JP2023135365A - Picking system, picking method, and picking program - Google Patents

Picking system, picking method, and picking program Download PDF

Info

Publication number
JP2023135365A
JP2023135365A JP2022040528A JP2022040528A JP2023135365A JP 2023135365 A JP2023135365 A JP 2023135365A JP 2022040528 A JP2022040528 A JP 2022040528A JP 2022040528 A JP2022040528 A JP 2022040528A JP 2023135365 A JP2023135365 A JP 2023135365A
Authority
JP
Japan
Prior art keywords
mounting body
source
transfer destination
take
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022040528A
Other languages
Japanese (ja)
Inventor
春仁 古屋
Haruhito Furuya
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daifuku Co Ltd
Original Assignee
Daifuku Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daifuku Co Ltd filed Critical Daifuku Co Ltd
Priority to JP2022040528A priority Critical patent/JP2023135365A/en
Publication of JP2023135365A publication Critical patent/JP2023135365A/en
Pending legal-status Critical Current

Links

Images

Abstract

To avoid the accidental transfer of an article to a transfer destination platform in which a picking operation has been completed.SOLUTION: If a take-out source placing body 9s in a take-out source area As is an order final placing body 9f on which the final article to be transferred last in the group of order articles to be transferred to a transfer destination placing body 9d in a transfer destination area Ad is placed, a control device controls a take-out source placing body supply machine 1 to perform a take-out source placing body supply process Pss so that a new take-out source placing body 9s is supplied to the take-out source area As after the start of the execution of a transfer destination placing body take-out process Pod for taking out the transfer destination placing body 9d from the transfer destination area Ad.SELECTED DRAWING: Figure 4

Description

本発明は、オーダー情報により指定された種類及び数の物品からなるオーダー物品群を取出元載置体から取り出して移載先載置体に移載するピッキング作業を行うためのピッキングシステム、ピッキング方法、及びピッキングプログラムに関する。 The present invention provides a picking system and a picking method for performing a picking operation in which a group of ordered articles consisting of the type and number of articles specified by order information is taken out from a source mounting body and transferred to a destination mounting body. , and a picking program.

例えば、特許第4048426号公報には、取出元載置体から移載先載置体に物品を移載するピッキング作業を行うための設備が開示されている。以下、背景技術の説明の欄において括弧内に示される符号は、特許文献1のものである。 For example, Japanese Patent No. 4048426 discloses equipment for performing a picking operation of transferring articles from a source mounting body to a destination mounting body. Hereinafter, the symbols shown in parentheses in the column of explanation of the background art are those of Patent Document 1.

特許文献1に開示された設備は、物品をパレット(2)に載置した状態で収納する物品収納棚(3)と、パレット(2)を搬送する各種搬送装置と、を備えている。物品を載置したパレット(2a)は、物品収納棚(3)からピッキング作業箇所(4)に搬送される。ピッキング作業箇所(4)では、同文献の図3に示すように、取出元載置体である複数のパレット(2a)から移載先載置体である空パレット(2c)に、必要数の物品が移載される。作業者は、移載すべき物品をパレット(2a)から空パレット(2c)に移載した後は、ピック完了釦(16)をON操作することにより当該パレット(2a)を再び物品収納棚(3)に戻す。作業者は、ピッキング作業箇所(4)の空パレット(2c)に必要数の物品が揃うまで、上記の作業を繰り返す。 The equipment disclosed in Patent Document 1 includes an article storage shelf (3) that stores articles placed on a pallet (2), and various conveyance devices that convey the pallet (2). The pallet (2a) on which the articles are placed is transported from the article storage shelf (3) to the picking work location (4). At the picking work point (4), as shown in Figure 3 of the same document, the required number of pallets (2a), which are the source loading bodies, are transferred to empty pallets (2c), which are the destination loading bodies. Goods are transferred. After transferring the articles to be transferred from the pallet (2a) to the empty pallet (2c), the worker turns on the pick completion button (16) to transfer the pallet (2a) to the article storage shelf (2c) again. Return to 3). The worker repeats the above operations until the required number of items are on the empty pallet (2c) at the picking work location (4).

特許第4048426号公報Patent No. 4048426

上記のように、特許文献1に開示された設備では、作業者がピック完了釦(16)をON操作することにより、順次新たなパレット(2a)がピッキング作業箇所(4)に搬送され、当該ピッキング作業箇所(4)のパレット(2a)が順次入れ替えられる。そのため、移載先載置体である空パレット(2c)に対するピッキング作業が完了して当該空パレット(2c)に必要数の物品が揃った後に、作業者が、入れ替え後の新たなパレット(2a)から、ピッキング作業が完了した移載先載置体に対して誤って物品を移載する場合があり得る。 As described above, in the equipment disclosed in Patent Document 1, when the operator turns on the pick completion button (16), new pallets (2a) are sequentially transported to the picking work location (4), and the corresponding The pallets (2a) at the picking work location (4) are sequentially replaced. Therefore, after the picking work for the empty pallet (2c), which is the transfer destination loading body, is completed and the necessary number of items are collected on the empty pallet (2c), the worker picks up the new pallet (2a) after replacing it. ), there is a possibility that an article may be mistakenly transferred to the transfer destination mounting body after the picking operation has been completed.

上記実状に鑑みて、ピッキング作業が完了した移載先載置体に対して、誤って物品が移載されることを回避可能な技術の実現が望まれている。 In view of the above-mentioned circumstances, it is desired to realize a technique that can prevent articles from being erroneously transferred to a transfer destination mounting body after a picking operation has been completed.

本開示に係るピッキングシステムは、
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキングシステムであって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給装置と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出装置と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出装置と、
前記取出元載置体供給装置、前記取出元載置体搬出装置、及び、前記移載先載置体搬出装置を制御する制御装置と、を備え、
前記制御装置は、前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、前記取出元載置体供給装置を制御して取出元載置体供給処理を実行する。
The picking system according to the present disclosure includes:
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking system for performing a picking operation of taking out a group and transferring it to a transfer destination mounting body arranged in a transfer destination area,
an extraction source mounting body supply device that supplies the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out device that carries out the extraction source mounting body from the extraction source area;
a transfer destination mounting body unloading device that carries out the transfer destination mounting body from the transfer destination area;
A control device that controls the source mounting body supplying device, the source mounting body carrying out device, and the transfer destination mounting body carrying out device,
The control device is configured such that the take-out source mounting body in the take-out source area is the last of the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is an order final placement object on which a final article is placed, the removal process is performed after the start of execution of the transfer destination placement object carrying out process for carrying out the transfer destination placement object from the transfer destination area. The source mounting body supplying device is controlled to execute the source mounting body supply process so that the new source mounting body is supplied to the source area.

本開示に係るピッキング方法は、
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキング方法であって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給工程と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出工程と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出工程と、を備え、
前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する前記移載先載置体搬出工程の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、前記取出元載置体供給工程を実行する。
The picking method according to the present disclosure includes:
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking method for performing a picking operation in which a group is taken out and transferred to a transfer destination mounting body arranged in a transfer destination area, the picking method comprising:
an extraction source mounting body supplying step of supplying the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out step of carrying out the extraction source mounting body from the extraction source area;
a transfer destination mounting body carrying out step of carrying out the transfer destination mounting body from the transfer destination area,
The take-out source mounting body in the take-out source area places the final article to be transferred last among the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is the final placement object of the order, after the start of execution of the transfer destination placement object carrying out step for carrying out the transfer destination placement object from the transfer destination area, a new one is placed in the take-out source area. The extraction source mounting body supply step is performed so that the extraction source mounting body is supplied.

本開示に係るピッキングプログラムは、
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキングプログラムであって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給機能と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出機能と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出機能と、をコンピュータに実現させ、
前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、取出元載置体供給処理を実行する。
The picking program according to this disclosure is
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking program for performing a picking operation of picking up a group and transferring it to a transfer destination mounting body arranged in a transfer destination area,
an extraction source mounting body supply function that supplies the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out function for carrying out the extraction source mounting body from the extraction source area;
causing a computer to realize a transfer destination mounting body carrying out function of carrying out the transfer destination mounting body from the transfer destination area,
The take-out source mounting body in the take-out source area places the final article to be transferred last among the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is the final placement object of the order, a new object is added to the source area after the start of execution of the destination placement object carrying out process for carrying out the destination placement object from the transfer destination area. A source mounting body supply process is executed so that the source mounting body is supplied.

本構成によれば、最終物品が移載されてピッキング作業が完了した移載先載置体を搬出するための移載先載置体搬出処理(移載先載置体搬出工程)の実行開始以後に取出元エリアへ新たな取出元載置体が供給されるように、取出元エリアへ新たな取出元載置体を供給する取出元載置体供給処理(取出元載置体供給工程)が実行される。そのため、ピッキング作業が完了した移載先載置体が移載先エリアにあり且つ新たな取出元載置体が取出元エリアにある状態が継続することはない。従って、本構成によれば、ピッキング作業が完了した移載先載置体に対して、誤って別のオーダーに係る物品が移載されることを回避することができる。 According to this configuration, execution of the transfer destination mounting body unloading process (transfer destination mounting body unloading process) for unloading the transfer destination mounting body on which the final article has been transferred and the picking work has been completed is started. An extraction source mounting body supply process for supplying a new extraction source mounting body to the extraction source area so that a new extraction source mounting body is subsequently supplied to the extraction source area (extraction source mounting body supply process) is executed. Therefore, the state in which the transfer destination mounting body for which the picking operation has been completed is in the transfer destination area and the new extraction source mounting body is in the extraction source area does not continue. Therefore, according to this configuration, it is possible to avoid erroneously transferring an article related to another order to the transfer destination mounting body on which the picking operation has been completed.

本開示に係る技術のさらなる特徴と利点は、図面を参照して記述する以下の例示的かつ非限定的な実施形態の説明によってより明確になるであろう。 Further features and advantages of the technology according to the present disclosure will become clearer from the following description of illustrative and non-limiting embodiments, written with reference to the drawings.

ピッキングシステムの概略平面図Schematic plan view of the picking system オーダー最終載置体を判定する場合の説明図Explanatory diagram for determining the final placement object of an order 取出元エリアにある取出元載置体がオーダー最終載置体でない場合の処理を示す説明図Explanatory diagram showing the process when the extraction source placement object in the extraction source area is not the final order placement object 取出元エリアにある取出元載置体がオーダー最終載置体である場合の処理を示す説明図Explanatory diagram showing the process when the take-out source mounting object in the take-out source area is the final order placing object 制御装置の処理手順を示すフローチャートFlowchart showing the processing procedure of the control device 第2実施形態において、制御装置の処理手順を示すフローチャートFlowchart showing the processing procedure of the control device in the second embodiment

〔第1実施形態〕
ピッキングシステムの第1実施形態について説明する。
[First embodiment]
A first embodiment of the picking system will be described.

図1に示すように、ピッキングシステム100では、物品90が載置体9に載置された状態で搬送される。載置体9には、取出元載置体9sと移載先載置体9dとが含まれる。取出元載置体9sは、単一種類の複数の物品90からなる単一物品群Gsを載置するように構成されている。移載先載置体9dは、オーダー情報(α、β、γ…)により指定された種類及び数の物品90からなるオーダー物品群Goを載置するように構成されている。本明細書では、載置体9としてパレットを例示している。しかし、折り畳みコンテナや段ボール箱などの容器を載置体9として用いても良い。 As shown in FIG. 1, in the picking system 100, an article 90 is placed on a mounting body 9 and transported. The mounting body 9 includes an extraction source mounting body 9s and a transfer destination mounting body 9d. The extraction source mounting body 9s is configured to place a single article group Gs consisting of a plurality of articles 90 of a single type. The transfer destination mounting body 9d is configured to place an ordered article group Go consisting of articles 90 of the type and number specified by the order information (α, β, γ, . . . ). In this specification, a pallet is illustrated as the mounting body 9. However, a container such as a folding container or a cardboard box may also be used as the mounting body 9.

本開示に係るピッキングシステム100は、単一種類の複数の物品90からなる単一物品群Gsを載置していると共に取出元エリアAsに配置された取出元載置体9sから、オーダー情報(α、β、γ…)により指定された種類及び数の物品90からなるオーダー物品群Goを取り出して移載先エリアAdに配置された移載先載置体9dに移載するピッキング作業を行うためのシステムである。ピッキング作業では、単一物品群Gsを載置している取出元載置体9sから移載先載置体9dへの必要な物品90の移載を、複数の取出元載置体9s毎に繰り返し行うことにより、移載先載置体9dに、オーダー物品群Goに含まれる物品90を集める。なお、1つのオーダー物品群Goに含まれる複数の物品90を、複数の移載先載置体9dに分配して移載するようにしても良い。すなわち、複数の移載先載置体9dによって1つのオーダー物品群Goに含まれる複数の物品90が載置されるように構成されていても良い。 The picking system 100 according to the present disclosure collects order information ( A picking operation is performed in which an ordered article group Go consisting of the types and number of articles 90 specified by α, β, γ, etc. is taken out and transferred to the transfer destination mounting body 9d arranged in the transfer destination area Ad. This is a system for In the picking operation, the necessary articles 90 are transferred from the source mounting body 9s on which a single article group Gs is placed to the destination mounting body 9d, for each of the plurality of source mounting bodies 9s. By repeating this process, the articles 90 included in the ordered article group Go are collected on the transfer destination mounting body 9d. Note that a plurality of articles 90 included in one ordered article group Go may be distributed and transferred to a plurality of transfer destination mounting bodies 9d. That is, the configuration may be such that a plurality of articles 90 included in one ordered article group Go are placed on a plurality of transfer destination mounting bodies 9d.

図1に示すように、ピッキングシステム100は、取出元載置体9sが供給される取出元エリアAsと、移載先載置体9dが供給される移載先エリアAdと、取出元エリアAsに配置された取出元載置体9sから移載先エリアAdに配置された移載先載置体9dに物品90を移載するピッキング作業が行われるピッキングエリアApと、を備えている。ピッキングエリアApでは、作業者Wまたはロボット(不図示)によってピッキング作業が行われる。本実施形態において、ピッキングエリアApでは、作業者Wによってピッキング作業が行われる。なお、図示の例では、ピッキングシステム100は、取出元エリアAsに供給される取出元載置体9sが一時的に待機させられる待機エリアAwを更に備えている。 As shown in FIG. 1, the picking system 100 includes a source area As to which the source mounting body 9s is supplied, a transfer destination area Ad to which the transfer destination mounting body 9d is supplied, and a source area As. A picking area Ap is provided in which a picking operation is performed to transfer the article 90 from the source mounting body 9s located in the transfer destination area Ad to the transfer destination mounting body 9d located in the transfer destination area Ad. In the picking area Ap, picking work is performed by a worker W or a robot (not shown). In the present embodiment, picking work is performed by the worker W in the picking area Ap. In the illustrated example, the picking system 100 further includes a standby area Aw where the source mounting bodies 9s supplied to the source area As are temporarily held.

取出元エリアAsと移載先エリアAdとは、互いに隣接して配置されている。ピッキングエリアApは、取出元エリアAs及び移載先エリアAdの双方に対して隣接して配置されている。本実施形態では、取出元エリアAsは、物品供給路R1(後述)の一部に配置されている。移載先エリアAdは、載置体供給路R3(後述)の一部に配置されている。すなわち本実施形態では、取出元エリアAsと移載先エリアAdとは、互いに異なる経路に配置されると共に、互いに隣接して配置されている。そして、ピッキングエリアApは、物品供給路R1及び載置体供給路R3の外部に配置されると共に、取出元エリアAs及び移載先エリアAdの双方に対して隣接して配置されている。 The source area As and the destination area Ad are arranged adjacent to each other. The picking area Ap is arranged adjacent to both the source area As and the destination area Ad. In this embodiment, the extraction source area As is arranged in a part of the article supply path R1 (described later). The transfer destination area Ad is arranged in a part of the mounting body supply path R3 (described later). That is, in this embodiment, the source area As and the destination area Ad are arranged on different routes and adjacent to each other. The picking area Ap is arranged outside the article supply path R1 and the mounting body supply path R3, and is arranged adjacent to both the take-out source area As and the transfer destination area Ad.

ピッキングシステム100は、取出元載置体9sを取出元エリアAsに供給する取出元載置体供給装置1と、取出元エリアAsから取出元載置体9sを搬出する取出元載置体搬出装置2と、移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出装置4と、取出元載置体供給装置1、取出元載置体搬出装置2、及び、移載先載置体搬出装置4を制御する制御装置Cと、を備えている。 The picking system 100 includes a source mounting body supply device 1 that supplies a source mounting body 9s to a source area As, and a source mounting body carrying out device that carries out a source mounting body 9s from a source area As. 2, a transfer destination mounting body unloading device 4 that carries out the transfer destination mounting body 9d from the transfer destination area Ad, a source loading body supplying device 1, a source loading body unloading device 2, and A control device C that controls the transfer destination mounting body unloading device 4 is provided.

本実施形態では、ピッキングシステム100は、移載先載置体9dを移載先エリアAdに供給する移載先載置体供給装置3を更に備えている。そして、制御装置Cは、取出元載置体供給装置1、取出元載置体搬出装置2、及び、移載先載置体搬出装置4に加えて、移載先載置体供給装置3を制御する。 In this embodiment, the picking system 100 further includes a transfer destination mounting body supply device 3 that supplies the transfer destination mounting body 9d to the transfer destination area Ad. In addition to the source mounting body supply device 1, the source mounting body unloading device 2, and the transfer destination mounting body unloading device 4, the control device C controls the transfer destination mounting body supply device 3. Control.

制御装置Cは、取出元載置体供給装置1を制御することで取出元載置体9sを取出元エリアAsに供給する取出元載置体供給処理Pss(取出元載置体供給工程)と、取出元載置体搬出装置2を制御することで取出元エリアAsから取出元載置体9sを搬出する取出元載置体搬出処理Pos(取出元載置体搬出工程)と、移載先載置体搬出装置4を制御することで移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出処理Pod(移載先載置体搬出工程)と、を実行するように構成されている。本実施形態では、制御装置Cは、移載先載置体供給装置3を制御することで移載先載置体9dを移載先エリアAdに供給する移載先載置体供給処理Psd(移載先載置体供給工程)を更に実行するように構成されている。制御装置Cは、例えば、マイクロコンピュータ等のプロセッサ、メモリ等の周辺回路等を備えている。そして、これらのハードウェアとコンピュータ等のプロセッサ上で実行されるプログラムとの協働により、各処理または各機能が実現される。 The control device C performs a source mounting body supply process Pss (source mounting body supply process) that supplies the source mounting body 9s to the source area As by controlling the source mounting body supply device 1. , a source mounting body carrying out process Pos (source mounting body carrying out process) of carrying out the fetching source mounting body 9s from the fetching source area As by controlling the fetching source mounting body carrying out device 2, and a transfer destination. Execute a transfer destination mounting body carrying out process Pod (transfer destination mounting body carrying out process) which carries out the transfer destination mounting body 9d from the transfer destination area Ad by controlling the mounting body carrying out device 4. is configured to do so. In this embodiment, the control device C performs a transfer destination mounting body supply process Psd (which supplies the transfer destination mounting body 9d to the transfer destination area Ad by controlling the transfer destination mounting body supply device 3). The transfer destination mounting body supply step) is further executed. The control device C includes, for example, a processor such as a microcomputer, peripheral circuits such as a memory, and the like. Each process or each function is realized by cooperation between these hardware and a program executed on a processor such as a computer.

本実施形態では、取出元載置体供給装置1は、コンベヤを用いて構成されている。取出元載置体供給装置1は、単一物品群Gsを載置した取出元載置体9sが取出元エリアAsに供給されるまでの経路である物品供給路R1を構成している。本実施形態では、ピッキングシステム100は、単一物品群Gsを載置した取出元載置体9sを複数保管する物品保管部5を備えている。そして、物品供給路R1は、物品保管部5から取出元エリアAsまでを繋ぐ経路の少なくとも一部を構成している。図示の例では、上述の待機エリアAwは、物品供給路R1における、取出元エリアAsよりも搬送方向(取出元載置体9sが搬送される方向)の上流側に配置されている。 In this embodiment, the extraction source mounting body supply device 1 is configured using a conveyor. The source mounting body supply device 1 constitutes an article supply path R1, which is a path through which the source mounting body 9s on which the single article group Gs is placed is supplied to the source area As. In this embodiment, the picking system 100 includes an article storage section 5 that stores a plurality of extraction source placement bodies 9s on which a single article group Gs is placed. The article supply path R1 constitutes at least a part of the route connecting the article storage section 5 to the take-out source area As. In the illustrated example, the above-mentioned waiting area Aw is arranged on the upstream side of the take-out source area As in the transport direction (the direction in which the take-out source mounting body 9s is transported) in the article supply path R1.

本実施形態では、取出元載置体搬出装置2は、コンベヤを用いて構成されている。取出元載置体搬出装置2は、ピッキング作業によって必要な物品90を取り出し終えた取出元載置体9sが再び物品保管部5に戻るまでの経路である戻り路R2を構成している。戻り路R2は、取出元エリアAsから物品保管部5までを繋ぐ経路の少なくとも一部を構成している。 In this embodiment, the extraction source mounting body carrying out device 2 is configured using a conveyor. The source mounting body carrying out device 2 constitutes a return path R2, which is a path for the source mounting body 9s to return to the article storage section 5 again after having taken out the necessary articles 90 in the picking operation. The return path R2 constitutes at least a part of the path connecting the source area As to the article storage section 5.

本実施形態では、移載先載置体供給装置3は、コンベヤを用いて構成されている。移載先載置体供給装置3は、物品90を載置していない空の載置体9が移載先エリアAdに供給されるまでの経路である載置体供給路R3を構成している。本実施形態では、ピッキングシステム100は、空の載置体9を複数保管する空載置体保管部6を備えている。そして、載置体供給路R3は、空載置体保管部6から移載先エリアAdまでを繋ぐ経路の少なくとも一部を構成している。 In this embodiment, the transfer destination mounting body supply device 3 is configured using a conveyor. The transfer destination mounting body supply device 3 constitutes a placement body supply path R3, which is a path through which the empty mounting body 9 on which no article 90 is placed is supplied to the transfer destination area Ad. There is. In this embodiment, the picking system 100 includes an empty placement object storage section 6 that stores a plurality of empty placement objects 9. The mounted object supply path R3 constitutes at least a part of a route connecting the empty mounted object storage section 6 to the transfer destination area Ad.

本実施形態では、移載先載置体搬出装置4は、コンベヤを用いて構成されている。移載先載置体搬出装置4は、取出元載置体9sからのオーダー物品群Goの移載が完了した移載先載置体9d、すなわちピッキング作業が完了した移載先載置体9dが搬出される経路である搬出路R4を構成している。本実施形態では、ピッキングシステム100は、オーダー物品群Goを出荷するための出荷部7を備えている。図示の例では、出荷部7は、複数のオーダー情報(α、β、γ…)毎に配置されている。そして、搬出路R4は、移載先エリアAdから各出荷部7までを繋ぐ経路の少なくとも一部を構成している。 In this embodiment, the transfer destination mounting body carrying out device 4 is configured using a conveyor. The transfer destination mounting body unloading device 4 carries out the transfer destination mounting body 9d on which the transfer of the ordered article group Go from the pick-up source mounting body 9s has been completed, that is, the transfer destination mounting body 9d on which the picking work has been completed. constitutes an unloading route R4, which is a route for unloading. In this embodiment, the picking system 100 includes a shipping section 7 for shipping the ordered article group Go. In the illustrated example, the shipping section 7 is arranged for each piece of order information (α, β, γ, . . . ). The unloading route R4 constitutes at least a part of the route connecting the transfer destination area Ad to each shipping section 7.

出荷部7には、オーダー情報(α、β、γ…)に基づいてピッキングされたオーダー物品群Goが搬送される。本例では、「オーダー情報」には、物品90の種類や数の他、出荷先や出荷時間などの各種情報が含まれる。出荷部7に搬送されたオーダー物品群Goは、車両、船舶、航空機などの搬送手段によって、目的の出荷先へ搬送される。 A group of ordered articles Go picked based on order information (α, β, γ, . . . ) is transported to the shipping unit 7. In this example, the "order information" includes various information such as the type and number of items 90 as well as shipping destination and shipping time. The ordered article group Go transported to the shipping section 7 is transported to the intended shipping destination by a transport means such as a vehicle, a ship, or an aircraft.

本実施形態では、ピッキングシステム100は、作業者Wによって操作される操作部8を備えている。図示の例では、操作部8は、ピッキングエリアApに配置されている。 In this embodiment, the picking system 100 includes an operation unit 8 operated by the worker W. In the illustrated example, the operation unit 8 is arranged in the picking area Ap.

操作部8は、取出元エリアAsにある取出元載置体9sからオーダー物品群Goに含まれる物品90の取り出しが完了した場合に作業者Wによって操作される取出完了受付部8sと、移載先載置体9dへのオーダー物品群Goの移載が完了した場合に作業者Wによって操作されるピッキング完了受付部8dと、を備えている。取出完了受付部8s及びピッキング完了受付部8dのうち少なくとも一方は、ボタンやレバーを用いて構成されていても良いし、モニタやタッチパネルに表示されたアイコンなどを用いて構成されていても良い。 The operation unit 8 includes a take-out completion reception unit 8s, which is operated by the worker W when the take-out of the articles 90 included in the ordered article group Go from the take-out source placing body 9s in the take-out area As, and a transfer completion reception unit 8s. It includes a picking completion receiving section 8d that is operated by the worker W when the transfer of the ordered article group Go to the pre-loading body 9d is completed. At least one of the extraction completion receiving section 8s and the picking completion receiving section 8d may be configured using a button or a lever, or may be configured using an icon displayed on a monitor or a touch panel.

ここで、本開示に係るピッキングシステム100では、制御装置Cは、取出元エリアAsにある取出元載置体9sが、移載先エリアAdにある移載先載置体9dに移載するべきオーダー物品群Goのうち最後に移載される最終物品90を載置しているオーダー最終載置体9f(図4参照)である場合には、移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出処理Podの実行開始以後に取出元エリアAsへ新たな取出元載置体9sが供給されるように、取出元載置体供給装置1を制御して取出元載置体供給処理Pssを実行する。なお、「以後」には、その時点とそれより後の時点との双方が含まれる。そのため、新たな取出元載置体9sは、移載先載置体搬出処理Podの実行開始時点に、又は、移載先載置体搬出処理Podの実行開始時点よりも後の時点に、取出元エリアAsへ供給される(到達する)。 Here, in the picking system 100 according to the present disclosure, the control device C is configured to transfer the source mounting body 9s located in the source area As to the destination mounting body 9d located in the destination area Ad. In the case of the final order placement body 9f (see FIG. 4) on which the final article 90 to be transferred last among the order article group Go is placed, the transfer destination placement body 9f is placed from the transfer destination area Ad. The extraction source mounting body supply device 1 is controlled so that a new extraction source mounting body 9s is supplied to the extraction source area As after the start of execution of the transfer destination mounting body carrying out process Pod for carrying out the transfer destination mounting body 9d. The extraction source mounting body supply process Pss is executed. Note that "after" includes both that point in time and a later point in time. Therefore, the new extraction source mounting body 9s is unloaded at the time when the execution of the transfer destination mounting body unloading processing Pod starts, or at a time later than the execution start time of the transfer destination mounting body unloading processing Pod. It is supplied (reaches) to the original area As.

このように、最終物品90が移載されてピッキング作業が完了した移載先載置体9dを搬出するための移載先載置体搬出処理Podの実行開始以後に取出元エリアAsへ新たな取出元載置体9sが供給されるように、取出元エリアAsへ新たな取出元載置体9sを供給する取出元載置体供給処理Pssが実行される。そのため、ピッキング作業が完了した移載先載置体9dが移載先エリアAdにあり且つ新たな取出元載置体9sが取出元エリアAsにある状態が継続することはない。例えば、移載先載置体搬出処理Podの実行開始時点よりも後の時点に、取出元エリアAsへ新たな取出元載置体9sが供給されるようにした場合には、ピッキング作業が完了した移載先載置体9dが移載先エリアAdにある状態で、新たな取出元載置体9sが取出元エリアAsに供給されることがない。従って、本開示に係るピッキングシステム100によれば、ピッキング作業が完了した移載先載置体9dに対して、誤って別のオーダー情報に係る物品90が移載されることを回避することができる。 In this way, after the start of execution of the transfer destination mounting body unloading process Pod for carrying out the transfer destination mounting body 9d on which the final article 90 has been transferred and the picking work has been completed, a new A source mounting body supply process Pss is executed to supply a new source mounting body 9s to the source area As so that the source mounting body 9s is supplied. Therefore, the state in which the transfer destination mounting body 9d for which the picking operation has been completed is in the transfer destination area Ad and the new extraction source mounting body 9s is in the extraction source area As does not continue. For example, if a new source mounting body 9s is supplied to the source area As at a time later than the execution start time of the transfer destination mounting body unloading process Pod, the picking work is completed. A new source mounting body 9s is not supplied to the source area As while the transfer destination mounting body 9d is in the transfer destination area Ad. Therefore, according to the picking system 100 according to the present disclosure, it is possible to avoid erroneously transferring the article 90 related to different order information to the transfer destination mounting body 9d on which the picking operation has been completed. can.

本実施形態では、制御装置Cは、オーダー物品群Goに含まれる物品90を集めるために必要な取出元載置体9sを特定し、複数の取出元載置体9sを特定した場合には、当該複数の取出元載置体9sのうち取出元エリアAsに最後に供給される取出元載置体9sをオーダー最終載置体9fと判定する。 In the present embodiment, the control device C specifies the take-out source placement bodies 9s necessary for collecting the articles 90 included in the ordered article group Go, and when a plurality of take-out source placement bodies 9s are specified, Among the plurality of take-out source mounting bodies 9s, the take-out source mounting body 9s that is last supplied to the take-out source area As is determined to be the order final placing body 9f.

例えば図2は、オーダー情報αに係るオーダー物品群Goに含まれる物品90を集めるために必要な取出元載置体9sのリストを示している。図示の例では、オーダー情報αに係るオーダー物品群Goが、複数の取出元載置体A,B,Cのそれぞれに載置された物品90によって構成されている場合を示している。例えば、ピッキングエリアApに表示部を設け、当該表示部に上記リストを表示するようにしても良い。図2に示すリストは、取出元載置体Aからa個の物品90を取り出し、取出元載置体Bからb個の物品90を取り出し、取出元載置体Cからc個の物品90を取り出すことで、オーダー情報αに係るオーダー物品群Goに含まれる複数の物品90が集まることを意味している。 For example, FIG. 2 shows a list of retrieval source mounting bodies 9s necessary for collecting the articles 90 included in the ordered article group Go related to the order information α. In the illustrated example, the ordered article group Go related to the order information α is composed of articles 90 placed on each of a plurality of take-out source mounting bodies A, B, and C. For example, a display section may be provided in the picking area Ap, and the above list may be displayed on the display section. In the list shown in FIG. 2, a number of articles 90 are taken out from the source placement body A, b items 90 are taken out from the source placement body B, and c items 90 are taken out from the source placement body C. Taking out means that a plurality of articles 90 included in the ordered article group Go related to the order information α are collected.

図2に示す例では、制御装置Cは、オーダー情報αに係るオーダー物品群Goに含まれる物品90(本例では、複数の物品90)を集めるために必要な取出元載置体A,B,Cを特定する。取出元載置体A,B,Cのうち、取出元載置体Cが最初に取出元エリアAsに供給された場合には、作業者Wは、取出元載置体Cからc個の物品90を取り出して移載先載置体9dに移載する。そして、制御装置Cは、取出元載置体Cに対する作業が済んだ旨を記憶する。この旨は、作業者Wの操作によって記憶されても良い。図示の例では、取出元載置体Cに対する作業が済んだ後、リストにおける取出元載置体Cの欄に「済」が記入される(図2の中央図参照)。 In the example shown in FIG. 2, the control device C controls the extraction source mounting bodies A and B necessary for collecting the articles 90 (in this example, a plurality of articles 90) included in the ordered article group Go related to the order information α. ,C. Among the source mounting bodies A, B, and C, when the source mounting body C is first supplied to the source area As, the worker W picks up c items from the source mounting body C. 90 is taken out and transferred to the transfer destination mounting body 9d. Then, the control device C stores the fact that the work on the extraction source mounting body C has been completed. This information may be stored by the operator W's operation. In the illustrated example, after the work on the source mounting body C is completed, “Complete” is entered in the column of the source mounting body C in the list (see the center diagram of FIG. 2).

次に、残った取出元載置体A,Bのうち、取出元載置体Aが取出元エリアAsに供給された場合には、作業者Wは、取出元載置体Aからa個の物品90を取り出して移載先載置体9dに移載する。そして、制御装置Cは、取出元載置体Aに対する作業が済んだ旨を記憶する。図示の例では、取出元載置体Aに対する作業が済んだ後、リストにおける取出元載置体Aの欄に「済」が記入される(図2の右図参照)。 Next, among the remaining source mounting bodies A and B, when the source mounting body A is supplied to the source area As, the worker W selects a number of a pieces from the source mounting body A. The article 90 is taken out and transferred to the transfer destination mounting body 9d. Then, the control device C stores the fact that the work on the extraction source mounting body A has been completed. In the illustrated example, after the work on the source mounting body A is completed, “Complete” is entered in the column of the source mounting body A in the list (see the right diagram of FIG. 2).

そして、制御装置Cは、取出元載置体A,B,Cのうち作業が行われていない取出元載置体B(最後に残った取出元載置体B)をオーダー最終載置体9fと判定する。取出元載置体Bが取出元エリアAsに供給された場合には、作業者Wは、取出元載置体Bからb個の物品90を取り出して移載先載置体9dに移載する。これにより、オーダー物品群Goを構成する全ての物品90が移載先載置体9dに移載され、当該移載先載置体9dに対するピッキング作業が完了する。 Then, the control device C orders the final loading body 9f of the loading source loading bodies A, B, and C on which no work is being performed (the last remaining loading loading body B). It is determined that When the source mounting body B is supplied to the source area As, the worker W takes out b items 90 from the source mounting body B and transfers them to the destination mounting body 9d. . As a result, all the articles 90 constituting the ordered article group Go are transferred to the transfer destination mounting body 9d, and the picking operation for the transfer destination mounting body 9d is completed.

制御装置Cは、取出元エリアAsにある取出元載置体9sが、オーダー最終載置体9fである場合とオーダー最終載置体9fでない場合とで、異なる処理を実行する。図3は、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fでない場合に制御装置Cが実行する処理を示している。図4は、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fである場合に制御装置Cが実行する処理を示している。なお、図3及び図4では、複数の載置体9それぞれの動きを区別し易いように、各載置体9に異なる番号(No.1~No.4)を付している。また、載置体9に載置されている物品90は省略している。 The control device C executes different processes depending on whether the source mounting body 9s in the source area As is the final order placement body 9f or when it is not the final order placement body 9f. FIG. 3 shows the process that the control device C executes when the take-out source placement body 9s in the take-out source area As is not the order final placement body 9f. FIG. 4 shows the process that the control device C executes when the take-out source placement body 9s in the take-out source area As is the order final placement body 9f. In addition, in FIGS. 3 and 4, different numbers (No. 1 to No. 4) are given to each of the plurality of mounting bodies 9 so that the movements of each of the plurality of mounting bodies 9 can be easily distinguished. Moreover, the article 90 placed on the mounting body 9 is omitted.

図3に示すように、本実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9s(No.1)がオーダー最終載置体9fでない場合、取出元エリアAsから取出元載置体9s(No.1)を搬出する取出元載置体搬出処理Posと、取出元エリアAsに新たな取出元載置体9s(No.2)を供給する取出元載置体供給処理Pssと、を並行して実行する。これにより、取出元エリアAsからの取出元載置体9s(No.1)の搬出と並行して取出元エリアAsへの新たな取出元載置体9s(No.2)の供給が行われるため、次の取出元載置体9s(No.2)からの必要な物品90の取り出し作業を迅速に開始し易い。この場合、新たな取出元載置体9s(No.2)から移載先エリアAdにある移載先載置体9d(No.3)へ物品90が移載され、ピッキング作業が継続される。なお、複数の処理を並行して実行するとは、これら複数の処理を、それぞれの処理の実行期間が少なくとも一部で重複するように実行することを意味する。 As shown in FIG. 3, in the present embodiment, the control device C controls the extraction from the take-out source area As when the take-out source placing object 9s (No. 1) in the take-out source area As is not the order final placing object 9f. A source mounting body carrying out process Pos for carrying out the source mounting body 9s (No. 1) and a source mounting body supply supplying a new source mounting body 9s (No. 2) to the source area As. Processing Pss is executed in parallel. As a result, a new source mounting body 9s (No. 2) is supplied to the source area As in parallel with the removal of the source mounting body 9s (No. 1) from the source area As. Therefore, it is easy to quickly start the work of taking out the necessary article 90 from the next taking-out source mounting body 9s (No. 2). In this case, the article 90 is transferred from the new pick-up source mounting body 9s (No. 2) to the transfer destination mounting body 9d (No. 3) in the transfer destination area Ad, and the picking operation is continued. . Note that executing multiple processes in parallel means executing these multiple processes such that the execution periods of the respective processes overlap at least in part.

本実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9s(No.1)がオーダー最終載置体9fでない場合、取出完了受付部8s(図1参照)が操作されたことに基づいて取出元載置体搬出処理Posと取出元載置体供給処理Pssとを実行する。すなわち、作業者Wは、取出元エリアAsにある取出元載置体9s(No.1)からオーダー物品群Goに含まれる物品90の取り出しが完了した場合に、取出完了受付部8sを操作する。そして、制御装置Cは、取出元載置体搬出処理Posと取出元載置体供給処理Pssとを実行し、取出元エリアAsの取出元載置体9sを入れ替える(No.1→No.2)。その後、上述のように、取出元エリアAsの取出元載置体9s(No.2)から移載先エリアAdの移載先載置体9d(No.3)へ物品90を移載するピッキング作業が継続される。 In the present embodiment, the control device C controls the take-out completion receiving unit 8s (see FIG. 1) to be operated when the take-out source placing object 9s (No. 1) in the take-out source area As is not the order final placing object 9f. Based on this, the extraction source mounting body carrying out process Pos and the extraction source mounting body supplying process Pss are executed. That is, the worker W operates the retrieval completion reception unit 8s when the retrieval of the article 90 included in the ordered article group Go from the retrieval source mounting body 9s (No. 1) in the retrieval source area As is completed. . Then, the control device C executes the source mounting body carrying out process Pos and the source mounting body supplying process Pss, and replaces the source mounting body 9s in the source area As (No. 1→No. 2). ). Thereafter, as described above, picking is carried out to transfer the article 90 from the source mounting body 9s (No. 2) in the source area As to the destination mounting body 9d (No. 3) in the destination area Ad. Work continues.

図4(a)(b)に示すように、本実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9s(No.1)がオーダー最終載置体9fである場合、取出元載置体搬出処理Posを実行した後に、移載先載置体搬出処理Podと取出元載置体供給処理Pssとを並行して実行する。具体的には、制御装置Cは、移載先載置体搬出処理Podの実行開始以後に取出元エリアAsへ新たな取出元載置体9sが供給されるように、移載先載置体搬出処理Podと取出元載置体供給処理Pssとを並行して実行する。このように移載先載置体搬出処理Podと取出元載置体供給処理Pssとが並行して実行されるため、ピッキング作業が完了した移載先載置体9d(No.3)が移載先エリアAdに残ったままの状態で、取出元エリアAsに新たな取出元載置体9s(No.2)が供給されないようにすることができる。従って、ピッキング作業が完了した移載先載置体9d(No.3)に対して、誤って別のオーダー情報に係る物品90が移載されることを回避することができる。 As shown in FIGS. 4(a) and 4(b), in this embodiment, the control device C controls the case where the take-out source mounting body 9s (No. 1) in the take-out source area As is the order final placing body 9f. , after executing the source mounting body unloading process Pos, the transfer destination mounting body unloading process Pod and the source loading body supplying process Pss are executed in parallel. Specifically, the control device C controls the transfer destination mounting body so that a new extraction source mounting body 9s is supplied to the extraction source area As after the start of execution of the transfer destination mounting body unloading process Pod. The carry-out processing Pod and the extraction source mounting body supply processing Pss are executed in parallel. In this way, the transfer destination mounting body unloading processing Pod and the source mounting body supplying process Pss are executed in parallel, so that the transfer destination mounting body 9d (No. 3) for which the picking work has been completed is transferred. It is possible to prevent a new source mounting body 9s (No. 2) from being supplied to the source area As while remaining in the destination area Ad. Therefore, it is possible to prevent the article 90 related to different order information from being erroneously transferred to the transfer destination mounting body 9d (No. 3) on which the picking operation has been completed.

図4(b)に示すように、本実施形態では、制御装置Cは、移載先載置体搬出処理Podと並行して、移載先エリアAdへ新たな移載先載置体9d(No.4)を供給する移載先載置体供給処理Psdを実行する。すなわち本例では、制御装置Cは、移載先載置体搬出処理Podと移載先載置体供給処理Psdと取出元載置体供給処理Pssとを並行して実行する。これにより、ピッキング作業が完了した移載先載置体9d(No.3)に対する物品90の誤移載を回避できると共に、移載先エリアAdに対する移載先載置体9dの入れ替えを迅速に行うことができる(No.3→No.4)。 As shown in FIG. 4(b), in this embodiment, the control device C moves a new transfer destination mounting body 9d ( No. 4) is executed. That is, in this example, the control device C executes the transfer destination mounting body unloading processing Pod, the transfer destination mounting body supplying process Psd, and the extraction source mounting body supplying process Pss in parallel. As a result, it is possible to avoid erroneous transfer of the article 90 to the transfer destination mounting body 9d (No. 3) where the picking work has been completed, and to quickly replace the transfer destination mounting body 9d with respect to the transfer destination area Ad. It can be done (No.3→No.4).

本実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9s(No.1)がオーダー最終載置体9fである場合、取出完了受付部8s(図1参照)が操作されたことに基づいて取出元載置体搬出処理Posを実行し(図4(a)参照)、ピッキング完了受付部8d(図1参照)が操作されたことに基づいて移載先載置体搬出処理Podと取出元載置体供給処理Pssとを実行する(図4(b)参照)。すなわち、作業者Wは、移載先載置体9d(No.3)へのオーダー物品群Goの移載が完了した場合に、ピッキング完了受付部8dを操作する。そして、制御装置Cは、移載先載置体搬出処理Podと取出元載置体供給処理Pssとを実行する。本実施形態では、制御装置Cは、ピッキング完了受付部8dが操作されたことに基づいて、移載先載置体搬出処理Podと移載先載置体供給処理Psdと取出元載置体供給処理Pssとを実行する。これにより、ピッキング作業が完了した移載先載置体9d(No.3)が移載先エリアAdから搬出されると共に当該移載先エリアAdに新たな移載先載置体9d(No.4)が供給され、取出元エリアAsに新たな取出元載置体9s(No.2)が供給される(図4(b)参照)。 In the present embodiment, the control device C controls the removal completion receiving unit 8s (see FIG. 1) when the removal source mounting body 9s (No. 1) in the extraction source area As is the order final placement object 9f. Based on the operation of the picking completion reception unit 8d (see FIG. 1), the extraction source mounting body unloading process Pos is executed (see FIG. 4(a)). The carry-out processing Pod and the extraction source mounting body supply processing Pss are executed (see FIG. 4(b)). That is, the worker W operates the picking completion reception unit 8d when the transfer of the ordered article group Go to the transfer destination mounting body 9d (No. 3) is completed. Then, the control device C executes the destination mounting body unloading process Pod and the source mounting body supplying process Pss. In this embodiment, the control device C performs a transfer destination mounting body unloading process Pod, a transfer destination mounting body supply process Psd, and an extraction source mounting body supply based on the operation of the picking completion reception unit 8d. Processing Pss is executed. As a result, the transfer destination mounting body 9d (No. 3) on which the picking work has been completed is carried out from the transfer destination area Ad, and a new transfer destination mounting body 9d (No. 3) is transferred to the transfer destination area Ad. 4) is supplied, and a new source mounting body 9s (No. 2) is supplied to the source area As (see FIG. 4(b)).

図4(c)に示すように、制御装置Cが上記の一連の処理を終えた後は、取出元エリアAsに新たな取出元載置体9s(No.2)が配置されると共に、移載先エリアAdに新たな移載先載置体9d(No.4)が配置される。そして、別のオーダー情報に基づいて、新たな移載先載置体9d(No.4)に対する新たなピッキング作業が開始される。 As shown in FIG. 4(c), after the control device C finishes the above series of processes, a new extraction source mounting body 9s (No. 2) is placed in the extraction source area As, and a new extraction source mounting body 9s (No. 2) is placed in the extraction source area As. A new transfer destination mounting body 9d (No. 4) is placed in the destination area Ad. Then, based on another order information, a new picking operation for a new transfer destination mounting body 9d (No. 4) is started.

次に、制御装置Cが行う処理手順について、図5のフローチャートを参照して説明する。 Next, the processing procedure performed by the control device C will be explained with reference to the flowchart of FIG.

図5に示すように、制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fであるか否かを判定する(ステップ#11)。制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fであると判定した後(ステップ#11;Yes)、取出完了受付部8sが操作された場合には(ステップ#12;Yes)、取出元載置体搬出処理Posを実行する(ステップ#13)。制御装置Cは、その後、ピッキング完了受付部8dが操作された場合には(ステップ#14;Yes)、移載先載置体搬出処理Podと移載先載置体供給処理Psdと取出元載置体供給処理Pssとを並行して実行する(ステップ#15)。 As shown in FIG. 5, the control device C determines whether the take-out source mounting body 9s in the take-out source area As is the order final placing body 9f (step #11). After the control device C determines that the take-out source placing object 9s in the take-out source area As is the order final placing object 9f (step #11; Yes), when the take-out completion reception unit 8s is operated, (Step #12; Yes), the extraction source mounting body carrying out process Pos is executed (Step #13). Thereafter, when the picking completion reception unit 8d is operated (step #14; Yes), the control device C performs the transfer destination mounting body unloading process Pod, the transfer destination mounting body supply process Psd, and the source loading process. The body supply process Pss is executed in parallel (step #15).

一方、制御装置Cは、ステップ#11において、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fでないと判定した後(ステップ#11;No)、取出完了受付部8sが操作された場合には(ステップ#16;Yes)、取出元載置体搬出処理Posと取出元載置体供給処理Pssとを並行して実行する(ステップ#17)。 On the other hand, after the control device C determines in step #11 that the source placing object 9s in the source area As is not the order final placing object 9f (step #11; No), the taking-out completion reception unit 8s If the operation has been performed (Step #16; Yes), the source mounting body carrying out process Pos and the source mounting body supplying process Pss are executed in parallel (Step #17).

〔第2実施形態〕
次に、ピッキングシステム100の第2実施形態について説明する。第2実施形態では、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fである場合での制御装置Cが行う処理が、上記第1実施形態と異なる。以下では、第2実施形態について、上記第1実施形態と異なる点を主に説明する。特に説明しない点については、上記第1実施形態と同様である。
[Second embodiment]
Next, a second embodiment of the picking system 100 will be described. In the second embodiment, the process performed by the control device C when the take-out source placing body 9s in the take-out source area As is the order final placing body 9f is different from the first embodiment. In the following, the second embodiment will be mainly described with respect to the differences from the first embodiment. Points not particularly described are the same as those in the first embodiment.

本実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fである場合、移載先載置体搬出処理Podと取出元載置体搬出処理Posと取出元載置体供給処理Pssとを並行して実行する。具体的には、制御装置Cは、移載先載置体搬出処理Podの実行開始以後に取出元エリアAsへ新たな取出元載置体9sが供給されるように、移載先載置体搬出処理Podと取出元載置体搬出処理Posと取出元載置体供給処理Pssとを並行して実行する。このように移載先載置体搬出処理Podと取出元載置体搬出処理Posと取出元載置体供給処理Pssとが並行して実行されるため、ピッキング作業が完了した移載先載置体9dが移載先エリアAdに残ったままの状態で、取出元エリアAsに新たな取出元載置体9sが供給されないようにすることができる。従って、ピッキング作業が完了した移載先載置体9dに対して、誤って別のオーダー情報に係る物品90が移載されることを回避することができる。また、ピッキング作業が完了した移載先載置体9dを移載先エリアAdから搬出することと並行して、新たな取出元載置体9sが取出元エリアAsに供給されるため、次のオーダー物品群Goについてのピッキング作業を迅速に開始し易い。 In the present embodiment, when the source mounting body 9s in the source area As is the order final mounting body 9f, the control device C performs a transfer destination mounting body carrying out process Pod and a fetching source mounting body carrying out process. Pos and extraction source mounting body supply processing Pss are executed in parallel. Specifically, the control device C controls the transfer destination mounting body so that a new extraction source mounting body 9s is supplied to the extraction source area As after the start of execution of the transfer destination mounting body unloading process Pod. The carry-out process Pod, the source placement body carry-out process Pos, and the source placement body supply process Pss are executed in parallel. In this way, the transfer destination mounting body unloading process Pod, the source loading body unloading process Pos, and the source loading body supplying process Pss are executed in parallel, so that the transfer destination loading unit after the picking work is completed It is possible to prevent a new source mounting body 9s from being supplied to the source area As while the body 9d remains in the transfer destination area Ad. Therefore, it is possible to avoid erroneously transferring the article 90 related to different order information to the transfer destination mounting body 9d for which the picking operation has been completed. In addition, in parallel with carrying out the transfer destination mounting body 9d for which the picking work has been completed from the transfer destination area Ad, a new extraction source mounting body 9s is supplied to the extraction source area As, so that the next It is easy to quickly start picking work for the ordered article group Go.

本実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fである場合、取出完了受付部8sが操作されたことに基づいて移載先載置体搬出処理Podと取出元載置体搬出処理Posと取出元載置体供給処理Pssとを実行する。すなわち、作業者Wは、移載先載置体9dへのオーダー物品群Goの移載が完了した場合に、ピッキング完了受付部8dではなく、取出完了受付部8sを操作する。そして、制御装置Cは、移載先載置体搬出処理Podと取出元載置体搬出処理Posと取出元載置体供給処理Pssとを実行する。なお、本実施形態では、操作部8がピッキング完了受付部8dを備えていなくても良い。 In the present embodiment, when the source mounting body 9s in the source area As is the order final placement body 9f, the control device C controls the transfer destination mounting body based on the operation of the extraction completion reception unit 8s. Execute the placing body carrying out process Pod, the taking out source placing body carrying out process Pos, and the taking out source placing body supplying process Pss. That is, when the transfer of the ordered article group Go to the transfer destination mounting body 9d is completed, the worker W operates the removal completion reception unit 8s instead of the picking completion reception unit 8d. Then, the control device C executes a transfer destination mounting body unloading process Pod, a source mounting body unloading process Pos, and a source mounting body supplying process Pss. Note that in this embodiment, the operation unit 8 does not need to include the picking completion reception unit 8d.

次に、制御装置Cが行う処理手順について、図6のフローチャートを参照して説明する。 Next, the processing procedure performed by the control device C will be explained with reference to the flowchart of FIG.

図6に示すように、制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fであるか否かを判定する(ステップ#21)。制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fであると判定した後(ステップ#21;Yes)、取出完了受付部8sが操作された場合には(ステップ#22;Yes)、移載先載置体搬出処理Podと移載先載置体供給処理Psdと取出元載置体搬出処理Posと取出元載置体供給処理Pssとを並行して実行する(ステップ#23)。 As shown in FIG. 6, the control device C determines whether the take-out source mounting body 9s in the take-out source area As is the order final placing body 9f (step #21). After the control device C determines that the take-out source placing object 9s in the take-out source area As is the order final placing object 9f (step #21; Yes), when the take-out completion reception unit 8s is operated, (Step #22; Yes), the transfer destination mounting body unloading processing Pod, the transfer destination mounting body supplying process Psd, the source mounting body unloading process Pos, and the source mounting body supplying process Pss are performed in parallel. Execute (step #23).

一方、制御装置Cは、ステップ#21において、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fでないと判定した後(ステップ#21;No)、取出完了受付部8sが操作された場合には(ステップ#24;Yes)、取出元載置体搬出処理Posと取出元載置体供給処理Pssとを並行して実行する(ステップ#25)。 On the other hand, after the control device C determines in step #21 that the source placing object 9s in the source area As is not the order final placing object 9f (step #21; No), the taking-out completion reception unit 8s If the operation has been performed (Step #24; Yes), the source mounting body carrying out process Pos and the source mounting body supplying process Pss are executed in parallel (Step #25).

〔ピッキング方法およびピッキングプログラム〕
上記において第1実施形態及び第2実施形態を例示して説明したピッキングシステム100によれば、ピッキング作業が完了した移載先載置体9dに対して、誤って物品90が移載されることを回避できる。上記で説明したピッキングシステム100の構成は、ピッキング方法やピッキングプログラムにも用いることができる。
[Picking method and picking program]
According to the picking system 100 described above by exemplifying the first embodiment and the second embodiment, the article 90 may be erroneously transferred to the transfer destination mounting body 9d on which the picking work has been completed. can be avoided. The configuration of the picking system 100 described above can also be used for a picking method and a picking program.

すなわち、ピッキング方法は、単一種類の複数の物品90からなる単一物品群Gsを載置していると共に取出元エリアAsに配置された取出元載置体9sから、オーダー情報により指定された種類及び数の物品90からなるオーダー物品群Goを取り出して移載先エリアAdに配置された移載先載置体9dに移載するピッキング作業を行うための方法である。 That is, the picking method is specified by the order information from the pick-up source mounting body 9s that is placing a single article group Gs consisting of a plurality of articles 90 of a single type and is arranged in the pick-up source area As. This is a method for performing a picking operation in which an ordered article group Go consisting of different types and numbers of articles 90 is taken out and transferred to a transfer destination mounting body 9d arranged in a transfer destination area Ad.

このピッキング方法は、取出元載置体9sを取出元エリアAsに供給する取出元載置体供給工程と、取出元エリアAsから取出元載置体9sを搬出する取出元載置体搬出工程と、移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出工程と、を備えている。そして、ピッキング方法では、取出元エリアAsにある取出元載置体9sが、移載先エリアAdにある移載先載置体9dに移載するべきオーダー物品群Goのうち最後に移載される最終物品90を載置しているオーダー最終載置体9fである場合には、移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出工程の実行開始以後に取出元エリアAsへ新たな取出元載置体9sが供給されるように、取出元載置体供給工程を実行する。本開示に係るピッキング方法では、移載先載置体9dを移載先エリアAdに供給する移載先載置体供給工程を更に実行する。 This picking method includes a source mounting body supply step in which the source mounting body 9s is supplied to the source area As, and a source mounting body carrying out step in which the source mounting body 9s is carried out from the source area As. , and a transfer destination mounting body carrying out step of carrying out the transfer destination mounting body 9d from the transfer destination area Ad. In the picking method, the pick-up source mounting body 9s in the pick-up source area As is the last to be transferred out of the order article group Go to be transferred to the transfer destination mounting body 9d in the transfer destination area Ad. In the case of the final order placement body 9f on which the final product 90 is placed, after the start of the execution of the destination placement body carrying out process for carrying out the destination placement body 9d from the transfer destination area Ad. The source mounting body supply step is executed so that a new source mounting body 9s is supplied to the source area As. In the picking method according to the present disclosure, a transfer destination mounting body supply step of supplying the transfer destination mounting body 9d to the transfer destination area Ad is further executed.

また、ピッキングプログラムは、単一種類の複数の物品90からなる単一物品群Gsを載置していると共に取出元エリアAsに配置された取出元載置体9sから、オーダー情報により指定された種類及び数の物品90からなるオーダー物品群Goを取り出して移載先エリアAdに配置された移載先載置体9dに移載するピッキング作業を行うためのプログラムである。 In addition, the picking program picks up the items specified by the order information from the pick-up source mounting body 9s that is placing a single article group Gs consisting of a plurality of articles 90 of a single type and is arranged in the pick-up source area As. This is a program for performing a picking operation in which an ordered article group Go consisting of articles 90 of different types and numbers is taken out and transferred to a transfer destination mounting body 9d arranged in a transfer destination area Ad.

このピッキングプログラムは、取出元載置体9sを取出元エリアAsに供給する取出元載置体供給処理を、取出元載置体供給装置1に行わせる取出元載置体供給機能と、取出元エリアAsから取出元載置体9sを搬出する取出元載置体搬出処理を、取出元載置体搬出装置2に行わせる取出元載置体搬出機能と、移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出処理を、移載先載置体搬出装置4に行わせる移載先載置体搬出機能と、をコンピュータに実現させる。そして、ピッキングプログラムは、取出元エリアAsにある取出元載置体9sが、移載先エリアAdにある移載先載置体9dに移載するべきオーダー物品群Goのうち最後に移載される最終物品90を載置しているオーダー最終載置体9fである場合には、移載先エリアAdから移載先載置体9dを搬出する移載先載置体搬出処理の実行開始以後に取出元エリアAsへ新たな取出元載置体9sが供給されるように、取出元載置体供給処理を実行する。本開示に係るピッキングプログラムでは、移載先載置体9dを移載先エリアAdに供給する移載先載置体供給処理を、移載先載置体供給装置3に行わせる移載先載置体供給機能も、更にコンピュータに実現させる。ピッキングプログラムは、例えば、当該ピッキングプログラムを記録した記録媒体(光ディスクやフラッシュメモリ等の、コンピュータが読み取り可能な記録媒体)により提供され、或いは、通信ネットワークを介して提供される。そして、提供されたピッキングプログラムは、コンピュータが参照可能な記憶装置に記憶される。本実施形態では、制御装置C(具体的には、制御装置Cが備える演算処理装置)が「コンピュータ」として機能する。 This picking program includes a source mounting body supplying function that causes the source mounting body supply device 1 to perform a source mounting body supplying process of supplying the source mounting body 9s to the source area As, and A source mounting body unloading function that causes the source mounting body unloading device 2 to perform a source loading body unloading process of transporting the source loading body 9s from the area As, and a transfer destination from the transfer destination area Ad. The computer is made to realize a transfer destination mounting body unloading function that causes the transfer destination mounting body unloading device 4 to carry out a transfer destination mounting body unloading process for unloading the mounting body 9d. Then, the picking program transfers the pick-up source mounting body 9s in the pick-up source area As to the transfer destination mounting body 9d in the transfer destination area Ad last among the group of ordered articles Go to be transferred. In the case of the order final placement body 9f on which the final article 90 is placed, after the start of the execution of the transfer destination loading body carrying out process for carrying out the transfer destination loading body 9d from the transfer destination area Ad. The extraction source mounting body supply process is executed so that a new extraction source mounting body 9s is supplied to the extraction source area As. In the picking program according to the present disclosure, the transfer destination placement device 3 causes the transfer destination placement device supplying device 3 to perform a transfer destination placement device supplying process of supplying the transfer destination placement device 9d to the transfer destination area Ad. The computer also realizes the function of supplying the body. The picking program is provided, for example, by a recording medium (a computer-readable recording medium such as an optical disk or a flash memory) on which the picking program is recorded, or via a communication network. The provided picking program is then stored in a storage device that can be referenced by the computer. In this embodiment, the control device C (specifically, the arithmetic processing unit included in the control device C) functions as a “computer”.

〔その他の実施形態〕
次に、ピッキングシステム、ピッキング方法、及びピッキングプログラムのその他の実施形態について説明する。
[Other embodiments]
Next, other embodiments of a picking system, a picking method, and a picking program will be described.

(1)上記の実施形態では、制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fでない場合、取出元エリアAsから取出元載置体9sを搬出する取出元載置体搬出処理Posと、取出元エリアAsに新たな取出元載置体9sを供給する取出元載置体供給処理Pssと、を並行して実行する例について説明した。しかし、このような例に限定されることなく、制御装置Cは、取出元エリアAsにある取出元載置体9sがオーダー最終載置体9fでない場合であっても、取出元載置体搬出処理Posと取出元載置体供給処理Pssとを異なる時期に実行しても良い。 (1) In the above embodiment, if the source mounting body 9s in the source area As is not the final order placement body 9f, the control device C carries out the source mounting body 9s from the source area As. An example has been described in which the source mounting body carrying out process Pos and the source mounting body supplying process Pss for supplying a new source mounting body 9s to the source area As are executed in parallel. However, without being limited to such an example, the control device C controls the extraction source placement object to be carried out even if the removal source placement object 9s in the removal source area As is not the order final placement object 9f. The processing Pos and the extraction source mounting body supply processing Pss may be performed at different times.

(2)上記の実施形態では、制御装置Cは、移載先載置体搬出処理Podと並行して、移載先エリアAdへ新たな移載先載置体9dを供給する移載先載置体供給処理Psdを実行する例について説明した。しかし、制御装置Cは、移載先載置体搬出処理Podと移載先載置体供給処理Psdとを異なる時期に実行しても良い。 (2) In the above embodiment, the control device C supplies the new transfer destination mounting body 9d to the transfer destination area Ad in parallel with the transfer destination mounting body unloading processing Pod. An example of executing the body supply process Psd has been described. However, the control device C may execute the transfer destination mounting body unloading process Pod and the transfer destination mounting body supply process Psd at different times.

(3)上記の実施形態では、作業者Wが操作部8を操作することに基づいて、取出元載置体供給処理Pss、取出元載置体搬出処理Pos、移載先載置体供給処理Psd、及び移載先載置体搬出処理Podの各処理が実行される例について説明した。しかし、このような例に限定されることなく、作業者Wの意思を介することなく、制御装置Cが自動的に各処理を実行しても良い。この場合、操作部8は不要である。 (3) In the above embodiment, based on the operator W operating the operation unit 8, the extraction source mounting body supply processing Pss, the extraction source mounting body unloading process Pos, and the transfer destination mounting body supply processing An example in which each process of Psd and transfer destination mounting body unloading process Pod is executed has been described. However, without being limited to such an example, the control device C may automatically execute each process without involving the intention of the worker W. In this case, the operation section 8 is unnecessary.

(4)上記の実施形態では、取出元載置体供給装置1、取出元載置体搬出装置2、移載先載置体供給装置3、及び移載先載置体搬出装置4が、コンベヤを用いて構成されている例について説明した。しかし、このような例に限定されることなく、上記の各装置は、上下方向に沿って載置体9を搬送するリフタや、水平軸まわりに載置体9を周回させるように搬送する搬送装置など、複数の載置体9を同じ経路で連続して搬送する装置であれば良い。 (4) In the above embodiment, the source mounting body supply device 1, the source mounting body unloading device 2, the transfer destination mounting body supply device 3, and the transfer destination mounting body unloading device 4 are connected to a conveyor. An example configured using . However, without being limited to such an example, each of the above-mentioned devices may include a lifter that transports the mounting body 9 along the vertical direction, and a conveyor that transports the mounting body 9 so as to revolve around a horizontal axis. Any device, such as a device, that can continuously transport a plurality of mounting bodies 9 along the same route may be used.

(5)上記の実施形態では、ピッキングシステム100が、移載先載置体9dを移載先エリアAdに供給する移載先載置体供給装置3を更に備えている例について説明した。しかし、このような例に限定されることなく、ピッキングシステム100は、移載先載置体供給装置3を備えていなくても良い。この場合、例えば作業者Wによって、移載先エリアAdに移載先載置体9dが供給されても良い。 (5) In the above embodiment, an example has been described in which the picking system 100 further includes the transfer destination mounting body supply device 3 that supplies the transfer destination mounting body 9d to the transfer destination area Ad. However, the picking system 100 is not limited to such an example, and the picking system 100 may not include the transfer destination mounting body supply device 3. In this case, the transfer destination mounting body 9d may be supplied to the transfer destination area Ad by the worker W, for example.

(6)なお、上述した実施形態で開示された構成は、矛盾が生じない限り、他の実施形態で開示された構成と組み合わせて適用することも可能である。その他の構成に関しても、本明細書において開示された実施形態は全ての点で単なる例示に過ぎない。従って、本開示の趣旨を逸脱しない範囲内で、適宜、種々の改変を行うことが可能である。 (6) Note that the configuration disclosed in the embodiment described above can also be applied in combination with the configuration disclosed in other embodiments, as long as there is no contradiction. Regarding other configurations, the embodiments disclosed herein are merely illustrative in all respects. Therefore, various modifications can be made as appropriate without departing from the spirit of the present disclosure.

〔上記実施形態の概要〕
以下、上記において説明したピッキングシステム、ピッキング方法、及びピッキングプログラムについて説明する。
[Summary of the above embodiment]
The picking system, picking method, and picking program described above will be explained below.

本開示に係るピッキングシステムは、
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキングシステムであって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給装置と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出装置と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出装置と、
前記取出元載置体供給装置、前記取出元載置体搬出装置、及び、前記移載先載置体搬出装置を制御する制御装置と、を備え、
前記制御装置は、前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、前記取出元載置体供給装置を制御して取出元載置体供給処理を実行する。
The picking system according to the present disclosure includes:
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking system for performing a picking operation of taking out a group and transferring it to a transfer destination mounting body arranged in a transfer destination area,
an extraction source mounting body supply device that supplies the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out device that carries out the extraction source mounting body from the extraction source area;
a transfer destination mounting body unloading device that carries out the transfer destination mounting body from the transfer destination area;
A control device that controls the source mounting body supplying device, the source mounting body carrying out device, and the transfer destination mounting body carrying out device,
The control device is configured such that the take-out source mounting body in the take-out source area is the last of the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is an order final placement object on which a final article is placed, the removal process is performed after the start of execution of the transfer destination placement object carrying out process for carrying out the transfer destination placement object from the transfer destination area. The source mounting body supplying device is controlled to execute the source mounting body supply process so that the new source mounting body is supplied to the source area.

本構成によれば、最終物品が移載されてピッキング作業が完了した移載先載置体を搬出するための移載先載置体搬出処理(移載先載置体搬出工程)の実行開始以後に取出元エリアへ新たな取出元載置体が供給されるように、取出元エリアへ新たな取出元載置体を供給する取出元載置体供給処理(取出元載置体供給工程)が実行される。そのため、ピッキング作業が完了した移載先載置体が移載先エリアにあり且つ新たな取出元載置体が取出元エリアにある状態が継続することはない。従って、本構成によれば、ピッキング作業が完了した移載先載置体に対して、誤って別のオーダーに係る物品が移載されることを回避することができる。 According to this configuration, execution of the transfer destination mounting body unloading process (transfer destination mounting body unloading process) for unloading the transfer destination mounting body on which the final article has been transferred and the picking work has been completed is started. An extraction source mounting body supply process for supplying a new extraction source mounting body to the extraction source area so that a new extraction source mounting body is subsequently supplied to the extraction source area (extraction source mounting body supply process) is executed. Therefore, the state in which the transfer destination mounting body for which the picking operation has been completed is in the transfer destination area and the new extraction source mounting body is in the extraction source area does not continue. Therefore, according to this configuration, it is possible to avoid erroneously transferring an article related to another order to the transfer destination mounting body on which the picking operation has been completed.

前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出処理と前記取出元載置体供給処理とを並行して実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記取出元載置体搬出処理を実行した後に、前記移載先載置体搬出処理と前記取出元載置体供給処理とを並行して実行する、と好適である。
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, a take-out source placing body carry-out process of carrying out the take-out source placing body from the take-out source area; and the take-out source placing body; Executes supply processing in parallel,
If the source mounting body in the source area is the final order placement body, after executing the source mounting body unloading process, the transfer destination loading body unloading process and the unloading source loading body are performed. It is preferable to execute the placement body supply process in parallel.

本構成によれば、取出元エリアにある取出元載置体がオーダー最終載置体でない場合、取出元エリアからの取出元載置体の搬出と並行して取出元エリアへの新たな取出元載置体の供給が行われるため、次の取出元載置体からの必要な物品の取り出し作業を迅速に開始し易い。また、取出元エリアにある取出元載置体がオーダー最終載置体である場合、移載先エリアからの移載先載置体の搬出と並行して取出元エリアへの新たな取出元載置体の供給が行われるため、次のオーダー物品群についてのピッキング作業を迅速に開始し易い。 According to this configuration, when the take-out source mounting body in the take-out source area is not the final order placing body, a new take-out source is transferred to the take-out source area in parallel with the removal of the take-out source placing body from the take-out source area. Since the mounting body is supplied, it is easy to quickly start the work of taking out the necessary article from the next extraction source mounting body. In addition, if the source loading object in the source area is the final loading object for the order, a new loading object in the source area will be placed in parallel with the removal of the destination loading object from the destination area. Since the placed objects are supplied, it is easy to quickly start the picking operation for the next group of ordered articles.

作業者によって操作される操作部を備え、
前記操作部は、前記移載先載置体への前記オーダー物品群の移載が完了した場合に前記作業者によって操作されるピッキング完了受付部と、前記取出元エリアにある前記取出元載置体から前記オーダー物品群に含まれる前記物品の取り出しが完了した場合に前記作業者によって操作される取出完了受付部と、を備え、
前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出完了受付部が操作されたことに基づいて前記取出元載置体搬出処理と前記取出元載置体供給処理とを実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記取出完了受付部が操作されたことに基づいて前記取出元載置体搬出処理を実行し、前記ピッキング完了受付部が操作されたことに基づいて前記移載先載置体搬出処理と前記取出元載置体供給処理とを実行する、と好適である。
Equipped with an operation section operated by the worker,
The operation unit includes a picking completion reception unit that is operated by the operator when the transfer of the group of ordered articles to the transfer destination mounting body is completed, and a picking completion reception unit that is operated by the worker when the transfer of the group of ordered articles to the transfer destination mounting body is completed, and a picking completion reception unit that a retrieval completion reception unit operated by the operator when retrieval of the article included in the ordered article group from the body is completed;
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, the take-out source placing body carrying out process and the take-out source placing body are performed based on the operation of the take-out completion reception unit. Execute supply processing and
When the pick-up source placement object in the pick-up source area is the order final placement object, the pick-up source placement object carrying out process is executed based on the operation of the pick-up completion reception unit, and the picking Preferably, the transfer destination mounting body unloading process and the extraction source mounting body supplying process are executed based on the completion reception unit being operated.

本構成によれば、取出元エリアにある取出元載置体がオーダー最終載置体であるか否かに応じて、作業者の操作に基づき、移載先載置体搬出処理、取出元載置体搬出処理、及び取出元載置体供給処理を適切に実行することができる。 According to this configuration, based on the operator's operation, depending on whether or not the source loading body in the loading source area is the final loading body of the order, It is possible to appropriately carry out the processing for carrying out the mounting body and the processing for supplying the mounting body from the extraction source.

前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出処理と前記取出元載置体供給処理とを並行して実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記移載先載置体搬出処理と前記取出元載置体搬出処理と前記取出元載置体供給処理とを並行して実行する、と好適である。
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, a take-out source placing body carry-out process of carrying out the take-out source placing body from the take-out source area; and the take-out source placing body; Executes supply processing in parallel,
When the source mounting body in the source area is the final order placement body, the transfer destination mounting body carrying out process, the fetching source mounting body carrying out process, and the picking source mounting body supplying process It is preferable to execute these in parallel.

本構成によれば、取出元エリアにある取出元載置体がオーダー最終載置体でない場合、取出元エリアからの取出元載置体の搬出と並行して取出元エリアへの新たな取出元載置体の供給が行われるため、次の取出元載置体からの必要な物品の取り出し作業を迅速に開始し易い。また、取出元エリアにある取出元載置体がオーダー最終載置体である場合、移載先エリアからの移載先載置体の搬出と並行して取出元エリアからの取出元載置体の搬出と取出元エリアへの新たな取出元載置体の供給とが行われるため、次のオーダー物品群についてのピッキング作業を迅速に開始し易い。 According to this configuration, when the take-out source mounting body in the take-out source area is not the final order placing body, a new take-out source is transferred to the take-out source area in parallel with the removal of the take-out source placing body from the take-out source area. Since the mounting body is supplied, it is easy to quickly start the work of taking out the necessary article from the next extraction source mounting body. In addition, if the retrieval source mounting body in the retrieval source area is the final order loading object, the retrieval source mounting body from the retrieval source area will be removed from the retrieval source area in parallel with the removal of the transfer destination mounting object from the transfer destination area. and a new take-out source mounting body is supplied to the take-out source area, making it easy to quickly start picking work for the next group of ordered articles.

作業者によって操作される操作部を備え、
前記操作部は、前記取出元エリアにある前記取出元載置体から前記オーダー物品群に含まれる前記物品の取り出しが完了した場合に前記作業者によって操作される取出完了受付部を備え、
前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出完了受付部が操作されたことに基づいて前記取出元載置体搬出処理と前記取出元載置体供給処理とを実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記取出完了受付部が操作されたことに基づいて前記移載先載置体搬出処理と前記取出元載置体搬出処理と前記取出元載置体供給処理とを実行する、と好適である。
Equipped with an operation section operated by the worker,
The operation unit includes a take-out completion reception unit that is operated by the operator when taking out the articles included in the ordered article group from the take-out source mounting body in the take-out source area is completed;
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, the take-out source placing body carrying out process and the take-out source placing body are performed based on the operation of the take-out completion reception unit. Execute supply processing and
When the take-out source mounting body in the take-out source area is the order final place, the transfer destination mounting body unloading process and the take-out source loading process are performed based on the operation of the take-out completion reception unit. It is preferable to execute the placing body carrying out process and the extraction source placing body supplying process.

本構成によれば、取出元エリアにある取出元載置体がオーダー最終載置体であるか否かに応じて、作業者の操作に基づき、移載先載置体搬出処理、取出元載置体搬出処理、及び取出元載置体供給処理を適切に実行することができる。 According to this configuration, based on the operator's operation, depending on whether or not the source loading body in the loading source area is the final loading body of the order, It is possible to appropriately carry out the processing for carrying out the mounting body and the processing for supplying the mounting body from the extraction source.

前記移載先載置体を前記移載先エリアに供給する移載先載置体供給装置を更に備え、
前記制御装置は、前記移載先載置体搬出処理と並行して、前記移載先エリアへ新たな前記移載先載置体を供給する移載先載置体供給処理を実行する、と好適である。
further comprising a transfer destination mounting body supplying device for supplying the transfer destination mounting body to the transfer destination area,
The control device executes a transfer destination mounting body supplying process for supplying the new transfer destination mounting body to the transfer destination area in parallel with the transfer destination mounting body unloading process. suitable.

本構成によれば、移載先エリアに対する移載先載置体の入れ替えを迅速に行うことができる。 According to this configuration, the transfer destination mounting body can be quickly replaced with respect to the transfer destination area.

本開示に係るピッキング方法は、
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキング方法であって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給工程と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出工程と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出工程と、を備え、
前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する前記移載先載置体搬出工程の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、前記取出元載置体供給工程を実行する。
The picking method according to the present disclosure includes:
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking method for performing a picking operation in which a group is taken out and transferred to a transfer destination mounting body arranged in a transfer destination area, the picking method comprising:
an extraction source mounting body supplying step of supplying the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out step of carrying out the extraction source mounting body from the extraction source area;
a transfer destination mounting body carrying out step of carrying out the transfer destination mounting body from the transfer destination area,
The take-out source mounting body in the take-out source area places the final article to be transferred last among the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is the final placement object of the order, after the start of execution of the transfer destination placement object carrying out step for carrying out the transfer destination placement object from the transfer destination area, a new one is placed in the take-out source area. The extraction source mounting body supply step is performed so that the extraction source mounting body is supplied.

本開示に係るピッキングプログラムは、
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキングプログラムであって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給処理を、取出元載置体供給装置に行わせる取出元載置体供給機能と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出処理を、取出元載置体搬出装置に行わせる取出元載置体搬出機能と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理を、移載先載置体搬出装置に行わせる移載先載置体搬出機能と、をコンピュータに実現させ、
前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、取出元載置体供給処理を実行する。
The picking program according to this disclosure is
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking program for performing a picking operation of picking up a group and transferring it to a transfer destination mounting body arranged in a transfer destination area,
an extraction source mounting body supplying function that causes an extraction source mounting body supplying device to perform an extraction source mounting body supplying process for supplying the extraction source mounting body to the extraction source area;
a source mounting body carrying out function that causes a fetching source mounting body carrying out device to carry out a fetching source mounting body carrying out process of carrying out the fetching source mounting body from the fetching source area;
a transfer destination mounting body unloading function for causing a transfer destination mounting body unloading device to carry out a transfer destination mounting body unloading process of transporting the transfer destination mounting body from the transfer destination area; Make it happen,
The take-out source mounting body in the take-out source area places the final article to be transferred last among the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is the final placement object of the order, a new object is added to the source area after the start of execution of the destination placement object carrying out process for carrying out the destination placement object from the transfer destination area. A source mounting body supply process is executed so that the source mounting body is supplied.

本開示に係る技術は、オーダー情報により指定された種類及び数の物品からなるオーダー物品群を取出元載置体から取り出して移載先載置体に移載するピッキング作業を行うためのピッキングシステム、ピッキング方法、及びピッキングプログラムに利用することができる。 The technology according to the present disclosure is a picking system for performing a picking operation in which a group of ordered articles consisting of the type and number of articles specified by order information is taken out from a source loading body and transferred to a destination loading body. , a picking method, and a picking program.

100 :ピッキングシステム
1 :取出元載置体供給装置
2 :取出元載置体搬出装置
3 :移載先載置体供給装置
4 :移載先載置体搬出装置
8 :操作部
8d :ピッキング完了受付部
8s :取出完了受付部
9 :載置体
9d :移載先載置体
9s :取出元載置体
9f :オーダー最終載置体
90 :物品
Go :オーダー物品群
Gs :単一物品群
Ad :移載先エリア
As :取出元エリア
C :制御装置
W :作業者
Pod :移載先載置体搬出処理
Pos :取出元載置体搬出処理
Psd :移載先載置体供給処理
Pss :取出元載置体供給処理
100: Picking system 1: Source mounting body supply device 2: Source mounting body unloading device 3: Transfer destination mounting body supply device 4: Transfer destination mounting body unloading device 8: Operation unit 8d: Picking complete Reception section 8s: Retrieval completion reception section 9: Placement body 9d: Transfer destination placement body 9s: Source placement body 9f: Order final placement body 90: Article Go: Ordered article group Gs: Single article group Ad : Transfer destination area As : Retrieval source area C : Control device W : Operator Pod : Transfer destination mounting body unloading process Pos : Retrieval source loading body unloading process Psd : Transfer destination mounting body supply process Pss : Retrieval Original mounting body supply processing

Claims (8)

単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキングシステムであって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給装置と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出装置と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出装置と、
前記取出元載置体供給装置、前記取出元載置体搬出装置、及び、前記移載先載置体搬出装置を制御する制御装置と、を備え、
前記制御装置は、前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、前記取出元載置体供給装置を制御して取出元載置体供給処理を実行する、ピッキングシステム。
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking system for performing a picking operation of taking out a group and transferring it to a transfer destination mounting body arranged in a transfer destination area,
an extraction source mounting body supply device that supplies the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out device that carries out the extraction source mounting body from the extraction source area;
a transfer destination mounting body unloading device that carries out the transfer destination mounting body from the transfer destination area;
A control device that controls the source mounting body supplying device, the source mounting body carrying out device, and the transfer destination mounting body carrying out device,
The control device is configured such that the take-out source mounting body in the take-out source area is the last of the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is an order final placement object on which a final article is placed, the removal process is performed after the start of execution of the transfer destination placement object carrying out process for carrying out the transfer destination placement object from the transfer destination area. A picking system that controls the source mounting body supply device to execute a source mounting body supply process so that the new source mounting body is supplied to the source area.
前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出処理と前記取出元載置体供給処理とを並行して実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記取出元載置体搬出処理を実行した後に、前記移載先載置体搬出処理と前記取出元載置体供給処理とを並行して実行する、請求項1に記載のピッキングシステム。
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, a take-out source placing body carry-out process of carrying out the take-out source placing body from the take-out source area; and the take-out source placing body; Executes supply processing in parallel,
If the source mounting body in the source area is the final order placement body, after executing the source mounting body unloading process, the transfer destination loading body unloading process and the unloading source loading body are performed. The picking system according to claim 1, wherein the picking system executes the placing body supply process in parallel.
作業者によって操作される操作部を備え、
前記操作部は、前記移載先載置体への前記オーダー物品群の移載が完了した場合に前記作業者によって操作されるピッキング完了受付部と、前記取出元エリアにある前記取出元載置体から前記オーダー物品群に含まれる前記物品の取り出しが完了した場合に前記作業者によって操作される取出完了受付部と、を備え、
前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出完了受付部が操作されたことに基づいて前記取出元載置体搬出処理と前記取出元載置体供給処理とを実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記取出完了受付部が操作されたことに基づいて前記取出元載置体搬出処理を実行し、前記ピッキング完了受付部が操作されたことに基づいて前記移載先載置体搬出処理と前記取出元載置体供給処理とを実行する、請求項2に記載のピッキングシステム。
Equipped with an operation section operated by the worker,
The operation unit includes a picking completion reception unit that is operated by the operator when the transfer of the group of ordered articles to the transfer destination mounting body is completed, and a picking completion reception unit that is operated by the worker when the transfer of the group of ordered articles to the transfer destination mounting body is completed, and a picking completion reception unit that a retrieval completion reception unit operated by the operator when retrieval of the article included in the ordered article group from the body is completed;
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, the take-out source placing body carrying out process and the take-out source placing body are performed based on the operation of the take-out completion reception unit. Execute supply processing and
When the pick-up source placement object in the pick-up source area is the order final placement object, the pick-up source placement object carrying out process is executed based on the operation of the pick-up completion reception unit, and the picking The picking system according to claim 2, wherein the transfer destination mounting body carrying out process and the extraction source mounting body supplying process are performed based on the completion reception unit being operated.
前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出処理と前記取出元載置体供給処理とを並行して実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記移載先載置体搬出処理と前記取出元載置体搬出処理と前記取出元載置体供給処理とを並行して実行する、請求項1に記載のピッキングシステム。
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, a take-out source placing body carry-out process of carrying out the take-out source placing body from the take-out source area; and the take-out source placing body; Executes supply processing in parallel,
When the source mounting body in the source area is the final order placement body, the transfer destination mounting body carrying out process, the fetching source mounting body carrying out process, and the picking source mounting body supplying process The picking system according to claim 1, wherein the picking system executes the above steps in parallel.
作業者によって操作される操作部を備え、
前記操作部は、前記取出元エリアにある前記取出元載置体から前記オーダー物品群に含まれる前記物品の取り出しが完了した場合に前記作業者によって操作される取出完了受付部を備え、
前記制御装置は、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体でない場合、前記取出完了受付部が操作されたことに基づいて前記取出元載置体搬出処理と前記取出元載置体供給処理とを実行し、
前記取出元エリアにある前記取出元載置体が前記オーダー最終載置体である場合、前記取出完了受付部が操作されたことに基づいて前記移載先載置体搬出処理と前記取出元載置体搬出処理と前記取出元載置体供給処理とを実行する、請求項4に記載のピッキングシステム。
Equipped with an operation section operated by the worker,
The operation unit includes a take-out completion reception unit that is operated by the operator when taking out the articles included in the ordered article group from the take-out source mounting body in the take-out source area is completed;
The control device includes:
If the take-out source mounting body in the take-out source area is not the order final placement body, the take-out source placing body carrying out process and the take-out source placing body are performed based on the operation of the take-out completion reception unit. Execute supply processing and
When the take-out source mounting body in the take-out source area is the order final place, the transfer destination mounting body unloading process and the take-out source loading process are performed based on the operation of the take-out completion reception unit. 5. The picking system according to claim 4, wherein the picking system executes a placing object carrying out process and a taking-out source placing object supplying process.
前記移載先載置体を前記移載先エリアに供給する移載先載置体供給装置を更に備え、
前記制御装置は、前記移載先載置体搬出処理と並行して、前記移載先エリアへ新たな前記移載先載置体を供給する移載先載置体供給処理を実行する、請求項1から5のいずれか一項に記載のピッキングシステム。
further comprising a transfer destination mounting body supplying device for supplying the transfer destination mounting body to the transfer destination area,
The control device executes a transfer destination mounting body supplying process for supplying the new transfer destination mounting body to the transfer destination area in parallel with the transfer destination mounting body unloading process. The picking system according to any one of Items 1 to 5.
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキング方法であって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給工程と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出工程と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出工程と、を備え、
前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する前記移載先載置体搬出工程の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、前記取出元載置体供給工程を実行する、ピッキング方法。
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking method for performing a picking operation in which a group is taken out and transferred to a transfer destination mounting body arranged in a transfer destination area, the picking method comprising:
an extraction source mounting body supplying step of supplying the extraction source mounting body to the extraction source area;
an extraction source mounting body carrying out step of carrying out the extraction source mounting body from the extraction source area;
a transfer destination mounting body carrying out step of carrying out the transfer destination mounting body from the transfer destination area,
The take-out source mounting body in the take-out source area places the final article to be transferred last among the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is the final placement object of the order, after the start of execution of the transfer destination placement object carrying out step for carrying out the transfer destination placement object from the transfer destination area, a new one is placed in the take-out source area. A picking method, wherein the picking source mounting body supplying step is performed so that the picking source mounting body is supplied.
単一種類の複数の物品からなる単一物品群を載置していると共に取出元エリアに配置された取出元載置体から、オーダー情報により指定された種類及び数の前記物品からなるオーダー物品群を取り出して移載先エリアに配置された移載先載置体に移載するピッキング作業を行うためのピッキングプログラムであって、
前記取出元載置体を前記取出元エリアに供給する取出元載置体供給処理を、取出元載置体供給装置に行わせる取出元載置体供給機能と、
前記取出元エリアから前記取出元載置体を搬出する取出元載置体搬出処理を、取出元載置体搬出装置に行わせる取出元載置体搬出機能と、
前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理を、移載先載置体搬出装置に行わせる移載先載置体搬出機能と、をコンピュータに実現させ、
前記取出元エリアにある前記取出元載置体が、前記移載先エリアにある前記移載先載置体に移載するべき前記オーダー物品群のうち最後に移載される最終物品を載置しているオーダー最終載置体である場合には、前記移載先エリアから前記移載先載置体を搬出する移載先載置体搬出処理の実行開始以後に前記取出元エリアへ新たな前記取出元載置体が供給されるように、取出元載置体供給処理を実行する、ピッキングプログラム。
Ordered articles consisting of the type and number of said articles specified by the order information from a take-out source mounting body which is placed in a take-out source area and which carries a single article group made up of a plurality of articles of a single type. A picking program for performing a picking operation of picking up a group and transferring it to a transfer destination mounting body arranged in a transfer destination area,
an extraction source mounting body supplying function that causes an extraction source mounting body supplying device to perform an extraction source mounting body supplying process for supplying the extraction source mounting body to the extraction source area;
a source mounting body carrying out function that causes a fetching source mounting body carrying out device to carry out a fetching source mounting body carrying out process of carrying out the fetching source mounting body from the fetching source area;
a transfer destination mounting body unloading function for causing a transfer destination mounting body unloading device to carry out a transfer destination mounting body unloading process of transporting the transfer destination mounting body from the transfer destination area; Make it happen,
The take-out source mounting body in the take-out source area places the final article to be transferred last among the group of ordered articles to be transferred to the transfer destination mounting body in the transfer destination area. If it is the final placement object of the order, a new object is added to the source area after the start of execution of the destination placement object carrying out process for carrying out the destination placement object from the transfer destination area. A picking program that executes a source mounting body supply process so that the source mounting body is supplied.
JP2022040528A 2022-03-15 2022-03-15 Picking system, picking method, and picking program Pending JP2023135365A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022040528A JP2023135365A (en) 2022-03-15 2022-03-15 Picking system, picking method, and picking program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022040528A JP2023135365A (en) 2022-03-15 2022-03-15 Picking system, picking method, and picking program

Publications (1)

Publication Number Publication Date
JP2023135365A true JP2023135365A (en) 2023-09-28

Family

ID=88143997

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022040528A Pending JP2023135365A (en) 2022-03-15 2022-03-15 Picking system, picking method, and picking program

Country Status (1)

Country Link
JP (1) JP2023135365A (en)

Similar Documents

Publication Publication Date Title
JP5825348B2 (en) Picking and sorting system
US8527088B2 (en) Transportation system
JP5641338B2 (en) Picking method
JP7084257B2 (en) Picking support system and support method
JP5930406B2 (en) Picking equipment
WO2024067368A1 (en) Conveying control method and related device
JP2003137406A (en) Parts supply system
JP2023135365A (en) Picking system, picking method, and picking program
JP4924028B2 (en) Picking equipment
JP4026468B2 (en) Material handling equipment
JP5585836B2 (en) Goods transport equipment
CN216937121U (en) Picking system
TW202233499A (en) Picking system and method for controlling picking system
JP2005247554A (en) Picking system
JP2023023631A (en) Article storage facility, article storage method, and article storage program
JP7317489B2 (en) transportation system
JP2012104683A (en) Manufacturing line of semiconductor device, and manufacturing method of semiconductor device
JP4048426B2 (en) Goods storage equipment
JP2021024659A (en) Picking facility
JP2000001203A (en) Picking method and picking device
JP7379896B2 (en) picking equipment
JP5598415B2 (en) Picking equipment and identification code assigning method in picking equipment
WO2023167159A1 (en) Transport facility
JP7571713B2 (en) Palletizing System
JP7392686B2 (en) Goods sorting equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240227