JP2023064362A - Method for controlling switch of watt-hour meter and watt-hour meter - Google Patents

Method for controlling switch of watt-hour meter and watt-hour meter Download PDF

Info

Publication number
JP2023064362A
JP2023064362A JP2021174597A JP2021174597A JP2023064362A JP 2023064362 A JP2023064362 A JP 2023064362A JP 2021174597 A JP2021174597 A JP 2021174597A JP 2021174597 A JP2021174597 A JP 2021174597A JP 2023064362 A JP2023064362 A JP 2023064362A
Authority
JP
Japan
Prior art keywords
contact
time
current
switch
movable contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2021174597A
Other languages
Japanese (ja)
Other versions
JP7235829B1 (en
Inventor
泰亨 辻
Yasuyuki Tsuji
澄人 田川
Sumito Tagawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Toko Meter Systems Co Ltd
Original Assignee
Toshiba Toko Meter Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Toko Meter Systems Co Ltd filed Critical Toshiba Toko Meter Systems Co Ltd
Priority to JP2021174597A priority Critical patent/JP7235829B1/en
Application granted granted Critical
Publication of JP7235829B1 publication Critical patent/JP7235829B1/en
Publication of JP2023064362A publication Critical patent/JP2023064362A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Keying Circuit Devices (AREA)
  • Arc-Extinguishing Devices That Are Switches (AREA)
  • Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
  • Relay Circuits (AREA)

Abstract

To provide a method for controlling the switch of a watt-hour meter that suppresses damage to contacts and improves the reliability and life of contacts, and provide the watt-hour meter.SOLUTION: Provided is a watt-hour meter equipped with a switch 4 in which a fixed contact 7a and a movable contact 7b are provided between a power system and a load, and which supplies or cuts off the power of the power system to the load with the movable contact exerting opening or closing operation on the fixed contact by supplying or cutting off a current to an excitation coil 5. The watt-hour meter comprises: a current sensor 8 for detecting the peak value of a contact current flowing between the movable contact and the fixed contact; a control unit 22 for controlling a contact opening time when the movable contact makes opening operation from the time at which the peak value of contact current is detected, and after delaying by the contact opening time from the detected time, outputting a drive signal to the switch for the movable contact to make opening operation; and a switch control circuit 6 for outputting a drive signal to the excitation coil and reducing the contact current to zero or close to zero when the movable contact goes to an open state a prescribed time after the time at which the drive signal is outputted.SELECTED DRAWING: Figure 1

Description

本発明は、電力量計の開閉器の制御方法及び電力量計に関する。 The present invention relates to a switch control method for a power meter and a power meter.

電力量計の電力系統(Source)から負荷(Load)の間に設けられる開閉器において、開閉器に設けられた可動接点を固定接点に対して閉動作させると、可動接点と固定接点との間に電流が流れる。 In the switch installed between the power system (Source) and the load (Load) of the watt-hour meter, when the movable contact provided in the switch is closed against the fixed contact, current flows through

次に、開閉器の可動接点を固定接点に対して開動作させると、可動接点と固定接点との間に流れていた電流が遮断される。 Next, when the movable contact of the switch is opened with respect to the fixed contact, the current flowing between the movable contact and the fixed contact is interrupted.

特許第2892717号公報Japanese Patent No. 2892717 特許第3716691号公報Japanese Patent No. 3716691

しかしながら、電流がゼロではない場合には、可動接点と固定接点との間にアーク(火花)が発生し、可動接点と固定接点とへダメージを与えることになる。両方の接点に与えダメージは、アーク放電電流の大きさとアーク放電の持続時間によって決定される。 However, if the current is not zero, an arc (spark) will occur between the moving and stationary contacts, damaging the moving and stationary contacts. Damage to both contacts is determined by the magnitude of the arcing current and the duration of the arcing.

このため、電流がゼロ又はゼロ近傍のタイミングにおいて、可動接点を固定接点に対して開動作させた方が、両方の接点へのダメージを抑制し、両方の接点を保護することができる。 For this reason, opening the movable contact with respect to the fixed contact at a timing when the current is zero or near zero can suppress damage to both contacts and protect both contacts.

本発明の課題は、接点へのダメージを抑制し、接点の信頼性及び寿命を向上させることができる電力量計の開閉器の制御方法及び電力量計を提供する。 SUMMARY OF THE INVENTION An object of the present invention is to provide a switch control method for a watt hour meter and a watt hour meter that can suppress damage to contacts and improve the reliability and life of the contacts.

上記課題を解決するために、本発明に係る電力量計の開閉器の制御方法の請求項1は、電力系統と負荷との間に固定接点と可動接点が設けられ、励磁コイルへの電流の供給又は遮断により前記可動接点が前記固定接点に対して開動作と閉動作することにより前記電力系統の電力の前記負荷への供給遮断を行う電力量計の開閉器の制御方法であって、前記可動接点と前記固定接点との間に流れる接点電流のピーク値を検出し、前記接点電流の前記ピーク値を検出した時刻から前記可動接点を開動作させる接点開時間を制御し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記可動接点を開動作させる駆動信号を前記励磁コイルに出力し、前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にすることを特徴とする。 In order to solve the above problems, claim 1 of the switch control method for a watt-hour meter according to the present invention provides a fixed contact and a movable contact between the electric power system and the load, and supplies current to the exciting coil. A control method for a switch of a watt-hour meter that cuts off supply of electric power of the power system to the load by opening and closing the movable contact with respect to the fixed contact by supply or cutoff, the method comprising: detecting the peak value of the contact current flowing between the movable contact and the fixed contact; controlling the contact opening time for opening the movable contact from the time when the peak value of the contact current is detected; After delaying by the contact opening time, a drive signal for opening the movable contact is output to the exciting coil, and the movable contact is in an open state after a predetermined time has passed from the time when the driving signal is output to the exciting coil. The contact current is set to zero or near zero when

請求項2は、請求項1記載の電力量計の開閉器の制御方法であって、第1制御部が前記接点電流のピーク値の時刻を検出し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記駆動信号を前記開閉器内の第2制御部に出力し、前記第2制御部が前記駆動信号を前記励磁コイルに出力して前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にすることを特徴とする。 According to a second aspect of the present invention, there is provided a switch control method for a watt-hour meter according to the first aspect, wherein the first control unit detects the time of the peak value of the contact current, and the contact opening time is reached from the detected time. After the delay, the drive signal is output to a second control unit in the switch, and the time at which the second control unit outputs the drive signal to the excitation coil and outputs the drive signal to the excitation coil The contact current is set to zero or near zero when the movable contact is opened after a lapse of a predetermined time.

請求項3は、請求項1又は2記載の電力量計の開閉器の制御方法であって、前記所定時間は、前記開閉器毎に予め定められた一定値であり、前記接点開時間は、前記ピーク値を検出した時刻と前記所定時間と前記接点電流の周期とに基づき設定されることを特徴とする。 Claim 3 is the switch control method for a watt-hour meter according to claim 1 or 2, wherein the predetermined time is a constant value predetermined for each switch, and the contact opening time is: It is characterized in that it is set based on the time when the peak value is detected, the predetermined time, and the cycle of the contact current.

請求項4は、請求項2記載の電力量計の開閉器の制御方法であって、前記励磁コイルの特性のばらつきに対応付けした前記所定時間をメモリに記憶し、前記第1制御部は、前記所定時間を前記メモリから読み出し、読み出した前記所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき前記接点開時間を設定することを特徴とする。 According to a fourth aspect of the present invention, there is provided a switch control method for a watt-hour meter according to the second aspect, wherein the predetermined time associated with variations in the characteristics of the excitation coil is stored in a memory, and the first control unit comprises: The predetermined time is read from the memory, and the contact opening time is set based on the read predetermined time, the time when the peak value of the current is detected, and the cycle of the contact current.

請求項5は、電力系統と負荷との間に固定接点と可動接点が設けられ、励磁コイルへの電流の供給又は遮断により前記可動接点が前記固定接点に対して開動作と閉動作することにより前記電力系統の電力の前記負荷への供給遮断を行う開閉器を備えた電力量計であって、前記可動接点と前記固定接点との間に流れる接点電流のピーク値を検出する電流センサと、前記電流センサで検出した時刻から前記可動接点を開動作させる接点開時間を制御し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記可動接点を開動作させる駆動信号を前記励磁コイルに出力し、駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にする制御部とを備えることを特徴とする。 According to a fifth aspect of the present invention, a fixed contact and a movable contact are provided between a power system and a load, and the movable contact opens and closes the fixed contact by supplying or interrupting current to an exciting coil. A watt-hour meter comprising a switch that cuts off the supply of power from the power system to the load, the current sensor detecting a peak value of a contact current flowing between the movable contact and the fixed contact; A contact opening time for opening the movable contact is controlled from the time detected by the current sensor, and after delaying the contact opening time from the detected time, a driving signal for opening the movable contact is supplied to the exciting coil and a control unit that outputs the contact current to zero or near zero when the movable contact is opened after a predetermined time has elapsed from the time when the drive signal was output to the exciting coil. .

請求項6は、請求項5記載の電力量計であって、前記制御部は、前記接点電流のピーク値の時刻を検出し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記駆動信号を前記開閉器に出力する第1制御部と、前記開閉器内に設けられ、前記駆動信号を前記励磁コイルに出力して前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にする第2制御部とを備えることを特徴とする。 According to a sixth aspect of the present invention, there is provided a watt-hour meter according to the fifth aspect, wherein the control section detects the time of the peak value of the contact current, and delays the contact opening time from the detected time by the contact opening time. a first control unit provided in the switch for outputting a drive signal to the switch, and outputting the drive signal to the excitation coil after a predetermined time has elapsed from the time when the drive signal was output to the excitation coil and a second control section for setting the contact current to zero or near zero when the movable contact is in an open state.

請求項7は、請求項5又は6記載の電力量計であって、前記所定時間は、前記開閉器毎に予め定められた一定値であり、前記接点開時間は、前記ピーク値を検出した時刻と前記所定時間と前記接点電流の周期とに基づき設定されることを特徴とする。 Claim 7 is the watt-hour meter according to Claim 5 or 6, wherein the predetermined time is a constant value predetermined for each switch, and the contact opening time is the peak value detected. It is characterized in that it is set based on the time, the predetermined time, and the cycle of the contact current.

請求項8は、請求項6記載の電力量計であって、前記励磁コイルの特性のばらつきに対応付けした前記所定時間を記憶するメモリを備え、前記第1制御部は、前記所定時間を前記メモリから読み出し、読み出した前記所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき前記接点開時間を設定することを特徴とする。 According to an eighth aspect of the present invention, there is provided a watt-hour meter according to the sixth aspect, further comprising a memory for storing the predetermined time associated with variations in the characteristics of the excitation coil, wherein the first control unit stores the predetermined time The contact opening time is set based on the predetermined time read out from the memory, the time when the peak value of the current is detected, and the cycle of the contact current.

請求項1,5によれば、接点電流のピーク値を検出した時刻から可動接点を開動作させる接点開時間を制御し、検出した時刻から接点開時間だけ遅延させた後、可動接点を開動作させる駆動信号を励磁コイルに出力する。駆動信号を励磁コイルに出力した時刻から所定時間経過後に可動接点が開状態となるので、接点開時間を制御することで、可動接点が開状態となったときに接点電流をゼロ又はゼロ近傍にする。従って、接点へのダメージを抑制し、接点の信頼性及び寿命を向上させることができる。 According to claims 1 and 5, the contact opening time for opening the movable contact is controlled from the time when the peak value of the contact current is detected, and after delaying the contact opening time from the detection time, the movable contact is opened. A drive signal is output to the exciting coil. Since the moving contact opens after a predetermined time has passed since the drive signal was output to the excitation coil, by controlling the contact opening time, the contact current can be reduced to zero or near zero when the moving contact opens. do. Therefore, damage to the contacts can be suppressed, and the reliability and life of the contacts can be improved.

請求項2,6によれば、第1制御部が接点電流のピーク値を検出した時刻から接点開時間だけ遅延させた後、駆動信号を開閉器内の第2制御部に出力する。第2制御部が駆動信号を励磁コイルに出力した時刻から所定時間経過後に可動接点が開状態となったときに接点電流をゼロ又はゼロ近傍にすることができる。 According to claims 2 and 6, the drive signal is output to the second control section in the switch after the contact opening time is delayed from the time when the first control section detects the peak value of the contact current. The contact current can be reduced to zero or near zero when the movable contact is opened after a predetermined time has passed from the time when the second control unit outputs the drive signal to the exciting coil.

請求項3,7によれば、接点開時間は、ピーク値を検出した時刻と所定時間と接点電流の周期とに基づき設定されるので、可動接点が開状態となったときに接点電流がゼロ又はゼロ近傍にすることができる。 According to claims 3 and 7, the contact opening time is set based on the time when the peak value is detected, the predetermined time, and the cycle of the contact current. or can be near zero.

請求項4,8によれば、励磁コイルの特性のばらつきに対応した所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき接点開時間を設定するので、励磁コイルの特性がばらついても可動接点が開状態となったときに接点電流がゼロ又はゼロ近傍にすることができる。 According to claims 4 and 8, the contact opening time is set based on the predetermined time corresponding to the variation in the characteristics of the exciting coil, the time when the peak value of the current is detected, and the cycle of the contact current. Even if there is variation, the contact current can be zero or near zero when the movable contact is opened.

本発明の第1の実施形態に係る電力量計を示す図である。1 is a diagram showing a watt-hour meter according to a first embodiment of the present invention; FIG. 本発明の第1の実施形態に係る電力量計の開閉器閉時の接点状態と接点電流波形を示す図である。FIG. 4 is a diagram showing a contact state and a contact current waveform when the switch of the watt-hour meter according to the first embodiment of the present invention is closed. 本発明の第1の実施形態に係る電力量計の開閉器の可動接点を開動作させた時の接点状態と接点間で発生するアーク放電電流波形を示す図である。FIG. 5 is a diagram showing a contact state and an arc discharge current waveform generated between the contacts when the movable contact of the switch of the watt-hour meter according to the first embodiment of the present invention is opened. 本発明の第1の実施形態に係る電力量計の開閉器において接点電流がゼロの瞬間に可動接点を開動作させたときに、アークが一番発生しないことを示す図である。FIG. 5 is a diagram showing that the arc is least generated when the movable contact is opened at the instant when the contact current is zero in the switch of the watt-hour meter according to the first embodiment of the present invention. の第1の実施形態に係る電力量計の開閉器において接点電流がゼロを過ぎた直後の時刻に可動接点を開動作させたとき、アーク時間が一番長くなることを示す図である。1 is a diagram showing that the arc time is the longest when the movable contact is opened immediately after the contact current passes zero in the switch of the watt-hour meter according to the first embodiment of FIG. 本発明の第1の実施形態に係る電力量計の開閉器の接点におけるアークを抑制した可動接点の開動作の制御を示す図である。FIG. 4 is a diagram showing control of the opening operation of the movable contact that suppresses arcing at the contact of the switch of the watt-hour meter according to the first embodiment of the present invention; 本発明の第2の実施形態に係る電力量計の開閉器の接点におけるアークを抑制した可動接点の開動作の制御を示す図である。FIG. 10 is a diagram showing control of the opening operation of the movable contact that suppresses arcing at the contact of the switch of the watt-hour meter according to the second embodiment of the present invention; 本発明の第3の実施形態に係る電力量計の開閉器の接点におけるアークを抑制した可動接点の開動作の制御を示す図である。FIG. 10 is a diagram showing control of opening operation of a movable contact that suppresses arcing at the contact of the switch of the watt-hour meter according to the third embodiment of the present invention;

以下、本発明の実施の形態に係る電力量計の開閉器の接点制御方法及び電力量計について、図面を参照しながら詳細に説明する。 Hereinafter, a contact control method for a switch of a watt hour meter and a watt hour meter according to an embodiment of the present invention will be described in detail with reference to the drawings.

(第1の実施形態)
図1に第1の実施形態に係る電力量計の構成図を示す。電力量計1は、電力系統1S,2S(Source側)の系統電圧と電流を検出し、検出された電圧と電流とに基づき電力量を演算する。電力系統1Sは、商用周波数(50Hz又は60Hz)の交流電圧及び交流電流を負荷に供給する。
(First embodiment)
FIG. 1 shows a configuration diagram of a power meter according to the first embodiment. The watt-hour meter 1 detects the system voltage and current of the power systems 1S and 2S (Source side), and calculates the electric energy based on the detected voltage and current. The power system 1S supplies AC voltage and AC current of commercial frequency (50 Hz or 60 Hz) to loads.

電力量計1は、図1に示すようにCPU2(中央処理装置)、電圧信号変換回路3、開閉器4、開閉器制御回路6、電流センサ8、電流信号変換回路10、電源回路11を備えている。 The watt-hour meter 1 includes a CPU 2 (central processing unit), a voltage signal conversion circuit 3, a switch 4, a switch control circuit 6, a current sensor 8, a current signal conversion circuit 10, and a power supply circuit 11, as shown in FIG. ing.

電圧信号変換回路3は、電力系統1S,2S(Source側)のアナログ信号の系統電圧をデジタル信号の電圧信号に変換する。CPU2は、演算部21、制御部22、メモリ23を備える。 The voltage signal conversion circuit 3 converts the system voltage of analog signals of the electric power systems 1S and 2S (Source side) into voltage signals of digital signals. The CPU 2 includes an arithmetic unit 21 , a control unit 22 and a memory 23 .

演算部21は、電圧信号変換回路3からの電圧信号と電流センサ8からの電流信号とを入力し、電圧信号の電圧と電流信号の電流とを乗算することにより電力量を演算する。メモリ23は、後述する接点開時間Δt1を記憶する。 The calculation unit 21 receives the voltage signal from the voltage signal conversion circuit 3 and the current signal from the current sensor 8, and multiplies the voltage of the voltage signal by the current of the current signal to calculate the power consumption. The memory 23 stores a contact opening time Δt1, which will be described later.

制御部22は、第1制御部に対応し、メモリ23から接点開時間Δt1を読み出し、電流信号変換回路10を介して電流センサ8から入力される接点電流に基づき接点電流のピーク値とピーク値の時刻を検出し、検出した時刻から接点開時間Δt1だけ遅延させた後、励磁コイル5を駆動するための駆動信号を開閉器制御回路6に出力する。 The control unit 22 corresponds to the first control unit, reads out the contact opening time Δt1 from the memory 23, and calculates the peak value and the peak value of the contact current based on the contact current input from the current sensor 8 via the current signal conversion circuit 10. is detected, and after delaying the contact opening time Δt1 from the detected time, a drive signal for driving the exciting coil 5 is output to the switch control circuit 6 .

電流センサ8は、電力系統1Sと負荷1Lとの間の電線9に設けられ、可動接点7bが固定接点7aに対して閉動作している時に電力系統1Sから負荷1Lに流れる接点電流を検出する。電流センサ8としては、磁気センサや変流器(CT)やシャント抵抗等がある。 The current sensor 8 is provided on the electric wire 9 between the electric power system 1S and the load 1L, and detects contact current flowing from the electric power system 1S to the load 1L when the movable contact 7b is closed with respect to the fixed contact 7a. . Current sensor 8 includes a magnetic sensor, a current transformer (CT), a shunt resistor, and the like.

電流信号変換回路10は、電流センサ8で検出されたアナログ信号の電流信号をデジタル信号の電流信号に変換し、CPU2に出力する。電源回路11は、CPU2と開閉器制御回路6に電源を供給する。 The current signal conversion circuit 10 converts the analog current signal detected by the current sensor 8 into a digital current signal and outputs the digital current signal to the CPU 2 . The power supply circuit 11 supplies power to the CPU 2 and the switch control circuit 6 .

開閉器制御回路6は、CPU2からの駆動信号に基づき駆動信号により開閉器4内の励磁コイル5を駆動する。 The switch control circuit 6 drives the exciting coil 5 in the switch 4 with a drive signal based on the drive signal from the CPU 2 .

開閉器4は、ラッチングリレーからなり、励磁コイル5と、電力系統1Sと負荷1Lとの間に固定接点7aと可動接点7bとが設けられ、可動接点7bが固定接点7aに対して開閉することにより電力系統の電力の負荷1Lへの供給遮断を行う。 The switch 4 consists of a latching relay, and is provided with a fixed contact 7a and a movable contact 7b between the excitation coil 5, the power system 1S and the load 1L, and the movable contact 7b opens and closes with respect to the fixed contact 7a. cuts off the supply of power from the power system to the load 1L.

励磁コイル5に励磁電流を一方向に流すと、電磁力が発生して、電磁力により可動接点7bが固定接点7aに対して閉動作する。一方、励磁コイル5に励磁電流を一方向とは逆方向に流すと、可動接点7bが固定接点7aに対して開動作する。 When an exciting current is passed through the exciting coil 5 in one direction, an electromagnetic force is generated, and the electromagnetic force causes the movable contact 7b to close with respect to the fixed contact 7a. On the other hand, when an exciting current is passed through the exciting coil 5 in the direction opposite to the one direction, the movable contact 7b opens with respect to the fixed contact 7a.

図2は、本発明の第1の実施形態に係る電力量計の開閉器の閉動作時の接点状態と接点電流波形を示す図である。図2(a)に示すように、可動接点7bが固定接点7aに閉動作している時には、負荷側で電力を消費している場合であり、図2(b)に示すように、商用周波数の電流が流れている。 FIG. 2 is a diagram showing the contact state and the contact current waveform during the closing operation of the switch of the watt-hour meter according to the first embodiment of the present invention. As shown in FIG. 2(a), when the movable contact 7b is closing to the fixed contact 7a, power is consumed on the load side. current is flowing.

図3は、本発明の第1の実施形態に係る電力量計の開閉器の開動作時の可動接点7bを開動作させた時の接点状態とアーク放電電流波形を示す図である。図3(a)に示すように、可動接点7bが固定接点7aに開動作させた時、図3(b)に示すように、電流がゼロでない場合には、固定接点7aから可動接点7bにアーク(火花)が発生する。 FIG. 3 is a diagram showing the contact state and the arc discharge current waveform when the movable contact 7b is opened during the opening operation of the switch of the watt hour meter according to the first embodiment of the present invention. As shown in FIG. 3(a), when the movable contact 7b is caused to open to the fixed contact 7a, as shown in FIG. 3(b), if the current is not zero, a An arc (spark) is generated.

アークが発生した場合、図3(b)に示すように、可動接点7bの開動作の時刻t10から電流がゼロになる時刻t11(ゼロクロス)まで、アークが継続する。従って、図4に示すように、接点電流がゼロになる時刻t12に可動接点7bを開動作させたとき、アークが一番発生しない。 When an arc occurs, as shown in FIG. 3B, the arc continues from time t10 when the movable contact 7b is opened to time t11 (zero cross) when the current becomes zero. Therefore, as shown in FIG. 4, the arc is least generated when the movable contact 7b is opened at time t12 when the contact current becomes zero.

上記とは逆に、図5に示すように、接点電流がゼロを過ぎた直後の時刻t13に可動接点7bを開動作させたときには、時刻t13から、接点電流がゼロクロスする時刻t14までアークが発生し、アーク時間が一番長くなる。 Contrary to the above, as shown in FIG. 5, when the movable contact 7b is opened at time t13 immediately after the contact current passes zero, an arc is generated from time t13 to time t14 when the contact current crosses zero. and the arc time is the longest.

このように開閉器4の可動接点7bの開動作のタイミングを制御しない場合には、可動接点7bの開動作のタイミングは図4、図5のいずれかのタイミングとなる。 When the timing of the opening operation of the movable contact 7b of the switch 4 is not controlled in this manner, the timing of the opening operation of the movable contact 7b is either timing shown in FIG. 4 or FIG.

アークは光と熱を大量に発生させ、アーク時間が長ければ長いほど、熱も発生する。可動接点7bの一度の開動作でのアーク時間が電流の1/4波であった場合でも、可動接点7bと固定接点7aとは、発生する熱によって変形してしまう。 Arcs produce large amounts of light and heat, and the longer the arcing time, the more heat is produced. Even if the arc time in one opening operation of the movable contact 7b is 1/4 wave of the current, the movable contact 7b and the fixed contact 7a are deformed by the generated heat.

可動接点7bの開動作を多数回繰り返すことで可動接点7bと固定接点7aのダメージが蓄積し、いずれ接点が故障に至る。 By repeating the opening operation of the movable contact 7b many times, the damage to the movable contact 7b and the fixed contact 7a accumulates, eventually leading to failure of the contacts.

接点が故障に至るまでの開閉回数寿命は、アーク時間が一定であれば、接点部分の材料や構造を強化するしかない。アークが発生しないまたはアークが発生しても短い時間で常に可動接点7bを開動作制御できるならば、接点のダメージが軽減され、故障までの寿命(開閉回数)を延ばすことができる。 If the arc time is constant, the only way to improve the life of the number of switching operations until the contact fails is to strengthen the material and structure of the contact. If the movable contact 7b can be always controlled to open in a short time without arcing or even if an arc occurs, the damage to the contact can be reduced and the service life (opening/closing times) until failure can be extended.

そこで、第1の実施形態に係る電力量計においては、制御部22が、電流センサ8からの接点電流(図6(b)に示す電流波形)のピーク値とピーク値の時刻t1を検出し、検出した時刻から接点開時間(t2-t1=Δt1)だけ遅延させた時刻t2に、励磁コイル5を駆動するための駆動信号(図6(a)に示すCPU2からの制御信号)を開閉器制御回路6に出力する。接点開時間Δt1は、図6(b)に示す電流がゼロクロスで可動接点7bを開動作させるための調整時間である。 Therefore, in the watt-hour meter according to the first embodiment, the control unit 22 detects the peak value of the contact current from the current sensor 8 (the current waveform shown in FIG. 6B) and the time t1 of the peak value. , at time t2 delayed by the contact opening time (t2-t1=Δt1) from the time of detection, the drive signal for driving the exciting coil 5 (control signal from the CPU 2 shown in FIG. 6A) is sent to the switch. Output to the control circuit 6 . The contact opening time Δt1 is an adjustment time for opening the movable contact 7b when the current shown in FIG. 6(b) crosses zero.

開閉器制御回路6は、制御部22からの駆動信号により励磁コイル5を駆動する。時刻t2から電流がゼロクロスする時刻t3までの所定時間Δt2は、励磁コイル5に電流が流れて可動接点7bが開動作(離れる)までの時間である。所定時間Δt2は、開閉器4毎に概ね一定値である。 The switch control circuit 6 drives the exciting coil 5 according to the drive signal from the control section 22 . A predetermined time Δt2 from time t2 to time t3 at which the current crosses zero is the time until the current flows through the exciting coil 5 and the movable contact 7b opens (separates). The predetermined time Δt2 is approximately a constant value for each switch 4 .

接点開時間Δt1を考慮せずに可動接点7bの開動作を制御した場合には、前述したように図4、図5のようなアーク時間となる。 If the opening operation of the movable contact 7b is controlled without considering the contact opening time .DELTA.t1, arc times as shown in FIGS. 4 and 5 are obtained as described above.

これに対して、接点開時間Δt1を制御して電流のゼロクロスを狙って制御した場合には、図4に示すようにアークの発生が抑制でき、これによって、接点へのダメージが抑制できる。 On the other hand, when the contact opening time Δt1 is controlled to aim at the zero crossing of the current, arc generation can be suppressed as shown in FIG. 4, thereby suppressing damage to the contacts.

接点開時間Δt1の開始時刻の基準については、図6(b)に示すように電流波形のピーク値としている。電流波形は、様々な形となるため、電流のピーク値を基準にした制御が好適である。 The peak value of the current waveform, as shown in FIG. 6B, is used as the reference for the start time of the contact opening time Δt1. Since current waveforms take various forms, control based on the current peak value is preferable.

接点開時間Δt1は、電流のピーク値を検出した時刻と所定時間Δt2と接点電流の周期とに基づき設定される。電力系統の交流電源の商用周波数が例えば50Hzとすると、図6(b)に示す電流波形の周期は、20msである。周期が20msであることから、時刻t1から時刻t3までの時間は、35msである。 The contact opening time Δt1 is set based on the time when the peak value of the current is detected, the predetermined time Δt2, and the cycle of the contact current. Assuming that the commercial frequency of the AC power source of the electric power system is 50 Hz, the period of the current waveform shown in FIG. 6(b) is 20 ms. Since the period is 20 ms, the time from time t1 to time t3 is 35 ms.

所定時間Δt2は、開閉器4毎に概ね一定値で既知であることから、所定時間Δt2が例えば、23msであるとすると、接点開時間Δt1は、12msとなる。 Since the predetermined time Δt2 is known as a substantially constant value for each switch 4, if the predetermined time Δt2 is, for example, 23 ms, the contact opening time Δt1 is 12 ms.

従って、ピーク値を検出した時刻t1から12ms遅延した時刻t2に、駆動信号を励磁コイル5に出力すると、所定時間Δt2経過時の時刻t3に可動接点7bが開動作し、その時に電流がゼロクロスする。 Therefore, when the driving signal is output to the excitation coil 5 at time t2, which is 12 ms after the time t1 when the peak value is detected, the movable contact 7b opens at time t3 after the lapse of the predetermined time Δt2, and the current crosses zero at that time. .

従って、アークの発生が大幅に抑制でき、接点へのダメージが抑制できる。これにより、接点の信頼性及び寿命を向上させることができる。 Therefore, arc generation can be greatly suppressed, and damage to the contacts can be suppressed. This can improve the reliability and life of the contacts.

(第2の実施形態)
次に、第2の実施形態に係る電力量計について説明する。同じ種類の開閉器4を大量生産した場合に、開閉器4内の励磁コイル5の特性がばらつく。この場合には、所定時間Δt2は、一定値ではなく、励磁コイル5毎にばらつき、変化する。
(Second embodiment)
Next, a watt-hour meter according to a second embodiment will be described. When the switches 4 of the same type are mass-produced, the characteristics of the exciting coils 5 in the switches 4 vary. In this case, the predetermined time .DELTA.t2 is not a constant value, but varies and changes for each exciting coil 5. FIG.

しかし、第1の実施形態に係る電力量計のように、一定値の時間Δt2を用いて接点開時間Δt1を設定すると、可動接点7bが開動作した時に電流がゼロクロスせず、アークの発生が抑制できない。 However, if the contact opening time Δt1 is set using a constant time Δt2 as in the watt-hour meter according to the first embodiment, the current does not cross zero when the movable contact 7b is opened, and an arc is generated. Uncontrollable.

即ち、励磁コイル5に電流が流れて接点が動作するまでの時間Δt2にはバラツキがある。このため、第2の実施形態に係る電力量計では、統計的手法を用い、所定時間Δt2の平均時間とバラツキを加味して、時間Δt2を固定値に設定している。 That is, the time Δt2 from when the current flows through the exciting coil 5 to when the contact operates has variations. For this reason, in the watt-hour meter according to the second embodiment, the time Δt2 is set to a fixed value by using a statistical method, taking into account the average time and variations of the predetermined time Δt2.

あるメーカーの開閉器において、制御信号を受けてから接点が「開」になるまでの所定時間(コイル励磁時間)を大量に測定したとき、その測定結果が正規分布に従うものと仮定する。平均時間=Δt2av, 標準偏差=σと仮定する。 It is assumed that when measuring a large amount of predetermined time (coil excitation time) from receiving a control signal to opening a contact in a switch manufactured by a certain manufacturer, the measurement results follow a normal distribution. Assume mean time=Δt2av, standard deviation=σ.

複数個nの開閉器4-1~4-nの励磁コイル5-1~5-nの特性のばらつきにより、所定時間Δt2-1~Δt2-nもばらつくので、制御部22が所定時間Δt2-1~Δt2-nの平均時間Δt2avを求める。平均時間Δt2avは、式(1)で求められる。
Δt2av=(Δt2-1+Δt2-2+Δt2-3…Δt2-n)/n …(1)
理想としては、時間が最も長い(ここではΔt2av+3σとして扱う)開閉器であっても電流がゼロクロスする直前で開閉器が「開」状態になることが望ましい。即ち、図7に示すようになる。
Due to variations in the characteristics of the exciting coils 5-1 to 5-n of the plurality of n switches 4-1 to 4-n, the predetermined times Δt2-1 to Δt2-n also vary. Find the average time Δt2av of 1 to Δt2-n. The average time Δt2av is obtained by Equation (1).
Δt2av=(Δt2−1+Δt2−2+Δt2−3 …Δt2−n)/n (1)
Ideally, even if the switch has the longest time (here, treated as Δt2av+3σ), it is desirable that the switch should be in the “open” state just before the current crosses zero. That is, it becomes as shown in FIG.

この場合、Δt2=Δt2av+3σを固定値として設定し、メモリ23に所定時間Δt2=Δt2av+3σを記憶する。なお、管理上限値を+3σにするか或いは他の値にするかは、採用する開閉器の実態に合わせて決めれば良い。 In this case, Δt2=Δt2av+3σ is set as a fixed value, and the predetermined time Δt2=Δt2av+3σ is stored in the memory 23 . Whether the control upper limit value is set to +3σ or another value may be determined according to the actual state of the switch to be adopted.

制御部22は、メモリ23から読み出した所定時間Δt2=Δt2av+3σと電流のピーク値を検出した時刻と接点電流の周期とに基づき平均値化された接点開時間Δt1avを設定する。 The control unit 22 sets the averaged contact opening time Δt1av based on the predetermined time Δt2=Δt2av+3σ read from the memory 23, the time when the peak value of the current is detected, and the period of the contact current.

従って、ピーク値を検出した時刻から接点開時間Δt1avだけ遅延した時刻に、駆動信号を励磁コイル5に出力すると、時間Δt2=Δt2av+3σの時間経過時に可動接点7bが開動作し、その時に電流がゼロクロス又はゼロクロス近傍になる。従って、アークの発生が大幅に抑制でき、接点へのダメージが抑制できる。これにより、接点の信頼性及び寿命を向上させることができる。 Therefore, when the drive signal is output to the exciting coil 5 at a time delayed by the contact opening time Δt1av from the time when the peak value is detected, the movable contact 7b opens when the time Δt2=Δt2av+3σ elapses, and the current becomes zero cross or near zero cross. Therefore, arc generation can be greatly suppressed, and damage to the contacts can be suppressed. This can improve the reliability and life of the contacts.

また、使用する開閉器の各々の個体に合わせて時間Δt2を設定する必要がなく、電力量計内蔵のメモリ23で所定時間Δt2=Δt2av+3σを固定値として扱うため、電力量計の製造性が良い。 In addition, there is no need to set the time Δt2 according to each individual switch to be used, and the memory 23 built into the watt-hour meter handles the predetermined time Δt2=Δt2av+3σ as a fixed value, so the manufacturability of the watt-hour meter is good.

(第3の実施形態)
次に、第3の実施形態に係る電力量計について説明する。第2の実施形態に係る電力量計で説明したように、所定時間Δt2は、励磁コイル5毎にばらつく。所定時間Δt2のバラツキが大きい場合、所定時間Δt2を固定値として扱うと、図8に示すように、一部開閉器の制御が電流ピークより前の接点動作となってしまい、アーク時間が伸びて信頼性を損なうこととなる。
(Third embodiment)
Next, a power meter according to the third embodiment will be described. As described for the watt-hour meter according to the second embodiment, the predetermined time Δt2 varies for each exciting coil 5 . If the predetermined time Δt2 has a large variation and the predetermined time Δt2 is treated as a fixed value, as shown in FIG. Reliability will be lost.

このため、開閉器における所定時間Δt2を個別に測定し、その結果をそれぞれの電力量計内蔵のメモリ23に保存し、制御時にメモリ23から所定時間Δt2を読み出して用いる。 Therefore, the predetermined time Δt2 in the switch is individually measured, the result is stored in the memory 23 built into each watt-hour meter, and the predetermined time Δt2 is read out from the memory 23 and used during control.

即ち、第3の実施形態に係る電力量計では、制御部22が、所定時間Δt2のばらつきに応じて、接点開時間Δt1を変化させる制御を行う。 That is, in the watt-hour meter according to the third embodiment, the control unit 22 performs control to change the contact opening time Δt1 according to variations in the predetermined time Δt2.

この制御方法は、開閉器毎の各々の励磁コイル5に電流を流し、各々の所定時間Δt2を測定し、測定された各々の所定時間Δt2をCPU2内のメモリ23に記憶する。具体的には、複数個の開閉器4-1~4-nにおいて、励磁コイル5-1~5-nの特性のばらつきに対応付けした所定時間Δt2-1~Δt2-nをメモリ23に記憶する。 In this control method, a current is passed through each exciting coil 5 of each switch, each predetermined time Δt2 is measured, and each measured predetermined time Δt2 is stored in the memory 23 in the CPU 2 . Specifically, in the plurality of switches 4-1 to 4-n, the memory 23 stores predetermined times Δt2-1 to Δt2-n associated with variations in the characteristics of the exciting coils 5-1 to 5-n. do.

次に、制御部22は、開閉器4-1では、励磁コイル5-1の特性のばらつきに対応付けした所定時間Δt2-1をメモリ23から読み出す。制御部22は、所定時間Δt2-1と電流のピーク値を検出した時刻と接点電流の周期とに基づき接点開時間Δt1-1を設定する。 Next, in the switch 4-1, the controller 22 reads from the memory 23 the predetermined time Δt2-1 associated with the variation in the characteristics of the exciting coil 5-1. The control unit 22 sets the contact opening time Δt1-1 based on the predetermined time Δt2-1, the time when the peak value of the current is detected, and the cycle of the contact current.

また、制御部22は、開閉器4-nでは、励磁コイル5-nの特性のばらつきに対応付けした所定時間Δt2-nをメモリ23から読み出す。制御部22は、所定時間Δt2-nと電流のピーク値を検出した時刻と接点電流の周期とに基づき接点開時間Δt1-nを設定する。 In the switch 4-n, the controller 22 reads out from the memory 23 the predetermined time Δt2-n associated with the variation in the characteristics of the excitation coil 5-n. The control unit 22 sets the contact opening time Δt1-n based on the predetermined time Δt2-n, the time when the peak value of the current is detected, and the cycle of the contact current.

このように第3の実施形態に係る電力量計によれば、制御部22が、励磁コイル5の特性のばらつきに対応した所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき接点開時間を設定する。 As described above, according to the watt-hour meter according to the third embodiment, the control unit 22 controls the predetermined time corresponding to the variation in the characteristics of the exciting coil 5, the time when the peak value of the current is detected, and the cycle of the contact current. Set the contact opening time based on

従って、励磁コイル5の特性がばらついても可動接点7bが開状態となったときに接点電流がゼロ又はゼロ近傍にすることができる。これにより、アークの発生が大幅に抑制でき、接点へのダメージが抑制でき、接点の信頼性及び寿命を向上させることができる。また、開閉器のバラツキを気にしなくて済むので、精度良い接点開制御が行える。 Therefore, even if the characteristics of the exciting coil 5 vary, the contact current can be zero or near zero when the movable contact 7b is opened. As a result, arcing can be greatly suppressed, damage to the contacts can be suppressed, and the reliability and life of the contacts can be improved. In addition, since there is no need to worry about variations in the switches, contact opening control can be performed with high accuracy.

1 電力量計
2,2a CPU
3 電圧信号変換回路
4 開閉器
5 励磁コイル
6 開閉器制御回路
7a 固定接点
7b 可動接点
8 電流センサ
9 電線
10 電流信号変換回路
11 電源回路
21 演算部
22 制御部
23 メモリ
1 watt hour meter 2, 2a CPU
3 Voltage signal conversion circuit 4 Switch 5 Exciting coil 6 Switch control circuit 7a Fixed contact 7b Movable contact 8 Current sensor 9 Electric wire 10 Current signal conversion circuit 11 Power supply circuit 21 Operation unit 22 Control unit 23 Memory

上記課題を解決するために、本発明に係る電力量計の開閉器の制御方法の請求項1は、電力系統と負荷との間に固定接点と可動接点が設けられ、励磁コイルへの電流の供給又は遮断により前記可動接点が前記固定接点に対して開動作と閉動作することにより前記電力系統の電力の前記負荷への供給遮断を行う電力量計の開閉器の制御方法であって、前記可動接点と前記固定接点との間に流れる接点電流のピーク値を検出し、制御部が前記接点電流のピーク値の時刻を検出し、前記接点電流の前記ピーク値を検出した時刻から前記可動接点を開動作させる接点開時間だけ遅延させた時刻に、前記可動接点を開動作させる駆動信号を開閉器制御回路に出力し、前記開閉器制御回路が前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過した時刻に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にすることを特徴とする。 In order to solve the above problems, claim 1 of the switch control method for a watt-hour meter according to the present invention provides a fixed contact and a movable contact between the electric power system and the load, and supplies current to the exciting coil. A control method for a switch of a watt-hour meter that cuts off supply of electric power of the power system to the load by opening and closing the movable contact with respect to the fixed contact by supply or cutoff, the method comprising: A peak value of a contact current flowing between the movable contact and the fixed contact is detected, a control unit detects the time of the peak value of the contact current, and the movable contact is detected from the time when the peak value of the contact current is detected. A drive signal for opening the movable contact is output to the switch control circuit at the time delayed by the contact opening time for the opening operation, and from the time when the switch control circuit outputs the drive signal to the excitation coil The contact current is set to zero or near zero when the movable contact is opened after a predetermined time has elapsed .

請求項は、請求項記載の電力量計の開閉器の制御方法であって、前記所定時間は、前記開閉器毎に予め定められた一定値であり、前記接点開時間は、前記ピーク値を検出した時刻と前記所定時間と前記接点電流の周期とに基づき設定されることを特徴とする。 According to a second aspect of the present invention, there is provided the switch control method for a watt-hour meter according to the first aspect, wherein the predetermined time is a constant value predetermined for each switch, and the contact opening time is equal to the peak time. It is characterized in that it is set based on the time when the value is detected, the predetermined time, and the cycle of the contact current.

請求項は、請求項記載の電力量計の開閉器の制御方法であって、前記励磁コイルの特性のばらつきに対応付けした前記所定時間をメモリに記憶し、前記制御部は、前記所定時間を前記メモリから読み出し、読み出した前記所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき前記接点開時間を設定することを特徴とする。 According to a third aspect of the present invention, there is provided a switch control method for a watt-hour meter according to the first aspect , wherein the predetermined time associated with variations in the characteristics of the excitation coil is stored in a memory, and the control unit comprises: The predetermined time is read from the memory, and the contact opening time is set based on the read predetermined time, the time when the peak value of the current is detected, and the cycle of the contact current.

請求項は、電力系統と負荷との間に固定接点と可動接点が設けられ、励磁コイルへの電流の供給又は遮断により前記可動接点が前記固定接点に対して開動作と閉動作することにより前記電力系統の電力の前記負荷への供給遮断を行う開閉器を備えた電力量計であって、前記可動接点と前記固定接点との間に流れる接点電流のピーク値を検出する電流センサと、前記接点電流のピーク値の時刻を検出し、前記接点電流のピーク値を検出した時刻から前記可動接点を開動作させる接点開時間だけ遅延させた時刻に、前記可動接点を開動作させる駆動信号を開閉器制御回路に出力する制御部とを備え、前記開閉器制御回路が、前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過した時刻に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にすることを特徴とする。 According to a fourth aspect of the present invention, a fixed contact and a movable contact are provided between the electric power system and the load, and the movable contact opens and closes the fixed contact by supplying or interrupting current to an exciting coil. A watt-hour meter comprising a switch that cuts off the supply of power from the power system to the load, the current sensor detecting a peak value of a contact current flowing between the movable contact and the fixed contact; The time of the peak value of the contact current is detected, and a driving signal for opening the movable contact is generated at a time delayed by the contact opening time for opening the movable contact from the time of detection of the peak value of the contact current . a control unit for outputting to a switch control circuit , when the movable contact is opened at a time after a predetermined time has elapsed from the time when the switch control circuit outputs the drive signal to the excitation coil. The contact current is set to zero or near zero.

請求項は、請求項記載の電力量計であって、前記所定時間は、前記開閉器毎に予め定められた一定値であり、前記接点開時間は、前記ピーク値を検出した時刻と前記所定時間と前記接点電流の周期とに基づき設定されることを特徴とする。 A fifth aspect of the present invention is the watt-hour meter according to the fourth aspect, wherein the predetermined time is a constant value predetermined for each switch, and the contact opening time is the time when the peak value is detected. It is characterized in that it is set based on the predetermined time and the cycle of the contact current.

請求項は、請求項記載の電力量計であって、前記励磁コイルの特性のばらつきに対応付けした前記所定時間を記憶するメモリを備え、前記制御部は、前記所定時間を前記メモリから読み出し、読み出した前記所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき前記接点開時間を設定することを特徴とする。 According to a sixth aspect of the present invention, there is provided a watt-hour meter according to the fourth aspect, further comprising a memory for storing the predetermined time associated with variations in the characteristics of the excitation coil, wherein the control section stores the predetermined time The contact opening time is set based on the predetermined time read out from the memory, the time when the peak value of the current is detected, and the cycle of the contact current.

請求項1,によれば、接点電流のピーク値を検出した時刻から可動接点を開動作させる接点開時間だけ遅延させた時刻に、可動接点を開動作させる駆動信号を開閉器制御回路に出力する。開閉器制御回路が駆動信号を励磁コイルに出力した時刻から所定時間経過した時刻に可動接点が開状態となるので、接点開時間を制御することで、可動接点が開状態となったときに接点電流をゼロ又はゼロ近傍にする。従って、接点へのダメージを抑制し、接点の信頼性及び寿命を向上させることができる。 According to claims 1 and 4 , the drive signal for opening the movable contact is output to the switch control circuit at the time delayed by the contact opening time for opening the movable contact from the time when the peak value of the contact current is detected. do. Since the movable contact is opened at a predetermined time after the switch control circuit outputs the drive signal to the excitation coil, by controlling the contact opening time, the contact is opened when the movable contact is opened. Make the current zero or near zero. Therefore, damage to the contacts can be suppressed, and the reliability and life of the contacts can be improved.

請求項によれば、接点開時間は、ピーク値を検出した時刻と所定時間と接点電流の周期とに基づき設定されるので、可動接点が開状態となったときに接点電流がゼロ又はゼロ近傍にすることができる。 According to claims 2 and 5 , the contact opening time is set based on the time when the peak value is detected, the predetermined time, and the cycle of the contact current. or can be near zero.

請求項によれば、励磁コイルの特性のばらつきに対応した所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき接点開時間を設定するので、励磁コイルの特性がばらついても可動接点が開状態となったときに接点電流がゼロ又はゼロ近傍にすることができる。 According to claims 3 and 6 , the contact opening time is set based on the predetermined time corresponding to the variation in the characteristics of the exciting coil, the time when the peak value of the current is detected, and the cycle of the contact current. Even if there is variation, the contact current can be zero or near zero when the movable contact is opened.

Claims (8)

電力系統と負荷との間に固定接点と可動接点が設けられ、励磁コイルへの電流の供給又は遮断により前記可動接点が前記固定接点に対して開動作と閉動作することにより前記電力系統の電力の前記負荷への供給遮断を行う電力量計の開閉器の制御方法であって、
前記可動接点と前記固定接点との間に流れる接点電流のピーク値を検出し、
前記接点電流の前記ピーク値を検出した時刻から前記可動接点を開動作させる接点開時間を制御し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記可動接点を開動作させる駆動信号を前記励磁コイルに出力し、
前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にすることを特徴とする電力量計の開閉器の制御方法。
A fixed contact and a movable contact are provided between an electric power system and a load, and the electric power of the electric power system is generated by opening and closing the movable contact with respect to the fixed contact by supplying or interrupting current to an exciting coil. A control method for a switch of a watt-hour meter that cuts off the supply to the load of
detecting a peak value of a contact current flowing between the movable contact and the fixed contact;
A drive signal for controlling a contact opening time for opening the movable contact from the time when the peak value of the contact current is detected, delaying the contact opening time from the detection time by the contact opening time, and then opening the movable contact. to the excitation coil,
Control of a switch for a watt-hour meter, characterized in that the contact current is set to zero or near zero when the movable contact is opened after a predetermined time has passed from the time when the drive signal is output to the excitation coil. Method.
第1制御部が前記接点電流のピーク値の時刻を検出し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記駆動信号を前記開閉器内の第2制御部に出力し、
前記第2制御部が前記駆動信号を前記励磁コイルに出力して前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にすることを特徴とする請求項1記載の電力量計の開閉器の制御方法。
After the first control unit detects the time of the peak value of the contact current and delays the contact opening time from the detected time, the drive signal is output to the second control unit in the switch,
When the second control unit outputs the drive signal to the excitation coil and outputs the drive signal to the excitation coil after a lapse of a predetermined time, the contact current is reduced to zero or when the movable contact is opened. 2. The method of controlling a switch of a watt hour meter according to claim 1, wherein the switch is set to near zero.
前記所定時間は、前記開閉器毎に予め定められた一定値であり、前記接点開時間は、前記ピーク値を検出した時刻と前記所定時間と前記接点電流の周期とに基づき設定されることを特徴とする請求項1又は2記載の電力量計の開閉器の制御方法。 The predetermined time is a constant value predetermined for each switch, and the contact opening time is set based on the time when the peak value is detected, the predetermined time, and the cycle of the contact current. 3. The method for controlling a switch of a watt hour meter according to claim 1 or 2. 前記励磁コイルの特性のばらつきに対応付けした前記所定時間をメモリに記憶し、
前記第1制御部は、前記所定時間を前記メモリから読み出し、読み出した前記所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき前記接点開時間を設定することを特徴とする請求項2記載の電力量計の開閉器の制御方法。
storing in a memory the predetermined time associated with variations in the characteristics of the exciting coil;
The first control unit reads the predetermined time from the memory, and sets the contact opening time based on the read predetermined time, the time when the peak value of the current is detected, and the cycle of the contact current. 3. The method for controlling a switch of a watt hour meter according to claim 2.
電力系統と負荷との間に固定接点と可動接点が設けられ、励磁コイルへの電流の供給又は遮断により前記可動接点が前記固定接点に対して開動作と閉動作することにより前記電力系統の電力の前記負荷への供給遮断を行う開閉器を備えた電力量計であって、
前記可動接点と前記固定接点との間に流れる接点電流のピーク値を検出する電流センサと、
前記電流センサで検出した時刻から前記可動接点を開動作させる接点開時間を制御し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記可動接点を開動作させる駆動信号を前記励磁コイルに出力し、駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にする制御部と、
を備えることを特徴とする電力量計。
A fixed contact and a movable contact are provided between an electric power system and a load, and the electric power of the electric power system is generated by opening and closing the movable contact with respect to the fixed contact by supplying or interrupting current to an exciting coil. A watt-hour meter comprising a switch that cuts off the supply to the load of
a current sensor that detects a peak value of contact current flowing between the movable contact and the fixed contact;
A contact opening time for opening the movable contact is controlled from the time detected by the current sensor, and after delaying the contact opening time from the detected time, a driving signal for opening the movable contact is supplied to the exciting coil a control unit that outputs the contact current to zero or near zero when the movable contact is in an open state after a predetermined time has elapsed from the time when the drive signal was output to the exciting coil;
A watt hour meter comprising:
前記制御部は、
前記接点電流のピーク値の時刻を検出し、前記検出した時刻から前記接点開時間だけ遅延させた後、前記駆動信号を前記開閉器に出力する第1制御部と、
前記開閉器内に設けられ、前記駆動信号を前記励磁コイルに出力して前記駆動信号を前記励磁コイルに出力した時刻から所定時間経過後に前記可動接点が開状態となったときに前記接点電流をゼロ又はゼロ近傍にする第2制御部と、
を備えることを特徴とする請求項5記載の電力量計。
The control unit
a first control unit that detects the time of the peak value of the contact current, delays the contact opening time from the detected time, and then outputs the drive signal to the switch;
provided in the switch and outputting the drive signal to the excitation coil, and outputting the contact current when the movable contact is opened after a predetermined time has passed since the time when the drive signal was output to the excitation coil. A second control unit to be zero or near zero;
The electricity meter according to claim 5, comprising:
前記所定時間は、前記開閉器毎に予め定められた一定値であり、前記接点開時間は、前記ピーク値を検出した時刻と前記所定時間と前記接点電流の周期とに基づき設定されることを特徴とする請求項5又は6記載の電力量計。 The predetermined time is a constant value predetermined for each switch, and the contact opening time is set based on the time when the peak value is detected, the predetermined time, and the cycle of the contact current. The electricity meter according to claim 5 or 6. 前記励磁コイルの特性のばらつきに対応付けした前記所定時間を記憶するメモリを備え、
前記第1制御部は、前記所定時間を前記メモリから読み出し、読み出した前記所定時間と電流のピーク値を検出した時刻と接点電流の周期とに基づき前記接点開時間を設定することを特徴とする請求項6記載の電力量計。
A memory that stores the predetermined time associated with the variation in the characteristics of the excitation coil,
The first control unit reads the predetermined time from the memory, and sets the contact opening time based on the read predetermined time, the time when the peak value of the current is detected, and the cycle of the contact current. The electricity meter according to claim 6.
JP2021174597A 2021-10-26 2021-10-26 Electric hour meter switch control method and electric hour meter Active JP7235829B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021174597A JP7235829B1 (en) 2021-10-26 2021-10-26 Electric hour meter switch control method and electric hour meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021174597A JP7235829B1 (en) 2021-10-26 2021-10-26 Electric hour meter switch control method and electric hour meter

Publications (2)

Publication Number Publication Date
JP7235829B1 JP7235829B1 (en) 2023-03-08
JP2023064362A true JP2023064362A (en) 2023-05-11

Family

ID=85475716

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021174597A Active JP7235829B1 (en) 2021-10-26 2021-10-26 Electric hour meter switch control method and electric hour meter

Country Status (1)

Country Link
JP (1) JP7235829B1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003536211A (en) * 2000-06-07 2003-12-02 エービービー エービー Method and apparatus for predicting alternating zero crossings
JP2004241204A (en) * 2003-02-04 2004-08-26 Mitsubishi Electric Corp Switching device
JP6933786B1 (en) * 2021-05-13 2021-09-08 東光東芝メーターシステムズ株式会社 Contact state detection method for watt-hour meter switch and switch drive circuit for watt-hour meter

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003536211A (en) * 2000-06-07 2003-12-02 エービービー エービー Method and apparatus for predicting alternating zero crossings
JP2004241204A (en) * 2003-02-04 2004-08-26 Mitsubishi Electric Corp Switching device
JP6933786B1 (en) * 2021-05-13 2021-09-08 東光東芝メーターシステムズ株式会社 Contact state detection method for watt-hour meter switch and switch drive circuit for watt-hour meter

Also Published As

Publication number Publication date
JP7235829B1 (en) 2023-03-08

Similar Documents

Publication Publication Date Title
US10345381B2 (en) Cleaning and motor heating electromagnetic motor control switching
EP3627529B1 (en) Operator coil parameter based electromagnetic switching
EP3018678B1 (en) Detection of electric motor short circuits
US10361051B2 (en) Single pole, single current path switching system and method
EP3018674B1 (en) Wear-balanced electromagnetic motor control switching
US9806642B2 (en) Modular multiple single-pole electromagnetic switching system and method
US20100265629A1 (en) Relay Coil Drive Circuit
KR20100125808A (en) Abnormal current detecting circuit for circuit breaker
US9722513B2 (en) Torque-based stepwise motor starting
US7227732B2 (en) Apparatus and method for controlling open/close timing of relay
EP3018679B1 (en) 5-pole based wye-delta motor starting system and method
JP7235829B1 (en) Electric hour meter switch control method and electric hour meter
JP7235837B1 (en) Electric hour meter switch control method and electric hour meter
KR20090025619A (en) Device for compensating zero crossing to prevent fusion of relay contact
JP2022177995A (en) Electronic type watt-hour meter
JP3601406B2 (en) Inductive load switch opening method and control device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220412

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20220412

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220712

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221025

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221108

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230214

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230224

R150 Certificate of patent or registration of utility model

Ref document number: 7235829

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150