in-place concrete floor
JPH06156982A (en) Crane device
JPH0932120A (en) Method of construction of structure
JP2942054B2 (en) How to build a building
JP3279290B2 (en) Rebar prefab vertical composition device
JP2997843B2 (en) Construction method
JP3675286B2 (en) Heavy goods transport mechanism
JP3416759B2 (en) Underground structure frame building equipment
JPH0893237A (en) Construction of temporary side wall
JP2003253887A (en) Construction equipment and construction method
JP2637358B2 (en) Chimney erection method and equipment
JPH073896A (en) All weather construction method
JPH0537876U (en) Tower crane climbing jig
JP2001032537A (en) Installing method for temporary stair case
JPH04315664A (en) Construction method for building
JPH06280396A (en) Jack up building constructing apparatus
JPH0762747A (en) Building method of pillar and beam and device therefor
JPH06294163A (en) Constructing method for building
JPS5955963A (en) Method and apparatus for raising power transmission tower
JP2802568B2 (en) Construction method
JP2876957B2 (en) Self-elevating construction equipment
JP3225385B2 (en) Jacking device of the driving floor advance type construction method