JP2504150Y2 JP4627793U JP4627793U JP2504150Y2 JP 2504150 Y2 JP2504150 Y2 JP 2504150Y2 JP 4627793 U JP4627793 U JP 4627793U JP 4627793 U JP4627793 U JP 4627793U JP 2504150 Y2 JP2504150 Y2 JP 2504150Y2
Authority
JP
Japan
Prior art keywords
frame
building
brace
metal fitting
building frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4627793U
Other languages
Japanese (ja)
Other versions
JPH0715938U (en
Inventor
正大 松浦
映一 合川
洋 寺田
哲雄 戸井
基史 佐竹
Original Assignee
アサヒ産業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by アサヒ産業株式会社 filed Critical アサヒ産業株式会社
Priority to JP4627793U priority Critical patent/JP2504150Y2/en
Publication of JPH0715938U publication Critical patent/JPH0715938U/en
Application granted granted Critical
Publication of JP2504150Y2 publication Critical patent/JP2504150Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】この考案は、仮設枠組足場を構築
する建枠にパイプ製の手摺枠等を取付けるためのパイプ
取付金具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe mounting bracket for mounting a pipe handrail frame or the like on a building frame for constructing a temporary frame scaffold.

【0002】[0002]

【従来の技術】従来、建枠を用いて枠組仮設足場を構築
するには、対向状に配置した建枠をX字状のブレースで
結合すると共に、両建枠の上部横桟間に足場板を架設し
て両建枠を自立させ、これを横方向に連続して一階床を
構築し、次に足場板上に載って各建枠上に新たな建枠を
継ぎ足し、対向する建枠をブレースによる結合と足場板
の架設によって組み、二階床を構築する。
2. Description of the Related Art Conventionally, in order to construct a framed temporary scaffolding using a building frame, the building frames arranged opposite to each other are connected by an X-shaped brace, and scaffolding boards are provided between the upper horizontal rails of both building frames. Erection of both building frames to make them stand-alone, which are continuously constructed in the lateral direction to build a first-floor floor, and then placed on scaffolding boards to add new building frames on each building frame, and the opposing building frames The second floor is constructed by combining with the braces and installing scaffolding boards.

【0003】このように、各階床を上方へ順次繰返して
組立てることにより、所望する高さの枠組仮設足場を構
築するものであり、足場の解体は上記と逆に上位の階床
から順に解体していく。
In this way, by constructing the frame temporary scaffolding of a desired height by sequentially assembling each floor upward, the scaffolding is disassembled from the upper floor in reverse order. To go.

【0004】ところで、従来のブレースは、二本のパイ
プをX字状に結合した構造になっているため、対向する
建枠を互に結合するだけであり、階床の組立て後におい
ては足場板の両側に安全柵を形成する機能をもつことに
なるが、上位階床を組立てる作業時は、建枠の建込み後
に対向する建枠を結合するため、上位階床の組立て作業
時には足場板の両側に手摺等の安全を確保するものが全
く存在しないことになり、足場組立てが高くなるにつれ
作業の危険度が増すという問題がある。また、解体時も
同様である。
By the way, since the conventional brace has a structure in which two pipes are connected to each other in an X shape, only the opposing construction frames are connected to each other, and the scaffolding plate is assembled after the floor is assembled. Although it will have the function of forming safety fences on both sides of the floor, when assembling the upper floor, the opposite building frames are connected after the building is built, so the scaffolding board of the scaffolding board can be used when assembling the upper floor. Since there is no such thing as a handrail to ensure safety on both sides, there is a problem that the risk of work increases as the scaffolding assembly becomes expensive. The same applies when dismantling.

【0005】[0005]

【考案が解決しようとする課題】そこで、仮設枠組足場
の構築時において、建枠間の上部にクランプ金具を用い
て手摺枠を取付けることが考えられているが、クランプ
金具の使用は着脱操作に手間がかかり、手摺枠の両端を
建枠間に仮置できないため、着脱に複数の作業者が必要
になるという問題がある。
[Problems to be Solved by the Invention] Therefore, when constructing a temporary frame scaffold, it is considered to attach the handrail frame to the upper part between the building frames by using the clamp metal fittings. Since it takes time and labor, and both ends of the handrail frame cannot be temporarily placed between the building frames, there is a problem that a plurality of workers are required to attach and detach.

【0006】そこでこの考案は、上記のような問題点を
解決するため、建枠間に対する手摺枠の取付けが簡単確
実に能率よく行なえ、手摺枠の着脱作業が省力的に行な
える足場建枠へのパイプ取付金具を提供することを課題
としている。
Therefore, in order to solve the above problems, the present invention provides a scaffolding construction frame in which the handrail frames can be easily and reliably attached between the construction frames, and the handrail frame attachment / detachment work can be performed labor-savingly. It is an object of the invention to provide a pipe fitting.

【0007】[0007]

【課題を解決するための手段】上記のような課題を解決
するため、この考案は、足場建枠に取付けんとするパイ
プに金具本体を固定し、この金具本体の先端に、足場建
枠の縦柱に外接する凹欠部と横桟に外接する凹欠部を形
成し、前記金具本体の下部に縦柱へ係脱自在となる爪金
具を取付け、前記金具本体の側面に横桟上へ係止するフ
ックを固定した構成を採用したものである。
In order to solve the above-mentioned problems, the present invention has a metal fitting body fixed to a pipe to be attached to a scaffolding construction frame, and a tip of the metal fitting body is attached to the tip of the scaffolding construction frame. Form a concave cutout that circumscribes the vertical pillar and a concave cutout that circumscribes the horizontal crosspiece, and attach a claw metal fitting that can be detachably attached to the vertical pillar to the bottom of the metal fitting body, and mount it on the horizontal crosspiece on the side surface of the metal fitting body. It adopts a configuration in which a hook for locking is fixed.

【0008】[0008]

【作用】足場建枠に対してパイプを取付けるには、建枠
の横桟上にフックを係止すると共に、金具本体の先端に
形成した二つの凹欠部を縦柱と横桟に外接させる。この
後爪金具を縦柱に係合させると、建枠に対してパイプ
は、上下方向と横桟の軸方向及び横桟の径方向に対して
固定化された状態で取付けられることになる。
[Operation] To attach a pipe to the scaffolding frame, hook the hook on the horizontal rail of the building frame and circumscribe the two vertical recesses formed on the tip of the metal fitting body on the vertical column and the horizontal rail. . When the rear claw fitting is engaged with the vertical column, the pipe is attached to the building frame in a fixed state in the vertical direction, the axial direction of the horizontal rail, and the radial direction of the horizontal rail.

【0009】[0009]

【実施例】以下、この考案の実施例を添付図面に基づい
て説明する。
Embodiments of the present invention will be described below with reference to the accompanying drawings.

【0010】先ず、建枠1は周知のように、パイプを用
いた一対の縦柱2、2を横桟3で結合した門形や鳥居形
に形成され、縦柱2、2の上下端部にブレースピン4、
5が突設され、横桟3に足場板6が架設されると共に、
上下の建枠はジョイント7で結合されて上方に継足され
ることになる。
First, as is well known, the building frame 1 is formed in a gate shape or a torii shape in which a pair of vertical columns 2 and 2 using pipes are connected by a horizontal rail 3, and the upper and lower ends of the vertical columns 2 and 2 are formed. Brace pin 4,
5, the scaffolding plate 6 is erected on the horizontal rail 3, and
The upper and lower building frames will be joined by a joint 7 and added upward.

【0011】次に、建枠1に取付けるパイプ構造物であ
るブレース手摺枠8は、図2のように、両側に平行配置
となる一対の支柱9、9と、両支柱9、9の下端部を結
合する下部横桟10と、両支柱9、9の上端部を結合す
る上部横桟11と、両支柱9、9の途中を結合する補強
パイプ12とからなり、これらは鋼管等を用い、所定の
間隔で対向する建枠1、1間に納まる幅と建枠1の高さ
の2分の1強の高さに形成されている。なお、ブレース
手摺枠8のパターン形状は、強度的に実用化できる範囲
で任意のデザインを採用すればよい。
Next, as shown in FIG. 2, the brace handrail frame 8 which is a pipe structure attached to the building frame 1 has a pair of columns 9 and 9 arranged in parallel on both sides, and lower ends of the columns 9 and 9. A lower horizontal rail 10 connecting the two columns, an upper horizontal rail 11 coupling the upper ends of both columns 9 and 9, and a reinforcing pipe 12 coupling the middle of both columns 9, 9 using steel pipes or the like. It is formed with a width that can be accommodated between the building frames 1 and 1 facing each other at a predetermined interval and a height that is slightly over half the height of the building frame 1. The pattern shape of the brace handrail frame 8 may be any design as long as it can be practically used in terms of strength.

【0012】上記ブレース手摺枠8における両支柱9、
9には、このブレース手摺枠8と建枠1、1を結合して
建枠1の起立保持と強度を向上させ、同時に建枠1に対
するブレース手摺枠8の固定化を図るため、縦柱2と横
桟3に係止する取付金具13と、縦柱2に係止するロッ
クプレート14及び建枠ホルダー15とが取付けられて
いる。
Both columns 9 of the brace handrail frame 8,
In FIG. 9, the brace handrail frame 8 and the building frames 1 and 1 are connected to each other in order to improve the upright holding and strength of the building frame 1 and at the same time to fix the brace handrail frame 8 to the building frame 1. A mounting bracket 13 that is locked to the horizontal rail 3, a lock plate 14 and a building frame holder 15 that are locked to the vertical column 2 are mounted.

【0013】取付金具13は、両支柱9、9の下端部に
近い位置に固定され、この取付金具13を建枠1の上部
横桟3と縦柱2に係止することにより、建枠1に対する
ブレース手摺枠8の取付け位置の基準が設定されること
になる。
The mounting bracket 13 is fixed at a position close to the lower ends of both columns 9, and the mounting bracket 13 is locked to the upper horizontal rail 3 and the vertical column 2 of the building frame 1 so that the building frame 1 The reference of the mounting position of the brace handrail frame 8 with respect to is set.

【0014】上記取付金具13は、図4と図5に示すよ
うに、ブレース手摺枠8の支柱9に外方へ突出するよう
固定した金具本体16と、この金具本体16に取付けた
爪金具17及び金具本体16の側面に固定したフック2
5とからなり、金具本体16は、水平上壁18の先端
に、縦柱2の外周面で横桟3側の略4分の1外周面に当
接する凹欠部19を設け、上壁18の両側に設けた側壁
20、21の一方で、横桟3側に位置する側壁20の先
端に、横桟3の上部略4分の1外周面に当接する凹欠部
22を設け、両側壁20、21の後端に突設した取付片
23、24を溶接叉はピンで支柱9に固定した構造にな
っている。
As shown in FIGS. 4 and 5, the fitting 13 has a fitting main body 16 fixed to the pillar 9 of the brace handrail frame 8 so as to project outward, and a claw fitting 17 attached to the fitting main body 16. And a hook 2 fixed to the side surface of the metal fitting body 16
5, the metal fitting body 16 is provided with a recessed portion 19 at the tip of the horizontal upper wall 18 that abuts on the outer peripheral surface of the vertical column 2 on the outer peripheral surface of the horizontal crosspiece 3 at about a quarter. One of the side walls 20 and 21 provided on both sides of the side wall 20 is provided with a recess 22 that abuts the outer peripheral surface of the upper portion of the horizontal bar 3 at the tip of the side wall 20 located on the side of the horizontal bar 3. It has a structure in which mounting pieces 23 and 24 protruding from the rear ends of 20 and 21 are fixed to the column 9 by welding or pins.

【0015】従って、金具本体16は、その先端が縦柱
2に外接すると同時に横桟3上に当接することになる。
Therefore, the end of the metal fitting body 16 circumscribes the vertical column 2 and simultaneously contacts the horizontal rail 3.

【0016】爪金具17は金具本体16の両側壁20、
21間に納まるよう側面略三角形に形成され、側壁2
0、21間に架設した支点ピン26で途中が支持されて
揺動自在となっている。この爪金具17は上壁18及び
側壁20に設けた凹欠部19、22と丁度上下逆になる
ように、先端部に縦柱2の横桟3と反対側の外面に略2
分の1の範囲で外接する半円状の凹欠部27が設けら
れ、一方側板28の先端部上縁が横桟3の下部に対する
当接部29となっている。
The claw metal fitting 17 is formed on both side walls 20 of the metal fitting body 16,
The side wall 2 is formed into a substantially triangular shape so as to fit between the two 21
The midway is supported by a fulcrum pin 26 installed between 0 and 21 and is swingable. The claw metal fitting 17 has a tip end portion of approximately 2 on the outer surface opposite to the horizontal rail 3 of the vertical column 2 so that it is just upside down with the recessed portions 19 and 22 provided on the upper wall 18 and the side wall 20.
A semicircular concave cutout portion 27 that is circumscribed in a range of one-half is provided, and the upper edge of the tip of one side plate 28 serves as a contact portion 29 for the lower portion of the horizontal rail 3.

【0017】金具本体16における両側壁20、21の
上部に上下方向の長孔30を設け、両長孔30間にロッ
クピン31を上下動可能に架設し、このロックピン31
が下降位置にあるとき爪金具17の上面に当接し、爪金
具17が図4(A)の時計方向へ回動するのを阻止し、
先端が縦柱2及び横桟3に当接する状態を固定化すると
共に、ロックピン31を引上げると爪金具17は自重で
図4(A)の時計方向に回動し、縦柱2及び横桟3への
当接を解くようになっている。
Vertical holes 30 are provided in the upper portions of both side walls 20 and 21 of the metal fitting body 16, and a lock pin 31 is vertically movably installed between the long holes 30.
When it is in the lowered position, it abuts the upper surface of the claw fitting 17 and prevents the claw fitting 17 from rotating clockwise in FIG. 4 (A),
While fixing the state in which the tip is in contact with the vertical column 2 and the horizontal rail 3, and when the lock pin 31 is pulled up, the claw fitting 17 rotates by its own weight in the clockwise direction in FIG. The contact with the crosspiece 3 is released.

【0018】前記フック25は、金具本体16の一方側
面で上部の位置に固定され、下面側に形成した弧状の凹
欠部25aを横桟3上に係止するようになっている。
The hook 25 is fixed at an upper position on one side surface of the metal fitting body 16, and the arcuate recess 25a formed on the lower surface side is locked on the horizontal rail 3.

【0019】上記のように、取付金具13は、図4
(A)、(B)に矢印で示す如く、縦柱2と横桟3に対
して外接し、上下方向aと横桟3の軸方向に沿う横方向
b及び横桟3の直径方向cの移動が防止され、これによ
り、ブレース手摺枠8は建枠1に対して上記各方向に固
定化されることになる。
As described above, the mounting bracket 13 is shown in FIG.
As shown by the arrows in (A) and (B), the vertical column 2 and the horizontal rail 3 are circumscribed, and the vertical direction a and the horizontal direction b along the axial direction of the horizontal rail 3 and the diameter direction c of the horizontal rail 3 are defined. Movement is prevented, whereby the brace handrail frame 8 is fixed to the building frame 1 in each of the above directions.

【0020】前記したロックプレート14は、ブレース
手摺枠8の支柱9における上下方向の中間部とクランプ
金具13の下方との二個所の位置に取付けられ、下位の
ロックプレート14は建枠1の上部ブレースピン4と対
応し、上位のロックプレート14は上位建枠1の下部ブ
レースピン5と対応する。
The above-mentioned lock plates 14 are attached to the brace handrail frame 8 at two positions, that is, in the vertical middle part of the columns 9 and below the clamp fittings 13, and the lower lock plate 14 is the upper part of the building frame 1. Corresponding to the brace pin 4, the upper lock plate 14 corresponds to the lower brace pin 5 of the upper building frame 1.

【0021】このロックプレート14は、図7(A)、
(B)の如く、支柱9にピン32で枢止した後端を中心
に上下に揺動自在となり、ピン32に組込んだばね33
によって姿勢が保持されると共に、先端の下部にブレー
スピン4又は5に対する係合切欠34を設けて形成さ
れ、このロックプレート14によってブレース手摺枠8
を建枠1に対して、建枠1の並列方向に固定できる。
This lock plate 14 is shown in FIG.
As shown in (B), it is possible to swing up and down around the rear end pivotally fixed to the support column 9 by the pin 32, and the spring 33 assembled in the pin 32.
The brace handrail frame 8 is formed by the lock plate 14 which holds the posture and is provided with an engaging notch 34 for the brace pin 4 or 5 at the lower end of the tip.
Can be fixed to the building frame 1 in the parallel direction of the building frame 1.

【0022】ブレース手摺枠8は、取付金具13で建枠
1の横桟3に係止されるので、取付金具13を基準にし
て上下の位置が決まり、これにより、既成建枠のブレー
スピン4、5をそのまま有効利用できる。
Since the brace handrail frame 8 is locked to the horizontal rail 3 of the building frame 1 by the mounting bracket 13, the upper and lower positions are determined with reference to the mounting bracket 13, and thus the brace pin 4 of the existing building frame. 5 can be effectively used as it is.

【0023】前記建枠ホルダー15は、支柱9の上下両
端部に取付けられ、図6(A)〜(C)に示すように、
一方側面にフック61を回動可能に取付けて形成されて
いる。
The building frame holders 15 are attached to the upper and lower ends of the column 9, and as shown in FIGS. 6 (A) to 6 (C),
On one side, a hook 61 is rotatably attached and formed.

【0024】建枠ホルダー15は、後端の二叉部を支柱
9に外嵌してピン62で上下に揺動自在となるよう支柱
9に枢止し、先端部に水平伏倒時、建枠1の縦柱2に対
して外接する略半円形の凹欠部63を設けて形成され、
この縦枠ホルダー15は、ブレース手摺枠8の着脱時、
支柱9に外嵌するよう起立させておき、ブレース手摺枠
8の建枠1への結合時は、水平に伏倒させて凹欠部63
を縦柱2に外嵌する。
The building frame holder 15 has its rear end forked part fitted on the support column 9 and is pivotally fixed to the support column 9 so as to be vertically swingable by a pin 62. It is formed by providing a substantially semicircular recessed portion 63 that circumscribes the vertical column 2 of the frame 1.
The vertical frame holder 15 is provided when the brace handrail frame 8 is attached or detached.
When the brace handrail frame 8 is connected to the building frame 1, the brace handrail frame 8 is laid down so as to be fitted onto the pillar 9, and the brace handrail frame 8 is laid down horizontally to form the recess 63.
Is fitted on the vertical column 2.

【0025】この建枠ホルダー15の水平状態の維持
は、建枠ホルダー15の後端部に設けた下面側への屈曲
部の弧状端縁64が支柱9に当接することによって得ら
れる。
The horizontal state of the building frame holder 15 can be maintained by bringing the arcuate edge 64 of the bent portion provided at the rear end of the building frame holder 15 toward the lower surface into contact with the column 9.

【0026】フック61は円軸材を用い、直線部65の
先端に略90°の角度で弧状に屈曲する屈曲部66を連
成して形成され、建枠ホルダー15の側面に溶接した筒
状ホルダー67で直線部65が保持され、この直線部6
5の軸心を中心に回動可能になっている。
The hook 61 is made of a circular shaft material and is formed by connecting a bent portion 66, which is bent in an arc shape at an angle of approximately 90 °, to the tip of a straight portion 65, and is tubularly welded to the side surface of the building frame holder 15. The straight portion 65 is held by the holder 67.
It is rotatable about the axis of 5.

【0027】上記フック61の回動を、建枠ホルダー1
5の水平伏倒時において、屈曲部66が建枠1の縦柱2
に外接する水平状態から上向きに起立する間の範囲に規
制すると共に、筒状ホルダー67に対する抜止めのた
め、直線部65のホルダー67から突出する後端に角度
規制ピン68が径方向に貫通して両端が外部に突出する
よう取付けられている。
When the hook 61 is rotated, the building frame holder 1
In the horizontal lying down of No. 5, the bent portion 66 is the vertical column 2 of the building frame 1.
In order to prevent the tubular holder 67 from coming off from the horizontal state in which it is circumscribed from the horizontal state and to prevent the tubular holder 67 from coming off, an angle regulating pin 68 radially penetrates the rear end of the linear portion 65 protruding from the holder 67. Are attached so that both ends project outward.

【0028】この角度規制ピン68は、図6(C)のよ
うに、屈曲部66が水平状態のとき一方端部が建枠ホル
ダー15の側面に当接し、屈曲部66が起立するとき、
他方の端部が建枠ホルダー15の側面に当接し、フック
61の回動範囲を90°に規制している。
As shown in FIG. 6C, when the bent portion 66 is in a horizontal state, one end of the angle regulating pin 68 abuts the side surface of the building frame holder 15, and when the bent portion 66 stands up,
The other end is in contact with the side surface of the building frame holder 15 and regulates the turning range of the hook 61 to 90 °.

【0029】これによってブレース手摺枠8は、建枠1
に対して幅方向及び並列方向の何れにも固定化されるこ
とになる。
As a result, the brace handrail frame 8 becomes the building frame 1.
On the other hand, it is fixed in both the width direction and the parallel direction.

【0030】なお、図1と図2において、最下部建枠に
おける下部を結合するため、最下位用ブレース枠41が
別途用意されている。この最下位用ブレース枠41は先
に述べたブレース手摺枠8と上下の高さ寸法が短い以外
は略同様の構造を有し、両側支柱42、42の上下を上
部横桟43と下部横桟44で結合し、上下の横桟43、
44間に補強パイプ45を設けると共に、両側支柱4
2、44の各上下端部に建枠ホルダー15と、下部寄り
の位置に下位ブレースピン5に対するロックプレート1
4aを取付けた構造になっている。
1 and 2, a lowermost brace frame 41 is separately prepared for connecting the lower parts of the lowermost building frame. This bottom brace frame 41 has substantially the same structure as the above-mentioned brace handrail frame 8 except that the vertical height is short. 44, and upper and lower horizontal bars 43,
The reinforcement pipe 45 is provided between the two 44,
The building frame holder 15 is provided at the upper and lower ends of each of 2, 44, and the lock plate 1 for the lower brace pin 5 is provided at a position near the lower part.
4a is attached.

【0031】上記、ロックプレート14aは、図8
(A)、(B)の如く、建枠2の下部に固定したブレー
スピン5と対応する位置に、支柱42から外側に向けて
突出するように固定され、先端部にブレースピン5へ外
嵌挿する孔37が設けられている。
The lock plate 14a is shown in FIG.
As shown in (A) and (B), the brace pin 5 is fixed at a position corresponding to the brace pin 5 fixed to the lower portion of the building frame 2 so as to project outward from the support column 42, and is fitted onto the brace pin 5 at the tip end portion. A hole 37 for inserting is provided.

【0032】このロックプレート14aにより、建枠1
と1間にブレース枠41を取付けるとき、建枠1、1に
対するブレース枠41の上下取付け位置が決定され、ブ
レース枠41は両側の建枠ホルダー15とロックプレー
ト14aにより、両側に対向する建枠1、1を結合する
ブレースの役目を果すことになる。
With this lock plate 14a, the building frame 1
When mounting the brace frame 41 between the building frames 1 and 1, the vertical mounting position of the brace frame 41 with respect to the building frames 1 and 1 is determined, and the brace frame 41 is opposed to the building frames by the building frame holders 15 and the lock plates 14a on both sides. It will serve as a brace that joins the 1 and the 1 together.

【0033】この考案のパイプ取付金具は上記のような
構成であり、仮設枠組足場を構築するには、一階床用の
最下位建枠1、1を両側に対向させ、建物と反対側の位
置にある縦柱2の下部を最下位ブレース枠41で互に結
合する。
The pipe fitting of the present invention is constructed as described above. To construct a temporary frame scaffold, the lowest building frames 1 and 1 for the first floor are made to face each other on the opposite side of the building. The lower portions of the vertical columns 2 in the position are connected to each other by the lowermost brace frame 41.

【0034】この結合作業は、両側のロックプレート1
4a、14aを下位ブレースピン5に挿入し、この後、
上下の建枠ホルダー15を外方へ倒すことによって行な
う。
This coupling work is performed by the lock plates 1 on both sides.
Insert 4a and 14a into the lower brace pin 5, and then
This is done by tilting the upper and lower building frame holders 15 outward.

【0035】次に、ブレース手摺枠8を両手で水平に保
持し、対向する建枠1、1間において、建物と反対側の
縦柱2、2間の上部に臨ませ、両側取付金具13を建枠
1の縦柱2と水平横桟3に対して外接させる。
Next, the brace handrail frame 8 is held horizontally with both hands, and is faced to the upper part between the vertical columns 2 and 2 on the opposite side of the building between the opposing building frames 1 and 1, and the both side mounting brackets 13 are attached. The vertical pillar 2 and the horizontal horizontal rail 3 of the building frame 1 are circumscribed.

【0036】取付金具13は、予めロックピン31を引
上げ、爪金具17を先端が下向きとなる姿勢にしてお
き、先ず、フック25を横桟3上に係止して金具本体1
6の先端に設けた凹欠部22を横桟3上に当接させ、次
にブレース手摺枠8全体を建枠1の外方に押し、凹欠部
19を縦柱2に当接させる。
In the mounting bracket 13, the lock pin 31 is pulled up in advance, the pawl bracket 17 is placed in a posture in which the tip end faces downward, and first, the hook 25 is locked onto the horizontal rail 3 to mount the bracket body 1.
The recess 22 provided at the tip of 6 is brought into contact with the horizontal rail 3, and then the entire brace handrail frame 8 is pushed outward of the building frame 1 to bring the recess 19 into contact with the vertical column 2.

【0037】この後、爪金具17を先端が建枠1側に向
くよう回動させ、先端の凹欠部27を縦柱2に当接さ
せ、当接部29を横桟3の下面に当接させれば、図4の
ように、ロックピン31が爪金具17の上面に載り、爪
金具17の姿勢が自動的にロックされる。
After that, the claw fitting 17 is rotated so that the tip end faces the building frame 1 side, the recessed portion 27 at the tip end is brought into contact with the vertical column 2, and the contact portion 29 is brought into contact with the lower surface of the horizontal rail 3. When they are brought into contact with each other, as shown in FIG. 4, the lock pin 31 is placed on the upper surface of the claw fitting 17, and the posture of the claw fitting 17 is automatically locked.

【0038】上記取付金具13により、建枠1に対して
ブレース手摺枠8は、上下及び横方向に固定化され、同
時にフック25で建枠1の対向方向にも移動しないこと
になる。
The brace handrail frame 8 is fixed to the building frame 1 in the vertical and horizontal directions by the mounting metal fitting 13 and at the same time, the hook 25 does not move in the opposing direction of the building frame 1.

【0039】この後、下位の両ロックプレート14を外
方に倒し、建枠1の上部ブレースピン4に係合させると
共に、下端の建枠ホルダー15を外方に倒し、先端の凹
欠部63とフック61で縦柱2を抱持する。
After that, both lower lock plates 14 are tilted outward to engage with the upper brace pins 4 of the building frame 1, and the building frame holder 15 at the lower end is tilted outward so that the recessed portion 63 at the tip is formed. And hold the vertical column 2 with the hook 61.

【0040】これによって、建枠1、1間の上部にブレ
ース手摺枠8が固定化され、ブレース手摺枠8は、建枠
1、1間において、建物と反対側の位置で、建枠1の上
端よりも上方に起立することになり、このブレース手摺
枠8の起立後に建枠1、1の上部横桟3、3間に足場板
6を架設する。
As a result, the brace handrail frame 8 is fixed to the upper part between the building frames 1 and 1, and the brace handrail frame 8 is located between the building frames 1 and 1 at a position opposite to the building. The brace handrail frame 8 is erected above the upper end, and after the brace handrail frame 8 is erected, the scaffolding plate 6 is installed between the upper horizontal rails 3 and 3 of the building frames 1 and 1.

【0041】このような作業を横方向に繰り返して行な
うことにより一階床の組立てを行なう。
Assembling of the first floor is performed by repeating such work in the lateral direction.

【0042】次に、二階床の組立ては、足場板6上に作
業者が載り、建枠1の継ぎ足しを行なう。このとき、足
場板6上で建物と反対側の位置にブレース手摺枠8が起
立しているので、作業の安全を確保することができる。
Next, when assembling the second floor, an operator is placed on the scaffolding plate 6 to replenish the building frame 1. At this time, since the brace handrail frame 8 is erected at a position on the scaffolding plate 6 on the side opposite to the building, it is possible to ensure work safety.

【0043】建枠1の継ぎ足し後は上位ロックプレート
14を伏倒させ、継ぎ足した建枠1の下位ブレースピン
5に係止すると共に、上端の建枠ホルダー15も伏倒さ
せ、上記のような作業を横方向に繰り返すことによって
二階床の組立てが行なえ、このような作業を上方へ順次
繰り返して行なうことにより、必要とする高さの仮設枠
組足場を構築する。
After adding the building frame 1, the upper lock plate 14 is laid down, locked to the lower brace pin 5 of the building frame 1 that has been added, and the building frame holder 15 at the upper end is also laid down. By repeating the work in the horizontal direction, the second floor can be assembled. By repeating such work in the upward direction, the temporary frame scaffolding of the required height is constructed.

【0044】仮設枠組足場の構築において、各階床の両
側建枠1、1は、ブレース手摺枠8により、上下のブレ
ースピン4、5の部分で結合されると共に、取付金具1
3が横桟3を抱持し、建枠ホルダー15、15が建枠1
の縦柱2を抱持するので、対向する建枠1、1の結合が
強固に行なえ、安全性の高い仮設枠組足場を構築するこ
とができる。なお、建枠1、1の建物側の結合は、従来
のX字状ブレースを用いて行なってもよい。
In the construction of the temporary frame scaffold, both side building frames 1 and 1 of each floor are connected by the brace handrail frame 8 at the upper and lower brace pins 4 and 5, and the mounting bracket 1
3 holds the cross rail 3, and the building frame holders 15 and 15 are the building frames 1
Since the vertical columns 2 are held, the building frames 1 and 1 facing each other can be firmly connected, and a highly safe temporary frame scaffolding can be constructed. The building frames 1 and 1 may be connected to the building side by using a conventional X-shaped brace.

【0045】次に、仮設枠組足場の解体時にブレース手
摺枠8の取外しを行なうには、ブレース手摺枠8の両側
ロックプレート14と建枠ホルダー15を起立させ、取
付金具13のロックピン31を指先で押上げ、爪金具1
7を先端が下向きになるよう回動させ、縦柱2及び横桟
3への係合を解いた状態でブレース手摺枠8を手前に引
いて全体を持上げれば、建枠1、1間からのブレース手
摺枠8の撤去が行なえる。
Next, in order to remove the brace handrail frame 8 when dismantling the temporary frame scaffold, both side lock plates 14 and the building frame holder 15 of the brace handrail frame 8 are erected, and the lock pin 31 of the mounting bracket 13 is fingertipted. Push up with the claw metal fitting 1
Rotate 7 so that the tip end faces downward, pull the brace handrail frame 8 toward you with the engagement with the vertical column 2 and the horizontal rail 3 released, and lift up the whole, The brace handrail frame 8 can be removed.

【0046】この後、上位建枠1の抜取りを行ない、こ
れを下方に繰り返して行なうことにより、仮設枠組足場
の解体が可能になる。
After that, the upper building frame 1 is extracted, and by repeating this downward, the temporary frame scaffolding can be disassembled.

【0047】上記、仮設足場の解体は構築時と逆に上部
から行ない、この解体作業時においても、足場板6の側
部にブレース手摺枠8が位置することになり、安全性の
確保が行えると共に、構築した仮設足場の外観は建枠1
間にブレース手摺枠8が位置するパターン形状となり、
デザイン的にも優れ、美感の向上を図ることができる。
The above-mentioned disassembly of the temporary scaffold is performed from the upper side, which is the reverse of the construction. Even during this disassembly work, the brace handrail frame 8 is positioned on the side portion of the scaffold plate 6, and safety can be ensured. Along with that, the appearance of the constructed temporary scaffold is the building frame 1
It has a pattern shape in which the brace handrail frame 8 is located between
It is also excellent in design and can improve aesthetics.

【0048】[0048]

【考案の効果】以上のように、この考案によると、足場
建枠に取付けんとするパイプを、足場建枠の上下と横桟
の軸方向及び直径方向に対して固定化でき、足場建枠へ
のパイプの固定が強固に安定よく行なえると共に、フッ
クによって横桟上に仮置きできるので、パイプ取付け作
業が簡単に能率よく行なえる。
As described above, according to the present invention, the pipes to be attached to the scaffolding frame can be fixed to the top and bottom of the scaffolding frame and the axial and diametrical directions of the cross rails. The pipe can be firmly and stably fixed to the pipe, and it can be temporarily placed on the horizontal rail by the hook, so the pipe can be attached easily and efficiently.

【0049】また、建枠に対するパイプの着脱を爪金具
の操作のみで行なえ、操作が簡単である。
Further, the pipe can be attached to and detached from the building frame only by operating the claw fittings, and the operation is simple.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案に係る取付金具を用いたブレース手摺
枠の使用状態を示す斜視図
FIG. 1 is a perspective view showing a usage state of a brace handrail frame using a mounting bracket according to the present invention.

【図2】同上正面図FIG. 2 is a front view of the same.

【図3】同上の要部の拡大正面図FIG. 3 is an enlarged front view of the main part of the above.

【図4】(A)は取付金具の使用状態を示す縦断正面
図、(B)は同横断平面図
FIG. 4A is a vertical cross-sectional front view showing a usage state of the mounting bracket, and FIG.

【図5】取付金具の使用状態を示す分解斜視図FIG. 5 is an exploded perspective view showing how the mounting bracket is used.

【図6】(A)は建枠ホルダーの横断平面図、(B)は
同正面図、(C)は(A)の矢印C−Cの拡大断面図
6A is a cross-sectional plan view of a building frame holder, FIG. 6B is a front view of the same, and FIG. 6C is an enlarged cross-sectional view of arrow C-C in FIG. 6A.

【図7】(A)はロックプレートの横断平面図、(B)
は同上の正面図
7A is a cross-sectional plan view of the lock plate, FIG.
Is the same front view

【図8】(A)は最下位ブレース手摺枠用ロックプレー
トの横断平面図、(B)は同正面図
FIG. 8A is a cross-sectional plan view of the lock plate for the bottom brace handrail frame, and FIG. 8B is a front view thereof.

【符号の説明】[Explanation of symbols]

1 建枠 2 建柱 3 横桟 4、5 ブレースピン 6 足場板 8 ブレース手摺枠 9 支柱 13 取付金具 14 ロックプレート 15 建枠ホルダー 16 金具本体 17 爪金具 19、22、27 凹欠部 25 フック 1 Building Frame 2 Building Pillar 3 Side Rail 4, 5 Brace Pin 6 Scaffolding Board 8 Brace Handrail Frame 9 Strut 13 Mounting Bracket 14 Lock Plate 15 Building Frame Holder 16 Bracket Body 17 Claw Bracket 19, 22, 27 Recessed Notch 25 Hook

───────────────────────────────────────────────────── フロントページの続き (72)考案者 戸井 哲雄 吹田市岸部南2丁目2番15号 アサヒ産 業株式会社内 (72)考案者 佐竹 基史 吹田市岸部南2丁目2番15号 アサヒ産 業株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tetsuo Toi 2-15 No. 2-15 Kishibe Minami Suita City Asahi Industrial Co., Ltd. (72) Motoshi Satake 2-2-15 Kishibe Minami Suita City Asahi Industry Co., Ltd. Within the corporation

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 足場建枠に取付けんとするパイプに金具
本体を固定し、この金具本体の先端に、足場建枠の縦柱
に外接する凹欠部と横桟に外接する凹欠部を形成し、前
記金具本体の下部に縦柱へ係脱自在となる爪金具を取付
け、前記金具本体の側面に横桟上へ係止するフックを固
定した足場建枠へのパイプ取付金具。
1. A metal fitting main body is fixed to a pipe to be attached to a scaffold building frame, and a recessed portion circumscribing a vertical pillar of the scaffolding building frame and a recessed portion circumscribing a horizontal crosspiece are provided at the tip of the metal fitting body. A metal fitting for pipe mounting to a scaffolding frame, which is formed by attaching a hook metal fitting that can be freely engaged and disengaged to a vertical pillar to the bottom of the metal fitting main body, and fixing a hook for locking onto a horizontal rail on the side surface of the metal fitting main body.
JP4627793U 1993-08-25 1993-08-25 Pipe mounting bracket for scaffolding frame Expired - Fee Related JP2504150Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4627793U JP2504150Y2 (en) 1993-08-25 1993-08-25 Pipe mounting bracket for scaffolding frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4627793U JP2504150Y2 (en) 1993-08-25 1993-08-25 Pipe mounting bracket for scaffolding frame

Publications (2)

Publication Number Publication Date
JPH0715938U JPH0715938U (en) 1995-03-17
JP2504150Y2 true JP2504150Y2 (en) 1996-07-10

Family

ID=12742740

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4627793U Expired - Fee Related JP2504150Y2 (en) 1993-08-25 1993-08-25 Pipe mounting bracket for scaffolding frame

Country Status (1)

Country Link
JP (1) JP2504150Y2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002248298A (en) * 2001-02-23 2002-09-03 Meitsu:Kk Clothes-drying stand
JP2014031623A (en) * 2012-08-01 2014-02-20 Step Up Kk Preceding handrail for framework scaffold and method of constructing the same
JP7050376B1 (en) * 2021-11-26 2022-04-08 東阪工業株式会社 Strut reinforcement and temporary scaffolding using this

Also Published As

Publication number Publication date
JPH0715938U (en) 1995-03-17

Similar Documents

Publication Publication Date Title
JP3851105B2 (en) Construction method of temporary structure and handrail braiding used for this
JP2504150Y2 (en) Pipe mounting bracket for scaffolding frame
JP2506545B2 (en) Brace handrail frame for temporary scaffolding
JP2002356989A (en) Device for attaching handrail to prefabricated scaffold
JP2001200632A (en) Construction method for temporary structure
JP2500350Y2 (en) Building frame holder for handrail frame for temporary scaffolding
JP3606346B2 (en) Swivel hanger scaffold
JP2500351Y2 (en) Handrail frame device for temporary scaffolding
JP2500347Y2 (en) Brace handrail frame for temporary scaffolding
JP2515363Y2 (en) Brace handrail frame device for temporary scaffolding
JP3880454B2 (en) Safety handrail
JP3898559B2 (en) Temporary scaffolding for steel construction
JP2000017828A (en) Temporary scaffold overhang stage
JPH05505Y2 (en)
JP3538511B2 (en) Temporary handrail for temporary scaffolding and method of assembling and disassembling temporary scaffolding
JP7426160B1 (en) Outrigger mounting structure on pillar
JP3537379B2 (en) Stand for holding beam material
JPH0849404A (en) Mounting structure of handrail frame for temporary scaffolding
JPH0311298Y2 (en)
JPH0913656A (en) Built-up scaffolding
JP2004068450A (en) Safety handrail
JPH0740595Y2 (en) Suspension for scaffolding and dismantling work
JP4068603B2 (en) Safety handrail
JPH0678491U (en) Brace handrail frame for temporary scaffolding
JP4549876B2 (en) Leading railing fixing bracket and building frame with leading railing fixing bracket

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960227

LAPS Cancellation because of no payment of annual fees