JP2023146901A JP2022054333A JP2022054333A JP2023146901A JP 2023146901 A JP2023146901 A JP 2023146901A JP 2022054333 A JP2022054333 A JP 2022054333A JP 2022054333 A JP2022054333 A JP 2022054333A JP 2023146901 A JP2023146901 A JP 2023146901A
Authority
JP
Japan
Prior art keywords
transformer
related information
construction
information
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022054333A
Other languages
Japanese (ja)
Inventor
聡太郎 杉村
Sotaro Sugimura
祥一郎 惠美
Shoichiro Emi
敏治 天野
Toshiharu Amano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2022054333A priority Critical patent/JP2023146901A/en
Publication of JP2023146901A publication Critical patent/JP2023146901A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Indication And Recording Devices For Special Purposes And Tariff Metering Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To make it possible to properly check whether or not a combination of an instrument and a transformer is correct.SOLUTION: An instrument transformer combination check system includes: related information 31, 32 provided in a combined instrument K and transformer H for associating the instrument K with the transformer H and the related information 31, 32 of the combined instrument K and transformer H; construction information storage means for storing construction information including an installation place of the instrument K and the transformer H; a smartphone 4 that is used by a construction company M for installing the instrument K and the transformer H, capable of acquiring a current position, and capable of reading related the information 31, 32 from the instrument K and the transformer H; and check means for determining whether or not the related information 31, 32 read by the smartphone 4 and a current position respectively match the related information 31, 32 included in the construction information and the installation place.SELECTED DRAWING: Figure 1

Description

本発明は、電力量計などの計器と変成器(変流器)とを組み合わせて使用する場合に、組み合わせが正しいかをチェック・確認するための計器変成器組み合わせチェックシステムおよびチェック方法に関する。 The present invention relates to an instrument transformer combination checking system and checking method for checking and confirming whether the combination is correct when a meter such as a watt-hour meter and a transformer (current transformer) are used in combination.

従来から、計器と変成器を新設したり取り替えたりする場合、それぞれの容量や乗率などを適合させて組み合わる必要がある。このため、電力会社の倉庫から工事業者への庫出の際に、担当者が工事依頼書に基づいて計器と変成器との組み合わせが正しいか否かを目視で確認したり、工事業者においても、作業員が工事依頼書に基づいて組み合わせが正しいか否かを目視で確認したりしていた。しかしながら、作業員等による確認に時間と労力を要するばかりでなく、人の目視による確認のため、チェックミスが生じるおそれがあった。 Traditionally, when installing or replacing meters and transformers, it has been necessary to match their capacities and multipliers and combine them. For this reason, when unloading from a power company's warehouse to a construction company, the person in charge visually confirms whether the combination of meters and transformers is correct based on the construction request form, and the construction company also , workers visually checked whether the combination was correct based on the construction request form. However, not only is it time-consuming and labor-intensive to check by a worker, but also the checking is done visually, so there is a risk that a checking error may occur.

このような背景の下、計器と変成器との誤組み合わせを防止することができる計器誤組合せ防止システムが知られている(例えば、特許文献1参照。)。このシステムは、組み合わされた計器と変成器に関連付けバーコード情報を付し、設置現場等において携帯電話で関連付けバーコード情報を読み取って送信すると、計器と変成器との組み合わせが正しいか否かがチェックされて、その結果が携帯電話に送信されるものである。 Against this background, an instrument miscombination prevention system that can prevent incorrect combinations of meters and transformers is known (for example, see Patent Document 1). This system attaches association barcode information to the combined instrument and transformer, and when the association barcode information is read and transmitted with a mobile phone at the installation site, etc., it is possible to check whether the combination of the instrument and transformer is correct or not. It will be checked and the results will be sent to your mobile phone.

特開2007-33362号公報Japanese Patent Application Publication No. 2007-33362

ところで、従来、工事業者が計器と変成器の組み合わせのチェックを設置現場以外(例えば、工事業者の倉庫)で行ったり、設置日の前に行ったりするおそれがあった。この場合、その後実際に設置する際に、計器と変成器を間違って組み合わせてしまうおそれがあり、このようなミスが生じてもチェックをしないため、ミスを防ぐ(検知する)ことができない。このことは、特許文献1に記載のシステムを使用したとしても、生じ得る問題であった。 By the way, heretofore, there has been a risk that the construction contractor may check the combination of the meter and the transformer at a location other than the installation site (for example, in the construction contractor's warehouse) or before the installation date. In this case, there is a risk that the meter and transformer may be combined incorrectly during the actual installation, and even if such a mistake occurs, there is no check, so it is impossible to prevent (detect) the mistake. This was a problem that could occur even if the system described in Patent Document 1 was used.

そこで本発明は、計器と変成器との組み合わせが正しいかを適正にチェック可能な、計器変成器組み合わせチェックシステムおよびチェック方法を提供することを目的とする。 SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide an instrument transformer combination checking system and checking method that can appropriately check whether the combination of an instrument and a transformer is correct.

上記課題を解決するために、請求項1の発明は、組み合わされた計器と変成器に設けられ、当該計器と変成器を関連付けるための関連情報と、前記組み合わされた計器と変成器の関連情報と、当該計器と変成器の設置場所を含む工事情報を記憶する工事情報記憶手段と、計器と変成器を設置する工事業者が使用し、現在位置を取得可能で、前記計器と変成器から前記関連情報を読み取り可能な通信端末と、前記通信端末で読み取られた関連情報と現在位置が、前記工事情報に含まれる関連情報と設置場所に一致するか否かを判定するチェック手段と、を備えることを特徴とする計器変成器組み合わせチェックシステムである。 In order to solve the above problem, the invention of claim 1 provides related information provided in a combined meter and transformer for associating the meter and the transformer, and related information of the combined meter and transformer. and construction information storage means for storing construction information including the installation locations of the meters and transformers, which can be used by construction contractors installing the meters and transformers to obtain their current positions, A communication terminal capable of reading related information; and a checking means for determining whether the related information read by the communication terminal and the current location match the related information included in the construction information and the installation location. This is an instrument transformer combination check system characterized by the following.

請求項2の発明は、請求項1に記載の計器変成器組み合わせチェックシステムにおいて、前記工事情報に前記計器と変成器の設置日を含み、前記チェック手段は、前記通信端末で読み取られた関連情報と現在位置と読取日が、前記工事情報に含まれる関連情報と設置場所と設置日に一致するか否かを判定する、ことを特徴とする。 The invention according to claim 2 is the instrument transformer combination check system according to claim 1, wherein the construction information includes an installation date of the meter and the transformer, and the checking means is configured to check the related information read by the communication terminal. It is characterized in that it is determined whether or not the current position and the reading date match the related information included in the construction information, the installation location, and the installation date.

請求項3の発明は、請求項1または2に記載の計器変成器組み合わせチェックシステムにおいて、前記通信端末は、複数組の前記関連情報を読み取り可能で、前記チェック手段は、前記通信端末で読み取られた前記複数組の各関連情報に対して前記判定を行う、ことを特徴とする。 The invention according to claim 3 is the instrument transformer combination check system according to claim 1 or 2, wherein the communication terminal is capable of reading a plurality of sets of the related information, and the checking means is configured to read the related information by the communication terminal. The method is characterized in that the determination is performed for each of the plurality of sets of related information.

請求項4の発明は、請求項1から3に記載の計器変成器組み合わせチェックシステムにおいて、前記通信端末には、前記関連情報の読み取り、前記判定の操作を画面上で案内するガイドプログラムが備わっている、ことを特徴する。 The invention according to claim 4 is the instrument transformer combination check system according to claims 1 to 3, wherein the communication terminal is equipped with a guide program that guides the reading of the related information and the operation of the determination on a screen. Characterized by being.

請求項5の発明は、組み合わされた計器と変成器に、当該計器と変成器を関連付けるための関連情報を設け、前記組み合わされた計器と変成器の関連情報と、当該計器と変成器の設置場所を含む工事情報を記憶し、計器と変成器を設置する工事業者が、通信端末で前記計器と変成器から前記関連情報を読み取り、チェック手段によって、前記通信端末で読み取られた関連情報と現在位置が、前記工事情報に含まれる関連情報と設置場所に一致するか否かを判定する、ことを特徴とする計器変成器組み合わせチェック方法である。 The invention of claim 5 provides related information for associating the combined meter and transformer with the combined meter and transformer, and the related information of the combined meter and transformer and the installation of the meter and transformer. A construction contractor who stores construction information including location and installs meters and transformers reads the related information from the meters and transformers with a communication terminal, and checks the related information read by the communication terminal and the current state by a checking means. A method for checking combinations of instrument transformers is characterized in that it is determined whether a position matches related information included in the construction information and an installation location.

請求項6の発明は、請求項5に記載の計器変成器組み合わせチェック方法において、前記工事情報に前記計器と変成器の設置日を含み、前記チェック手段は、前記通信端末で読み取られた関連情報と現在位置と読取日が、前記工事情報に含まれる関連情報と設置場所と設置日に一致するか否かを判定する、ことを特徴とする。 The invention according to claim 6 is the instrument transformer combination checking method according to claim 5, wherein the construction information includes an installation date of the meter and the transformer, and the checking means includes related information read by the communication terminal. It is characterized in that it is determined whether or not the current position and the reading date match the related information included in the construction information, the installation location, and the installation date.

請求項7の発明は、請求項5または6に記載の計器変成器組み合わせチェック方法において、前記通信端末は、複数組の前記関連情報を読み取り可能で、前記チェック手段は、前記通信端末で読み取られた前記複数組の各関連情報に対して前記判定を行う、ことを特徴とする。 The invention according to claim 7 is the instrument transformer combination checking method according to claim 5 or 6, wherein the communication terminal is capable of reading a plurality of sets of the related information, and the checking means is configured to read the related information by the communication terminal. The method is characterized in that the determination is performed for each of the plurality of sets of related information.

請求項1および請求項5に記載の発明によれば、工事業者が通信端末で計器と変成器から関連情報を読み取ると、読み取られた関連情報が予め記憶された工事情報に含まれる関連情報と一致するか否か、つまり、計器と変成器の組み合わせが正しいか否かが判定される。さらに、通信端末の現在位置が予め記憶された工事情報に含まれる設置場所に一致するか否か、つまり、設置場所において計器と変成器から関連情報を読み取っているか否かが判定される。このように、正しい設置場所で(設置の直前・直後において)組み合わせが正しいか否かが判定されるため(その後組み合わせに間違いが生じることがないため)、計器と変成器との組み合わせが正しいかを適正にチェックすることが可能となる。 According to the inventions recited in claims 1 and 5, when a construction contractor reads related information from a meter and a transformer with a communication terminal, the read related information is combined with related information included in pre-stored construction information. It is determined whether they match, that is, whether the combination of the meter and the transformer is correct. Further, it is determined whether the current position of the communication terminal matches the installation location included in pre-stored construction information, that is, whether or not related information is being read from the meters and transformers at the installation location. In this way, since it is determined whether the combination is correct at the correct installation location (just before or after installation) (so that there will be no mistakes in the combination afterwards), it is possible to check whether the combination of the meter and transformer is correct. It becomes possible to check properly.

請求項2および請求項6に記載の発明によれば、通信端末で関連情報が読み取られた読取日が、予め記憶された工事情報に含まれる設置日と一致するか否か、つまり、設置日において計器と変成器から関連情報を読み取っているか否かが判定される。このように、正しい設置日に(設置の直前・直後において)組み合わせが正しいか否かが判定されるため(その後組み合わせに間違いが生じることがないため)、計器と変成器との組み合わせが正しいかをより適正にチェックすることが可能となる。 According to the inventions recited in claims 2 and 6, it is possible to determine whether or not the reading date on which the related information was read by the communication terminal matches the installation date included in the construction information stored in advance, that is, the installation date. It is determined whether relevant information is being read from the meter and transformer. In this way, since it is determined whether the combination is correct on the correct installation date (just before or after installation) (so that no mistakes will occur in the combination afterwards), it is possible to check whether the combination of the meter and transformer is correct. can be checked more appropriately.

請求項3および請求項7に記載の発明によれば、通信端末で複数組の関連情報を読み取り可能で、それぞれの組に対して判定が行われるため、チェックに要する労力と時間を削減することが可能となる。例えば、同じ設置場所に複数組の計器と変成器を設置する場合でも、一度に複数組のチェックを行うことが可能となる。 According to the inventions recited in claims 3 and 7, multiple sets of related information can be read by the communication terminal, and determination is made for each set, so that the effort and time required for checking can be reduced. becomes possible. For example, even when multiple sets of meters and transformers are installed at the same installation location, it is possible to check multiple sets at once.

請求項4に記載の発明によれば、関連情報の読み取り、判定の操作を画面上で案内するガイドプログラムが通信端末に備わっているため、画面の案件に従って、誰でも容易かつ適正に関連情報の読み取り、判定の操作を行うことが可能となる。 According to the invention set forth in claim 4, since the communication terminal is equipped with a guide program that guides the operation of reading and determining related information on the screen, anyone can easily and properly read the related information according to the matter on the screen. It becomes possible to perform reading and judgment operations.

この発明の実施の形態に係る計器変成器組み合わせチェックシステムを示す概略構成図である。1 is a schematic configuration diagram showing an instrument transformer combination check system according to an embodiment of the present invention. 図1の計器変成器組み合わせチェックシステムのスマートフォンの概略構成ブロック図である。2 is a schematic configuration block diagram of a smartphone of the instrument transformer combination check system shown in FIG. 1. FIG. 図2のスマートフォンの記憶部に記憶されたデータ構成を示す図である。3 is a diagram showing a data structure stored in a storage unit of the smartphone shown in FIG. 2. FIG. 図2のスマートフォンのチェックアプリによる第1の画面を示す図である。FIG. 3 is a diagram showing a first screen of the check application of the smartphone shown in FIG. 2; 図2のスマートフォンのチェックアプリによる第2の画面を示す図である。FIG. 3 is a diagram showing a second screen by the check app of the smartphone shown in FIG. 2; 図2のスマートフォンのチェックアプリによる第3の画面を示す図である。FIG. 3 is a diagram showing a third screen of the check application of the smartphone shown in FIG. 2; 図2のスマートフォンのチェックアプリによる第4の画面を示す図である。FIG. 3 is a diagram showing a fourth screen of the check application of the smartphone shown in FIG. 2; 図2のスマートフォンのチェックアプリによる第5の画面を示す図である。It is a figure which shows the 5th screen by the check application of the smart phone of FIG. 図2のスマートフォンのチェックアプリによる第6の画面を示す図である。It is a figure which shows the 6th screen by the check application of the smart phone of FIG. 図2のスマートフォンのチェックアプリによる第7の画面を示す図である。It is a figure which shows the 7th screen by the check application of the smart phone of FIG.

以下、この発明を図示の実施の形態に基づいて説明する。 The present invention will be described below based on the illustrated embodiments.

図1は、この発明の実施の形態に係る計器変成器組み合わせチェックシステム1を示す概略構成図である。この計器変成器組み合わせチェックシステム1は、電力量計などの計器Kと変成器(変流器)Hとを設置する場合に、組み合わせが正しいかをチェック・確認するためのシステムであり、管理コンピュータ2と、2次元コード(関連情報)31、32と、スマートフォン(通信端末)4と、を備える。 FIG. 1 is a schematic configuration diagram showing an instrument transformer combination check system 1 according to an embodiment of the present invention. This meter transformer combination check system 1 is a system for checking and confirming whether the combination is correct when installing a meter K such as a watt-hour meter and a transformer (current transformer) H. 2, two-dimensional codes (related information) 31 and 32, and a smartphone (communication terminal) 4.

管理コンピュータ2は、電力会社Cの施設(事務所、倉庫など)に配設され、工事業者Mに庫出する計器Kと変成器Hを管理したりするためのコンピュータ・サーバである。すなわち、電力会社Cにおいて、工事の申し込み内容(電力契約種別、契約容量など)等に基づいて、所定の容量、乗率などを有する計器Kと変成器Hを選定して組み合わせ、管理コンピュータ2で関連情報を生成して記憶する。 The management computer 2 is a computer server installed in a facility (office, warehouse, etc.) of the electric power company C and used to manage the meters K and the transformer H to be delivered to the construction company M. That is, electric power company C selects and combines a meter K and a transformer H having a predetermined capacity, multiplication factor, etc. based on the construction application details (power contract type, contract capacity, etc.), and the management computer 2 selects and combines them. Generate and store relevant information.

関連情報とは、組み合わされた計器Kと変成器Hに設けられ、当該計器Kと変成器Hを関連付ける(2つが組み合わされていることを示す)ための情報であり、この実施の形態では、工事の受付番号、合番号(組み合わされた計器Kと変成器Hを明確にするために双方に付される同一の番号)、組み合わされた計器Kおよび変成器Hの識別情報、工事内容などを含む。 The related information is information provided in the combined meter K and transformer H to associate the meter K and transformer H (indicating that the two are combined), and in this embodiment, The construction receipt number, combination number (the same number given to both the combined instrument K and transformer H to make it clear), the identification information of the combined instrument K and transformer H, the details of the work, etc. include.

ここで、関連情報に設置場所と設置日を含めてもよいが、この実施の形態では、後述するように、設置場所と設置日は、関連情報とは別に工事情報に含まれる。すなわち、工事情報は、関連情報のほかに設置場所と設置日などを含み、管理コンピュータ2で生成され記憶される。また、1つの計器Kに対して複数の変成器Hが組み合わされる場合もある。 Here, the installation location and installation date may be included in the related information, but in this embodiment, the installation location and installation date are included in the construction information separately from the related information, as will be described later. That is, the construction information includes the installation location, installation date, etc. in addition to related information, and is generated and stored by the management computer 2. Further, a plurality of transformers H may be combined with one meter K in some cases.

このような関連情報を管理コンピュータ2でコード化して2次元コード31、32を生成、印刷する。すなわち、2次元コード31、32は、関連情報が記号化された2次元のコードであり、計器用2次元コード31は、計器Kの表面に貼り付けられ、変成器用2次元コード32は、変成器Hの表面に貼り付けられる。そして、2次元コード31、32が貼り付けられた計器Kと変成器Hおよび後述するスマートフォン4などが、電力会社Cから工事業者Mの事務所や倉庫などに配送されるものである。この際、後述するチェックアプリ47で入力するためのID、パスワードおよび受付番号など(工事、工事業者などを識別するための情報)や設置場所、設置日、工事内容などが記載された工事依頼書が工事業者Mに送られる。 Such related information is encoded by the management computer 2 to generate and print two-dimensional codes 31 and 32. That is, the two-dimensional codes 31 and 32 are two-dimensional codes in which related information is encoded, the two-dimensional code for meters 31 is pasted on the surface of the meter K, and the two-dimensional code for transformers 32 is for transformation It is pasted on the surface of the vessel H. Then, the meter K, the transformer H, and the smartphone 4 to be described later, to which the two-dimensional codes 31 and 32 are attached, are delivered from the electric power company C to the office or warehouse of the construction company M. At this time, a construction request form containing the ID, password, reception number, etc. (information to identify the construction work, construction contractor, etc.), installation location, installation date, construction details, etc. to be input in the check application 47 described later. is sent to construction contractor M.

スマートフォン4は、計器Kと変成器Hを設置する工事業者Mが使用し、現在位置を取得可能で、計器Kと変成器Hから関連情報つまり2次元コード31、32を読み取り可能な多機能携帯電話である。このスマートフォン4は、計器Kと変成器Hの組み合わせの正否をチェックする機能などを有することを除いて、既製・既存の多機能携帯電話と同等の機能・構成であり、図2に示すように、主として、通信部41と、タッチパネル42と、時計43と、GPS部44と、カメラ45と、記憶部(工事情報記憶手段)46と、チェックアプリ(チェック手段、ガイドプログラム)47と、これらを制御などする中央処理部48と、を備える。 The smartphone 4 is used by a construction contractor M who installs the meter K and the transformer H, and is a multifunctional mobile phone that can obtain the current location and read related information, that is, two-dimensional codes 31 and 32 from the meter K and the transformer H. It's a phone. This smartphone 4 has the same functions and configuration as existing multi-function mobile phones, except that it has a function to check whether the combination of meter K and transformer H is correct, etc., and as shown in Fig. 2. , mainly a communication section 41, a touch panel 42, a clock 43, a GPS section 44, a camera 45, a storage section (construction information storage means) 46, a check application (check means, guide program) 47, and these. It includes a central processing unit 48 that performs control and the like.

通信部41は、外部と通信するためのインターフェイスであり、具体的には、管理コンピュータ2に対して後述するチェック結果を送信したりする。タッチパネル42は、各種情報や画像を表示したり、各種情報や指令を入力したりするための表示部および入力部である。例えば、後述するチェックアプリ47による案内画面・画像を表示したり、後述するID、パスワードや受付番号などを入力したりする。 The communication unit 41 is an interface for communicating with the outside, and specifically transmits check results, which will be described later, to the management computer 2. The touch panel 42 is a display section and an input section for displaying various information and images, and inputting various information and commands. For example, a guide screen/image by a check application 47, which will be described later, is displayed, and an ID, password, reception number, etc., which will be described later, are input.

時計43は、現在時刻を常時測定する装置であり、現在の日付・年月日も測定する。GPS部44は、自己の位置を検出するための(現在位置を取得可能な)機能部であり、GPS(Global Positioning System)衛星から時刻信号電波を受信して、スマートフォン4の現在の位置情報(緯度、経度)をリアルタイムに演算、取得するものである。カメラ45は、映像を撮影する装置であり、主として、この実施の形態では、2次元コード31、32を撮影することで、2次元コード31、32から計器Kと変成器Hの関連情報を読み取るものである。 The clock 43 is a device that constantly measures the current time, and also measures the current date, year, month, and day. The GPS unit 44 is a functional unit for detecting its own position (capable of acquiring the current position), and receives time signal radio waves from GPS (Global Positioning System) satellites to obtain current position information ( It calculates and obtains latitude, longitude) in real time. The camera 45 is a device that takes pictures, and in this embodiment, mainly reads the related information of the meter K and the transformer H from the two-dimensional codes 31 and 32 by taking pictures of the two-dimensional codes 31 and 32. It is something.

記憶部46は、各種情報・データを記憶するメモリであり、主として、工事情報を記憶する。具体的には、図3に示すように、計器Kと変成器Hの組み合わせごとに(受付番号ごとに)、関連情報461、設置場所462、設置日463およびその他464の工事情報が記憶されている。 The storage unit 46 is a memory that stores various information and data, and mainly stores construction information. Specifically, as shown in FIG. 3, for each combination of meter K and transformer H (for each reception number), related information 461, installation location 462, installation date 463, and other construction information 464 are stored. There is.

関連情報461には、組み合わされた計器Kと変成器Hの関連情報、すなわち、工事の受付番号、合番号、組み合わされた計器Kおよび変成器Hの識別情報、工事内容などが記憶されている。設置場所462には、この計器Kと変成器Hが設置されるべき場所(緯度、経度)が記憶され、設置日463には、この計器Kと変成器Hが設置されるべき年月日が(時刻が指定されている場合には、時刻も)記憶されている。 The related information 461 stores related information about the combined instrument K and transformer H, that is, construction reception number, combination number, identification information of the combined instrument K and transformer H, construction details, etc. . The installation location 462 stores the location (latitude, longitude) where this meter K and transformer H should be installed, and the installation date 463 stores the date when this meter K and transformer H should be installed. (If a time is specified, the time is also stored.)

このような工事情報は、電力会社Cから工事業者Mに配送される際にスマートフォン4に記憶され、配送先の工事業者Mが設置する計器Kと変成器Hに関する工事情報が記憶される。すなわち、上記のようにして計器Kと変成器Hを工事業者Mに配送する際に、管理コンピュータ2に記憶された該当する計器Kと変成器Hの工事情報がスマートフォン4に記憶され、工事業者Mに配送される。 Such construction information is stored in the smartphone 4 when delivered from the electric power company C to the construction contractor M, and construction information regarding the meter K and the transformer H installed by the construction contractor M at the delivery destination is stored. That is, when the instrument K and the transformer H are delivered to the construction contractor M as described above, the construction information of the corresponding instrument K and transformer H stored in the management computer 2 is stored in the smartphone 4, and the construction information is stored in the smartphone 4 and delivered to the construction contractor M. Delivered to M.

チェックアプリ47は、関連情報の読み取りや判定などの操作を画面上(タッチパネル42上)で案内しながら、設置しようとしている計器Kと変成器Hの組み合わせが正しいかを判定したりするためのアプリケーション・プログラムである。すなわち、タッチパネル42で起動指令が入力されると起動され、タッチパネル42の案内画面に従って所定の操作を行うと、スマートフォン4で読み取った関連情報と現在位置と読取日が、記憶部46に記憶された工事情報に含まれる関連情報と設置場所と設置日に一致するか否かを判定する。この際、複数組の関連情報を読み取り可能で、読み取った複数組の各関連情報に対して判定を行うものである。 The check application 47 is an application that guides operations such as reading and determining related information on the screen (on the touch panel 42) and determines whether the combination of the meter K and transformer H that is to be installed is correct.・It is a program. That is, it is activated when an activation command is input on the touch panel 42, and when a predetermined operation is performed according to the guidance screen on the touch panel 42, the related information read with the smartphone 4, the current position, and the reading date are stored in the storage unit 46. It is determined whether the related information included in the construction information matches the installation location and installation date. At this time, multiple sets of related information can be read, and a determination is made for each of the read multiple sets of related information.

具体的には、まず、図4に示すような第1の画面(ログイン画面)をタッチパネル42に表示し、画面上の「ログインID」と「パスワード」に、工事業者Mに予め送られたIDとパスワードが入力されて、画面上の「ログイン」ボタンが押下されると、図5に示すような第2の画面をタッチパネル42に表示する。次に、画面上の「受付番号入力」ボタンが押下されると、図6に示すような第3の画面をタッチパネル42に表示し、工事業者Mに予め送られた受付番号が画面上の「受付番号」に入力されて、画面上の「入力完了」ボタンが押下されると、図7に示すような第4の画面をタッチパネル42に表示する。 Specifically, first, a first screen (login screen) as shown in FIG. When the password is entered and the "Login" button on the screen is pressed, a second screen as shown in FIG. 5 is displayed on the touch panel 42. Next, when the "Enter reception number" button on the screen is pressed, a third screen as shown in FIG. When the "reception number" is entered and the "input complete" button on the screen is pressed, a fourth screen as shown in FIG. 7 is displayed on the touch panel 42.

この画面には、4つの「組合せチェック」ボタンが設けられ、1件の工事申し込み(受付番号)で複数組の計器Kと変成器Hが含まれる場合には、その組数に応じた数の「組合せチェック」ボタンが活性化されて表示される。図7では、1件の工事申し込みで1組の計器Kと変成器Hしか含まれておらず、1つの「組合せチェック」ボタンが活性化されている場合を図示している。そして、活性化された「組合せチェック」ボタンが押下されると、図8に示すような第5の画面をタッチパネル42に表示する。 This screen has four "combination check" buttons, and if multiple sets of instruments K and transformers H are included in one construction application (reception number), the number of combinations corresponding to the number of sets is included. The "Combination Check" button is activated and displayed. FIG. 7 illustrates a case where one construction application includes only one set of instrument K and transformer H, and one "check combination" button is activated. Then, when the activated "Combination Check" button is pressed, a fifth screen as shown in FIG. 8 is displayed on the touch panel 42.

次に、画面上の「QRコード撮影(計器)」ボタンが押下されると(「QRコード」は登録商標)カメラ45を作動し、図9の第6の画面に示すように、カメラ45で計器Kの計器用2次元コード31が撮影されると、図8の第5の画面に戻る。同様に、「QRコード撮影(変流器/変成器)」ボタンが押下されるとカメラ45を作動し、カメラ45で変成器Hの変成器用2次元コード32が撮影されると、図8の第5の画面に戻る。ここで、組み合わされた変成器Hが2台ある場合には、もう1つ「QRコード撮影(変流器/変成器)」ボタンが活性化されて表示され、同様にして変成器用2次元コード32が撮影される。 Next, when the "QR code capture (instrument)" button on the screen is pressed ("QR code" is a registered trademark), the camera 45 is activated, and as shown in the sixth screen of FIG. When the two-dimensional instrument code 31 of the instrument K is photographed, the screen returns to the fifth screen in FIG. Similarly, when the "QR code capture (current transformer/transformer)" button is pressed, the camera 45 is activated, and when the two-dimensional transformer code 32 of the transformer H is captured by the camera 45, the image shown in FIG. Return to the fifth screen. Here, if there are two combined transformers H, another "QR code capture (current transformer/transformer)" button will be activated and displayed, and the two-dimensional transformer 32 is photographed.

このようにして2次元コード31、32を撮影して計器Kと変成器Hの関連情報の読み取りが終わり、図8の画面の「組合せチェック」ボタンが押下されると、読み取った関連情報と現在位置と読取日が、記憶部46の工事情報に含まれる関連情報と設置場所と設置日に一致するか否かを判定する。すなわち、読み取った関連情報と工事情報の関連情報とが一致し、工事対象・受付番号に対して計器Kと変成器Hとの組み合わせが正しいか否かを判定する。 In this way, when the two-dimensional codes 31 and 32 are photographed and the related information of the meter K and transformer H is read, and the "Combination check" button on the screen shown in FIG. 8 is pressed, the read related information and the current It is determined whether the position and reading date match the related information included in the construction information in the storage unit 46, the installation location, and the installation date. That is, it is determined whether the read related information matches the related information of the construction information and the combination of the meter K and the transformer H is correct for the construction object/reception number.

また、2次元コード31、32を読み取った際のGPS部44による現在位置と、工事情報の設置場所とが一致するか否かを判定する。さらに、2次元コード31、32を読み取った際の時計43による日付・年月日と、工事情報の設置日とが一致するか否かを(時刻が指定されている場合には、時刻も)判定する。 Further, it is determined whether the current position determined by the GPS unit 44 when reading the two-dimensional codes 31 and 32 matches the installation location of the construction information. Furthermore, check whether the date/year/month/day indicated by the clock 43 when reading the two-dimensional codes 31 and 32 matches the installation date of the construction information (if the time is specified, also the time). judge.

その結果、いずれかが一致しない場合には、何が一致しないかを示すエラーメッセージをタッチパネル42に表示する。続いて、1件の工事申し込みで複数組の計器Kと変成器Hが含まれる場合には、図7の画面に戻り、それぞれの組に対して、このような組み合わせのチェックを繰り返す。そして、すべてのチェックが完了すると、図10に示すような第7の画面をタッチパネル42に表示する。この画面で「結果送信」ボタンが押下されると、チェック結果(組み合わせが正しいか、チェック場所・設置場所が正しいか、チェック日・設置日が正しいか)を管理コンピュータ2に送信し、図4のログイン画面に戻るものである。 As a result, if any one of them does not match, an error message indicating what does not match is displayed on the touch panel 42. Subsequently, if multiple sets of meters K and transformers H are included in one construction application, the screen returns to the screen shown in FIG. 7, and such a combination check is repeated for each set. When all checks are completed, a seventh screen as shown in FIG. 10 is displayed on the touch panel 42. When the "Send results" button is pressed on this screen, the check results (are the combinations correct, the check location/installation location correct, the check date/installation date correct) are sent to the management computer 2, and the results shown in Figure 4 This will return you to the login screen.

次に、このような構成の計器変成器組み合わせチェックシステム1による計器変成器組み合わせチェック方法について説明する。 Next, a method for checking the combination of instrument transformers using the system 1 for checking combinations of instrument transformers having such a configuration will be described.

まず、上記のように、電力会社Cにおいて、計器Kと変成器Hを選定して組み合わせ、関連情報および2次元コード31、32を生成、印刷して計器Kと変成器Hに貼り付けるとともに、関連情報と設置場所と設置日を含む工事情報をスマートフォン4の記憶部46に記憶する。そして、これらの計器K、変成器H、スマートフォン4および工事依頼書を電力会社Cから工事業者Mに配送する。 First, as mentioned above, electric power company C selects and combines meter K and transformer H, generates and prints related information and two-dimensional codes 31 and 32, and pastes them on meter K and transformer H. Construction information including related information, installation location, and installation date is stored in the storage unit 46 of the smartphone 4. Then, these meter K, transformer H, smartphone 4, and construction request form are delivered from electric power company C to construction contractor M.

次に、工事業者Mが工事依頼書に記載された設置日に設置場所に行き、スマートフォン4のチェックアプリ47を起動して、上記のような画面案内に従って計器Kと変成器Hから2次元コード31、32つまり関連情報を読み取る。これにより、読み取られた関連情報と現在位置と読取日が、工事情報として記憶された関連情報と設置場所と設置日に一致するか否かが判定される。そして、所定の操作を行うことで、チェック結果を管理コンピュータ2つまり電力会社Cに送信し、これを受けて電力会社Cは、チェック結果などを管理コンピュータ2に記憶するとともに、関連情報などが一致しない場合には、所定の措置を講じる。また、工事業者Mは、スマートフォン4を電力会社Cに返却・返送するものである。 Next, the construction contractor M goes to the installation site on the installation date stated in the construction request form, starts the check application 47 on the smartphone 4, and reads the two-dimensional code from the meter K and transformer H according to the screen guidance as described above. 31 and 32, that is, read related information. Thereby, it is determined whether the read related information, current position, and reading date match the related information stored as construction information, the installation location, and the installation date. Then, by performing a predetermined operation, the check results are sent to the management computer 2, that is, the electric power company C. Upon receiving this, the electric power company C stores the check results etc. in the management computer 2, and also makes sure that related information etc. match. If not, take the prescribed measures. Furthermore, the construction contractor M returns the smartphone 4 to the electric power company C.

以上のように、この計器変成器組み合わせチェックシステム1および計器変成器組み合わせチェック方法によれば、工事業者Mがスマートフォン4で計器Kと変成器Kから2次元コード31、32つまり関連情報を読み取ると、読み取られた関連情報が予め記憶された工事情報に含まれる関連情報と一致するか否か、つまり、計器Kと変成器Mの組み合わせが正しいか否かが判定される。さらに、スマートフォン4の現在位置が予め記憶された工事情報に含まれる設置場所に一致するか否か、つまり、設置場所において計器Kと変成器Mから関連情報を読み取っているか否かが判定される。このように、正しい設置場所で(設置の直前・直後において)組み合わせが正しいか否かが判定されるため(その後組み合わせに間違いが生じることがないため)、計器Kと変成器Mとの組み合わせが正しいかを適正にチェックすることが可能となる。 As described above, according to the instrument transformer combination check system 1 and the instrument transformer combination check method, when the construction contractor M reads the two-dimensional codes 31 and 32, that is, related information, from the instrument K and transformer K with the smartphone 4, It is determined whether the read related information matches the related information included in the construction information stored in advance, that is, whether the combination of the meter K and the transformer M is correct. Furthermore, it is determined whether the current location of the smartphone 4 matches the installation location included in the pre-stored construction information, that is, whether or not related information is being read from the meter K and the transformer M at the installation location. . In this way, since it is determined whether the combination is correct at the correct installation location (just before or after installation) (so that there will be no mistakes in the combination afterwards), the combination of instrument K and transformer M is It becomes possible to properly check whether it is correct.

しかも、スマートフォン4で関連情報が読み取られた読取日が、予め記憶された工事情報に含まれる設置日と一致するか否か、つまり、設置日において計器Kと変成器Mから関連情報を読み取っているか否かが判定される。このように、正しい設置日に(設置の直前・直後において)組み合わせが正しいか否かが判定されるため(その後組み合わせに間違いが生じることがないため)、計器Kと変成器Mとの組み合わせが正しいかをより適正にチェックすることが可能となる。 Moreover, whether or not the reading date on which the relevant information was read by the smartphone 4 matches the installation date included in the pre-stored construction information, that is, whether the relevant information was read from the meter K and the transformer M on the installation date. It is determined whether or not there is. In this way, since it is determined whether the combination is correct on the correct installation date (just before or after installation) (so that there will be no mistakes in the combination afterwards), the combination of instrument K and transformer M is It becomes possible to check whether the information is correct or not.

また、スマートフォン4で複数組の関連情報を読み取り可能で、それぞれの組に対して判定が行われるため、チェックに要する労力と時間を削減することが可能となる。例えば、同じ設置場所に複数組の計器Kと変成器Mを設置する場合でも、一度に複数組のチェックを行うことが可能となる。 Further, since multiple sets of related information can be read by the smartphone 4 and determination is made for each set, it is possible to reduce the effort and time required for checking. For example, even when multiple sets of meters K and transformers M are installed at the same installation location, it is possible to check multiple sets at once.

さらに、関連情報の読み取り、判定などの操作がタッチパネル42の画面上で案内されるため、この案件に従って、誰でも容易かつ適正に関連情報の読み取り、判定などの操作を行うことが可能となる。 Further, since operations such as reading and determining related information are guided on the screen of the touch panel 42, anyone can easily and appropriately perform operations such as reading and determining related information according to this case.

以上、この発明の実施の形態を詳述してきたが、具体的な構成はこの実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、上記の実施の形態では、スマートフォン4に工事情報記憶手段とチェック手段を備えているが、管理コンピュータ2に備えて管理コンピュータ2で組み合わせのチェックなどを行い、その判定結果をスマートフォン4に送信してタッチパネル42に表示させるようにしてもよい。また、関連情報が2次元コード31、32として計器Kおよび変成器Hに貼り付けられているが、関連情報を単なる識別情報・機器番号などとし、組み合わされた計器Kと変成器Hの識別情報を工事情報として記憶してもよい。あるいは、単に合番号を関連情報としてもよい。また、2次元コード31、32に代ってバーコードやIC(Integrated Circuit)タグなどを使用してもよい。 Although the embodiments of this invention have been described in detail above, the specific configuration is not limited to this embodiment, and even if there are changes in the design within the scope of the gist of this invention, Included in invention. For example, in the above embodiment, the smartphone 4 is equipped with a construction information storage means and a checking means, but in preparation for the management computer 2, the management computer 2 performs a combination check and sends the determination result to the smartphone 4. It may also be displayed on the touch panel 42. In addition, although related information is pasted on the instrument K and transformer H as two-dimensional codes 31 and 32, the related information is simply identification information, equipment number, etc., and the identification information of the combined instrument K and transformer H is used. may be stored as construction information. Alternatively, the matching number may simply be used as related information. Further, instead of the two-dimensional codes 31 and 32, a bar code, an IC (Integrated Circuit) tag, or the like may be used.

1 計器変成器組み合わせチェックシステム
2 管理コンピュータ
31 計器用2次元コード(関連情報)
32 変成器用2次元コード(関連情報)
4 スマートフォン(通信端末)
41 通信部
42 タッチパネル
43 時計
44 GPS部
45 カメラ
46 記憶部(工事情報記憶手段)
47 チェックアプリ(チェック手段、ガイドプログラム)
K 計器
H 変成器
M 工事業者
1 Instrument transformer combination check system 2 Management computer 31 Instrument 2D code (related information)
32 2D code for transformer (related information)
4 Smartphone (communication terminal)
41 Communication section 42 Touch panel 43 Clock 44 GPS section 45 Camera 46 Storage section (construction information storage means)
47 Check app (check means, guide program)
K Instrument H Transformer M Construction contractor

Claims (7)

組み合わされた計器と変成器に設けられ、当該計器と変成器を関連付けるための関連情報と、
前記組み合わされた計器と変成器の関連情報と、当該計器と変成器の設置場所を含む工事情報を記憶する工事情報記憶手段と、
計器と変成器を設置する工事業者が使用し、現在位置を取得可能で、前記計器と変成器から前記関連情報を読み取り可能な通信端末と、
前記通信端末で読み取られた関連情報と現在位置が、前記工事情報に含まれる関連情報と設置場所に一致するか否かを判定するチェック手段と、
を備えることを特徴とする計器変成器組み合わせチェックシステム。
Relevant information provided on the combined meter and transformer for associating the meter and transformer;
construction information storage means for storing construction information including related information of the combined meter and transformer and installation locations of the meter and transformer;
a communication terminal that is used by a construction contractor who installs meters and transformers, is capable of acquiring the current position, and is capable of reading the related information from the meters and transformers;
a checking means for determining whether the related information read by the communication terminal and the current location match the related information included in the construction information and the installation location;
An instrument transformer combination check system comprising:
前記工事情報に前記計器と変成器の設置日を含み、
前記チェック手段は、前記通信端末で読み取られた関連情報と現在位置と読取日が、前記工事情報に含まれる関連情報と設置場所と設置日に一致するか否かを判定する、
ことを特徴とする請求項1に記載の計器変成器組み合わせチェックシステム。
The construction information includes the installation date of the meter and transformer,
The checking means determines whether the related information, current location, and reading date read by the communication terminal match the related information, installation location, and installation date included in the construction information.
The instrument transformer combination check system according to claim 1.
前記通信端末は、複数組の前記関連情報を読み取り可能で、
前記チェック手段は、前記通信端末で読み取られた前記複数組の各関連情報に対して前記判定を行う、
ことを特徴とする請求項1または2のいずれか1項に記載の計器変成器組み合わせチェックシステム。
The communication terminal is capable of reading multiple sets of the related information,
The checking means performs the determination on each of the plurality of sets of related information read by the communication terminal.
The instrument transformer combination check system according to claim 1 or 2, characterized in that:
前記通信端末には、前記関連情報の読み取り、前記判定の操作を画面上で案内するガイドプログラムが備わっている、
ことを特徴とする請求項1から3のいずれか1項に記載の計器変成器組み合わせチェックシステム。
The communication terminal is equipped with a guide program that guides the reading of the related information and the operation of the determination on the screen.
The instrument transformer combination check system according to any one of claims 1 to 3.
組み合わされた計器と変成器に、当該計器と変成器を関連付けるための関連情報を設け、
前記組み合わされた計器と変成器の関連情報と、当該計器と変成器の設置場所を含む工事情報を記憶し、
計器と変成器を設置する工事業者が、通信端末で前記計器と変成器から前記関連情報を読み取り、
チェック手段によって、前記通信端末で読み取られた関連情報と現在位置が、前記工事情報に含まれる関連情報と設置場所に一致するか否かを判定する、
ことを特徴とする計器変成器組み合わせチェック方法。
Providing relevant information for associating the combined meter and transformer with the meter and transformer,
storing related information of the combined meter and transformer and construction information including the installation location of the meter and transformer;
A construction contractor installing meters and transformers reads the related information from the meters and transformers with a communication terminal,
Determining whether the related information read by the communication terminal and the current location match the related information included in the construction information and the installation location by a checking means;
A method for checking combinations of instrument transformers.
前記工事情報に前記計器と変成器の設置日を含み、
前記チェック手段は、前記通信端末で読み取られた関連情報と現在位置と読取日が、前記工事情報に含まれる関連情報と設置場所と設置日に一致するか否かを判定する、
ことを特徴とする請求項5に記載の計器変成器組み合わせチェック方法。
The construction information includes the installation date of the meter and transformer,
The checking means determines whether the related information, current location, and reading date read by the communication terminal match the related information, installation location, and installation date included in the construction information.
6. The instrument transformer combination checking method according to claim 5.
前記通信端末は、複数組の前記関連情報を読み取り可能で、
前記チェック手段は、前記通信端末で読み取られた前記複数組の各関連情報に対して前記判定を行う、
ことを特徴とする請求項5または6のいずれか1項に記載の計器変成器組み合わせチェック方法。
The communication terminal is capable of reading multiple sets of the related information,
The checking means performs the determination on each of the plurality of sets of related information read by the communication terminal.
The instrument transformer combination check method according to claim 5 or 6, characterized in that:
JP2022054333A 2022-03-29 2022-03-29 Instrument transformer combination check system and check method Pending JP2023146901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022054333A JP2023146901A (en) 2022-03-29 2022-03-29 Instrument transformer combination check system and check method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022054333A JP2023146901A (en) 2022-03-29 2022-03-29 Instrument transformer combination check system and check method

Publications (1)

Publication Number Publication Date
JP2023146901A true JP2023146901A (en) 2023-10-12

Family

ID=88286634

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022054333A Pending JP2023146901A (en) 2022-03-29 2022-03-29 Instrument transformer combination check system and check method

Country Status (1)

Country Link
JP (1) JP2023146901A (en)

Similar Documents

Publication Publication Date Title
US20200051052A1 (en) Payment system, payment method, and program
JP6236199B2 (en) Bar arrangement system
EP2051203A1 (en) Position information tag registering method and auxiliary setting device
JP2010165317A (en) Mobile terminal for gas facility security check and gas facility security check system
CN103210357A (en) Handheld field maintenance tool with improved diagnostics
JP2011002878A (en) Meter reading system and meter reading method
US20160042308A1 (en) Timesly: A Mobile Solution for Attendance Verification Powered by Face Technology
CN104048687A (en) Measurement system with image capture capabilities
JP2008032483A (en) Meter management terminal and management system
CN101443639B (en) Electronic scales and method for the operation thereof
JP2014220726A (en) Meter reading system
US9135648B2 (en) Method, terminal, server, and system for providing a service
JP2010250471A (en) Settlement history management system, settlement history management method, settlement equipment, and settlement history management program
JP6163335B2 (en) Identification system and identification method
JP2023146901A (en) Instrument transformer combination check system and check method
JP2007183813A (en) Construction management system and information collection system
KR20170036280A (en) Electric pole managing program and the program installed mobile terminal
US20150227855A1 (en) Authentication processing system
US20220092222A1 (en) Data recovery device, data management server, data management system, data recovery method and program
CN110114773A (en) Electronic equipment
CN108174048B (en) Image forming system
JP2024060821A (en) Installation assistance system, installation assistance method, and program
JP2016028314A (en) Construction information management system, maintenance information management system, construction information management device, and maintenance information management device
JP2015059023A (en) Information processing system and method
JP6460302B2 (en) Progress management system