JP2024069813A - Inter-company adjustment device and inter-company adjustment method - Google Patents

Inter-company adjustment device and inter-company adjustment method Download PDF

Info

Publication number
JP2024069813A
JP2024069813A JP2022180031A JP2022180031A JP2024069813A JP 2024069813 A JP2024069813 A JP 2024069813A JP 2022180031 A JP2022180031 A JP 2022180031A JP 2022180031 A JP2022180031 A JP 2022180031A JP 2024069813 A JP2024069813 A JP 2024069813A
Authority
JP
Japan
Prior art keywords
adjustment
company
information
order
proposal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022180031A
Other languages
Japanese (ja)
Inventor
晃久 辻部
聡士 永原
多津 野本
鉄平 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2022180031A priority Critical patent/JP2024069813A/en
Publication of JP2024069813A publication Critical patent/JP2024069813A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

【課題】サプライチェーンに属する複数の企業の中の企業間の取り決め上の不整合を調整するための調整案を生成して各企業に提示すること。【解決手段】サプライチェーンを構成する複数の企業の各々に属する各個別情報処理システムからの情報を入力情報としてそれぞれ入力する入力部と、複数の企業のうち受注側企業と発注側企業との間の取り決め上の不整合が発生しうる受発注に対する調整内容であって、受注側企業と発注側企業に対する調整内容を含む複数の対策を、受注側企業と発注側企業の在庫状況に対応づけて記録する調整案ライブラリ情報を有する記憶部と、入力部の入力による入力情報の各々と調整案ライブラリ情報とを基に複数の対策の中の少なくとも一つの対策を含む調整案を生成する調整案生成部と、調整案生成部の生成による調整案を含む情報を各個別情報処理システムに送信する出力部と、を備える。【選択図】図1[Problem] To generate an adjustment plan for adjusting inconsistencies in agreements between multiple companies belonging to a supply chain and present it to each company. [Solution] The system includes an input unit that inputs information from each individual information processing system belonging to each of the multiple companies constituting the supply chain as input information, a storage unit having adjustment plan library information that records multiple measures including adjustment contents for the order-receiving company and the ordering company, which are adjustment contents for ordering and receiving orders where inconsistencies in agreements between the order-receiving company and the ordering company among the multiple companies may occur, in association with the inventory statuses of the order-receiving company and the ordering company, an adjustment plan generation unit that generates an adjustment plan including at least one of the multiple measures based on each of the input information input by the input unit and the adjustment plan library information, and an output unit that transmits information including the adjustment plan generated by the adjustment plan generation unit to each individual information processing system. [Selected Figure] Figure 1

Description

本発明は、企業間調整装置および企業間調整方法に関する。 The present invention relates to an inter-company coordination device and an inter-company coordination method.

製造業においては、サプライヤ、工場、販社といった複数企業からなるサプライチェーンが同期して市場の需要に応える。近年は需要と供給の不確実性が高く、突発的な変化への迅速な対応が求められている。そのため、各企業は在庫などのリソースに余裕を持ち、不確実性と突発的な変化に対応している。しかし、企業間ではリソース情報は開示されないため、各企業は限られた情報で優先判断などの意思決定を行う。そのため、サプライチェーン全体にとっての不整合が発生し、納期遵守率・収益率の低下を招く場合がある。 In the manufacturing industry, a supply chain consisting of multiple companies such as suppliers, factories, and sales companies works in sync to meet market demand. In recent years, there has been a high degree of uncertainty in supply and demand, requiring rapid responses to sudden changes. For this reason, each company has surplus resources such as inventory to deal with uncertainty and sudden changes. However, resource information is not disclosed between companies, so each company makes decisions such as prioritizing with limited information. This can lead to inconsistencies in the entire supply chain, leading to lower delivery deadline compliance rates and profitability.

そこで、企業間の調整案を導出する技術が提案されている。例えば、特許文献1には、「交渉の相手方に示す提案の候補を設定し、設定された前記候補毎に、当該候補が前記相手方に受け入れられた場合の効用を示す、効用値を算出し、前記候補毎の前記効用値を用いて、設定基準を満たす前記候補を選出し、更に、選出した前記候補それぞれに、その効用値に基づいて、優先順位を設定し、前記相手方に対して、前記優先順位に沿って、選出された前記候補の1つを提案する。(中略)効用値は、メーカー(自分)からの提案をサプライヤー(相手方)が受け入れた場合に、メーカー(自分)が得られる(または、得られる可能性がある)好都合の程度を表す。」という技術が記載されている(要約参照)。 In response, a technology has been proposed for deriving an adjustment proposal between companies. For example, Patent Document 1 describes a technology that "sets proposal candidates to be presented to the negotiating party, calculates a utility value for each set candidate indicating the utility if the candidate is accepted by the negotiating party, selects the candidates that satisfy a set criterion using the utility value for each candidate, sets a priority for each selected candidate based on its utility value, and proposes one of the selected candidates to the negotiating party in accordance with the priority. (Omitted) The utility value represents the degree of convenience that the manufacturer (yourself) will obtain (or may obtain) if the supplier (the other party) accepts the proposal from the manufacturer (yourself)" (see abstract).

WO2020/183709号公報Publication No. WO2020/183709

特許文献1に記載されている技術においては、相手方との交渉案を自動で生成する機能を有しているが、自身の指標しか考慮しておらず、全体指標をよくするために個別指標に対する調整案を作成する手段については記載されていない。 The technology described in Patent Document 1 has the function of automatically generating negotiation proposals with the other party, but it only takes into account its own indicators, and does not describe a means for creating adjustment proposals for individual indicators to improve the overall indicators.

本発明の目的は、サプライチェーンに属する複数の企業の中の企業間の取り決め上の不整合を調整するための調整案を生成して各企業に提示することにある。 The objective of the present invention is to generate and present to each company an adjustment proposal for adjusting inconsistencies in agreements between multiple companies in a supply chain.

上記課題を解決するために、本発明は、サプライチェーンを構成する複数の企業の各々に属する各個別情報処理システムから、前記各個別情報処理システムの生成による情報を入力情報としてそれぞれ入力する入力部と、前記複数の企業のうち受注側企業と発注側企業との間の取り決め上の不整合が発生しうる受発注に対する調整内容であって、前記受注側企業と前記発注側企業に対する調整内容を含む複数の対策を、前記受注側企業と前記発注側企業の在庫状況に対応づけて記録する調整案ライブラリ情報を有する記憶部と、前記入力部の入力による前記入力情報の各々と前記調整案ライブラリ情報とを基に前記複数の対策の中の少なくとも一つの対策を含む調整案を生成する調整案生成部と、前記調整案生成部の生成による前記調整案を含む情報を前記各個別情報処理システムに送信する出力部と、を備えることを特徴とする。 In order to solve the above problem, the present invention is characterized by comprising an input unit that inputs information generated by each individual information processing system from each individual information processing system belonging to each of a plurality of companies constituting a supply chain as input information, a storage unit having adjustment plan library information that records a plurality of measures including adjustment contents for the order receiving company and the ordering company, which are adjustment contents for orders and purchases that may cause inconsistencies in the agreement between the order receiving company and the ordering company among the plurality of companies, in association with the inventory status of the order receiving company and the ordering company, an adjustment plan generation unit that generates an adjustment plan including at least one of the plurality of measures based on each of the input information input by the input unit and the adjustment plan library information, and an output unit that transmits information including the adjustment plan generated by the adjustment plan generation unit to each of the individual information processing systems.

本発明によれば、サプライチェーンに属する複数の企業の中の企業間の取り決め上の不整合を調整するための調整案を生成して各企業に提示することができる。 According to the present invention, it is possible to generate and present to each company an adjustment proposal for adjusting inconsistencies in agreements between multiple companies belonging to a supply chain.

上記した以外の課題、構成、及び効果は、以下の実施の形態の説明により明らかにされる。 Issues, configurations, and advantages other than those mentioned above will become clear from the description of the embodiments below.

本発明の実施例に係る企業間調整システムの機能ブロックの一例を示すブロック図である。1 is a block diagram showing an example of a functional block of an inter-company adjustment system according to an embodiment of the present invention. 本発明の実施例に係るサプライチェーン情報のデータ構造の一例を示す構成図である。FIG. 2 is a block diagram showing an example of a data structure of supply chain information according to an embodiment of the present invention. 本発明の実施例に係るBOM情報のデータ構造の一例を示す構成図である。FIG. 2 is a diagram illustrating an example of a data structure of BOM information according to an embodiment of the present invention. 本発明の実施例に係る受発注情報のデータ構造の一例を示す構成図である。FIG. 2 is a block diagram showing an example of a data structure of order information according to an embodiment of the present invention. 図5は、本発明の実施例に係る在庫情報のデータ構造の一例を示す構成図である。FIG. 5 is a diagram showing an example of a data structure of inventory information according to an embodiment of the present invention. 本発明の実施例に係る調整案ライブラリ情報のデータ構造の一例を示す構成図である。1 is a block diagram showing an example of a data structure of adjustment proposal library information according to an embodiment of the present invention. FIG. 本発明の実施例に係る調整案情報のデータ構造の一例を示す構成図である。1 is a block diagram illustrating an example of a data structure of adjustment proposal information according to an embodiment of the present invention. FIG. 本発明の実施例に係る調整案サマリ情報のデータ構造の一例を示す構成図である。1 is a block diagram showing an example of a data structure of adjustment proposal summary information according to an embodiment of the present invention. FIG. 本発明の実施例に係る調整順序情報のデータ構造の一例を示す構成図である。FIG. 4 is a block diagram illustrating an example of a data structure of adjustment order information according to an embodiment of the present invention. 本発明の実施例に係る回答結果情報のデータ構造の一例を示す構成図である。FIG. 4 is a diagram illustrating an example of a data structure of answer result information according to an embodiment of the present invention. 本発明の実施例に係る個別調整装置の調整案回答画面の一例を示す構成図である。FIG. 13 is a configuration diagram showing an example of an adjustment proposal response screen of the individual adjustment device according to the embodiment of the present invention. 本発明の実施例に係る個別調整装置の調整結果確認画面の一例を示す構成図である。FIG. 13 is a configuration diagram showing an example of an adjustment result confirmation screen of the individual adjustment device according to the embodiment of the present invention. 本発明の実施例に係る企業間調整装置のハードウェア構成例を示すブロック図である。1 is a block diagram showing an example of a hardware configuration of an inter-company adjustment device according to an embodiment of the present invention. 本発明の実施例に係る企業間処理システムの企業間調整処理の一例を示すフローチャートである。11 is a flowchart showing an example of inter-company reconciliation processing in the inter-company processing system according to the embodiment of the present invention.

以下、図面に基づいて、実施例を説明するが、本発明の範囲は実施例に限定されるものではない。本実施例では、対象物品のサプライチェーンにおける全体指標を向上させる調整案を自動で生成する。対象物品としては、例えば、自動車、電機製品、機械製品、昇降機装置、電車、航空機、発電機、制御装置、制御盤、ストレージ装置、NAS(Network Attached Storage)などのネットワークストレージ、サーバ、水処理装置などを挙げることができる。 Below, an embodiment will be described based on the drawings, but the scope of the present invention is not limited to the embodiment. In this embodiment, an adjustment plan for improving the overall indicators in the supply chain of a target item is automatically generated. Examples of the target item include automobiles, electrical products, mechanical products, elevators, trains, aircraft, generators, control devices, control panels, storage devices, network storage such as NAS (Network Attached Storage), servers, and water treatment devices.

図1は、本発明の実施例に係る企業間調整システムの機能ブロックの一例を示すブロック図である。図1において、企業間調整システム1は、企業間調整装置10と、各企業の個別システム2-1~2-Nと、を備え、企業間調整装置10と、各企業の個別システム2-1~2-Nが各々ネットワーク30を介して通信可能に接続される。 Figure 1 is a block diagram showing an example of the functional blocks of an inter-company coordination system according to an embodiment of the present invention. In Figure 1, the inter-company coordination system 1 includes an inter-company coordination device 10 and individual systems 2-1 to 2-N of each company, and the inter-company coordination device 10 and the individual systems 2-1 to 2-N of each company are connected to each other so as to be able to communicate with each other via a network 30.

企業間調整装置10は、PC(Personal Computer)又はサーバーコンピュータ等の情報処理装置である。企業間調整装置10は、入力部11と、演算部12と、記憶部13と、出力部14と、通信部15と、を備える。 The inter-company coordination device 10 is an information processing device such as a PC (Personal Computer) or a server computer. The inter-company coordination device 10 includes an input unit 11, a calculation unit 12, a storage unit 13, an output unit 14, and a communication unit 15.

入力部11は、キーボードやタッチパネル等の入力装置を介して、企業間調整装置10への情報の入力を受け付ける。演算部12は、各企業から情報を取得し各企業に対する調整案を導出する。記憶部13は、企業間調整に必要な情報を記憶している。出力部14は、ディスプレイ等の出力装置に対して情報を出力させる。通信部15は、ネットワーク30を介して接続された他の装置との間で情報を送信又は受信する。 The input unit 11 accepts information input to the inter-company coordination device 10 via an input device such as a keyboard or touch panel. The calculation unit 12 acquires information from each company and derives a coordination proposal for each company. The memory unit 13 stores information necessary for inter-company coordination. The output unit 14 outputs information to an output device such as a display. The communication unit 15 transmits and receives information to and from other devices connected via the network 30.

入力部11は、サプライチェーン情報受付部110と、回答結果受付部111と、を備える。サプライチェーン情報受付部110及び回答結果受付部111は、各々通信部15を介して必要な情報を各企業のユーザ端末21又はデータベース22から取得し、取得した情報を記憶部13に格納する。 The input unit 11 includes a supply chain information receiving unit 110 and a response result receiving unit 111. The supply chain information receiving unit 110 and the response result receiving unit 111 each obtain necessary information from each company's user terminal 21 or database 22 via the communication unit 15, and store the obtained information in the memory unit 13.

演算部12は、調整案生成部120と、調整コスト算出部121と、調整順序生成部122と、調整案問合せ部123と、調整案更新部124と、調整結果生成部125と、を備える。 The calculation unit 12 includes an adjustment proposal generation unit 120, an adjustment cost calculation unit 121, an adjustment order generation unit 122, an adjustment proposal inquiry unit 123, an adjustment proposal update unit 124, and an adjustment result generation unit 125.

調整案生成部120は、後述するように、サプライチェーン情報と、BOM(Bill Of Material)情報と、受発注情報と、在庫情報と、調整案ライブラリ情報とから、サプライチェーン全体を評価する指標である全体評価指標を向上させるための調整案の情報を生成し、生成した情報を調整案情報135として記憶部13に格納する。 As described below, the adjustment proposal generation unit 120 generates information on adjustment proposals for improving the overall evaluation index, which is an index for evaluating the entire supply chain, from supply chain information, BOM (Bill Of Material) information, order information, inventory information, and adjustment proposal library information, and stores the generated information in the memory unit 13 as adjustment proposal information 135.

調整コスト算出部121は、調整案生成部120で生成された各調整案での調整に係るコストを調整コストとして算出し、算出した調整コストの情報を調整案情報135に追記して記憶部13に格納する。また、調整コスト算出部121は、調整案生成部120で生成された調整案毎の調整コストを算出し、算出結果から調整案毎の調整コストの情報を生成し、生成した情報を調整案サマリ情報136として記憶部13に格納する。 The adjustment cost calculation unit 121 calculates the cost related to the adjustment in each adjustment plan generated by the adjustment plan generation unit 120 as an adjustment cost, adds information on the calculated adjustment cost to the adjustment plan information 135, and stores it in the storage unit 13. The adjustment cost calculation unit 121 also calculates the adjustment cost for each adjustment plan generated by the adjustment plan generation unit 120, generates information on the adjustment cost for each adjustment plan from the calculation result, and stores the generated information in the storage unit 13 as adjustment plan summary information 136.

調整順序生成部122は、調整案情報135の調整コストを参照し、調整案生成部120で生成された各調整案を、調整コストが小さい順に並び替えた調整順序を生成し、生成した調整順序と各調整案との関係を含む情報を調整順序情報137として記憶部13に格納する。 The adjustment order generation unit 122 references the adjustment costs in the adjustment plan information 135, generates an adjustment order by rearranging each adjustment plan generated by the adjustment plan generation unit 120 in ascending order of adjustment cost, and stores information including the relationship between the generated adjustment order and each adjustment plan as adjustment order information 137 in the storage unit 13.

調整案問合せ部123は、調整順序生成部122で生成された調整順序情報137に記録された調整順序の順に各調整案の情報を、通信部15を介して各企業のユーザ端末21に送信し、各企業に対して調整案の内容について問い合わせる。この際、調整案問合せ部123は、調整案情報135を参照し、調整案情報135を基に調整案回答画面情報を生成し、生成した調整案回答画面情報を出力部14に転送する。 The adjustment proposal inquiry unit 123 transmits information on each adjustment proposal in the order of the adjustment order recorded in the adjustment order information 137 generated by the adjustment order generation unit 122 to the user terminal 21 of each company via the communication unit 15, and inquires of each company about the contents of the adjustment proposal. At this time, the adjustment proposal inquiry unit 123 refers to the adjustment proposal information 135, generates adjustment proposal answer screen information based on the adjustment proposal information 135, and transfers the generated adjustment proposal answer screen information to the output unit 14.

調整案更新部124は、企業間調整装置10から各企業に提案した調整案についての回答結果(調整案回答)を、回答結果受付部111が、通信部15を介して受信した場合、受信した回答結果(調整案回答)を基に回答結果情報138を生成し、生成した回答結果情報138を記憶部13に格納する。 When the response result receiving unit 111 receives a response result (adjustment proposal response) regarding the adjustment proposal proposed to each company from the inter-company adjustment device 10 via the communication unit 15, the adjustment proposal update unit 124 generates response result information 138 based on the received response result (adjustment proposal response) and stores the generated response result information 138 in the memory unit 13.

調整結果生成部125は、調整案情報135と回答結果情報138を基に調整結果を確認するために示す調整結果確認画面情報を生成し、生成した調整結果確認画面情報を出力部14に転送する。 The adjustment result generation unit 125 generates adjustment result confirmation screen information that is displayed to confirm the adjustment result based on the adjustment proposal information 135 and the response result information 138, and transfers the generated adjustment result confirmation screen information to the output unit 14.

記憶部13は、サプライチェーン情報130と、BOM情報131と、受発注情報132と、在庫情報133と、調整案ライブラリ情報134と、調整案情報135と、調整案サマリ情報136と、調整順序情報137と、回答結果情報138と、を記憶する。 The memory unit 13 stores supply chain information 130, BOM information 131, order information 132, inventory information 133, adjustment plan library information 134, adjustment plan information 135, adjustment plan summary information 136, adjustment order information 137, and response result information 138.

出力部14は、調整案通知部140と、調整結果通知部141と、を備える。調整案通知部140は、調整案問合せ部123から転送された調整案回答画面情報を、通信部15を介してユーザ端末21に送信する機能を備える。この際、各企業のユーザ端末21の調整案回答画面(図11参照)には、後述するように、対象となる企業名と、調整対象となる受発注データと、調整内容と、受諾するか否かを示す回答欄と、登録ボタンと、が表示される。 The output unit 14 includes an adjustment proposal notification unit 140 and an adjustment result notification unit 141. The adjustment proposal notification unit 140 has a function of transmitting the adjustment proposal response screen information transferred from the adjustment proposal inquiry unit 123 to the user terminal 21 via the communication unit 15. At this time, the adjustment proposal response screen (see FIG. 11) of each company's user terminal 21 displays the target company name, the order data to be adjusted, the adjustment content, a response field indicating whether to accept or not, and a registration button, as described below.

調整結果通知部141は、調整結果生成部125から転送された調整結果確認画面情報を、通信部15を介してユーザ端末21に送信する機能を備える。この際、各企業のユーザ端末21の調整結果確認画面(図12参照)には、後述するように、調整内容と、全体評価指標の情報と、が表示される。 The adjustment result notification unit 141 has a function of transmitting the adjustment result confirmation screen information transferred from the adjustment result generation unit 125 to the user terminal 21 via the communication unit 15. At this time, the adjustment content and information on the overall evaluation index are displayed on the adjustment result confirmation screen (see FIG. 12) of each company's user terminal 21, as described below.

個別システム2-1及び2-Nは、各企業のユーザ端末21と、各企業のデータベース22と、各企業の個別調整装置23と、を備え、それぞれ個別情報処理システムとして構成される。 The individual systems 2-1 and 2-N each include a user terminal 21 for each company, a database 22 for each company, and an individual adjustment device 23 for each company, and are each configured as an individual information processing system.

ユーザ端末21は、PC等の情報処理装置であって、企業間調整装置10により提供される企業間調整サービスを利用する利用者により操作される。データベース22は、例えばERP(Enterprise Resource Planning)等のシステム、またはそれに準じるデータを蓄積したデータベース、又は記憶装置である。データベース22には、各企業の個別調整装置23により生成される情報として、例えば、サプライチェーン情報130と、BOM(Bill Of Material)情報131と、受発注情報132、及び在庫情報133が格納される。 The user terminal 21 is an information processing device such as a PC, and is operated by a user who uses the inter-company coordination service provided by the inter-company coordination device 10. The database 22 is, for example, a system such as ERP (Enterprise Resource Planning), or a database that accumulates data equivalent thereto, or a storage device. The database 22 stores, for example, supply chain information 130, BOM (Bill Of Material) information 131, order information 132, and inventory information 133 as information generated by each company's individual coordination device 23.

個別調整装置23は、PC又はサーバーコンピュータ等の情報処理装置である。個別調整装置23は、通信部24と、入力部25と、演算部26と、出力部27と、を備える。 The individual adjustment device 23 is an information processing device such as a PC or a server computer. The individual adjustment device 23 includes a communication unit 24, an input unit 25, a calculation unit 26, and an output unit 27.

通信部24は、ネットワーク30を介して接続された他の装置との間で情報を送信又は受信する。入力部25は、キーボードやタッチパネル等の入力装置を介して、個別調整装置23への情報の入力を受け付ける。演算部26は、企業間調整装置10から提案された調整案の検討とオペレーションを実施する。出力部27は、ディスプレイ等の出力装置に対して情報を出力する。 The communication unit 24 transmits and receives information to and from other devices connected via the network 30. The input unit 25 accepts information input to the individual adjustment device 23 via an input device such as a keyboard or touch panel. The calculation unit 26 considers and operates the adjustment plan proposed by the inter-company adjustment device 10. The output unit 27 outputs information to an output device such as a display.

入力部25は、調整案受付部250と、調整結果受付部251と、を備える。調整案受付部250及び調整結果受付部251は、通信部24を介して企業間調整装置10から情報を取得する。 The input unit 25 includes an adjustment proposal receiving unit 250 and an adjustment result receiving unit 251. The adjustment proposal receiving unit 250 and the adjustment result receiving unit 251 acquire information from the inter-company adjustment device 10 via the communication unit 24.

演算部26は、調整案検討部260と、オペレーション実施部261と、を備える。調整案検討部260は、調整案受付部251で受け付けた調整案が受諾可能か否かを検討する。オペレーション実施部261は、調整結果受付部251で受け付けた調整結果に応じて、自身が受諾した調整内容をオペレーション実施する。 The calculation unit 26 includes an adjustment proposal review unit 260 and an operation implementation unit 261. The adjustment proposal review unit 260 reviews whether the adjustment proposal accepted by the adjustment proposal acceptance unit 251 is acceptable or not. The operation implementation unit 261 implements an operation for the adjustment content that it has accepted, according to the adjustment result accepted by the adjustment result acceptance unit 251.

出力部27は、回答結果通知部270を備える。回答結果通知部270は、調整案検討部260で検討した結果を回答結果として生成し、生成した回答結果の情報を、通信部24を介して企業間調整装置10に送信する。 The output unit 27 includes a response result notification unit 270. The response result notification unit 270 generates the results considered by the adjustment proposal review unit 260 as a response result, and transmits information on the generated response result to the inter-company adjustment device 10 via the communication unit 24.

ネットワーク30は、企業間調整装置10と、ユーザ端末21と、データベース22と、個別調整装置23を通信可能に接続する。ネットワーク30は、コンピュータネットワーク(CN)であって、例えばLAN(Local Area Network)、WAN(Wide Area Network)、VPN(Virtual Private Network)、又はインターネット等の一般公衆回線を一部又は全部に用いた通信網のいずれかである。 The network 30 communicatively connects the inter-company coordination device 10, the user terminal 21, the database 22, and the individual coordination device 23. The network 30 is a computer network (CN), such as a LAN (Local Area Network), a WAN (Wide Area Network), a VPN (Virtual Private Network), or a communication network that uses general public lines such as the Internet in part or in whole.

なお、本実施例では、ユーザ端末21とデータベース22とを個別調整装置23の外部に設けているが、個別システム2-1の構成はこれに限られない。例えば、データベース22に記憶される情報を、新たに記憶部を設けて格納してもよい。企業間調整装置システム1の装置構成は、本実施例の目的を損なわない限りにおいて、適宜変更が可能である。 In this embodiment, the user terminal 21 and the database 22 are provided outside the individual adjustment device 23, but the configuration of the individual system 2-1 is not limited to this. For example, the information stored in the database 22 may be stored in a new storage unit. The device configuration of the inter-company adjustment device system 1 can be changed as appropriate as long as it does not impair the purpose of this embodiment.

図2は、本発明の実施例に係るサプライチェーン情報のデータ構造の一例を示す構成図である。図2において、サプライチェーン情報130は、サプライチェーンのパスに関わる情報として、各企業の個別調整装置23で生成され、各企業のデータベース22及び企業間調整装置の記憶部13に格納される情報である。このサプライチェーン情報130は、From企業1301と、To企業1302と、品目1303と、輸送リードタイム(LT)1304を備える。サプライチェーン情報130は、品目が、From企業からTo企業へ輸送リードタイムの時間を要して輸送されることを示す情報である。すなわち、サプライチェーン情報130には、受注側企業から発注側企業に品目を輸送するのに要する輸送リードタイムの情報が記録されている。 Figure 2 is a block diagram showing an example of the data structure of supply chain information according to an embodiment of the present invention. In Figure 2, supply chain information 130 is information related to the supply chain path that is generated by the individual coordination device 23 of each company and stored in the database 22 of each company and the memory unit 13 of the inter-company coordination device. This supply chain information 130 includes a From company 1301, a To company 1302, an item 1303, and a transportation lead time (LT) 1304. The supply chain information 130 is information indicating that an item is transported from the From company to the To company over the transportation lead time. In other words, the supply chain information 130 records information on the transportation lead time required to transport an item from the order-receiving company to the ordering company.

From企業1301には、部品や製品などの供給元(受注側企業)として、例えば、「サプライヤ1」の情報が記録される。To企業1302には、部品や製品などの供給先(発注側企業)として、例えば、「工場1」の情報が記録される。品目1303には、部品や製品などの名称として、例えば、「部品A」の情報が記録される。輸送リードタイム(LT)1304には、部品や製品などの品目をFrom企業からTo企業へ輸送するのに要する時間(日数)として、例えば、「7日」の情報が記録される。 In the From Company 1301, information such as "Supplier 1" is recorded as the source of parts, products, etc. (the company receiving the order). In the To Company 1302, information such as "Factory 1" is recorded as the destination of parts, products, etc. (the company placing the order). In the Item 1303, information such as "Part A" is recorded as the name of the part, product, etc. In the Transportation Lead Time (LT) 1304, information such as "7 days" is recorded as the time (number of days) required to transport items such as parts and products from the From Company to the To Company.

図3は、本発明の実施例に係るBOM情報のデータ構造の一例を示す構成図である。図3において、BOM情報131は、製造機能を有する企業の個別調整装置23で生成される部品構成情報であって、データベース22及び企業間調整装置23の記憶部13に格納される情報である。このBOM情報131は、製造企業1311と、子品目1312と、親品目1313と、員数1314と、製造リードタイム(LT)1315を備え、親品目の製造1単位あたりの子品目の構成数を記録する。すなわち、BOM情報131には、複数の企業のうち製造企業が品目を製造するのに要する製造リードタイムの情報が記録されている。 Figure 3 is a block diagram showing an example of the data structure of BOM information according to an embodiment of the present invention. In Figure 3, BOM information 131 is part configuration information generated by an individual adjustment device 23 of a company with manufacturing capabilities, and is information stored in the database 22 and the memory unit 13 of the inter-company adjustment device 23. This BOM information 131 includes a manufacturing company 1311, child items 1312, a parent item 1313, a quantity 1314, and a manufacturing lead time (LT) 1315, and records the number of child items configured per one unit of production of a parent item. In other words, BOM information 131 records information on the manufacturing lead time required for a manufacturing company among multiple companies to manufacture an item.

製造企業1311には、部品や製品などの品目を製造する製造元として、例えば、「サプライヤ1」の情報が記録される。子品目1312には、部品や製品などの品目を親子の関係で分けたときに、子に相当する品目(親を構成するための品目)として、例えば、「材料A」の情報が記録される。親品目1313には、部品や製品などの品目を親子の関係で分けたときに、親に相当する品目(子から構成された品目)として、例えば、「部品A」の情報が記録される。員数1314には、親品目を構成するための子品目の数として、例えば、「1個」の情報が記録される。製造リードタイム(LT)1315には、子品目から親品目を製造するのに要する時間(日数)として、例えば、「3日」の情報が記録される。 In the manufacturing company 1311, information such as "Supplier 1" is recorded as the manufacturer that produces items such as parts and products. In the child item 1312, information such as "Material A" is recorded as the item that corresponds to the child (item that constitutes the parent) when items such as parts and products are divided into parent-child relationships. In the parent item 1313, information such as "Part A" is recorded as the item that corresponds to the parent (item that is composed of children) when items such as parts and products are divided into parent-child relationships. In the quantity 1314, information such as "1 piece" is recorded as the number of child items that constitute the parent item. In the manufacturing lead time (LT) 1315, information such as "3 days" is recorded as the time (number of days) required to manufacture the parent item from the child items.

図4は、本発明の実施例に係る受発注情報のデータ構造の一例を示す構成図である。図4において、受発注情報132は、対象物品の受発注に関する情報として、各企業の個別調整装置23で生成され、各企業のデータベース22及び各企業の企業間調整装置23の記憶部13に格納される情報である。この受発注情報132は、From企業1321と、To企業1322と、品目1323と、数量1324と、要求納期1325と、回答納期1326を備える。 Figure 4 is a block diagram showing an example of the data structure of order information according to an embodiment of the present invention. In Figure 4, order information 132 is information related to the ordering and placement of the target item that is generated by each company's individual coordination device 23 and stored in each company's database 22 and the memory unit 13 of each company's inter-company coordination device 23. This order information 132 includes a From company 1321, a To company 1322, an item 1323, a quantity 1324, a requested delivery date 1325, and a replied delivery date 1326.

From企業1321には、部品や製品などの供給元(受注側企業)として、例えば、「サプライヤ1」の情報が記録される。To企業1322には、部品や製品などの供給先(発注側企業)として、例えば、「工場1」の情報が記録される。対象物品である品目1323には、部品や製品などの名称として、例えば、「部品A」の情報が記録される。数量1324には、部品や製品などの受注量(発注量)として、例えば、「10個」の情報が記録される。要求納期1325には、部品や製品などを納品する供給元(受注側企業)に要求された納期(日付)として、例えば、「6/15」の情報が記録される。回答納期1326には、要求納期1325に対して、供給元(受注側企業)が納品できると回答した納期(日付)として、例えば、「6/17」の情報が記録される。この場合、要求納期1325の「6/15」に対して、回答納期1326が「6/17」となるので、納期が2日遅延することになり、納期遅延リスクが発生することになる。 In the From Company 1321, information such as "Supplier 1" is recorded as the supplier (receiving company) of parts, products, etc. In the To Company 1322, information such as "Factory 1" is recorded as the supply destination (ordering company) of parts, products, etc. In the item 1323, which is the target item, information such as "Part A" is recorded as the name of the part, product, etc. In the quantity 1324, information such as "10 pieces" is recorded as the order quantity (order amount) of the part, product, etc. In the requested delivery date 1325, information such as "6/15" is recorded as the delivery date (date) requested by the supplier (receiving company) that delivers the parts, products, etc. In the responded delivery date 1326, information such as "6/17" is recorded as the delivery date (date) that the supplier (receiving company) responded that it can deliver in response to the requested delivery date 1325. In this case, the requested delivery date 1325 is "6/15" and the responded delivery date 1326 is "6/17", so the delivery date will be delayed by two days, creating a risk of delivery delay.

図5は、本発明の実施例に係る在庫情報のデータ構造の一例を示す構成図である。図5において、在庫情報133は、各企業の各品目の現時点までの在庫を示す情報として、各企業の個別調整装置23で生成され、各企業のデータベース22及び各企業の企業間調整装置23の記憶部13に格納される情報である。この在庫情報133は、企業1331と、品目1332と、時点1333と、在庫量1334を備える。 Figure 5 is a block diagram showing an example of the data structure of inventory information according to an embodiment of the present invention. In Figure 5, inventory information 133 is information indicating the current inventory of each item at each company, which is generated by each company's individual adjustment device 23 and stored in each company's database 22 and the memory unit 13 of each company's inter-company adjustment device 23. This inventory information 133 includes company 1331, item 1332, time 1333, and inventory amount 1334.

企業1331には、部品や製品などを保管する企業の名称として、例えば、「サプライヤ1」の情報が記録される。品目1332には、企業に保管される部品や製品などの名称として、例えば、「部品A」の情報が記録される。時点1333には、企業間調整装置10により企業間調整処理が実行される時間(日付)として、例えば、「6/1」の情報が記録される。在庫量1334には、時点1333に記録された時間(日付)である現時点における部品や製品などの在庫の数として、例えば、「50」の情報が記録される。なお、現時点において、部品や製品などの在庫が存在しないときには、「0」の情報が記録される。 In company 1331, information such as "Supplier 1" is recorded as the name of the company storing parts, products, etc. In item 1332, information such as "Part A" is recorded as the name of the part, product, etc. stored at the company. In time 1333, information such as "6/1" is recorded as the time (date) when the inter-company reconciliation process is performed by the inter-company reconciliation device 10. In inventory amount 1334, information such as "50" is recorded as the number of parts, products, etc. in stock at the current time, which is the time (date) recorded in time 1333. Note that when there are no parts, products, etc. in stock at the current time, information such as "0" is recorded.

図6は、本発明の実施例に係る調整案ライブラリ情報のデータ構造の一例を示す構成図である。図6において、調整案ライブラリ情報134は、当該受発注取引に関わる受注側企業(From企業)と発注側企業(To企業)の在庫状況に応じた、From/To企業に対する対策をまとめた情報として、企業間調整装置10で生成され、企業間調整装置10の記憶部13に格納される情報である。この調整案ライブラリ情報134は、調整案ライブラリ番号(#)1341と、From企業子品目在庫1342と、From企業親品目在庫1343と、To企業子品目在庫1344と、To企業親品目在庫1345と、From企業調整内容1346と、To企業調整内容1347と、を備える。すなわち、調整案ライブラリ情報134は、受注側企業の管理下にある受注側管理品目の在庫の有無と発注側企業の管理下にある発注側管理品目の在庫の有無との組合せ毎に複数の対策の各々が対応づけられ、各対策には、受注側企業に対する調整内容(第1調整内容)と発注側企業に対する調整内容(第2調整内容)が規定されている。 Figure 6 is a configuration diagram showing an example of the data structure of adjustment proposal library information according to an embodiment of the present invention. In Figure 6, adjustment proposal library information 134 is information generated by the inter-company adjustment device 10 and stored in the memory unit 13 of the inter-company adjustment device 10 as information summarizing measures for the From/To companies according to the inventory status of the order-receiving company (From company) and the ordering company (To company) involved in the order-receiving transaction. This adjustment proposal library information 134 includes an adjustment proposal library number (#) 1341, From company child item inventory 1342, From company parent item inventory 1343, To company child item inventory 1344, To company parent item inventory 1345, From company adjustment content 1346, and To company adjustment content 1347. In other words, the adjustment proposal library information 134 associates multiple measures with each combination of the availability of inventory of an order-receiving-side managed item under the management of the order-receiving company and the availability of inventory of an order-receiving-side managed item under the management of the order-receiving company, and each measure specifies the adjustment content for the order-receiving company (first adjustment content) and the adjustment content for the order-receiving company (second adjustment content).

調整案ライブラリ番号(#)1341には、調整案を管理する番号が、「1」から順番に記録される。From企業子品目在庫1342には、From企業の親品目に対する在庫の有無を表す情報として、例えば、在庫がある場合、「有」の情報が記録され、在庫が無い場合には、「無」の情報が記録される。From企業親品目在庫1343には、From企業の子品目に対する在庫の有無を表す情報として、例えば、在庫がある場合、「有」の情報が記録され、在庫が無い場合には、「無」の情報が記録される。To企業子品目在庫1344には、To企業の子品目に対する在庫の有無を表す情報として、例えば、在庫がある場合、「有」の情報が記録され、在庫が無い場合には、「無」の情報が記録される。To企業親品目在庫1345には、To企業の親品目に対する在庫の有無を表す情報として、例えば、在庫がある場合、「有」の情報が記録され、在庫が無い場合には、「無」の情報が記録される。From企業調整内容1346には、From企業に対する調整内容を表す情報として、例えば、短いリードタイムの輸送手段に変更する必要がある場合、「短LTの輸送手段に変更」の情報が記録される。To企業調整内容1347には、To企業に対する調整内容を表す情報として、例えば、納期を延伸する必要がある場合、「納期延伸」の情報が記録される。 In the adjustment proposal library number (#) 1341, the number for managing the adjustment proposal is recorded in order starting from "1". In the From company child item inventory 1342, information indicating the presence or absence of inventory for the parent item of the From company is recorded, for example, "yes" if there is inventory, and "no" if there is no inventory. In the From company parent item inventory 1343, information indicating the presence or absence of inventory for the child item of the From company is recorded, for example, "yes" if there is inventory, and "no" if there is no inventory. In the To company child item inventory 1344, information indicating the presence or absence of inventory for the child item of the To company is recorded, for example, "yes" if there is inventory, and "no" if there is no inventory. In the To company parent item inventory 1345, information indicating the presence or absence of inventory for the parent item of the To company is recorded, for example, "yes" if there is inventory, and "no" if there is no inventory. In From company adjustment details 1346, information indicating the adjustment details for the From company is recorded, for example, if a change to a means of transportation with a short lead time is required, information such as "change to a means of transportation with short LT" is recorded. In To company adjustment details 1347, information indicating the adjustment details for the To company is recorded, for example, if a delivery date needs to be extended, information such as "delivery date extension" is recorded.

なお、在庫の有無に関して、在庫の有無が判別条件に含まれない場合には、From企業子品目在庫1342と、From企業親品目在庫1343と、To企業子品目在庫1344、及びTo企業親品目在庫1345には、それぞれ「-」の情報が記録される。また、調整内容に関して、該当する調整内容が存在しない場合には、From企業調整内容1346とTo企業調整内容1347には、それぞれ「-」の情報が記録される。また、調整案ライブラリ番号(#)1341の1番から12番には、当事者間の調整に用いる調整案のライブラリ情報が記録され、調整案ライブラリ番号(#)1341の13番から18番には、第三者の余裕を活用した調整案のライブラリ情報が記録される。 Regarding the availability of inventory, if the availability of inventory is not included in the discrimination conditions, the information "-" is recorded in From company child item inventory 1342, From company parent item inventory 1343, To company child item inventory 1344, and To company parent item inventory 1345. Regarding the adjustment content, if there is no relevant adjustment content, the information "-" is recorded in From company adjustment content 1346 and To company adjustment content 1347. Furthermore, in adjustment proposal library number (#) 1341, numbers 1 to 12 record library information of adjustment proposals used for adjustment between the parties, and in adjustment proposal library number (#) 1341, numbers 13 to 18 record library information of adjustment proposals utilizing the slack of a third party.

ここで、調整案ライブラリ情報134のうち調整案ライブラリ番号(#)1341が6番の場合を例に取って説明すると、From企業の子品目の在庫が0より大きな値であり、From企業の親品目の在庫が0より大きな値であり、To企業の子品目在庫が0であった場合、From企業側の調整内容として「短LTの輸送手段に変更」が存在し、To企業側で実施できる調整内容は、「-」であって、調整内容が存在しないことになる。この際、From企業側の親品目とTo企業側の子品目は同じ品目であり、From企業側の子品目とTo企業側の親品目は、BOM情報131より把握可能である。またFrom企業側の子品目が複数ある場合は、全ての子品目の在庫を確認し、一つでも在庫が0であれば、子品目の在庫は無となる。 Here, let's take an example where the adjustment plan library number (#) 1341 in the adjustment plan library information 134 is 6. If the inventory of the From company's child item is greater than 0, the inventory of the From company's parent item is greater than 0, and the To company's child item inventory is 0, the From company's adjustment content will be "change to short LT transportation method," and the To company's adjustable content will be "-," meaning that there is no adjustment content. In this case, the From company's parent item and the To company's child item are the same item, and the From company's child item and the To company's parent item can be identified from the BOM information 131. Furthermore, if the From company has multiple child items, the inventory of all child items is checked, and if even one of them has 0 inventory, the child item is deemed to have no inventory.

調整案ライブラリ情報134を用いるに際しては、在庫の「有無」だけを判定条件にして説明したが、設備や人員などのリソースの「有無」などを判定条件としてもよく、また他の条件を組合せても構わない。 When using the adjustment proposal library information 134, the only criterion used in the explanation was the "presence" of inventory, but the "presence" of resources such as equipment and personnel could also be used as a criterion, and other conditions could also be combined.

図7は、本発明の実施例に係る調整案情報のデータ構造の一例を示す構成図である。図7において、調整案情報135は、調整案生成部120の生成による各調整案の調整内容を纏めた情報であって、企業間調整装置10の記憶部13に格納される。この調整案情報135は、調整案1351と、対策1352と、企業1353と、調整内容1354と、対象品目1355と、対象数量1356と、対象納期1357と、調整コスト1358と、を備える。 Figure 7 is a block diagram showing an example of the data structure of adjustment proposal information according to an embodiment of the present invention. In Figure 7, adjustment proposal information 135 is information summarizing the adjustment contents of each adjustment proposal generated by the adjustment proposal generation unit 120, and is stored in the memory unit 13 of the inter-company adjustment device 10. This adjustment proposal information 135 includes an adjustment proposal 1351, a measure 1352, a company 1353, adjustment contents 1354, a target item 1355, a target quantity 1356, a target delivery date 1357, and an adjustment cost 1358.

調整案1351には、調整案番号を表す情報として、例えば、「1」の情報が記録される。対策1352には、対策番号を表す情報として、例えば、「1」の情報が記録される。企業1353には、調整案が適用される企業の名称として、例えば、「サプライヤ1」の情報が記録される。調整内容1354には、調整案の内容として、例えば、企業に稼働時間の追加が要求される場合、「稼働時間追加」の情報が記録される。対象品目1355には、企業の納品対象となる品目として、例えば、「部品A」の情報が記録される。対象数量1356には、企業の納品対象となる品目の数量として、例えば、「10」の情報が記録される。対象納期1357には、企業の納品対象となる品目の納期として、例えば、「6/1」の情報が記録される。調整コスト1358には、調整案に対して調整に係る費用として、例えば、「稼働時間追加」の調整コストを「100」とし、対策実施企業数(ステークホルダー)が1社の調整コストを「1」とした場合、両者の合計である「101」の情報が記録される。 In adjustment proposal 1351, information such as "1" is recorded as information indicating the adjustment proposal number. In measure 1352, information such as "1" is recorded as information indicating the measure number. In company 1353, information such as "Supplier 1" is recorded as the name of the company to which the adjustment proposal applies. In adjustment content 1354, information such as "additional operating hours" is recorded as the content of the adjustment proposal, for example, if an additional operating time is requested of the company. In target item 1355, information such as "Part A" is recorded as the item to be delivered by the company. In target quantity 1356, information such as "10" is recorded as the quantity of the item to be delivered by the company. In target delivery date 1357, information such as "6/1" is recorded as the delivery date of the item to be delivered by the company. In the adjustment cost 1358, the cost related to the adjustment to the adjustment proposal is recorded. For example, if the adjustment cost of "adding operating hours" is "100" and the adjustment cost for a company with one countermeasure implementation company (stakeholder) is "1", the total of the two, "101", is recorded.

なお、調整案情報135には、調整案番号が2番のレコードが4つあり、そのうち対策番号2番のレコードが2つ、3番のレコードが2つある。ここで、調整案番号が同じものと対策番号が同じものはセットであることを意味している。例えば、対策番号2番は、「工場2に、製品Aを10個6/10要求納期の受注に対して、他拠点・他品目を優先する」という調整内容(調整案番号が2番)と、「販社2に、製品Aを10個6/10要求納期の受注に対して、納期延伸する」という調整内容(調整案番号が2番)の2つがセットになっている。対策番号3番も同様に2つの調整内容(調整案番号が2番)がセットとなっており、調整案番号2番の調整案は、4つの調整内容が全て受諾されて成り立つ調整内容となる。また、調整案番号2番の調整案については、調整内容に「稼働時間追加」がないので、調整コスト1358には、「1」の情報が記録される。 In the adjustment proposal information 135, there are four records with the adjustment proposal number 2, of which there are two records with the measure number 2 and two records with the measure number 3. Here, it means that the same adjustment proposal number and the same measure number are a set. For example, measure number 2 is a set of two adjustment contents: "Give priority to other bases and other items for orders of 10 units of product A from factory 2 with a required delivery date of 6/10" (adjustment proposal number 2), and "Extend the delivery date for orders of 10 units of product A from distributor 2 with a required delivery date of 6/10" (adjustment proposal number 2). Similarly, measure number 3 is a set of two adjustment contents (adjustment proposal number 2), and the adjustment proposal with adjustment proposal number 2 is an adjustment proposal that is valid when all four adjustment contents are accepted. In addition, since the adjustment proposal with adjustment proposal number 2 does not have "additional operating hours" in the adjustment contents, the information "1" is recorded in the adjustment cost 1358.

図8は、本発明の実施例に係る調整案サマリ情報のデータ構造の一例を示す構成図である。図8において、調整案サマリ情報136は、調整案情報135から調整案毎の調整コストを算出して合計した情報であって、企業間調整装置10の記憶部13に格納される。この調整案サマリ情報136は、調整案1361と、調整コスト1362と、を備える。 Figure 8 is a configuration diagram showing an example of the data structure of adjustment proposal summary information relating to an embodiment of the present invention. In Figure 8, adjustment proposal summary information 136 is information obtained by calculating and totaling the adjustment costs for each adjustment proposal from adjustment proposal information 135, and is stored in the memory unit 13 of the inter-company adjustment device 10. This adjustment proposal summary information 136 includes an adjustment proposal 1361 and an adjustment cost 1362.

調整案1361には、調整案番号を表す情報として、例えば、「1」の情報が記録される。調整コスト1362には、調整案情報135から調整案毎の調整コストを算出して合計した情報として、例えば、「101」が記録される。なお、調整案番号2番の調整案については、4つの調整案の各調整コスト「1」の合計として、「4」の情報が記録される。 In adjustment proposal 1361, for example, information "1" is recorded as information indicating the adjustment proposal number. In adjustment cost 1362, for example, "101" is recorded as information obtained by calculating and totaling the adjustment costs for each adjustment proposal from adjustment proposal information 135. Note that for the adjustment proposal with adjustment proposal number 2, information "4" is recorded as the sum of the adjustment costs of each of the four adjustment proposals, which are all "1."

図9は、本発明の実施例に係る調整順序情報のデータ構造の一例を示す構成図である。図9において、調整順序情報137は、調整案生成部120の生成による各調整案を調整コストに応じて並び替えた情報であって、企業間調整装置10の記憶部13に格納される。この調整順序情報137に記録される調整コストは、調整案の調整に係るコストを示すものであり、その値が小さいほど調整が受け入れられ易いことを示す。そのため、調整順序情報137は、調整が成立し易くなるように、調整コストの昇順に、調整案情報135に属する調整案の調整順序を並び変えた情報である。この調整順序情報137は、調整順序1371と、調整案1372と、対策1373と、企業1374と、を備える。 FIG. 9 is a block diagram showing an example of the data structure of adjustment order information according to an embodiment of the present invention. In FIG. 9, adjustment order information 137 is information in which each adjustment plan generated by the adjustment plan generating unit 120 is rearranged according to the adjustment cost, and is stored in the memory unit 13 of the inter-company adjustment device 10. The adjustment cost recorded in this adjustment order information 137 indicates the cost related to the adjustment of the adjustment plan, and the smaller the value, the more likely the adjustment is to be accepted. Therefore, adjustment order information 137 is information in which the adjustment order of the adjustment plans belonging to adjustment plan information 135 is rearranged in ascending order of adjustment cost so that the adjustment is more likely to be established. This adjustment order information 137 includes adjustment order 1371, adjustment plan 1372, measure 1373, and company 1374.

調整順序1371には、調整順序を表す情報として、例えば、「1」から順番に数字の情報が記録される。調整案1372には、生成された調整案の調整案番号を表す情報として、例えば、調整案情報135に属する調整案の調整案番号を表す「2」の情報が記録される。対策1373には、調整案情報135に属する調整案の対策番号を表す「2」の情報が記録される。企業1374には、調整案情報135に属する企業のうち調整コストの値が最も小さい企業の名称として、例えば、「販社2」の情報が記録される。 In adjustment order 1371, for example, numerical information starting from "1" is recorded as information indicating the adjustment order. In adjustment proposal 1372, for example, information "2" is recorded as information indicating the adjustment proposal number of the generated adjustment proposal, which indicates the adjustment proposal number of the adjustment proposal belonging to adjustment proposal information 135. In measure 1373, information "2" is recorded as information indicating the measure number of the adjustment proposal belonging to adjustment proposal information 135. In company 1374, for example, information "Sales company 2" is recorded as the name of the company with the smallest adjustment cost value among the companies belonging to adjustment proposal information 135.

図10は、本発明の実施例に係る回答結果情報のデータ構造の一例を示す構成図である。図10において、回答結果情報138は、各企業に提案した調整案に対する回答結果を纏めた情報であって、企業間調整装置10の記憶部13に格納される。この回答結果情報138は、調整案1381と、対策1382と、企業1383と、回答結果1384と、を備える。 Figure 10 is a configuration diagram showing an example of the data structure of response result information according to an embodiment of the present invention. In Figure 10, response result information 138 is information summarizing the response results to the adjustment proposal proposed to each company, and is stored in the memory unit 13 of the inter-company adjustment device 10. This response result information 138 includes an adjustment proposal 1381, a measure 1382, a company 1383, and a response result 1384.

調整案1381には、調整案生成部120で生成された調整案の調整案番号を表す情報として、例えば、調整順序情報137に属する調整案の調整案番号を表す「2」の情報が記録される。対策1382には、調整順序情報137に属する調整案の対策番号を表す「2」の情報が記録される。企業1383には、調整順序情報137に属する企業の名称として、例えば、「販社2」の情報が記録される。回答結果1384には、各企業からの回答結果を表す情報として、例えば、企業から「受諾」した旨の情報を受信した場合、「受諾」が記録される。 In adjustment proposal 1381, information indicating the adjustment proposal number of the adjustment proposal generated by adjustment proposal generation unit 120, for example, information "2" indicating the adjustment proposal number of the adjustment proposal belonging to adjustment order information 137, is recorded. In measure 1382, information "2" indicating the measure number of the adjustment proposal belonging to adjustment order information 137 is recorded. In company 1383, information such as "Sales company 2" is recorded as the name of the company belonging to adjustment order information 137. In response result 1384, information indicating the response result from each company, for example, if information to the effect that "acceptance" has been received from a company, "acceptance" is recorded.

図11は、本発明の実施例に係る個別調整装置の調整案回答画面の一例を示す構成図である。図11において、各個別調整装置23の調整案回答画面142は、各企業が、企業間調整装置10から提案された調整案に対して回答するための画面であって、対象企業を示す対象企業名14201と、調整対象の受発注データ情報である、From企業名14202と、To企業名14203と、品目14204と、数量14205と、要求納期14206と、回答納期14207と、調整内容14208と、調整内容を受諾するか否かを示す回答欄14209と、その結果を登録する登録ボタン14210と、を備える。 Figure 11 is a block diagram showing an example of an adjustment proposal response screen of an individual adjustment device according to an embodiment of the present invention. In Figure 11, the adjustment proposal response screen 142 of each individual adjustment device 23 is a screen for each company to respond to the adjustment proposal proposed by the inter-company adjustment device 10, and includes a target company name 14201 indicating the target company, a From company name 14202 and a To company name 14203, which are order placement and receipt data information of the adjustment target, an item 14204, a quantity 14205, a requested delivery date 14206, a replied delivery date 14207, adjustment contents 14208, a reply field 14209 indicating whether or not to accept the adjustment contents, and a registration button 14210 for registering the result.

対象企業名14201には、調整案を受信した企業の名称として、例えば、「販社2」が表示される。From企業名14202には、調整案の対象となる企業の名称として、例えば、「工場2」が表示される。To企業名14203には、調整案に回答する企業の名称として、例えば、「販社2」が表示される。品目14204には、調整案の対象となる品目として、例えば、「製品A」が表示される。数量14205には、調整案の対象となる品目の数量として、例えば、「10」が表示される。要求納期14206には、調整案で要求されている納期として、例えば、「6/10」が表示される。回答納期14207には、例えば、品目の納品期限として回答した納期が6月10日である場合、「6/10」が表示される。なお、調整案の調整後に、品目の納品期限として回答した納期が6月25日である場合、受発注情報132の回答納期1326に記録された情報に合わせて、「6/25」が表示される。調整内容14208には、調整案で選択された調整内容が、「納期延伸」の場合、すなわち、調整案ライブラリ情報134で、To企業調整内容1347として、「納期延伸」が選択された場合、「納期延伸」が表示される。回答欄14209には、調整内容14208に表示された調整内容を受諾するか否かを示す情報として、「受諾」と「拒否」が表示される。なお、付言すれば、調整案を提案し企業に回答してもらう調整案回答画面142の表示形式は、図11に示す態様に限られない。 Target company name 14201 displays the name of the company that received the adjustment proposal, for example, "Sales Company 2". From company name 14202 displays the name of the company that is the target of the adjustment proposal, for example, "Factory 2". To company name 14203 displays the name of the company that responds to the adjustment proposal, for example, "Sales Company 2". Item 14204 displays the item that is the target of the adjustment proposal, for example, "Product A". Quantity 14205 displays the quantity of the item that is the target of the adjustment proposal, for example, "10". Requested delivery date 14206 displays the delivery date requested in the adjustment proposal, for example, "6/10". For example, if the delivery date responded as the delivery deadline of the item is June 10, "6/10" is displayed in the responded delivery date 14207. Note that if the delivery date responded as the delivery deadline of the item after the adjustment of the adjustment proposal is June 25, "6/25" is displayed in accordance with the information recorded in responded delivery date 1326 of the order information 132. In the case where the adjustment content selected in the adjustment proposal is "Delivery date extension", that is, when "Delivery date extension" is selected as the To company adjustment content 1347 in the adjustment proposal library information 134, "Delivery date extension" is displayed in the adjustment content 14208. In the response field 14209, "Accept" and "Reject" are displayed as information indicating whether or not the adjustment content displayed in the adjustment content 14208 is accepted. It should be noted that the display format of the adjustment proposal response screen 142, which proposes an adjustment proposal and asks the company to respond, is not limited to the form shown in FIG. 11.

ここで、個別調整装置23を利用するユーザが、調整案回答画面142上の回答欄14209のうち、「受諾」または「拒否」を選択する操作を実行すると、「受諾」または「拒否」の操作内容が調整案回答画面142上の情報と共に、通信部24を介して企業間調整装置10に送信される。 Here, when a user using the individual adjustment device 23 executes an operation to select "accept" or "reject" in the response field 14209 on the adjustment proposal response screen 142, the operation content of "accept" or "reject" is transmitted to the inter-company adjustment device 10 via the communication unit 24 together with the information on the adjustment proposal response screen 142.

「受諾」または「拒否」の操作内容と調整案回答画面142上の情報を企業間調整装置10が受信した場合、受信した情報は、回答結果受付部111を介して調整案更新部124に転送される。調整案更新部124は、回答結果受付部111から転送された情報を基に回答結果情報138を生成し、生成した回答結果情報138を記憶部13に格納する。調整結果生成部125は、記憶部13に格納された回答結果情報138と調整案情報135を基に調整結果を示す情報を生成する。この際、調整結果生成部125は、回答結果情報138から、受諾された調整によって、納期遅延の発生リスクが解消された受発注の取引数を計算することで、調整後の納期遵守率を算出する。この後、調整結果生成部125は、調整結果と納期遵守率とを表示するための調整結果確認画面情報(調整結果確認画面143の画像情報)を生成し、生成した調整結果確認画面情報を、調整結果通知部141と通信部15を介して各企業の個別調整装置23に送信する。各企業の個別調整装置23の調整結果確認画面には、調整結果確認画面情報を基に、各企業に提案して受諾された調整案と、調整案による調整を実施することで得られる全体評価指標と、を含む情報が表示される。 When the inter-company adjustment device 10 receives the operation content of "accept" or "reject" and the information on the adjustment proposal response screen 142, the received information is transferred to the adjustment proposal update unit 124 via the response result reception unit 111. The adjustment proposal update unit 124 generates response result information 138 based on the information transferred from the response result reception unit 111, and stores the generated response result information 138 in the memory unit 13. The adjustment result generation unit 125 generates information indicating the adjustment result based on the response result information 138 and adjustment proposal information 135 stored in the memory unit 13. At this time, the adjustment result generation unit 125 calculates the delivery date compliance rate after adjustment by calculating, from the response result information 138, the number of order-placement transactions in which the risk of delivery date delays has been eliminated by the accepted adjustment. Thereafter, the adjustment result generating unit 125 generates adjustment result confirmation screen information (image information of the adjustment result confirmation screen 143) for displaying the adjustment results and the delivery date compliance rate, and transmits the generated adjustment result confirmation screen information to the individual adjustment device 23 of each company via the adjustment result notifying unit 141 and the communication unit 15. The adjustment result confirmation screen of each company's individual adjustment device 23 displays information including the adjustment plan proposed to each company and accepted based on the adjustment result confirmation screen information, and the overall evaluation index obtained by implementing the adjustment according to the adjustment plan.

図12は、本発明の実施例に係る個別調整装置の調整結果確認画面の一例を示す構成図である。図12において、調整結果を各企業が確認するための調整結果確認画面143は、各企業が、企業間調整装置10から提案された調整案に対する調整結果を確認するための画面であって、上段に調整内容を表示するための表示領域1431を備え、下段に調整内容の実施による全体評価指標の変更度合いを表示するための表示領域1432を備える。 Fig. 12 is a configuration diagram showing an example of an adjustment result confirmation screen of an individual adjustment device according to an embodiment of the present invention. In Fig. 12, the adjustment result confirmation screen 143 on which each company confirms the adjustment result is a screen on which each company confirms the adjustment result for the adjustment proposal proposed by the inter-company adjustment device 10, and includes a display area 1431 on the upper level for displaying the adjustment contents, and a display area 1432 on the lower level for displaying the degree of change in the overall evaluation index due to the implementation of the adjustment contents.

調整内容の表示領域1431には、調整内容情報の項目として、調整内容番号(#)14301と、調整対象の受発注データ情報のFrom企業名14302と、To企業名14303と、品目14304と、数量14305と、要求納期14306と、回答納期14307と、調整内容14308と、が表示される。 In the adjustment content display area 1431, the following items of adjustment content information are displayed: adjustment content number (#) 14301, From company name 14302 of the order data information to be adjusted, To company name 14303, item 14304, quantity 14305, requested delivery date 14306, answered delivery date 14307, and adjustment content 14308.

調整内容番号(#)14301には、調整内容を管理する番号が、「1」から順番に表示される。調整対象の受発注データ情報のFrom企業名14302には、受発注情報132のFrom企業1321に相当する情報、例えば、調整案の対象となる企業の名称として、「工場2」が表示される。To企業名14303には、調整案に回答する企業の名称として、例えば、「販社2」が表示される。品目14304には、調整案の対象となる品目として、例えば、「製品A」が表示される。数量14305には、調整案の対象となる品目の数量として、例えば、「10」が表示される。要求納期14306には、調整案で要求されている納期として、例えば、「6/10」が表示される。回答納期14307には、例えば、品目の納品期限として回答した納期が6月10日である場合、「6/10」が表示される。なお、調整案の調整後に、品目の納品期限として回答した納期が6月25日である場合、受発注情報132の回答納期1326に記録された情報に合わせて、「6/25」が表示される。調整内容14308には、調整案で選択された調整内容が表示される。例えば、調整案ライブラリ情報134で、「販社2」として、「納期延伸」が選択された場合、「納期延伸」が表示され、また、調整案ライブラリ情報134で、「工場2」として、「他拠点・他品目を優先」が選択された場合、「他拠点・他品目を優先」が表示される。 The adjustment content number (#) 14301 displays the number that manages the adjustment content, starting from "1". The From Company Name 14302 of the order data information to be adjusted displays information equivalent to the From Company 1321 of the order information 132, for example, "Factory 2" as the name of the company that is the subject of the adjustment proposal. The To Company Name 14303 displays, for example, "Sales Company 2" as the name of the company that responds to the adjustment proposal. The Item 14304 displays, for example, "Product A" as the item that is the subject of the adjustment proposal. The Quantity 14305 displays, for example, "10" as the quantity of the item that is the subject of the adjustment proposal. The Requested Delivery Date 14306 displays, for example, "6/10" as the delivery date requested in the adjustment proposal. The Answered Delivery Date 14307 displays, for example, "6/10" if the delivery date responded as the delivery deadline for the item is June 10th. If the delivery date given as the delivery deadline for the item after adjustment in the adjustment proposal is June 25th, "6/25" is displayed in accordance with the information recorded in the given delivery date 1326 in the order information 132. The adjustment content selected in the adjustment proposal is displayed in the adjustment content 14308. For example, if "Delivery extension" is selected for "Sales company 2" in the adjustment proposal library information 134, "Delivery extension" is displayed, and if "Prefer other locations/other items" is selected for "Factory 2" in the adjustment proposal library information 134, "Prefer other locations/other items" is displayed.

全体評価指標の表示領域1432には、全体評価指標情報の項目として、指標番号14309と、サプライチェーンにおける最終顧客14310と、品目14311と、調整前の納期遵守率14312と、調整後の納期遵守率14313と、が表示される。 In the overall evaluation index display area 1432, the following items of overall evaluation index information are displayed: index number 14309, end customer in the supply chain 14310, item 14311, delivery date compliance rate before adjustment 14312, and delivery date compliance rate after adjustment 14313.

指標番号14309には、全体評価指標を一意に識別する番号として、例えば、全体評価指標を管理する番号が、「1」から順番に表示される。最終顧客14310には、サプライチェーンにおける最終顧客の名称として、例えば、「市場1」の情報が表示される。品目14311には、最終顧客に納品される品目として、例えば、「製品A」の情報が表示される。調整前の納期遵守率14312には、調整案によって調整される前に実行された納期遵守率として、例えば、「95%」の情報が表示される。調整後の納期遵守率14313には、調整案によって調整された後に実行された納期遵守率として、例えば、「100%」の情報が表示される。この場合、企業間で調整案による調整を行うことで、納期が「100%」達成されることになる。すなわち、各企業に対して、サプライチェーン全体を評価するための全体評価指標を向上させるための調整案を提示できたことになる。なお、付言すれば、調整結果を各企業が確認する調整結果確認画面143の表示形式は図12に示す態様に限られない。 In the index number 14309, for example, a number that manages the overall evaluation index is displayed in order starting from "1" as a number that uniquely identifies the overall evaluation index. In the end customer 14310, for example, information on "Market 1" is displayed as the name of the end customer in the supply chain. In the item 14311, for example, information on "Product A" is displayed as the item to be delivered to the end customer. In the delivery date compliance rate before adjustment 14312, for example, information on "95%" is displayed as the delivery date compliance rate executed before adjustment by the adjustment proposal. In the delivery date compliance rate after adjustment 14313, for example, information on "100%" is displayed as the delivery date compliance rate executed after adjustment by the adjustment proposal. In this case, by making adjustments between companies according to the adjustment proposal, the delivery date will be achieved "100%". In other words, an adjustment proposal for improving the overall evaluation index for evaluating the entire supply chain has been presented to each company. In addition, the display format of the adjustment result confirmation screen 143 on which each company confirms the adjustment results is not limited to the form shown in FIG. 12.

図13は、本発明の実施例に係る企業間調整装置のハードウェア構成例を示すブロック図である。図13において、企業間調整装置10は、入力装置161と、出力装置162と、外部記憶装置163と、演算装置164と、主記憶装置165と、通信装置166と、を備え、各構成要素はバス167により接続される。 Fig. 13 is a block diagram showing an example of the hardware configuration of an inter-company coordination device according to an embodiment of the present invention. In Fig. 13, the inter-company coordination device 10 includes an input device 161, an output device 162, an external storage device 163, a computing device 164, a main storage device 165, and a communication device 166, and each component is connected by a bus 167.

入力装置161は、ユーザからの入力操作を受け付ける装置であり、例えばタッチパネル、キーボード、マウス、マイク等である。 The input device 161 is a device that accepts input operations from the user, such as a touch panel, keyboard, mouse, microphone, etc.

出力装置162は、主記憶装置165に格納されたデータや演算装置164の演算結果を示すデータの出力処理を行う装置であって、例えばLCD(Liquid Crystal Display)等の表示装置、又はプリンタ等である。なお、入力装置161及び出力装置162は、ネットワーク30上のユーザ端末21によってその機能が実現されてもよい。 The output device 162 is a device that performs output processing of data stored in the main memory device 165 and data showing the results of calculations by the calculation device 164, and is, for example, a display device such as an LCD (Liquid Crystal Display) or a printer. Note that the functions of the input device 161 and the output device 162 may be realized by a user terminal 21 on the network 30.

外部記憶装置163は、例えばHDD(Hard Disk Drive)等の書き込み及び読み出し可能な記憶メディアである。演算装置164は、中央演算装置であって、主記憶装置165又は外部記憶装置163に記録された各種プログラムに従って処理を実行する。この際、主記憶装置165又は外部記憶装置163に記録された各種プログラムを演算装置164が実行することにより、図1に示す演算部12を構成する各処理部と、入力部12と、出力部14及び通信部15は、各々の機能を実現する。 The external storage device 163 is a writable and readable storage medium such as a hard disk drive (HDD). The arithmetic unit 164 is a central processing unit that executes processing according to various programs recorded in the main storage device 165 or the external storage device 163. At this time, the arithmetic unit 164 executes the various programs recorded in the main storage device 165 or the external storage device 163, whereby each processing unit constituting the arithmetic unit 12 shown in FIG. 1, the input unit 12, the output unit 14, and the communication unit 15 realize their respective functions.

主記憶装置165は、RAM(Random Access Memory)又はフラッシュメモリ等の記憶装置であり、プログラムやデータが一時的に読み出される記憶エリアとして機能する。通信装置166は、企業間調整装置10をネットワーク30に接続するための装置であって、例えばNIC(Network Interface Card)等の通信デバイスである。この際、図1に示す記憶部13は、外部記憶装置163又は主記憶装置165によりその機能が実現される。また、記憶部13は、ネットワーク30上のデータベース22によってその機能が実現されてもよい。 The main memory device 165 is a memory device such as a RAM (Random Access Memory) or a flash memory, and functions as a storage area from which programs and data are temporarily read. The communication device 166 is a device for connecting the inter-company coordination device 10 to the network 30, and is, for example, a communication device such as a NIC (Network Interface Card). In this case, the function of the memory unit 13 shown in FIG. 1 is realized by the external memory device 163 or the main memory device 165. The function of the memory unit 13 may also be realized by a database 22 on the network 30.

なお、企業間調整装置10の各構成要素の処理は、1つのハードウェアで実行されてもよいし、複数のハードウェアで実行されてもよい。また、企業間調整装置10の各構成要素の処理は、1つのプログラムで実現されてもよいし、複数のプログラムで実現されてもよい。各企業の個別調整装置23についても、企業間調整装置10と同様のハードウェア構成を有するため、説明を省略する。 The processing of each component of the inter-company coordination device 10 may be executed by a single piece of hardware or by multiple pieces of hardware. The processing of each component of the inter-company coordination device 10 may be realized by a single program or by multiple programs. The individual coordination devices 23 of each company also have the same hardware configuration as the inter-company coordination device 10, so a description thereof will be omitted.

図14は、本発明の実施例に係る企業間処理システムの企業間調整処理の一例を示すフローチャートである。本処理は、サプライチェーンに関わる企業間で予め合意した実行サイクル・タイミングで企業間調整装置10により開始される。なお、本処理は、納期遅延等、企業間の取り決め上の不整合が発生した際に、調整を行いたい企業のユーザ端末21から、企業間調整装置10に調整を依頼する形で開始してもよい。 Figure 14 is a flowchart showing an example of inter-company adjustment processing of the inter-company processing system according to an embodiment of the present invention. This processing is started by the inter-company adjustment device 10 at an execution cycle and timing previously agreed upon between the companies involved in the supply chain. Note that this processing may also be started by requesting adjustment from the user terminal 21 of the company that wishes to make adjustment to the inter-company adjustment device 10 when an inconsistency in the agreement between the companies occurs, such as a delivery date delay.

まず、サプライチェーン情報受付部110が、各企業から入力情報を取得する(ステップS1)。具体的には、企業間調整装置10のサプライチェーン情報受付部110は、通信部15を介して、各企業のデータベース22からサプライチェーンの構成情報であるサプライチェーン情報130及びBOM情報131を読み出し、読み出したサプライチェーン情報130及びBOM情報131を記憶部13に格納する。なお、サプライチェーン情報受付部110は、2回目以降で、記憶部13に格納した情報に変更がなければ、ステップS1の処理をスキップしてもよい。また、サプライチェーン情報受付部110は、ステップS1の処理として、各企業のデータベース22から受発注の注残情報である受発注情報132及び現時点の在庫情報である在庫情報133を読み出し、読み出した受発注情報132及び在庫情報133を記憶部13に格納する。 First, the supply chain information receiving unit 110 acquires input information from each company (step S1). Specifically, the supply chain information receiving unit 110 of the inter-company adjustment device 10 reads supply chain information 130 and BOM information 131, which are configuration information of the supply chain, from the database 22 of each company via the communication unit 15, and stores the read supply chain information 130 and BOM information 131 in the storage unit 13. Note that the supply chain information receiving unit 110 may skip the processing of step S1 if there is no change in the information stored in the storage unit 13 from the second time onwards. In addition, as the processing of step S1, the supply chain information receiving unit 110 reads order information 132, which is backorder information for order placement and receipt, and inventory information 133, which is current inventory information, from the database 22 of each company, and stores the read order information 132 and inventory information 133 in the storage unit 13.

次に、調整案生成部120は、記憶部13に格納された受発注情報132を参照し、受発注情報132のレコード毎に、受発注情報132の要求納期1325に記録された情報(日付)と回答納期1326に記録された情報(日付)とを比較し、要求納期1325に記録された情報(日付)に対して、回答納期1326に記録された情報(日付)が遅延しているレコードを、納期遅延の発生リスクがある取引を示すレコード(企業間の取り決め上不整合となる取引を示すレコード)に設定するために、受発注取引分だけステップS2からステップS4の処理(ループL1の処理)を繰り返し実行する。 Next, the adjustment proposal generating unit 120 refers to the order information 132 stored in the memory unit 13, and for each record of the order information 132, compares the information (date) recorded in the requested delivery date 1325 of the order information 132 with the information (date) recorded in the answered delivery date 1326. It then repeatedly executes the processing from step S2 to step S4 (processing of loop L1) for the number of order transactions in order to set records in which the information (date) recorded in the answered delivery date 1326 is delayed compared to the information (date) recorded in the requested delivery date 1325 as records indicating transactions at risk of delaying delivery (records indicating transactions that are inconsistent in terms of the agreement between the companies).

次に、調整案生成部120は、記憶部13から、サプライチェーン情報130と、BOM情報131と、受発注情報132と、在庫情報133と、調整案ライブラリ情報134と、を読み込み、読み込んだ各情報を基に取引企業の在庫状況と調整案ライブラリとを照合して、調整案を含む調整案情報135を作成し、作成した調整案情報135を記憶部13に格納する(ステップS3)。 Next, the adjustment plan generation unit 120 reads the supply chain information 130, BOM information 131, order information 132, inventory information 133, and adjustment plan library information 134 from the memory unit 13, compares the inventory status of the trading company with the adjustment plan library based on each of the read information, creates adjustment plan information 135 including an adjustment plan, and stores the created adjustment plan information 135 in the memory unit 13 (step S3).

具体的には、例えば、調整案生成部120が記憶部13を参照する時点である、現時点を6/1とした場合、調整案生成部120は、受発注情報132を参照した際に、受発注情報132の1番目のレコード(From企業:サプライヤ1、To企業:工場1、品目:部品A、数量:10個、要求納期:6/15、回答納期:6/17)に対して、要求納期よりも回答納期が遅い日付であるため、納期遅延の発生リスクがあるレコードに設定し、1番目のレコードに対する調整案を生成する処理を実行する。 Specifically, for example, if the current time, when the adjustment proposal generating unit 120 refers to the memory unit 13, is 6/1, the adjustment proposal generating unit 120 refers to the order information 132 and, since the replied delivery date is later than the requested delivery date, sets the first record in the order information 132 (From company: Supplier 1, To company: Factory 1, Item: Part A, Quantity: 10 units, Requested delivery date: 6/15, Answered delivery date: 6/17) as a record with a risk of delivery delay, and executes the process of generating an adjustment proposal for the first record.

この後、調整案生成部120は、1番目のレコードで特定される関連企業(サプライヤ1と工場1)の在庫量を在庫情報133から取得し、また関連企業(サプライヤ1と工場1)の情報として、サプライチェーン情報130と、BOM情報131を取得し、取得した各情報を基に、各企業のいつの時点のどの品目の在庫が当該受注情報に関係するかを算出する。 Then, the adjustment proposal generation unit 120 obtains the inventory amounts of the related companies (Supplier 1 and Factory 1) identified in the first record from the inventory information 133, and also obtains supply chain information 130 and BOM information 131 as information on the related companies (Supplier 1 and Factory 1), and based on each of the obtained information, calculates which items' inventory at which point in time for each company is related to the order information.

本例では、受発注情報132に記録された当該要求納期は6/15で、サプライヤ1から工場1までの輸送リードタイム(サプライチェーン情報130の輸送LT1304)は7日、サプライヤ1での材料Aから部品Aの製造リードタイム(BOM情報131の製造LT1315)は3日であるため、(1)工場1の6/15時点の部品Aの在庫と、(2)サプライヤ1の(6/15-7日=)6/8時点の部品Aの在庫と、(3)サプライヤ1の(6/8-3日=)6/5時点の材料Aの在庫と、を算出する必要があることになる。 In this example, the required delivery date recorded in the order information 132 is 6/15, the transportation lead time from supplier 1 to factory 1 (transportation LT 1304 in supply chain information 130) is 7 days, and the manufacturing lead time from material A to part A at supplier 1 (manufacturing LT 1315 in BOM information 131) is 3 days, so it is necessary to calculate (1) factory 1's inventory of part A as of 6/15, (2) supplier 1's inventory of part A as of 6/8 (6/15 - 7 days =), and (3) supplier 1's inventory of material A as of 6/5 (6/8 - 3 days =).

調整案生成部120は、まず、(1)について、現時点6/1の在庫量(「0」)を在庫情報133から取得し、受発注情報132から6/15にまでに予定されている出荷量を、在庫量から差し引くことで6/15時点の在庫を算出する。今回の例では、6/15にまでに予定されている出荷量がなく(要求納期が6/15以前のものがない)、工場1の6/15時点の部品Aの在庫は0のままとなる。 First, for (1), the adjustment proposal generating unit 120 obtains the current inventory amount as of 6/1 ("0") from the inventory information 133, and calculates the inventory as of 6/15 by subtracting the shipping amount scheduled up to 6/15 from the inventory amount based on the order information 132. In this example, there is no shipping amount scheduled up to 6/15 (there is no shipping amount with a required delivery date before 6/15), so the inventory amount of part A at factory 1 as of 6/15 remains 0.

次に、調整案生成部120は、(2)について、現時点6/1の在庫量(「0」)を在庫情報133から取得し、受発注情報132から6/8にまでに予定されている出荷量を、在庫量から差し引くことで6/8時点の在庫を算出する。今回の例では、6/8にまでに予定されている出荷量がなく、サプライヤ1の6/8時点の部品Aの在庫は0のままとなる。 Next, for (2), the adjustment proposal generating unit 120 obtains the current inventory amount as of 6/1 ("0") from the inventory information 133, and calculates the inventory as of 6/8 by subtracting the shipping amount scheduled up to 6/8 from the order information 132 from the inventory amount. In this example, there is no shipping amount scheduled up to 6/8, so supplier 1's inventory of part A as of 6/8 remains 0.

最後に、調整案生成部120は、(3)について、現時点6/1の在庫量(「50」)を在庫情報133から取得し、受発注情報132から6/8にまでに予定されている出荷量に員数1314の1個を掛け合わした数量を、在庫量から差し引くことで6/5時点の在庫を算出する。つまり、もし6/7に予定されている出荷があれば、製造リードタイムは3日であり、6/4に材料Aが消費されるため、このような形で在庫の見通しを算出できる。今回の例では、6/8にまでに予定されている出荷量がなく、サプライヤ1の6/5時点の材料Aの在庫は50のままとなる。 Finally, for (3), the adjustment proposal generation unit 120 obtains the current inventory amount as of 6/1 ("50") from the inventory information 133, and calculates the inventory as of 6/5 by subtracting from the inventory amount the quantity calculated by multiplying the shipment amount scheduled until 6/8 from the order information 132 by the quantity 1314 (1). In other words, if there is a shipment scheduled for 6/7, the manufacturing lead time is 3 days and material A will be consumed on 6/4, so the inventory outlook can be calculated in this manner. In this example, there is no shipment amount scheduled until 6/8, so supplier 1's inventory of material A as of 6/5 remains at 50.

上記の結果、調整案生成部120は、1番目のレコードにおける在庫状況を、From企業の子品目在庫(サプライヤ1の6/5時点の材料Aの在庫)は有り、From企業の親品目在庫(サプライヤ1の6/8時点の部品Aの在庫)は無し、To企業の子品目在庫(工場1の6/15時点の部品Aの在庫)は無し、と判別する。この後、調整案生成部120は、1番目のレコードにおける在庫状況と調整案ライブラリ情報134とを照合し、照合結果として、1番目のレコードにおける在庫状況は、調整案ライブラリ情報134の調整案番号10の調整案に該当し、From企業(サプライヤ1)の調整内容は、「稼働時間の追加」で、To企業(工場1)の調整内容は、「-」つまり調整内容なし、と判別する。この後、調整案生成部120は、本調整内容を含む調整案の情報を、調整案番号1番の対策番号1番と採番して、調整案情報135に格納する。 As a result of the above, the adjustment proposal generating unit 120 determines the inventory status in the first record as follows: there is a child item inventory of the From company (supplier 1's inventory of material A as of 6/5), there is no parent item inventory of the From company (supplier 1's inventory of part A as of 6/8), and there is no child item inventory of the To company (factory 1's inventory of part A as of 6/15). After this, the adjustment proposal generating unit 120 compares the inventory status in the first record with the adjustment proposal library information 134, and as a result of the comparison, it determines that the inventory status in the first record corresponds to the adjustment proposal with adjustment proposal number 10 in the adjustment proposal library information 134, the adjustment content of the From company (supplier 1) is "addition of operating hours", and the adjustment content of the To company (factory 1) is "-", that is, there is no adjustment content. After this, the adjustment proposal generating unit 120 assigns the information of the adjustment proposal including this adjustment content adjustment proposal number 1 and stores it in the adjustment proposal information 135.

以上の処理により、調整案生成部120は、受発注情報132の1番目のレコード(納期遅延の発生リスクのあるレコード)に対して、当事者間の調整を行うための調整案(調整案番号1番で対策番号1番の調整案)を生成することができる。 By performing the above processing, the adjustment proposal generation unit 120 can generate an adjustment proposal (adjustment proposal number 1 and measure number 1) for adjustment between the parties for the first record in the order information 132 (a record that has a risk of a delivery delay).

ここで、第三者の余裕を活用した調整案の生成する処理について説明する。この際、受発注情報132のうち、第三者の余裕を活用した調整案の生成対象としては、納期遅延の発生しうる受発注取引と同じ供給元(受注企業)から別の供給先(発注企業)に同時期に出荷している受発注取引が調整候補になる。本例では、サプライヤ1は、工場1だけでなく、工場2にも出荷しているため、納期遅延の発生リスクがある受発注と関連する受発注として、同じ要求納期6/15である、受発注情報132の2番目のレコード(レコード#2)が候補に挙がる。 Here, the process of generating an adjustment proposal that utilizes a third party's slack is explained. In this case, the adjustment candidates for generating an adjustment proposal that utilizes a third party's slack from among the order information 132 are order transactions that ship from the same supplier (receiving company) to another supply destination (ordering company) at the same time as the order transaction that may experience a delivery delay. In this example, since supplier 1 ships not only to factory 1 but also to factory 2, the second record (record #2) in the order information 132, which has the same requested delivery date of 6/15, is selected as a candidate for the order related to the order that is at risk of experiencing a delivery delay.

また、受発注情報132のうち、受発注情報132の2番目のレコードに関連して、その受発注取引の供給先が供給元になっているサプライチェーン下流方向(顧客・市場方向)の受発注取引も、先ほどの受発注取引が前提となり、供給可否が決定されるため、調整候補となる。例えば、受発注情報132の4番目のレコード(レコード#4)は、レコード#2の要求納期6/15に、工場2の部品Aから製品Aを製造する製造リードタイム3日と、工場2から販社2へ輸送する輸送リードタイム7日を加算した(6/15+3日+7日=)6/25が要求納期になっているため、レコード#2に付随する受発注であると考えられる。 In addition, among the order information 132, the order transaction downstream of the supply chain (towards the customer or market) in which the supply destination of the order transaction is the supplier in relation to the second record of the order information 132 is also a candidate for adjustment, since the supply availability is determined based on the previous order transaction. For example, the fourth record of the order information 132 (record #4) is considered to be an order associated with record #2, because the required delivery date is 6/25, which is the requested delivery date of 6/15 of record #2 plus the manufacturing lead time of 3 days to manufacture product A from part A at factory 2 and the transportation lead time of 7 days to transport from factory 2 to distributor 2 (6/15 + 3 days + 7 days =).

また、受発注情報132の6番目のレコード(レコード#6)も同様に、レコード#4の要求納期6/25に、販社2から市場2への輸送リードタイム7日を加算した7/2が要求納期になっており、レコード#4に付随する受発注であると考えられる。よって、納期遅延の発生リスクがある受発注(レコード#1)と関連する受発注として、レコード#2、4、6が調整候補のレコードとなる。 Similarly, the sixth record (record #6) in order information 132 has a required delivery date of 7/2, which is the requested delivery date of 6/25 for record #4 plus the transportation lead time of 7 days from distributor 2 to market 2, and is therefore considered to be an order associated with record #4. Therefore, records #2, 4, and 6 are candidates for adjustment as orders related to the order (record #1) that is at risk of a delivery delay.

まず、レコード#2については、当該要求納期は6/15で、工場2での部品Aから製品Aの製造リードタイム1315は3日であるため、(1)工場2の6/15時点の部品Aの在庫と、(2)工場2の6/18時点の製品Aの在庫と、を算出する必要がある。レコード#2の場合、レコード#1における納期遅延の発生リスクがある場合の調整と違い、From企業側の在庫を確認する必要はなく、To企業側の親品目及び子品目の在庫を確認し、他を優先しても問題ないか否かの確認が必要となる。 First, for record #2, the requested delivery date is 6/15, and the manufacturing lead time 1315 from part A to product A at factory 2 is 3 days, so it is necessary to calculate (1) the inventory of part A at factory 2 as of 6/15, and (2) the inventory of product A at factory 2 as of 6/18. In the case of record #2, unlike the adjustment when there is a risk of a delivery date delay in record #1, there is no need to check the inventory at the From company, but it is necessary to check the inventory of parent and child items at the To company and confirm whether it is okay to give priority to others.

調整案生成部120は、レコード#2について、レコード#1のときと同様に、在庫情報を算出する。この際、調整案生成部120は、レコード#2における在庫状況として、To企業の子品目在庫(工場2の6/15時点の部品Aの在庫)は無し、To企業の親品目在庫(工場2の6/18時点の製品Aの在庫)は無し、と判別する。この際、調整案生成部120は、レコード#2における在庫状況と調整案ライブラリ情報134とを照合し、照合結果として、レコード#2における在庫状況は、調整案ライブラリ情報134の調整案番号18の調整案に該当し、From企業(サプライヤ1)及びTo企業(工場2)の調整内容は、「-」つまり調整内容なし、と判別する。 The adjustment proposal generating unit 120 calculates inventory information for record #2 in the same way as for record #1. At this time, the adjustment proposal generating unit 120 determines that the inventory status in record #2 is that there is no child item inventory of the To company (inventory of part A at factory 2 as of 6/15) and no parent item inventory of the To company (inventory of product A at factory 2 as of 6/18). At this time, the adjustment proposal generating unit 120 compares the inventory status in record #2 with the adjustment proposal library information 134, and as a result of the comparison, it determines that the inventory status in record #2 corresponds to the adjustment proposal with adjustment proposal number 18 in the adjustment proposal library information 134, and that the adjustment contents of the From company (supplier 1) and To company (factory 2) are "-", that is, there is no adjustment content.

次に、レコード#4については、当該要求納期は6/25で、(1)販社2の6/25時点の製品Aの在庫を算出する必要がある。レコード#4の場合、レコード#2と違って、To企業には製造機能がないため、親品目の在庫を確認する必要はなく、子品目の在庫を確認するだけでよい。 Next, for record #4, the required delivery date is 6/25, and (1) it is necessary to calculate the inventory of product A at distributor 2 as of 6/25. In the case of record #4, unlike record #2, since To company does not have a manufacturing function, it is not necessary to check the inventory of the parent item, and it is only necessary to check the inventory of the child item.

調整案生成部120は、レコード#4について、レコード#1のときと同様に、在庫情報を算出する。この際、調整案生成部120は、レコード#4における在庫状況として、To企業の子品目在庫(販社2の6/25時点の製品Aの在庫)は有り、と判別する。この後、調整案生成部120は、レコード#4における在庫状況と調整案ライブラリ情報134とを照合し、照合結果として、レコード#4における在庫状況は、調整案ライブラリ情報134の調整案番号13の調整案に該当し、From企業(工場2)の調整内容は、「他拠点・他品目を優先」で、To企業(販社2)の調整内容は、「納期遅延」である、と判別する。この後、調整案生成部120は、本調整内容を含む調整案の情報を、調整案番号2番の対策番号2番と採番して、調整案情報135に格納する。 The adjustment proposal generating unit 120 calculates the inventory information for record #4 in the same way as for record #1. At this time, the adjustment proposal generating unit 120 determines that the inventory status in record #4 is that the To company's child item inventory (sales company 2's inventory of product A as of 6/25) is available. After this, the adjustment proposal generating unit 120 compares the inventory status in record #4 with the adjustment proposal library information 134, and as a result of the comparison, determines that the inventory status in record #4 corresponds to the adjustment proposal with adjustment proposal number 13 in the adjustment proposal library information 134, the adjustment content of the From company (factory 2) is "prioritize other bases and other items", and the adjustment content of the To company (sales company 2) is "delivery delay". After this, the adjustment proposal generating unit 120 assigns the information on the adjustment proposal including this adjustment content as adjustment proposal number 2 and measure number 2, and stores it in the adjustment proposal information 135.

ここで、本調整内容として、レコード#4について生成された調整案(調整案番号2番で対策番号2番の調整案)の内容を実施した場合、本来、工場2から販社2へ製品Aを10個、6/18に出荷する予定が延伸されるので、工場2の6/18時点の製品Aの在庫が0から10個に変更になる。これにより、調整案生成部120は、レコード#2について、(2)工場2の6/18時点の製品Aの在庫を無し、と判別したが、レコード#4について生成された調整案を実施した場合を想定して、レコード#2について、工場2の6/18時点の製品Aの在庫を有りに変更できる、と判別する。この際、調整案生成部120は、この変更後のレコード#2における在庫状況と調整案ライブラリ情報134とを再照合し、照合結果として、変更後のレコード#2における在庫状況は、調整案ライブラリ情報134の調整案番号16の調整案に該当し、From企業(サプライヤ1)の調整内容は、「他拠点・他品目を優先」で、To企業(工場2)の調整内容は、「納期延伸」である、と判別する。本調整内容を含む調整案は、レコード#4について生成された調整案が実施された場合に成立する内容であるため、調整案番号2番となる調整案のもう一つの対策となる。このため、調整案生成部120は、本調整内容を含む調整案の情報を、調整案番号2番の対策番号3番として採番して調整案情報135に格納する。 Here, if the contents of the adjustment proposal generated for record #4 (adjustment proposal number 2, measure number 2) are implemented as the actual adjustment content, the original plan to ship 10 units of product A from factory 2 to distributor 2 on 6/18 will be postponed, so the inventory of product A at factory 2 as of 6/18 will change from 0 to 10 units. As a result, the adjustment proposal generation unit 120 determined that (2) there was no inventory of product A at factory 2 as of 6/18 for record #2, but assuming the case in which the adjustment proposal generated for record #4 is implemented, it determines that the inventory of product A at factory 2 as of 6/18 for record #2 can be changed to available. At this time, the adjustment proposal generation unit 120 re-verifies the inventory status in record #2 after the change with the adjustment proposal library information 134, and as a result of the comparison, it determines that the inventory status in record #2 after the change corresponds to the adjustment proposal with adjustment proposal number 16 in the adjustment proposal library information 134, that the adjustment content of the From company (Supplier 1) is "give priority to other locations and other items," and that the adjustment content of the To company (Factory 2) is "extension of delivery date." Since the adjustment proposal including this adjustment content will be established if the adjustment proposal generated for record #4 is implemented, it becomes another measure of the adjustment proposal with adjustment proposal number 2. Therefore, the adjustment proposal generation unit 120 assigns the information of the adjustment proposal including this adjustment content as measure number 3 of adjustment proposal number 2 and stores it in the adjustment proposal information 135.

最後に、レコード#6について、当該要求納期は7/2で、(1)市場2の7/2時点の製品Aの在庫を算出する必要がある。調整案生成部120は、レコード#6について、レコード#1のときと同様に、在庫情報を算出する。この際、調整案生成部120は、レコード#6における在庫状況として、To企業の子品目在庫(市場2の7/2時点の製品Aの在庫)は無し、と判別する。この後、調整案生成部120は、レコード#6における在庫状況と調整案ライブラリ情報134とを照合し、照合結果として、レコード#6における在庫状況は、調整案ライブラリ情報134の調整案番号14の調整案に該当し、From企業(販社2)及びTo企業(市場2)の調整内容は、「-」つまり調整内容なし、と判別する。 Finally, for record #6, the required delivery date is 7/2, and (1) it is necessary to calculate the inventory of product A as of 7/2 in market 2. The adjustment plan generating unit 120 calculates inventory information for record #6 in the same way as for record #1. At this time, the adjustment plan generating unit 120 determines that the inventory status in record #6 is that there is no child item inventory (inventory of product A as of 7/2 in market 2). After this, the adjustment plan generating unit 120 compares the inventory status in record #6 with the adjustment plan library information 134, and as a result of the comparison, it determines that the inventory status in record #6 corresponds to the adjustment plan with adjustment plan number 14 in the adjustment plan library information 134, and that the adjustment contents for the From company (distributor 2) and To company (market 2) are "-", that is, there is no adjustment content.

上述したように、調整案生成部120は、記憶部13に格納された受発注情報132を参照し、受発注情報132のレコード毎に、受発注情報132の要求納期1325に記録された情報(日付)と回答納期1326に記録された情報(日付)とを比較し、要求納期1325に記録された情報(日付)に対して、回答納期1326に記録された情報(日付)が遅延しているレコードを、納期遅延の発生リスクがあるレコードに設定し、受発注取引分だけステップS2からステップS4の処理(ループL1の処理)を繰り返し実行することで、納期遅延の発生リスクがあるレコード(受発注情報132のレコード#1)に対する調整案を、当事者間の調整を行うための調整案として生成し、生成した調整案を含む情報を調整案情報135として記憶部13に格納することができる。 As described above, the adjustment proposal generating unit 120 refers to the order information 132 stored in the memory unit 13, compares the information (date) recorded in the requested delivery date 1325 of the order information 132 with the information (date) recorded in the answered delivery date 1326 for each record of the order information 132, sets the record in which the information (date) recorded in the answered delivery date 1326 is delayed compared to the information (date) recorded in the requested delivery date 1325 as a record at risk of a delivery date delay, and repeatedly executes the processing from step S2 to step S4 (processing of loop L1) for the number of order transactions to generate an adjustment proposal for the record at risk of a delivery date delay (record #1 of the order information 132) as an adjustment proposal for adjustment between the parties, and stores information including the generated adjustment proposal in the memory unit 13 as adjustment proposal information 135.

すなわち、調整案生成部120は、受発注情報132を参照して、受発注情報132の中に納期遅延が発生しうる受発注の取引が存在する場合、納期遅延が発生しうる受発注の取引の対象となる受注側企業及び発注側企業の在庫状況を在庫情報133から抽出し、抽出した受注側企業及び発注側企業の在庫状況を基に調整案ライブラリ情報134を参照して、複数の対策の中から受注側企業及び発注側企業の在庫状況に対応した対策を抽出し、抽出した対策の調整内容を含む第1調整案を、調整案番号1番で対策番号1番の調整案として生成することができる。 In other words, the adjustment proposal generation unit 120 refers to the order/receive information 132, and when there is an order/receive transaction in the order/receive information 132 that may cause a delivery delay, extracts from the inventory information 133 the inventory statuses of the receiving-order company and the ordering company that are the subject of the order/receive transaction that may cause a delivery delay, and based on the extracted inventory statuses of the receiving-order company and the ordering company, refers to the adjustment proposal library information 134 and extracts measures that correspond to the inventory statuses of the receiving-order company and the ordering company from among multiple measures, and generates a first adjustment proposal that includes the adjustment content of the extracted measure as adjustment proposal number 1 and adjustment proposal number 1.

また、調整案生成部120は、記憶部13に格納された受発注情報132を参照し、受発注情報132のレコード毎に、受発注情報132の要求納期1325に記録された情報(日付)と回答納期1326に記録された情報(日付)とを比較した際に、要求納期1325に記録された情報(日付)に対して、回答納期1326に記録された情報(日付)が遅延していないレコードであっても、納期遅延の発生リスクがあるレコード(1番目のレコード)と関連するレコード(受発注情報132のレコード#2、#4、#6)を、第三者の余裕を活用した調整案として生成し、生成した調整案を含む情報を調整案情報135として記憶部13に格納することができる。 The adjustment proposal generating unit 120 also refers to the order information 132 stored in the memory unit 13, and when comparing the information (date) recorded in the requested delivery date 1325 of the order information 132 with the information (date) recorded in the answered delivery date 1326 for each record of the order information 132, even if the information (date) recorded in the answered delivery date 1326 is not delayed compared to the information (date) recorded in the requested delivery date 1325, it can generate an adjustment proposal that utilizes a third party's slack for records (records #2, #4, and #6 of the order information 132) that are related to the record (first record) that has a risk of a delivery date delay, and store information including the generated adjustment proposal in the memory unit 13 as adjustment proposal information 135.

すなわち、調整案生成部120は、受発注情報132を参照して、受発注情報132の中に納期遅延が発生しうる受発注の取引の状況によっては納期に影響を受ける可能性のある受発注の取引が存在する場合、納期に影響を受ける可能性のある受発注の取引の対象となる受注側企業及び発注側企業の在庫状況を在庫情報133から抽出し、抽出した受注側企業及び発注側企業の在庫状況を基に調整案ライブラリ情報134を参照して、複数の対策の中から受注側企業及び発注側企業の在庫状況に対応した対策を抽出し、抽出した対策の調整内容を含む第2調整案を、調整案番号2番で対策番号2番の調整案として生成することができる。 In other words, the adjustment proposal generation unit 120 refers to the order information 132, and when there is an order transaction in the order information 132 that may be affected by the delivery date depending on the status of the order transaction in which a delivery date delay may occur, extracts from the inventory information 133 the inventory statuses of the receiving company and the ordering company that are the subject of the order transaction that may be affected by the delivery date, and based on the extracted inventory statuses of the receiving company and the ordering company, refers to the adjustment proposal library information 134 and extracts measures that correspond to the inventory statuses of the receiving company and the ordering company from among multiple measures, and generates a second adjustment proposal containing the adjustment content of the extracted measure as adjustment proposal number 2 and adjustment proposal number 2.

また、調整案生成部120は、受発注情報132を参照して、受発注情報132の中に納期遅延が発生しうる受発注の取引の状況によっては納期に影響を受ける可能性のある、特定の受発注の取引が2以上存在する場合(受発注情報132のレコード#2、#4、#6)、特定の受発注の取引の対象となる受注側企業及び発注側企業の各々の在庫状況を在庫情報133から抽出し、抽出した受注側企業及び発注側企業の各々の在庫状況を基に調整案ライブラリ情報134を参照して、複数の対策の中から受注側企業及び発注側企業の各々の在庫状況に対応した対策を2以上抽出し、抽出した2以上の対策の調整内容を含む第2調整案を1巡目の第2調整案(調整案番号2番で対策番号2番の調整案)として生成し、その後、1巡目の第2調整案に属する2以上の対策のいずれかの対策による調整が実行されることを条件に、サプライチェーン情報130とBOM情報(部品構成情報)131を参照して、特定の受発注の取引の対象となる受注側企業及び発注側企業のうち少なくとも一つの企業の在庫を変更できるか否かを判別し、この判別で肯定の結果を得た場合、少なくとも一つの企業の変更後の在庫状況を算出し、算出した少なくとも一つの企業の変更後の在庫状況を基に調整案ライブラリ情報134を参照して、複数の対策の中から少なくとも一つの企業の変更後の在庫状況に対応した対策を2以上抽出し、抽出した2以上の対策の調整内容を含む第2調整案を2巡目の第2調整案(調整案番号2番で対策番号3番の調整案)として生成することができる。 In addition, the adjustment proposal generation unit 120 refers to the order information 132, and when there are two or more specific order transactions in the order information 132 that may be affected by the delivery date depending on the status of the order transaction in which a delivery delay may occur (records #2, #4, and #6 of the order information 132), extracts from the inventory information 133 the inventory statuses of the receiving company and the ordering company that are the subject of the specific order transaction, and based on the extracted inventory statuses of the receiving company and the ordering company, refers to the adjustment proposal library information 134 to extract two or more measures that correspond to the inventory statuses of the receiving company and the ordering company from among the multiple measures, and generates a second adjustment proposal including the adjustment contents of the two or more extracted measures as the first round second adjustment proposal (adjustment proposal number 2 and adjustment proposal number 2), and then generates the first round On the condition that an adjustment is made using one of the two or more measures belonging to the second adjustment plan, the supply chain information 130 and BOM information (parts configuration information) 131 are referenced to determine whether or not it is possible to change the inventory of at least one of the receiving company and ordering company that are the subject of a specific order-receiving transaction, and if a positive result is obtained in this determination, the post-change inventory status of at least one company is calculated, and based on the calculated post-change inventory status of at least one company, the adjustment plan library information 134 is referenced to extract two or more measures that correspond to the post-change inventory status of at least one company from among the multiple measures, and a second adjustment plan including the adjustment contents of the extracted two or more measures is generated as a second round second adjustment plan (adjustment plan number 2 and adjustment plan number 3).

上記実施例では、各拠点(各企業)の在庫情報を活用した例で説明したが、装置や人員などのリソースの稼働情報を各拠点に開示させ、リソースの空き状況に応じて調整案を生成しても構わない。その場合、図14のステップS3の処理では、取引企業のリソース状況と調整案ライブラリとを照合して調整案を作成する。 In the above embodiment, an example was described in which inventory information from each base (each company) was used, but it would also be acceptable to have each base disclose operating information for resources such as equipment and personnel, and generate an adjustment plan based on the availability of resources. In that case, in the process of step S3 in FIG. 14, the resource status of the trading company is compared with the adjustment plan library to create an adjustment plan.

ステップS2~ステップS4の繰り返し処理の後、調整コスト算出部121は、調整案情報135に格納している各調整案に対して、調整に係るコスト(調整に要するコスト)を示す調整コストを算出し、算出した調整コストの情報を調整案情報135に追加する。調整コストは、調整により生じる金銭もしくは労力もしくは時間を定量化したもので、調整コストが少ないほど調整が受け入れられ易いことを示す。また、調整コスト算出部121は、調整案毎の調整コストを算出し、算出した情報を調整案サマリ情報136として生成し、生成した調整案サマリ情報136を記憶部13に格納する(ステップS5)。 After repeating steps S2 to S4, the adjustment cost calculation unit 121 calculates an adjustment cost indicating the cost of adjustment (cost required for adjustment) for each adjustment plan stored in the adjustment plan information 135, and adds information on the calculated adjustment cost to the adjustment plan information 135. The adjustment cost quantifies the money, effort, or time incurred by an adjustment, and the lower the adjustment cost, the more likely the adjustment is to be accepted. The adjustment cost calculation unit 121 also calculates the adjustment cost for each adjustment plan, generates the calculated information as adjustment plan summary information 136, and stores the generated adjustment plan summary information 136 in the memory unit 13 (step S5).

具体的には、受発注情報132のレコード#1に対して生成された調整案であって、調整案情報135の調整案1-対策1に対応する調整案の場合、調整内容1354が「稼働時間追加」であるので、調整コスト算出部121は、「稼働時間追加」の調整コストを、「100」として算出する。また、対策実施企業数(ステークホルダー)が1社(サプライヤ1)であるため、調整コスト算出部121は、この調整コストを「1」として算出する。算出された各調整コストの合計「101」が調整案1-対策1の調整コストになり、合計「101」の情報が調整案情報135の調整コスト1358に格納される。そして、調整案情報135の調整案1には対策1の対策として、他の対策がないため、この合計「101」が調整案1の調整コストになり、合計「101」の情報が調整案サマリ情報136の調整コスト1362に格納される。 Specifically, in the case of an adjustment proposal generated for record #1 of the order receiving and placing information 132 and corresponding to adjustment proposal 1-measure 1 of the adjustment proposal information 135, since the adjustment content 1354 is "addition of operating hours", the adjustment cost calculation unit 121 calculates the adjustment cost of "addition of operating hours" as "100". Furthermore, since the number of companies (stakeholders) implementing the measure is one company (supplier 1), the adjustment cost calculation unit 121 calculates this adjustment cost as "1". The sum of the calculated adjustment costs, "101", becomes the adjustment cost of adjustment proposal 1-measure 1, and the information of the sum "101" is stored in the adjustment cost 1358 of the adjustment proposal information 135. Since there is no other measure for measure 1 in the adjustment proposal 1 of the adjustment proposal information 135, this sum "101" becomes the adjustment cost of adjustment proposal 1, and the information of the sum "101" is stored in the adjustment cost 1362 of the adjustment proposal summary information 136.

ここで、「稼働時間追加」の調整コストを「100」としているが、これは予め調整内容についての調整コスト1358の原単位を各企業で準備しておいても良いし、その都度、在庫情報133などから算出しても構わない。また上記実施例では、調整内容とステークホルダー数で調整コストを算出したが、その他に過去に同様の対策を提案した際の受諾率などで算出しても構わない。 Here, the adjustment cost for "adding operating hours" is set to "100", but this can be done by having each company prepare the basic unit of adjustment cost 1358 for the adjustment content in advance, or it can be calculated each time from inventory information 133, etc. Also, in the above example, the adjustment cost was calculated from the adjustment content and the number of stakeholders, but it can also be calculated from the acceptance rate when similar measures were proposed in the past.

次に、調整順序生成部122は、調整案情報135及び調整案サマリ情報136を参照した際に、調整コストが低く、1つの調整案に複数の対策がある場合は、前提事項となる対策(調整コストが低い方の対策)を優先して調整案を提案する第1調整順序生成ルールと、対策に複数の企業が関係する場合は、受注側(From企業)よりも発注側(To企業)を優先して調整案を提案する第2調整順序生成ルールに基づいて、各調整案を並び替えて調整順序情報137を生成し、生成した調整順序情報137を記憶部13に格納する(S6)。 Next, when referring to the adjustment plan information 135 and the adjustment plan summary information 136, the adjustment order generation unit 122 rearranges each adjustment plan based on a first adjustment order generation rule that, if the adjustment cost is low and there are multiple measures in one adjustment plan, proposes an adjustment plan by prioritizing the prerequisite measure (the measure with the lower adjustment cost), and based on a second adjustment order generation rule that, if multiple companies are involved in the measure, proposes an adjustment plan by prioritizing the ordering party (To company) over the receiving party (From company), and generates adjustment order information 137, and stores the generated adjustment order information 137 in the memory unit 13 (S6).

具体的には、調整順序生成部122は、調整案サマリ情報136を参照した際に、「調整案1」の調整コストが「101」、「調整案2」の調整コストが「4」である場合、調整コストが低い方が、調整が容易であることを示すため、「調整案1」によりも「調整案2」を先に提案する順番に設定する。また、調整案情報135の「調整案2」には、「対策2」と「対策3」が含まれるが、調整案を生成したステップS3で検討した通り、「対策2」が各企業に受諾されて初めて「対策3」を実施できる。このため、調整順序生成部122は、「調整案2」に対して、「対策3」を含む「調整案2」よりも「対策2」を含む「調整案2」を先に提案する順番に設定する。また、「対策2」と「対策3」には、複数の企業が関係するため、どちらから提案するかを決定する必要があるが、サプライチェーンにおいて発注側が納期延伸などの調整案を受諾すれば、受注側も受諾する可能性が高くなる。このため、調整順序生成部122は、「対策2」に対して、「工場2」(受注側企業)よりも「販社2」(発注側企業)を先に提案する順番に設定する。以上の調整順序生成ルールに基づいて調整順序情報137が生成され、生成された調整順序情報137が記憶部13に格納される。 Specifically, when the adjustment plan summary information 136 is referred to, if the adjustment cost of "Adjustment Plan 1" is "101" and the adjustment cost of "Adjustment Plan 2" is "4", the adjustment order generation unit 122 sets the order of proposing "Adjustment Plan 2" before "Adjustment Plan 1" because the lower adjustment cost indicates that the adjustment is easier. Also, "Adjustment Plan 2" in the adjustment plan information 135 includes "Measure 2" and "Measure 3", but as considered in step S3 in which the adjustment plan was generated, "Measure 3" can be implemented only after "Measure 2" is accepted by each company. For this reason, the adjustment order generation unit 122 sets the order of proposing "Adjustment Plan 2" including "Measure 2" before "Adjustment Plan 2" including "Measure 3". Also, since multiple companies are involved in "Measure 2" and "Measure 3", it is necessary to decide which one to propose first, but if the ordering side accepts an adjustment plan such as a delivery date extension in the supply chain, the receiving side is more likely to accept it as well. Therefore, the adjustment order generation unit 122 sets the order of proposal for "Measure 2" to be made to "Sales Company 2" (ordering company) before "Factory 2" (receiving order company). Adjustment order information 137 is generated based on the above adjustment order generation rules, and the generated adjustment order information 137 is stored in the storage unit 13.

次に、調整案問合せ部123は、ステップS7からステップS15の処理(ループL2の処理)を調整順序情報137に格納されている調整案の数だけ繰り返し実行する。さらに、調整案問合せ部123は、ステップS8からステップS12の処理(ループL3の処理)を当該調整案に関わる対策と企業の数だけ繰り返し実行する。 Next, the adjustment proposal inquiry unit 123 repeatedly executes the processes from step S7 to step S15 (loop L2 process) for the number of adjustment proposals stored in the adjustment order information 137. Furthermore, the adjustment proposal inquiry unit 123 repeatedly executes the processes from step S8 to step S12 (loop L3 process) for the number of measures and companies related to the adjustment proposal.

まず、調整案問合せ部123は、受発注情報132と、調整案情報135と、調整順序情報137と、を記憶部13から読み込んで、調整対象の受発注データ(From企業名、To企業名と、品目と、数量と、要求納期と、回答納期)と、調整内容と、回答欄(調整案を受諾できるか否かの回答欄)と、を含む調整案回答画面情報(調整案回答画面142の画像情報)を、調整案の送信情報として生成し、生成した調整案回答画面情報を調整順序に従って調整案通知部140に転送する。調整案通知部140は、調整案問合せ部123から受信した調整案回答画面情報を、通信部15を介して、提案対象の企業のユーザ端末21に送信する(ステップ9)。 First, the adjustment proposal inquiry unit 123 reads the order information 132, adjustment proposal information 135, and adjustment order information 137 from the memory unit 13, and generates adjustment proposal response screen information (image information of the adjustment proposal response screen 142) including the order data to be adjusted (From company name, To company name, item, quantity, requested delivery date, and answered delivery date), adjustment content, and an answer field (answer field for whether the adjustment proposal can be accepted) as transmission information for the adjustment proposal, and transfers the generated adjustment proposal response screen information to the adjustment proposal notification unit 140 in accordance with the adjustment order. The adjustment proposal notification unit 140 transmits the adjustment proposal response screen information received from the adjustment proposal inquiry unit 123 via the communication unit 15 to the user terminal 21 of the company to which the proposal is made (step 9).

次に、提案対象の企業のユーザ端末21が、企業間調整装置10から調整案回答画面情報を受信した場合、ユーザ端末21の調整案受付部250は、受信した調整案回答画面情報を受付け、受付けた調整案回答画面情報を調整案検討部260に転送する。この際、提案対象の企業のユーザ端末21に属する表示装置の画面には、調整案回答画面情報による画面、すなわち、調整案回答画面142の画像情報が表示される。調整案検討部260は、調整案回答画面142に対する、利用者(ユーザ)の操作情報を取り込み、提案された調整案を受諾するか否かを示す回答結果(検討結果)の情報として企業回答情報を生成し、生成した企業回答情報を、回答結果通知部270を通じて、企業間調整装置10に返信する。 Next, when the user terminal 21 of the proposed company receives the adjustment proposal response screen information from the inter-company adjustment device 10, the adjustment proposal receiving unit 250 of the user terminal 21 receives the received adjustment proposal response screen information and transfers the received adjustment proposal response screen information to the adjustment proposal review unit 260. At this time, the screen of the display device belonging to the user terminal 21 of the proposed company displays a screen based on the adjustment proposal response screen information, that is, image information of the adjustment proposal response screen 142. The adjustment proposal review unit 260 takes in operation information of the user (user) on the adjustment proposal response screen 142, generates company response information as information on the response result (review result) indicating whether or not to accept the proposed adjustment proposal, and returns the generated company response information to the inter-company adjustment device 10 via the response result notification unit 270.

企業間調整装置10の通信部15が、企業のユーザ端末21から企業回答情報を受信した場合、受信した企業回答情報を、回答結果受付部111を介して調整案更新部124に転送する。調整案更新部124は、受信した企業回答情報を基に、提案した調整案の受諾結果を確認し、提案した調整案が受諾されなかった場合(ステップS10で「NO」の場合)、提案した調整案は廃案となり、本調整案に関わる未提案の対策については提案せず、提案した調整案に対する企業回答情報から回答結果情報138を生成し、生成した回答結果情報138を記憶部13に格納する(ステップS13)。 When the communication unit 15 of the inter-company adjustment device 10 receives company response information from the company's user terminal 21, it transfers the received company response information to the adjustment proposal update unit 124 via the response result reception unit 111. The adjustment proposal update unit 124 checks the acceptance result of the proposed adjustment proposal based on the received company response information, and if the proposed adjustment proposal is not accepted (if "NO" in step S10), the proposed adjustment proposal is discarded, no unproposed measures related to this adjustment proposal are proposed, and response result information 138 is generated from the company response information for the proposed adjustment proposal and the generated response result information 138 is stored in the memory unit 13 (step S13).

一方、調整案更新部124は、受信した企業回答情報を基に、提案した調整案の受諾結果を確認し、提案した調整案が受諾された場合(ステップS10で「YES」の場合)は、全ての改善を企業に提案したかを確認し、まだ提案していない改善がある場合(ステップS11で「NO」の場合)は、ステップS12に進み、ステップ8からステップS12の処理を繰り返す。 On the other hand, the adjustment proposal update unit 124 checks the acceptance result of the proposed adjustment proposal based on the received company response information, and if the proposed adjustment proposal has been accepted (YES in step S10), it checks whether all improvements have been proposed to the company, and if there are improvements that have not yet been proposed (NO in step S11), it proceeds to step S12 and repeats the processing from step 8 to step S12.

また、全ての改善を企業に提案した場合(ステップS11で「YES」の場合)、調整案更新部124は、提案した調整案に対する企業回答情報から回答結果情報138を生成し、生成した回答結果情報138を記憶部13に格納する(ステップS13)。 In addition, if all improvements have been proposed to the company (YES in step S11), the adjustment proposal update unit 124 generates response result information 138 from the company response information to the proposed adjustment proposals, and stores the generated response result information 138 in the memory unit 13 (step S13).

調整順序情報137に格納されている調整案を全て提案していない場合(ステップS14で「NO」の場合)、ステップ15に進み、ステップ7からステップ15の処理が繰り返えされる。一方、調整順序情報137に格納されている調整案を全て提案した場合(ステップS14で「YES」の場合)、ステップ16に進む。 If all adjustment proposals stored in the adjustment order information 137 have not been proposed (if "NO" in step S14), the process proceeds to step 15, and the processes from step 7 to step 15 are repeated. On the other hand, if all adjustment proposals stored in the adjustment order information 137 have been proposed (if "YES" in step S14), the process proceeds to step 16.

最後に、調整結果生成部125は、回答結果情報138の中に調整案が受諾されたことを示す回答結果(受諾)が存在することを条件に、回答結果情報138から、受諾された調整案による調整で納期遅延の発生リスクが解消される受発注の取引数を算出し、算出した受発注の取引数を基に、受諾された調整案による調整後の納期遵守率を算出する。この際、調整結果生成部125は、回答結果情報138から、受諾された調整案による調整前の受発注の取引数を算出し、算出した受発注の取引数を基に、受諾された調整案による調整前の納期遵守率を算出することもできる。この後、調整結果生成部125は、調整前の納期遵守率と調整後の納期遵守率と受発注情報132の各項目と受諾された調整案に属する調整内容とを含む調整結果確認画面情報(調整結果確認画面143の画像情報)を、受諾された調整案の情報として各企業に対応して生成し、生成した調整結果確認画面情報を、調整結果通知部141と通信部15を介して各企業のユーザ端末21に送信する。すなわち、企業間調整装置10は、受諾された調整案を各企業に出力し、各企業に、受諾された調整案による調整の実施を依頼する。 Finally, on condition that there is a response result (acceptance) in the response result information 138 indicating that the adjustment proposal has been accepted, the adjustment result generating unit 125 calculates from the response result information 138 the number of order transactions in which the risk of delivery delays will be eliminated by adjustment based on the accepted adjustment proposal, and calculates the delivery date compliance rate after adjustment based on the accepted adjustment proposal based on the calculated number of order transactions. At this time, the adjustment result generating unit 125 can also calculate from the response result information 138 the number of order transactions before adjustment based on the accepted adjustment proposal, and calculate the delivery date compliance rate before adjustment based on the accepted adjustment proposal based on the calculated number of order transactions. Thereafter, the adjustment result generating unit 125 generates adjustment result confirmation screen information (image information of the adjustment result confirmation screen 143) including the delivery date compliance rate before and after the adjustment, each item of the order information 132, and the adjustment content belonging to the accepted adjustment proposal for each company as information on the accepted adjustment proposal, and transmits the generated adjustment result confirmation screen information to the user terminal 21 of each company via the adjustment result notifying unit 141 and the communication unit 15. In other words, the inter-company adjustment device 10 outputs the accepted adjustment proposal to each company and requests each company to carry out adjustment according to the accepted adjustment proposal.

各企業のユーザ端末21が、企業間調整装置10から調整結果確認画面情報を受信した場合、ユーザ端末21の調整結果受付部251は、受信した調整結果確認画面情報を受付け、受付けた調整結果確認画面情報をオペレーション実施部261に転送する。この際、ユーザ端末21の表示画面には、調整結果確認画面情報による画面、すなわち、調整結果確認画面143の画像情報が表示される。オペレーション実施部261は、調整結果確認画面情報に属する調整結果を確認し、自身が受諾した調整内容を実施する(ステップS16)。その後、演算部12は本フローチャートの処理を終了する。 When each company's user terminal 21 receives adjustment result confirmation screen information from the inter-company adjustment device 10, the adjustment result reception unit 251 of the user terminal 21 accepts the received adjustment result confirmation screen information and transfers the received adjustment result confirmation screen information to the operation implementation unit 261. At this time, the screen based on the adjustment result confirmation screen information, i.e., the image information of the adjustment result confirmation screen 143, is displayed on the display screen of the user terminal 21. The operation implementation unit 261 checks the adjustment results belonging to the adjustment result confirmation screen information and implements the adjustment contents that it has accepted (step S16). Thereafter, the calculation unit 12 ends the processing of this flowchart.

なお、受諾された調整案が1つもなければ、その旨を各企業のユーザ端末21に送信し、演算部12は本フローチャートの処理を終了する。 If none of the adjustment proposals are accepted, a message to that effect is sent to each company's user terminal 21, and the calculation unit 12 ends the processing of this flowchart.

本実施例によれば、サプライチェーン全体の流通の状況を俯瞰し、サプライチェーンに属する企業間の取り決め上の不整合である納期遅延を調整するための調整案を各企業に提示することができ、結果として、各企業に対して、サプライチェーン全体を評価するための全体評価指標を向上させるための調整案を提示することができる。また、本実施例によれば、サプライチェーン全体の流通の安定性の向上に寄与することができる。さらに、本実施例によれば、各企業が限られた情報の中で意思決定することで生じる不整合を調整するための調整案を迅速に生成し、早期に各企業と調整内容の合意に至らせることが可能になる。 According to this embodiment, it is possible to obtain an overview of the distribution situation throughout the entire supply chain, and to present each company with an adjustment proposal for adjusting delivery delays, which are inconsistencies in the agreements between companies belonging to the supply chain. As a result, it is possible to present each company with an adjustment proposal for improving the overall evaluation index for evaluating the entire supply chain. Furthermore, this embodiment can contribute to improving the stability of distribution throughout the supply chain. Furthermore, this embodiment makes it possible to quickly generate an adjustment proposal for adjusting inconsistencies that arise when each company makes decisions with limited information, and to reach an agreement on the adjustment content with each company at an early stage.

なお、本発明は前述した実施例に限定されるものではなく、添付した特許請求の範囲の趣旨内における様々な変形例及び同等の構成が含まれる。例えば、入力部11と通信部15とを一体化したり、出力部14と通信部15とを一体化したり、することができる。前述した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに本発明は限定されない。 The present invention is not limited to the above-described embodiments, but includes various modified examples and equivalent configurations within the spirit of the appended claims. For example, the input unit 11 and the communication unit 15 can be integrated, or the output unit 14 and the communication unit 15 can be integrated. The above-described embodiments have been described in detail to explain the present invention in an easily understandable manner, and the present invention is not necessarily limited to those having all of the configurations described.

また、前述した各構成、機能等は、それらの一部又は全部を、例えば集積回路で設計する等により、ハードウェアで実現してもよく、プロセッサがそれぞれの機能を実現するプログラムを解釈し実行することにより、ソフトウェアで実現してもよい。 Furthermore, each of the configurations, functions, etc. described above may be realized in part or in whole in hardware, for example by designing them as integrated circuits, or in software, by a processor interpreting and executing a program that realizes each function.

各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリ、ハードディスク、SSD(Solid State Drive)等の記憶装置、又は、IC(Integrated Circuit)カード、SD(Secure Digital)カード、DVD(Digital Versatile Disc)の記録媒体に格納することができる。 Information such as programs, tables, and files that realize each function can be stored in a storage device such as a memory, a hard disk, or an SSD (Solid State Drive), or in a recording medium such as an IC (Integrated Circuit) card, an SD (Secure Digital) card, or a DVD (Digital Versatile Disc).

1 企業間調整システム、2-1~2-N 個別システム、10 企業間調整装置、11 入力部、12 演算部、13 記憶部、14 出力部、15 通信部、21 ユーザたんまつ、22 データベース、23 個別調整装置、24 通信部、25 入力部、26 演算部、27 出力部、30 ネットワーク 1 Inter-company coordination system, 2-1 to 2-N Individual systems, 10 Inter-company coordination device, 11 Input unit, 12 Calculation unit, 13 Storage unit, 14 Output unit, 15 Communication unit, 21 User terminal, 22 Database, 23 Individual coordination device, 24 Communication unit, 25 Input unit, 26 Calculation unit, 27 Output unit, 30 Network

Claims (15)

サプライチェーンを構成する複数の企業の各々に属する各個別情報処理システムから、前記各個別情報処理システムの生成による情報を入力情報としてそれぞれ入力する入力部と、
前記複数の企業のうち受注側企業と発注側企業との間の取り決め上の不整合が発生しうる受発注に対する調整内容であって、前記受注側企業と前記発注側企業に対する調整内容を含む複数の対策を、前記受注側企業と前記発注側企業の在庫状況に対応づけて記憶する調整案ライブラリ情報を有する記憶部と、
前記入力部の入力による前記入力情報の各々と前記調整案ライブラリ情報とを基に前記複数の対策の中の少なくとも一つの対策を含む調整案を生成する調整案生成部と、
前記調整案生成部の生成による前記調整案を含む情報を前記各個別情報処理システムに送信する出力部と、を備えることを特徴とする企業間調整装置。
an input unit that inputs information generated by each individual information processing system from each individual information processing system belonging to each of a plurality of companies constituting a supply chain as input information;
a storage unit having adjustment plan library information that stores a plurality of measures including adjustment contents for the order receiving company and the order placing company, which are adjustment contents for an order receiving company and an order placing company among the plurality of companies that may cause an inconsistency in the agreement between the order receiving company and the order placing company, in association with the inventory status of the order receiving company and the order placing company;
an adjustment plan generating unit that generates an adjustment plan including at least one measure among the plurality of measures based on each of the input information input by the input unit and the adjustment plan library information;
an output unit that transmits information including the adjustment plan generated by the adjustment plan generation unit to each of the individual information processing systems.
請求項1に記載の企業間調整装置であって、
前記入力部は、
前記受注側企業と前記発注側企業とを含む企業間の受発注の取引の複数の項目として品目・数量・要求納期・回答納期を記録する受発注情報と、前記各企業における前記品目の在庫状況を日付に対応づけて記録する在庫情報と、を前記入力情報として入力し、
前記調整案生成部は、
前記入力部の入力による前記受発注情報を参照して、前記受発注情報の中に前記不整合が発生しうる受発注の取引が存在する場合、前記不整合が発生しうる受発注の取引の対象となる前記受注側企業及び前記発注側企業の在庫状況を前記在庫情報から抽出し、抽出した前記受注側企業及び前記発注側企業の在庫状況を基に前記調整案ライブラリ情報を参照して、前記複数の対策の中から前記受注側企業及び前記発注側企業の在庫状況に対応した対策を抽出し、抽出した前記対策の調整内容を含む第1調整案を前記調整案として生成することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 1,
The input unit is
inputting, as the input information, order information that records item, quantity, requested delivery date, and reply delivery date as multiple items of order transactions between companies including the order receiving company and the order placing company, and inventory information that records the inventory status of the items at each company in association with a date;
The adjustment proposal generation unit,
an inter-company adjustment device which, when referring to the order/receive information input by the input unit and when an order/receive transaction in which the inconsistency may occur is present in the order/receive information, extracts from the inventory information the inventory statuses of the receiving-order company and the ordering company which are the subject of the order/receive transaction in which the inconsistency may occur, refers to the adjustment plan library information based on the extracted inventory statuses of the receiving-order company and the ordering company, extracts from the multiple measures a measure that corresponds to the inventory status of the receiving-order company and the ordering company, and generates as the adjustment plan a first adjustment plan including adjustment contents of the extracted measure.
請求項2に記載の企業間調整装置であって、
前記調整案生成部は、
前記入力部の入力による前記受発注情報を参照して、前記受発注情報の中に前記不整合が発生しうる受発注の取引の状況によっては納期に影響を受ける可能性のある受発注の取引が存在する場合、前記納期に影響を受ける可能性のある受発注の取引の対象となる前記受注側企業及び前記発注側企業の在庫状況を前記在庫情報から抽出し、抽出した前記受注側企業及び前記発注側企業の在庫状況を基に前記調整案ライブラリ情報を参照して、前記複数の対策の中から前記受注側企業及び前記発注側企業の在庫状況に対応した対策を抽出し、抽出した前記対策の調整内容を含む第2調整案を前記調整案として生成することを特徴とする企業間調整装置。
The inter-company adjustment device according to claim 2,
The adjustment proposal generation unit,
an inter-company adjustment device which, when referring to the order/receive information input by the input unit and when there is an order/receive transaction in the order/receive information that may be affected by the delivery date depending on the status of the order/receive transaction in which the inconsistency may occur, extracts from the inventory information the inventory statuses of the receiving-order company and the ordering company which are the subject of the order/receive transaction that may be affected by the delivery date, refers to the adjustment plan library information based on the extracted inventory statuses of the receiving-order company and the ordering company, extracts from the multiple measures measures that correspond to the inventory statuses of the receiving-order company and the ordering company, and generates as the adjustment plan a second adjustment plan including adjustment contents of the extracted measure.
請求項2に記載の企業間調整装置であって、
前記入力部は、
前記受注側企業から前記発注側企業に前記品目を輸送するのに要する輸送リードタイムを記録したサプライチェーン情報と、前記複数の企業のうち製造企業が前記品目を製造するのに要する製造リードタイムを記録した部品構成情報と、を前記入力情報として入力し、
前記調整案生成部は、
前記入力部の入力による前記受発注情報を参照して、前記受発注情報の中に前記不整合が発生しうる受発注の取引の状況によっては納期に影響を受ける可能性のある、特定の受発注の取引が2以上存在する場合、前記特定の受発注の取引の対象となる前記受注側企業及び前記発注側企業の各々の在庫状況を前記在庫情報から抽出し、抽出した前記受注側企業及び前記発注側企業の各々の在庫状況を基に前記調整案ライブラリ情報を参照して、前記複数の対策の中から前記受注側企業及び前記発注側企業の各々の在庫状況に対応した対策を2以上抽出し、抽出した前記2以上の対策の調整内容を含む第2調整案を1巡目の第2調整案として生成し、その後、前記1巡目の第2調整案に属する前記2以上の対策のいずれかの対策による調整が実行されることを条件に、前記入力部の入力による前記サプライチェーン情報と前記部品構成情報を参照して、前記特定の受発注の取引の対象となる前記受注側企業及び前記発注側企業のうち少なくとも一つの企業の在庫を変更できるか否かを判別し、この判別で肯定の結果を得た場合、前記少なくとも一つの企業の変更後の在庫状況を算出し、算出した前記少なくとも一つの企業の変更後の在庫状況を基に前記調整案ライブラリ情報を参照して、前記複数の対策の中から前記少なくとも一つの企業の変更後の在庫状況に対応した対策を2以上抽出し、抽出した前記2以上の対策の調整内容を含む第2調整案を2巡目の第2調整案として生成することを特徴とする企業間調整装置。
The inter-company adjustment device according to claim 2,
The input unit is
inputting, as the input information, supply chain information recording a transportation lead time required to transport the item from the receiving company to the ordering company, and parts configuration information recording a manufacturing lead time required for a manufacturing company among the plurality of companies to manufacture the item;
The adjustment proposal generation unit,
With reference to the order information input by the input unit, when there are two or more specific order transactions in the order information that may be affected by the delivery date depending on the status of the order transaction in which the inconsistency may occur, the inventory status of each of the order receiving company and the ordering company that are the subject of the specific order transaction is extracted from the inventory information, and based on the extracted inventory statuses of each of the order receiving company and the ordering company, two or more measures corresponding to the inventory statuses of each of the order receiving company and the ordering company are extracted from the multiple measures by referring to the adjustment plan library information, and a second adjustment plan including adjustment contents of the two or more extracted measures is generated as a first round second adjustment plan, and then, an inter-company adjustment device which, on the condition that adjustment using any of the measures is carried out, refers to the supply chain information and the parts configuration information input by the input unit to determine whether or not it is possible to change the inventory of at least one of the order-receiving company and the order-placing company which are the subject of the specific order-receiving/selling transaction, and if a positive result is obtained in this determination, calculates the inventory status after the change of the at least one company, refers to the adjustment plan library information based on the calculated inventory status after the change of the at least one company, extracts two or more measures from the multiple measures that correspond to the inventory status after the change of the at least one company, and generates a second adjustment plan for a second round that includes adjustment contents of the two or more extracted measures.
請求項1~4のうちいずれか1項に記載の企業間調整装置であって、
前記調整案ライブラリ情報は、
前記受注側企業の管理下にある受注側管理品目の在庫の有無と前記発注側企業の管理下にある発注側管理品目の在庫の有無との組合せ毎に前記複数の対策の各々が対応づけられ、前記各対策には、前記受注側企業に対する第1調整内容と前記発注側企業に対する第2調整内容が規定されていることを特徴とする企業間調整装置。
The inter-company adjustment device according to any one of claims 1 to 4,
The adjustment proposal library information is
An inter-company coordination device characterized in that each of the plurality of measures is associated with each combination of the presence or absence of inventory of an order-receiving-side managed item under the control of the order-receiving company and the presence or absence of inventory of an order-receiving-side managed item under the control of the order-receiving company, and a first coordination content for the order-receiving company and a second coordination content for the order-receiving company are defined for each of the measures.
請求項2に記載の企業間調整装置であって、
前記調整案生成部の生成による前記調整案での調整に要する調整コストを算出する調整コスト算出部と、
前記調整コスト算出部の算出による前記調整コストと前記調整案生成部の生成による前記調整案の調整内容とを基に前記調整案生成部の生成による前記調整案に対する第1調整順序を示す第1調整順序情報を生成する調整順序生成部と、
前記受発注情報を基に前記受発注情報の各項目と前記調整案生成部の生成による前記調整案に属する調整内容と前記調整案生成部の生成による前記調整案を受諾できるか否かの回答欄とを含む調整案回答画面情報を生成する調整案問合せ部と、を更に備え、
前記出力部は、
前記第1調整順序情報と前記調整案回答画面情報とを取り込み、前記調整案回答画面情報を、前記調整案を含む情報として前記第1調整順序に従って前記各個別情報処理システムに送信することを特徴とする企業間調整装置。
The inter-company adjustment device according to claim 2,
an adjustment cost calculation unit that calculates an adjustment cost required for adjustment based on the adjustment plan generated by the adjustment plan generation unit;
an adjustment order generation unit that generates first adjustment order information indicating a first adjustment order for the adjustment plan generated by the adjustment plan generation unit, based on the adjustment cost calculated by the adjustment cost calculation unit and an adjustment content of the adjustment plan generated by the adjustment plan generation unit;
an adjustment plan inquiry unit that generates adjustment plan response screen information including each item of the order information, adjustment contents belonging to the adjustment plan generated by the adjustment plan generation unit, and a response field for whether or not the adjustment plan generated by the adjustment plan generation unit can be accepted based on the order information,
The output unit is
An inter-company adjustment device characterized by importing the first adjustment order information and the adjustment proposal response screen information, and transmitting the adjustment proposal response screen information to each of the individual information processing systems in accordance with the first adjustment order as information including the adjustment proposal.
請求項6に記載の企業間調整装置であって、
前記各個別情報処理システムから前記各企業の回答を示す企業回答情報を前記入力部が入力した場合、前記入力部の入力による前記企業回答情報を基に前記各企業の回答結果を含む回答結果情報を生成する調整案更新部と、
前記調整案更新部の生成による前記回答結果情報の中に前記調整案が受諾されたことを示す回答結果が存在することを条件に、前記回答結果情報から、受諾された前記調整案による調整で納期遅延の発生リスクが解消される受発注の取引数を算出し、算出した前記受発注の取引数を基に前記受諾された前記調整案による調整後の納期遵守率を算出する調整結果生成部と、を更に備え、
前記調整結果生成部は、
少なくとも前記調整後の納期遵守率と前記受発注情報の各項目と前記調整案に属する調整内容とを含む調整結果確認画面情報を前記各企業に対応して生成し、生成した調整結果確認画面情報を前記出力部に転送し、
前記出力部は、
前記調整結果確認画面情報を、前記調整案を含む情報として前記各個別情報処理システムに送信することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 6,
an adjustment proposal update unit that generates response result information including a response result of each of the companies based on the company response information input by the input unit when the input unit inputs company response information indicating the response of each of the companies from each of the individual information processing systems;
an adjustment result generating unit that, on condition that the response result information generated by the adjustment proposal updating unit contains a response result indicating that the adjustment proposal has been accepted, calculates, from the response result information, a number of order placement and receipt transactions in which the risk of a delivery date delay will be eliminated by the adjustment based on the accepted adjustment proposal, and calculates a delivery date compliance rate after the adjustment based on the accepted adjustment proposal based on the calculated number of order placement and receipt transactions;
The adjustment result generation unit is
generating, for each of the companies, adjustment result confirmation screen information including at least the delivery deadline compliance rate after the adjustment, each item of the order information, and the adjustment content belonging to the adjustment plan, and transferring the generated adjustment result confirmation screen information to the output unit;
The output unit is
The inter-company adjustment device is characterized in that the adjustment result confirmation screen information is transmitted to each of the individual information processing systems as information including the adjustment proposal.
請求項1に記載の企業間調整装置であって、
前記調整案生成部は、
前記不整合が発生しうる取引に対する対策であって、当事者間の調整を要する対策を含む第1調整案と、前記不整合が発生しうる取引と関係する取引に対する対策であって、第三者の余裕を活用した調整を要する対策を含む第2調整案を、前記調整案として生成することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 1,
The adjustment proposal generation unit,
An inter-company reconciliation device characterized in that it generates as the reconciliation proposals: a first reconciliation proposal for a transaction in which the inconsistency may occur, the first reconciliation proposal including a measure requiring reconciliation between the parties; and a second reconciliation proposal for a transaction related to the transaction in which the inconsistency may occur, the second reconciliation proposal including a measure requiring reconciliation utilizing a third party's slack.
請求項1に記載の企業間調整装置であって、
前記調整案生成部は、
前記不整合の発生を解消するための対策として、前記複数の対策の中から2以上の対策を抽出した場合、抽出した前記2以上の対策の各々の調整内容を含む2以上の調整案を一つに束ねた調整案を前記調整案として生成することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 1,
The adjustment proposal generation unit,
When two or more measures are extracted from the plurality of measures as measures to resolve the occurrence of the inconsistency, an inter-company adjustment device generates an adjustment plan that combines two or more adjustment plans, each of which includes adjustment contents for the two or more extracted measures, into one as the adjustment plan.
請求項6に記載の企業間調整装置であって、
前記調整コスト算出部は、
前記調整案に属する前記対策に掛かる費用、前記調整案に属する前記対策に関わる企業数、または前記調整案に属する前記対策のうち過去に同様の対策が前記企業で受諾された割合から前記調整コストを算出することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 6,
The adjustment cost calculation unit
An inter-company adjustment device characterized by calculating the adjustment cost from the cost of the measures belonging to the adjustment plan, the number of companies involved in the measures belonging to the adjustment plan, or the proportion of similar measures among the measures belonging to the adjustment plan that have been accepted by the companies in the past.
請求項6に記載の企業間調整装置であって、
前記調整順序生成部は、
前記調整案の中に2以上の対策がある場合には、前記2以上の対策のうち前提事項となっている対策から順番に調整するための第2調整順序を前記2以上の対策に対して設定し、設定した前記第2調整順序を示す第2調整順序情報を生成して前記出力部に転送し、
前記出力部は、
前記2以上の対策を含む前記調整案を前記2調整順序に従って前記各個別情報処理システムに送信することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 6,
The adjustment sequence generation unit
When the adjustment plan includes two or more measures, a second adjustment order is set for the two or more measures for adjusting the two or more measures in order starting from the measure that is a prerequisite, and second adjustment order information indicating the set second adjustment order is generated and transferred to the output unit;
The output unit is
an inter-company adjustment device for transmitting the adjustment plan including the two or more measures to each of the individual information processing systems in accordance with the two adjustment orders;
請求項6に記載の企業間調整装置であって、
前記調整順序生成部は、
前記調整案に属する前記対策の中に前記複数の企業のうち2以上の企業が関係する対策がある場合には、前記発注側企業から順番に調整するための第3調整順序を設定し、設定した前記第3調整順序を示す第3調整順序情報を前記出力部に転送し、
前記出力部は、
前記2以上の企業が関係する対策を含む前記調整案を前記第3調整順序に従って前記各個別情報処理システムに送信することを特徴とする企業間調整装置。
The inter-company coordination device according to claim 6,
The adjustment sequence generation unit
When the measures belonging to the adjustment plan include measures related to two or more of the multiple companies, a third adjustment order is set for adjusting the measures in order starting from the ordering company, and third adjustment order information indicating the set third adjustment order is transferred to the output unit;
The output unit is
an inter-company adjustment device configured to transmit the adjustment plan including measures involving the two or more companies to each of the individual information processing systems in accordance with the third adjustment order;
サプライチェーンを構成する複数の企業の各々に属する各個別情報処理システムと情報の送受信を行う企業間調整装置における方法であって、
前記企業間調整装置が、前記各個別情報処理システムから、前記各個別情報処理システムの生成による情報を入力情報としてそれぞれ入力する入力ステップと、
前記企業間調整装置が、前記複数の企業のうち受注側企業と発注側企業との間の取り決め上の不整合が発生しうる受発注に対する調整内容であって、前記受注側企業と前記発注側企業に対する調整内容を含む複数の対策を、前記受注側企業と前記発注側企業の在庫状況に対応づけて調整案ライブラリ情報として記憶する記憶ステップと、
前記企業間調整装置が、前記入力ステップでの入力による前記入力情報の各々と前記調整案ライブラリ情報とを基に前記複数の対策の中の少なくとも一つの対策を含む調整案を生成する調整案生成ステップと、
前記企業間調整装置が、前記調整案生成ステップでの生成による前記調整案を含む情報を前記各個別情報処理システムに送信する出力ステップと、を備えることを特徴とする企業間調整方法。
A method for an inter-company coordination device that transmits and receives information to and from each individual information processing system belonging to each of a plurality of companies constituting a supply chain, comprising:
an input step in which the inter-company adjustment device inputs information generated by each of the individual information processing systems as input information from each of the individual information processing systems;
a storage step in which the inter-company adjustment device stores, as adjustment plan library information, a plurality of measures including adjustment contents for the order receiving company and the order placing company, which are adjustment contents for an order receiving company and an order placing company among the plurality of companies that may cause an inconsistency in the agreement between the order receiving company and the order placing company, in association with the inventory status of the order receiving company and the order placing company;
an adjustment plan generating step in which the inter-company adjustment device generates an adjustment plan including at least one measure among the plurality of measures based on each of the input information input in the input step and the adjustment plan library information;
an output step in which the inter-company adjustment device transmits information including the adjustment proposal generated in the adjustment proposal generating step to each of the individual information processing systems.
請求項13に記載の企業間調整方法であって、
前記企業間調整装置は、
前記入力ステップでは、前記受注側企業と前記発注側企業とを含む企業間の受発注の取引の複数の項目として品目・数量・要求納期・回答納期を記録する受発注情報と、前記各企業における前記品目の在庫状況を日付に対応づけて記録する在庫情報と、を前記入力情報として入力し、
前記調整案生成ステップでは、前記入力ステップでの入力による前記受発注情報を参照して、前記受発注情報の中に前記不整合が発生しうる受発注の取引が存在する場合、前記不整合が発生しうる受発注の取引の対象となる前記受注側企業及び前記発注側企業の在庫状況を前記在庫情報から抽出し、抽出した前記受注側企業及び前記発注側企業の在庫状況を基に前記調整案ライブラリ情報を参照して、前記複数の対策の中から前記受注側企業及び前記発注側企業の在庫状況に対応した対策を抽出し、抽出した前記対策の調整内容を含む第1調整案を前記調整案として生成することを特徴とする企業間調整方法。
The inter-company coordination method according to claim 13,
The inter-company adjustment device includes:
In the input step, order information that records item, quantity, requested delivery date, and reply delivery date as multiple items of order transactions between companies including the order receiving company and the order placing company, and inventory information that records the inventory status of the items at each company in association with a date are input as the input information,
In the adjustment proposal generation step, by referring to the order/receive information input in the input step, if an order/receive transaction in which the inconsistency may occur exists in the order/receive information, the inventory statuses of the receiving-order company and the ordering company which are the subject of the order/receive transaction in which the inconsistency may occur are extracted from the inventory information, and based on the extracted inventory statuses of the receiving-order company and the ordering company, measures corresponding to the inventory statuses of the receiving-order company and the ordering company are extracted from the multiple measures by referring to the adjustment proposal library information, and a first adjustment proposal including adjustment contents of the extracted measure is generated as the adjustment proposal.
請求項14に記載の企業間調整方法であって、
前記企業間調整装置は、
前記調整案生成ステップでは、前記入力ステップでの入力による前記受発注情報を参照して、前記受発注情報の中に前記不整合が発生しうる受発注の取引の状況によっては納期に影響を受ける可能性のある受発注の取引が存在する場合、前記納期に影響を受ける可能性のある受発注の取引の対象となる前記受注側企業及び前記発注側企業の在庫状況を前記在庫情報から抽出し、抽出した前記受注側企業及び前記発注側企業の在庫状況を基に前記調整案ライブラリ情報を参照して、前記複数の対策の中から前記受注側企業及び前記発注側企業の在庫状況に対応した対策を抽出し、抽出した前記対策の調整内容を含む第2調整案を前記調整案として生成することを特徴とする企業間調整方法。
The inter-company coordination method according to claim 14,
The inter-company adjustment device includes:
In the adjustment proposal generation step, by referring to the order/receive information input in the input step, if there is an order/receive transaction in the order/receive information that may be affected by the delivery date depending on the status of the order/receive transaction in which the inconsistency may occur, the inventory statuses of the receiving-order company and the ordering company that are the subject of the order/receive transaction that may be affected by the delivery date are extracted from the inventory information, and based on the extracted inventory statuses of the receiving-order company and the ordering company, the adjustment proposal library information is referred to, and measures corresponding to the inventory statuses of the receiving-order company and the ordering company are extracted from the multiple measures, and a second adjustment proposal including adjustment contents of the extracted measures is generated as the adjustment proposal.
JP2022180031A 2022-11-10 2022-11-10 Inter-company adjustment device and inter-company adjustment method Pending JP2024069813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022180031A JP2024069813A (en) 2022-11-10 2022-11-10 Inter-company adjustment device and inter-company adjustment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022180031A JP2024069813A (en) 2022-11-10 2022-11-10 Inter-company adjustment device and inter-company adjustment method

Publications (1)

Publication Number Publication Date
JP2024069813A true JP2024069813A (en) 2024-05-22

Family

ID=91121825

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022180031A Pending JP2024069813A (en) 2022-11-10 2022-11-10 Inter-company adjustment device and inter-company adjustment method

Country Status (1)

Country Link
JP (1) JP2024069813A (en)

Similar Documents

Publication Publication Date Title
Riggins et al. Interdependent benefits from interorganizational systems: Opportunities for business partner reengineering
Audy et al. A framework for an efficient implementation of logistics collaborations
US7236947B2 (en) Providing highly automated procurement services
JP5738779B2 (en) Supply capability estimation system, method, and program
US20040073507A1 (en) Method and system for providing international procurement, such as via an electronic reverse auction
Alotaibi et al. Average waiting time of customers in a new queue system with different classes
US20050015319A1 (en) Computer-implemented method for automatic contract monitoring
Arikan et al. Risk pooling via unidirectional inventory transshipments in a decentralized supply chain
Lau et al. A case-based roadmap for lateral transshipment in supply chain inventory management
JP2021005186A (en) Supply chain design system and supply chain design method
WO2015198365A1 (en) Coordination server, coordination program, and electronic commerce system
Hafeez et al. SCOR implementation in oil and gas company from an emerging market
JP2024069813A (en) Inter-company adjustment device and inter-company adjustment method
KR20230091976A (en) supply method determination device
WO2015198364A1 (en) Coordination server, coordination program, and electronic commerce system
JP2003331114A (en) Apparatus and method for evaluating design alteration and program
CN115187317B (en) Invoicing method, device and business system related to outsourcing processing flow
US11704612B2 (en) Supply chain management system, supply chain management method, and supply chain management apparatus
WO2015198362A1 (en) Coordination server, coordination program, and electronic commerce system
Alotaibi et al. Queuing system for different classes of customers
JP2013196180A (en) Dispute management and reliability evaluation system in international factoring job
JP2013105216A (en) Purchase history analysis system of indirect material
US20230094849A1 (en) Distributed cryptographic network integrated with crowd-sourced database