JP2500581Y2 - Pipe shaft cover - Google Patents

Pipe shaft cover

Info

Publication number
JP2500581Y2
JP2500581Y2 JP9995891U JP9995891U JP2500581Y2 JP 2500581 Y2 JP2500581 Y2 JP 2500581Y2 JP 9995891 U JP9995891 U JP 9995891U JP 9995891 U JP9995891 U JP 9995891U JP 2500581 Y2 JP2500581 Y2 JP 2500581Y2
Authority
JP
Japan
Prior art keywords
brace
pipe shaft
shaft cover
joint material
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9995891U
Other languages
Japanese (ja)
Other versions
JPH0547198U (en
Inventor
和明 渋谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP9995891U priority Critical patent/JP2500581Y2/en
Publication of JPH0547198U publication Critical patent/JPH0547198U/en
Application granted granted Critical
Publication of JP2500581Y2 publication Critical patent/JP2500581Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は、ブレースが架設された
建物内のブレースが通る所定区画内に設置されるパイプ
シャフトカバーに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe shaft cover installed in a predetermined section through which a brace passes in a building where the brace is installed.

【0002】[0002]

【背景技術】例えば、ピンブレース構造の鉄骨の建物に
パネルによりパイプシャフトを作ろうとした場合、パイ
プシャフトカバーは、次のようにして現場施工で設置し
ている。即ち、先ず、図4に示すように、パイプシャフ
トカバー設置区画の下端から上端までの長さを有するパ
イプシャフトカバー1を用意する。このパイプシャフト
カバー1の場合、両側面板2及び正面板はそれぞれ別体
となっていて、現場でこれらが一体のカバー1として組
み立てられるものである。これらの側面板2の上部の梁
3が位置する部分には、予め切欠部4が形成されてい
る。
BACKGROUND ART For example, when a pipe shaft is made of a panel in a steel frame building having a pin brace structure, the pipe shaft cover is installed on-site in the following manner. That is, first, as shown in FIG. 4, the pipe shaft cover 1 having a length from the lower end to the upper end of the pipe shaft cover installation section is prepared. In the case of the pipe shaft cover 1, the side plates 2 and the front plate are separate bodies, and they are assembled as an integral cover 1 on site. A notch 4 is formed in advance at a portion of the side plate 2 where the beam 3 is located.

【0003】そして、これらの両側面板2及び正面板を
設置した際、梁3間に対角線状に架設されたブレース5
が通ることになる部分を現場で二点鎖線で示すように横
方向に切断して大きめの切除部6を形成する。次に、図
5に示すように、大きめの切除部6にブレース5が挿通
されるようにしてこれらの両側面板2及び正面板を設置
した後、略ブレース5の直径に相当する幅の小さめの切
除部7が形成されたスチールプレート8を前記大きめの
切除部6に被せるようにして取り付ける。この後、小さ
めの切除部7及び梁3の周囲を防火のため、図示しない
ロックウールで塞ぐ。
When the side plates 2 and the front plate are installed, the braces 5 are installed between the beams 3 in a diagonal shape.
The part through which is cut is laterally cut on site to form a larger cut portion 6 as shown by the chain double-dashed line. Next, as shown in FIG. 5, after installing the both side plates 2 and the front plate so that the brace 5 is inserted into the large cutout portion 6, a small width corresponding to the diameter of the brace 5 is formed. The steel plate 8 on which the cutout portion 7 is formed is attached so as to cover the larger cutout portion 6. Thereafter, the small cut portion 7 and the periphery of the beam 3 are closed with rock wool (not shown) for fire protection.

【0004】[0004]

【考案が解決しようとする課題】上述した従来のパイプ
シャフトカバー1の場合、現場で大きめの切除部6を形
成するための横方向の切断作業は容易ではなく、しかも
その後の小さめの切除部7が形成されたスチールプレー
ト8を大きめの切除部6に被せる作業も面倒であった。
特に、ブレース5が側面板2又は正面板の側端から遠い
場所に位置することになる場合、切除部6がかなり大き
くなって作業が大変であり、加えてこの大きな切除部6
により切除部6の上の部分のカバー1が不安定になって
折れる虞れもあった。そこで、本考案は、架設されたブ
レースを通すための作業を容易に行うことができるパイ
プシャフトカバーを提供することを目的とする。
In the case of the conventional pipe shaft cover 1 described above, the lateral cutting work for forming the large cut portion 6 is not easy at the site, and the smaller cut portion 7 is then formed. The work of covering the large excision portion 6 with the steel plate 8 on which is formed was also troublesome.
In particular, when the brace 5 is located at a position far from the side edge of the side plate 2 or the front plate, the cutting portion 6 becomes considerably large and the work is difficult.
As a result, the cover 1 above the cutout portion 6 may become unstable and may be broken. Therefore, an object of the present invention is to provide a pipe shaft cover that can easily perform a work for passing an installed brace.

【0005】[0005]

【課題を解決するための手段】本考案は、梁間にブレー
スが架設された建物の前記ブレースが通る所定区画内に
設置されるパイプシャフトカバーにおいて、パイプシャ
フトカバー設置区画の下端から略ブレース架設部位まで
の長さを有する第1部材及び略ブレース架設部位から前
記パイプシャフトカバー設置区画の上端までの長さを有
する第2部材を備え、かつ、前記第1部材の上部及び第
2部材の下部のいずれか一方に前記ブレースが挿通され
るジョイント材が設けられ、このジョイント材を介して
前記第1部材と第2部材とが連結されて構成されている
ことを特徴とする。
DISCLOSURE OF THE INVENTION The present invention provides a pipe shaft cover installed in a predetermined section through which the brace is installed in a building having braces installed between beams. A first member having a length of up to and a second member having a length from the substantially brace installation portion to the upper end of the pipe shaft cover installation section, and A joint material through which the brace is inserted is provided in either one of the two, and the first member and the second member are connected via the joint material.

【0006】前記第1部材及び第2部材は、パイプシャ
フトカバーの設置前において、両側面板及び正面板がそ
れぞれ別体となっているものでもよく、又は両側面板及
び正面板が連結されて一体となっているものでもよい。
前記ジョイント材は、第1部材の上部又は第2部材の下
部に別部材として接合により設けられていても、又は同
時成形により一体に設けられていてもよい。また、この
パイプシャフトカバーにおいて、前記ジョイント材にブ
レースが挿通される複数の孔部を形成しておき、実際に
ブレースが挿通されることになる孔部の上部又は下部を
切除するようにしてもよい。
The first member and the second member may have separate side plates and front plates before the pipe shaft cover is installed, or both side plates and the front plate may be connected to form an integral body. It may be one that has become.
The joint material may be provided on the upper portion of the first member or the lower portion of the second member as a separate member by joining, or may be integrally provided by simultaneous molding. Further, in this pipe shaft cover, a plurality of holes through which the brace is inserted are formed in the joint material, and the upper or lower part of the hole where the brace is actually inserted may be cut off. Good.

【0007】[0007]

【作用】本考案に係るパイプシャフトカバーを設置する
際、例えば第1部材及びジョイント材が下部に設けられ
た第2部材を用意する。先ず、第1部材をパイプシャフ
トカバー設置区画に配置し、その後前記ジョイント材の
ブレースが位置する部分にブレース挿通用の切除部を垂
直方向に形成する。この切除部形成の際、複数の孔部が
形成されたジョイント材が設けられた第2部材を使用し
た場合には、ブレースが挿通されることになる孔部の下
部だけを部分的に切り取ればよいため現場作業が容易に
なる。
When the pipe shaft cover according to the present invention is installed, for example, the first member and the second member provided with the joint material at the bottom thereof are prepared. First, the first member is arranged in the pipe shaft cover installation section, and then a cut portion for inserting a brace is formed in a vertical direction in a portion of the joint material where the brace is located. When the second member provided with the joint material in which a plurality of holes are formed is used in forming the cutout portion, it is necessary to partially cut out only the lower portion of the hole portion through which the brace is inserted. Good work facilitates on-site work.

【0008】次に、前記第2部材をジョイント材の切除
部にブレースが挿通されるようにして第1部材上に配置
する。そして、このジョイント材を介して第2部材を第
1部材に連結することにより、本考案に係るパイプシャ
フトカバーを設置する。このように、パイプシャフトカ
バーにブレースを通すための切除部は、ジョイント材の
部分について、下部から垂直方向に形成すればよく、ブ
レースが側面板又は正面板の側端から遠い場所に位置す
る場合であっても、同じ短い切除部の形成で済むため、
作業が容易になる。
Next, the second member is placed on the first member such that the brace is inserted into the cutout portion of the joint material. Then, the pipe shaft cover according to the present invention is installed by connecting the second member to the first member through the joint material. In this way, the cutout for passing the brace through the pipe shaft cover may be formed vertically from the lower part of the joint material, and when the brace is located far from the side edge of the side plate or front plate. However, since the same short excision part can be formed,
Work becomes easy.

【0009】[0009]

【実施例】図1〜3を参照して本考案の一実施例に係る
パイプシャフトカバーを説明する。本実施例のパイプシ
ャフトカバー11は、フレーム31の梁32間にブレース33が
対角線状に架設された住宅34のブレース33が通る所定区
画内に設置されるものである。このフレーム31は、柱、
梁32等で組み建てられて構成される。このフレーム31の
外側にパネル36が取り付けられている。このパイプシャ
フトカバー11は、第1部材12及びジョイント材13が下部
に設けられた第2部材14を備え、両部材12,14 がジョイ
ント材13を介して連結されて構成される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A pipe shaft cover according to an embodiment of the present invention will be described with reference to FIGS. The pipe shaft cover 11 of the present embodiment is installed in a predetermined section through which the brace 33 of the house 34 in which the brace 33 is installed diagonally between the beams 32 of the frame 31 passes. This frame 31 is a pillar,
It is constructed by building with beams 32 and so on. A panel 36 is attached to the outside of the frame 31. The pipe shaft cover 11 is provided with a first member 12 and a second member 14 having a joint member 13 provided at a lower portion thereof, and both members 12 and 14 are connected via a joint member 13.

【0010】図1,2に示すように、前記第1部材12
は、パイプシャフトカバー設置区画の下端から略ブレー
ス架設部位までの長さを有し、接続金具(図示せず)に
よりコ字状に接合された正面板15及び両側面板16の3点
で構成されている。この正面板15の略中央には、点検口
17が設けられている。前記第2部材14は、略ブレース架
設部位から前記パイプシャフトカバー設置区画の上端ま
での長さを有し、第1部材12と同じく、接続金具18によ
りコ字状に接合された正面板19及び両側面板21の3点で
構成されている。なお、この図1において、両側面板1
6,21 は、一方についてのみ示し、他方については省略
してある。
As shown in FIGS. 1 and 2, the first member 12
Has a length from the lower end of the pipe shaft cover installation section to the substantially brace installation site, and is composed of three points: a front plate 15 and both side plates 16 joined in a U shape by a connecting fitting (not shown). ing. At the center of the front plate 15,
17 are provided. The second member 14 has a length from a substantially brace installation portion to an upper end of the pipe shaft cover installation section, and like the first member 12, a front plate 19 joined in a U-shape by a connecting fitting 18, and It is composed of three points on both side plates 21. In addition, in FIG. 1, both side plates 1
6,21 is shown only for one and omitted for the other.

【0011】これらの正面板15,19 及び両側面板16,21
は、ALC板のように無機建材で一体に作製されたもの
でも、表面材、裏面材及び側面材等で組み立てられたも
のでもよい。前記ジョイント材13は、ブレース33より若
干大きめの孔部22が複数、例えば4,5個等間隔で形成
されたものである。そして、前記ジョイント材13は、第
2部材14の裏面側の下部にねじ等で固定されている。こ
のジョイント材13は、防火性を有するように、例えばス
チールで作製されている。
These front plates 15 and 19 and both side plates 16 and 21
May be integrally manufactured with an inorganic building material such as an ALC plate, or may be assembled with a surface material, a back surface material, a side material, and the like. The joint material 13 has a plurality of holes 22, which are slightly larger than the brace 33, for example, four or five holes 22 formed at equal intervals. The joint material 13 is fixed to the lower portion of the second member 14 on the back surface side with screws or the like. The joint material 13 is made of, for example, steel so as to have a fireproof property.

【0012】このようなパイプシャフトカバー11は、例
えば軸組みパネル構法で建てられる住宅34において次の
ようにして設置する。この住宅34内には、フレーム31の
梁32間にブレース33が対角線状に架設されている。先
ず、図1に示すように、正面板15及び両側面板16がコ字
状に接合された前記第1部材12を複数のパイプ35を囲む
ようにしてパイプシャフトカバー設置区画に配置する。
The pipe shaft cover 11 as described above is installed as follows in a house 34 constructed by a framed panel construction method, for example. In the house 34, braces 33 are installed diagonally between the beams 32 of the frame 31. First, as shown in FIG. 1, the first member 12 in which the front plate 15 and both side plates 16 are joined in a U shape is arranged in a pipe shaft cover installation section so as to surround a plurality of pipes 35.

【0013】次に、ジョイント材13のブレース33が位置
することになる孔部22の下部13A をカッターで垂直方向
に切り取ってブレース挿通用切除部23を形成する。次
に、図1に示すように、第2部材2の正面板19及び側面
板21をそれぞれジョイント材13の切除部23にブレース33
が挿通されるようにして第1部材12上に配置する。そし
て、第2部材12の正面板19及び側面板21同士を接合する
と共に、ジョイント材13を第1部材12の上部に連結する
ことにより、本考案に係るパイプシャフトカバー11を設
置する。この後、ジョイント材13の孔部22や梁32等の隙
間に図示しないロックウールを充填して防火処理を施
す。
Next, the lower portion 13A of the hole 22 in which the brace 33 of the joint material 13 is located is vertically cut by a cutter to form a brace insertion cutout portion 23. Next, as shown in FIG. 1, the front plate 19 and the side plate 21 of the second member 2 are braced 33 to the cutout 23 of the joint material 13, respectively.
Is placed on the first member 12 so that Then, the front plate 19 and the side plate 21 of the second member 12 are joined together, and the joint material 13 is connected to the upper part of the first member 12 to install the pipe shaft cover 11 according to the present invention. Thereafter, rock wool (not shown) is filled in the gaps such as the holes 22 and the beams 32 of the joint material 13 to perform fire prevention treatment.

【0014】上記実施例に係るパイプシャフトカバー11
によれば、パイプシャフトカバー11にブレース33を通す
ための切除部23は、ジョイント材13のブレース33が位置
することになる孔部22の下部13A を垂直方向に切り取っ
てブレース挿通用切除部23を形成すればよく、ブレース
33が側面板16,21 又は正面板15,19 の側端から近い場所
にあっても、又は遠い場所にあっても、同じ短い切除部
23の形成で済む。従って、ブレース33が側面板16,21 又
は正面板15,19 の側端から遠い場所にある場合には、長
い切除部の形成が必要であった従来のパイプシャフトカ
バーと比べて、ブレースを通すためのための作業が容易
である。
Pipe shaft cover 11 according to the above embodiment
According to the above, the cutting portion 23 for passing the brace 33 through the pipe shaft cover 11 is formed by vertically cutting the lower portion 13A of the hole portion 22 where the brace 33 of the joint material 13 is located by cutting the brace insertion cutting portion 23. To form the brace
The same short cut, whether 33 is near or far from the side edges of the side plates 16,21 or the front plates 15,19.
23 formation is enough. Therefore, when the brace 33 is located far from the side edges of the side plates 16 and 21 or the front plates 15 and 19, the brace is passed through as compared with the conventional pipe shaft cover which requires the formation of a long cut portion. It is easy to work for.

【0015】また、ジョイント材13には、既に複数の孔
部22が形成されているため、ブレース挿通用切除部23の
形成の際、垂直方向に2本の切断線を入れればよく、孔
部22が形成されていない場合には、2本の垂直方向の切
断線と接続するように水平方向の切断線も形成しなけれ
ばならない場合と比べて、切断作業の簡易化が図れる。
更に、このように、どの部分に形成されたブレース挿通
用切除部23であっても、その長さが短く、しかも垂直方
向であるため、この切除部23によって切除部23の上の部
分のカバー11が不安定になることはない。
Further, since a plurality of holes 22 are already formed in the joint material 13, it is sufficient to insert two cutting lines in the vertical direction when forming the brace insertion cutout 23. When 22 is not formed, the cutting work can be simplified as compared with the case where a horizontal cutting line must be formed so as to be connected to the two vertical cutting lines.
Further, since the brace insertion cutting portion 23 formed in any portion in this way has a short length and is in the vertical direction, the cutting portion 23 covers the portion above the cutting portion 23. 11 will not be unstable.

【0016】なお、上記実施例では、ジョイント材13を
第2部材14の下部に設けたが、逆に第1部材12の上部に
設けるようにしてもよい。この場合、ブレース挿通用切
除部は、ジョイント材13のブレース33が位置することに
なる孔部22の上部を垂直方向に切り取ることにより形成
する。また、上記実施例では、孔部22が複数個等間隔で
形成されたジョイント材13を使用したが、孔部の形成さ
れていないジョイント材を使用することもできる。
Although the joint member 13 is provided in the lower portion of the second member 14 in the above embodiment, it may be provided in the upper portion of the first member 12 conversely. In this case, the brace insertion cutout portion is formed by vertically cutting off the upper portion of the hole portion 22 of the joint material 13 where the brace 33 is located. Further, in the above embodiment, the joint material 13 in which the plurality of holes 22 are formed at equal intervals is used, but a joint material in which no holes are formed may be used.

【0017】[0017]

【考案の効果】本考案に係るパイプシャフトカバーによ
れば、架設されたブレースを通すための作業を容易に行
うことができる。
According to the pipe shaft cover of the present invention, the work for passing the erected brace can be easily performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例に係るパイプシャフトカバー
の設置方法を示す斜視図である。
FIG. 1 is a perspective view showing a method of installing a pipe shaft cover according to an embodiment of the present invention.

【図2】同じ実施例のパイプシャフトカバーが設置され
た状態を示す斜視図である。
FIG. 2 is a perspective view showing a state in which a pipe shaft cover of the same embodiment is installed.

【図3】同じ実施例のパイプシャフトカバーが設置され
た状態を示す断面図である。
FIG. 3 is a sectional view showing a state in which the pipe shaft cover of the same embodiment is installed.

【図4】従来例に係るパイプシャフトカバーの設置方法
を示す斜視図である。
FIG. 4 is a perspective view showing a method of installing a pipe shaft cover according to a conventional example.

【図5】同じ従来例に係るパイプシャフトカバーの設置
方法を示す斜視図である。
FIG. 5 is a perspective view showing a method of installing a pipe shaft cover according to the same conventional example.

【符号の説明】[Explanation of symbols]

11 パイプシャフトカバー 12 第1部材 13 ジョイント材 14 第2部材 15,19 正面板 16,21 側面板 22 孔部 23 ブレース挿通用切除部 31 フレーム 32 梁 33 ブレース 34 建物である住宅 11 Pipe shaft cover 12 First member 13 Joint material 14 Second member 15,19 Front plate 16,21 Side plate 22 Hole 23 Brace insertion cutout 31 Frame 32 Beam 33 Brace 34 Building house

Claims (2)

(57)【実用新案登録請求の範囲】(57) [Scope of utility model registration request] 【請求項1】 梁間にブレースが架設された建物の前記
ブレースが通る所定区画内に設置されるパイプシャフト
カバーにおいて、 パイプシャフトカバー設置区画の下端から略ブレース架
設部位までの長さを有する第1部材及び略ブレース架設
部位から前記パイプシャフトカバー設置区画の上端まで
の長さを有する第2部材を備え、 かつ、前記第1部材の上部及び第2部材の下部のいずれ
か一方に前記ブレースが挿通されるジョイント材が設け
られ、このジョイント材を介して前記第1部材と第2部
材とが連結されて構成されていることを特徴とするパイ
プシャフトカバー。
1. A pipe shaft cover installed in a predetermined section through which the brace passes in a building in which a brace is installed between beams, wherein the pipe shaft cover has a length from a lower end of the installation section of the pipe shaft cover to a substantially brace installation site. A second member having a length from the member and substantially the brace installation portion to the upper end of the pipe shaft cover installation section, and the brace is inserted into either the upper portion of the first member or the lower portion of the second member. The pipe shaft cover is characterized in that a joint material is provided, and the first member and the second member are connected via the joint material.
【請求項2】 前記ジョイント材にブレースが挿通され
る複数の孔部が形成されていることを特徴とする請求項
1記載のパイプシャフトカバー。
2. The pipe shaft cover according to claim 1, wherein a plurality of holes through which the brace is inserted are formed in the joint material.
JP9995891U 1991-12-04 1991-12-04 Pipe shaft cover Expired - Lifetime JP2500581Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9995891U JP2500581Y2 (en) 1991-12-04 1991-12-04 Pipe shaft cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9995891U JP2500581Y2 (en) 1991-12-04 1991-12-04 Pipe shaft cover

Publications (2)

Publication Number Publication Date
JPH0547198U JPH0547198U (en) 1993-06-22
JP2500581Y2 true JP2500581Y2 (en) 1996-06-05

Family

ID=14261201

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9995891U Expired - Lifetime JP2500581Y2 (en) 1991-12-04 1991-12-04 Pipe shaft cover

Country Status (1)

Country Link
JP (1) JP2500581Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852322A (en) * 2012-10-16 2013-01-02 中国十七冶集团有限公司 Device of intensive pipe well of solar hot water pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852322A (en) * 2012-10-16 2013-01-02 中国十七冶集团有限公司 Device of intensive pipe well of solar hot water pipeline

Also Published As

Publication number Publication date
JPH0547198U (en) 1993-06-22

Similar Documents

Publication Publication Date Title
FR2531737A1 (en) PANEL CONSTRUCTION, PARTICULARLY FOR THE FITTING OF A STABLE STABLE FOR HORSES
JP2500581Y2 (en) Pipe shaft cover
JP2847382B2 (en) Construction method of the wall behind the hut
JP3241124B2 (en) Room unit with ceiling
JP2847383B2 (en) Construction method of the wall behind the eaves
JP2821617B2 (en) Roof panel support at Alcove
JP2840200B2 (en) Floor panel mounting structure
JP3413066B2 (en) Roof structure
JP4163851B2 (en) Wall frame joint structure
JP3027709B2 (en) Indoor partition wall, method of assembling the indoor partition wall, and decorative frame joined to the indoor partition wall
JP2764211B2 (en) Field support system on the back wall of eaves
JPH0710101U (en) Balcony mounting structure
JP3501224B2 (en) Exterior wall construction structure
TW504535B (en) Method for constructing buildings using fabricated elements
JP2787329B2 (en) Alcove hut back wall construction method
JP3339993B2 (en) Joining hardware for column base and base of wooden frame
JP2813553B2 (en) Steel basement with dry area
JP3247606B2 (en) How to install the opening frame for the partition
JP2812664B2 (en) Steel basement
JP4313512B2 (en) Building structural beams
JP3030316U (en) Earthquake-resistant metal fittings
JPH03265778A (en) Work execution method for pipe through part
JP2840199B2 (en) Floor structure
JP2004238976A (en) Cutoff structure for concrete construction
JPH0334981Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960116