JP2024029846A - Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator - Google Patents

Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator Download PDF

Info

Publication number
JP2024029846A
JP2024029846A JP2022132263A JP2022132263A JP2024029846A JP 2024029846 A JP2024029846 A JP 2024029846A JP 2022132263 A JP2022132263 A JP 2022132263A JP 2022132263 A JP2022132263 A JP 2022132263A JP 2024029846 A JP2024029846 A JP 2024029846A
Authority
JP
Japan
Prior art keywords
gate
elevator
machine room
trolley
hoisting machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022132263A
Other languages
Japanese (ja)
Inventor
圭一 仙田
Keiichi Senda
侑司 池田
Yuji Ikeda
隆太 吉田
Ryuta Yoshida
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2022132263A priority Critical patent/JP2024029846A/en
Publication of JP2024029846A publication Critical patent/JP2024029846A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

To provide a device capable of easily installing a hoist at a prescribed position in a machine room and carry in and install the hoist in the machine room at low cost even if the device is for carrying the hoist of the elevator into the very small machine room of the elevator.SOLUTION: The hoist carrying-in and installation device for the elevator, which carries in and installs a hoist 5 in a machine room 1 using two portal doors, comprises at least: a first portal door 6 of a length in which one end of a trolley beam constituting the portal door protrudes outside from a machine room entrance 2; a second portal door 7 of a length in which the trolley beam does not protrude outside from the machine room entrance 2; a chain block 9a and a trolley 8a attached to the first portal door 6; a hitch wire rope 10a hooked to the chain block 9a; a chain block 9b and a trolley 8b attached to the second portal door 7; and a suspended hitch wire rope hooked to the chain block 9b.SELECTED DRAWING: Figure 1

Description

本発明はエレベーターの巻上機搬入、据付方法及びその巻上機搬入、据付装置に係り、例えば、小規模マンションなど極小機械室の所定の位置に、エレベーターの巻上機を搬入して据付するものに好適なエレベーターの巻上機搬入、据付方法及びその巻上機搬入、据付装置に関する。 The present invention relates to a method for carrying in and installing an elevator hoisting machine, and a device for carrying in and installing the hoisting machine. The present invention relates to a method for carrying in and installing a hoisting machine of an elevator suitable for use in elevators, and a device for carrying in and installing the hoisting machine.

エレベーターのリニューアル工事においては、例えば、建物の入口から通路を経由して巻上機をエレベーターの機械室まで運搬し、機械室内の所定の位置に巻上機を設置する必要がある。通常は、単管パイプなどで構成された2本の足部をH鋼などの繋ぎ部材に固定した足部を機械室内に配置し、前記の足部の上にH鋼などから構成されたトロリービームを配置した後に、接続固定された門型雇を使用して巻上機を機械室内に搬入していた。 In elevator renewal work, for example, it is necessary to transport the hoisting machine from the entrance of the building through a passageway to the elevator machine room, and install the hoisting machine at a predetermined position in the machine room. Usually, two legs made of a single pipe or the like are fixed to a connecting member such as H steel, and the legs are placed inside the machine room, and a trolley made of H steel or the like is placed on top of the legs. After the beams were placed, the hoisting machine was carried into the machine room using a connected and fixed portal.

このようなエレベーターの機械室に巻上機などを搬入する先行技術文献として、特許文献1を挙げることができる。この特許文献1には、単管パイプなどで構成された2本の足部3対を、H鋼で構成された2本のトロリービームに接続した門型雇を用いて重量物を搬送する「揚重機を用いた重量物の揚重運搬方法」が開示されている。 Patent Document 1 can be cited as a prior art document for transporting a hoist or the like into the machine room of such an elevator. This Patent Document 1 describes a method for transporting heavy objects using a portal structure in which three pairs of two legs made of single pipes are connected to two trolley beams made of H steel. A method for lifting and transporting heavy objects using a lifting machine is disclosed.

上記した特許文献1に開示された従来技術は、2本のトロリービームを直列に、即ち、H鋼の長手方向に接続することで、巻上機などの重量物の運搬距離を長くするものであった。 The conventional technology disclosed in Patent Document 1 mentioned above increases the transportation distance of heavy objects such as hoisting machines by connecting two trolley beams in series, that is, in the longitudinal direction of the H steel. there were.

特開2019-206423号公報JP2019-206423A

しかしながら、小規模マンションなどに納入されているエレベーターの機械室は、非常に狭く、巻上機の更新を行うリニューアルの際には、新製巻上機の機械室内への搬入、据付が課題となる。具体的には、新製巻上機を機械室前まで運搬して狭い機械室内に搬入し、狭い機械室内の所定の位置に設置するためには、上述した特許文献1の構造の門型雇では、門型雇自体が狭い機械室内に設置することが難しかった。 However, the machine rooms of elevators delivered to small condominiums are extremely small, and when upgrading the hoisting machine, carrying and installing the new hoisting machine into the machine room becomes an issue. Become. Specifically, in order to transport the newly manufactured hoisting machine to the front of the machine room, bring it into the narrow machine room, and install it at a predetermined position in the narrow machine room, it is necessary to use the gate type hoist with the structure of Patent Document 1 described above. However, it was difficult to install the gate type in a narrow machine room.

また、上述した特許文献1に記載の門型雇以外の方法としては、機械室内にアンカーボルトを打設して、複数の吊りブラケットを設置する方法が一般的であるが、アンカーボルトの打設前に埋設物の探査や壁の強度確認が必要であり、また、アンカーボルトが打設できない場合は、鳶業者に外注する必要があるためコストが掛かっていた。 In addition, as a method other than the gate type construction described in Patent Document 1 mentioned above, a method of driving an anchor bolt in the machine room and installing a plurality of hanging brackets is common. It is necessary to search for buried objects and check the strength of the wall before installing, and if anchor bolts cannot be installed, it is necessary to outsource to a towing company, which is costly.

本発明は上述の点に鑑みなされたもので、その目的とするところは、例えば、小規模マンションなどに納入されているエレベーターの極小機械室に、エレベーターの巻上機を搬入するものであっても、巻上機を機械室内の所定の位置に容易に設置することができ、低コストで巻上機の機械室への搬入、据付が行えるエレベーターの巻上機搬入、据付方法及びその巻上機搬入、据付装置を提供することにある。 The present invention has been made in view of the above points, and its purpose is to carry an elevator hoisting machine into a very small machine room of an elevator delivered to a small condominium, etc. Also, the hoisting machine can be easily installed in a predetermined position in the machine room, and the hoisting machine can be carried into the machine room and installed at low cost. Our goal is to provide equipment for transporting and installing equipment.

本発明のエレベーターの巻上機搬入、据付方法は、上記目的を達成するために、エレベーターの機械室に、2つの門型雇を用いてエレベーターの巻上機を搬入して据付けるエレベーターの巻上機搬入、据付方法であって、
2つの前記門型雇は、該門型雇を構成するトロリービームの一端が、前記エレベーターの機械室出入口から外部に突出する長さの第1の門型雇と、前記門型雇を構成するトロリービームが、前記エレベーターの前記機械室出入口から外部に突出しない長さの第2の門型雇から成り、
前記第1の門型雇の前記トロリービームと前記第2の門型雇の前記トロリービームを平行に、かつ、前記第1の門型雇の前記トロリービームの一端を、前記機械室出入口から外部に突出するように前記機械室内に設置すると共に、前記第2の門型雇の前記トロリービームを、前記機械室出入口から外部に突出しないように設置し、
次に、台車に積載された新製巻上機を、前記第1の門型雇の前記トロリービームが前記機械室出入口から突出している部分の真下に来るように運搬し、その後、前記台車に積載された前記新製巻上機を、前記第1の門型雇に取り付けられているチェーンブロック及びトロリーと前記チェーンブロックに掛けられている玉掛けワイヤーロープとを用いて揚重し、揚重された前記新製巻上機を、前記第1の門型雇の前記トロリーを前記第1の門型雇の前記トロリービームに沿って前記機械室内に揚重した状態で移動することにより、前記機械室内に搬入され、
次に、前記機械室内に設置した前記第2の門型雇に取り付けられているチェーンブロックに掛けられているケンカ吊り玉掛けワイヤーロープを、前記機械室内に搬入されている前記新製巻上機に巻掛けてケンカ吊り状態にし、前記第1の門型雇の前記チェーンブロックと前記第2の門型雇の前記チェーンブロックを操作して、前記新製巻上機の体勢を変更し、
次に、前記第2の門型雇の前記チェーンブロックを引き上げる操作を行いながら前記第1の門型雇の前記チェーンブロックを引き下げる操作行い、前記機械室内の設置位置まで揚重した状態で移動させ、そして、前記機械室内の設置位置まで揚重した状態で前記新製巻上機を移動できたら、前記第2の門型雇の前記チェーンブロックを引き上げる操作を行い、前記新製巻上機を前記機械室内の所定の位置に設置して据付けることを特徴とする。
In order to achieve the above object, the method of carrying in and installing an elevator hoisting machine of the present invention involves carrying an elevator hoisting machine into an elevator machine room using two portals and installing the elevator hoisting machine. A method for carrying in and installing an upper machine,
The two gates include a first gate, in which one end of the trolley beam constituting the gate protrudes outward from the entrance/exit of the machine room of the elevator, and the gate. The trolley beam is comprised of a second portal having a length that does not protrude outside from the machine room entrance of the elevator,
The trolley beam of the first portal and the second trolley are parallel, and one end of the trolley beam of the first portal is connected to the outside from the machine room entrance. installed in the machine room so as to protrude from the machine room, and install the trolley beam of the second portal so as not to protrude outside from the machine room entrance;
Next, the newly manufactured hoisting machine loaded on the trolley is transported so that the trolley beam of the first portal is directly below the part protruding from the machine room entrance, and then the new hoist is loaded onto the trolley. The loaded newly manufactured hoist is lifted using a chain block and a trolley attached to the first gate type hoist and a sling wire rope hung on the chain block, and the hoist is lifted. The machine is moved by moving the newly manufactured hoisting machine with the trolley of the first gantry in a lifted state along the trolley beam of the first gantry into the machine room. carried into the room,
Next, a wire rope for hanging a sling hanging from a chain block attached to the second gate installed in the machine room is attached to the new hoisting machine that has been carried into the machine room. Wrap it around and put it in a fighting hanging state, and operate the chain block of the first gate-type hoist and the chain block of the second gate-type hoist to change the posture of the newly manufactured hoist;
Next, while pulling up the chain hoist of the second gantry, pull down the chain block of the first gantry, and move it in a lifted state to the installation position in the machine room. Then, when the newly manufactured hoisting machine can be moved while being lifted to the installation position in the machine room, the chain block of the second portal type is pulled up, and the newly manufactured hoisting machine is moved. It is characterized in that it is installed at a predetermined position within the machine room.

また、本発明のエレベーターの巻上機搬入、据付装置は、上記目的を達成するために、エレベーターの機械室に、2つの門型雇を用いてエレベーターの巻上機を搬入して据付けるエレベーターの巻上機搬入、据付装置であって、
前記エレベーターの巻上機搬入、据付装置は、前記門型雇を構成するトロリービームの一端が、前記エレベーターの機械室出入口から外部に突出する長さの第1の門型雇と、前記門型雇を構成するトロリービームが、前記エレベーターの前記機械室出入口から外部に突出しない長さの第2の門型雇と、
台車に積載された新製巻上機を揚重し、揚重された前記新製巻上機を前記機械室内に揚重した状態で移動することにより前記機械室内に搬入する前記第1の門型雇に取り付けられているチェーンブロック、トロリー及び前記第1の門型雇の前記チェーンブロックに掛けられている玉掛けワイヤーロープと、
前記第2の門型雇に取り付けられているチェーンブロック及びトロリーと、前記第2の門型雇に取り付けられ、前記機械室内に搬入されている前記新製巻上機に巻掛けてケンカ吊り状態にし、前記第1の門型雇の前記チェーンブロックと前記第2の門型雇の前記チェーンブロックを操作して、前記新製巻上機の体勢を変更する前記第2の門型雇の前記チェーンブロックに掛けられているケンカ吊り玉掛けワイヤーロープと、を少なくとも備えていることを特徴とする。
Moreover, in order to achieve the above object, the elevator hoisting machine carrying-in and installation device of the present invention is an elevator in which the elevator hoisting machine is carried into and installed in the machine room of the elevator using two portals. A hoisting machine import and installation device,
The hoisting machine loading and installation device for the elevator includes: a first gate-type rack having a length such that one end of the trolley beam constituting the gate-type wire protrudes outside from the machine room entrance/exit of the elevator; a second gate-shaped trolley beam having a length such that the trolley beam constituting the trolley does not protrude outside from the machine room entrance of the elevator;
The first gate lifts a newly manufactured hoisting machine loaded on a trolley and transports the newly lifted hoisting machine into the machine room in a lifted state. A chain block and a trolley attached to the chain block, and a sling wire rope hung on the chain block of the first gate block;
A chain block and a trolley attached to the second gate-shaped roller are tied to the newly manufactured hoist that is attached to the second gate-shaped roller and carried into the machine room, and the trolley is in a fighting hanging state. and operating the chain block of the first gantry and the chain block of the second gantry to change the posture of the newly manufactured hoist. The apparatus is characterized by comprising at least a wire rope for hanging a sling hanging on a chain block.

本発明によれば、例えば、小規模マンションなどに納入されているエレベーターの極小機械室に、エレベーターの巻上機を搬入するものであっても、巻上機を機械室内の所定の位置に容易に設置することができ、低コストで巻上機の機械室への搬入、据付が行える。 According to the present invention, for example, even if an elevator hoisting machine is to be carried into a very small machine room of an elevator delivered to a small condominium, the hoisting machine can be easily moved to a predetermined position in the machine room. The hoisting machine can be carried into the machine room and installed at low cost.

本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付の状態を示す斜視図である。FIG. 2 is a perspective view showing a state in which a newly manufactured hoisting machine is carried into an elevator machine room and installed according to a first embodiment of the elevator hoisting machine carrying-in and installation device of the present invention. 本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付装置における新製巻上機のケンカ吊り状態を示す斜視図である。FIG. 2 is a perspective view showing a state in which a newly manufactured hoist is carried into an elevator machine room and a newly manufactured hoist is suspended in the installation device according to Example 1 of the elevator hoisting machine and the installation device of the present invention. 本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付装置における巻上機の所定位置への設置状態を示す斜視図である。FIG. 2 is a perspective view showing a state in which a newly manufactured hoisting machine is carried into a machine room of an elevator according to Example 1 of the elevator hoisting machine and installation device of the present invention, and the hoisting machine is installed at a predetermined position in the installation device. . 本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付装置における巻上機のケンカ吊り状態を示す上面図である。FIG. 3 is a top view showing a newly manufactured hoisting machine being carried into an elevator machine room according to Example 1 of the elevator hoisting machine and the installation apparatus of the present invention, and a state in which the hoisting machine is suspended in a fighting manner in the installation apparatus.

以下、図示した実施例に基づいて本発明のエレベーターの巻上機搬入、据付方法及びその巻上機搬入、据付装置を説明する。なお、各図において、同一構成部品には同符号を使用する。 DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, a method for carrying in and installing a hoisting machine of an elevator and a device for carrying in and installing the hoisting machine of the present invention will be explained based on the illustrated embodiment. In each figure, the same reference numerals are used for the same components.

図1、図2、図3及び図4に、本発明のエレベーターの巻上機搬入、据付方法及びその巻上機搬入、据付装置の実施例1を示す。 1, 2, 3, and 4 show a first embodiment of an elevator hoisting machine carrying-in and installation method and a hoisting machine carrying-in and installation device of the present invention.

図1は、本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付の状態を示す斜視図、図2は、本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付装置における新製巻上機のケンカ吊り状態を示す斜視図、図3は、本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付装置における巻上機の所定位置への設置状態を示す斜視図、図4は、本発明のエレベーターの巻上機搬入、据付装置の実施例1によるエレベーターの機械室への新製巻上機の搬入、据付装置における巻上機のケンカ吊り状態を示す上面図である。 FIG. 1 is a perspective view showing how a newly manufactured hoisting machine is carried into an elevator machine room and installed according to Example 1 of the elevator hoisting machine carrying-in and installation device of the present invention. Carrying in an elevator hoisting machine, carrying a new hoisting machine into the elevator machine room according to Embodiment 1 of the installation device, and a perspective view showing the newly made hoisting machine hanging in the installation device. FIG. 4 is a perspective view showing how the hoisting machine of an elevator according to the invention is carried in and a newly manufactured hoisting machine is carried into the machine room of the elevator according to the first embodiment of the installation device, and the hoisting machine is installed at a predetermined position in the installation device. FIG. 2 is a top view showing a newly manufactured hoisting machine being carried into an elevator machine room according to Example 1 of the elevator hoisting machine and the installation apparatus of the present invention, and a state in which the hoisting machine is suspended in a fight in the installation apparatus.

該図に示すように、リニューアルを行う既設のエレベーターの機械室1は、機械室天井1a、機械室壁1b及び機械室床1cから構成されており、機械室出入口2から機械室1内に新製巻上機5などのリニューアル部品が搬入される。この時、新製巻上機5を台車12などに積載し、搬入経路である通路3を通って機械室出入口2まで運搬する。また、小規模マンションなどに設置されているエレベーターの機械室1は、非常に狭くなっている。 As shown in the figure, the machine room 1 of the existing elevator to be renovated consists of a machine room ceiling 1a, a machine room wall 1b, and a machine room floor 1c. Renewal parts such as the winding machine 5 are brought in. At this time, the newly manufactured hoisting machine 5 is loaded onto a trolley 12 or the like, and is transported to the machine room entrance 2 through the passage 3 which is the carry-in route. Furthermore, the machine room 1 of an elevator installed in a small condominium or the like is extremely narrow.

また、該図において、6は第1の門型雇で、この第1の門型雇6は、2本の第1の門型雇6の足6cと、この2本の第1の門型雇6の足6cの上部を一定の間隔を開けて接続する第1の門型雇6の繋ぎ部材6dから構成された門型形状の第1の門型雇6の第1の足部6aと、第1の門型雇6の第1の足部6aと同一構造の第1の門型雇6の第2の足部6bと、第1の門型雇6の第1の足部6aと第1の門型雇6の第2の足部6bの上部を接続するH鋼などで構成された第1の門型雇6のトロリービーム6eとから概略構成されている。 In addition, in the figure, 6 is a first gate-type pedestal, and this first gantry 6 has two legs 6c of the first gantry 6, and two first gate-shaped pedestals 6. The first leg part 6a of the first gate-shaped part 6 has a portal shape and is composed of a connecting member 6d of the first portal part 6 which connects the upper part of the leg 6c of the part 6 at a certain interval. , a second leg 6b of the first portal 6 having the same structure as the first leg 6a of the first portal 6, and a first leg 6a of the first portal 6. It is generally composed of a trolley beam 6e of the first gantry 6 made of H steel or the like, which connects the upper part of the second leg 6b of the first gantry 6.

なお、第1の門型雇6の第1の足部6aと第1の門型雇6の第2の足部6bを構成している第1の門型雇6の足6cは、パイプ形状で長さを調整可能な構成となっている。また、第1の門型雇6のトロリービーム6eの一端は、第1の門型雇6の第2の足部6bを機械室1の奥行方向の機械室壁1bに近接するように配置したときに、機械室出入口2から外部に突出する長さとなっている。即ち、第1の門型雇6のトロリービーム6eの機械室出入口2から外部に突出する突出長さは、第1の門型雇6のトロリービーム6eの突出部分の下方に台車12が入る程度の突出長さとなっている。 Note that the legs 6c of the first portal 6, which constitute the first leg 6a of the first portal 6 and the second leg 6b of the first portal 6, have a pipe shape. It has an adjustable length. Further, one end of the trolley beam 6e of the first gantry 6 is arranged such that the second leg 6b of the first gantry 6 is close to the machine room wall 1b in the depth direction of the machine room 1. Sometimes, the length is such that it protrudes from the machine room entrance/exit 2 to the outside. That is, the protruding length of the trolley beam 6e of the first portal 6 to the outside from the machine room entrance 2 is such that the trolley 12 can fit under the protruding portion of the trolley beam 6e of the first portal 6. It has a protruding length of .

また、該図において、7は第2の門型雇で、この第2の門型雇7は、第1の門型雇6を構成している第1の足部6aと同一品である第2の門型雇7の第1の足部7aを2本使用し、この2本の第2の門型雇7の第1の足部7aは、上部を一定の間隔を空けて第2の門型雇7の繋ぎ部材7dで接続され、更に、第2の門型雇7の第2の足部7bは、第1の門型雇6の足6cと同一品を1本使用し、第2の門型雇7は、足が合計3本の構成となっている。 In addition, in the figure, 7 is a second gate type foot 7, and this second gate type foot 7 is the same as the first leg 6a constituting the first gate type foot 6. The two first legs 7a of the second gate-type legs 7 are used, and the two first legs 7a of the second gate-shaped legs 7 are attached to the second leg with a certain interval at the upper part. The second leg 7b of the second gate 7 is connected by a connecting member 7d of the gate 7, and the second leg 7b of the second gate 7 is made of the same material as the leg 6c of the first gate 6. The gate type employment 7 in 2 has a total of three legs.

即ち、第2の門型雇7は、第2の門型雇7の第1の足部7aと第2の門型雇7の第2の足部7bの上部をH鋼などで構成されたトロリービーム7eで接続した構成となっており、第1の門型雇6の足が4本に対して、第2の門型雇7は、3本足の構成となっている。 That is, in the second gate type 7, the upper parts of the first leg 7a of the second gate 7 and the second foot 7b of the second gantry 7 are made of H steel or the like. They are connected by a trolley beam 7e, and while the first gantry 6 has four legs, the second gantry 7 has three legs.

また、第2の門型雇7のトロリービーム7eは、第2の門型雇7の第2の足部7bを、機械室1の奥行方向の機械室壁1bに近接するように配置したときに、機械室1内に設置可能な長さとなっている。即ち、第2の門型雇7のトロリービーム7eは、機械室出入口2から外部に突出しない程度の長さ、つまり、第2の門型雇7のトロリービーム7eは、機械室1内に収まる(はみ出ない)程度の長さとなっている。 Moreover, the trolley beam 7e of the second portal type 7 is arranged such that the second leg 7b of the second portal 7 is arranged close to the machine room wall 1b in the depth direction of the machine room 1. In addition, the length is such that it can be installed inside the machine room 1. In other words, the trolley beam 7e of the second gate type 7 has a length that does not protrude outside from the machine room entrance 2, that is, the trolley beam 7e of the second gate type 7 fits within the machine room 1. The length is such that it does not protrude.

次に、第1の門型雇6のトロリービーム6eには、第1の門型雇6のトロリー8aとチェーンブロック9aが、第1の門型雇6のトロリービーム6eに沿って移動可能なように取付けられ、第2の門型雇7のトロリービーム7eには、第2の門型雇7のトロリー8bとチェーンブロック9bが、第2の門型雇7のトロリービーム7eに沿って移動可能なように取付けられている。 Next, the trolley 8a and chain block 9a of the first gate 6 are movable along the trolley beam 6e of the first gate 6. The trolley 8b and chain block 9b of the second gantry 7 move along the trolley beam 7e of the second gantry 7. Installed as possible.

また、第1の門型雇6のチェーンブロック9aには、玉掛けワイヤーロープ10aが掛けられており、この玉掛けワイヤーロープ10aを用いて新製巻上機5が揚重できるようになっている。 Further, a sling wire rope 10a is hung on the chain block 9a of the first gate-type hoist 6, and the new hoist 5 can be lifted using this sling wire rope 10a.

また、第1の門型雇6と第2の門型雇7は、第1の門型雇6のトロリービーム6e及び第2の門型雇7のトロリービーム7eが、単管パイプとクランプから構成された第1の接続部材11aで接続され、第1の門型雇6の第2の足部6bと第2の門型雇7の第2の足部7bが、単管パイプとクランプから構成された第2の接続部材11bで接続されている。なお、符号4は、既設巻上機ベースである。 In addition, the first gantry 6 and the second gantry 7 are such that the trolley beam 6e of the first gantry 6 and the trolley beam 7e of the second gantry 7 are separated from the single pipe and the clamp. The second leg 6b of the first gantry 6 and the second leg 7b of the second gantry 7 are connected by the first connecting member 11a configured to connect the single pipe and the clamp. They are connected by a second connecting member 11b configured as shown in FIG. In addition, the code|symbol 4 is an existing hoisting machine base.

このように構成、設置された第1の門型雇6と第2の門型雇7を用いた新製巻上機5の機械室1内の所定位置への据付について、図1、図2、図3及び図4を用いて説明する。 FIGS. 1 and 2 show how to install the newly manufactured hoisting machine 5 in a predetermined position in the machine room 1 using the first gate type 6 and second gate type 7 constructed and installed in this way. , will be explained using FIGS. 3 and 4.

先ず、第1の門型雇6を、第1の門型雇6のトロリービーム6eの一端が、機械室出入口2から突出するように機械室1内に設置すると共に、第2の門型雇7を、第2の門型雇7のトロリービーム7eが、機械室出入口2から突出しない(はみ出ない)ように機械室1内に設置し、かつ、第1の門型雇6のトロリービーム6eと第2の門型雇7のトロリービーム7eが平行になるように設置する。そして、第1及び第2の接続部材11a及び11bを用いて、上述したようにして、第1の門型雇6と第2の門型雇7を接続する。 First, the first portal 6 is installed in the machine room 1 so that one end of the trolley beam 6e of the first portal 6 protrudes from the machine room entrance 2, and the second portal 7 is installed in the machine room 1 so that the trolley beam 7e of the second gate-type train 7 does not protrude (protrude) from the machine room entrance 2, and the trolley beam 6e of the first gate-type train 6 and the trolley beam 7e of the second portal type 7 are installed so that they are parallel to each other. Then, using the first and second connecting members 11a and 11b, the first gate type 6 and the second portal 7 are connected as described above.

次に、台車12に積載された新製巻上機5を、通路3を横引きして機械室出入口2の前まで運搬する。即ち、台車12に積載された新製巻上機5が、第1の門型雇6のトロリービーム6eが機械室入口2から突出している部分の真下に来るように運搬される。 Next, the newly manufactured hoist 5 loaded on the trolley 12 is transported across the passage 3 to the front of the machine room entrance 2. That is, the newly manufactured hoist 5 loaded on the trolley 12 is transported so that the trolley beam 6e of the first portal 6 is directly below the portion protruding from the machine room entrance 2.

この時、第1の門型雇6のトロリービーム6eの一端が、機械室出入口2よりも突出しているため、台車12上に積載した新製巻上機5を、第1の門型雇のチェーンブロック9aに掛けられている玉掛けワイヤーロープ10aと第1の門型雇6のチェーンブロック9a及びトロリー8aを用いて揚重することができる。 At this time, since one end of the trolley beam 6e of the first gantry 6 protrudes beyond the machine room entrance/exit 2, the newly manufactured hoist 5 loaded on the trolley 12 is moved from the first gantry. Lifting can be carried out using the slinging wire rope 10a hung on the chain block 9a, the chain block 9a of the first portal 6, and the trolley 8a.

揚重された新製巻上機5は、第1の門型雇6のトロリー8aを第1の門型雇6のトロリービーム6eに沿って機械室1内に揚重した状態で移動することにより、機械室1内に搬入される(図1の状態)。 The lifted new hoist 5 moves the trolley 8a of the first gantry 6 along the trolley beam 6e of the first gantry 6 into the machine room 1 in a lifted state. The machine is carried into the machine room 1 (the state shown in FIG. 1).

次に、機械室1内に設置した第2の門型雇7に設置されている第2の門型雇7のトロリー8bとチェーンブロック9bに取り付けられているケンカ吊り玉掛けワイヤーロープ10bを、機械室1内に搬入されている新製巻上機5に巻掛けてケンカ吊り状態にし、第1の門型雇6のチェーンブロック9aと第2の門型雇7のチェーンブロック9bを操作して、新製巻上機5の体勢を、既設巻上機ベース4上に設置する向きに変更する(新製巻上機5を図1の方向から図2の方向になるように向きを変更する)。 Next, the fighting wire rope 10b attached to the trolley 8b and the chain block 9b of the second gate 7 installed in the machine room 1 is connected to the machine. Wrap it around the newly manufactured hoist 5 that has been brought into the room 1 and put it in a suspended state, and operate the chain block 9a of the first gate-type hoist 6 and the chain block 9b of the second gate-type hoist 7. , change the orientation of the new hoist 5 to the direction in which it will be installed on the existing hoist base 4 (change the orientation of the new hoist 5 from the direction shown in Fig. 1 to the direction shown in Fig. 2). ).

次に、第2の門型雇7のチェーンブロック9bを引き上げる操作を行いながら第1の門型雇6のチェーンブロック9aを引き下げる操作行うことで、新製巻上機5を所定の位置、即ち、既設巻上機ベース4の設置位置まで揚重した状態で移動させる(新製巻上機5を図2の位置から図3の位置に移動させる)。 Next, by pulling up the chain block 9b of the second gantry 7 and pulling down the chain block 9a of the first gantry 6, the new hoist 5 is placed in a predetermined position, i.e. , the existing hoisting machine base 4 is moved in a lifted state to the installation position (the new hoisting machine 5 is moved from the position shown in FIG. 2 to the position shown in FIG. 3).

これらの操作をしている間、新製巻上機5の揚重位置、即ち、新製巻上機5の重心位置は移動していくが、第1及び第2の接続部材11a及び11bで、第1の門型雇6と第2の門型雇7は強固に固定されているため、新製巻上機5は安定した状態で揚重移動が可能である。 While performing these operations, the lifting position of the new hoisting machine 5, that is, the center of gravity of the new hoisting machine 5 moves, but the lifting position of the new hoisting machine 5 moves; Since the first gantry 6 and the second gantry 7 are firmly fixed, the newly manufactured hoist 5 can be lifted and moved in a stable state.

そして、既設巻上機ベース4の設置位置まで揚重した状態で新製巻上機5を移動できたら、第2の門型雇7のチェーンブロック9bを引き上げる操作を行い、新製巻上機5を既設巻上機ベース4の上に設置する。 When the new hoist 5 can be moved while being lifted to the installation position of the existing hoist base 4, the chain block 9b of the second gate-type hoist 7 is pulled up, and the new hoist 5 is moved. 5 is installed on the existing hoisting machine base 4.

なお、上述した実施例では、第1の門型雇6と第2の門型雇7は、第1及び第2の接続部材11a及び11bを用いて接続する構成を示したが、機械室天井1aや機械室壁1b或いは機械室床1cなどに突っ張り棒の方式で固定する方法でも良い。 In the above-described embodiment, the first gate type 6 and the second gate type 7 are connected using the first and second connecting members 11a and 11b, but the machine room ceiling 1a, the machine room wall 1b, or the machine room floor 1c using a tension rod method.

例えば、突っ張り棒を用いて第1の門型雇6と第2の門型雇7を直接機械室天井1aや機械室壁1b或いは機械室床1cに固定するか、或いは第1の接続部材11a及び/又は第2の接続部材11bを介して突っ張り棒で、第1の門型雇6と第2の門型雇7を機械室天井1aや機械室壁1b或いは機械室床1cに固定することでも良い。 For example, the first gantry 6 and the second gantry 7 may be directly fixed to the machine room ceiling 1a, the machine room wall 1b, or the machine room floor 1c using tension rods, or the first connecting member 11a may be and/or fixing the first gate type 6 and the second gate type 7 to the machine room ceiling 1a, the machine room wall 1b, or the machine room floor 1c with a tension rod via the second connecting member 11b. But it's okay.

また、第2の門型雇7を構成している、第2の門型雇7の足7cは、機械室1の広さや既設機器の配置などから3本の構成を示したが、機械室1の広さに余裕がある場合などでは4本でも構わない。 In addition, the legs 7c of the second portal 7, which constitute the second portal 7, are shown as having three legs due to the size of the machine room 1 and the arrangement of existing equipment. If there is enough space for 1, 4 may be sufficient.

以上のように構成した本実施例のエレベーターの巻上機搬入、据付においては、小規模マンションなどに納入されている極小の機械室1内に、巻上機を搬入する門型雇を容易に設置することが可能である。 In carrying in and installing the hoisting machine of the elevator of this embodiment configured as described above, it is possible to easily carry the hoisting machine into the very small machine room 1 that is delivered to small-scale condominiums. It is possible to install

また、2台の第1の門型雇6と第2の門型雇7は、それぞれクランプと単管パイプで接続されているため、巻上機のような重量物でも安定して揚重することが可能である。 In addition, since the two first gate-type lifters 6 and second gate-type lifters 7 are connected by clamps and single pipes, they can stably lift even heavy objects such as hoisting machines. Is possible.

また、この状態で新製巻上機5をケンカ吊りし所定の位置に据付けるため、小規模マンションなどに納入されている極小の機械室1に対して、新製巻上機5を容易に搬入可能で、機械室1内にアンカーボルトを打設して複数の吊りブラケットを設置する方法を実施することが無いため、アンカーボルトの打設前に埋設物の探査や壁の強度確認が不要で、アンカーボルトが打設できない場合の鳶業者に外注するためのコストも不要である。 In addition, since the newly manufactured hoisting machine 5 is hung in this state and installed in a predetermined position, the newly manufactured hoisting machine 5 can be easily installed in the extremely small machine room 1 that is delivered to small-scale condominiums. It can be carried in and there is no need to drive anchor bolts into the machine room 1 and install multiple hanging brackets, so there is no need to search for buried objects or check the strength of walls before driving anchor bolts. In addition, there is no need to outsource the cost of outsourcing to a bolter when anchor bolts cannot be driven.

従って、本実施例によれば、例えば、小規模マンションなどに納入されているエレベーターの極小機械室に、エレベーターの巻上機を搬入するものであっても、巻上機を機械室内の所定の位置に容易に設置することができ、低コストで巻上機の機械室への搬入、据付が行える効果がある。 Therefore, according to this embodiment, even if an elevator hoisting machine is to be carried into a very small machine room of an elevator delivered to a small condominium, the hoisting machine can be moved to a predetermined location in the machine room. It can be easily installed at any location, and has the effect of allowing the hoist to be carried into the machine room and installed at low cost.

なお、本発明は上述した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上述した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明したすべての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換える事が可能であり、また、ある実施例の構成に他の実施例の構成を加える事も可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をする事が可能である。 Note that the present invention is not limited to the embodiments described above, and includes various modifications. For example, the embodiments described above are described in detail to explain the present invention in an easy-to-understand manner, and the present invention is not necessarily limited to having all the configurations described. Furthermore, it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. Furthermore, it is possible to add, delete, or replace a part of the configuration of each embodiment with other configurations.

1…エレベーターの機械室、1a…機械室天井、1b…機械室壁、1c…機械室床、2…機械室出入口、3…通路、4…既設巻上機ベース、5…新製巻上機、6…第1の門型雇、6a…第1の門型雇の第1の足部、6b…第1の門型雇の第2の足部、6c…第1の門型雇の足、6d…第1の門型雇の繋ぎ部材、6e…第1の門型雇のトロリービーム、7…第2の門型雇、7a…第2の門型雇の第1の足部、7b…第2の門型雇の第2の足部、7c…足、7d…第2の門型雇の繋ぎ部材、7e…第2の門型雇のトロリービーム、8a…第1の門型雇のトロリー、9a…第1の門型雇のチェーンブロック、8b…第2の門型雇のトロリー、9b…第2の門型雇のチェーンブロック、10a…玉掛けワイヤーロープ、10b…ケンカ吊り玉掛けワイヤーロープ、11a…第1の接続部材、、11b…第2の接続部材、12…台車。 1... Elevator machine room, 1a... Machine room ceiling, 1b... Machine room wall, 1c... Machine room floor, 2... Machine room entrance/exit, 3... Passage, 4... Existing hoisting machine base, 5... New hoisting machine , 6...first portal employment, 6a...first leg of the first portal employment, 6b...second leg of the first portal employment, 6c...leg of the first portal employment , 6d... Connecting member of the first portal, 6e... Trolley beam of the first portal, 7... Second portal, 7a... First leg of the second portal, 7b ...Second leg of the second portal, 7c...Legs, 7d...Connecting member of the second portal, 7e...Trolley beam of the second portal, 8a...First portal trolley, 9a... first chain block, 8b... second trolley, 9b... second chain block, 10a... sling wire rope, 10b... fight hanging sling wire Rope, 11a...first connection member, 11b...second connection member, 12...truck.

Claims (9)

エレベーターの機械室に、2つの門型雇を用いてエレベーターの巻上機を搬入して据付けるエレベーターの巻上機搬入、据付方法であって、
2つの前記門型雇は、該門型雇を構成するトロリービームの一端が、前記エレベーターの機械室出入口から外部に突出する長さの第1の門型雇と、前記門型雇を構成するトロリービームが、前記エレベーターの前記機械室出入口から外部に突出しない長さの第2の門型雇から成り、
前記第1の門型雇の前記トロリービームと前記第2の門型雇の前記トロリービームを平行に、かつ、前記第1の門型雇の前記トロリービームの一端を、前記機械室出入口から外部に突出するように前記機械室内に設置すると共に、前記第2の門型雇の前記トロリービームを、前記機械室出入口から外部に突出しないように設置し、
次に、台車に積載された新製巻上機を、前記第1の門型雇の前記トロリービームが前記機械室出入口から突出している部分の真下に来るように運搬し、その後、前記台車に積載された前記新製巻上機を、前記第1の門型雇に取り付けられているチェーンブロック及びトロリーと前記チェーンブロックに掛けられている玉掛けワイヤーロープとを用いて揚重し、揚重された前記新製巻上機を、前記第1の門型雇の前記トロリーを前記第1の門型雇の前記トロリービームに沿って前記機械室内に揚重した状態で移動することにより、前記機械室内に搬入され、
次に、前記機械室内に設置した前記第2の門型雇に取り付けられているチェーンブロックに掛けられているケンカ吊り玉掛けワイヤーロープを、前記機械室内に搬入されている前記新製巻上機に巻掛けてケンカ吊り状態にし、前記第1の門型雇の前記チェーンブロックと前記第2の門型雇の前記チェーンブロックを操作して、前記新製巻上機の体勢を変更し、
次に、前記第2の門型雇の前記チェーンブロックを引き上げる操作を行いながら前記第1の門型雇の前記チェーンブロックを引き下げる操作行い、前記機械室内の設置位置まで揚重した状態で移動させ、そして、前記機械室内の設置位置まで揚重した状態で前記新製巻上機を移動できたら、前記第2の門型雇の前記チェーンブロックを引き上げる操作を行い、前記新製巻上機を前記機械室内の所定の位置に設置して据付けることを特徴とするエレベーターの巻上機搬入、据付方法。
A method for carrying and installing an elevator hoisting machine in which the hoisting machine for an elevator is carried into and installed in an elevator machine room using two gate-type cages, the method comprising:
The two gates include a first gate, in which one end of the trolley beam constituting the gate protrudes outward from the entrance/exit of the machine room of the elevator, and the gate. The trolley beam is comprised of a second portal having a length that does not protrude outside from the machine room entrance of the elevator,
The trolley beam of the first portal and the second trolley are parallel, and one end of the trolley beam of the first portal is connected to the outside from the machine room entrance. installed in the machine room so as to protrude from the machine room, and install the trolley beam of the second portal so as not to protrude outside from the machine room entrance;
Next, the newly manufactured hoisting machine loaded on the trolley is transported so that the trolley beam of the first portal is directly below the part protruding from the machine room entrance, and then the new hoist is loaded onto the trolley. The loaded newly manufactured hoist is lifted using a chain block and a trolley attached to the first gate type hoist and a sling wire rope hung on the chain block, and the hoist is lifted. The machine is moved by moving the newly manufactured hoisting machine with the trolley of the first gantry in a lifted state along the trolley beam of the first gantry into the machine room. carried into the room,
Next, a wire rope for hanging a sling hanging from a chain block attached to the second gate installed in the machine room is attached to the new hoisting machine that has been carried into the machine room. Wrap it around and put it in a fighting hanging state, and operate the chain block of the first gate-type hoist and the chain block of the second gate-type hoist to change the posture of the newly manufactured hoist;
Next, while pulling up the chain hoist of the second gantry, pull down the chain block of the first gantry, and move it in a lifted state to the installation position in the machine room. Then, when the newly manufactured hoisting machine can be moved while being lifted to the installation position in the machine room, the chain block of the second portal type is pulled up, and the newly manufactured hoisting machine is moved. A method for carrying in and installing an elevator hoist, the method comprising installing and installing an elevator hoist at a predetermined position in the machine room.
請求項1に記載のエレベーターの巻上機搬入、据付方法であって、
前記第1の門型雇と前記第2の門型雇は、接続部材で接続された状態で前記エレベーターの機械室への前記巻上機を搬入、据付けが行なわれることを特徴とするエレベーターの巻上機搬入、据付方法。
A method for carrying in and installing an elevator hoisting machine according to claim 1,
An elevator characterized in that the hoisting machine is carried into the machine room of the elevator and installed in a state where the first gate type and the second gate type are connected by a connecting member. How to bring in and install the hoist.
請求項2に記載のエレベーターの巻上機搬入、据付方法であって、
前記第1の門型雇は、2本の第1の門型雇の足と、この2本の第1の門型雇の足の上部を一定の間隔を開けて接続する第1の門型雇の繋ぎ部材から構成された門型形状の第1の門型雇の第1の足部と、前記第1の門型雇の前記第1の足部と同一構造の前記第1の門型雇の第2の足部と、前記第1の足部と前記第2の足部の上部を接続する前記第1の門型雇の前記トロリービームとから構成され、
前記第2の門型雇は、前記第1の門型雇を構成している前記第1の足部と同一品である前記第2の門型雇の第1の足部を2本使用し、この2本の前記第2の門型雇の前記第1の足部は、上部を一定の間隔を空けて前記第2の門型雇の繋ぎ部材で接続され、更に、前記第2の門型雇の第2の足部は、前記第1の門型雇の足と同一品を1本使用し、前記第2の門型雇は足が合計3本で構成され、
前記第1の門型雇と前記第2の門型雇は、前記第1の門型雇のトロリービーム及び前記第2の門型雇の前記トロリービームが第1の接続部材で接続され、前記第1の門型雇の前記第2の足部と前記第2の門型雇の前記第2の足部が第2の接続部材で接続された状態で前記エレベーターの機械室への前記巻上機を搬入、据付けが行なわれることを特徴とするエレベーターの巻上機搬入、据付方法。
The elevator hoisting machine carrying-in and installation method according to claim 2,
The first gate type is a first gate type that connects two legs of the first gate type and the upper parts of the two legs of the first gate type with a certain interval. a first leg of a first gate-shaped bridge formed of a connecting member; and a first leg having the same structure as the first leg of the first portal-shaped bridge. a second leg of the trolley; and the trolley beam of the first portal connecting the first leg and the upper part of the second leg;
The second gantry uses two first legs of the second gantry that are the same as the first legs constituting the first gantry. , the first legs of the two second gates are connected at the upper portions with a fixed interval by a connecting member of the second gates; The second leg of the kata-gata uses the same product as the first leg of the kata-ga, and the second leg of the kata-gata consists of a total of three legs,
The first gantry and the second gantry are such that the trolley beam of the first gantry and the trolley beam of the second gantry are connected by a first connecting member; The hoisting of the elevator to the machine room in a state where the second leg of the first portal and the second leg of the second portal are connected by a second connecting member. A method for carrying in and installing an elevator hoisting machine, characterized in that the machine is carried in and installed.
請求項1に記載のエレベーターの巻上機搬入、据付方法であって、
前記第1の門型雇と前記第2の門型雇は、前記機械室に突っ張り棒で固定された状態で前記エレベーターの機械室への前記巻上機を搬入、据付けが行なわれることを特徴とするエレベーターの巻上機搬入、据付方法。
A method for carrying in and installing an elevator hoisting machine according to claim 1,
The first gate-type elevator and the second gate-type elevator are characterized in that the hoisting machine is carried into the machine room of the elevator and installed while being fixed in the machine room with a tension rod. How to bring in and install an elevator hoist.
エレベーターの機械室に、2つの門型雇を用いてエレベーターの巻上機を搬入して据付けるエレベーターの巻上機搬入、据付装置であって、
前記エレベーターの巻上機搬入、据付装置は、前記門型雇を構成するトロリービームの一端が、前記エレベーターの機械室出入口から外部に突出する長さの第1の門型雇と、前記門型雇を構成するトロリービームが、前記エレベーターの前記機械室出入口から外部に突出しない長さの第2の門型雇と、
台車に積載された新製巻上機を揚重し、揚重された前記新製巻上機を前記機械室内に揚重した状態で移動することにより前記機械室内に搬入する前記第1の門型雇に取り付けられているチェーンブロック、トロリー及び前記第1の門型雇の前記チェーンブロックに掛けられている玉掛けワイヤーロープと、
前記第2の門型雇に取り付けられているチェーンブロック及びトロリーと、前記第2の門型雇に取り付けられ、前記機械室内に搬入されている前記新製巻上機に巻掛けてケンカ吊り状態にし、前記第1の門型雇の前記チェーンブロックと前記第2の門型雇の前記チェーンブロックを操作して、前記新製巻上機の体勢を変更する前記第2の門型雇の前記チェーンブロックに掛けられているケンカ吊り玉掛けワイヤーロープと、を少なくとも備えていることを特徴とするエレベーターの巻上機搬入、据付装置。
An elevator hoisting machine carrying and installation device for carrying and installing an elevator hoisting machine into an elevator machine room using two gate-type cages,
The hoisting machine loading and installation device for the elevator includes: a first gate-type rack having a length such that one end of the trolley beam constituting the gate-type wire protrudes outside from the machine room entrance/exit of the elevator; a second gate-shaped trolley beam having a length such that the trolley beam constituting the trolley does not protrude outside from the machine room entrance of the elevator;
The first gate lifts a newly manufactured hoisting machine loaded on a trolley, and transports the newly lifted hoisting machine into the machine room in a lifted state. A chain block and a trolley attached to the chain block, and a sling wire rope hung on the chain block of the first gate block;
The chain block and trolley attached to the second gate-shaped roller are tied to the newly manufactured hoisting machine, which is attached to the second gate-shaped roller and carried into the machine room. and operating the chain block of the first gate-type hoist and the chain block of the second gate-type hoist to change the posture of the newly manufactured hoist. An elevator hoisting machine carrying-in and installation device comprising at least a wire rope for hanging a sling hung on a chain block.
請求項5に記載のエレベーターの巻上機搬入、据付装置であって、
前記第1の門型雇は、2本の第1の門型雇の足と、この2本の第1の門型雇の足の上部を一定の間隔を開けて接続する第1の門型雇の繋ぎ部材から構成された門型形状の第1の門型雇の第1の足部と、前記第1の門型雇の前記第1の足部と同一構造の前記第1の門型雇の第2の足部と、前記第1の足部と前記第2の足部の上部を接続する前記第1の門型雇の前記トロリービームとから構成され、
前記第2の門型雇は、前記第1の門型雇を構成している前記第1の足部と同一品である前記第2の門型雇の第1の足部を2本使用し、この2本の前記第2の門型雇の前記第1の足部は、上部を一定の間隔を空けて前記第2の門型雇の繋ぎ部材で接続され、更に、前記第2の門型雇の第2の足部は、前記第1の門型雇の足と同一品を1本使用し、前記第2の門型雇は足が合計3本で構成され、
前記第1の門型雇と前記第2の門型雇は、前記第1の門型雇のトロリービーム及び前記第2の門型雇の前記トロリービームが第1の接続部材で接続され、前記第1の門型雇の前記第2の足部と前記第2の門型雇の前記第2の足部が第2の接続部材で接続されていることを特徴とするエレベーターの巻上機搬入、据付装置。
The elevator hoisting machine carrying-in and installation device according to claim 5,
The first gate type is a first gate type that connects two legs of the first gate type and the upper parts of the two legs of the first gate type with a certain interval. a first leg of a first gate-shaped bridge formed of a connecting member; and a first leg having the same structure as the first leg of the first portal-shaped bridge. a second leg of the trolley; and the trolley beam of the first portal connecting the first leg and the upper part of the second leg;
The second gantry uses two first legs of the second gantry that are the same as the first legs constituting the first gantry. , the first legs of the two second gates are connected at the upper portions with a fixed interval by a connecting member of the second gates; The second leg of the kata-gata uses the same product as the first leg of the kata-ga, and the second leg of the kata-gata consists of a total of three legs,
The first gantry and the second gantry are such that the trolley beam of the first gantry and the trolley beam of the second gantry are connected by a first connecting member; Carrying in a hoisting machine for an elevator, wherein the second foot of the first gate and the second foot of the second gate are connected by a second connecting member. , installation equipment.
請求項6に記載のエレベーターの巻上機搬入、据付装置であって、
前記第1及び第2の門型雇の足は、パイプ形状で長さが調整可能な構成となっていることを特徴とするエレベーターの巻上機搬入、据付装置。
The elevator hoisting machine carrying-in and installation device according to claim 6,
An elevator hoisting machine carrying-in and installation device, wherein the first and second gate-shaped legs are pipe-shaped and have adjustable lengths.
請求項5に記載のエレベーターの巻上機搬入、据付装置であって、
前記第1の門型雇の前記トロリービームの前記機械室出入口から外部に突出する突出長さは、前記第1の門型雇の前記トロリービームの突出部分の下方に前記台車が入る程度の突出長さとなっていることを特徴とするエレベーターの巻上機搬入、据付装置。
The elevator hoisting machine carrying-in and installation device according to claim 5,
The length of the protrusion of the trolley beam of the first gantry to the outside from the machine room entrance is such that the trolley can fit under the protruding portion of the trolley beam of the first gantry. An elevator hoisting machine loading and installation device characterized by a long length.
請求項5に記載のエレベーターの巻上機搬入、据付装置であって、
前記第1の門型雇と前記第2の門型雇は、前記機械室に突っ張り棒で固定されたていることを特徴とするエレベーターの巻上機搬入、据付装置。
The elevator hoisting machine carrying-in and installation device according to claim 5,
An elevator hoisting machine carrying-in and installation device, characterized in that the first gate-type gearbox and the second gate-type gearbox are fixed to the machine room with tension rods.
JP2022132263A 2022-08-23 2022-08-23 Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator Pending JP2024029846A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022132263A JP2024029846A (en) 2022-08-23 2022-08-23 Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022132263A JP2024029846A (en) 2022-08-23 2022-08-23 Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator

Publications (1)

Publication Number Publication Date
JP2024029846A true JP2024029846A (en) 2024-03-07

Family

ID=90106708

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022132263A Pending JP2024029846A (en) 2022-08-23 2022-08-23 Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator

Country Status (1)

Country Link
JP (1) JP2024029846A (en)

Similar Documents

Publication Publication Date Title
US9592997B2 (en) Guide rail installation arrangement and a method for installing guide rails
CN107207208B (en) Vehicle and method for elevator system installation
JP6012578B2 (en) Heavy material transport method and heavy material transport device
JP2006348691A (en) System for working on exterior wall part of building
CN106241618A (en) A kind of curtain wall profiles boom hoisting
JP2008156015A (en) Mobile crane
JP7241154B2 (en) MOVEMENT SYSTEMS, METHODS FOR MOVEMENT OF ARTICLES, AND RELATED COMPONENTS
JP2024029846A (en) Hoist carrying-in and installation method and hoist carrying-in and installation device for elevator
JP2013036287A (en) Device and method for lifting floor unit
JP4694859B2 (en) Inclined passenger conveyor equipment, installation method thereof, and delivery method thereof
JP7033993B2 (en) Heavy load transport method using a hoist
JP2019206423A (en) Lifting auxiliary fixture and method for lifting and transporting heavy article using lifting auxiliary fixture
JP6646220B2 (en) Construction method of suspended steel frame for suspended ceiling
JP2008285260A (en) Guide rail installation engineering method of machine room-less elevator
JP5150313B2 (en) Three-dimensional parking device in void and its construction method
JP3920527B2 (en) Elevator for construction
JP2012001894A (en) Continuous lifting device
JP2017155463A (en) Lifting support column and lifting device
JP6789836B2 (en) Heavy load transport device and heavy load transport method
KR101764582B1 (en) Cable tower constructing method for the cableway
JP2020023389A (en) Elevator device conveyance method and elevator device installation method
JPH07315740A (en) Carrying out method for escalator truss
JPH09125578A (en) Fitting device and fitting method for floor member
JPH07304582A (en) Carrying-in and carrying-out method for escalator truss and device therefor
JPH10140839A (en) Device for vertically hoisting form material and pipe support